Cascade hydropower short-term flexibility quantification method considering water flow time lag
By considering the water stagnation and random response processes in the cascaded hydropower short-term flexibility quantification method, the dual theoretical model is used to solve the problem of short-term flexibility quantification of hydropower, and the accurate quantification and effective execution of flexible responses are achieved, ensuring the power system's Safe and stable.
Patent Information
- Application Number
- CN202410950690.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-12
AI Technical Summary
In high proportion of new energy power systems, the problem of short-term flexibility quantification of hydropower is affected by water stagnation, resulting in increased flexibility response complexity of cascade hydropower, making it difficult to accurately quantify and effectively execute, affecting the safety and stability of the power system.
The short-term flexibility quantification method of cascade hydropower considering water stagnation is adopted, and the stochastic flexibility response process stagnation deviation cumulative effect is incorporated, and the dual theoretical transformation model is used to efficiently solve the flexibility and response methods of each period are accurately quantified.
It realizes the flexibility of accurately quantifying the various periods of hydropower under many restrictions, ensures the effective implementation of flexible responses, avoids insufficient flexibility of hydropower caused by unacceptable hysteresis, and ensures the safe and stable operation of the power grid.
Smart Images

Figure CN118944190A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of new power system dispatching and relates to a method for quantifying the short-term flexibility of cascade hydropower considering water flow lag. Background Art
[0002] Guided by the goal of "carbon peak and carbon neutrality", my country has fully developed and utilized renewable energy such as water, wind and light to build a clean, low-carbon, safe and efficient energy and power system. The volatility and intermittency of wind and light power output have led to more profound power and electricity balance problems in the short-term operation of the power system. China is rich in hydropower resources, and hydropower has strong flexibility. River basin clean energy bases are being developed and constructed on a large scale. River basin clean energy bases mainly focus on the existing large-scale cascade hydropower in the river basin, plan and build supporting complementary wind and solar power sources, and make full use of the flexibility of hydropower to promote the grid connection and consumption of wind and solar power. The role of large-scale cascade hydropower in the river basin is reshaped to "power source + 'battery' regulator", giving full play to the flexibility of hydropower and responding to the flexibility needs of the system, which is related to the efficient utilization of clean energy resources and the safety and stability of high-proportion wind and light power systems. In a high-proportion new energy power system, the quantification of hydropower flexibility is an important link in the formulation and implementation of power generation plans for river basin reservoir groups. The problem of flexibility quantification involves the dynamic changes in flexibility demand and the time-dependent state characteristics of flexibility. Under the complex hydraulic spatiotemporal coupling, the flexibility of large-scale cascade hydropower in each period will be affected by the operating status of the previous period; the response of any period to random flexibility demand will also affect the flexibility of all subsequent periods. In particular, the lag effect between the upstream and downstream outflow and inflow of the cascade caused by water flow lag has aggravated the complexity of hydraulic spatiotemporal coupling, as well as the operational requirements such as hydropower water level control and medium- and long-term energy storage, making the quantification of short-term flexibility of hydropower more difficult and important. Under many restrictions, how to accurately quantify the flexibility of hydropower generation plans and ensure the effective implementation of flexibility responses is particularly important to ensure the safe and stable operation of hydropower and power systems.
[0003] In response to the above problems, the present invention proposes a method for quantifying the short-term flexibility of cascade hydropower considering water flow lag, incorporates the cumulative effect of lag deviation in the random flexibility response process and transforms the model based on the dual theory for efficient solution; accurately quantifies the flexibility of cascade hydropower in each time period under the established power generation plan, and obtains the corresponding flexibility response mode; explores the importance of water flow lag in short-term hydropower scheduling and its impact on the flexibility and response mode of cascade hydropower. Summary of the invention
[0004] The purpose of the present invention is to provide a method for quantifying the short-term flexibility of cascade hydropower taking into account water flow lag, accurately quantify the flexibility of the cascade reservoir group in each time period under the established power generation plan, and obtain the corresponding flexibility response mode, which can effectively cope with the flexibility demand dilemma of high-proportion new energy power system and ensure the effective implementation of flexibility response.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A method for quantifying the short-term flexibility of cascade hydropower considering water flow hysteresis mainly includes: realizing the quantification of the short-term flexibility of hydropower considering water flow hysteresis; incorporating the cumulative effect of the hysteresis deviation of the random flexibility response process and transforming the model based on the duality theory to efficiently solve; accurately quantifying the flexibility of each period under the established power generation plan of the hydropower station group, and obtaining the corresponding flexibility response mode. The quantification of the short-term flexibility of cascade hydropower considering water flow hysteresis includes the following steps:
[0007] Step 1: Collect the initial calculation conditions, including the total planned output of cascade hydropower and complementary wind and solar power sources hour by hour in the next day, the output of photovoltaic power and wind power hour by hour in the next day, the operation conditions and constraints of power stations, the demand conditions for power and water power dispatching, and the water flow delay of hydropower;
[0008] Step 2: Define flexibility and flexibility response methods. The flexibility of hydropower is used to balance the deviation between the actual output and the planned output of complementary wind and solar power sources. The flexibility scheduling process needs to be implemented at the power station level. The flexibility demand response ratio of each power station in each period directly affects the flexibility of hydropower.
