Transformer bushing transition connection assembly

By designing transformer casing transition connection components that are adapted to different interface sizes, installation difficulties and production delays caused by inconsistent interfaces are solved, and rapid installation and replacement are achieved, ensuring the normal operation and timely delivery of the transformer.

CN118942849APending Publication Date: 2024-11-12SHANDONG POWER EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411216551.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Transformer casing of different brands and models leads to installation difficulties due to inconsistent interface sizes, resulting in delays in production and delivery tasks, and emergency power outages and recovery of the casing manufacturer when replacing old transformers in the power grid due to the absence of casing manufacturers or mismatched interfaces. Loss of fortune.

Method used

A transformer casing transition connection assembly is designed, including transition flange, transition flange fixing bolt, sleeve flange fixing bolt, disc spring and flat washer. The inter-joint connection of different interfaces is achieved through cylindrical counterhole design and hexagon bolt. Adapt and prevent vibration from loosening during operation by disc springs and flat washer.

Benefits of technology

It realizes rapid installation and replacement of casings of different interface sizes, avoids pollution and delays in the production workshop, ensures the normal operation and timely delivery of the transformer, and reduces the losses of on-site transformation and replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942849A_ABST
    Figure CN118942849A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of transformer equipment, and relates to a transformer bushing transition connection assembly which comprises a transition flange, a transition flange fixing bolt, a bushing flange fixing bolt, a belleville spring and a flat washer. The transition flange is an annular steel component, a plurality of transition flange fixing screw holes are formed in the upper portion of the transition flange, the cylindrical counter bore design is adopted, the positions of the transition flange fixing screw holes are circularly arranged, and the number and the specification of the transition flange fixing screw holes are consistent with those of connecting holes in a transformer tank cover or a lifting seat. The transition flange is connected with a transformer box cover or an ascending flanged base; a plurality of sleeve flange fixing screw holes are formed in the upper surface of the transition flange and are circularly arranged, and the number and the specification of the screw holes are consistent with those of the connecting holes in the sleeve flange; the transition flange is connected with the sleeve flange; and the transition flange fixing screw hole and the sleeve flange fixing screw hole need to ensure that the positions do not interfere with each other. The sleeve mounting device can be used for mounting sleeves with different connector sizes, and the purpose of quickly mounting the sleeves or replacing sleeves of other brands is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a transformer bushing transition connection assembly, belonging to the technical field of transformer equipment. Background Art

[0002] The transformer bushing is generally installed on the transformer box cover or riser by fastening with bolts. The bushing flange installation hole spacing size, quantity, etc. must be consistent with the size of the installation holes reserved on the box cover or riser. Bushings of different brands and models have different bushing flange interface sizes. When designing the transformer, the box cover or riser installation interface must be designed according to the different brands and models of bushings. Under normal circumstances, the two can fit closely together. However, sometimes due to some unexpected factors, such as transformer design errors, bushing manufacturer production errors, etc., the bushing flange and the box cover or riser interface are inconsistent, resulting in the bushing being unable to be installed properly. At this time, it is necessary to contact the bushing manufacturer to replace the appropriate bushing, or cut the oil tank or riser to make changes. However, on the one hand, the bushings produced by bushing manufacturers are usually series parts, and they may not have bushings with just the right interface size and performance parameters. If they are to be specially made, the time period will be long, which will delay the production and delivery of transformers. On the other hand, in order to control the amount of dust and foreign matter, especially metal foreign matter, in the clean environment of the transformer production workshop, cutting the oil tank or riser will cause pollution. In principle, it is not allowed to be carried out in the production workshop. If the oil tank or riser is transported out and returned to the oil tank or riser production workshop for processing, it will also delay the production and delivery of transformers.

