Method and apparatus for reducing power consumption of terminal in wireless communication system

By introducing the application delay time interval mechanism in the 5G wireless communication system, adjusting the scheduling time interval of the data channel and the control channel, the problem of high power consumption of terminal devices is solved, and lower power consumption and longer battery life is achieved.

CN118945624APending Publication Date: 2024-11-12SAMSUNG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411068843.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2019-07-19
Filing Date
2020-07-17
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In 5G wireless communication systems, the power consumption of the terminal device is high, especially when monitoring the downlink control channel in a state of no traffic, resulting in low efficiency and affecting the battery life and cost of the device.

Method used

By introducing an application delay time interval (Tdelay) mechanism into the terminal device, the scheduling time interval of the data channel and the control channel is adjusted according to the minimum offset information sent by the base station, unnecessary channel monitoring and cache are reduced, and power consumption is reduced.

Benefits of technology

It effectively reduces the power consumption of terminal devices, extends battery life, and reduces power consumption in a flow-free state, improving system efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118945624A_ABST
    Figure CN118945624A_ABST
Patent Text Reader

Abstract

The present disclosure provides a method performed by a user equipment (UE) in a communication system, the method comprising: identifying a time domain resource allocation (TDRA) table for a physical downlink shared channel (PDSCH); receiving downlink control information (DCI) indicating a minimum offset value from the base station in a time slot n; determining a K0min value on the basis of the DCI, the K0min value being a minimum applicable value of a PDSCH scheduling offset K0 in a TDRA table for the PDSCH; and applying the K0min value in a time slot n + X, where X is an application delay.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of an invention patent application with an application date of July 17, 2020, application number: 202080023592.2, and invention name: “Method and device for reducing terminal power consumption in a wireless communication system”. Technical Field

[0002] The present disclosure relates to a method and apparatus for receiving terminal power consumption in a wireless communication system. Background Art

[0003] In order to meet the demand for wireless data traffic that has increased since the deployment of 4G communication systems, efforts have been made to develop improved 5G or quasi-5G communication systems. Therefore, 5G or quasi-5G communication systems are also referred to as "super 4G networks" or "post-LTE systems". 5G communication systems are considered to be implemented in higher frequency (millimeter wave) bands (such as 60GHz bands) in order to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple input multiple output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technology are discussed in 5G communication systems. In addition, in 5G communication systems, system network improvements are being developed based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communications, wireless backhaul, mobile networks, collaborative communications, coordinated multi-point (CoMP), receiving-end interference elimination, etc. In 5G systems, hybrid FSK and QAM modulation (FQAM) and sliding window superposition coding (SWSC) have also been developed as advanced coding modulation (ACM), as well as filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA) as advanced access technologies.

[0004] The Internet, which is a human-centered connected network in which humans generate and consume information, is now evolving into the Internet of Things (IoT), in which distributed entities (such as things) exchange and process information without human intervention. The Internet of Everything (IoE), which is a combination of IoT technology and big data processing technology through connection with cloud servers, has emerged. Because IoT implementation requires technical elements such as "sensing technology", "wired / wireless communication and network infrastructure", "service interface technology" and "security technology", sensor networks, machine-to-machine (M2M) communication, machine type communication (MTC), etc. have been studied recently. Such an IoT environment can provide smart Internet technology services that create new value for human life by collecting and analyzing data generated between connected things. IoT can be applied to multiple fields such as smart homes, smart buildings, smart cities, smart cars or connected cars, smart grids, health care, smart appliances, and advanced medical services through the integration and combination of existing information technology (IT) with various industrial applications.

[0005] In line with this, various attempts have been made to apply 5G communication systems to IoT networks. For example, technologies such as sensor networks, machine type communications (MTC), and machine-to-machine (M2M) communications can be implemented through beamforming, MIMO, and array antennas. Cloud radio access networks (RANs) as an application of the above-mentioned big data processing technologies can also be considered as an example of the fusion of 5G technology and IoT technology.

[0006] With the advancement of wireless communication systems as described above, various services can be provided, and thus, a scheme for efficiently providing these services is required. Summary of the invention

[0007] Technical issues

[0008] Embodiments of the present disclosure provide an apparatus and method for efficiently providing services in a mobile communication system.

[0009] Solution to the problem

[0010] In order to solve the above problems, a method for a terminal in a wireless communication system according to an embodiment of the present disclosure may include: receiving control information indicating a minimum offset related to a time interval between a control channel and a data channel scheduled by the control channel from a base station; identifying an application delay time interval related to a subcarrier spacing of the control channel and a received symbol position of the control information; and sending a control channel and a data channel to the base station or receiving a control channel and a data channel from the base station according to the minimum offset after the application delay time interval starting from a time slot where the control information is received.

[0011] According to an embodiment, the application delay time interval is related to the sum of first information determined according to the subcarrier spacing of the control channel and second information determined according to the reception symbol position of the control information.

[0012] According to an embodiment, when the control information is received within the first three symbols in the time slot, the second information is 0, and when the control information is received outside the first three symbols in the time slot, the second information is 1.

[0013] According to an embodiment, the control information may correspond to downlink control information (DCI) format 0_1 ​​or DCI format 1_1.

[0014] In addition, according to an embodiment of the present disclosure, a method of a base station in a wireless communication system may include: sending control information indicating a minimum offset related to a time interval between a control channel and a data channel scheduled by the control channel to a terminal; and sending a control channel and a data channel to the terminal or receiving a control channel and a data channel from the terminal based on the minimum offset, wherein the minimum offset is applied after an application delay time interval starting from a time slot in which the control information is received from the terminal, and the application delay time interval is related to the subcarrier spacing of the control channel and the received symbol position of the control information of the terminal.

[0015] In addition, according to an embodiment of the present disclosure, a terminal in a wireless communication system may include: a transceiver; and a controller, which is configured to: receive control information indicating a minimum offset related to a time interval between a control channel and a data channel scheduled by the control channel from a base station; identify an application delay time interval related to a subcarrier spacing of the control channel and a received symbol position of the control information; and send a control channel and a data channel to the base station or receive a control channel and a data channel from the base station according to the minimum offset after the application delay time interval starting from a time slot in which the control information is received.

[0016] In addition, according to an embodiment, a base station in a wireless communication system may include: a transceiver; and a controller, which is configured to: send control information indicating a minimum offset related to a time interval between a control channel and a data channel scheduled by the control channel to a terminal; and send a control channel and a data channel to the terminal or receive a control channel and a data channel from the terminal based on the minimum offset, wherein the minimum offset is applied after an application delay time interval starting from a time slot in which the control information is received from the terminal, and the application delay time interval is related to the subcarrier spacing of the control channel and the received symbol position of the control information of the terminal.

[0017] In addition, according to a method performed by a user equipment UE in a communication system of an embodiment, the method includes: identifying a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; receiving downlink control information DCI indicating a minimum offset value from a base station in a time slot n; determining K based on the DCI 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH; and the K is applied in time slot n+X 0min Value, where X is the application delay.

[0018] In addition, according to a method performed by a base station in a communication system according to an embodiment, the method includes: identifying a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; determining K 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH, and downlink control information DCI indicating the minimum offset value is sent to the user equipment UE in time slot n; the K is applied in time slot n+X 0min Value, where X is the application delay.

[0019] In addition, according to a user equipment UE in a communication system of an embodiment, the UE includes: a transceiver; and at least one processor, configured to: identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; receive downlink control information DCI indicating a minimum offset value from a base station in a time slot n; determine K based on the DCI 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH; and the K is applied in time slot n+X 0min Value, where X is the application delay.

[0020] In addition, according to a base station in a communication system of an embodiment, the base station includes: a transceiver; and at least one processor configured to: identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; determine K 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH, and downlink control information DCI indicating the minimum offset value is sent to the user equipment UE in time slot n; the K is applied in time slot n+X 0min Value, where X is the application delay.

[0021] Advantageous Effects of the Invention

[0022] Embodiments of the present disclosure provide an apparatus and method for efficiently providing services in a mobile communication system. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 The basic structure of the time-frequency domain in the next generation mobile communication system according to the embodiment of the present disclosure is shown.

[0024] Figure 2 The structures of frames, subframes, and time slots in a next generation mobile communication system according to an embodiment of the present disclosure are shown.

[0025] Figure 3 An example of the configuration of a bandwidth section in a next-generation mobile communication system according to an embodiment of the present disclosure is shown.

[0026] Figure 4 An example of a control resource set (CORESET) of a downlink control channel in a next generation wireless communication system according to an embodiment of the present disclosure is shown.

[0027] Figure 5 The basic unit of a downlink control channel in a next generation mobile communication system according to an embodiment of the present disclosure is shown.

[0028] Figure 6 An example of a discontinuous reception (DRX) operation in a next generation mobile communication system according to an embodiment of the present disclosure is shown.

[0029] Figure 7 An example of a cross-time slot scheduling method according to some embodiments of the present disclosure is shown.

[0030] Figure 8 Examples of terminal operations according to some embodiments of the present disclosure are shown.

[0031] Fig. 9 is a block diagram illustrating a structure of a terminal according to an embodiment of the present disclosure.

[0032] Fig.10 is a block diagram showing the structure of a base station according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0033] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.

[0034] When describing the embodiments of the present disclosure, descriptions of technical contents related to those well-known in the art and not directly related to the present disclosure will be omitted. Such unnecessary descriptions are omitted to prevent blurring the main idea of ​​the present disclosure and to convey the main idea more clearly.

[0035] For the same reason, in the accompanying drawings, some elements may be enlarged, omitted or schematically shown. In addition, the size of each element does not fully reflect the actual size. In the accompanying drawings, the same or corresponding elements have the same reference numerals.

[0036] By referring to the embodiments described in detail below in conjunction with the accompanying drawings, the advantages and features of the present disclosure and the ways to achieve them will become clear. However, the present disclosure is not limited to the embodiments set forth below, but can be implemented in various different forms. The following embodiments are provided only to fully disclose the present disclosure and inform those skilled in the art of the scope of the present disclosure, and the present disclosure is limited only by the scope of the appended claims. Throughout the specification, the same or similar reference numerals designate the same or similar elements. In addition, in the following description of the present disclosure, when it is determined that the description may make the subject matter of the present disclosure unnecessarily unclear, the detailed description of the known functions or configurations incorporated herein will be omitted. The terms to be described below are terms defined in consideration of the functions in the present disclosure, and may differ according to the user, the user's intention or custom. Therefore, the definition of the terms should be based on the content of the entire specification.

[0037] In the following, a base station is an entity that allocates resources of a terminal, and may be at least one of a gNode B, an eNode B, a node B, a base station (BS), a wireless access unit, a base station controller, or a node on a network. The terminal may include a user equipment (UE), a mobile station (MS), a cellular phone, a smart phone, a computer, or a multimedia system capable of performing a communication function. In the present disclosure, a downlink (DL) means a radio transmission path of a signal sent from a base station to a terminal, and an uplink (UL) means a radio transmission path of a signal sent from a terminal to a base station. In addition, in the following, an LTE or LTE-A system is described as an example in the present disclosure, but the embodiments of the present disclosure may be applied to other communication systems having similar technical backgrounds or channel types. For example, the fifth generation mobile communication technology (5G or new radio (NR)) developed outside LTE-A may be included therein. In addition, according to the determination of a technician with technical knowledge, the embodiments of the present disclosure may be applied to other communication systems through some modifications without greatly departing from the scope of the present disclosure.

[0038] Here, it will be understood that each box of the flowchart diagram and the combination of boxes in the flowchart diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device create a component for implementing the function specified in one or more flowchart boxes. These computer program instructions can also be stored in a computer-usable or computer-readable memory, which can instruct the computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-usable or computer-readable memory produce an article of instruction components including the functions specified in one or more flowchart boxes. Computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are performed on the computer or other programmable device, thereby generating a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more flowchart boxes.

[0039] In addition, each box of the flowchart diagram may represent a module, a code segment or a code portion, which includes one or more executable instructions for implementing (multiple) specified logical functions. It should also be noted that in some alternative implementations, the functions mentioned in the box may occur out of order. For example, depending on the functions involved, two boxes shown in succession may actually be executed substantially simultaneously, or these boxes may sometimes be executed in reverse order.

[0040] As used herein, "unit" refers to a software element or hardware element that performs a predetermined function, such as a field programmable gate array (FPGA) or an application specific integrated circuit (ASIC). However, "unit" does not always have the meaning that is limited to software or hardware. "Unit" can be constructed to be stored in an addressable storage medium or to execute one or more processors. Therefore, "unit" includes, for example, software elements, object-oriented software elements, class elements or task elements, processes, functions, attributes, processes, subroutines, program code segments, drivers, firmware, microcodes, circuits, data, databases, data structures, tables, arrays and parameters. The elements and functions provided by "unit" can be combined into a smaller number of elements or "units" or divided into a larger number of elements or "units". In addition, elements and "units" can be implemented as one or more CPUs in a reproduction device or a secure multimedia card. In addition, "unit" in an embodiment can include one or more processors.

[0041] Wireless communication systems have moved beyond their original role of providing voice-oriented services and have evolved into broadband wireless communication systems that provide high-speed and high-quality packet data services according to communication standards such as, for example, High Speed ​​Packet Access (HSPA), Long Term Evolution (LTE or Evolved Universal Terrestrial Radio Access (E-UTRA)), and LTE-Advanced (LTE-A) of 3GPP; High Speed ​​Packet Data (HRPD) and Ultra Mobile Broadband (UMB) of 3GPP2; and IEEE's 802.16e.

