Communication system, base station, and communication terminal
By controlling the movement and switching of base stations and terminals in a multipath communication system, the problem of communication interruption caused by redundant path interruption is solved, ensuring the reliability of communication and the continuity of time-sensitive communication.
Patent Information
- Application Number
- CN202411283974.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2019-11-26
- Filing Date
- 2020-11-20
- Publication Date
- 2024-11-12
AI Technical Summary
In 3GPP, there is a problem that when a redundant path is interrupted, other path communication cannot be avoided from being interrupted, which leads to damage to communication reliability and time-sensitive communication.
In multiple communication paths, when one path becomes unreachable, the base station and communication terminal do not move or switch, maintaining stable communication on other paths. The reliability of communication is ensured by controlling measurement reports and the handover process through signaling control.
It effectively prevents communication interruptions caused by path disruptions, ensuring the reliability of communication and the continuity of time-sensitive communication.
Smart Images

Figure CN118945700A_ABST
Abstract
Description
This invention application is a divisional application of the invention patent application with international application number PCT / JP2020 / 043341, international application date November 20, 2020, application number 202080080962.6 entering the Chinese national phase, and name “Communication system, base station and communication terminal”. Technical Field
[0001] The present invention relates to wireless communication technology. Background Art
[0002] In the 3rd Generation Partnership Project (3GPP), a standardization organization for mobile communication systems, a communication method called Long Term Evolution (LTE) in terms of the wireless section and System Architecture Evolution (SAE) in terms of the overall system structure including the core network and the radio access network (hereinafter collectively referred to as the network) is studied (for example, non-patent documents 1 to 5). This communication method is also called a 3.9G (3.9 Generation) system.
[0003] As the access method of LTE, OFDM (Orthogonal Frequency Division Multiplexing) is used in the downlink direction, and SC-FDMA (Single Carrier Frequency Division Multiple Access) is used in the uplink direction. In addition, unlike W-CDMA (Wideband Code Division Multiple Access), LTE does not include line switching and is only a packet communication method.
[0004] use Figure 1 The following describes the decisions regarding the frame structure of the LTE system in 3GPP described in Non-Patent Document 1 (Chapter 5). Figure 1 This is an explanatory diagram showing the structure of a radio frame used in a communication system of the LTE method. Figure 1In the radio frame, a radio frame is 10ms. The radio frame is divided into 10 subframes of equal size. The subframe is divided into 2 slots of equal size. The first subframe and the sixth subframe of each radio frame contain the downlink synchronization signal. The synchronization signal includes the first synchronization signal (Primary Synchronization Signal: P-SS) and the second synchronization signal (Secondary Synchronization Signal: S-SS).
[0005] Non-Patent Document 1 (Chapter 5) describes the decisions made by 3GPP regarding the channel structure in the LTE system. It is assumed that the same channel structure as that of the non-CSG cell is used in the CSG (Closed Subscriber Group) cell.
[0006] The Physical Broadcast Channel (PBCH) is a downlink transmission channel from a base station device (hereinafter sometimes referred to as "base station") to a communication terminal device (hereinafter sometimes referred to as "communication terminal") such as a mobile terminal device (hereinafter sometimes referred to as "mobile terminal"). The BCH transport block is mapped to four subframes in a 40ms interval. There is no clear signaling of 40ms timing.
[0007] The Physical Control Format Indicator Channel (PCFICH) is a downlink transmission channel from a base station to a communication terminal. The PCFICH notifies the communication terminal of the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols used for PDCCHs from the base station. The PCFICH is transmitted in each subframe.
[0008] The Physical Downlink Control Channel (PDCCH) is a channel for downlink transmission from the base station to the communication terminal. PDCCH notifies the resource allocation information of the downlink shared channel (DL-SCH), which is one of the transmission channels described later, the resource allocation information of the paging channel (PCH), which is one of the transmission channels described later, and the HARQ (Hybrid Automatic Repeat reQuest) information related to the DL-SCH. PDCCH transmits the uplink scheduling grant. PDCCH transmits the response signal for the uplink transmission, namely Ack (Acknowledgement) / Nack (Negative Acknowledgement). PDCCH is also called L1 / L2 control signal.
[0009] The Physical Downlink Shared Channel (PDSCH) is a downlink transmission channel from a base station to a communication terminal. A downlink shared channel (DL-SCH) as a transport channel and a PCH as a transport channel are mapped to the PDSCH.