[0003] In addition, there are many old transformers on the power grid that need on-site renovation or emergency power outages to replace bushings. This is because different bushing manufacturers have different interface sizes, or the bushings of the same manufacturer are being updated, or some bushing manufacturers no longer exist. At this time, the technical problems mentioned above will also be encountered. If they are not handled in a timely manner, the resumption of the transformer will be delayed, causing great losses and social impact. Summary of the invention

[0004] In view of the above technical problems, the present invention provides a transformer bushing transition connection assembly, and the technical solution adopted is as follows: A transformer bushing transition connection assembly comprises a transition flange, transition flange fixing bolts, bushing flange fixing bolts, a disc spring and a flat washer; the transition flange is a circular steel component, a plurality of transition flange fixing screw holes are provided on the upper surface of the transition flange, the transition flange fixing screw holes are designed with a cylindrical countersunk hole, the positions of the transition flange fixing screw holes are arranged in a circle, the number and specifications of the transition flange fixing screw holes are consistent with the connection holes on the transformer box cover or the riser, and the transition flange is connected to the transformer box cover or the riser through the transition flange fixing bolts; a plurality of bushing flange fixing screw holes are also provided on the upper surface of the transition flange, the bushing flange fixing screw holes are arranged in a circle, the number and specifications of the bushing flange fixing screw holes are consistent with the connection holes on the bushing flange, and the bushing flange is connected to the transition flange through the bushing flange fixing bolts; a disc spring and a flat washer which are installed in a buckle manner are added to the lower part of the end of the transition flange fixing bolt; the positions of the transition flange fixing screw holes and the bushing flange fixing screw holes do not interfere with each other.

[0005] Preferably, the size of the bushing flange is smaller than the mounting interface of the transformer cover or the riser, and the inner ring sealing gasket of the transition flange is installed in the sealing groove provided on the transformer cover or the riser; a circle of inner ring sealing groove is set on the upper surface of the transition flange, and the bushing flange sealing gasket is installed in the inner ring sealing groove.

[0006] Preferably, the size of the sleeve flange is larger than the mounting interface of the transformer cover or the riser, and the transition flange inner ring sealing gasket is installed in the sealing groove on the transformer cover or the riser, and an outer ring sealing groove is arranged on the outer periphery of the sleeve flange fixing screw hole on the lower surface of the transition flange, and the transition flange outer ring sealing gasket is installed in the outer ring sealing groove; an inner ring sealing groove is arranged on the upper surface of the transition flange, and the sleeve flange sealing gasket is installed in the inner ring sealing groove.

[0007] Preferably, the transition flange fixing bolts are hexagon socket bolts.

[0008] Preferably, the transition flange is made of low alloy or low magnetic steel plate.

[0009] Beneficial effects of the present invention: The transformer bushing transition connection assembly provided by the present invention can be used for the installation and fixation of bushings with different interface sizes, so as to achieve the purpose of quickly installing bushings or replacing bushings of other brands and models, and solve the defects of the prior art; disc springs and flat washers are used to reinforce the transition flange fixing bolts to prevent the bolts from loosening due to vibration during the operation of the transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings used in the technical solution are briefly introduced below; Figure 1 It is a top view of the transition flange; Figure 2This is the assembly drawing of the transition flange when the casing flange size is smaller than the mounting interface; Figure 3 This is the assembly drawing of the transition flange when the casing flange size is larger than the mounting interface; Figure 4 The partial assembly drawing of the connection and fastening of the transition flange and the transformer oil tank or riser; In the figure, 1- casing; 2- casing flange sealing gasket; 3- casing flange fixing bolt; 4- casing flange; 5- transition flange fixing bolt; 6- transition flange; 7- transformer box cover or riser seat flange; 8- transition flange inner ring sealing gasket; 9- transition flange outer ring sealing gasket; 10- disc spring; 11- flat washer; 12- transition flange fixing screw hole; 13- casing flange fixing screw hole. DETAILED DESCRIPTION