[0042] As a representative example of a broadband wireless communication system, in the LTE system, an orthogonal frequency division multiplexing (OFDM) scheme has been adopted for the downlink (DL), and both the OFDM scheme and the single carrier frequency division multiple access (SC-FDMA) scheme have been adopted for the uplink (UL). The uplink indicates a radio link for sending data or control signals from a terminal (user equipment (UE) or mobile station (MS)) to a base station (eNodeB or base station (BS)), and the downlink indicates a radio link for sending data or control signals from a base station to a terminal. In the above-mentioned multiple access scheme, generally, data or control information is distinguished according to users by allocating or managing time-frequency resources for carrying data or control information of each user, wherein the time-frequency resources do not overlap, that is, orthogonality is established.

[0043] The future communication system after LTE (i.e., 5G communication system) must be able to freely reflect various demands from users, service providers, etc., and therefore, it is necessary to support services that meet all different demands. For the 5G communication system, the services considered include enhanced mobile broadband (eMBB), massive machine type communication (mMTC), ultra-reliable low latency communication (URLLC), etc.

[0044] eMBB is designed to provide data rates that are superior to those supported by existing LTE, LTE-A, or LTE-Pro. For example, in a 5G communication system, from the perspective of a base station, eMBB should be able to provide a peak data rate of 20 Gbps in the downlink and a peak data rate of 10 Gbps in the uplink. In addition, the 5G communication system should be able to provide not only peak data rates, but also increased user-perceived terminal data rates. In order to meet these requirements, improvements in various transmission and reception technologies are required in the 5G communication system, including further improved multiple-input multiple-output (MIMO) transmission technology. In addition, in the 2 GHz frequency band used by the current LTE, a transmission bandwidth of up to 20 MHz is used to transmit signals, but the 5G communication system uses a wider bandwidth than 20 MHz in a frequency band of 3 to 6 GHz or 6 GHz or higher, thereby meeting the data rate required in the 5G communication system.

[0045] In addition, mMTC is being considered to support application services such as the Internet of Things (IoT) in 5G communication systems. In order to efficiently provide IoT, mMTC may be required to support access to a large number of terminals in a cell, enhanced coverage of the terminals, improved battery life, and reduced cost of the terminals. IoT needs to be able to support a large number of terminals in a cell (e.g., 1,000,000 terminals / km 2 ), because it is connected to various sensors and devices to provide communication functions. In addition, due to the nature of the service, terminals supporting mMTC are more likely to be located in shaded areas that are not covered by cells (such as basements of buildings), so terminals require wider coverage than other services provided in 5G communication systems. Terminals supporting mMTC need to be configured as inexpensive terminals and may require a very long battery life (such as 10 to 15 years) because it is difficult to frequently replace the battery of the terminal.

[0046] Finally, URLLC is a cellular-based wireless communication service for mission-critical purposes and can be applied to services such as remote control of robots or machinery, industrial automation, unmanned aerial vehicles, telehealth, emergency alerts, etc. Therefore, the communication provided by URLLC can provide ultra-low latency and ultra-high reliability. For example, services supporting URLLC need to meet an air interface latency of less than 0.5 milliseconds and may also need to reach 10 -5 Or lower packet error rate. Therefore, for services supporting URLLC, the 5G system needs to provide a smaller transmission time interval (TTI) than other services, and there may also be design issues in allocating wide resources in the frequency band to ensure the reliability of the communication link.

[0047] The above three services considered in the 5G communication system, namely eMBB, URLLC and mMTC, can be multiplexed and transmitted in a single system. Here, in order to meet the different requirements of each of the services, different transmission or reception schemes and different transmission and reception parameters can be used for the services. The services in the 5G communication system are not limited to the above three services.

[0048] Hereinafter, a frame structure in a 5G system will be described in detail with reference to the accompanying drawings.

[0049] Figure 1 The basic structure of a time-frequency region in a next-generation mobile communication system according to an embodiment of the present disclosure is shown, where the time-frequency region is a radio resource region for transmitting data or a control channel.

[0050] exist Figure 1 , the horizontal axis indicates the time region, and the vertical axis indicates the frequency region. Figure 1A subframe 110 is shown in FIG. The basic unit of resources in the time-frequency domain is a resource element (RE) 101, and can be defined as an orthogonal frequency division multiplexing (OFDM) symbol 102 on the time axis and a subcarrier 103 on the frequency axis. In the frequency domain, (eg, 12) consecutive REs may constitute one resource block (RB) 104 .

[0051] Figure 2 The structures of frames, subframes, and time slots in a next generation mobile communication system according to an embodiment of the present disclosure are shown.

[0052] exist Figure 2 2, an example of the structure of a frame 200, a subframe 201, and a time slot 202 or 203 is shown. One frame 200 may be defined as 10 ms. One subframe 201 may be defined as 1 ms, and thus, one frame 200 may include a total of 10 subframes 201. One time slot 202 or 203 may be defined as 14 OFDM symbols (i.e., the number of symbols per time slot). ). A subframe 201 may include one or more time slots 202 and 203, and the number of time slots 202 or 203 in each subframe 201 may vary according to the configured value μ 204 or 205 of the subcarrier spacing. Figure 2 In the example of FIG. 1 , a case with a subcarrier spacing configuration value of μ=0 204 and a case with a subcarrier spacing configuration value of μ=1 205 are shown. In the case of μ=0 204, one subframe 201 may include one time slot 202, and in the case of μ=1 205, one subframe 201 may include two time slots 203. That is, the number of time slots per subframe is The number of time slots per frame can vary according to the configured value μ of the subcarrier spacing. Can be changed. According to each subcarrier spacing configuration value μ and It can be defined as shown in Table 1.

[0053]

Table 1

[0054]

[0055] Next, the configuration of the bandwidth part (BWP) in the 5G communication system will be described in detail with reference to the accompanying drawings.

[0056] Figure 3 An example of the configuration of a bandwidth section in a next-generation mobile communication system according to an embodiment of the present disclosure is shown.

[0057] Figure 3An example is shown in which the terminal bandwidth (UE bandwidth) 300 is configured as two bandwidth parts, namely bandwidth part #1 301 and bandwidth part #2 302. The base station may configure one or more bandwidth parts for the terminal, and may configure the following information for each bandwidth part.

[0058]

Table 2

[0059]

[0060] Not limited to the above examples, not only the configuration information can be configured for the terminal, but also various parameters associated with the bandwidth part can be configured for the terminal. Information can be sent from the base station to the terminal through higher layer signaling (e.g., radio resource control (RRC) signaling). Among the one or more configured bandwidth parts, at least one bandwidth part can be activated. Information indicating whether the configured bandwidth part is activated can be semi-statically transmitted from the base station to the terminal through RRC signaling, or can be dynamically transmitted through downlink control information (DCI).

[0061] According to some embodiments, before the RRC connection, the terminal may receive the configuration of the initial bandwidth part (initial BWP) for initial access from the base station through the master information block (MIB). More specifically, the terminal may receive configuration information for the control resource set (CORESET) and the search space, in which the PDCCH for receiving the system information required for initial access through the MIB (remaining system information: RMSI or system information block 1: SIB1) may be sent in the initial access phase. Each of the control resource set and the search space configured as the MIB may be considered as an identification (ID) 0. The base station may notify the terminal of configuration information such as frequency allocation information, time allocation information, parameter set (numerology), etc. of the control resource set #0 through the MIB. In addition, the base station may notify the terminal of the configuration information of the monitoring period (period) and opportunity (occasion) for monitoring the control resource set #0, that is, the configuration information of the search space #0 through the MIB. The terminal may regard the frequency region of the control resource set #0 configured to be obtained from the MIB as the initial bandwidth part for initial access. At this time, the ID of the initial bandwidth part may be regarded as 0.

[0062] The configuration of the bandwidth portions supported by 5G can be used for various purposes.

[0063] According to some embodiments, the bandwidth supported by the terminal is less than the system bandwidth through the configuration of the bandwidth part. For example, when the frequency position of the bandwidth part is configured for the terminal (configuration information 2), the terminal can send or receive data at a specific frequency position within the system bandwidth.

[0064] In addition, according to some embodiments, in order to support different parameter sets, the base station can configure multiple bandwidth parts for the terminal. For example, in order to support the terminal to use both a subcarrier spacing of 15kHz and a subcarrier spacing of 30kHz for data transmission and reception, two bandwidth parts can be configured as subcarrier spacings of 15kHz and 30kHz, respectively. Different bandwidth parts can be frequency-division multiplexed, and when sending or receiving data with a specific subcarrier spacing, the bandwidth part configured as the corresponding subcarrier spacing can be activated.

[0065] In addition, according to some embodiments, in order to reduce the power consumption of the terminal, the base station can configure the terminal with bandwidth parts of different sizes. For example, when the terminal supports a very large bandwidth (e.g., a bandwidth of 100 MHz) and always sends or receives data through the corresponding bandwidth, very high power consumption may result. Specifically, from the perspective of power consumption, it may be very inefficient to monitor unnecessary downlink control channels through a large bandwidth of 100 MHz in the absence of traffic. In order to reduce the power consumption of the terminal, the base station can configure a bandwidth part with a relatively narrow bandwidth, such as a bandwidth part of 20 MHz, for the terminal. The terminal can perform monitoring operations in a bandwidth part of 20 MHz in the absence of traffic, and when generating data, the terminal can send or receive data through a bandwidth part of 100 MHz according to instructions from the base station.

[0066] In the method for configuring the bandwidth part, the terminal before the RRC connection can receive the configuration information for the initial bandwidth part through the master information block (MIB) in the initial access phase. More specifically, the terminal can receive the configuration of the control resource set (CORESET) for the downlink control channel, in which the downlink control information (DCI) for scheduling the system information block (SIB) can be sent from the MIB of the physical broadcast channel (PBCH). The bandwidth of the control resource set configured as the MIB can be regarded as the initial bandwidth part, and the terminal can receive the physical downlink shared channel (PDSCH) in which the SIB is sent through the configured initial bandwidth part. The initial bandwidth part can be used not only for receiving SIBs, but also for other system information (OSI), paging or random access.

[0067] When there are one or more bandwidth parts configured for the terminal, the base station can indicate the switching of bandwidth parts by using the bandwidth part indicator field in the DCI. Figure 3 In the present invention, when the currently activated bandwidth part of the terminal is bandwidth part #1 301, the base station can indicate bandwidth part #2 302 to the terminal as the bandwidth part indicator in the DCI, and the terminal can switch the bandwidth part to bandwidth part #2 302 indicated as the bandwidth part indicator in the received DCI.

[0068] The above-mentioned DCI-based switching to the bandwidth part can be indicated by the DCI for scheduling PDSCH or PUSCH. Therefore, when the terminal receives a request for bandwidth part switching, the reception or transmission of PDSCH or PUSCH scheduled by the corresponding DCI can be smoothly performed in the switched bandwidth part. For this reason, the standard specifies the delay time interval (T BWP ) requirements are specified, for example, can be defined as follows.

[0069]

[0070] According to the terminal capability, the requirement for the bandwidth part switching delay time interval supports type 1 or type 2. The terminal can report the supportable bandwidth part switching delay type to the base station.

[0071] According to the above requirements for the bandwidth part switching delay time interval, when the terminal receives the DCI including the bandwidth part switching indicator in time slot n, the terminal can switch the bandwidth part to the same bandwidth part as the bandwidth part switching indicator at a time slot n+T. BWP The base station completes the switching to the new bandwidth part indicated by the bandwidth part switching indicator at a time point of , and can perform the transmission or reception of the data channel scheduled by the corresponding DCI in the switched new bandwidth part. When the base station is to schedule the data channel in the new bandwidth part, the base station can consider the bandwidth part switching delay time interval (T BWP ) determines the time domain resource allocation for the data channel. That is, in the method of determining the time domain resource allocation for the data channel when the base station schedules the data channel in the new bandwidth part, the scheduling of the corresponding data channel can be performed after the bandwidth part switching delay time interval. Therefore, the terminal may not expect that the DCI indicating the bandwidth part switching is less than the bandwidth part switching delay time interval (T BWP )’s value.

[0072] When the terminal receives a DCI indicating bandwidth part switching (e.g., DCI format 1_1 or 0_1), the terminal may not perform any transmission or reception during the time interval from the third symbol of the time slot in which the PDCCH including the corresponding DCI is included to the start point of the time slot indicated by the time slot offset (K0 or K2) value indicated by the time domain resource allocation indicator field in the corresponding DCI. For example, when the terminal receives a DCI indicating bandwidth part switching in time slot n and the time slot offset value indicated by the corresponding DCI is K, the terminal may not perform any transmission or reception from the third symbol of time slot n to the symbol before time slot n+K (i.e., the last symbol in time slot n+K-1).

[0073] Next, the synchronization signal (SS) / physical broadcast channel (PBCH) block in 5G will be described.

[0074] The SS / PBCH block may refer to a physical layer channel block including a primary SS (PSS), a secondary SS (SSS), and a PBCH, and is defined as follows:

[0075] -PSS: PSS is a reference signal used for downlink time / frequency synchronization, which provides partial information of the cell ID.

[0076] -SSS: SSS is a reference signal used for downlink time / frequency synchronization, which provides the rest of the cell ID information not provided by PSS. SSS can also be used as another reference signal for demodulation of PBCH.

[0077] -PBCH: PBCH is a channel that provides UE with essential system information required for transmission or reception of data channels and control channels. Essential system information may include search space-related control information indicating radio resource mapping information of control channels, scheduling control information of additional data channels for transmitting system information, etc.

[0078] -SS / PBCH block: SS / PBCH block is a combination of PSS, SSS and PBCH. One or more SS / PBCH blocks can be sent within 5ms, and each SS / PBCH block can be distinguished by an index.

