Method and device for measuring electric quantity-economic coupling degree based on big data mining

By using big data mining technology, combined with the analytic hierarchy process (AHP) and entropy weight method, the coupling degree between electricity consumption and the economy is quantified, which solves the problem of insufficient applicability of existing analysis methods, and enables an accurate assessment of the correlation between electricity consumption systems and economic development, supporting energy planning and economic coordination.

CN118941162APending Publication Date: 2024-11-12STATE GRID SHANXI ELECTRIC POWER CO ECONOMIC & TECH RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411176571.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing methods for analyzing the correlation between electricity consumption and the economy fail to fully consider multiple sectors, resulting in low applicability and an inability to accurately assess the degree of correlation between electricity consumption systems and economic development.

Method used

By employing a big data mining approach, the index information of the electricity and economic subsystems is obtained. The weights of each index are determined using the analytic hierarchy process (AHP) and the entropy weight method. Finally, the electricity-economic coupling degree is quantified by combining the comprehensive evaluation method and the coupling degree calculation.

Benefits of technology

This improves the accuracy of assessing the correlation between electricity systems and economic development, enabling a better understanding and optimization of electricity supply and demand, and supporting the coordination and balance between sustainable energy planning and economic development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941162A_ABST
    Figure CN118941162A_ABST
Patent Text Reader

Abstract

The invention provides an electric quantity-economic coupling degree measuring method and device based on big data mining. According to the method, index information related to electric quantity subsystems and corresponding economic subsystems in different regions can be obtained; analyzing the index information related to the electric quantity subsystem and the corresponding economic subsystem to obtain the index weight of each index related to the electric quantity subsystem and the index weight of each index related to the economic subsystem; determining comprehensive evaluation values of the electric quantity subsystems of the corresponding regions according to the index weights of the indexes related to the electric quantity subsystems of the different regions; determining comprehensive evaluation values of the economic subsystems of the corresponding regions according to the index weights of the indexes related to the economic subsystems of the different regions; and based on the quantum system comprehensive evaluation values of the different regions and the economic subsystem comprehensive evaluation values of the corresponding regions, determining electric quantity-economic coupling degree measurement values of the corresponding regions. The method improves the accurate evaluation of the correlation degree between the electric quantity system and the economic development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electricity consumption and economic development adaptation analysis, and specifically, to a method and device for measuring electricity-economy coupling based on big data mining. Background Art

[0002] With the continuous development of the economy and society, the support of electricity to the economy has become more important. Without electricity support, regional economic development will continue to be in an undercoupled state. As one of the important economic growth poles in the world today, China has received continuous attention for the coupling between electricity consumption in key industries and economic development. Some existing analyses of the relationship between electricity consumption and the economy have ignored the comprehensive analysis of multiple fields, or have not taken into account the support of electricity to the economy and the coupling between the economy and electricity. Therefore, there are problems such as incomplete analysis methods and low applicability. Summary of the invention

[0003] The purpose of the embodiments of the present application is to provide a method and device for measuring electricity-economy coupling based on big data mining. By using big data mining technology and combining economic and electricity consumption industry scenarios, the economic and electricity coupling characteristics of different regions and industries are analyzed to achieve rapid identification of under-coupling and coupled states, thereby improving the accurate assessment of the degree of correlation between the electricity system and economic development.

[0004] In a first aspect, a method for measuring power-economy coupling based on big data mining is provided, which is applied to a power-economy coupling measurement system including power subsystems of multiple regions and economic subsystems of corresponding regions. The method may include:

[0005] Obtaining indicator information respectively related to the electricity subsystem and the corresponding economic subsystem in different regions; the indicator information includes indicators and indicator values;

[0006] Analyze the indicator information respectively involved in the electric quantity subsystem and the corresponding economic subsystem to obtain the indicator weight of each indicator involved in the electric quantity subsystem and the indicator weight of each indicator involved in the economic subsystem;

[0007] According to the indicator weights of various indicators involved in the electric quantity subsystems in different regions, the comprehensive evaluation value of the electric quantity subsystems in the corresponding regions is determined;

[0008] According to the indicator weights of various indicators involved in the economic subsystems of different regions, determine the comprehensive evaluation value of the economic subsystems of the corresponding regions;

[0009] Based on the comprehensive evaluation value of the quantum system in different regions and the comprehensive evaluation value of the economic subsystem in the corresponding regions, the measurement value of the electricity-economy coupling degree in the corresponding regions is determined.

[0010] In a possible implementation, obtaining indicator information related to the power subsystem and the corresponding economic subsystem includes:

[0011] Query the database of network, electricity and economy to obtain the initial indicator information involved in the electricity subsystem and the corresponding economic subsystem in different regions; the initial indicator information includes the initial indicator and the indicator value;

[0012] After the initial indicator information is cleaned, a word frequency analysis is performed on the cleaned initial indicator information to obtain indicator information related to the electricity subsystem and the corresponding economic subsystem in different regions.

