By setting the communication cycle and reserved period in the battery management system, the communication between the battery management device and the battery unit is optimized, and the communication problem of inefficient caused by the increase in the number of battery units is solved, and efficient data transmission and management are achieved.
Patent Information
- Application Number
- CN202310523771.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
As the number of battery cells managed by the battery management device and the number of parameters required to be collected increases, how to optimize the communication process between the battery management device and the battery cell to improve management efficiency has become an urgent problem.
By setting a predetermined communication cycle, including an uplink period, a downlink period and a reserved period, the duration and maximum allowable number of communication cycles are set according to the needs of the battery management device, data conflicts and delay problems are alleviated, and communication efficiency is improved.
Effectively alleviate data conflicts, improve communication efficiency between the battery management device and the battery unit, ensure timely acquisition and processing of battery parameters, and reduce power consumption and communication data volume.
Smart Images

Figure CN118945622A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of battery technology, and in particular relates to a battery system and electrical equipment. Background Art
[0002] With the widespread development of electric vehicles and energy storage systems, many studies are being conducted on high-performance batteries that can be repeatedly recharged. At the same time, in devices such as electric vehicles that require high capacity and high voltage, multiple battery cells are usually required to be connected in series or in parallel, and each battery cell is managed by a battery management device. However, with the increasing number of battery cells managed by the battery management device and the number of parameters that need to be collected, how to optimize the communication process between the battery management device and the battery cells to improve management efficiency has become an urgent problem to be solved. Summary of the invention
[0003] The present application provides a battery system and electrical equipment, aiming to solve the above-mentioned technical problems existing in the prior art.
[0004] To solve the above technical problems, a technical solution adopted in the present application is: to provide a battery system, which includes a battery management device and multiple battery cells, the battery management device communicates with the multiple battery cells in a predetermined communication cycle, wherein the communication cycle is set according to the parameter upload cycle of the battery cell required by the battery management device, each communication cycle includes at least one downlink time period, an uplink time period corresponding to each battery cell and a first reserved time period, the battery management device sends downlink data to the battery cell through the downlink time period, wherein the maximum allowable number of battery cells communicating with the battery management device in each communication cycle is set according to the duration of the communication cycle, the total duration of the downlink time period in each communication cycle, the total duration of the uplink time period in each communication cycle and the duration of the first reserved time period. Therefore, the communication cycle is set according to the parameter upload period of the battery cells required by the battery management device, and the maximum allowable number of battery cells communicating with the battery management device in each communication cycle is set according to the duration of the communication cycle, the total duration of the downlink period in each communication cycle, the total duration of the uplink period in each communication cycle and the duration of the first reserved period. This can effectively alleviate the data conflict problem of different battery cells and improve the communication efficiency between the battery management device and the battery cells.
[0005] In some embodiments, the duration of the communication cycle is less than or equal to the duration of the parameter upload cycle. Thus, the battery management device can obtain the parameters of the battery unit in a timely manner in each communication cycle according to demand.
[0006] In some embodiments, the duration of the parameter upload cycle is less than or equal to 500 ms. Thus, the battery management device can manage the battery cells according to the parameters of the battery cells in a timely manner, thereby improving the management effect.
[0007] In some embodiments, the duration of the first reserved period is set at least according to the network delay between the battery unit and the battery management device, thereby alleviating the data conflict problem caused by the network delay.
[0008] In some embodiments, the duration of the first reserved period is greater than or equal to the network delay between the battery unit and the battery management device, thereby alleviating the data conflict problem caused by the network delay during the upload process.
[0009] In some embodiments, the network delay between the battery unit and the battery management device is less than or equal to 20 ms. Thus, the time proportion of the first reserved period in the entire communication cycle can be reduced, thereby improving data transmission efficiency.
[0010] In some embodiments, the duration of the first reserved period is set at least according to the processing delay of the battery management device for uplink data, so that the battery management device can process the uplink data of the current communication cycle in time, alleviating the data conflict problem caused by the processing delay of the battery management device.
[0011] In some embodiments, the duration of the first reserved period is greater than or equal to the time required for the battery management device to make a control decision based on the uplink data uploaded in the current communication cycle. Thus, the battery management device can process the uplink data of the current communication cycle in a timely manner, alleviating the data conflict problem caused by the processing delay of the battery management device.
[0012] In some embodiments, the uplink period includes an uplink transmission period and a second reserved period, wherein the uplink transmission period is for the battery unit to upload uplink data to the battery management device. Thus, the uplink transmission periods of each battery unit can be effectively staggered to alleviate data conflict problems.
[0013] In some embodiments, the duration of the second reserved period is set at least according to the network delay from the battery unit to the battery management device, thereby alleviating the data conflict problem caused by the network delay during the upload process.
[0014] In some embodiments, the duration of the second reserved period is greater than or equal to the network delay between the battery unit and the battery management device, thereby alleviating the data conflict problem caused by the network delay during the upload process.
[0015] In some embodiments, the network delay between the battery unit and the battery management device is less than or equal to 20 ms. Thus, the proportion of the second reserved period in the entire communication cycle can be reduced, thereby improving data transmission efficiency.
[0016] In some embodiments, the duration of the second reserved period is set at least according to the sampling synchronization difference of the battery cells, thereby alleviating the data conflict problem caused by the sampling synchronization difference.