[0010] A physical multicast channel (PMCH) is a downlink transmission channel from a base station to a communication terminal. A multicast channel (MCH) as a transport channel is mapped to the PMCH.
[0011] The Physical Uplink Control Channel (PUCCH) is a channel for uplink transmission from the communication terminal to the base station. PUCCH transmits the response signal (response signal) for downlink transmission, namely Ack / Nack. PUCCH transmits CSI (Channel State Information). CSI is composed of RI (Rank Indicator), PMI (Precoding Matrix Indicator), and CQI (Channel Quality Indicator) reports. RI refers to the rank information of the channel matrix of MIMO. PMI refers to the information of the precoding waiting matrix used in MIMO. CQI refers to quality information indicating the quality of the received data, or indicating the quality of the communication line. And PUCCH transmits a scheduling request (Scheduling Request: SR).
[0012] The physical uplink shared channel (PUSCH) is a channel for uplink transmission from a communication terminal to a base station. An uplink shared channel (UL-SCH), which is one of the transport channels, is mapped to the PUSCH.
[0013] The Physical Hybrid ARQ Indicator Channel (PHICH) is a channel for downlink transmission from a base station to a communication terminal. PHICH transmits Ack / Nack, a response signal for uplink transmission. The Physical Random Access Channel (PRACH) is a channel for uplink transmission from a communication terminal to a base station. PRACH transmits a random access preamble.
[0014] The downlink reference signal (Reference Signal: RS) is a codeword known as a communication system in the LTE mode. The following five types of downlink reference signals are defined. Cell-specific Reference Signal (CRS), MBSFN Reference Signal (MBSFN Reference Signal), UE-specific Reference Signal (UE-specific Reference Signal) i.e., Data Demodulation Reference Signal (Demodulation Reference Signal: DM-RS), Positioning Reference Signal (Positioning Reference Signal: PRS), and Channel State Information Reference Signal (Channel State Information Reference Signal: CSI-RS). As a measurement of the physical layer of the communication terminal, there is a measurement of the received power of the reference signal (Reference Signal Received Power: RSRP).
[0015] The uplink reference signal is also a symbol known as a communication system of the LTE scheme. The following two types of uplink reference signals are defined: a data demodulation reference signal (Demodulation Reference Signal: DM-RS) and a sounding reference signal (Sounding Reference Signal: SRS).
[0016] The transport channel described in Non-Patent Document 1 (Chapter 5) is described below. The broadcast channel (BCH) in the downlink transport channel is broadcast to the entire coverage area of its base station (cell). The BCH is mapped to the physical broadcast channel (PBCH).
[0017] HARQ (HybridARQ: Hybrid ARQ) based retransmission control is applied to the downlink shared channel (DL-SCH). DL-SCH can broadcast to the entire coverage area of the base station (cell). DL-SCH supports dynamic or semi-static resource allocation. Quasi-static resource allocation is also called persistent scheduling. DL-SCH supports discontinuous reception (DRX) of communication terminals in order to reduce power consumption of communication terminals. DL-SCH is mapped to the physical downlink shared channel (PDSCH).
[0018] The Paging Channel (PCH) supports DRX of the communication terminal in order to reduce the power consumption of the communication terminal. The PCH is required to be broadcast to the entire coverage area of the base station (cell). The PCH is mapped to a physical resource such as the Physical Downlink Shared Channel (PDSCH) that can be dynamically used for traffic.
[0019] The multicast channel (MCH) is used to broadcast to the entire coverage area of the base station (cell). MCH supports SFN synthesis of MBMS (Multimedia Broadcast Multicast Service) services (MTCH and MCCH) in multi-cell transmission. MCH supports quasi-static resource allocation. MCH is mapped to PMCH.
[0020] Retransmission control based on HARQ (Hybrid ARQ) is applied to the uplink shared channel (UL-SCH) in the uplink transmission channel. UL-SCH supports dynamic or semi-static resource allocation. UL-SCH is mapped to the physical uplink shared channel (PUSCH).
[0021] The Random Access Channel (RACH) is limited to control information. There is a risk of collision in the RACH. The RACH is mapped to the Physical Random Access Channel (PRACH).