[0013] In a possible implementation, the indicator information respectively involved in the electric quantity subsystem and the corresponding economic subsystem is analyzed to obtain the indicator weight of each indicator involved in the electric quantity subsystem and the indicator weight of each indicator involved in the economic subsystem;

[0014] The analytic hierarchy process is used to analyze the indicator information involved in the electric quantity subsystem in different regions, and the indicator weight of each indicator involved in the electric quantity subsystem is obtained;

[0015] The entropy weight method is used to analyze the indicator information involved in the economic subsystems in different regions to obtain the indicator weights of each indicator involved in the economic subsystems.

[0016] In a possible implementation, the analytic hierarchy process is used to analyze the indicator information involved in the power subsystem in different regions to obtain the indicator weights of the indicators involved in the power subsystem, including:

[0017] For any region, based on the relative importance of different indicators in the configured indicator information, a relative importance matrix of indicators in the region is constructed;

[0018] Using the configured weight algorithm, the relative importance matrix of the indicators is processed to obtain the initial indicator weights of the processed indicators;

[0019] If the initial indicator weights meet the preset consistency condition, the initial indicator weights are determined as the indicator weights of the indicators.

[0020] In a possible implementation, the entropy weight method is used to analyze the indicator information involved in the economic subsystems in different regions to obtain the indicator weights of the indicators involved in the economic subsystems in different regions, including:

[0021] Based on the indicator information of the economic subsystems in different regions, an initial data matrix is ​​constructed;

[0022] Based on the indicator type of the indicator information, any type of indicator information is standardized and positively processed in turn to obtain the current data matrix;

[0023] Based on the proportion of the index value of any indicator in any region in the current data matrix to the total index value of each indicator in different regions in the data matrix, the information entropy redundancy g for evaluating each indicator is determined. j and the corresponding entropy weight w j ;

[0024] The entropy weight w of each indicator j Determine the weight of the corresponding indicator.

[0025] In a possible implementation, according to the indicator weights of various indicators involved in the electric quantity subsystems of different regions, the comprehensive evaluation value of the electric quantity subsystem of the corresponding region is obtained, including:

[0026] The indicator values ​​of various indicators involved in the electric quantity subsystem in different regions are processed dimensionlessly to obtain the dimensionless quantitative values ​​of various indicators in different regions;

[0027] The preset comprehensive electricity evaluation algorithm is used to process the dimensionless quantitative values ​​of various indicators in different regions and the indicator weights of corresponding indicators to obtain the comprehensive evaluation value of the electricity subsystem in the corresponding region.

[0028] In a possible implementation, according to the indicator weights of various indicators involved in the economic subsystems of different regions, the comprehensive evaluation value of the economic subsystem of the corresponding region is obtained, including:

[0029] Obtain the entropy weight of each evaluation indicator in different regions;

[0030] The preset comprehensive economic evaluation algorithm is used to process the entropy weight of each evaluation indicator in different regions and the indicator weight of the corresponding indicator to obtain the comprehensive evaluation value of the economic subsystem of the corresponding region.

[0031] In a possible implementation, the formula for determining the measurement value of the electricity-economy coupling degree of the corresponding region is:

[0032] C k ={[f(x k )·g(y k )] / [(f(x k )+g(y k )) / 2] 2} 1 / 2 ;

[0033] Among them, g(y k ) represents the comprehensive evaluation value of the economic subsystem of the kth region; f(x k ) represents the comprehensive evaluation value of the electric quantity subsystem of the kth region; Ck is the electricity-economy coupling degree of the kth region.

[0034] In a possible implementation, the electricity-economy coupling degree C of the kth region is k The value range is [0,1].

[0035] In a second aspect, a computer-readable storage medium is provided, wherein a computer program is stored in the computer-readable storage medium, and when the computer program is executed by a processor, any method step described in the first aspect is implemented.

[0036] The method for measuring the electric quantity-economy coupling degree based on big data mining provided in this application can obtain the index information respectively involved in the electric quantity subsystem and the corresponding economic subsystem of different regions; analyze the index information respectively involved in the electric quantity subsystem and the corresponding economic subsystem, and obtain the index weights of each index involved in the electric quantity subsystem and the index weights of each index involved in the economic subsystem; determine the comprehensive evaluation value of the electric quantity subsystem of the corresponding region according to the index weights of each index involved in the electric quantity subsystem of different regions; determine the comprehensive evaluation value of the economic subsystem of the corresponding region according to the index weights of each index involved in the economic subsystem of different regions; determine the measurement value of the electric quantity-economy coupling degree of the corresponding region based on the comprehensive evaluation value of the quantum system of different regions and the comprehensive evaluation value of the economic subsystem of the corresponding region. This method improves the accurate assessment of the degree of correlation between the electric quantity system and economic development. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 A schematic diagram of the relationship between an electric quantity subsystem and an economic subsystem provided in an embodiment of the present application;