[0017] In some embodiments, the duration of the second reserved period is greater than or equal to the sampling synchronization difference of the plurality of battery cells, thereby alleviating the data conflict problem caused by the sampling synchronization difference.
[0018] In some embodiments, the sampling synchronization difference of the multiple battery cells is less than or equal to 20 ms. Thus, the time proportion of the second reserved period in the entire communication cycle can be reduced, thereby improving data transmission efficiency.
[0019] In some embodiments, the maximum allowed number is less than or equal to the result of further dividing the total duration of the uplink period by the difference between the duration of the communication cycle and the total duration of the downlink period and the first reserved period. Thus, each battery unit that communicates with the battery management device in each communication cycle can have enough time to upload data.
[0020] In some embodiments, the uplink data includes voltage parameters, and at least some of the battery cells upload voltage parameters in each communication cycle. Thus, the battery management device can obtain the voltage parameters of at least some of the battery cells in each communication cycle, and thus manage them in a timely manner.
[0021] In some embodiments, the uplink data also includes other operating parameters in addition to the voltage parameters, and at least some of the battery cells selectively upload at least some of the other operating parameters in each communication cycle, so that the upload frequency of at least some of the other operating parameters is less than or equal to the upload frequency of the voltage parameters. In this way, the amount of data transmitted in communication can be reduced, and the power consumption of the battery cells and the battery management device can be reduced.
[0022] In some embodiments, the communication cycle includes a first communication cycle and a second communication cycle, wherein at least some of the battery cells upload a first set of operating parameters in a first upload period of the first communication cycle, and upload a second set of operating parameters in a second upload period of the second communication cycle, wherein the position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and the parameter types of at least some of the operating parameters in the first set of operating parameters and the second set of operating parameters are different. Thus, operating parameters of different parameter types are reused in different communication cycles, which can shorten the communication cycle between the battery management device and the battery cells and improve management efficiency.
[0023] In some embodiments, the position of the first upload period in the first communication cycle is the same as the position of the second upload period in the second communication cycle, or the position of the first upload period in the first communication cycle is greater than or equal to 50% of the position of the second upload period in the second communication cycle. Thus, the communication cycle between the battery management device and the battery unit can be further shortened, and the management efficiency can be improved. The first upload period and the second upload period must be greater than or equal to 50% to achieve the effect of period reuse and improve management efficiency. If the position is less than 50%, the communication cycle between the battery management device and the battery unit cannot be significantly shortened, and its management efficiency is relatively low.
[0024] In some embodiments, the downlink data includes sampling parameter indication data, and the sampling parameter indication data is used to indicate the parameter type that the battery unit needs to upload in the current communication cycle, wherein the parameter types indicated by the sampling parameter indication data sent in at least some communication cycles are different. As a result, the battery unit can upload working parameters of different parameter types in different communication cycles, so that the working parameters can be uploaded on demand, which can reduce the amount of communication data between the battery management device and the battery unit, and reduce the power consumption of the battery unit and the battery management device.
[0025] In order to solve the above technical problems, a technical solution adopted in the present application is: to provide an electrical device, which includes the battery system described in any of the above embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work, among which:
[0027] Figure 1 is a structural diagram of an embodiment of a battery system of the present application;
[0028] Figure 2 is a schematic diagram of a communication cycle of a first embodiment of a battery system of the present application;
[0029] Figure 3 is a schematic diagram of a communication cycle of a second embodiment of a battery system of the present application;
[0030] Figure 4 is a schematic diagram of a communication cycle of a third embodiment of a battery system of the present application;
[0031] Figure 5 It is a structural schematic diagram of an embodiment of the electrical equipment of the present application. DETAILED DESCRIPTION
[0032] The following detailed description and drawings of the embodiments of the present application are used to illustrate the principles of the present application, but cannot be used to limit the scope of the present application, that is, the present application is not limited to the described embodiments.
[0033] In the description of the present application, it should be noted that, unless otherwise specified, "multiple" means more than two; the terms "upper", "lower", "left", "right", "inside", "outside", etc., indicating the orientation or positional relationship, are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. "Vertical" is not strictly vertical, but is within the allowable error range. "Parallel" is not strictly parallel, but is within the allowable error range.
[0034] The directional words appearing in the following description are all directions shown in the figures, and do not limit the specific structure of this application. In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0035] With the widespread development of electric vehicles and energy storage systems, many studies are being conducted on high-performance batteries that can be repeatedly recharged. At the same time, in devices such as electric vehicles that require high capacity and high voltage, multiple battery cells are usually required to be connected in series or in parallel, and each battery cell is managed by a battery management device. However, with the increasing number of battery cells managed by the battery management device and the number of parameters that need to be collected, how to optimize the communication process between the battery management device and the battery cells to improve management efficiency has become an urgent problem to be solved.
[0036] Specifically, in order to improve the management efficiency of the battery management device, the battery management device needs to manage the battery cells at a higher management frequency, so it is necessary to obtain the working parameters of the battery cells in a relatively short communication cycle. However, as the number of battery cells managed by the battery management device and the number of parameters that need to be collected continue to increase, the communication time requirement is gradually increasing, which forms a contradiction between the two. Therefore, it is necessary to achieve a balance between the above two contradictory requirements.