[0022] HARQ is explained. HARQ is a technology that improves the communication quality of a transmission line by combining Automatic Repeat reQuest (ARQ) and Forward Error Correction (Forward Error Correction). HARQ has the following advantages: even for a transmission line with changed communication quality, error correction can be effectively used by retransmission. In particular, when retransmission is performed, the quality can be further improved by synthesizing the reception result of the initial transmission and the reception result of the retransmission.
[0023] An example of the retransmission method is described. When the receiving side cannot correctly decode the received data, in other words, when a CRC (Cyclic Redundancy Check) error occurs (CRC=NG), "Nack" is sent from the receiving side to the sending side. The sending side that receives "Nack" retransmits the data. When the receiving side can correctly decode the received data, in other words, when no CRC error occurs (CRC=OK), "Ack" is sent from the receiving side to the sending side. The sending side that receives "Ack" sends the next data.
[0024] The logical channel described in Non-Patent Document 1 (Chapter 6) is described below. The Broadcast Control Channel (BCCH) is a downlink channel for broadcasting system control information. The BCCH as a logical channel is mapped to the Broadcast Channel (BCH) as a transport channel or the Downlink Shared Channel (DL-SCH).
[0025] The Paging Control Channel (PCCH) is a downlink channel used to send paging information and changes to system information. PCCH is used when the network does not know the cell location of the communication terminal. The PCCH, which is a logical channel, is mapped to the Paging Channel (PCH), which is a transport channel.
[0026] The Common Control Channel (CCCH) is a channel used to send control information between a communication terminal and a base station. The CCCH is used when there is no RRC connection between the communication terminal and the network. In the downlink direction, the CCCH is mapped to the downlink shared channel (DL-SCH) as a transmission channel. In the uplink direction, the CCCH is mapped to the uplink shared channel (UL-SCH) as a transmission channel.
[0027] The Multicast Control Channel (MCCH) is a downlink channel used for point-to-multipoint transmission. The MCCH is used to send MBMS control information for one or more MTCHs from the network to the communication terminal. The MCCH is only used by the communication terminal during the MBMS reception process. The MCCH is mapped to the Multicast Channel (MCH) as a transport channel.
[0028] Dedicated Control Channel (DCCH) is a channel used to send dedicated control information between a communication terminal and the network in a point-to-point manner. DCCH is used when the communication terminal is in an RRC connection. DCCH is mapped to the uplink shared channel (UL-SCH) in the uplink and to the downlink shared channel (DL-SCH) in the downlink.
[0029] Dedicated Traffic Channel (DTCH) is a point-to-point communication channel used to send user information to dedicated communication terminals. DTCH exists in both uplink and downlink. DTCH is mapped to the uplink shared channel (UL-SCH) in the uplink and to the downlink shared channel (DL-SCH) in the downlink.
[0030] The multicast traffic channel (MTCH) is a downlink channel for transmitting traffic data from the network to the communication terminal. The MTCH is a channel used only for the communication terminal in the MBMS reception process. The MTCH is mapped to the multicast channel (MCH).
[0031] CGI refers to Cell Global Identifier. ECGI refers to E-UTRAN Cell Global Identifier. CSG (Closed Subscriber Group) cells are introduced in LTE, LTE-A (Long Term Evolution Advanced) and UMTS (Universal Mobile Telecommunication System).
[0032] The location tracking of the communication terminal is performed in units of an area consisting of one or more cells. The location tracking is performed to track the location of the communication terminal even in the standby state, so as to call the communication terminal, in other words, to be able to call the communication terminal. The area used for the location tracking of the communication terminal is called a tracking area.
[0033] In addition, 3GPP is advancing the standardization of Long Term Evolution Advanced (LTE-A) as Release 10 (see Non-Patent Documents 3 and 4). LTE-A is based on the wireless communication method of LTE and is constructed by adding some new technologies thereto.
[0034] In the LTE-A system, in order to support a wider frequency bandwidth (transmission bandwidths) up to 100 MHz, carrier aggregation (CA) of aggregating (also called aggregation) two or more component carriers (CC) is studied. CA is described in Non-Patent Document 1.
[0035] When CA is configured, the UE has a unique RRC connection (RRCconnection) with the network (Network: NW). In the RRC connection, one serving cell provides NAS mobility information and security input. This cell is called the primary cell (Primary Cell: PCell). In the downlink, the carrier corresponding to the PCell is the downlink primary component carrier (DLPCC). In the uplink, the carrier corresponding to the PCell is the uplink primary component carrier (ULPCC).