[0039] Figure 2 A flow chart of a method for measuring power-economy coupling based on big data mining provided in an embodiment of the present application;

[0040] Figure 3 A schematic diagram of a XX power saving subsystem evaluation value from 2005 to 2023 provided in an embodiment of the present application;

[0041] Figure 4 A schematic diagram of the evaluation value of the economic subsystem of XX Province from 2005 to 2023 provided in the embodiment of the present application;

[0042] Figure 5 An embodiment of the present application provides a schematic diagram of the calculation results of electricity-economy coupling degree in XX Province from 2005 to 2023. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. Unless otherwise defined, the technical terms or scientific terms used in this application should be the common meanings understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "Including" or "including" and other similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connected", "coupled" or "connected" and other similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0044] For ease of understanding, the terms involved in the embodiments of the present application are explained below:

[0045] 1. Text Big Data Mining

[0046] As an emerging data mining and quantitative analysis method based on qualitative research, text big data mining can reveal the changes and characteristics of texts and provide new ideas for the study of classic problems. Text refers to an information structure composed of certain symbols or codes, which can be expressed in different forms. Therefore, the intention and purpose of the text provider can be inferred from the analysis of text content. Text analysis is applied to many fields. For example, in the tourism industry, text analysis can be used to study the perception of tourism image. For example, in economics, text analysis can be used to study current insurance policies. Therefore, text analysis can be used to extract electricity and economic keywords from massive data to assist in determining electricity and economic indicators.

[0047] (II) Entropy Weight Method

[0048] The Entropy Weight Method is a commonly used multi-index comprehensive evaluation method. It is based on the concept of information entropy and is used to determine the weights of indicators. The Entropy Weight Method can quantify the degree of difference between indicators and assign corresponding weights according to the information entropy value of the indicators. The Entropy Weight Method has good mathematical properties and applicability, can fully consider the differences and importance between indicators, and provide relatively objective weight allocation results. However, the Entropy Weight Method also has some limitations, such as sensitivity to data and processing of correlations between indicators. When using the Entropy Weight Method, reasonable data processing and weight interpretation are required according to the specific situation to ensure the reliability and effectiveness of the evaluation results.

[0049] 3. Comprehensive evaluation method

[0050] When evaluating multiple evaluation units with multiple indicators and dimensions, corresponding evaluation methods need to be adopted. Comprehensive evaluation method plays an important role in multi-indicator and multi-dimensional evaluation. Comprehensive evaluation method is widely used in many fields, such as project evaluation, product quality evaluation, talent selection, etc. By comprehensively considering multiple indicators, it can provide more comprehensive and objective evaluation results, which helps to support decision-making and improvement.

[0051] (IV) Coupling coordination

[0052] Coupling Coordination Degree refers to an indicator that measures the overall operation of multiple interrelated systems or elements by evaluating the degree of coordination between them. The concept of coupling coordination degree is often used to describe the coordination and balance between different fields or different levels. Coupling coordination degree analysis evaluates the overall coordination degree of the system by comprehensively considering the interactions, dependencies and synergies between various elements. This analysis can help identify and resolve contradictions, conflicts or imbalances in the system, and provide guidance and decision support. Coupling coordination degree analysis has a wide range of applications in many fields, such as urban planning and development, ecological and environmental protection, economic development and sustainability. By evaluating the degree of coordination between different elements, the balanced development and synergy of the system can be promoted, and the overall efficiency and sustainability can be improved.

[0053] The method for measuring the power-economy coupling degree based on big data mining provided in the embodiment of the present application can be applied in Figure 1 In the power-economy coupling measurement system shown in Figure 1As shown in the figure, the system can include: electricity subsystems and economic subsystems in multiple regions. There is a correlation between the electricity subsystem and the economic subsystem, and there are different indicator dimensions within the two subsystems. For the electricity subsystem, an indicator system that can reflect the operating status of the electricity subsystems of different industries in a certain region is constructed; for the economic subsystem, an indicator system that can reflect the development status of the economic subsystem in a certain region is constructed. Then, a comprehensive evaluation method is used to evaluate the electricity subsystem and the economic subsystem respectively. Finally, the coupling degree calculation method is used to obtain the electricity-economy coupling degree, thereby quantitatively analyzing the coupling relationship between the electricity subsystem and the economic subsystem.

[0054] The relationship between the electricity subsystem and the economic subsystem is reflected in the following aspects: the electricity demand of various industries is due to the energy demand caused by economic activities; the development of the economic subsystem and the industrial structure determine the changes in the demand and quality of electricity.

[0055] The demand for electricity varies greatly among different industries and sectors, such as industrial production, commercial services, and household residents. Economic growth, population growth, and technological progress all have an impact on electricity demand.