[0037] In order to solve the above problems, this application proposes a battery system. Figure 1 , Figure 1 Schematic diagram of the structure of an embodiment of the battery system of the present application. Figure 1 As shown, the battery system 100 of this embodiment includes a battery management device 10 and a plurality of battery cells 20 .
[0038] In this embodiment, the battery management device 10 communicates with a plurality of battery cells 20 in a predetermined communication cycle, wherein the communication cycle is set according to the parameter upload cycle of the battery cell 20 required by the battery management device 10, and each communication cycle includes at least one downlink period, an uplink period corresponding to each battery cell 20, and a first reserved period, and the battery management device 10 sends downlink data to the battery cell 20 through the downlink period. The maximum allowable number of battery cells 20 that communicate with the battery management device 10 in each communication cycle is set according to the duration of the communication cycle, the total duration of the downlink period in each communication cycle, the total duration of the uplink period in each communication cycle, and the duration of the first reserved period.
[0039] Before introducing the battery system 100 of the present application, please first refer to Figure 2 , Figure 2 This is a schematic diagram of the communication cycle of the first embodiment of the battery system of the present application. Figure 2 , each embodiment described below is exemplified. Figure 2 As shown, in each communication cycle of duration t1, there is a downlink period of duration t2, multiple uplink periods of duration t3, and a first retention period of duration t4. The duration t1 of the communication cycle is set according to the parameter upload period of the battery unit 20 required by the battery management device 10. The battery management device 10 sends downlink data to the battery units 20 wirelessly connected to the battery management device 10 in the downlink period. The downlink data can be used to instruct the battery unit 20 to collect and upload working parameters. In response to the downlink data, the battery unit 20 uploads the uplink data in the corresponding uplink period. The uplink data is the working parameter collected by the battery unit 20 itself. Among them, as Figure 2 As shown, t1 is the duration of the communication cycle, t2 is the total duration of the downlink period in each communication cycle, t3 is the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle, and t4 is the duration of the first reserved period.
[0040] Among them, in the battery system 100 of this embodiment, the battery unit 20 in the battery system 100 can be a battery monomer, or can include a collection of multiple battery monomers, including but not limited to a battery pack. It should be understood that the battery monomers in the embodiments of the present application include but are not limited to lithium-ion batteries, lithium metal batteries, lead-acid batteries, nickel-cadmium batteries, silver-hydrogen batteries, lithium-sulfur batteries, lithium-air batteries or sodium-ion batteries. The parameter upload cycle includes but is not limited to a voltage upload cycle, a current upload cycle and a temperature upload cycle. In this embodiment, the voltage parameter is an important parameter of the battery system 100. Therefore, when setting the communication cycle of the battery system 100, most of them are set according to the voltage upload cycle of the battery unit 20 required by the battery management device 10.
[0041] The battery management device 10 may be a battery management system (BMS), a central control platform of an electric vehicle or an energy storage device, which is not limited here. Figure 1 The shape and arrangement of the battery cells 20 shown in the figure are only for illustration and are not limited to this. Further, the communication method used includes but is not limited to optical communication, Bluetooth communication, radio frequency communication, etc.
[0042] In this embodiment, the parameter upload cycle of the battery unit 20 required by the battery management device 10 can be determined according to the management requirements of the battery management device 10, that is, the interval time at which the battery management device 10 requires the battery unit 20 to upload parameters can be determined. The communication cycle of the battery system 100 can be set according to the parameter upload cycle. Figure 2 , the maximum allowed number of battery cells 20 communicating with the battery management device 10 in each communication cycle is set according to the duration t1 of the communication cycle, the total duration t2 of the downlink period in each communication cycle, the total duration t3 of the uplink period in each communication cycle, and the duration t4 of the first reserved period. Among them, the total duration t2 of the downlink period can be set according to the number of bytes of downlink data that needs to be sent to the battery cell 20 in each communication cycle and the downlink transmission rate. The total duration t3 of the uplink period in each communication cycle can be set according to the number of bytes of uplink data that a single battery cell needs to upload to the battery management device 10 in each communication cycle and the uplink transmission rate. The purpose of setting the first reserved period with a duration of t4 is to solve the data conflict problem caused by various delays, and is described in detail below.
[0043] Through the above-mentioned method, the data conflict problem of different battery cells 20 can be effectively alleviated, and the communication efficiency between the battery management device 10 and the battery cells 20 can be improved.
[0044] Optionally, the above setting method can be used in the wireless architecture design of the battery management device 10 and the battery cells 20, for example, the actual number of battery cells 20 communicating with the battery management device 10 in each communication cycle is set to be less than the maximum allowable number.