[0036] According to the capability of the UE (capability), a secondary cell (SCell) is formed to form a group of serving cells together with the PCell. In the downlink, the carrier corresponding to the SCell is the downlink secondary component carrier (DLSCC). In the uplink, the carrier corresponding to the SCell is the uplink secondary component carrier (ULSCC).
[0037] For one UE, a group of service cells consisting of one PCell and one or more SCells is formed.
[0038] In addition, new technologies of LTE-A include technologies supporting wider bandwidth (Wider bandwidth extension) and coordinated multiple point transmission and reception (CoMP) technologies, etc. CoMP, which is being studied to implement LTE-A in 3GPP, is described in Non-Patent Document 1.
[0039] In addition, in order to cope with the large amount of traffic in the future, 3GPP is studying the use of small eNBs (hereinafter sometimes referred to as "small-scale base station devices") that constitute small cells. For example, the following technologies are being studied, namely, by setting up multiple small eNBs and constituting multiple small cells to improve frequency utilization efficiency and increase communication capacity. Specifically, there is dual connectivity (DC) in which a UE connects to two eNBs for communication. DC is described in Non-Patent Document 1.
[0040] Sometimes, one of the eNBs performing dual connectivity (DC) is called a "master eNB (abbreviated as MeNB)" and the other is called a "secondary eNB (abbreviated as SeNB)".
[0041] Mobile network traffic is increasing, and communication speeds are also increasing. If LTE and LTE-A are put into full-scale use, communication speeds will be further increased.
[0042] In addition, the fifth generation (hereinafter sometimes referred to as "5G") wireless access system is being studied with the goal of starting service for the upgraded mobile communication after 2020. For example, in Europe, the METIS organization is summarizing the requirements for 5G (see Non-Patent Document 5).
[0043] In the 5G wireless access system, with respect to the LTE system, assuming that the system capacity is 1000 times, the data transmission speed is 100 times, the data processing delay is 1 / 10, and the number of simultaneous connections of communication terminals is 100 times, further low power consumption and low cost of the device can be listed as necessary conditions.
[0044] In order to meet such requirements, 3GPP is advancing the discussion of 5G standards as Release 15 (see Non-Patent Documents 6 to 18). The technology of the wireless section of 5G is called "New Radio Access Technology" ("New Radio" is abbreviated as "NR").
[0045] Discussions on the NR system based on the LTE system and LTE-A system are continuously advancing, but changes and additions from the LTE system and LTE-A system are made in the following point.
[0046] As the access method of NR, OFDM is used in the downlink direction, and OFDM and DFT-s-OFDM (DFT-spread-OFDM) are used in the uplink direction.
[0047] In NR, higher frequencies can be used compared to LTE to increase transmission speeds and reduce processing delays.
[0048] In NR, an effort is made to ensure cell coverage by forming a narrow beam-shaped transmission and reception range (beamforming) while changing the direction of the beam (beam scanning).
[0049] The NR frame structure supports various subcarrier spacings, that is, various parameter sets (Numerology). In NR, one subframe is 1 millisecond, and one time slot consists of 14 symbols, regardless of the parameter set. In addition, the number of time slots contained in one subframe is one in the parameter set with a subcarrier spacing of 15kHz, and increases in proportion to the subcarrier spacing in other parameter sets (refer to non-patent document 13 (TS38.211 v15.7.0)).
[0050] The downlink synchronization signal in NR is sent from the base station as a synchronization signal burst (Synchronization Signal Burst; sometimes referred to as SS burst below) at a specified period for a specified duration. The SS burst consists of a synchronization signal module (Synchronization Signal Block; sometimes referred to as SS module below) for each beam of the base station. The base station changes the beam to send the SS module of each beam during the duration of the SS burst. The SS module consists of P-SS, S-SS and PBCH.
[0051] In NR, a phase tracking reference signal (PTRS) is added as a downlink reference signal of NR to reduce the influence of phase noise. PTRS is also added to the uplink reference signal in the same way as the downlink.
[0052] In NR, in order to flexibly switch DL / UL within a time slot, a time slot format indication (Slot Format Indication: SFI) is added to the information included in the PDCCH.