[0056] The method for measuring the coupling degree of electricity and economy based on big data mining provided in this application uses big data mining technology to conduct text analysis on the factors that electricity supports industry development and economic development, determine the evaluation indicators of the electricity-economy system, and use the coupling degree measurement method to comprehensively judge the degree of adaptation between the electricity consumption of key industries and economic development. It improves the accurate assessment of the degree of correlation between electricity and economic development, and can better understand and evaluate the interaction between electricity and economic development, so as to improve the understanding of the complex relationship between electricity and economy, understand and optimize the supply and demand relationship of electricity, the efficiency of energy resource utilization, and the interaction between the electricity industry and economic development, and provide more reliable data and analysis for decision makers and relevant stakeholders to support the coordination and balance of sustainable energy planning, carbon reduction measures and economic development.

[0057] The preferred embodiments of the present application are described below in conjunction with the drawings in the specification. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present application, and are not used to limit the present application. In addition, the embodiments and features in the embodiments of the present application may be combined with each other if there is no conflict.

[0058] Figure 2 A flow chart of a method for measuring power-economy coupling based on big data mining provided in an embodiment of the present application. Figure 2 As shown, the method may include:

[0059] Step S210: Obtain indicator information related to the electricity quantity subsystem and the corresponding economic subsystem in different regions.

[0060] Among them, the indicator information includes indicators and corresponding indicator values. The indicators involved in the electricity subsystem may include: total social electricity consumption, electricity consumption of various industries, electricity consumption of key industries, new capacity, and business expansion registration volume. The indicators involved in the economic subsystem may include: per capita GDP, added value of various industries, and total retail sales of social consumer goods.

[0061] Query the database of network, electricity and economy to obtain initial indicator information related to the electricity subsystem and the corresponding economic subsystem in different regions; the initial indicator information may include initial indicators and indicator values;

[0062] After the initial indicator information is cleaned, a word frequency analysis is performed on the cleaned initial indicator information to obtain indicator information related to the electricity subsystem and the corresponding economic subsystem in different regions.

[0063] In a specific implementation, step S210 may specifically include:

[0064] (1) Data Collection

[0065] Using crawler tools and words such as "electricity" and "economy" as search keywords, information is extracted from massive data sources such as existing policies and documents (papers, news), and after extracting complete information, the information text is saved in the local database.

[0066] (2) Data cleaning

[0067] Use NLTK (Natural Language Toolkit), spacy, and TextBlob tools in Python to process text data, remove special characters, punctuation, perform word segmentation, part-of-speech tagging, and delete special characters, punctuation, HTML tags, etc.

[0068] (3) Feature extraction

[0069] The bag-of-words model is used to extract text features.

[0070] The bag-of-words model represents text as binary values ​​for the frequency or presence of words.

[0071] It ignores the order and grammatical information of words and only focuses on the occurrence of words. The bag-of-words model can be used to extract features, and the extracted features can be weighted using methods such as word frequency and TF-IDF.

[0072] (4) Determine the indicators

[0073] Based on the data of word frequency analysis, the ordinal sorting method and relevance are used to select words with higher frequency of occurrence, and finally the corresponding evaluation indicators of the electrical quantity subsystem and the economic subsystem are selected.

[0074] Step S220: Analyze the indicator information respectively involved in the electric quantity subsystem and the corresponding economic subsystem to obtain the indicator weight of each indicator involved in the electric quantity subsystem and the indicator weight of each indicator involved in the economic subsystem.

[0075] In specific implementation, the following process can be performed:

[0076] (1) Using the analytic hierarchy process, analyze the indicator information involved in the electricity subsystem in different regions to obtain the indicator weights of each indicator involved in the electricity subsystem;

[0077] For any region, based on the relative importance of different indicators in the configured indicator information, the indicator relative importance matrix of the region is constructed;

[0078] The configured weight algorithm is used to process the indicator relative importance matrix to obtain the initial indicator weights of each indicator after processing;

[0079] If the initial indicator weights meet the preset consistency conditions, the initial indicator weights are determined as the indicator weights of each indicator.

[0080] In a specific implementation, (1) for the s indicators of the electric quantum system, a relative importance matrix of each indicator is constructed: a ij is the relative importance between factor i and factor j.

[0081] (2) For all a ij Assign a value.

[0082] a ij The value range is 1 / 9-9, where 1 / 9 means very unimportant, 1 means equally important, and 9 means very important. Other values ​​are between very unimportant and very important, and the importance increases with the increase of the value.

[0083] (3) Calculate the weight of each indicator.

[0084] Weight calculation of each indicator: There are two main methods: geometric mean method and normalized column mean method. For example, the normalized column mean method is used to normalize each column of matrix A to obtain matrix B. Then, the elements of each row of B are averaged to obtain a matrix C with one column and S rows. At this time, the element c in the obtained matrix C is j It is the weight of the i-th indicator.