[0009] Hydropower flexibility:
[0010] Assume that the flexibility of hydropower in period t is in are the upward and downward flexibility of each cascade power station h in period t The accumulated value of It indicates the maximum adjustable amount of output climbing and descending of power plant h in period t, which is limited by output state and climbing ability and satisfies the following formula:
[0011]
[0012] Where: They represent the output drop and ramp limit of power station h during period t, MW; P h,t is the output of power station h during period t, MW; are the upper and lower limits of the output of power station h in period t, MW;
[0013] Power system flexibility requirements:
[0014] The grid's flexibility demand for hydropower in time period t It comes from the forecast deviation of fluctuating and intermittent wind and solar output; Indicates an increase in flexibility requirements, Indicates a downward adjustment of flexibility demand; in order to ensure the reliability and adequacy of system power supply, the grid expects that the flexibility demand borne by hydropower should not exceed its flexibility, that is:
[0015]
[0016] Hydropower flexibility response methods:
[0017] The response of cascade hydropower to the grid flexibility needs to be implemented at the level of each power station. h,t , are the response ratio of power station h to the grid flexibility demand and the flexibility demand value of the response in time period t, respectively, and the following equations (3)-(4) are satisfied; the flexibility response process of each power station is based on λ h,t implementation, hereinafter referred to as the hydropower flexibility response approach;
[0018]
[0019] Where: h, H are the power station number and the total number of power stations, and the one with the smaller number is located upstream; t is the dispatching period number; unless otherwise specified, h and t are subscripts in the following text, which represent power stations and time periods;
[0020] Step 3: Establish the objective function of the hydropower short-term flexibility quantitative model, with the maximum flexibility during the entire dispatch period as the objective function:
[0021]
[0022] Based on the uncertainty of flexibility demand and the coordinated operation of various power sources in the system, the flexibility requirements of the power system may be different in different periods; the introduction of upward and downward flexibility base values is satisfy The relationship between the base value and the flexibility of each period is established as and where α min,max ≥0, and It is determined by the system according to the forecast of flexibility demand; the objective function (5) can be further expressed as:
[0023]
[0024] Where: α min,max ≥0, and is the preset parameter; T is the total number of time periods; therefore, the objective function can be equivalently transformed into:
[0025]
[0026] Step 4: Establish the constraints of the planning stage of the hydropower short-term flexibility quantitative model. In this stage, hydropower and complementary wind and solar power sources need to perform the power generation tasks issued by the power grid, and the operation of hydropower needs to meet the constraints of conventional guaranteed operation;
[0027] Constraints on water, wind and solar power output process:
[0028]
[0029] Where: P t w is the predicted output of complementary wind power in period t, MW; P t s is the predicted output of complementary photovoltaic power generation in period t, MW; D t The power station group and complementary wind and solar power generation plan during period t issued by the power grid, MW;
[0030] Hydropower water balance constraints:
[0031]
[0032] Where: V h,t is the storage capacity of power station h at the end of period t, m 3 ; are the interval flow, power generation flow and abandoned water flow of power station h in period t, respectively. 3 / s; Δt is the step length of the scheduling calculation period; d h-1,h is the water flow delay time from the upstream power station to the power station h;
[0033] Hydropower operation boundary constraints:
[0034]
[0035] Where: (10)-(12) are the power generation flow, output and storage capacity boundary constraints of power station h in period t respectively; are the upper and lower limits of the power generation flow of power station h in period t, m 3 / s; are the upper and lower limits of the storage capacity of power station h in period t, m 3 ;
[0036] Hydropower storage capacity constraints:
[0037]
[0038] Where: V h,0 is the initial storage capacity of power station h at time t, 10,000 m 3 ; V h,t is the storage capacity of power station h at the end of period t, 10,000 m 3 ; are the storage capacity control value at the beginning and end of the dispatch period given by power station h, respectively. 3 ;
[0039] Hydropower generation function:
[0040] In short-term dispatching, the daily water level fluctuation of the power station has little effect on the water consumption rate. According to the actual operation of the research object, the fixed water consumption rate method is used to calculate the output; the power generation function of the power station is expressed as follows:
[0041]
[0042] Where: w h,t represents the water consumption rate of power station h during period t, m 3 / kW·h;
[0043] Function of the relationship between hydropower water level and reservoir capacity:
[0044] Z h,t =f h,t (V h,t ) (16)
[0045] Where: Z h,t represents the water level of power station h at the end of time period t, m; f h,t (V h,t ) represents the water level and storage capacity relationship curve function of power station h;
[0046] Hydropower ramping constraints:
[0047]
[0048] Step 5: Establish constraints on the short-term flexibility response process of cascade hydropower. Affected by the random flexibility demand of the power system, the operation mode of the hydropower flexibility response process may have random deviations from the planned value. The output, power flow and water level of the power station are all random variables and must meet the operation constraints.
[0049] Hydropower flexibility response process output and generation flow constraints:
[0050]
[0051] Where: They are the output and power generation flow of the flexibility response process of power station h at time t, MW and m3 / s respectively.
[0052] Water balance equation for hydropower flexibility response process:
[0053] According to the conventional water balance equation (9), the water balance equation of the hydropower flexibility response process is obtained;
[0054]
[0055] Where: represents the storage capacity of power station h in the flexibility response process at time t, m 3 ; The water abandonment item of the flexibility response process. The power station flexibility response process should not cause water abandonment, so the limit 0m 3 / s, simplifying formula (20) to:
[0056]
[0057] Hydropower flexibility responds to process boundary constraints:
[0058] Similar to conventional operation boundary constraints, during the flexibility response process of hydropower, the output, power generation flow and storage capacity must meet the operation boundary constraints (22)-(24) respectively;
[0059]
[0060] Hydropower flexibility response process guarantees storage capacity constraints:
[0061] Hydropower operation undertakes the task of energy storage guarantee. While responding to random flexibility demands, it should avoid affecting medium- and long-term plans and guarantee requirements. Therefore, the storage capacity at the end of the period during the flexibility response process is limited to meet the storage capacity requirements for guaranteed operation.
[0062]
[0063] Where: They represent the upper and lower guaranteed operation boundaries of the storage capacity of power station h at the end of the dispatch period during the flexibility response process;
[0064] Step 6: Reconstruct the model based on the duality theory and reconstruct the hydropower flexibility response process constraints (22)-(25) so that all constraints no longer contain random variables and it is easy to solve the model efficiently.