[0053] In addition, in NR, the base station pre-sets a part of the carrier frequency band for the UE (hereinafter sometimes referred to as Bandwidth Part (BWP)), and the UE transmits and receives between itself and the base station in the BWP, thereby striving to reduce power consumption in the UE.
[0054] In 3GPP, as DC modes, DC performed by LTE base stations and NR base stations connected to EPC, DC performed by NR base stations connected to 5G core systems, and DC performed by LTE base stations and NR base stations connected to 5G core systems are discussed (refer to non-patent documents 12, 16, and 19).
[0055] In addition, 3GPP is studying some new technologies, for example, a technology that provides redundancy in a communication path (hereinafter sometimes referred to as a redundant path) and ensures reliability (see Non-Patent Document 20 (TR23.725)). Prior art literature Non-patent literature
[0056] Non-patent document 1: 3GPP TS36.300 V15.7.0 Non-patent document 2: 3GPP S1-083461 Non-patent document 3: 3GPP TR 36.814 V9.2.0 Non-patent document 4: 3GPP TR 36.912 V15.0.0 Non-Patent Document 5: “Scenarios, requirements and KPIs for 5G mobile and wireless system”, ICT-317669-METIS / D.1 Non-patent document 6: 3GPP TR 23.799 V14.0.0 Non-patent document 7: 3GPP TR 38.801 V14.0.0 Non-patent document 8: 3GPP TR 38.802 V14.2.0 Non-patent document 9: 3GPP TR 38.804 V14.0.0 Non-patent document 10: 3GPP TR 38.912 V15.0.0 Non-patent document 11: 3GPP RP-172115 Non-patent document 12: 3GPP TS37.340 V15.7.0 Non-patent document 13: 3GPP TS38.211 V15.7.0 Non-patent document 14: 3GPP TS38.213 V15.7.0 Non-patent document 15: 3GPP TS38.214 V15.7.0 Non-Patent Document 16: 3GPP TS38.300 V15.7.0 Non-patent document 17: 3GPP TS38.321 V15.7.0 Non-patent document 18: 3GPP TS38.212 V15.7.0 Non-Patent Document 19: 3GPP RP-161266 Non-patent document 20: 3GPP TR 23.725 V16.2.0 Non-patent document 21: 3GPP S1-192758 Non-patent document 22: 3GPP TS38.331 V15.7.0 Non-patent document 23: 3GPP TS36.331 V15.7.0 Non-patent document 24: 3GPP TS23.501 V16.2.0 Non-patent document 25: 3GPP TS23.502 V16.2.0 Non-patent document 26: 3GPP TS38.401 V15.6.0 Summary of the invention Technical problem to be solved by the invention
[0057] In 3GPP, it is being discussed to improve the reliability of communication by setting redundant communication paths (see non-patent documents 20 and 21). However, when communication interruption occurs in a redundant path, a method for avoiding communication interruption in the remaining redundant paths has not been disclosed. Therefore, there is a possibility that communication interruption may occur in any redundant path, resulting in a problem that the reliability of communication cannot be ensured. In addition, there is a problem that time sensitive communication (TSC) is damaged.
[0058] In view of the above problems, one of the objects of the present invention is to provide a technology capable of ensuring reliability and maintaining TSC. Technical means for solving technical problems
[0059] The communication system of the present invention is a communication system in which a first host and a second host communicate via multiple communication paths, and is characterized in that when any one of the multiple communication paths has become unable to communicate or is about to become unable to communicate, the communication terminal on the remaining communication paths is not moved.
[0060] The base station of the present invention is a base station that constitutes one communication path among multiple communication paths between a first host and a second host, and when other communication paths among the multiple communication paths have become or are about to become unable to communicate, the base station does not move the communication terminal that constitutes the one communication path.
[0061] The communication terminal of the present invention is a communication terminal that constitutes one of the multiple communication paths between the first host and the second host, and the communication terminal does not move when other communication paths among the multiple communication paths have become or are about to become unable to communicate. Effects of the Invention
[0062] According to the present invention, it is possible to ensure reliability and maintain TSC.