[0085] (4) Perform consistency check.

[0086] The importance of indicators should have reasonable logical consistency. If there is a large logical inconsistency between indicators, the credibility of the obtained weights will be difficult to guarantee. The calculation method of consistency index is:

[0087]

[0088] Among them, λ is the maximum eigenvalue of matrix A. When CI = 0, matrix A is consistent; if the consistency ratio is within a certain tolerance range, it is considered that the weights taken are highly scientific and pass the consistency test.

[0089] The calculation method of consistency ratio is:

[0090] RI is the random consistency index, which can be obtained by looking up a table. When CR < 0.1, we believe that the eigenvector corresponding to the matrix A can be used as the weight vector.

[0091] Table 1 RI value range

[0092] n 1 2 3 4 5 6 7 8 9 10 RI 0 0 0.52 0.89 1.12 1.26 1.36 1.41 1.46 1.49 n 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 20 RI 1.52 1.54 1.56 1.58 1.59 1.59 1.60 1.61 1.62 1.62

[0093] (ii) The entropy weight method is used to analyze the indicator information involved in the economic subsystems in different regions and obtain the indicator weights of each indicator involved in the economic subsystem.

[0094] Based on the indicator information related to the economic subsystem in different regions, an initial data matrix is ​​constructed; the elements in the initial data matrix represent the combination parameters of different regions and different indicators;

[0095] Based on the indicator type of the indicator information, any type of indicator information is standardized and positively processed in turn to obtain the current data matrix;

[0096] Based on the proportion of the index value of any index in any region in the current data matrix to the total index value of each index in different regions in the data matrix, the information entropy redundancy and corresponding entropy weight of each index are determined;

[0097] The entropy weight of each indicator is determined as the weight of the corresponding indicator.

[0098] In a specific implementation, (1) an initial data matrix is ​​established.

[0099] Assume that the number of samples is m, select n evaluation indicators, and the jth indicator of the kth sample is X kj , then the initial data matrix A X As shown in the formula:

[0100]

[0101] (2) Standardized processing.

[0102] Since the dimensions and units of different evaluation indicators are different, there is no way to compare them directly. Therefore, the evaluation indicators are divided into four categories according to their properties: positive indicators with larger values, better; negative indicators with smaller values, better; moderate indicators with closer values, better; and optimal interval indicators with reasonable intervals. X′ is obtained through standardization. kj That is to say, for different indicators obtained, the indicator types of different indicators need to be determined in advance so as to perform subsequent standardization processing.

[0103] The normalization process of positive indicators is shown in the formula:

[0104]

[0105] The normalization process of the reverse indicator is shown in the formula:

[0106]

[0107] The normalization process of the fitness index is shown in the formula:

[0108]

[0109] Among them, X 0j is the ideal value of the jth indicator.

[0110] There is a normalization process for the optimal interval indicator, as shown in the formula:

[0111]

[0112] in, X j is the left boundary of the optimal interval of the jth index, is the right boundary of the optimal interval for the jth indicator.

[0113] Before obtaining the entropy weight of the evaluation index, it is necessary to calculate the entropy value of the evaluation index. The entropy value of the evaluation index needs to be applied to the logarithm. In order to prevent the data denominator from being 0, which leads to the meaningless entropy weight, it is necessary to calculate X′ kj Perform positive number processing to eliminate 0 or negative numbers in the standardized matrix to ensure that the calculation is meaningful. a is greater than min|X′ kj | (i.e., the smallest positive integer in the matrix), usually 1, and the positive number Y kj As shown in the formula: kj =X′ kj +a;

[0114] The matrix A obtained after positive number processing y As shown in the formula:

[0115]

[0116] Find the proportion P of the jth index value in the kth region to the index kj As shown in the formula:

[0117]

[0118] Calculate the information entropy value e of evaluation index j j As shown in the formula:

[0119]

[0120] Calculate the information entropy redundancy g of evaluation index j j As shown in the formula:

[0121] g j =1―e j

[0122] Find the entropy weight w of evaluation index j j As shown in the formula:

[0123] Finally, we get the weights w of each indicator in the economic subsystem j .

[0124] Step S230: Determine the comprehensive evaluation value of the electric quantity subsystem of the corresponding region according to the indicator weights of various indicators involved in the electric quantity subsystem of different regions.

[0125] For the electric quantity subsystem, the indicator values ​​of each indicator involved in the electric quantity subsystem in different regions are processed dimensionlessly to obtain the dimensionless quantitative values ​​of each indicator in different regions;

[0126] The preset comprehensive electricity evaluation algorithm is used to process the dimensionless quantitative values ​​of various indicators in different regions and the indicator weights of corresponding indicators to obtain the comprehensive evaluation value of the electricity subsystem in the corresponding region.