[0065] Reconstruction of power generation flow and output constraints during flexibility response:
[0066] Substituting formula (18) into formula (22) yields:
[0067]
[0068] Formula (26) is equivalent to any In this case, the maximum output of the flexibility response process is less than the upper limit of the output, and the minimum output of the flexibility response process is greater than the upper limit of the output. Further simplification can be performed to reconstruct the output boundary constraint of the flexibility response process equivalently as (27);
[0069]
[0070] Similarly, the power generation flow boundary constraint (23) of the flexibility response process can be equivalently reconstructed as:
[0071]
[0072] Reconstruction of storage capacity boundary and guaranteed storage capacity constraints in the flexible response process:
[0073] During the flexibility response process, the storage and power generation flows in each period often deviate from the planned values and accumulate continuously, resulting in the storage capacity deviation at the end of the period. To characterize the above process, substitute equation (19) into equation (21) and iterate multiple times to establish With all previous periods The relationship (29) is referred to as the time-delay deviation cumulative water balance equation below;
[0074]
[0075] Since the random flexibility demand satisfies constraint (2), the storage capacity of power station h at time t in the flexibility response process has a maximum and a minimum value, which are expressed as and The interval formed by the maximum and minimum values of the storage capacity of the flexibility response process at any time is the variation range of the storage capacity of the flexibility response process; the maximum value of the storage capacity of the flexibility response process at any time Minimum Respectively expressed as:
[0076]
[0077] The storage capacity of the flexible response process must satisfy the storage capacity operation boundary constraint (24) and the guaranteed storage capacity constraint (25) respectively. To unify the expression, the constraints (24) and (25) are combined, and the following is made: and They represent the upper and lower boundaries of the storage capacity of the flexibility response process, and must satisfy:
[0078]
[0079]
[0080] Therefore, the upper and lower bound constraints of the storage capacity in the flexibility response process can be expressed as
[0081] Formula (30) is a linear optimization problem with random variables as decision variables. The duality theory is introduced to solve it. First, according to the flexibility requirement constraint (2), the model (30) is transformed into The feasible domain of is transformed into constraint form:
[0082]
[0083] Where: They represent the flexibility demand of power station h in period τ respectively. The dual variable for the flexibility constraint during the τ period; are the flexibility requirements in period τ respectively.
[0084] The reconstruction idea is: first establish the maximum value of the storage capacity of the flexibility response process The Lagrangian function of formula (30) is constructed, and the dual function and dual problem are constructed based on the Lagrangian function; Expression (30) is a linear convex optimization model. Based on the strong duality theory, the optimal solution of the dual problem is consistent with the optimal solution of the original problem. By solving the dual problem, the optimal solution of the original problem can be obtained, and the equivalent constraint (35) of the upper boundary constraint (30) of the storage capacity of the flexible response process can be obtained.
[0085]
[0086] The reconstruction method of the storage capacity lower bound constraint in the flexibility response process is the same as the upper bound constraint reconstruction method, and the reconstruction result is shown in (36);
[0087]
[0088] Where: They represent the flexibility requirements of power station h during the period τ. The dual variable for the flexibility constraint during the τ period;
[0089] Step 7: Flexible quantitative solution strategy. The model inputs decision variables and various parameters and performs iterative solution. The steps are as follows: First, select an initial interval [a, b] to ensure that When the two endpoints of the interval are taken respectively, the model optimization results are respectively solvable and unsolvable, so as to ensure that the constraints are met. The maximum value is within the interval; the second step is to calculate the midpoint of the interval c = (a + b) / 2; when When a and c are selected, the model optimization results are respectively solvable and unsolvable. The maximum value of is in the interval [a,c], update b = c; when When b and c are taken, the model optimization results are respectively solvable and unsolvable, then the constraints that meet the constraints are The maximum value of is in the interval [c, b], update a = c; repeat the second step until the interval accuracy requirement is met, and the interval that makes the model solvable is obtained. One of the endpoints satisfies the constraint condition. The maximum value of α min,max ≥0, and Calculate the flexibility of hydropower in different time periods;
[0090] Step 8, integrating the linear programming model without random variables constructed in steps 3 to 6, and calling the solver to solve the model through the method provided in step 7, so as to obtain the quantitative results of hydropower short-term flexibility.
[0091] The present invention has the following beneficial effects: the model and solution method proposed in the present invention can accurately quantify the flexibility of hydropower in various time periods under many restrictions and different water inflow conditions, and obtain corresponding response methods. Water flow lag exacerbates the complexity of the hydraulic spatiotemporal coupling of cascade hydropower. The response methods obtained by considering and not considering water flow lag are used to simulate actual production scheduling to illustrate the necessity of correctly considering water flow lag. The simulation results show that the response method obtained by not considering water flow lag will cause some power stations to break through the guaranteed operation requirements in actual applications, while the response method obtained by considering water flow lag is actually applicable correctly. This shows that the result of not considering water flow lag is likely to lead to insufficient hydropower flexibility in actual applications. If the impact of water flow lag is not correctly considered, the flexibility of hydropower will be misjudged, which can easily affect the safety of system operation. In summary, the present invention solves the problem of quantifying the short-term flexibility of hydropower considering water flow lag, and ensures the flexible support of hydropower for the safety and stability of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0092] Figure 1 It is a schematic diagram of the cascade hydropower output process and flexibility obtained by the present invention during normal water period.
[0093] Figure 2 It is a schematic diagram of the cascade hydropower output process and flexibility obtained by the present invention during the flood season.
[0094] Figure 3 It is a schematic diagram of the cascade hydropower output process and flexibility obtained during the dry season according to the present invention.