[0063] The objects, features, aspects and advantages of the present invention will become more apparent from the following detailed description and accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 This is an explanatory diagram showing the structure of a radio frame used in a communication system of the LTE method. Figure 2 This is a block diagram showing the overall configuration of a communication system 200 of the LTE scheme being discussed in 3GPP. Figure 3 This is a block diagram showing the overall structure of the NR-based communication system 210 discussed in 3GPP. Figure 4 This is a structural diagram of DC performed by eNB and gNB connected to EPC. Figure 5 This is a structural diagram of DC performed by gNB connected to the NG core. Figure 6 This is a structural diagram of DC performed by eNB and gNB connected to the NG core. Figure 7 This is a structural diagram of DC performed by eNB and gNB connected to the NG core. Figure 8 It is shown Figure 2 A block diagram of the structure of the mobile terminal 202 is shown. Fig. 9It is shown Figure 2 A block diagram of the structure of the base station 203 is shown. Fig.10 is a block diagram showing the structure of an MME. Fig.11 It is a block diagram showing the structure of 5GC. Fig.12 This is a flowchart showing an overview of operations from cell search to standby performed by a communication terminal (UE) in a communication system using the LTE method. Fig.13 is a diagram showing an example of a cell structure of an NR system. Fig.14 This is a sequence diagram showing the establishment of communication using a redundant path using a plurality of UEs in accordance with the first embodiment. Fig.15 This is a sequence diagram showing the establishment of communication using a redundant path using a plurality of UEs in accordance with the first embodiment. Fig.16 This is a sequence diagram showing the establishment of communication using a redundant path using a plurality of UEs in accordance with the first embodiment. Fig.17 This is a sequence diagram showing, in Embodiment 1, an operation of suppressing switching in other redundant paths by causing switching in one redundant path and an operation of releasing the suppression. Fig.18 This is a sequence diagram showing, in Embodiment 1, an operation of suppressing switching in other redundant paths by causing switching in one redundant path and an operation of releasing the suppression. Fig.19 This is a sequence diagram showing, in Embodiment 1, an operation of suppressing switching in other redundant paths by causing switching in one redundant path and an operation of releasing the suppression. Fig. 20 This is a sequence diagram showing the operation of canceling switching in other redundant paths and the operation of starting switching in accordance with Modification 1 of Embodiment 1, in response to communication interruption in one redundant path. Fig.21 This is a sequence diagram showing the operation of canceling switching in other redundant paths and the operation of starting switching in accordance with Modification 1 of Embodiment 1, in response to communication interruption in one redundant path. Fig. 22 It is a timing diagram showing, with respect to Embodiment 2, an action of a UE using a DC-based redundant path maintaining a security key of a secondary base station before and after a primary base station switch. Fig.23 It is a timing diagram showing, with respect to Embodiment 2, an action of a UE using a DC-based redundant path maintaining a security key of a secondary base station before and after a primary base station switch. Fig.24This is a sequence diagram showing, with respect to Embodiment 2, an operation of a UE using a DC-based redundant path changing a security key of a secondary base station before switching of the primary base station. Fig.25 This is a sequence diagram showing, with respect to Embodiment 2, an operation of a UE using a DC-based redundant path changing a security key of a secondary base station before switching of the primary base station. Fig.26 This is a sequence diagram showing a first example of an operation of continuing communication with a secondary base station after an MCG failure, in accordance with Modification 1 of Embodiment 2. Fig. 27 1 is a sequence diagram showing a second example of the operation of continuing communication with the secondary base station after an MCG failure, in accordance with Modification 1 of Embodiment 2. DETAILED DESCRIPTION
[0065] Implementation Method 1 Figure 2 1 is a block diagram showing the overall structure of a communication system 200 of the LTE method discussed in 3GPP. Figure 2 The wireless access network is referred to as E-UTRAN (Evolved Universal Terrestrial Radio Access Network) 201. The communication terminal device, i.e., the mobile terminal device (hereinafter referred to as "mobile terminal (User Equipment: UE)") 202 can wirelessly communicate with the base station device (hereinafter referred to as "base station (E-UTRAN NodeB: eNB)") 203, and transmit and receive signals by wireless communication.
[0066] Here, the "communication terminal device" includes not only mobile terminal devices such as mobile phone terminal devices that can be moved, but also non-mobile devices such as sensors. In the following description, the "communication terminal device" may be simply referred to as a "communication terminal".