[0079] The terminal can detect the PSS and SSS during the initial access process and decode the PBCH. The terminal can obtain the MIB from the PBCH and can be configured with a control resource set (CORESET) #0 accordingly (this can correspond to a control resource set with a control resource set index of 0). Assuming that the demodulation reference signal (DMRS) sent in the control resource set #0 is quasi-co-located (QCL) with the selected SS / PBCH block, the terminal can monitor the control resource set #0. The terminal can receive system information as downlink control information sent in the control resource set #0. The terminal can obtain the random access channel (RACH) related configuration information required for initial access from the received system information. Taking into account the selected SS / PBCH index, the terminal can send a physical RACH (PRACH) to the base station, and the base station that has received the PRACH can obtain information about the SS / PBCH block index selected by the terminal. The base station can identify the block selected by the terminal from among the various SS / PBCH blocks, and can identify that the control resource set #0 associated with the selected block is monitored.

[0080] Next, downlink control information (DCI) in the 5G system will be described in detail.

[0081] In a 5G system, scheduling information for uplink data (or physical uplink shared channel (PUSCH)) or downlink data (or physical downlink shared channel (PDSCH)) is sent from a base station to a terminal via DCI. The terminal can monitor the fallback DCI format and non-fallback DCI format for PUSCH or PDSCH. The fallback DCI format may include a fixed field predefined between the base station and the terminal, while the non-fallback DCI format may include a configurable field.

[0082] After the channel coding and modulation process, the DCI can be sent via the physical downlink control channel (PDCCH). A cyclic redundancy check (CRC) can be attached to the DCI message payload, and the CRC can be scrambled by a radio network temporary identifier (RNTI) corresponding to the terminal's identity. Depending on the use of the DCI message (e.g., UE-specific data transmission, power control commands, random access responses, etc.), different RNTIs can be used. In other words, the RNTI is not sent explicitly, but is included in the CRC calculation process and sent. When a DCI message sent on the PDCCH is received, the terminal can check the CRC by using the allocated RNTI, and when the CRC check result is correct, it is determined that the corresponding message is sent to the terminal.

[0083] For example, the DCI that schedules the PDSCH for system information (SI) can be scrambled by the SI-RNTI. The DCI that schedules the PDSCH for the random access response (RAR) message can be scrambled by the RA-RNTI. The DCI that schedules the PDSCH for the paging message can be scrambled by the P-RNTI. The DCI that notifies the slot format indicator (SFI) can be scrambled by the SFI-RNTI. The DCI that notifies the transmit power control (TPC) can be scrambled by the TPC-RNTI. The DCI that schedules the UE-specific PDSCH or PUSCH can be scrambled by the cell RNTI (C-RNTI).

[0084] DCI format 0_0 may be used for fallback DCI scheduling PUSCH, and in this case, the CRC may be scrambled by the C-RNTI. For example, DCI format 0_0 with CRC scrambled by the C-RNTI may include the following information.

[0085]

Table 3

[0086]

[0087] DCI format 0_1 ​​may be used for scheduling non-fallback DCI for PUSCH, and in this case, the CRC may be scrambled by the C-RNTI. For example, DCI format 0_1 ​​with CRC scrambled by the C-RNTI may include the following information.

[0088]

Table 4

[0089]

[0090]

[0091]

[0092] DCI format 1_0 may be used for fallback DCI scheduling PDSCH, and in this case, the CRC may be scrambled by C-RNTI.For example, DCI format 1_0 with CRC scrambled by C-RNTI may include the following information.

[0093]

Table 5

[0094]

[0095]

[0096] DCI format 1_1 may be used for scheduling non-fallback DCI for PDSCH, and in this case, the CRC may be scrambled by the C-RNTI. For example, DCI format 1_1 with CRC scrambled by the C-RNTI may include the following information.

[0097]

Table 6

[0098]

[0099]

[0100] Hereinafter, a time domain resource allocation method for a data channel in a 5G communication system will be described.

[0101] The base station can configure the time domain resource allocation information table for the downlink data channel (physical downlink shared channel (PDSCH)) and the uplink data channel (physical uplink shared channel (PUSCH)) for the terminal through higher layer signaling (e.g., RRC signaling). For PDSCH, a table including up to 16 (maxNrofDL-Allocations=16) entries can be configured, and for PUSCH, a table including up to 16 (maxNrofUL-Allocations=16) entries can be configured. The time domain resource allocation information may include PDCCH-to-PDSCH time slot timing (corresponding to the time interval in time slots between the time point when the PDCCH is received and the time point when the PDSCH scheduled by the received PDCCH is received, and is represented as "K0"), PDCCH-to-PUSCH time slot timing (corresponding to the time interval in time slots between the time point when the PDCCH is received and the time point when the PUSCH scheduled by the received PDCCH is sent, and is represented as "K2"), information related to the position and length of the starting symbol in the time slot in which the PDSCH or PUSCH is scheduled, the mapping type of the PDSCH or PUSCH, etc. For example, the information in Tables 7 and 8 below can be notified from the base station to the terminal.

[0102]

Table 7

[0103]

[0104]

Table 8

[0105]

[0106] The base station may notify the terminal of one of the entries in the table related to the time domain resource allocation information via L1 signaling (e.g., via DCI, e.g., by using the "time domain resource allocation" field in the DCI). The terminal may obtain the time domain resource allocation information for PDSCH or PUSCH by using the DCI received from the base station.

[0107] A downlink control channel in a 5G communication system will be described in detail with reference to the accompanying drawings.

[0108] Figure 4 An example of a control resource set (CORESET) for transmitting a downlink control channel in a next generation wireless communication system according to an embodiment of the present disclosure is shown.

[0109] Figure 4An example is shown in which a terminal bandwidth part (UE BWP) 410 is configured on the frequency axis, and two control resource sets (control resource set #1 401 and control resource set #2 402) are configured on the time axis in a time slot 420. On the frequency axis, the control resource sets 401 and 402 may be configured in a specific frequency resource 403 in the entire UE BWP 410. One or more OFDM symbols may be configured on the time axis, and one or more OFDM symbols are defined as a control resource setting duration 404. Figure 4 In the example of FIG. 4 , control resource set #1 401 is configured to have a control resource set duration of two symbols, and control resource set #2 402 is configured to have a control resource set duration of one symbol.

[0110] The control resource set in the above-mentioned 5G system can be configured for the terminal by the base station via high-level signaling (for example, via system information, master information block (MIB) or RRC signaling). Configuring a control resource set for a terminal refers to providing the terminal with information such as a control resource set identifier, a frequency position of the control resource set, and a symbol length of the control resource set. For example, the information may include the following information.

[0111]

Table 9

[0112]

[0113]

[0114] In Table 9, the tci-StatesPDCCH (abbreviated as transmission configuration indication (TCI) state) configuration information may include information about one or more channel state information reference signal (CSI-RS) indexes or synchronization signal (SS) / physical broadcast channel (PBCH) block indexes, wherein the synchronization signal (SS) / physical broadcast channel (PBCH) block index has a QCL relationship with the DMRS transmitted in the corresponding control resource set.

[0115] Figure 5 An example of a basic unit of time and frequency resources constituting a downlink control channel that can be used in a next-generation mobile communication system according to an embodiment of the present disclosure is shown.

[0116] refer to Figure 5 , the basic unit of time and frequency resources constituting the control channel is called a resource element group (REG) 503. REG 503 can be defined by one OFDM symbol 501 on the time axis and one physical resource block (PRB) 502 (i.e., 12 subcarriers) on the frequency axis. The base station can configure the downlink control channel allocation unit by cascading with REG 503.

[0117] like Figure 5 As shown, in a 5G system, when the downlink control channel allocation unit is a control channel element (CCE) 504, one CCE 504 may include multiple REGs 503. For example, Figure 5 As shown, REG 503 may include 12 REs, and when one CCE 504 includes six REGs 503, one CCE 504 may include 72 REs. When a downlink control resource set is configured, the corresponding control resource set may include multiple CCEs 504, and a specific downlink control channel may be transmitted by being mapped to one or more CCEs 504 in the control resource set according to an aggregation level (AL). The CCEs 504 in the control resource set may be distinguished by numbers, and in this case, numbers may be assigned to the CCEs 504 according to a logical mapping scheme.

[0118] Figure 5 The basic unit of the downlink control channel shown (ie, REG 503) may include both REs to which DCI is mapped and regions to which DMRS 505 corresponding to a reference signal is mapped. Figure 5 As shown, three DMRS 505 can be sent in one REG 503. Depending on the aggregation level (AL), the number of CCEs required to send the PDCCH can be 1, 2, 4, 8 or 16, and different numbers of CCEs can be used to achieve link adaptation of the downlink control channel. For example, when AL=L, a single downlink control channel can be sent by L CCEs. The terminal needs to detect the signal without knowing the information about the downlink control channel, and a search space representing a CCE set is defined for blind decoding. The search space is a downlink control channel candidate set including the CCEs that the terminal needs to try to decode on it with a given AL, and the terminal can have multiple search spaces because there are various ALs, each AL is bound to 1, 2, 4, 8 or 16 CCEs. A search space set can be defined as a search space set in all configured ALs.

[0119] The search space can be classified into a common search space and a terminal-specific (UE-specific) search space. A specific terminal group or all terminals can check the common search space of the PDCCH to dynamically schedule system information or receive cell common control information, such as paging messages. For example, PDSCH scheduling allocation information for sending SIBs including cell operator information, etc. can be received by checking the common search space of the PDCCH. For the common search space, a specific terminal group or all terminals need to receive the PDCCH, so the common search space can be defined as a pre-specified CCE set. UE-specific PDSCH or PUSCH scheduling allocation information can be received by checking the UE-specific search space of the PDCCH. The UE-specific search space can be UE-specifically defined as a function of various system parameters and terminal identification.

[0120] In the 5G system, the parameters of the search space of the PDCCH can be configured for the terminal by the base station via higher layer signaling (e.g., SIB, MIB or RRC signaling). For example, the base station can configure the number of PDCCH candidates in each ALL, the monitoring period of the search space, the monitoring opportunity in units of symbols in the time slot of the search space, the type of the search space (common search space or UE-specific search space), the combination of DCI format and RNTI to be monitored in the search space, the control resource set index of the monitoring search space, etc. For example, the configuration information may include the following information.

[0121]

Table 10

[0122]

[0123]

[0124] According to the configuration information, the base station may configure one or more search space sets for the terminal. According to some embodiments, the base station may configure search space set 1 and search space set 2 for the terminal, wherein the terminal may be configured to monitor DCI format A scrambled by X-RNTI in search space set 1 in the common search space, and monitor DCI format B scrambled by Y-RNTI in search space set 2 in the UE-specific search space.

[0125] The configuration information may indicate that there are one or more search space sets in a common search space or a UE-specific search space. For example, search space set #1 and search space set #2 may be configured as common search spaces, and search space set #3 and search space set #4 may be set as UE-specific search spaces.

[0126] In the common search space, the following combinations of DCI formats and RNTIs may be monitored, and are not limited to the following examples.

[0127] - DCI format 0_0 / 1_0 with CRC scrambled by C-RNTI, CS-RNTI, SP-CSI-RNTI, RA-RNTI, TC-RNTI, P-RNTI, SI-RNTI

[0128] - DCI format 2_0 with CRC scrambled by SFI-RNTI

[0129] - DCI format 2_1 with CRC scrambled by INT-RNTI

[0130] -DCI format 2_2 with CRC scrambled by TPC-PUSCH-RNTI, TPC-PUCCH-RNTI

[0131] -DCI format 2_3 with CRC scrambled by TPC-SRS-RNTI

[0132] In the UE-specific search space, the following combinations of DCI formats and RNTIs may be monitored, and are not limited to the following examples.

[0133] - DCI format 0_0 / 1_0 with CRC scrambled by C-RNTI, CS-RNTI, TC-RNTI

[0134] - DCI format 1_0 / 1_1 scrambled by C-RNTI, CS-RNTI, TC-RNTI

[0135] The listed RNTIs may follow the following definitions and uses.

[0136] Cell RNTI (C-RNTI): used for UE-specific PDSCH scheduling

[0137] Temporary Cell RNTI (TC-RNTI): used for UE-specific PDSCH scheduling

[0138] Configured Scheduling RNTI (CS-RNTI): used for semi-statically configured UE-specific PDSCH scheduling

[0139] Random access RNTI (RA-RNTI): used for PDSCH scheduling during random access

[0140] Paging RNTI (P-RNTI): used to schedule the PDSCH for sending paging messages

[0141] System Information RNTI (SI-RNTI): used to schedule the PDSCH that sends system information

[0142] Interrupt RNTI (INT-RNTI): used to indicate whether to puncture the PDSCH

[0143] Transmit power control of PUSCH RNTI (TPC-PUSCH-RNTI): used to indicate power control indication for PUSCH

[0144] Transmit power control of PUCCH RNTI (TPC-PUCCH-RNTI): used to indicate the power control indication for PUCCH

[0145] Transmit power control of SRS RNTI (TPC-SRS-RNTI): used to indicate power control instructions for SRS

[0146] The above DCI format may follow the following definition.

[0147]

Table 11

[0148]

[0149] In the 5G system, in the control resource set p and the search space set s, the search space in AL L can be expressed as the following equation.

[0150] [Equation 1]

[0151]

[0152] -L: aggregation level

[0153] -n CI : Carrier index

[0154] -N CCE,p : The total number of CCEs in control resource set p

[0155] -n μs,f : Time slot index

[0156] -M (L) p,s,max : Number of PDCCH candidates at aggregation level L

[0157] -m snCI =0,...,M (L) p,s,max -1: Index of PDCCH candidate with aggregation level L

[0158] -i=0,...,L-1

[0159] Y p,-1 =n RNTI ≠0, A 0 =39827, A 1 =39829, A 2 =39839, D=65537

[0160] -n RNTI : Terminal identifier

[0161] In the case of a common search space, Y_(p,n μ s,f ) can correspond to 0.