[0095] Figure 4 Schematic diagram of the effect of water flow hysteresis on the flexibility of cascade hydropower in the embodiment, wherein (a) is considering the hysteresis, and (b) is not considering the hysteresis;
[0096] Figure 5 Schematic diagram of the simulated water level scheduling process in the embodiment, wherein (a) is the HJD power station, (b) is the DF power station, (c) is the SFY power station, (d) is the WJD power station, (e) is the GPT power station, and (f) is the SL power station. DETAILED DESCRIPTION
[0097] The present invention is further described below in conjunction with the accompanying drawings and implementation examples.
[0098] Take the cascade hydropower consisting of 6 reservoirs in a river basin in the southwestern province of G and the complementary wind and solar power sources in the river basin as an example. The power grid requires hydropower to give full play to its flexibility to ensure system stability. The total installed capacity of this cascade hydropower accounts for about 32% of the total installed capacity of hydropower in the whole network of Province G. Table 1 shows the basic situation of each power station in the order of upstream and downstream of the cascade. The power grid issues the energy base power generation plan and wind and solar power output using the actual operating data of a typical day in 2021. Unless otherwise specified, the following analysis uses the typical daily operation of the hydropower leveling period in 2023 for simulation calculations at 24 o'clock a day. Without loss of generality, the present invention sets α min,max =1, and
[0099] Table 1 Basic data information of power station
[0100]
[0101] The analysis using the method for quantifying short-term hydropower flexibility considering water flow hysteresis includes the following steps:
[0102] Step 1: Collect initial calculation conditions, including the total planned output of hydropower and complementary wind and solar power sources hour by hour in the next day, the output of photovoltaic power and wind power hour by hour in the next day, the operating conditions and constraints of power stations, the demand conditions for power and water power dispatching, and the water flow delay of hydropower;
[0103] Step 2: Define flexibility and flexibility response methods. The flexibility of hydropower is mainly used to balance the deviation between the actual output and the planned output of complementary wind and solar power sources. The flexibility response process needs to be implemented at the power station level. The flexibility response ratio of each power station in each period directly affects the flexibility of hydropower.
[0104] Hydropower flexibility:
[0105] Assume that the flexibility of hydropower in period t is in are the upward and downward flexibility of each cascade power station h in period t The accumulated value of It indicates the maximum adjustable amount of output climbing and descending of power plant h in period t, which is limited by output state and climbing ability and satisfies the following formula:
[0106]
[0107] Where: They represent the output drop and ramp limit of power station h during period t, MW; P h,t is the output of power station h during period t, MW; are the upper and lower limits of the output of power station h in period t, MW;
[0108] Power system flexibility requirements:
[0109] The grid's flexibility demand for hydropower in time period t It mainly comes from the forecast deviation of fluctuating and intermittent wind and solar output. Indicates an increase in flexibility requirements, In order to ensure the reliability and adequacy of power supply, the grid expects that the flexibility demand borne by hydropower should not exceed its flexibility, that is:
[0110]
[0111] Hydropower flexibility response methods:
[0112] The response of hydropower to the grid flexibility needs to be implemented at the level of each power station. h,t , are the flexibility response allocation ratio and flexibility demand value of power station h in period t, respectively, and the following equations (39)-(40) are satisfied. The flexibility response of each power station is calculated according to λ h,t Execution, which the present invention calls a hydropower flexibility response mode.
[0113]
[0114] Where: h, H are the power station number and the total number of power stations, and the smaller number is located upstream; t is the dispatch period number. Unless otherwise specified, h and t are subscripts in the following text, which represent power stations and time periods.
[0115] Step 3: Establish the objective function of the hydropower short-term flexibility quantitative model, with the maximum flexibility during the entire dispatch period as the objective function:
[0116]
[0117] Based on the uncertainty of flexibility demand and the coordinated operation of various power sources in the system, the flexibility requirements of the power system may be different in different periods; the introduction of upward and downward flexibility base values is satisfy The relationship between the base value and the flexibility of each period is established as and where α min,max ≥0, and It is determined by the system according to the forecast of flexibility demand; the objective function (41) can be further expressed as:
[0118]
[0119] Where: α min,max ≥0, and is the preset parameter; T is the total number of time periods; therefore, the objective function can be equivalently transformed into:
[0120]
[0121] Step 4: Establish constraints for the planning phase of the hydropower short-term flexibility quantitative model. In this phase, hydropower and complementary wind and solar power sources must execute power generation tasks assigned by the power grid, and hydropower operations must meet conventional guaranteed operation constraints.
[0122] Constraints on water, wind and solar power output process:
[0123]
[0124] Where: P t w is the predicted output of complementary wind power in period t, MW; P t s is the predicted output of complementary photovoltaic power generation in period t, MW; D t It is the power station group and complementary wind and solar power generation plan in period t issued by the power grid, MW.
[0125] Hydropower water balance constraints:
[0126]
[0127] Where: V h,t is the storage capacity of power station h at the end of period t, m 3 ; are the interval flow, power generation flow and abandoned water flow of power station h in period t, respectively. 3 / s; Δt is the step length of the scheduling calculation period, which is 1h in this embodiment; d h-1,h is the water flow delay from the upstream power station to the power station h. In order to ensure the maximum utilization of water resources, this embodiment limits the abandoned water to 0m 3 / s.
[0128] Hydropower operation boundary constraints:
[0129]
[0130] Where: (46)-(48) are the power generation flow, output and storage capacity boundary constraints of power station h in period t. are the upper and lower limits of the power generation flow of power station h in period t, m 3 / s; are the upper and lower limits of the storage capacity of power station h in period t, m 3 ;
[0131] Hydropower storage capacity constraints:
[0132]
[0133] Where: V h,0 is the storage capacity of power station h at the initial time of the dispatch period, 10,000 m3; V h,t is the storage capacity of power station h at the end of period t, 10,000 m 3 ; are the storage capacity control value at the beginning and end of the dispatch period given by power station h, respectively. 3 .