[0067] If the control protocols for the mobile terminal 202, such as RRC (Radio Resource Control), and the user plane (hereinafter sometimes also referred to as U-Plane), such as PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control), and PHY (Physical layer) are terminated at the base station 203, then the E-UTRAN is composed of one or more base stations 203.
[0068] The control protocol RRC (Radio Resource Control) between the mobile terminal 202 and the base station 203 performs broadcast, paging, RRC connection management, etc. The states of the base station 203 and the mobile terminal 202 in RRC include RRC_IDLE and RRC_CONNECTED.
[0069] In RRC_IDLE, PLMN (Public Land Mobile Network) selection, system information (SI) broadcasting, paging, cell reselection, mobility, etc. are performed. In RRC_CONNECTED, the mobile terminal has an RRC connection and can send and receive data with the network. In addition, in RRC_CONNECTED, handover (HO), neighbor cell measurement, etc. are performed.
[0070] The base station 203 is composed of one or more eNBs 207. In addition, the system composed of EPC (Evolved Packet Core) as the core network and E-UTRAN 201 as the radio access network is called EPS (Evolved Packet System). Sometimes, EPC as the core network and E-UTRAN 201 as the radio access network are collectively referred to as "network".
[0071] The eNB 207 is connected to a Mobility Management Entity (MME), a Serving Gateway (S-GW), or an MME / S-GW unit (hereinafter sometimes referred to as an "MME unit") 204 including the MME and the S-GW via an S1 interface, and control information is communicated between the eNB 207 and the MME unit 204. One eNB 207 can be connected to multiple MME units 204. The eNBs 207 are connected to each other via an X2 interface, and control information is communicated between the eNBs 207.
[0072] The MME unit 204 is an upper device, specifically, an upper node, and controls the connection between the eNB 207 as a base station and the mobile terminal (UE) 202. The MME unit 204 constitutes the EPC as a core network. The base station 203 constitutes the E-UTRAN 201.
[0073] The base station 203 may constitute one cell or multiple cells. Each cell has a predetermined range as a range in which communication with the mobile terminal 202 can be performed, i.e., a coverage range, and wireless communication is performed with the mobile terminal 202 within the coverage range. When one base station 203 constitutes multiple cells, each cell is configured to be able to communicate with the mobile terminal 202.
[0074] Figure 3 2 is a block diagram showing the overall structure of a 5G communication system 210 discussed in 3GPP. Figure 3 For explanation. The wireless access network is called NG-RAN (Next Generation Radio Access Network) 211. UE 202 can wirelessly communicate with the NR base station device (hereinafter referred to as "NR base station (NG-RAN NodeB: gNB)") 213 to send and receive signals in the form of wireless communication. In addition, the core network is called 5G Core (5G Core: 5GC).
[0075] If the control protocols for UE202, such as RRC (Radio Resource Control), and the user plane (hereinafter sometimes also referred to as U-Plane), such as SDAP (Service Data Adaptation Protocol), PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control), and PHY (Physical layer) are terminated at the NR base station 213, then the NG-RAN is composed of one or more NR base stations 213.
[0076] The function of the control protocol RRC (Radio Resource Control) between UE202 and NR base station 213 is the same as that of LTE. The states between NR base station 213 and UE202 in RRC include RRC_IDLE, RRC_CONNECTED, and RRC_INACTIVE.
[0077] RRC_IDLE and RRC_CONNECTED are the same as LTE. While RRC_INACTIVE maintains the connection between the 5G core and the NR base station 213, it broadcasts system information (SI), paging, cell reselection, and movement.
[0078] gNB217 is connected to the access / mobility management function (Access and Mobility Management Function: AMF), session management function (Session Management Functio: SMF), or UPF (User Plane Function), or the AMF / SMF / UPF unit (hereinafter sometimes referred to as "5GC unit") 214 including AMF, SMF and UPF through the NG interface. Communication of control information and / or user data is performed between gNB217 and the 5GC unit 214. The NG interface is a general term for the N2 interface between gNB217 and AMF, the N3 interface between gNB217 and UPF, the N11 interface between AMF and SMF, and the N4 interface between UPF and SMF. One gNB217 can be connected to multiple 5GC units 214. The gNB217s are connected to each other through the Xn interface, and communication of control information and / or user data is performed between the gNB217s.
[0079] The NR base station 213 is also the same as the base station 203 and can constitute one or more cells. When one NR base station 213 constitutes multiple cells, each cell is configured to be able to communicate with the UE 202.