[0162] In the case of UE-specific search space, Y_(p,n μ s,f ) may correspond to a value that changes according to the terminal identification (C-RNTI or ID configured by the base station for the terminal) and the time index.

[0163] Since multiple search space sets can be configured with different parameters (e.g., the parameters in Table 10) in the 5G system, the search space set monitored by the terminal can change each time. For example, when search space set #1 is configured with an X time slot period, search space set #2 is configured with a Y time slot period, and X and Y are different, the terminal can monitor both search space set #1 and search space set #2 in a specific time slot, and monitor one of search space set #1 and search space set #2 in another specific time slot.

[0164] When a plurality of search space sets are configured for a terminal, the following conditions may be considered in a method for determining a search space set to be monitored by the terminal.

[0165] [Condition 1: Limitation on the maximum number of PDCCH candidates]

[0166] The number of PDCCH candidates to be monitored for each time slot does not exceed M μ . M μ can be defined as being configured with 15·2 μ The maximum number of PDCCH candidates per time slot on a cell with kHz subcarrier spacing is shown in Table 12 below.

[0167]

Table 12

[0168]

[0169] [Condition 2: Limitation on the maximum number of CCEs]

[0170] The number of CCEs that constitute the entire search space (the entire search space here refers to the entire CCE set corresponding to the joint area of ​​multiple search space sets) for each time slot does not exceed C μ . C μ can be defined as being configured with 15·2 μ The maximum number of CCEs per timeslot on a cell with a kHz subcarrier spacing is shown in Table 13 below.

[0171]

Table 13

[0172]

[0173]

[0174] For convenience of description, a case where both condition 1 and condition 2 are satisfied at a specific time point is defined as “condition A.” Therefore, not satisfying condition A may mean that at least one of conditions 1 or 2 is not satisfied.

[0175] Depending on the configuration of the search space set of the base station, there may be a chance that condition A is not satisfied at a specific time point. When condition A is not satisfied at a specific time point, the terminal may select and monitor some of the search space sets that are configured to satisfy condition A at the corresponding time point, and the base station may send the PDCCH in the selected search space set.

[0176] Selecting some of the entire search space set can be performed in the following way.

[0177]

Method 1

[0178] When condition A for PDCCH is not met at a specific time point (time slot),

[0179] The terminal may select, from among the search space sets existing at the corresponding time point, a search space set whose search space type is configured as a common search space on the search space set configured for the UE-specific search space.

[0180] When all search space sets configured as common search spaces are selected (i.e., when condition A is satisfied despite the selection of all search spaces configured as common search spaces), the terminal (or base station) may select a search space set configured as a UE-specific space. In this case, when there are multiple search space sets configured as UE-specific search spaces, a search space set with a lower search space index may have a higher priority. In consideration of the priority, the terminal or base station may select a UE-specific search space set within the range in which the UE-specific search space set satisfies condition A.

[0181] Figure 6 An example of a discontinuous reception (DRX) operation in a next generation mobile communication system according to an embodiment of the present disclosure is shown.

[0182] DRX is an operation in which a terminal using a service receives data discontinuously in an RRC connected state (in which a radio link is configured between the terminal and the base station). When DRX is applied, the terminal can turn on the receiver at a specified time point to monitor the control channel, and turn off the receiver when no data is received within a predetermined time interval, thereby reducing the power consumption of the terminal. The DRX operation can be controlled by a medium access control (MAC) layer device according to various parameters and timers.

[0183] refer to Figure 6 , the active time 605 is the time interval during which the terminal wakes up and monitors the PDCCH in each DRX cycle. The active time 605 can be defined as follows:

[0184] -drx-onDurationTimer or drx-InactivityTimer or drx-RetransmissionTimerDL or drx-RetransmissionTimerUL or ra-ContentionResolutionTimer is running; or

[0185] - The scheduling request is sent on the PUCCH and is pending;

[0186] - After successfully receiving a random access response to a random access preamble that is not selected by the MAC entity among contention-based random access preambles, a PDCCH indicating a new transmission of the C-RNTI addressed to the MAC entity has not been received.

[0187] drx-onDurationTimer, drx-InactivityTimer, drx-etransmissionTimerDL, drx-RetransmissionTimerUL, ra-ContentionResolutionTimer, etc. are timers whose values ​​are configured by the base station and have a function of configuring the terminal to monitor the PDCCH when a predetermined condition is met.

[0188] drx-onDurationTimer 615 is a parameter for configuring the minimum time interval for a terminal to stay awake. drx-InactivityTimer 620 is a parameter for configuring an additional time interval for a terminal to stay awake when a PDCCH (630) indicating a new uplink or downlink transmission is received. drx-RetransmissionTimerDL is a parameter for configuring the maximum time interval for a terminal to stay awake to receive a downlink retransmission in a downlink HARQ process. drx-RetransmissionTimerUL is a parameter for configuring the maximum time interval for a terminal to stay awake to receive an uplink retransmission grant in an uplink HARQ process. For example, drx-onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimerDL and drx-RetransmissionTimerUL can be configured with time, the number of subframes, the number of time slots, etc. ra-ContentionResolutionTimer is a parameter for monitoring PDCCH during a random access process.

[0189] The inactive time 610 is a time interval during the DRX operation in which the terminal is configured not to monitor the PDCCH and / or is configured not to receive the PDCCH, and the time interval remaining after excluding the active time 605 from the entire time interval in which the DRX operation is performed may be the inactive time 610. The terminal may enter a sleep or inactive state while not monitoring the PDCCH during the active time 605 to reduce power consumption.

[0190] The DRX cycle refers to the cycle in which the terminal wakes up and monitors the PDCCH. In other words, the DRX cycle refers to the time interval from the time when the terminal monitors the PDCCH to the time when it monitors the next PDCCH, or the occurrence cycle of the on-duration. There are two types of DRX cycles: short DRX cycle and long DRX cycle. The short DRX cycle can be selectively applied.

[0191] The long DRX cycle 625 is the longer cycle of the two DRX cycles configured for the terminal. During the long DRX operation, at a time point after the long DRX cycle 625 has passed from the starting point (e.g., the start symbol) of the drx-onDurationTimer 615, the terminal starts the drx-onDurationTimer 615 again. When operating in the long DRX cycle 625, the terminal may start the drx-onDurationTimer 615 in a time slot after the drx-SlotOffset in the subframe satisfying the following equation 2. Here, drx-SlotOffset refers to the delay before the drx-onDurationTimer 615 is started. For example, drx-SlotOffset may be configured with time, the number of time slots, etc.

[0192] [Equation 2]

[0193] modulo(drx-LongCycle)=drx-StartOffset

[0194] In this case, drx-LongCycleStartOffset may include the long DRX cycle 625 and drx-StartOffset, and may be used to define a subframe to start the long DRX cycle 625. For example, drx-LongCycleStartOffset may be configured with time, the number of subframes, the number of slots, etc.

[0195] Hereinafter, carrier aggregation and scheduling methods in 5G communication systems will be described in detail.

[0196] Multiple cells (cells or component carriers (CCs)) can be configured for the terminal from the base station, and the terminal can be configured whether to perform cross-carrier scheduling on the cell configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. In this case, the scheduled cell (cell A) and the scheduling cell (cell B) may be configured by different parameter sets. The parameter set may include subcarrier spacing, cyclic prefix, etc. When the parameter sets of cell A and cell B are different from each other, when the PDCCH of cell B schedules the PDSCH of cell A, the following minimum scheduling offset may be additionally considered between the PDCCH and the PDSCH.

[0197]

Cross-carrier scheduling method

[0198] ■When the subcarrier spacing (μ B ) is smaller than the subcarrier spacing (μ) of cell A.A ), the PDSCH may be scheduled from the next PDSCH slot corresponding to X symbols after the last symbol of the PDCCH received in cell B. Here, X may be determined based on μ B When μ B =15kHz, we can define X=4 symbols; when μ B =30kHz, we can define X=4 symbols; and when μ B =60kHz, X=8 symbols can be defined.

[0199] ■When the subcarrier spacing (μ B ) is greater than the subcarrier spacing (μ A ), the PDSCH may be scheduled from a time point corresponding to X symbols after the last symbol of the PDCCH received in cell B. Here, X may be determined based on μ B When μ B =30kHz, we can define X=4 symbols; when μ B = 60kHz, we can define X = 8 symbols; and when μ B =120kHz, X=12 symbols can be defined.

[0200] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings. A 5G system is described as an example in the present disclosure, but embodiments of the present disclosure may be applied to other communication systems having similar technical backgrounds or channel types. For example, mobile communication technologies developed outside of LTE or LTE-A mobile communication systems and 5G systems may be included therein. Therefore, according to the determination of a technician with technical knowledge, with some modifications, embodiments of the present disclosure may be applied to other communication systems without greatly departing from the scope of the present disclosure.

[0201] In addition, when describing the present disclosure, if a detailed description of a related function or configuration is considered to make the main points of the present disclosure unnecessarily vague, the description will be omitted. In addition, the terms to be described below have been defined by considering the functions in the present disclosure, and the terms may differ depending on the intention or practice of the user or operator. Therefore, each term should be defined based on the content of the entire specification.

[0202] Hereinafter, higher layer signaling may be signaling corresponding to at least one or a combination of one or more of the following signaling types.

[0203] -Master Information Block (MIB)

[0204] - System Information Block (SIB) or SIB X (X=1, 2, ...)

[0205] -Radio Resource Control (RRC)

[0206] -Media Access Control (MAC) Control Element (CE)

[0207] In addition, L1 signaling may be signaling corresponding to at least one of the following physical layer channels or signaling methods, or a combination of one or more of the following physical layer channels or signaling methods.

[0208] - Physical Downlink Control Channel (PDCCH)

[0209] - Downlink Control Information (DCI)

[0210] -UE-specific DCI

[0211] -Group Common DCI

[0212] - Public DCI

[0213] - Scheduling DCI (e.g., DCI for downlink or uplink data scheduling)

[0214] - Non-scheduled DCI (e.g., DCI not used for downlink or uplink data scheduling)

[0215] -Physical Uplink Control Channel (PUCCH)

[0216] - Uplink Control Information (UCI)

[0217] <First Embodiment>

[0218] In the first embodiment, a method of allocating time domain resources to a data channel in a next-generation mobile communication system (5G or NR system) will be described.

[0219] The base station can configure a table of PDSCH and PUSCH time domain resource allocation information for the terminal through higher layer signaling (e.g., SIB or RRC signaling). For PDSCH, a table including up to 16 (maxNrofDL-Allocations=16) entries can be configured, and for PUSCH, a table including up to 16 (maxNrofUL-Allocations=16) entries can be configured. The time domain resource allocation information may include PDCCH-to-PDSCH time slot timing (corresponding to the time interval in time slots between the time point when the PDCCH is received and the time point when the PDSCH scheduled by the received PDCCH is sent, and is represented as "K0"), PDCCH-to-PUSCH time slot timing (corresponding to the time interval in time slots between the time point when the PDCCH is received and the time point when the PUSCH scheduled by the received PDCCH is sent, and is represented as "K2"), information related to the position and length of the starting symbol in the time slot for scheduling PDSCH or PUSCH, the mapping type of PDSCH or PUSCH, etc. For example, the information in Tables 7 and 8 above can be notified from the base station to the terminal.

[0220] According to an embodiment of the present disclosure, the base station may notify the terminal via L1 signaling (e.g., via DCI, for example, by using a "time domain resource allocation" field in the DCI) of one of the entries in the table related to the time domain resource allocation information. The terminal may obtain the time domain resource allocation information for the PDSCH or PUSCH by using the DCI received from the base station.

[0221] When an entry in which the value of K0 / K2 is 0 is indicated, this means that the PDCCH and the data channel are scheduled in the same slot, and is called "self-slot scheduling".

[0222] When an entry in which the value of K0 / K2 is greater than 0 is indicated, this means that the PDCCH and the data channel are scheduled in different slots, and is referred to as "cross-slot scheduling".

[0223] In the next generation mobile communication system (5G or NR system), in order to reduce the power consumption of the terminal, cross-slot scheduling can be used. When cross-slot scheduling is supported, the terminal can operate in sleep mode between the time point when the PDCCH is received and the time point when the data channel is sent or received, so the power consumption can be reduced. In addition, when cross-slot scheduling is supported, the terminal may take longer to process the PDCCH, thereby reducing the operating speed and reducing power consumption. In addition, once the decoding is completed after the PDCCH is received, the time domain scheduling information for the PDSCH can be finally obtained. Therefore, during the time interval for receiving and decoding the PDCCH, the terminal cannot identify whether the PDSCH is scheduled, so it is necessary to cache the OFDM symbols in which the PDSCH can be scheduled, thereby greatly increasing the power consumption of the terminal. If the terminal can identify the time domain resource allocation information of the PDSCH before decoding the PDCCH, that is, if the terminal can identify that the cross-slot scheduling is performed in advance, the terminal can minimize unnecessary caching of the PDSCH, thereby reducing power consumption.

[0224] In order to reduce the power consumption of the terminal, the base station may indicate the minimum K0 / K2 value for data channel scheduling to the terminal via high-layer signaling or L1 signaling. The terminal may expect to always perform scheduling by using a K0 / K2 value corresponding to a value equal to or greater than the minimum K0 / K2 value received from the base station. For convenience of description, the minimum K0 / K2 value indicated by the base station to the terminal is referred to as "minimum offset".