[0134] Hydropower generation function:
[0135] In short-term scheduling, the daily water level fluctuation of the power station has little effect on the water consumption rate. According to the actual operation of the research object, the present invention adopts a fixed water consumption rate method to calculate the output. The power generation function of the power station is expressed as follows:
[0136]
[0137] Where: w h,t represents the water consumption rate of power station h during period t, m 3 / kW·h.
[0138] Function of the relationship between hydropower water level and reservoir capacity:
[0139] Z h,t =f h,t (V h,t ) (52)
[0140] Where: Z h,t represents the water level of power station h at the end of time period t, m; f h,t (V h,t ) represents the water level and storage capacity relationship curve function of power station h.
[0141] Hydropower ramping constraints:
[0142]
[0143] Step 5: Establish the constraints of the hydropower short-term flexibility quantitative model response process. Affected by the random flexibility demand of the power system, the operation mode of the hydropower flexibility response process may have random deviations from the planned value. The power station output, power flow and water level are all random variables and must meet the operation constraints.
[0144] Hydropower flexibility response process output and generation flow constraints:
[0145]
[0146] Where: They are the output and power generation flow of the flexibility response process of power station h at time t, MW and m3 / s respectively.
[0147] Water balance equation for hydropower flexibility response process:
[0148] According to the conventional water balance equation (45), the water balance equation for the hydropower flexibility response process is obtained.
[0149]
[0150] Where: represents the storage capacity of power station h in the flexibility response process at time t, m 3 ; The water abandonment item of the flexibility response process. The power station flexibility response process should not cause water abandonment, so the limit 0m 3 / s, simplifying formula (20) to:
[0151]
[0152] Hydropower flexibility responds to process boundary constraints:
[0153] Similar to conventional operation boundary constraints, during the flexibility response process of hydropower, the output, power generation flow and storage capacity must meet the operation boundary constraints respectively:
[0154]
[0155] Hydropower flexibility response process guarantees storage capacity constraints:
[0156] Hydropower operation undertakes the task of energy storage guarantee and should avoid affecting the medium- and long-term plans and guarantee requirements while responding to random flexibility demands. Therefore, the storage capacity at the end of the period during the flexibility response process is limited to meet the storage capacity requirements for guaranteed operation.
[0157]
[0158] Where: They respectively represent the upper and lower guaranteed operation boundaries of the storage capacity of power station h at the end of the dispatch period during the flexibility response process.
[0159] Step 6, reconstruct the model based on the duality theory and reconstruct the hydropower flexibility response process constraints (58)-(61) so that all constraints no longer contain random variables, making it easier to solve the model efficiently.
[0160] Reconstruction of power generation flow and output constraints during flexibility response:
[0161] Substituting formula (54) into formula (58) yields:
[0162]
[0163] The formula is equivalent to any In this case, the maximum output of the flexibility response process is less than the output upper limit, and the minimum output of the flexibility response process is greater than the output upper limit. Further simplification can be performed to reconstruct the output boundary constraint of the flexibility response process equivalently as follows:
[0164]
[0165] Similarly, the power generation flow boundary constraint (23) of the flexibility response process can be equivalently reconstructed as:
[0166]
[0167] Reconstruction of storage capacity boundary and guaranteed storage capacity constraints in the flexible response process:
[0168] In the flexible response process, the storage and power generation flows in each period often deviate from the planned values and accumulate continuously, resulting in the end-of-period storage capacity deviation. To characterize the above process, substitute equation (55) into equation (57) and iterate multiple times to establish With all previous periods The relationship (65) is called the time-delay deviation cumulative water balance equation in the present invention.
[0169]
[0170] Since the random flexibility demand meets the constraints, the storage capacity of power station h at time t has a maximum and a minimum, which are expressed as and The interval formed by the maximum and minimum values of the storage capacity of the flexibility response process at any time is the range of change of the storage capacity of the flexibility response process. Minimum Respectively expressed as:
[0171]
[0172] The storage capacity of the flexible response process must satisfy the storage capacity operation boundary constraint (60) and the guaranteed storage capacity constraint (61). Combining the two constraints, let and They represent the upper and lower bounds of the storage capacity of the flexibility response process, respectively, and must satisfy:
[0173]
[0174] Therefore, the upper and lower bound constraints of the storage capacity in the flexibility response process can be expressed as
[0175] Formula (66) is a linear optimization problem with random variables as decision variables. The present invention introduces duality theory to solve it. First, according to the flexibility requirement constraint, the formula (66) is transformed into The feasible domain of is transformed into constraint form:
[0176]
[0177] Where: They represent the flexibility requirements of power station h during the period τ. Dual variable for the flexibility constraint over time period τ. are the flexibility requirements in period τ respectively.
[0178] The reconstruction idea is: first establish the maximum value of the storage capacity of the flexibility response process The Lagrangian function of the formula is used, and the dual function and dual problem are constructed based on the Lagrangian function; Expression (66) is a linear convex optimization model. Based on the strong duality theory, the optimal solution of the dual problem is consistent with the optimal solution of the original problem. By solving the dual problem, the optimal solution of the original problem can be obtained, and based on this, the equivalent constraint of the storage capacity upper boundary constraint (66) of the flexible response process is obtained:
[0179]
[0180] The lower bound constraint reconstruction method of the storage capacity in the flexibility response process is similar to the upper bound constraint reconstruction method. The reconstruction result is as follows:
[0181]
[0182] Where: They represent the flexibility requirements of power station h during the period τ. Dual variable for the flexibility constraint over time period τ.