[0127] Specifically, (1) collect data on the indicators corresponding to the electricity subsystems in m regions and create a data table E kj , where k = 1, 2, ..., m; j = 1, 2, ..., s.

[0128] (2) Perform dimensionless quantization on the data of different units. The processing method is: dimensionless quantization value:

[0129] (3) According to the weight of each indicator, the comprehensive evaluation value of the electricity subsystem in the kth region is calculated. The calculation method is:

[0130] Where: f(x k) represents the comprehensive evaluation value of the electricity subsystem in the kth region; c j Indicates the weight of each indicator in the electric quantity subsystem; E′ kj It represents the dimensionless quantitative value of the jth indicator in the kth region of the electric quantity subsystem.

[0131] Step S240: Determine the comprehensive evaluation value of the economic subsystem of the corresponding region according to the indicator weights of the various indicators involved in the economic subsystem of the different regions.

[0132] For the economic subsystem: obtain the entropy weight of each indicator in different regions;

[0133] The preset comprehensive economic evaluation algorithm is used to process the entropy weight of each evaluation indicator in different regions and the indicator weight of the corresponding indicator to obtain the comprehensive evaluation value of the economic subsystem of the corresponding region.

[0134] Specifically, according to the weight of each indicator, the comprehensive evaluation value of the economic subsystem of the kth region is calculated. The calculation method is:

[0135] Where: g(y k ) represents the comprehensive evaluation value of the economic subsystem of the kth region; w j Indicates the weight of each indicator in the economic subsystem; X′ kj It represents the standardized value of the jth indicator in the economic subsystem of the kth region.

[0136] Step S250: Based on the comprehensive evaluation values ​​of quantum systems in different regions and the comprehensive evaluation values ​​of economic subsystems in the corresponding regions, determine the measurement values ​​of the electricity-economy coupling degree of the corresponding regions.

[0137] The formula for determining the measurement value of the electricity-economy coupling degree in the corresponding region is:

[0138] C k ={[f(x k )·g(y k )] / [(f(x k )+g(y k )) / 2] 2} 1 / 2 ;

[0139] Among them, g(y k ) represents the comprehensive evaluation value of the economic subsystem of the kth region; f(x k ) represents the comprehensive evaluation value of the electric quantity subsystem of the kth region; C k is the electricity-economy coupling degree of the kth region.

[0140] Among them, the electricity-economy coupling degree C of the kth region is kThe value range of [[C]] (hereinafter referred to as "C" for short) is between [0, 1]. When C = 0, the coupling degree is the lowest, indicating that there is no correlation between subsystems and the system is in a state of disorderly development; when C = 1, the coupling degree is the highest, indicating that the development of the subsystem tends to an orderly structure.

[0141] According to the magnitude of the coupling degree, the coupling degree can be divided into the following intervals: when 0 < C ≤ 0.2, the system is in a very low coupling state; when 0.2 < C ≤ 0.4, the system is in a straitened state; when 0.4 < C ≤ 0.6, the system is in a running-in state; when 0.6 < C ≤ 0.8, the system is in a high coupling state; when 0.8 < C ≤ 1, the system is in an extremely high-level coupling state.

[0142] The coupling degree measurement algorithm based on big data mining in this application originates from the collation and mining of big data, and can make targeted improvements to the dual subsystem and multi-subsystems according to different time periods, different regions and different evaluation requirements, and further quantify the matching degree between multiple systems. The advantages of the coupling degree measurement algorithm based on big data mining include:

[0143] The coupling degree measurement algorithm based on big data mining fully considers big data acquisition and realizes accurate identification of system indicators. The calculation framework has the ability to accommodate multiple subsystems and can calculate the matching degree between systems more accurately. The results of the coupling degree measurement algorithm are easier to understand and organize. The coupling degree measurement algorithm can be used to solve any problem of the adaptation degree between multiple systems.

[0144] In an example, taking the power subsystem and economic subsystem of XX Province as an example, with the natural year as the time resolution, the power-economy coupling degree of XX Province from 2005 to 2023 is measured.

[0145] 1. Mining big data of policies and literature (such as scientific papers, online literature)

[0146] (1) Mining big data on the sources of power economy-related policy documents

[0147] The sources of text retrieval include: ① National government websites, official websites of relevant departments; ② Online databases; ③ Professional databases such as CNKI.

[0148] Subsequently, the text content is encoded to form text units. Since the policy does not focus on power policies throughout, in order to ensure that the policy content fits the research theme, the relevance selection principle is established, and the parts with repeated content and low relevance are removed, and only the content and measures related to power economy, power system, grid construction, and economic development are retained.

[0149] Then the text is converted into a structured vector. First, a program is written in Python, and the jieba library is used to segment Chinese words and remove stop words. In order to avoid the inability to effectively divide proper nouns, a dictionary containing 62 words such as "electricity economy, power support, and tiered electricity prices" is built to complete the text preprocessing.