[0045] Optionally, the above setting method can also be used as a basis for dynamic adjustment after the wireless architecture design is completed. In a specific application scenario, the battery management device 10 can adjust the parameter upload cycle according to the specific working conditions. For example, for electric vehicles or energy storage devices, the parameter upload cycle can be increased when the output power is relatively low, and the parameter upload cycle can be reduced when the output power is relatively high. For another example, the parameter upload cycle can be increased when the charging input power is relatively low, and the parameter upload cycle can be reduced when the charging input power is relatively high. As a result, the duration t1 of the above communication cycle will also change with the change of the parameter upload cycle. At this time, the battery management device 10 and the battery unit 20 can adjust the total duration t2 of the downlink period, the total duration t3 of the uplink period corresponding to each battery unit 20, or the maximum allowable number according to the change of the duration t1 of the communication cycle. For example, the above duration is changed by changing the communication rate to ensure that the maximum allowable number remains unchanged. Alternatively, when the communication rate remains unchanged, the maximum allowable number is changed to adjust the actual number of battery units 20 that communicate with the battery management device 10 in each communication cycle.
[0046] In another application scenario, when the number of battery cells 20 is greater than the maximum allowable number, the actual number of battery cells 20 that communicate with the battery management device 10 in each communication cycle may be set to be less than or equal to the maximum allowable number according to the maximum allowable number, and a communication connection may be selectively established between the battery management device 10 and different combinations of battery cells 20 in different communication cycles in a predetermined polling manner. Specifically, the battery management device 10 may send the battery identification or battery identification range of the battery cell 20 to be wirelessly connected in a broadcasting form, and the battery cell 20 may establish a wireless connection with the battery management device 10 when its own battery identification is the same as the battery identification in the broadcast or is within the battery identification range in the broadcast.
[0047] Optionally, the duration t1 of the communication cycle may be less than or equal to the duration of the parameter upload cycle. Thus, the battery management device 10 can obtain the parameters of the battery cell 20 in a timely manner in each communication cycle according to demand.
[0048] Optionally, the duration of the parameter upload cycle is less than or equal to 500ms. In other embodiments, the duration of the parameter upload cycle may be further less than or equal to 200ms or 100ms. Thus, the battery management device 10 can manage the battery cell 20 in a timely manner according to the parameters of the battery cell 20, thereby improving the management effect.
[0049] Optionally, the duration t4 of the first reserved period is set at least according to the duration t5 of the network delay between the battery unit 20 and the battery management device 10. Thus, the data conflict problem caused by network delay can be alleviated. Specifically, the duration t5 of the network delay refers to the time required for data to be transmitted from one end of the network to the other end. Since there is a common network delay between the battery unit 20 and the battery management device 10, the uplink data of the previous communication cycle has not yet reached the battery management device 10 due to the network delay, and the battery management device 10 has already issued the downlink data of the next communication cycle, so data conflict will occur. The above problem can be effectively solved by setting the first reserved period with a duration of t4. Further, the first reserved period can be one, and can be optionally set after all uplink periods. At this time, the first reserved period can also be multiple, and can be set at any position outside the uplink period and the downlink period as needed. Generally speaking, under normal conditions, the first reserved period with a duration of t4 only provides transmission redundancy for the uplink data and downlink data that should have been transmitted in the uplink period and the downlink period, and does not transmit other additional data. That is, the first reserved period transmits uplink data and downlink data only when the uplink data or / and the downlink data are delayed.
[0050] Alternatively, if Figure 2 As shown, the duration t4 of the first reserved period is greater than or equal to the duration t5 of the network delay between the battery unit 20 and the battery management device 10. As a result, the data conflict problem caused by the duration t5 of the network delay during the upload process can be more effectively alleviated. At this time, the duration t4 of the first reserved period can be greater than or equal to the duration t5 of the average network delay by calculating the average network delay within a certain time range (for example, 1 hour) as a benchmark.
[0051] Optionally, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 20ms. Furthermore, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 10ms. Thus, the proportion of the first reserved period of duration t4 in the entire communication cycle can be reduced, thereby improving data transmission efficiency. Specifically, the greater the network delay, the longer the duration t4 of the first reserved period will be set, resulting in a shorter duration t3 used for the uplink period and a shorter duration t2 used for the downlink period in the communication cycle. Therefore, reasonably reducing the duration t5 of the network delay can increase the duration t3 of the uplink period and the duration t2 of the downlink period, thereby improving data transmission efficiency.
[0052] Optionally, the duration t4 of the first reserved period is set at least according to the processing delay of the uplink data by the battery management device 10. Thus, the battery management device 10 can process the uplink data of the current communication cycle in a timely manner, thereby alleviating the data conflict problem caused by the processing delay of the battery management device 10. Specifically, Figure 2 As shown, the processing delay refers to the time t6 required for the battery management device 10 to process the uplink data uploaded by the battery unit 20 and make a control decision. In the first reserved period of time t4, the battery management device 10 needs to process the collected uplink data. If the battery management device 10 has not processed the uplink data of the current communication cycle, and the uplink data of the next communication cycle has been uploaded, data conflict will occur. The above problem can be effectively solved by setting the first reserved period of time t4.
[0053] Alternatively, if Figure 2 As shown, the duration t4 of the first reserved period is greater than or equal to the time t6 required for the battery management device 10 to make a control decision based on the uplink data uploaded in the current communication cycle. As a result, the battery management device can process the uplink data of the current communication cycle in a timely manner, alleviating the data conflict problem caused by the processing delay of the battery management device. Specific control decisions include but are not limited to equalization decisions, overvoltage reminders, undervoltage reminders, and temperature control decisions.