[0183] Step 7: Flexible quantitative solution strategy. The model inputs decision variables and various parameters and performs iterative solution. The steps are as follows: First, select an initial interval [a, b] to ensure that When the two endpoints of the interval are taken respectively, the model optimization results are respectively solvable and unsolvable, so as to ensure that the constraints are met. The maximum value is within the interval; the second step is to calculate the midpoint of the interval c = (a + b) / 2; when When a and c are selected, the model optimization results are respectively solvable and unsolvable. The maximum value of is in the interval [a,c], update b = c; when When b and c are taken, the model optimization results are respectively solvable and unsolvable, then the constraints that meet the constraints are The maximum value of is in the interval [c, b], update a = c; repeat the second step until the interval accuracy requirement is met, and the interval that makes the model solvable is obtained. One of the endpoints satisfies the constraint condition. The maximum value of αmin,max ≥0, and Calculate the flexibility of hydropower in different time periods;
[0184] Step 8, integrating the linear programming model without random variables constructed in steps 3 to 6, and calling the solver to solve the model through the method provided in step 7, so as to obtain the quantitative results of hydropower short-term flexibility.
[0185] The simulation analysis results are as follows:
[0186] (1) Hydropower bears the requirements of energy storage guarantee, and the storage capacity at the end of the dispatch period must strictly meet the guaranteed storage capacity operation boundary. The guaranteed operation boundary is expressed in the form of a positive and negative interval based on the storage capacity at the end of the given period. Comprehensively considering the regulation capacity of each power station to avoid serious deviation from the plan for annual regulation and above power stations, the guaranteed operation boundary of the storage capacity at the end of the dispatch period is shown in Table 2. Through the model proposed in the present invention and its solution method, the flexibility of each time period is calculated to achieve the quantification of the flexibility of hydropower. The quantitative results of the flexibility of each power station under the guaranteed operation boundary, the response mode and the power generation plan are calculated as shown in Figure 1 .
[0187] Table 2 End-of-period storage capacity guarantee operation boundary (unit: 10,000 m3)
[0188]
[0189] Figures 1 to 3 It can be seen that in each period, each power station jointly exerts flexibility in a certain proportion, and the flexibility of the entire cascade in each period is increased or decreased by 437MW, that is, the cascade hydropower can continuously respond to the flexibility demand of increasing or decreasing 437MW in each period according to the calculated allocation method, and ensure that the guaranteed operation requirements are not damaged. Hydropower flexibility is related to the stability of system operation, but it is constrained by many conditions such as system guaranteed operation and hydropower regulation capacity. Disordered scheduling without full quantification often leads to excessive or conservative response to flexibility demand of cascade hydropower, affecting the smooth implementation of hydropower medium- and long-term plans and its own operational safety.
[0190] Hydropower is greatly affected by water conditions. To illustrate that the quantitative method proposed in this invention is applicable to different water conditions, the actual operation of typical days in the flood season and dry season of hydropower in 2023 is selected for calculation. The quantitative results of hydropower flexibility and the output process are as follows: Figure 2 and Figure 3As shown. It can be seen that the flexibility obtained in the flood season and the dry season is 329MW and 216MW respectively. Under different water inflow conditions, the flexibility, response mode and output plan of each cascade power station vary significantly. This is because the overall water inflow conditions in the basin are different, the water inflow levels of different power stations are also different, and they are subject to restrictions such as guaranteed operation requirements, which directly affect the arrangement of the power generation plan of each power station, and then affect the flexibility and response mode. In summary, the model and solution method proposed in the present invention can accurately quantify the flexibility of hydropower under many restrictions and different water inflow conditions.
[0191] (2) The scale of this cascade hydropower is huge, and the distance between the cascades is relatively long. The water flow delay between any upstream and downstream is basically about 3 hours. There are complex hydraulic spatiotemporal couplings between the cascade power stations, and the water flow delay makes the problem more complicated. To illustrate the impact of water flow delay on the flexibility of hydropower, the flexibility of the cascade power stations with and without considering the delay is calculated based on the 2 / 3 guaranteed operation boundary mode in Table 2. The results are shown in the figure. Figure 4 It can be seen that under the 2 / 3 guaranteed operation boundary, compared with not considering the time delay, the flexibility of the cascade power station in each period is reduced by 0.9MW when the time delay is considered, and the flexibility of the entire dispatch period is reduced by 21.6MW, and the flexibility response mode has undergone significant changes.
[0192] In order to reflect the necessity of fully considering the water flow delay, the flexibility and response results calculated without considering the delay and considering the delay are used to respond to typical flexibility demand scenarios, and a more realistic simulation dispatch is carried out under the delay to verify whether the storage capacity at the end of the dispatch period meets the requirements for guaranteed operation. Two typical flexibility demand scenarios, continuous increase and continuous decrease, are set. The flexibility demand in each period is increased by +260MW∈[-293.9MW, 293.9MW] and decreased by -280MW∈[-293.9MW, 293.9MW]. Simulation dispatch is carried out under four scenarios. Simulation dispatch 1: responding to the continuous +260MW flexibility demand with response mode without considering the delay; Simulation dispatch 2: responding to the continuous -280MW flexibility demand with response mode without considering the delay; Simulation dispatch 3: responding to the continuous -280MW flexibility demand with response mode considering the delay; Simulation dispatch 4: responding to the continuous +260MW flexibility demand with response mode considering the delay.