[0150] (2) Big data mining of literature sources (scientific papers, online literature)

[0151] The dimensions of the impact of electricity economy development in some domestic and foreign literature in the literature review were extracted comprehensively, and combined with the actual situation of electricity economy development in XX Province and the guidance and suggestions of scholars and experts in related fields, some indicator keywords were selected for the construction of the electricity economy indicator system of XX Province, as shown in Table 2.

[0152] Table 2 Keyword screening list of power economic literature source indicators

[0153]

[0154]

[0155] On the basis of reading policies and documents, and using the text analysis method of big data mining technology, the keywords related to the electricity system economy in relevant policy documents and historical documents were classified, and the relevant indicator keywords were adjusted according to the comprehensive suggestions of experts and scholars in related fields, and the electricity subsystem evaluation indicators were selected, as shown in Tables 3 and 4.

[0156] Table 3 Evaluation indicators of power subsystem

[0157]

[0158]

[0159] Currently, a total of 15 electricity indicators have been selected, including the total electricity consumption of the society.

[0160] Table 4 Economic subsystem indicators

[0161]

[0162] Currently, a total of 13 economic indicators have been selected, including per capita GDP.

[0163] 2. Evaluation results of the power subsystem

[0164] (1) Based on the analytic hierarchy process, the weight of each electricity indicator is determined.

[0165] The relative importance matrix of each indicator of the power subsystem is constructed as follows:

[0166] [1.000,0.488,1.538,1.000,1.513,0.825,0.750,0.488,0.650,0.650,0.650,0.650,0.711,0.813,0.442,0.542,0.923]

[0167] [2.049,1.000,3.150,2.049,3.100,1.688,1.536,1.000,1.333,1.333,1.333,1.333,1.453,1.658,0.904,1.108,1.880]

[0168] …

[0169] [1.083,0.528,1.655,1.083,1.638,0.891,0.810,0.528,0.704,0.704,0.704,0.704,0.768,0.877,0.478,0.587,1.000]

[0170] The current CR calculation result is 0.83, which meets the consistency test.

[0171] The weight calculation results of each power indicator are shown in Table 5.

[0172] Table 5 Weights of each indicator of the power subsystem

[0173]

[0174] Through the survey, the values ​​of various indicators of the electricity subsystem of XX Province from 2005 to 2023 are obtained. Combined with the weights of various indicators of the electricity subsystem, the comprehensive evaluation method is used to calculate the evaluation value of the electricity subsystem of XX Province from 2005 to 2023, such as Figure 3 As shown:

[0175] 3. Evaluation results of economic subsystem

[0176] The entropy weight method is used to determine the weights of each indicator of the economic subsystem, as shown in Table 6:

[0177] Table 6 Economic Indicator Weights

[0178]

[0179] Through the survey, the values ​​of various indicators of the economic subsystem of XX Province from 2005 to 2023 are obtained. Combined with the weights of various indicators of the economic subsystem, the comprehensive evaluation method is used to calculate the evaluation value of the economic subsystem of XX Province from 2005 to 2023, such as Figure 4 As shown:

[0180] 4. Calculation of electricity-economy coupling in XX Province from 2005 to 2023

[0181] The calculation results of electricity-economy coupling degree in XX Province from 2005 to 2023 are as follows: Figure 5 as shown.

[0182] The system status represented by the economic coupling degree of XX power saving in different periods is shown in Table 7:

[0183] Table 7 Changes of economic coupling of XX power saving in different periods

[0184]

[0185] In another embodiment provided in the present application, a computer-readable storage medium is also provided, in which instructions are stored. When the computer-readable storage medium is executed on a computer, the computer executes the method for measuring the electricity-economy coupling degree based on big data mining as described in any of the above embodiments.

[0186] In another embodiment provided in the present application, a computer program product comprising instructions is also provided. When the computer is run on a computer, the computer executes the method for measuring the electricity-economy coupling degree based on big data mining as described in any of the above embodiments.

[0187] Those skilled in the art will appreciate that the embodiments in the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt a complete hardware embodiment, a complete software embodiment, or a form of an embodiment combining software and hardware. Moreover, the present application may adopt a form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0188] The embodiments of the present application are described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0189] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0190] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0191] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the embodiments of the present application.

[0192] Obviously, those skilled in the art can make various changes and modifications to the embodiments in the present application without departing from the spirit and scope of the embodiments in the present application. Thus, if these modifications and variations of the embodiments in the present application fall within the scope of the claims and their equivalents in the embodiments of the present application, the embodiments of the present application are also intended to include these modifications and variations.