[0225] The minimum offset value may be indicated to the terminal by the base station via a DCI for scheduling PDSCH or PUSCH (e.g., DCI format 1_1 or DCI format 0_1), or via a non-scheduled DCI (e.g., a new DCI format defined to reduce power consumption, a new RNTI defined to reduce power consumption, DCI format 2_0, DCI format 2_1, etc.). The terminal may receive the K0 minimum offset value (K0 min ) and K2 minimum offset value (K2 min ) or may receive different values ​​for K0 and K2 minimum offset values ​​(K min ). In the present disclosure, it is assumed and described that a minimum offset value K min However, the details of the present disclosure may be indicated with K0 respectively. min and K2 min The same approach is applied in the case of

[0226] According to an embodiment of the present disclosure, according to the minimum offset received from the base station, the terminal can expect to perform scheduling using only entries with K0 / K2 values ​​equal to or greater than the indicated minimum offset value among the values ​​in the preconfigured time domain resource allocation table. For example, assuming that the base station has configured the following PDSCH time domain resource allocation table for the terminal.

[0227]

Table 14

[0228]

[0229]

[0230] If the base station indicates a minimum offset value of 3 to the terminal, the terminal may expect not to use entries with K0 values ​​less than 3 (i.e., entry indexes 1, 2, 3, 4, 5, and 6) to perform scheduling, and may expect to use the remaining entries (i.e., entry indexes 7, 8, ..., and 16) to perform scheduling. For convenience of description, the following terms are defined.

[0231] - Valid entry: A valid entry is an entry having a K0 / K2 value equal to or greater than the received minimum offset value among the values ​​in the preconfigured time domain resource allocation table, and can be used for scheduling.

[0232] - Invalid entry: An invalid entry is an entry having a K0 / K2 value less than the received minimum offset among the values ​​in the preconfigured time domain resource allocation table, and cannot be used for scheduling.

[0233] According to an embodiment of the present disclosure, the terminal may receive a minimum offset value sent via DCI at a specific time point from the base station, and may apply the received minimum offset value after a specific time point from the minimum offset value receiving time point. For example, the minimum offset value may be received by the base station via a DCI at T 0 The DCI received by the PDCCH sent at a certain time point indicates to the terminal, and the terminal can delay ) and then, from the time point (T app ) and apply the newly obtained minimum offset value. In this case, T app By using T 0 and T delay If the terminal has received an instruction from the base station from T 0 The terminal may not expect the minimum offset value of the DCI at the time point T app The indicated minimum offset value is previously applied. Here, applying the minimum value may correspond to a terminal operation of applying the minimum value by determining whether an entry in a time domain resource allocation table configured via higher layer signaling is valid or invalid according to the received minimum offset value.

[0234] Figure 7 An example of a cross-time slot scheduling method according to an embodiment of the present disclosure is shown. Figure 7 In the description, time slot n 710, time slot n+1 711, time slot n+2 712 and time slot n+3 713 are taken as examples.

[0235] As described above, the base station can indicate the minimum offset value K to the terminal via the DCI through the PDCCH 702 sent at a specific time point. min (Operation 700). The base station may 0 Time point (with Figure 7 The time slot n 710 in the example of FIG. 700 corresponds to the time slot n 710 in the example of FIG. 701 . The PDCCH 702 indicates K to the terminal. min The terminal can receive K min T 0 (and Figure 7 ) after a predetermined time interval (T delay ) at a time point T later app Apply the K received from the base station min value. Figure 7 The example shows that the terminal applies (operation 701) the K received in time slot n 700 in time slot n+k (k=3) 713. min Receive K min Time point and application K min The time interval between the time points of 720 is called the "application delay time interval (application delay)" 720 and is indicated as "T delay ”.

[0236] During the above-mentioned application delay time interval, the terminal may operate in a "power reduction mode." Here, when the terminal operates in the power reduction mode, it means that the terminal operates according to a combination of one or more of the following operations.

[0237] - Reduce power consumption by increasing PDCCH processing time

[0238] - Reduce power consumption by not performing buffering of OFDM symbols

[0239] - Operation to reduce power consumption by operating in sleep mode

[0240] That is, by considering the above-mentioned application delay time interval, the power consumption of the terminal can be reduced.

[0241] The application delay time interval may be determined according to at least one function of the following parameters.

[0242] -PDCCH subcarrier spacing (μ0)

[0243] -PDSCH subcarrier spacing (μ1)

[0244] -PUSCH subcarrier spacing (μ2)

[0245] -PDCCH processing time (T proc1 )

[0246] - Relaxed PDCCH processing time (corresponding to a time longer than the PDCCH processing time) (T proc2 )

[0247] -PDCCH related configuration information (e.g., the position of the start or last symbol of PDCCH), CORESET related configuration information (CORESET symbol length, CORESET frequency allocation information, precoding related configuration information, etc.), search space related configuration information (slot unit monitoring period and offset, symbol unit monitoring opportunity, number of PDCCH candidates, etc.)

[0248] - Minimum value of the application delay time interval (T delay,min )

[0249] -The maximum value of the application delay time interval (T delay,max )

[0250] -Whether cross-carrier scheduling is configured

[0251] -Minimum value of PDSCH scheduling offset (K0 min,2 )

[0252] -Minimum value of PUSCH scheduling offset (K2 min,2 )

[0253] - the minimum offset value assumed by the terminal before the newly indicated minimum offset value (i.e., at the point in time when the minimum offset value is received (T 0 )The minimum offset value assumed by the terminal) (K0 min,pre , K2 min,pre , K min,pre )

[0254] Hereinafter, various embodiments of a method for determining the above-mentioned application delay time interval will be described.

[0255] In describing the present disclosure, the following parameters will be defined and used.

[0256] -T 0 : The time point when the DCI including the minimum offset value is received

[0257] -T delay : Apply delay time interval

[0258] -T app: The time point at which the application receives the minimum offset value

[0259] In describing the present disclosure, the following functions will be defined and used.

[0260] -min(A,B): Outputs the smaller value of A and B or a function that is equal to the value of A and B

[0261] -max(A,B): A function that outputs the larger value of A and B or the value equal to A and B

[0262] -ceil(X): A function that outputs the smallest integer among integers equal to or greater than X

[0263] -floor(X): A function that outputs the largest integer among integers equal to or less than X

[0264] <Example (1-1)>

[0265] According to an embodiment of the present disclosure, the application delay time interval (T delay ) can be achieved by using the PDCCH subcarrier spacing (μ0), PDSCH subcarrier spacing (μ1) or PUSCH subcarrier spacing (μ2), the minimum value of the application delay time interval (T delay,min ) and the minimum offset value (K) applied or assumed by the terminal before the newly indicated minimum offset value min,pre ) function.

[0266] According to an embodiment of the present disclosure, the time point (T 0 ) and the application delay time interval (T delay ) can be defined in time slots. For example, when the terminal is in T 0 (=time slot n) to obtain the indicator of the minimum offset value, the terminal can obtain the minimum offset value from T app =T 0 (=time slot n)+T delay The minimum offset value from which the new indication is applied.

[0267] According to an embodiment of the present disclosure, by considering the subcarrier spacing of PDCCH, PDSCH or PUSCH and the case where the control channel has a subcarrier spacing different from that of the data channel, the application delay time interval (T delay More specifically, when the terminal has received a DCI including an indicator of the minimum offset in a time slot n with respect to the PDCCH subcarrier spacing (μ0), and the PDSCH or PUSCH subcarrier spacing scheduled by the corresponding DCI is μ1 or μ2, it is possible to determine the time interval to be applied in the delay time interval (T delay) is the time point at which the minimum offset is applied after . The time slot index may be reconverted taking into account the scaling parameter S. For example, when a PDCCH including an indicator for the minimum offset is received in time slot n, the time slot index may be reconverted from g((time slot n+T delay )*S) to apply the newly indicated minimum offset value. Here, g(·) may correspond to a predetermined function. In an example, S may correspond to a scaling parameter based on the subcarrier spacing of the data channel and may be defined as, for example, S=2 (μ1-μ0) (or S = 2 (μ2-μ0) In another example, S may correspond to a scaling parameter based on the minimum (or maximum) value of the subcarrier spacing of the data channel and the PDCCH, and may be determined as S=2. (μref-μ0) , μref=min(μ0,μ1) (or μref=min(μ0,μ2)) or S=2 (μref - μ0) , μref=max(μ0,μ1) (or μref=max(μ0,μ2)).

[0268] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the minimum value (K) applied or assumed by the terminal before the newly indicated minimum offset value may be considered. min,pre ). For example, T delay By using K min,pre This may be more advantageous in reducing the power consumption of the terminal. More specifically, for example, when the terminal assumes K min,pre =X, the terminal may be operated to spend a longer PDCCH processing time according to the value of X in order to reduce the power consumption of the terminal. For example, the terminal may perform decoding of the PDCCH by extending the PDCCH processing time by X. In this case, the time point at which the decoding of the DCI indicating the new minimum offset value is completed may be after X, and accordingly, the terminal may obtain the new minimum offset value after X. Therefore, the delay time interval T is applied. delay can have a value at least equal to or greater than X. Therefore, by considering K min,pre To define the application delay time interval (T delay ) can be more beneficial in increasing the effect of reducing terminal power consumption.

[0269] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the minimum application delay time interval (T delay,min ). delay,min may correspond to the minimum value of the application delay time interval that the terminal can assume and may be defined as satisfying T delay,min ≥0. When T delay =Tdelay,min =0, it means that the terminal applies the received minimum offset value in the time slot where the corresponding minimum offset value is received.

[0270] The base station may predefine or configure T for the terminal via higher layer signaling. delay,min Alternatively, T delay,min It may be determined by various system parameters (eg, minimum scheduling offset required during cross-carrier scheduling, minimum scheduling offset required during bandwidth part switching, other interruption times, PDCCH processing time, etc.).

[0271] For example, T delay,min It can be determined by whether cross-carrier scheduling is configured and the minimum scheduling offset value according to cross-carrier scheduling. Multiple cells (cells or component carriers (CCs)) can be configured for the terminal from the base station, and the terminal can be configured whether to perform cross-carrier scheduling on the cells configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. In this case, the scheduled cell (cell A) and the scheduling cell (cell B) may be configured by different parameter sets. The parameter set may include subcarrier spacing, cyclic prefix, and the like. When the parameter sets of cell A and cell B are different from each other, when the PDCCH of cell B schedules the PDSCH of cell A, the following minimum scheduling offset may be additionally considered between the PDCCH and the PDSCH (see [Cross-carrier Scheduling Method] above). The minimum scheduling offset required during cross-carrier scheduling between cells with different parameter sets is defined as T offset,min When the DCI indicating the minimum offset received by the terminal in cell B corresponds to the DCI corresponding to the cross-carrier scheduling (i.e., the DCI of cell A) and the subcarrier spacing of cell A is different from the subcarrier spacing of cell B (defined as "condition A"), in determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0272] In another example, T delay,min It can be determined by the minimum scheduling offset value according to the switching of the bandwidth part. When the terminal has received the DCI including the bandwidth part switching indicator in the time slot n, the terminal can BWPThe base station completes the switching to the new bandwidth part indicated by the bandwidth part switching indicator at a time point of , and can perform the transmission or reception of the data channel scheduled by the corresponding DCI in the switched new bandwidth part. When the base station is to schedule the data channel in the new bandwidth part, the base station can consider the bandwidth part switching delay time interval (T BWP ) determines the time domain resource allocation for the data channel. That is, in the method for determining the time domain resource allocation for the data channel when the base station schedules the data channel in the new bandwidth part, the scheduling of the corresponding data channel may be performed after the bandwidth part switching delay time interval. Therefore, the terminal may not expect that the DCI indicating the bandwidth part switching is less than the bandwidth part switching delay time interval (T BWP Consider the bandwidth part switching delay time interval T BWP The minimum scheduling offset can be indicated as the minimum offset T offset,min When the DCI indicating the minimum offset received by the terminal indicates a bandwidth partial switching, in determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0273] In another example, T delay,min It can be determined by the PDCCH processing time of the terminal. For example, when the PDCCH processing time capability of the terminal is T offset,min When T delay,min =T offset,min .

[0274] In addition to the above examples, the interruption time interval or the minimum scheduling offset (collectively referred to as T offset,min ) or PDCCH processing time, T delay,min In the same way, T offset,min Here, T offset,min It can be in time slots. offset,min When multiple T offset,min The value corresponding to the maximum value can be used to determine T delay,min For example, when the minimum value predefined as the default value is T offset,min0 When the minimum scheduling offset according to the cross-carrier scheduling between cells configured with different parameter sets is T offset,min1 , and the minimum scheduling offset considering the bandwidth part switching delay time interval is T offset,min2 , T delay,min According to T delay,min =max(T offset,min0 ,Toffset,min1, T offset,min2 ) to determine.

[0275] Considering the above parameters, the application delay time interval (T delay ) and the time point at which the new indicated minimum offset is applied (T app ). Each parameter in the following equation may follow the details of the above embodiment.

[0276] [Equation 1-1]

[0277] T app =ceil(T 0 +T delay )*S, where T delay =max(K min,pre ,T delay,min )

[0278] [Equation 1-2]

[0279] T app =T 0 *S+T delay , where T delay =max(K min,pre ,T delay,min )*S

[0280] [Equation 1-3]

[0281] T app =ceil(T 0 +T delay )*S, where T delay =K min,pre

[0282] [Equation 1-4]

[0283] T app =T 0 *S+T delay , where T delay =K min,pre *S

[0284] The above equation can be applied in the same manner as in the case of PDSCH and PUSCH, or can be applied to a PDSCH with K min,pre Replace K0 min,pre PDSCH situation and use K min,pre Replace K2 min,pre for each of the PUSCH cases.

[0285] Some of the parameters in the above equations may be omitted, or some parameters may be added to the above equations.