[0011] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0012] The transformer bushing transition connection assembly includes a transition flange 6, a transition flange fixing bolt 5, a bushing flange fixing bolt 3, a disc spring 10 and a flat washer 11. Figure 1 As shown, the transition flange 6 is a circular ring-shaped component, and a plurality of transition flange fixing screw holes 12 with a cylindrical countersunk hole structure are drilled on the transition flange 6. The positions of the transition flange fixing screw holes 12 are arranged in a circular pattern, and the spacing, quantity, and specifications of the transition flange fixing screw holes 12 are consistent with the connection holes on the transformer box cover or the riser 7. The transition flange fixing screw holes 12 adopt a cylindrical countersunk hole design, which can make the transition flange fixing bolts 5 sink below the upper surface of the transition flange 6 to avoid interference between the transition flange fixing bolts 5 and the sleeve flange 4. Since the transition flange fixing bolts 5 are installed by sinking, and the diameter of the cylindrical countersunk hole cannot be too large, conventional wrenches cannot be inserted, so the transition flange fixing bolts 5 adopt hexagon socket bolts. The transition flange fixing bolts 5 adopt hexagon socket bolts for easy installation. The upper surface of the transition flange 6 is provided with sleeve flange fixing screw holes 13 with an inner thread hole structure, and the sleeve flange fixing screw holes 13 are arranged in a circular pattern. The number and specifications of the sleeve flange fixing screw holes 13 are consistent with the connection holes of the sleeve flange 4. The thickness of the transition flange 6 is determined according to the countersink depth of the transition flange fixing screw hole 12 and the required hole depth of the sleeve flange fixing bolt 3 .

[0013] The inner diameter Φd of the transition flange 6 is determined according to the diameter of the oil end of the bushing 1, and can be less than or equal to the original opening size of the transformer cover or the riser 7, so as to press the inner ring sealing gasket 8 of the transition flange. The outer diameter ΦD of the transition flange 6 is determined according to the original bolt hole distribution diameter on the transformer cover or the riser 7 and the installation hole distribution diameter of the bushing flange 4. According to the number of bolt holes, the positional relationship between the bushing flange fixing screw holes 13 and the transition flange fixing screw holes 12 is adjusted to ensure that the transition flange fixing screw holes 12 and the bushing flange fixing screw holes 13 do not overlap or interfere with each other. For example, the diameter of the circle surrounded by the transition flange fixing screw holes 12 is Φd1, and the diameter of the circle surrounded by the bushing flange fixing screw holes 13 is Φd2. At the same time, the transition flange fixing screw holes 12 and the bushing flange fixing screw holes 13 are staggered and alternately arranged.

[0014] After installation, the sleeve flange 4 will block or completely cover the transition flange fixing bolts 5. In order to prevent the transition flange fixing bolts 5 from loosening due to vibration during transformer operation, two disc springs 10 and a flat washer 11 installed at the lower end of the transition flange fixing bolts 5 need to be installed. Figure 4 As shown. The number of disc springs 10 can be increased according to the voltage level, weight and other strength requirements of the bushing 1 to enhance the anti-vibration and anti-loosening capabilities of the transition flange fixing bolts 5. It should be noted that the disc springs 10 should be installed in pairs.

[0015] When the size of the bushing flange 4 is smaller than the installation interface of the transformer box cover or the riser 7, the overall installation structure of the transformer bushing transition connection assembly is as follows: Figure 2 As shown, the transition flange 6 is fixedly mounted on the transformer box cover or the riser 7 by the transition flange fixing bolts 5; the upper surface of the transformer box cover or the riser 7 usually has a sealing groove, and the transition flange inner ring sealing gasket 8 is installed in the sealing groove to seal and prevent the internal transformer oil from leaking out. The bushing 1 is fixedly connected to the bushing flange 4, and the bushing 1 is installed on the transition flange 6 by the bushing flange fixing bolts 3, and an inner ring sealing groove is added on the upper surface of the transition flange 6, and the bushing flange sealing gasket 2 is installed in the inner ring sealing groove for sealing.