[0054] Alternatively, if Figure 2As shown, the upload period of duration t3 includes an uplink transmission period of duration t32 and a second reserved period of duration t31, wherein the uplink transmission period of duration t32 is for the battery unit 20 to upload uplink data to the battery management device 10. In this way, the uplink transmission periods of each battery unit 20 can be effectively staggered to alleviate the data conflict problem. The second reserved period of duration t31 can be set before and / or after the uplink transmission period of the same upload period. Generally speaking, under normal conditions, the second reserved period of duration t31 also only provides transmission redundancy for the uplink data and downlink data that should have been transmitted in the uplink period and the downlink period, and does not transmit other additional data.
[0055] Optionally, the duration t31 of the second reserved period is set at least according to the duration t5 of the network delay from the battery unit 20 to the battery management device 10. In this way, the data conflict problem caused by the network delay during the upload process can be alleviated. Specifically, due to the common network delay between the battery unit 20 and the battery management device 10, in the same communication cycle, when the uplink data uploaded by a certain battery unit 20 has not yet been received by the battery management device 10, another battery unit 20 has started to upload uplink data, so data conflicts may occur. The above problem can be effectively solved by setting the second reserved period with a duration of t31.
[0056] Alternatively, if Figure 2 As shown, the duration t31 of the second reserved period is greater than or equal to the duration t5 of the network delay between the battery unit 20 and the battery management device 10. Thus, the data conflict problem caused by the network delay during the upload process can be alleviated.
[0057] Optionally, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 20ms. Furthermore, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is preferably less than or equal to 10ms. Thus, the proportion of the second reserved period of duration t31 in the entire communication cycle can be reduced, thereby improving data transmission efficiency. Similar to the above description, the larger the duration t5 of the network delay, the longer the duration t31 of the second reserved period will be set, resulting in a shorter duration t3 for the uplink period and a shorter duration t2 for the downlink period in the communication cycle. Therefore, reasonably reducing the duration t5 of the network delay can increase the duration t3 of the uplink period and the duration t2 of the downlink period, thereby improving data transmission efficiency.
[0058] Optionally, the duration t31 of the second reserved period is set at least according to the sampling synchronization difference of the battery unit 20. In this way, the data conflict problem caused by the sampling synchronization difference can be alleviated. Specifically, the sampling synchronization difference refers to the time difference between different battery units 20 to complete the sampling of corresponding working parameters, such as Figure 2As shown in t7 in . Among them, in this embodiment, there are two factors that cause the sampling synchronization difference between the battery cells 20, one is the time difference for the battery cell 20 to complete the sampling of the corresponding working parameters itself, and the other is the network delay difference before the battery management device 10 communicates with each different battery cell. Since uploading uplink data needs to wait for the sampling action of the corresponding working parameters to be completed before it can be executed, the sampling synchronization difference will cause a difference in the time of uploading uplink data. Therefore, the battery cell 20 that should have uploaded the uplink data first will be delayed in completing the sampling action, and its uplink data uploading time will overlap with the uplink data uploading time of other battery cells 20, thereby causing data conflict. The above problem can be effectively solved by setting a second reserved period with a duration of t31.
[0059] Optionally, the duration t31 of the second reserved period is greater than or equal to the duration t7 of the sampling synchronization difference of the multiple battery cells 20. Thus, the data conflict problem caused by the sampling synchronization difference of the multiple battery cells 20 can be alleviated.
[0060] Optionally, the duration t7 of the sampling synchronization difference of the battery unit 20 is less than or equal to 20ms. Thus, the time proportion of the second reserved period with a duration of t31 in the entire communication cycle can be reduced, thereby improving data transmission efficiency. The specific reasons are similar to the network delay described above and will not be repeated here.
[0061] Optionally, the maximum allowed number is less than or equal to the result of further dividing the difference between the duration t1 of the communication cycle and the total duration t4 of the downlink period by the total duration t3 of the uplink period. Thus, each battery unit 20 communicating with the battery management device 10 in each communication cycle has enough time to upload data. Figure 2 Describes how to set the maximum allowed number.
[0062] like Figure 2 As shown, the maximum allowable number M of battery cells 20 communicating with the battery management device 10 in each communication cycle satisfies the following formula:
[0063] M≤(t1-t2-t4) / t3 (1)
[0064] Among them, Figure 2 As shown, t1 is the duration of the communication cycle, t2 is the total duration of the downlink period in each communication cycle, t3 is the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle, and t4 is the duration of the first reserved period.
[0065] Further, as described in the above embodiment, the duration of the network delay between the battery unit 20 and the battery management device 10 is represented by t5, and the duration t4 of the first reserved period is set according to the duration t5 of the network delay between the battery management device 10, and Figure 2 The time required for the battery management device 10 to make a control decision based on the uplink data uploaded in the current communication cycle is represented by t6, and the length t4 of the first reserved period is set according to the time t6 required for the decision, and Figure 2 is set to be greater than the time t6 required for decision making.
[0066] Furthermore, each uplink period t3 includes a second reserved period of duration t31 and an uplink transmission period of duration t32. At this time, the duration t31 of the second reserved period is set according to the duration t5 of the network delay between the battery management devices 10, and Figure 2 It is set to be greater than the network delay duration t5.
[0067] In addition, the sampling synchronization difference of the battery cell 20 is represented by t7. The duration t31 of the second reserved period is set according to the sampling synchronization difference t7 and Figure 2 is set to be greater than the sampling synchronization difference t7.