[0286] <Example (1-2)>

[0287] According to an embodiment of the present disclosure, the application delay time interval (T delay ) can be achieved by using the PDCCH subcarrier spacing (μ0), PDSCH subcarrier spacing (μ1) or PUSCH subcarrier spacing (μ2), the minimum value of the application delay time interval (T delay,min ), the maximum value of the application delay time interval (T delay,max ) and the minimum offset value (K) applied or assumed by the terminal before the new indicated minimum offset value min,pre ) function.

[0288] According to an embodiment of the present disclosure, the application delay time interval (T delay ) can be defined in time slots. For example, when the terminal is in T 0 (=time slot n) to obtain the indicator of the minimum offset value, the terminal can obtain the minimum offset value from T app =T 0 (=time slot n)+T delay The minimum offset value from which the new indication is applied.

[0289] According to an embodiment of the present disclosure, scaling can be applied to the application delay time interval (T delay More specifically, when the terminal has received a DCI including an indicator for a minimum offset in a time slot n with respect to a PDCCH subcarrier spacing (μ0), and a PDSCH or PUSCH subcarrier spacing scheduled by the corresponding DCI is μ1 or μ2, the time slot index may be reconverted to determine the time interval for applying the delay time interval (T delay ) is the time point at which the minimum offset is to be applied after . The time slot index may be reconverted taking into account the scaling parameter S. For example, when a PDCCH including an indicator for the minimum offset is received in time slot n, the time slot index may be reconverted from g((time slot n+T delay )*S) to apply the newly indicated minimum offset value. Here, g(·) may correspond to a predetermined function. In an example, S may correspond to a scaling parameter based on the subcarrier spacing of the data channel and may be defined as, for example, S=2 (μ1-μ0) (or S = 2 (μ2-μ0) In another example, S may correspond to a scaling parameter based on the minimum (or maximum) value of the subcarrier spacing of the data channel and the PDCCH, and may be determined as S=2. (μref-μ0) , μref=min(μ0,μ1) (or μref=min(μ0,μ2)) or S=2 (μref-μ0), μref=max(μ0,μ1) (or μref=max(μ0,μ2)).

[0290] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the minimum value (K) applied or assumed by the terminal before the newly indicated minimum offset value may be considered. min,pre ). For example, T delay According to K min,pre This may be more advantageous in reducing the power consumption of the terminal. More specifically, for example, when the terminal assumes K min,pre =X, the terminal may be operated to spend a longer PDCCH processing time according to the value of X in order to reduce the power consumption of the terminal. For example, the terminal may perform decoding of the PDCCH by extending the PDCCH processing time by X. In this case, the time point at which the decoding of the DCI indicating the new minimum offset value is completed may be after X, and accordingly, the terminal may obtain the new minimum offset value after X. Therefore, the delay time interval T is applied. delay can have a value at least equal to or greater than X. Therefore, by considering K min,pre To define the application delay time interval (T delay ) can be more beneficial in increasing the effect of reducing terminal power consumption.

[0291] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the minimum application delay time interval (T delay,min ). delay,min may correspond to the minimum value of the application delay time interval that the terminal can assume and may be defined as satisfying T delay,min ≥0. When T delay =T delay,min =0, it means that the terminal applies the received minimum offset value in the time slot where the corresponding minimum offset value is received.

[0292] The base station may predefine or configure T for the terminal via higher layer signaling. delay,min Alternatively, T delay,min It may be determined by various system parameters (eg, minimum scheduling offset required during cross-carrier scheduling, minimum scheduling offset required during bandwidth part switching, other interruption times, PDCCH processing time, etc.).

[0293] For example, T delay,minIt can be determined by whether cross-carrier scheduling is configured and the minimum scheduling offset value according to cross-carrier scheduling. Multiple cells (cells or component carriers (CCs)) can be configured for the terminal from the base station, and the terminal can be configured whether to perform cross-carrier scheduling on the cells configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. In this case, the scheduled cell (cell A) and the scheduling cell (cell B) may be configured by different parameter sets. The parameter set may include subcarrier spacing, cyclic prefix, and the like. When the parameter sets of cell A and cell B are different from each other, when the PDCCH of cell B schedules the PDSCH of cell A, the following minimum scheduling offset may be additionally considered between the PDCCH and the PDSCH (see [Cross-carrier Scheduling Method] above). The minimum scheduling offset required during cross-carrier scheduling between cells with different parameter sets is defined as T offset,min When the DCI indicating the minimum offset received by the terminal in cell B corresponds to the DCI corresponding to the cross-carrier scheduling (i.e., the DCI of cell A) and the subcarrier spacing of cell A is different from the subcarrier spacing of cell B (defined as "condition A"), in determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0294] In another example, T delay,min It can be determined by the minimum scheduling offset value according to the switching in the bandwidth part. When the terminal has received the DCI including the bandwidth part switching indicator in time slot n, the terminal can BWP The base station completes the switching to the new bandwidth part indicated by the bandwidth part switching indicator at a time point of , and can perform the transmission or reception of the data channel scheduled by the corresponding DCI in the switched new bandwidth part. When the base station is to schedule the data channel in the new bandwidth part, the base station can consider the bandwidth part switching delay time interval (T BWP ) determines the time domain resource allocation for the data channel. That is, in the method for determining the time domain resource allocation for the data channel when the base station schedules the data channel in the new bandwidth part, the scheduling of the corresponding data channel may be performed after the bandwidth part switching delay time interval. Therefore, the terminal may not expect that the DCI indicating the bandwidth part switching is less than the bandwidth part switching delay time interval (T BWP Consider the bandwidth part switching delay time interval T BWP The minimum scheduling offset can be indicated as Toffset,min When the terminal receives a DCI indicating the minimum offset indicating the bandwidth part switching, after determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0295] In another example, T delay,min It can be determined by the PDCCH processing time of the terminal. For example, when the PDCCH processing time capability of the terminal is T offset,min When T delay,min =T offset,min .

[0296] In addition to the above examples, when considering the interruption time interval or the minimum scheduling offset (collectively referred to as T offset,min ) or PDCCH processing time, T delay,min In the same way, T offset,min Here, T offset,min It can be in time slots. offset,min When multiple T offset,min The value corresponding to the maximum value can be used to determine T delay,min For example, when the minimum value predefined as the default value is T offset,min0 When the minimum scheduling offset according to the cross-carrier scheduling between cells configured with different parameter sets is T offset,min1 , and the minimum scheduling offset considering the bandwidth part switching delay time interval is T offset,min2 , T delay,min According to T delay,min =max(T offset,min0 ,T offset,min1, T offset,min2 ) to determine.

[0297] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the maximum application delay time interval (T delay,max ). delay,max may correspond to the maximum value of the application delay time interval that the terminal can assume and may be defined as satisfying T delay,max ≥0. That is, for T delay , the terminal may not expect the application delay time interval to be equal to or greater than T delay,max Even when T delay By K min,pre When determining, the received K with a value smaller than the current assumption of the terminal within a specific time interval min,pre The minimum offset value will also be based on Tdelay,max is applied. For example, when K min,pre = X, T delay,max = Y and Y < X, T delay can be determined to have a value of Y. In this case, the base station can change the minimum offset value of the terminal within a delay time interval having a value less than the K min,pre value currently assumed by the terminal. T delay,max can be configured for the terminal by the base station via higher layer signaling, or can be defined as a fixed value. Alternatively, T delay,max can be defined by a function of various system parameters. For example, T delay,max can be defined by the PDCCH processing time, the PDCCH processing time capability, the relaxed PDCCH processing time or the maximum value of the PDCCH processing time of the terminal, the time interval during which the OFDM symbols of the terminal are not cached, or a function configured using the above parameters.

[0298] According to an embodiment, when determining the application delay time interval (T delay ), an additional delay time interval (d0) can be considered. d0 can correspond to the delay time that can be considered in addition to K min,pre and can correspond to a parameter that can be affected by various operations related to the reception or transmission of the terminal. In addition, d0 can be defined in units of time slots.

[0299] In an example, d0 can be determined by a series of terminal operations related to PDCCH reception and decoding or PDCCH-related configuration parameters. For example, d0 can be determined by the reception symbol position of the PDCCH received by the terminal. When the terminal has received the PDCCH that transmits the DCI indicating the minimum offset after a specific symbol in a time slot (for example, after the Xth symbol), for the application delay time interval, an additional offset can be considered so that the terminal ensures sufficient time for PDCCH decoding. In this case, X can be predefined or can be configured by the base station.

[0300] Alternatively, d0 can be determined by the PDCCH configuration parameters configured for the terminal (for example, CORESET configuration or search space configuration). For example, d0 may be affected by the number of CCEs monitored by the terminal and the number of PDCCH candidates (or the number of blind decoding times and the number of channel estimation times).

[0301] The number of CCEs and the number of PDCCH candidates monitored by the terminal can be determined by the CORESET configuration and the search space configuration. The terminal can be configured with the number of PDCCH candidates for each aggregation level (AL) via higher layer signaling configuration from the base station. When there are a large number of PDCCH candidates and CCEs configured for the terminal, the number of blind decodings and the number of channel estimates may increase, and accordingly, the PDCCH decoding time of the terminal may increase. On the other hand, when there are a small number of PDCCH candidates and CCEs configured for the terminal, the number of blind decodings and the number of channel estimates may decrease, and accordingly, the PDCCH decoding time of the terminal may decrease. Therefore, the additional delay time interval can be considered based on the number of PDCCH candidates and the number of CCEs configured for the terminal in the CORESET configuration and the search space configuration.

[0302] The number of CCEs monitored by the terminal and the number of PDCCH candidates may vary according to the cell (cell or component carrier (CC)) configuration and cross-carrier scheduling configuration used for carrier aggregation. Multiple cells (cells or CCs) may be configured for the terminal from the base station, and the terminal may be configured with whether to perform cross-carrier scheduling on the cell configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. When PDCCH monitoring for multiple cells is performed in cell B, the number of PDCCH candidates and the number of CCEs of the terminal in cell B may increase. Therefore, according to the cross-carrier scheduling configuration, an additional delay time interval may be considered. Taking into account the above description, d0 may be determined by, for example, at least one of the following one or more methods or a combination thereof.

[0303]

Method 1

[0304] If the last symbol of the PDCCH transmitting the DCI indicating the minimum offset received by the terminal corresponds to a symbol after the Xth symbol in the slot, d0=A; otherwise, d0=B.

[0305] (e.g., X=3, A=1 and B=0)

[0306]

Method 2

[0307] If the number M of PDCCH candidates or the number CCEs C is greater than a predetermined threshold X1 or X2 in a time slot in which the terminal has received a PDCCH transmitting a DCI indicating a minimum offset, then d0=A; otherwise d0=B.

[0308] (For example, X1 and X2 correspond to predetermined values ​​of M and C, respectively, and may be predefined or configured by the base station. Each of X1 and X2 may have a value associated with a restriction on the maximum number of PDCCH candidates (Table 12) or a restriction on the maximum number of CCEs (Table 13). A=1, B=0)

[0309]

Method 3

[0310] If the "first PDCCH configuration" is satisfied in the time slot in which the terminal has received the PDCCH transmitting the DCI indicating the minimum offset, d0=A; otherwise, d0=B.

[0311] (For example, the "first PDCCH configuration" may correspond to a combination of configuration values ​​that can affect an increase in PDCCH decoding time among various PDCCH configuration values. For example, the configuration values ​​may include the last symbol of the received PDCCH, the number of PDCCH candidates, the number of CCEs, whether cross-carrier scheduling is configured, CORESET-related parameters, and search space-related parameters.)

[0312] Considering the above parameters, the application delay time interval (T delay ) and the time point at which the new indicated minimum offset is applied (T app ). Each parameter in the following equation may follow the details of the above embodiment.

[0313] [Equation 2-1]

[0314] T app =ceil(T 0 +T delay )*S, where T delay =min(max(K min,pre ,T delay,min )+d0,T delay,max )

[0315] [Equation 2-2]

[0316] T app =T 0 *S+T delay , where T delay =min(max(K min,pre ,T delay,min )+d0,T delay,max )*S

[0317] The above equation can be applied in the same manner as in the case of PDSCH and PUSCH, or can be applied to a PDSCH with K min,pre Replace K0 min,pre PDSCH situation and use K min,preReplace K2 min,pre for each of the PUSCH cases.

[0318] Some of the parameters in the above equations may be omitted, or some parameters may be added to the above equations.

[0319] <Example (1-3)>

[0320] According to an embodiment of the present disclosure, the application delay time interval (T delay ) can be achieved by using the PDCCH subcarrier spacing (μ0), PDSCH subcarrier spacing (μ1) or PUSCH subcarrier spacing (μ2), the minimum value of the application delay time interval (T delay,min ), the maximum value of the application delay time interval (T delay,max ) and the minimum offset value (K) applied or assumed by the terminal before the new indicated minimum offset value min,pre ) function.

[0321] According to an embodiment of the present disclosure, the time point (T 0 ) and the application delay time interval (T delay ) can be defined in symbolic units. In this case, T 0 It can be defined as the last symbol of the PDCCH receiving the DCI indicating the minimum offset, the first symbol of the PDCCH receiving the DCI indicating the minimum offset, the third symbol in the time slot receiving the DCI indicating the minimum offset, etc. For example, when the terminal is at T 0 When obtaining an indicator for the minimum offset value, the terminal can obtain the app (T app =T 0 +T delay ) symbol and applies the new indicated minimum offset value.

[0322] According to an embodiment, the time point at which the minimum offset is applied may be quantified in units of time slots. 0 T starting from (corresponding to the symbol of the DCI indicating the minimum offset is received) delay The minimum offset is applied to the next PDSCH or PUSCH time slot corresponding to the time point after symbols. 0 When the last symbol of the PDCCH corresponding to the DCI indicating the minimum offset is received in time slot n, the terminal can 0 +T delay The first time slot after the symbol is time slot n+k (for example, k can be calculated according to k=ceil((T 0 +T delay ) / N symbThe minimum offset is applied starting from the corresponding PDSCH or PUSCH time slot.