[0016] When the size of the bushing flange 4 is larger than the installation interface of the transformer box cover or the riser 7, the overall installation structure of the transformer bushing transition connection assembly is as follows: Figure 3As shown. Due to the change in the size of the sleeve flange 4 and the size of the installation interface, the sleeve flange fixing screw hole 13 is set at the outermost periphery, while the transition flange fixing screw hole 12 is located at the inner periphery of the sleeve flange fixing screw hole 13. An outer ring sealing groove is added to the outer periphery of the transition flange fixing screw hole 12 on the lower surface of the transition flange 6, and the transition flange outer ring sealing gasket 9 is installed in the outer ring sealing groove. An inner ring sealing groove is set on the upper surface of the transition flange 6 (located in the inner ring of the sleeve flange fixing bolt 3), and the sleeve flange sealing gasket 2 is installed in the inner ring sealing groove. Prevent the internal transformer oil from flowing through the gap between the lower surface of the sleeve flange 4 and the upper surface of the transition flange 6, and leaking out along the transition flange fixing screw hole 12.

[0017] Figure 3 and Figure 4 Different sealing structures are used for structural combinations of different sizes, which can effectively prevent the internal transformer oil from leaking out.

[0018] The transition flange 6 is made of low alloy or low magnetic steel plate to improve the connection strength of the transition flange 6 and prevent the transition flange 6 from overheating in the leakage magnetic field.

[0019] In the embodiments of the present invention, technical features that are not described in detail are all existing technologies or conventional technical means and will not be described in detail here.

[0020] Finally, it should be noted that the above embodiments are only specific implementation methods of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them, and the protection scope of the present invention is not limited thereto. Those skilled in the art should understand that any technician familiar with the technical field can modify the technical solutions recorded in the above embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be covered within the protection scope of the present invention.

Claims

1. A transformer bushing transition connection assembly, characterized in that: It includes a transition flange, transition flange fixing bolts, sleeve flange fixing bolts, disc springs and flat washers; the transition flange is a circular steel component, and a plurality of transition flange fixing screw holes are provided on the upper surface of the transition flange. The transition flange fixing screw holes adopt a cylindrical countersunk hole design, and the positions of the transition flange fixing screw holes are arranged in a circle. The number and specifications of the transition flange fixing screw holes are consistent with the connecting holes on the transformer box cover or the rising seat, and the transition flange is connected to the transformer box cover or the rising seat through the transition flange fixing bolts; a plurality of sleeve flange fixing screw holes are also provided on the upper surface of the transition flange, and the sleeve flange fixing screw holes are arranged in a circle. The number and specifications of the sleeve flange fixing screw holes are consistent with the connecting holes on the sleeve flange, and the sleeve flange is connected to the transition flange through the sleeve flange fixing bolts; a disc spring and a flat washer that are installed in a buckle manner are added to the lower part of the end of the transition flange fixing bolt; the positions of the transition flange fixing screw holes and the sleeve flange fixing screw holes do not interfere with each other.

2. The transformer bushing transition connection assembly according to claim 1, characterized in that: The size of the bushing flange is smaller than the installation interface of the transformer cover or the riser, and the transition flange inner ring sealing gasket is installed in the sealing groove provided on the transformer cover or the riser; an inner ring sealing groove is set on the upper surface of the transition flange, and the bushing flange sealing gasket is installed in the inner ring sealing groove.

3. The transformer bushing transition connection assembly according to claim 1, characterized in that: The size of the bushing flange is larger than the installation interface of the transformer cover or the riser. The inner ring sealing gasket of the transition flange is installed in the sealing groove on the transformer cover or the riser. An outer ring sealing groove is set on the outer periphery of the bushing flange fixing screw hole on the lower surface of the transition flange, and the outer ring sealing gasket of the transition flange is installed in the outer ring sealing groove; an inner ring sealing groove is set on the upper surface of the transition flange, and the bushing flange sealing gasket is installed in the inner ring sealing groove.

4. The transformer bushing transition connection assembly according to any one of claims 1 to 3, characterized in that: The transition flange fixing bolts are hexagon socket bolts.

5. The transformer bushing transition connection assembly according to any one of claims 1 to 3, characterized in that: The transition flange is made of low alloy or low magnetic steel plate.