Claims

1. A method for measuring the power-economy coupling degree based on big data mining, which is applied to a power-economy coupling degree measurement system including power subsystems of multiple regions and economic subsystems of corresponding regions. It is characterized in that The method comprises: Obtaining indicator information respectively related to the electricity subsystem and the corresponding economic subsystem in different regions; the indicator information includes indicators and indicator values; Analyze the indicator information respectively involved in the electric quantity subsystem and the corresponding economic subsystem to obtain the indicator weight of each indicator involved in the electric quantity subsystem and the indicator weight of each indicator involved in the economic subsystem; According to the indicator weights of various indicators involved in the electric quantity subsystems in different regions, the comprehensive evaluation value of the electric quantity subsystems in the corresponding regions is determined; According to the indicator weights of various indicators involved in the economic subsystems of different regions, determine the comprehensive evaluation value of the economic subsystems of the corresponding regions; Based on the comprehensive evaluation value of the quantum system in different regions and the comprehensive evaluation value of the economic subsystem in the corresponding regions, the measurement value of the electricity-economy coupling degree in the corresponding regions is determined.

2. The method according to claim 1, It is characterized in that Obtain indicator information related to the power subsystem and the corresponding economic subsystem, including: Query the database of network, electricity and economy to obtain the initial indicator information involved in the electricity subsystem and the corresponding economic subsystem in different regions; the initial indicator information includes the initial indicator and the indicator value; After the initial indicator information is cleaned, a word frequency analysis is performed on the cleaned initial indicator information to obtain indicator information related to the electricity subsystem and the corresponding economic subsystem in different regions.

3. The method according to claim 1, It is characterized in that Analyze the indicator information respectively involved in the electric quantity subsystem and the corresponding economic subsystem to obtain the indicator weight of each indicator involved in the electric quantity subsystem and the indicator weight of each indicator involved in the economic subsystem; The analytic hierarchy process is used to analyze the indicator information involved in the electric quantity subsystem in different regions, and the indicator weight of each indicator involved in the electric quantity subsystem is obtained; The entropy weight method is used to analyze the indicator information involved in the economic subsystems in different regions to obtain the indicator weights of each indicator involved in the economic subsystems.

4. The method according to claim 3, It is characterized in that The analytic hierarchy process is used to analyze the indicator information involved in the power subsystem in different regions to obtain the indicator weights of each indicator involved in the power subsystem, including: For any region, based on the relative importance of different indicators in the configured indicator information, a relative importance matrix of indicators in the region is constructed; Using the configured weight algorithm, the relative importance matrix of the indicators is processed to obtain the initial indicator weights of the processed indicators; If the initial indicator weights meet the preset consistency condition, the initial indicator weights are determined as the indicator weights of the indicators.

5. The method according to claim 3, It is characterized in that The entropy weight method is used to analyze the indicator information involved in the economic subsystems in different regions, and the indicator weights of the indicators involved in the economic subsystems in different regions are obtained, including: Based on the indicator information of the economic subsystems in different regions, an initial data matrix is ​​constructed; Based on the indicator type of the indicator information, any type of indicator information is standardized and positively processed in turn to obtain the current data matrix; Based on the proportion of the index value of any index in any region in the current data matrix to the total index value of each index in different regions in the data matrix, the information entropy redundancy and corresponding entropy weight of each index are determined; The entropy weight of each indicator is determined as the weight of the corresponding indicator.

6. The method according to claim 4, It is characterized in that According to the indicator weights of each indicator involved in the electric quantity subsystem in different regions, the comprehensive evaluation value of the electric quantity subsystem in the corresponding region is obtained, including: The indicator values ​​of various indicators involved in the electric quantity subsystem in different regions are processed dimensionlessly to obtain the dimensionless quantitative values ​​of various indicators in different regions; The preset comprehensive electricity evaluation algorithm is used to process the dimensionless quantitative values ​​of various indicators in different regions and the indicator weights of corresponding indicators to obtain the comprehensive evaluation value of the electricity subsystem in the corresponding region.

7. The method according to claim 5, It is characterized in that According to the indicator weights of each indicator involved in the economic subsystem of different regions, the comprehensive evaluation value of the economic subsystem of the corresponding region is obtained, including: Obtain the entropy weight of each evaluation indicator in different regions; The preset comprehensive economic evaluation algorithm is used to process the entropy weight of each evaluation indicator in different regions and the indicator weight of the corresponding indicator to obtain the comprehensive evaluation value of the economic subsystem of the corresponding region.

8. The method according to claim 1, It is characterized in that The formula for determining the measurement value of the electricity-economy coupling degree in the corresponding region is: C k ={[f(x k )·g(y k )] / [(f(x k )+g(y k )) / 2] 2 } 1 / 2 ; Among them, g(y k ) represents the comprehensive evaluation value of the economic subsystem of the kth region; f(x k ) represents the comprehensive evaluation value of the electricity subsystem in the kth region; C k is the electricity-economy coupling degree of the kth region.

9. The method according to claim 6, It is characterized in that The electricity-economy coupling degree C of the kth region k The value range is [0,1].

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 9 is implemented.