[0323] According to an embodiment, for the time point to which the minimum offset is applied, quantization in units of time slots may not be applied. 0 T starts from (corresponding to the time point when the DCI indicating the minimum offset is received) delay The minimum offset is applied starting from the PDSCH or PUSCH symbol corresponding to the symbol after symbols.

[0324] According to an embodiment of the present disclosure, by considering the subcarrier spacing of PDCCH, PDSCH or PUSCH and the case where the control channel has a subcarrier spacing different from that of the data channel, the application delay time interval (T delay ) application scaling. More specifically, when the terminal has received a DCI including an indicator for the minimum offset with respect to the PDCCH subcarrier spacing (μ0) in symbol n, and the PDSCH or PUSCH subcarrier spacing scheduled by the corresponding DCI is μ1 or μ2, the application delay time interval (T delay ) is the time point at which the minimum offset is to be applied after . The scaling parameter S may be taken into account to reconvert the time slot index. For example, when a PDCCH including an indicator for the minimum offset is received in symbol n, the time slot index may be reconverted from g((symbol n+T delay )*S) to apply the new indicated minimum offset value. Here, g(·) may correspond to a predetermined function (e.g., g(·) may correspond to the above-mentioned function quantized in units of time slots). In an example, S may correspond to a scaling parameter based on the subcarrier spacing of the data channel and may be defined as, for example, S=2 (μ1-μ0) (or S = 2 (μ2-μ0) In another example, S may correspond to a scaling parameter based on the minimum (or maximum) value of the subcarrier spacing of the data channel and the PDCCH, and may be determined as, for example, S=2. (μref-μ0) , μref=min(μ0,μ1) (or μref=min(μ0,μ2)) or S=2 (μref-μ0) , μref=max(μ0,μ1) (or μref=max(μ0,μ2)). In another example, S may correspond to a scaling parameter based on the minimum (or maximum) value of the subcarrier spacing of the control channel and the data channel, and may be determined as S=2 -μref2 , μref2=max(μ0,μ1) or μref2=max(μ0,μ2).

[0325] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay), the minimum value (K) applied or assumed by the terminal before the newly indicated minimum offset value may be considered. min,pre ). For example, T delay According to K min,pre This may be more advantageous in reducing the power consumption of the terminal. More specifically, for example, when the terminal assumes K min,pre =X, the terminal may be operated to spend a longer PDCCH processing time according to the value of X in order to reduce the power consumption of the terminal. For example, the terminal may perform decoding of the PDCCH by extending the PDCCH processing time by X. In this case, the time point at which the decoding of the DCI indicating the new minimum offset value is completed may be after X, and accordingly, the terminal may obtain the new minimum offset value after X. Therefore, the delay time interval T is applied. delay can have a value at least equal to or greater than X. Therefore, by considering K min,pre To define the application delay time interval (T delay ) can be more beneficial in increasing the effect of reducing terminal power consumption.

[0326] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the minimum application delay time interval (T delay,min ). delay,min may correspond to the minimum value of the application delay time interval that the terminal can assume and may be defined as satisfying T delay,min ≥0. When T delay =T delay,min = 0, which means that the terminal receives the corresponding minimum offset value T 0 The smallest offset value received is applied immediately.

[0327] According to an embodiment of the present disclosure, the base station may predefine or configure T for the terminal via high-layer signaling. delay,min Alternatively, T delay,min It may be determined by various system parameters (eg, minimum scheduling offset required during cross-carrier scheduling, minimum scheduling offset required during bandwidth part switching, other interruption times, PDCCH processing time, etc.).

[0328] For example, T delay,minIt can be determined by whether cross-carrier scheduling is configured and the minimum scheduling offset value according to cross-carrier scheduling. Multiple cells (cells or component carriers (CCs)) can be configured for the terminal from the base station, and the terminal can be configured whether to perform cross-carrier scheduling on the cells configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. In this case, the scheduled cell (cell A) and the scheduling cell (cell B) may be configured by different parameter sets. The parameter set may include subcarrier spacing, cyclic prefix, and the like. When the parameter sets of cell A and cell B are different from each other, when the PDCCH of cell B schedules the PDSCH of cell A, the following minimum scheduling offset may be additionally considered between the PDCCH and the PDSCH (see [Cross-carrier Scheduling Method] above). The minimum scheduling offset required during cross-carrier scheduling between cells with different parameter sets is defined as T offset,min When the DCI indicating the minimum offset received by the terminal in cell B corresponds to the DCI corresponding to the cross-carrier scheduling (i.e., the DCI of cell A) and the subcarrier spacing of cell A is different from the subcarrier spacing of cell B (defined as "condition A"), in determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0329] In another example, T delay,min It can be determined by the minimum scheduling offset value according to the switching in the bandwidth part. When the terminal has received the DCI including the bandwidth part switching indicator in time slot n, the terminal can BWP The base station completes the switching to the new bandwidth part indicated by the bandwidth part switching indicator at a time point of , and can perform the transmission or reception of the data channel scheduled by the corresponding DCI in the switched new bandwidth part. When the base station is to schedule the data channel in the new bandwidth part, the base station can consider the bandwidth part switching delay time interval (T BWP ) determines the time domain resource allocation for the data channel. That is, in the method for determining the time domain resource allocation for the data channel when the base station schedules the data channel in the new bandwidth part, the scheduling of the corresponding data channel may be performed after the bandwidth part switching delay time interval. Therefore, the terminal may not expect that the DCI indicating the bandwidth part switching is less than the bandwidth part switching delay time interval (T BWP Consider the bandwidth part switching delay time interval T BWP The minimum scheduling offset can be expressed as Toffset,min When the terminal receives a DCI indicating the minimum offset indicating the bandwidth part switching, after determining T delay,min When T offset,min (For example, T delay,min =T offset,min ).

[0330] In another example, T delay,min It can be determined by the PDCCH processing time of the terminal. For example, when the PDCCH processing time capability of the terminal is T offset,min When T delay,min =T offset,min .

[0331] In addition to the above examples, when considering the interruption time interval or the minimum scheduling offset (collectively referred to as T offset,min ) or PDCCH processing time, T delay,min In the same way, T offset,min Here, T offset,min It can be in time slots. offset,min When multiple T offset,min The value corresponding to the maximum value can be used to determine T delay,min For example, when the minimum value predefined as the default value is T offset,min0 When the minimum scheduling offset according to the cross-carrier scheduling between cells configured with different parameter sets is T offset,min1 , and the minimum scheduling offset considering the bandwidth part switching delay time interval is T offset,min2 , T delay,min According to T delay,min =max(T offset,min0 ,T offset,min1, T offset,min2 ) to determine.

[0332] According to an embodiment of the present disclosure, when determining the application delay time interval (T delay ), the maximum application delay time interval (T delay,max ). delay,max may correspond to the maximum value of the application delay time interval that the terminal can assume and may be defined as satisfying T delay,max ≥ 0. T delay,max It can be defined in symbol units. That is, for T delay , the terminal may not expect the application delay time interval to be equal to or greater than T delay,max Even when T delay By K min,pre When determining, the received K with a value smaller than the current assumption of the terminal within a specific time intervalmin,pre The minimum offset value of the value will also be applied according to T delay,max For example, when K min,pre = X, T delay,max = Y and Y < X, T delay can be determined to have a value of Y. In this case, the base station can change the minimum offset value within a delay time interval having a value less than the currently assumed K of the terminal min,pre value. T delay,max can be configured for the terminal by the base station via higher layer signaling, or can be defined as a fixed value. Alternatively, T delay,max can be defined by a function of various system parameters. For example, T delay,max can be defined by the PDCCH processing time, the PDCCH processing time capability, the relaxed PDCCH processing time or the maximum value of the PDCCH processing time of the terminal, the time interval during which the OFDM symbols of the terminal are not cached, or a function configured using the above parameters.

[0333] According to an embodiment, when determining the application delay time interval (T delay ), an additional delay time interval (d0) can be considered. d0 can correspond to the delay time that can be considered in addition to K min,pre and can correspond to a parameter that can be affected by various operations related to the reception or transmission of the terminal. In addition, d0 can be defined in units of time slots.

[0334] In an example, d0 can be determined by a series of terminal operations related to PDCCH reception and decoding or PDCCH-related configuration parameters. For example, d0 can be determined by the reception symbol position of the PDCCH received by the terminal. When the terminal has received the PDCCH that transmits the DCI indicating the minimum offset after a specific symbol in a time slot (for example, after the Xth symbol), for the application delay time interval, an additional offset can be considered so that the terminal ensures sufficient time for PDCCH decoding. In this case, X can be predefined or can be configured by the base station.

[0335] Alternatively, d0 can be determined by the PDCCH configuration parameters configured for the terminal (for example, CORESET configuration or search space configuration). For example, d0 may be affected by the number of CCEs monitored by the terminal and the number of PDCCH candidates (or the number of blind decoding times and the number of channel estimation times).

[0336] The number of CCEs and the number of PDCCH candidates monitored by the terminal may be determined by the CORESET configuration and the search space configuration. The terminal may be configured with the number of PDCCH candidates for each AL via higher layer signaling from the base station. When there are a large number of PDCCH candidates and CCEs configured for the terminal, the number of blind decodings and the number of channel estimates may increase, and accordingly, the PDCCH decoding time of the terminal may increase. On the other hand, when there are a small number of PDCCH candidates and CCEs configured for the terminal, the number of blind decodings and the number of channel estimates may decrease, and accordingly, the PDCCH decoding time of the terminal may decrease. Therefore, an additional delay time interval may be considered based on the number of PDCCH candidates and the number of CCEs configured for the terminal in the CORESET configuration and the search space configuration.

[0337] The number of CCEs monitored by the terminal and the number of PDCCH candidates may vary according to the cell (cell or component carrier (CC)) configuration and cross-carrier scheduling configuration used for carrier aggregation. Multiple cells (cells or CCs) may be configured for the terminal from the base station, and the terminal may be configured with whether to perform cross-carrier scheduling on the cell configured for the terminal. When cross-carrier scheduling is configured for a specific cell (cell A or a scheduled cell), PDCCH monitoring for cell A may not be performed in cell A, but may be performed in other cells (cell B or scheduling cells) indicated by cross-carrier scheduling. When PDCCH monitoring for multiple cells is performed in cell B, the number of PDCCH candidates and the number of CCEs of the terminal in cell B may increase. Therefore, according to the cross-carrier scheduling configuration, an additional delay time interval may be considered. Taking into account the above description, d0 may be determined by, for example, at least one of the following one or more methods or a combination thereof.

[0338]

Method 1

[0339] If the last symbol in which the terminal has received the PDCCH transmitting the DCI indicating the minimum offset corresponds to a symbol after the Xth symbol in the slot, d0=A; otherwise, d0=B.

[0340] (e.g., X=3, A>0 and B=0)

[0341]

Method 2

[0342] If the number M of PDCCH candidates or the number CCEs C is greater than a predetermined threshold X1 or X2 in a time slot in which the terminal has received a PDCCH transmitting a DCI indicating a minimum offset, then d0=A; otherwise d0=B.

[0343] (For example, X1 and X2 correspond to predetermined values ​​of M and C, respectively, and may be predefined or configured by the base station. Each of X1 and X2 may have a value associated with a restriction on the maximum number of PDCCH candidates (Table 12) or a restriction on the maximum number of CCEs (Table 13). A>0, and B=0)

[0344]

Method 3

[0345] If the "first PDCCH configuration" is satisfied in the time slot in which the terminal has received the PDCCH transmitting the DCI indicating the minimum offset, d0=A; otherwise, d0=B.

[0346] (For example, the "first PDCCH configuration" may correspond to a combination of configuration values ​​that can affect an increase in the PDCCH decoding time among various configuration values. For example, the configuration values ​​may include the last symbol of the received PDCCH, the number of PDCCH candidates, the number of CCEs, whether cross-carrier scheduling is configured, CORESET-related parameters, and search space-related parameters. A>0 and B=0)

[0347] Considering the above parameters, the application delay time interval (T delay ) and the time point at which the new indicated minimum offset is applied (T app ). Each parameter in the following equation may follow the details of the above embodiment.

[0348] [Equation 3-1]

[0349] T app =ceil(T 0 +T delay )*S, where T delay =min(max(K min,pre *N symb ,T delay,min )+d0,T delay,max )

[0350] [Equation 3-2]

[0351] T app =T 0 *S+T delay , where T delay =min(max(K min,pre *N symb ,T delay,min )+d0,T delay,max )*S

[0352] N in the above equations 3-1 and 3-2 symb It can be defined by the number of symbols per time slot (e.g., N symb=14) When considering quantization in time slot units, the terminal can app The minimum offset is applied from the PDSCH or PUSCH time slot at the time point after the symbol. When quantization in time slot units is not considered, the terminal can start from T app The minimum offset is applied starting from the next PDSCH or PUSCH symbol after the subsequent time point.

[0353] According to an embodiment of the present disclosure, the T having the symbol unit as described above can be applied by converting the symbol unit into an absolute time unit. delay When converted to absolute time units, the value is T proc When T proc It can be defined as T proc =f(T delay ), and can be defined, for example, as follows.

[0354] T pro =f(T delay )=T delay *(2048+144)*κ*S*T C

[0355] T C =1 / (Δf max ·N f ) where Δf max =480·10 3 Hz and N f =4096.