[0068] Optionally, based on the above embodiments, the uplink data uploaded by the battery unit 20 to the battery management device 10 includes voltage parameters, and at least some of the battery units 20 upload voltage parameters in each communication cycle. Specifically, as described above, since the voltage parameters are important parameters for the battery management device 10 to manage and need to be obtained in a timely manner, the battery management device 10 can obtain the voltage parameters of at least some of the battery units 20 in each communication cycle through the above method, and then manage them in a timely manner.
[0069] Optionally, the uplink data uploaded by the battery cell 20 to the battery management device 10 also includes other operating parameters in addition to the voltage parameters, and at least some of the battery cells 20 selectively upload at least some of the other operating parameters in each communication cycle, so that the upload frequency of at least some of the other operating parameters is less than or equal to the upload frequency of the voltage parameters. Other operating parameters in addition to the voltage parameters include, but are not limited to, current parameters, temperature parameters, or air pressure parameters. Since the importance and demand frequency of other operating parameters are relatively small compared to the voltage parameters, the above method can reduce the amount of data transmitted during communication and reduce the power consumption of the battery cells 20 and the battery management device 10.
[0070] Please refer to Figure 3 , Figure 3 Schematic diagram of the communication cycle of the second embodiment of the battery system of the present application. Figure 3As shown, in each communication cycle of duration t1, there is a first downlink period of duration t21, a plurality of first uplink periods of duration t31, a plurality of second downlink periods of duration t22, a plurality of second uplink periods of duration t32, and a first retention period of duration t4. The duration t1 of the communication cycle is set according to the parameter upload cycle of the battery unit 20 required by the battery management device 10.
[0071] like Figure 3 As shown, the battery management device 10 sends first downlink data to the battery cells 20 wirelessly connected to the battery management device 10 in the first downlink time period of duration t21. The first downlink data can be used to instruct the battery cell 20 to collect and upload working parameters. In response to the first downlink data, the battery cells 20 upload the first uplink data in their respective corresponding first uplink time periods of duration t31, and the first uplink data is the working parameters collected by the battery cell 20 itself. The battery management device 10 further sends second downlink data for each battery cell 20 wirelessly connected to the battery management device 10 in each second downlink time period of duration t22. Each battery cell 20 responds to the second downlink data for itself and feeds back the second uplink data in the corresponding second uplink time period of duration t32. The second downlink data can be used to control the corresponding battery cell 20 to perform corresponding work, including but not limited to balancing actions.
[0072] like Figure 3 As shown, the total duration of the downlink period in each communication cycle is t2=t21+M × t22, the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle is t3=t31+t32, which can be obtained by substituting into the above formula:
[0073] M≤(t1-t21-M×t22-t4) / (t31+t32) (2)
[0074] By solving Formula 2, the maximum allowable number M of battery cells 20 that communicate with the battery management device 10 in each communication cycle can also be obtained.
[0075] See also Figure 4 , Figure 4 Schematic diagram of the communication cycle of the third embodiment of the battery system of the present application. Figure 4 As shown, in this embodiment, the communication cycle of the battery system 100 includes a first communication cycle T1 and a second communication cycle T2.
[0076] The first communication cycle T1 and the second communication cycle T2 each include a downlink period of duration t2 and multiple uplink periods of duration t3. The battery management device 10 sends downlink data to the battery unit 20 wirelessly connected to the battery management device 10 in the downlink period of the first communication cycle T1 and the second communication cycle T2. The battery unit 20 uploads the collected operating parameters in the uplink period corresponding to the first communication cycle T1 in response to the downlink data of the first communication cycle T1. The battery unit 20 uploads the collected operating parameters in the uplink period corresponding to the second communication cycle T2 in response to the downlink data of the second communication cycle T2.
[0077] Optionally, the communication cycle may include a first communication cycle T1 and a second communication cycle T2. At least part of the battery cells 20 upload a first set of operating parameters in a first upload period of the first communication cycle T1 with a duration of t3, and upload a second set of operating parameters in a second upload period of the second communication cycle T2 with a duration of t3, wherein the position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and the parameter types of at least part of the operating parameters in the first set of operating parameters and the second set of operating parameters are different. Generally speaking, in each communication cycle, an uplink period needs to be set for operating parameters of different parameter types for data upload. Therefore, as the number of operating parameters increases, the duration t3 of the uplink period becomes longer, and then the overall duration of the communication cycle becomes longer. In the above manner, the position of the first upload period in the first communication cycle is set to be at least partially the same as the position of the second upload period in the second communication cycle, so that the operating parameters of different parameter types can be reused in different communication cycles, which can shorten the communication cycle between the battery management device 10 and the battery cells 20 and improve management efficiency.
[0078] In this embodiment, the position of the first upload period in the first communication cycle T1 is at least partially the same as the position of the second upload period in the second communication cycle T2, which means that after aligning the starting point of the first communication cycle with the starting point of the second communication cycle on the time axis, the first upload period and the second upload period at least partially overlap.