[0193] In order to intuitively display the simulated dispatching situation, the simulated dispatching storage capacity process and the 2 / 3 guaranteed operation boundary are converted into water level conditions according to the water level storage capacity relationship (16). The results are shown in Figure 5. It can be seen that in the simulation dispatching 1, the storage capacity of SFY, GPT and SL power stations at the end of the period exceeded 2 / 3 of the guaranteed operation boundary; in the simulation dispatching 2, the storage capacity of DF, SFY and WJD power stations at the end of the period exceeded 2 / 3 of the guaranteed operation boundary, indicating that the result of not considering the water flow delay is insufficient in the actual application of hydropower flexibility, causing the storage capacity at the end of the dispatching period to exceed the guaranteed operation requirements. The results of simulation dispatching 3 and 4 show that the storage capacity at the end of the dispatching period fully meets the guaranteed operation requirements, that is, the response method considering the water flow delay can solve the actual engineering demands. It can be seen that due to the existence of water flow delay, the flexibility quantification results and response methods without considering the delay cannot be applied in practice, and it is very important to correctly consider the water flow delay. If the impact of water flow delay is not correctly considered in production dispatching, it is easy to misjudge the actual flexibility of hydropower and cause serious safety accidents.
[0194] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for quantifying short-term flexibility of cascade hydropower considering water flow hysteresis, characterized in that: The method for quantifying the short-term flexibility of cascade hydropower includes the following steps: Step 1: Collect the initial calculation conditions, including the total planned output of cascade hydropower and complementary wind and solar power sources hour by hour in the next day, the output of photovoltaic power and wind power hour by hour in the next day, the operation conditions and constraints of power stations, the demand conditions for power and water power dispatching, and the water flow delay of hydropower; Step 2: Define flexibility and flexibility response methods. The flexibility of hydropower is used to balance the deviation between the actual output and the planned output of complementary wind and solar power sources. The flexibility scheduling process needs to be implemented at the power station level. The flexibility demand response ratio of each power station in each period directly affects the flexibility of hydropower. Hydropower flexibility: Assume that the flexibility of hydropower in period t is in are the upward and downward flexibility of each cascade power station h in period t The accumulated value of It indicates the maximum adjustable amount of output climbing and descending of power plant h in period t, which is limited by output state and climbing ability and satisfies the following formula: Where: They represent the output drop and ramp limit of power station h during period t, MW; P h,t is the output of power station h during period t, MW; are the upper and lower limits of the output of power station h in period t, MW; Power system flexibility requirements: The grid's flexibility demand for hydropower in time period t It comes from the forecast deviation of fluctuating and intermittent wind and solar output; Indicates an increase in flexibility requirements, Indicates a downward adjustment of flexibility demand; in order to ensure the reliability and adequacy of system power supply, the grid expects that the flexibility demand borne by hydropower should not exceed its flexibility, that is: Hydropower flexibility response methods: The response of cascade hydropower to the grid flexibility needs to be implemented at the level of each power station. h,t , are the response ratio of power station h to the grid flexibility demand and the flexibility demand value of the response in time period t, respectively, and the following equations (3)-(4) are satisfied; the flexibility response process of each power station is based on λ h,t implementation, hereinafter referred to as the hydropower flexibility response approach; Where: h, H are the power station number and the total number of power stations, and the one with the smaller number is located upstream; t is the dispatching period number; unless otherwise specified, h and t are subscripts in the following text, which represent power stations and time periods; Step 3: Establish the objective function of the hydropower short-term flexibility quantitative model, with the maximum flexibility during the entire dispatch period as the objective function: Based on the uncertainty of flexibility demand and the coordinated operation of various power sources in the system, the flexibility requirements of the power system may be different in different periods; the introduction of upward and downward flexibility base values is satisfy The relationship between the base value and the flexibility of each period is established as m and where α min,max ≥0, and It is determined by the system according to the forecast of flexibility demand; the objective function (5) can be further expressed as: Where: α min,max ≥0, and is the preset parameter; T is the total number of time periods; therefore, the objective function can be equivalently transformed into: Step 4: Establish the constraints of the planning stage of the hydropower short-term flexibility quantitative model. In this stage, hydropower and complementary wind and solar power sources need to perform the power generation tasks issued by the power grid, and the operation of hydropower needs to meet the constraints of conventional guaranteed operation; Constraints on water, wind and solar power output process: Where: P t w is the predicted output of complementary wind power in period t, MW; P t s is the predicted output of complementary photovoltaic power generation in period t, MW; D t The power station group and complementary wind and solar power generation plan during period t issued by the power grid, MW; Hydropower water balance constraints: Where: V h,t is the storage capacity of power station h at the end of period t, m 3 ; are the interval flow, power generation flow and abandoned water flow of power station h in period t, respectively. 3 / s; Δt is the step length of the scheduling calculation period; d h-1,h is the water flow delay time from the upstream power station to the power station h; Hydropower operation boundary constraints: Where: (10)-(12) are the power generation flow, output and storage capacity boundary constraints of power station h in period t respectively; are the upper and lower limits of the power generation flow of power station h in period t, m 3 / s; are the upper and lower limits of the storage capacity of power station h in period t, m 3 ; Hydropower storage capacity constraints: Where: V h,0 is the initial storage capacity of power station h at time t, 10,000 m 3 ; V h,t is the storage capacity of power station h at the end of period t, 10,000 m 3 ; V h End are the storage capacity control value at the beginning and end of the dispatch period given by power station h, respectively. 