[0356] K=T S / T C =64 where T S =1 / (Δf ref N f,ref ), Δ fref =15·10 3 Hz and N f,ref =2048

[0357] [Equation 3-3]

[0358] T proc =f(T delay )=min(max(K min,pre *N symb , T delay,min )+d0,T delay,max )*(2048+144)*κ*S*T C

[0359] [Equation 3-4]

[0360] T proc =f(Tdelay )=min((max(K min,pre *N symb , T delay,min )+d0)*(2048+144)**S*T C , T proc,max ),

[0361] whereT proc,max =f(T delay,max )=T delay,max *(2048+144)*κ*S*T C

[0362] When considering quantization in time slot units, the terminal can receive the minimum offset T 0 Starting T proc The minimum offset is applied from the next PDSCH or PUSCH time slot at the time point after the time interval. When quantization in time slot units is not considered, the terminal can receive the minimum offset T from the time point after receiving the minimum offset 0 Starting T proc The minimum offset is applied from the point in time after the time interval.

[0363] The above detailed embodiments may be combined and managed.

[0364] Figure 8 A terminal operation according to an embodiment of the present disclosure is shown.

[0365] According to an embodiment of the present disclosure, the application delay time interval of the terminal may have a value that varies according to various system parameters. For example, when condition A is met, the terminal may apply the application delay time interval A, and when another condition B is met, the terminal may apply the application delay time interval B. Various conditions and methods for determining the application delay time interval are described in detail in the first embodiment of the present disclosure. Figure 8 In order to define the terminal operation by simplifying the above conditions and methods, the conditions affecting the application delay time interval are standardized and considered as the "first condition". The terminal can apply the "first application delay time interval" or the "second application delay time interval" according to whether the "first condition" is met.

[0366] More specifically, refer to Figure 8, in operation 801, the terminal may receive a DCI indicating a minimum offset. In operation 802, the terminal may determine whether a "first condition" for determining an application delay time interval is satisfied. When the "first condition" is satisfied, the terminal may apply the received minimum offset value by applying a "first application delay time interval" (operation 803). When the "first condition" is not satisfied, the terminal may apply the received minimum offset value by applying a "second application delay time interval" (operation 804).

[0367] Fig. 9 and Fig.10 The transceiver, memory and processor of the terminal and the base station are respectively shown to perform the above embodiments. The above embodiments describe the sending or receiving method of the base station and the terminal for reducing the power consumption of the terminal. In order to perform the method, it is necessary to operate the transceiver, memory and processor of each of the terminal and the base station according to the embodiment.

[0368] Fig. 9 is a block diagram illustrating a structure of a terminal according to an embodiment of the present disclosure.

[0369] refer to Fig. 9 , the terminal may include a transceiver 901, a memory 902, and a processor 903. However, the components of the terminal are not limited to the above examples. For example, the terminal may include more or fewer components than the above components. In addition, the transceiver 901, the memory 902, and the processor 903 may be implemented as a single chip.

[0370] According to an embodiment of the present disclosure, the transceiver 901 may send a signal to a base station or receive a signal from a base station. The signal may include control information and data. To this end, the transceiver 901 may include an RF transmitter for up-converting and amplifying the frequency of the transmitted signal, and an RF receiver for low-noise amplifying the received signal and down-converting its frequency. In addition, the transceiver 901 may receive a signal through a wireless channel, output it to the processor 903, and send a signal output from the processor 903 through a wireless channel.

[0371] According to an embodiment of the present disclosure, the memory 902 may store programs and data required for terminal operation. The memory 902 may store control information or data included in a signal sent or received by the terminal. The memory 902 may be a storage medium, such as a read-only memory (ROM), a random access memory (RAM), a hard disk, a CD-ROM, and a digital versatile disk (DVD), or a combination of storage media. In addition, the memory 902 may include a plurality of memories. According to an embodiment of the present disclosure, the memory 902 may store a program for controlling and receiving operations to reduce power consumption of the terminal.

[0372] According to an embodiment of the present disclosure, the processor 903 may control a series of processes that the terminal may operate according to the above-mentioned embodiment of the present disclosure. For example, according to an embodiment of the present disclosure, the processor 903 may control the power consumption reduction operation of the terminal.

[0373] Specifically, the processor 903 can receive configuration information related to the PDCCH from the base station, monitor the PDCCH from the base station according to the configuration information related to the PDCCH received from the base station, and control each configuration of the terminal having operations of applying control details related to the detection and reception of the PDCCH while monitoring.

[0374] In addition, the processor 903 may include a plurality of processors, and execute the terminal power consumption reduction method according to an embodiment of the present disclosure by executing a program stored in the memory 902 .

[0375] Fig.10 is a block diagram showing the structure of a base station according to an embodiment of the present disclosure.

[0376] refer to Fig.10 , the base station may include a transceiver 1001, a memory 1002, and a processor 1003. However, the components of the base station are not limited to the above examples. For example, the base station may include more or fewer components than the above components. In addition, the transceiver 1001, the memory 1002, and the processor 1003 may be implemented as a single chip.

[0377] According to an embodiment of the present disclosure, the transceiver 1001 can send a signal to a terminal or receive a signal from a terminal. The signal may include control information and data. To this end, the transceiver 1001 may include an RF transmitter for up-converting and amplifying the frequency of the transmitted signal, and an RF receiver for low-noise amplifying the received signal and down-converting its frequency. In addition, the transceiver 1001 can receive a signal through a wireless channel, output it to the processor 1003, and send a signal output from the processor 1003 through a wireless channel.

[0378] According to an embodiment of the present disclosure, the memory 1002 may store programs and data required for base station operation. The memory 1002 may store control information or data included in a signal sent or received by the base station. The memory 1002 may be a storage medium, such as a read-only memory (ROM), a random access memory (RAM), a hard disk, a CD-ROM, and a digital versatile disk (DVD), or a combination of storage media. In addition, the memory 1002 may include a plurality of memories. According to an embodiment of the present disclosure, the memory 1002 may store a program for the base station to generate and send control information for reducing terminal power consumption.

[0379] According to an embodiment of the present disclosure, the processor 1003 may control a series of processes that the base station may operate according to the above-mentioned embodiment of the present disclosure. For example, the processor 1003 may control each configuration of the base station to generate and send control information for reducing power consumption of the terminal.

[0380] In addition, the processor 1003 may include a plurality of processors, and perform a method for generating control information and transmitting a downlink control channel to reduce power consumption of a terminal according to an embodiment of the present disclosure by executing a program stored in the memory 1002 .

[0381] The methods disclosed in the claims and / or the methods according to the various embodiments described in the present disclosure may be implemented by hardware, software, or a combination of hardware and software.

[0382] When the method is implemented by software, a computer-readable storage medium for storing one or more programs (software modules) may be provided. One or more programs stored in the computer-readable storage medium may be configured to be executed by one or more processors in an electronic device. At least one program may include instructions for causing an electronic device to perform the method according to the various embodiments of the present disclosure as defined by the appended claims and / or disclosed herein.

[0383] The program (software module or software) can be stored in a non-volatile memory, including random access memory and flash memory, read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), magnetic disk storage device, compact disk ROM (CD-ROM), digital versatile disk (DVD) or other types of optical storage devices or cassette tapes. Alternatively, any combination of some or all of them can form a memory storing the program. In addition, multiple such memories may be included in the electronic device.

[0384] In addition, the program can be stored in an attachable storage device that can access the electronic device through a communication network such as the Internet, an intranet, a local area network (LAN), a wide area network (WAN), and a storage area network (SAN) or a combination thereof. Such a storage device can access the electronic device via an external port. In addition, a separate storage device on a communication network can access a portable electronic device.

[0385] In the above detailed embodiments of the present disclosure, the elements included in the present disclosure are expressed in the singular or plural, depending on the detailed embodiments presented. However, for ease of description, the singular form or plural form is appropriately selected for the presented situation, and the present disclosure is not limited to the elements expressed in the singular or plural form. Therefore, an element expressed in the plural may also include a single element, or an element expressed in the singular may also include multiple elements.

[0386] The embodiments of the present disclosure described and shown in the specification and the drawings are intended to easily explain the technical content of the present disclosure and help understand the present disclosure, rather than to limit the scope of the present disclosure. That is, it is obvious to those skilled in the art that other modifications and changes can be made to the present disclosure based on the technical ideas of the present disclosure. In addition, the above-mentioned various embodiments can be used in combination as needed. For example, an embodiment of the present disclosure can be combined with parts of other embodiments to operate base stations and terminals. In addition, embodiments of the present disclosure can be applied to other communication systems, and other variations based on the technical ideas of the embodiments can be implemented, for example, embodiments can be applied to LTE systems, 5G systems, NR systems, etc.

Claims

1. A method performed by a user equipment UE in a communication system, the method include: Identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; Receiving downlink control information DCI indicating a minimum offset value from a base station in time slot n; Determine K based on the DCI 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH; and Apply the K in time slot n+X 0min Value, where X is the application delay.

2. The method according to claim 1, further comprising: include: Identifying a TDRA table for a physical uplink shared channel PUSCH; Determine K based on the DCI 2min value, where the K 2min The value is the minimum applicable value of the PUSCH scheduling offset K2 in the TDRA table for the PUSCH; and Apply the K in time slot n+X 2min value.

3. The method according to claim 2, in, K 0min Value and K 2min The values ​​are defined separately, and the DCI indicates K 0min Value and K 2min value.

4. The method according to claim 1, in, The application delay is based on the K of the current application in time slot n. 0min The DCI is defined as a function of the value, the subcarrier spacing SCS configuration for the physical downlink control channel PDCCH, and the SCS configuration for the PDSCH, and the parameter depends on the symbol of the DCI received in time slot n.

5. The method according to claim 4, in, In case the DCI is contained within the first N symbols of time slot n, the parameter is a first value, and in case the DCI is received outside the first N symbols of time slot n, the parameter is a second value, and The second value is greater than the first value by 1.

6. A method performed by a base station in a communication system, the method include: Identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; Determine K 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH, Sending downlink control information DCI indicating a minimum offset value to a user equipment UE in time slot n; Apply the K in time slot n+X 0min Value, where X is the application delay.

7. The method according to claim 6, further comprising: include: Identifying a TDRA table for a physical uplink shared channel PUSCH; Determine K 2min value, where the K 2min The value is the minimum applicable value of the PUSCH scheduling offset K2 in the TDRA table for the PUSCH; and Apply the K in time slot n+X 2min value.

8. The method according to claim 7, in, K 0min Value and K 2min The values ​​are defined separately, and the DCI indicates K 0min Value and K 2min value.

9. The method according to claim 6, in, The application delay is based on the K of the current application in time slot n. 0min The DCI is defined as a function of the value, the subcarrier spacing SCS configuration for the physical downlink control channel PDCCH, and the SCS configuration for the PDSCH, and the parameter depends on the symbol in which the DCI is sent in time slot n.

10. The method according to claim 9, in, In case the DCI is contained within the first N symbols of time slot n, the parameter is a first value, and in case the DCI is transmitted outside the first N symbols of time slot n, the parameter is a second value, and The second value is greater than the first value by 1.

11. A user equipment UE in a communication system, the UE include: Transceiver; as well as At least one processor configured to: Identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; Receiving downlink control information DCI indicating a minimum offset value from a base station in time slot n; Determine K based on the DCI 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH; and Apply the K in time slot n+X 0min Value, where X is the application delay.

12. The UE according to claim 11, in, The at least one processor is further configured to: Identifying a TDRA table for a physical uplink shared channel PUSCH; Determine K based on the DCI 2min value, where the K 2min The value is the minimum applicable value of the PUSCH scheduling offset K2 in the TDRA table for the PUSCH; and Apply the K in time slot n+X 2min value.

13. The user equipment according to claim 12, in, K 0min Value and K 2min The values ​​are defined separately, and the DCI indicates K 0min Value and K 2min value.

14. The UE according to claim 11, in, The application delay is based on the K of the current application in time slot n. 0min The DCI is defined as a function of the value, the subcarrier spacing SCS configuration for the physical downlink control channel PDCCH, and the SCS configuration for the PDSCH, and the parameter depends on the symbol of the DCI received in time slot n.

15. The UE according to claim 14, in, In case the DCI is contained within the first N symbols of time slot n, the parameter is a first value, and in case the DCI is received outside the first N symbols of time slot n, the parameter is a second value, and The second value is greater than the first value by 1.

16. A base station in a communication system, the base station include: Transceiver; as well as At least one processor configured to: Identify a time domain resource allocation TDRA table for a physical downlink shared channel PDSCH; Determine K 0min value, where the K 0min The value is the minimum applicable value of the PDSCH scheduling offset K0 in the TDRA table for the PDSCH, Sending downlink control information DCI indicating a minimum offset value to a user equipment UE in time slot n; Apply the K in time slot n+X 0min Value, where X is the application delay.

17. The base station according to claim 16, in, The at least one processor is further configured to: Identifying a TDRA table for a physical uplink shared channel PUSCH; Determine K 2min value, where the K 2min The value is the minimum applicable value of the PUSCH scheduling offset K2 in the TDRA table for the PUSCH; and Apply the K in time slot n+X 2min value.

18. The base station according to claim 17, in, K 0min Value and K 2min The values ​​are defined separately, and the DCI indicates K 0min Value and K 2min value.

19. The base station according to claim 16, in, The application delay is based on the K of the current application in time slot n. 0min The DCI is defined as a function of the value, the subcarrier spacing SCS configuration for the physical downlink control channel PDCCH, and the SCS configuration for the PDSCH, and the parameter depends on the symbol in which the DCI is sent in time slot n.

20. The base station according to claim 19, in, In case the DCI is contained within the first N symbols of time slot n, the parameter is a first value, and in case the DCI is transmitted outside the first N symbols of time slot n, the parameter is a second value, and The second value is greater than the first value by 1.