[0079] See also Figure 2 and Figure 4 ,like Figure 4 As shown in FIG. 1 , the sampling parameter indication data sent in different communication cycles are different, so the parameters transmitted in the uplink period are also different in different communication cycles. Figure 2As shown, a second reserved period is set in each uplink period, and the duration t31 of the second reserved period is set according to factors such as sampling synchronization differences of the battery unit 20 and network delays from the battery unit 20 to the battery management device 10. The sampling synchronization differences of different parameters in different cycles may be different, so the duration t31 of the second reserved period set in different cycles is also different, which leads to the position of the first upload period in the first communication cycle and the position of the second upload period in the second communication cycle are not exactly the same.
[0080] Further, in other embodiments, the position of the first upload period in the first communication cycle T1 may be the same as the position of the second upload period in the second communication cycle T2. That is, after aligning the starting point of the first communication cycle T1 with the starting point of the second communication cycle T2 on the time axis, the first upload period and the second upload period completely overlap. Or the position of the first upload period in the first communication cycle and the position of the second upload period in the second communication cycle are greater than or equal to 50%, that is, after aligning the starting point of the first communication cycle with the starting point of the second communication cycle on the time axis, the position of the first upload period and the second upload period are greater than or equal to 50%. In addition, the position similarity of the first upload period and the second upload period refers to the ratio of the overlapping part of the first upload period and the second upload period to the first upload period or the second upload period. Therefore, by setting the position of the first upload time period in the first communication cycle T1 to be the same as the position of the second upload time period in the second communication cycle T2, or the position of the first upload time period in the first communication cycle T1 to be the same as the position of the second upload time period in the second communication cycle T2 to be greater than or equal to 50%, the communication cycle between the battery management device 10 and the battery cell 20 can be further shortened, and the management efficiency can be improved. The similarity between the positions of the first upload time period and the second upload time period must be greater than or equal to 50% to make the time period reuse effective and improve the management efficiency. If the similarity between the positions is less than 50%, the communication cycle between the battery management device 10 and the battery cell 20 cannot be significantly shortened, and its management efficiency is relatively low.
[0081] When the position similarity between the first upload period and the second upload period is greater than or equal to 60%, the effect of communication cycle period multiplexing is improved, and the management efficiency of the battery management device 10 is further improved; when the position similarity between the first upload period and the second upload period is greater than or equal to 80%, the effect of communication cycle period multiplexing is significantly improved, and the management efficiency of the battery management device 10 is also significantly improved; when the positions of the first upload period and the second upload period completely overlap, the effect of communication cycle period multiplexing reaches the maximum value, thereby maximizing the management efficiency of the battery management device 10.
[0082] Optionally, at least some of the operating parameters of different parameter types in the first group of operating parameters and the second group of operating parameters are used to characterize different operating indicators of the battery cell 20. For example, the first group of operating parameters may include any combination of voltage parameters, current parameters, temperature parameters and pressure parameters of the battery cell 20. The second group of operating parameters may include any combination of voltage parameters, current parameters, temperature parameters and pressure parameters of the battery cell 20 and may be at least partially different from the first group of operating parameters. In a specific application scenario, the demand frequency of the battery management device 10 for different operating parameters of the battery cell 20 may be inconsistent. For example, the voltage parameter has a larger weight for monitoring the battery status, and the voltage parameter needs to be obtained in each communication cycle; the temperature parameter and the pressure parameter have a smaller weight for monitoring the battery status, and can be obtained every few communication cycles. Therefore, the first group of operating parameters may include voltage parameters and temperature parameters, and the second group of operating parameters may include voltage parameters and pressure parameters.
[0083] Optionally, the downlink data includes sampling parameter indication data, and the sampling parameter indication data is used to indicate the parameter type that the battery cell 20 needs to upload in the current communication cycle, wherein the parameter types indicated by the sampling parameter indication data sent in at least some communication cycles are different. For example, in the first communication cycle T1, the sampling parameter indication data can indicate that the working parameters uploaded by the battery cell 20 to the battery management device 10 include voltage parameters and temperature parameters, and in the second communication cycle T2, the sampling parameter indication data can indicate that the working parameters uploaded by the battery cell 20 to the battery management device 10 include voltage parameters and pressure parameters. As a result, the battery cell 20 can upload working parameters of different parameter types in different communication cycles, so that the working parameters can be uploaded on demand, which can reduce the amount of communication data between the battery management device 10 and the battery cell 20, and reduce the power consumption of the battery cell 20 and the battery management device 10. Specifically, unique upload indicators can be assigned to different working parameters. The above-mentioned sampling parameter indication data is formed by combining different upload indicators in different communication cycles.
[0084] like Figure 4 As shown, the sampling parameter indication data 1 of the first communication cycle T1 is used to indicate the parameter type that the battery cell 20 needs to upload within the first communication cycle T1, and the sampling parameter indication data 2 of the second communication cycle T2 is used to indicate the parameter type that the battery cell 20 needs to upload within the second communication cycle T2, thereby enabling the same battery cell to upload working parameters of different parameter types in the first communication cycle T1 and the second communication cycle T2. The specific selection method is as described above and will not be repeated here.