3 ; Hydropower generation function: In short-term dispatching, the daily water level fluctuation of the power station has little effect on the water consumption rate. According to the actual operation of the research object, the fixed water consumption rate method is used to calculate the output; the power generation function of the power station is expressed as follows: Where: w h,t represents the water consumption rate of power station h during period t, m 3 / kW·h; Function of the relationship between hydropower water level and reservoir capacity: With h,t =f h,t (In h,t ) (16) Where: Z h,t represents the water level of power station h at the end of time period t, m; f h,t (V h,t ) represents the water level and storage capacity relationship curve function of power station h; Hydropower ramping constraints: Step 5: Establish the constraints of the short-term flexibility response process of cascade hydropower. Affected by the random flexibility demand of the power system, the operation mode of the hydropower flexibility response process may have random deviations from the planned value. The output, power flow and water level of the power station are all random variables and must meet the operation constraints. Hydropower flexibility response process output and generation flow constraints: Where: are the output and power generation flow of the flexibility response process of power station h at time t, MW, m3 / s; Water balance equation for hydropower flexibility response process: According to the conventional water balance equation (9), the water balance equation of the hydropower flexibility response process is obtained; Where: represents the storage capacity of power station h in the flexibility response process at time t, m 3 ; The water abandonment item of the flexibility response process. The power station flexibility response process should not cause water abandonment, so the limit 0m 3 / s, simplifying formula (20) to: Hydropower flexibility responds to process boundary constraints: Similar to conventional operation boundary constraints, during the flexibility response process of hydropower, the output, power generation flow and storage capacity must meet the operation boundary constraints (22)-(24) respectively; Hydropower flexibility response process guarantees storage capacity constraints: Hydropower operation undertakes the task of energy storage guarantee. While responding to random flexibility demands, it should avoid affecting medium- and long-term plans and guarantee requirements. Therefore, the storage capacity at the end of the period during the flexibility response process is limited to meet the storage capacity requirements for guaranteed operation. Where: They represent the upper and lower guaranteed operation boundaries of the storage capacity of power station h at the end of the dispatch period during the flexibility response process; Step 6: Reconstruct the model based on the duality theory and reconstruct the hydropower flexibility response process constraints (22)-(25) so that all constraints no longer contain random variables and it is easy to solve the model efficiently. Reconstruction of power generation flow and output constraints during flexibility response: Substituting formula (18) into formula (22) yields: Formula (26) is equivalent to any In this case, the maximum output of the flexibility response process is less than the upper limit of the output, and the minimum output of the flexibility response process is greater than the upper limit of the output. Further simplification can be performed to reconstruct the output boundary constraint of the flexibility response process equivalently as (27); Similarly, the power generation flow boundary constraint (23) of the flexibility response process can be equivalently reconstructed as: Reconstruction of storage capacity boundary and guaranteed storage capacity constraints in the flexibility response process: During the flexibility response process, the storage and power generation flows in each period often deviate from the planned values and accumulate continuously, resulting in the storage capacity deviation at the end of the period. To characterize the above process, substitute equation (19) into equation (21) and iterate multiple times to establish With all previous periods The relationship (29) is referred to as the time-delay deviation cumulative water balance equation below; Since the random flexibility demand satisfies constraint (2), the storage capacity of power station h at time t in the flexibility response process has a maximum and a minimum value, which are expressed as and The interval formed by the maximum and minimum values of the storage capacity of the flexibility response process at any time is the variation range of the storage capacity of the flexibility response process; the maximum value of the storage capacity of the flexibility response process at any time Minimum Respectively expressed as: The storage capacity of the flexible response process must satisfy the storage capacity operation boundary constraint (24) and the guaranteed storage capacity constraint (25) respectively. To unify the expression, the constraints (24) and (25) are combined, and the following is made: and They represent the upper and lower boundaries of the storage capacity of the flexibility response process, and must satisfy: Therefore, the upper and lower bound constraints of the storage capacity in the flexibility response process can be expressed as Formula (30) is a linear optimization problem with random variables as decision variables. The duality theory is introduced to solve it. First, according to the flexibility requirement constraint (2), the model (30) is transformed into The feasible domain of is transformed into constraint form: Where: They represent the flexibility demand of power station h in period τ respectively. The dual variable for the flexibility constraint during the τ period; are the flexibility requirements in period τ respectively; The reconstruction idea is: first establish the maximum value of the storage capacity of the flexibility response process The Lagrangian function of formula (30) is constructed, and the dual function and dual problem are constructed based on the Lagrangian function; Expression (30) is a linear convex optimization model. Based on the strong duality theory, the optimal solution of the dual problem is consistent with the optimal solution of the original problem. By solving the dual problem, the optimal solution of the original problem can be obtained, and the equivalent constraint (35) of the upper boundary constraint (30) of the storage capacity of the flexible response process can be obtained. The reconstruction method of the storage capacity lower bound constraint in the flexibility response process is the same as the upper bound constraint reconstruction method, and the reconstruction result is shown in (36); Where: They represent the flexibility requirements of power station h during the period τ. The dual variable for the flexibility constraint during the τ period; Step 7: Flexible quantitative solution strategy. The model inputs decision variables and various parameters and performs iterative solution. The steps are as follows: First, select an initial interval [a, b] to ensure that When the two endpoints of the interval are taken respectively, the model optimization results are respectively solvable and unsolvable, so as to ensure that the constraints are met. The maximum value is within the interval; the second step is to calculate the midpoint of the interval c = (a + b) / 2; when When a and c are selected, the model optimization results are respectively solvable and unsolvable, then the constraints that meet the constraints are The maximum value of is in the interval [a,c], update b = c; when When b and c are taken, the model optimization results are respectively solvable and unsolvable, then the constraints that meet the constraints are The maximum value of is in the interval [c, b], update a = c; repeat the second step until the interval accuracy requirement is met, and the interval that makes the model solvable is obtained. The endpoint of the interval satisfies the constraint condition. The maximum value of α min,max ≥0, and Calculate the flexibility of hydropower in different time periods; Step 8, integrating the linear programming model without random variables constructed in steps 3 to 6, and calling the solver to solve the model through the method provided in step 7, so as to obtain the quantitative results of hydropower short-term flexibility.
Citation Information
Cited By
Cascade hydropower subsection response method adaptive to new energy short-term power prediction deviation
CN122246897A