[0085] In addition, as described above, at least some of the battery cells 20 upload the first set of operating parameters and the second set of operating parameters in the uplink period of the first communication cycle T1 and the uplink period of the second communication cycle T2, respectively, and the parameter types of at least some of the operating parameters in the first set of operating parameters and the second set of operating parameters are different. At this time, since the position of the uplink period of the first communication cycle T1 in the first communication cycle T1 is at least partially the same as the position of the uplink period of the second communication cycle T2 in the second communication cycle T2, time period multiplexing of operating parameters of different parameter types in different communication cycles is achieved.
[0086] It is worth noting that the time period multiplexing of the above-mentioned sampling parameter indication data and working parameters can be used in combination or separately.
[0087] Optionally, the present application further proposes an electrical device, see Figure 5 , Figure 5 Schematic diagram of the structure of an embodiment of the electrical equipment of the present application. Figure 5 As shown, the electric device 200 includes the battery system 100 described in the above embodiment. It should be understood that the electric device can be a power device of a car, a ship, etc., or an electric car or other electric devices.
[0088] The above description is only an embodiment of the present application and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A battery system, characterized in that: The battery system includes a battery management device and a plurality of battery cells. The battery management device communicates with the plurality of battery cells in a predetermined communication cycle, wherein the communication cycle is set according to a parameter upload cycle of the battery cells required by the battery management device, each of the communication cycles includes at least one downlink period, an uplink period corresponding to each of the battery cells, and a first reserved period, and the battery management device sends downlink data to the battery cells via the downlink period, wherein the maximum allowable number of battery cells communicating with the battery management device in each of the communication cycles is set according to the duration of the communication cycle, the total duration of the downlink periods in each of the communication cycles, the total duration of the uplink periods in each of the communication cycles, and the duration of the first reserved period.
2. The battery system according to claim 1, characterized in that: The duration of the communication cycle is less than or equal to the duration of the parameter upload cycle.
3. The battery system according to claim 2, characterized in that: The duration of the parameter upload cycle is less than or equal to 500ms.
4. The battery system according to any one of claims 1 to 3, characterized in that: The duration of the first reserved period is set at least according to a network delay between the battery unit and the battery management device.
5. The battery system according to claim 4, characterized in that: The duration of the first reserved period is greater than or equal to a network delay between the battery unit and the battery management device.
6. The battery system according to claim 4 or 5, characterized in that: The network delay between the battery unit and the battery management device is less than or equal to 20ms.
7. The battery system according to any one of claims 1 to 6, characterized in that: The duration of the first reserved period is set at least according to a processing delay of the uplink data by the battery management device.
8. The battery system according to claim 7, characterized in that: The duration of the first reserved period is greater than or equal to the time required for the battery management device to make a control decision based on the uplink data uploaded in the current communication cycle.
9. The battery system according to any one of claims 1 to 8, characterized in that: The uplink period includes an uplink transmission period and a second reserved period, wherein the uplink transmission period is for the battery unit to upload uplink data to the battery management device.
10. The battery system according to claim 9, characterized in that: The duration of the second reserved period is set at least according to a network delay from the battery unit to the battery management device.
11. The battery system according to claim 10, characterized in that: The duration of the second reserved period is greater than or equal to a network delay between the battery unit and the battery management device.
12. The battery system according to claim 10 or 11, characterized in that: The network delay between the battery unit and the battery management device is less than or equal to 20ms.
13. The battery system according to any one of claims 10 to 12, characterized in that: The duration of the second reserved period is set at least according to the sampling synchronization difference of the battery unit.
14. The battery system according to claim 13, characterized in that: The duration of the second reserved period is greater than or equal to a sampling synchronization difference of the plurality of battery cells.
15. The battery system according to claim 14, characterized in that: The sampling synchronization difference of the multiple battery cells is less than or equal to 20 ms.
16. The battery system according to claim 1, characterized in that: The maximum allowed number is less than or equal to a result obtained by further dividing the difference between the duration of the communication cycle and the total duration of the downlink period and the first reserved period by the total duration of the uplink period.
17. The battery system according to any one of claims 1 to 16, characterized in that: The uplink data includes voltage parameters, and at least part of the battery units upload the voltage parameters in each communication cycle.
18. The battery system according to claim 17, characterized in that: The uplink data also includes other operating parameters besides the voltage parameters, and at least part of the battery units selectively upload at least part of the other operating parameters in each communication cycle, so that the upload frequency of at least part of the other operating parameters is less than or equal to the upload frequency of the voltage parameters.
19. The battery system according to any one of claims 1 to 18, characterized in that: The communication cycle includes a first communication cycle and a second communication cycle, wherein at least part of the battery cells upload a first set of operating parameters in a first upload period of the first communication cycle, and upload a second set of operating parameters in a second upload period of the second communication cycle, wherein the position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and the parameter types of at least part of the operating parameters in the first set of operating parameters and the second set of operating parameters are different.
20. The battery system according to claim 19, wherein a position of the first upload period in the first communication cycle is the same as a position of the second upload period in the second communication cycle, or a degree of similarity between a position of the first upload period in the first communication cycle and a position of the second upload period in the second communication cycle is greater than or equal to 50%.
21. The battery system according to any one of claims 1 to 19, characterized in that: The downlink data includes sampling parameter indication data, and the sampling parameter indication data is used to indicate the parameter type that the battery unit needs to upload in the current communication cycle, wherein the parameter types indicated by the sampling parameter indication data sent down in at least some of the communication cycles are different.