[0080] The gNB 217 can be divided into a central unit (hereinafter sometimes referred to as a CU) 218 and a distributed unit (hereinafter sometimes referred to as a DU) 219. The CU 218 is configured as one in the gNB 217. The DU 219 is configured as one or more in the gNB 217. The CU 218 is connected to the DU 219 via the F1 interface, and control information and / or user data are communicated between the CU 218 and the DU 219.
[0081] The 5G communication system may also include the Unified Data Management (UDM) function and the Policy Control Function (PCF) described in the non-patent document 24 (3GPP TS23.501 V16.2.0). UDM and / or PCF may be included in Figure 3In the 5GC department.
[0082] The 5G communication system may also include a non-3GPP interworking function (N3IWF) described in non-patent document 24 (3GPP TS23.501 V16.2.0). The N3IWF can terminate the access network (AN) between the UE and the UE in the non-3GPP access between the UE and the UE.
[0083] Figure 4 This is a diagram showing the structure of DC based on eNB and gNB connected to EPC. Figure 4 In the figure, the solid line indicates the connection of U-Plane, and the dotted line indicates the connection of C-Plane. Figure 4 In the example, eNB 223-1 is the primary base station and gNB 224-2 is the secondary base station (this DC structure is sometimes referred to as EN-DC). Figure 4 In the figure, an example is shown in which the U-Plane connection between the MME unit 204 and the gNB 224-2 is performed via the eNB 223-1, but it can also be performed directly between the MME unit 204 and the gNB 224-2.
[0084] Figure 5 1 is a diagram showing the structure of a DC based on a gNB connected to an NG core. Figure 5 In the figure, the solid line indicates the connection of U-Plane, and the dotted line indicates the connection of C-Plane. Figure 5 In this example, gNB224-1 is the primary base station and gNB224-2 is the secondary base station (this DC structure is sometimes referred to as NR-DC). Figure 5 In the figure, an example is shown in which the U-Plane connection between the 5GC unit 214 and the gNB 224-2 is performed via the gNB 224-1, but it can also be performed directly between the 5GC unit 214 and the gNB 224-2.
[0085] Figure 6 : is a diagram showing the structure of DC based on eNB and gNB connected to NG core. Figure 6 In the figure, the solid line indicates the connection of U-Plane, and the dotted line indicates the connection of C-Plane. Figure 6 In the example, eNB 226-1 is the primary base station and gNB 224-2 is the secondary base station (this DC structure is sometimes referred to as NG-EN-DC). Figure 6 In the figure, an example is shown in which the U-Plane connection between the 5GC unit 214 and the gNB 224-2 is performed via the eNB 226-1, but it can also be performed directly between the 5GC unit 214 and the gNB 224-2.
[0086] Figure 7 2 is a diagram showing another structure of DC based on eNB and gNB connected to NG core. Figure 7 In the figure, the solid line indicates the connection of U-Plane, and the dotted line indicates the connection of C-Plane. Figure 7 In the example, gNB 224-1 is the primary base station and eNB 226-2 is the secondary base station (this DC structure is sometimes referred to as NE-DC). Figure 7 In the figure, an example is shown in which the U-Plane connection between the 5GC unit 214 and the eNB 226-2 is performed via the gNB 224-1, but it can also be performed directly between the 5GC unit 214 and the eNB 226-2.
[0087] Figure 8 It shows Figure 2 The structure of the mobile terminal 202 is shown in FIG. Figure 8 The transmission processing of the mobile terminal 202 shown in the figure is explained. First, the control data from the protocol processing unit 301 and the user data from the application unit 302 are saved in the transmission data buffer unit 303. The data saved in the transmission data buffer unit 303 is transmitted to the encoding unit 304 to implement encoding processing such as error correction. There may also be data that is directly output from the transmission data buffer unit 303 to the modulation unit 305 without implementing encoding processing. The data after the encoding processing by the encoding unit 304 is modulated in the modulation unit 305. Precoding in MIMO may also be performed in the modulation unit 305. The modulated data is converted into a baseband signal, and then output to the frequency conversion unit 306, and converted into a wireless transmission frequency. Thereafter, the transmission signal is sent from the antennas 307-1 to 307-4 to the base station 203. In Figure 8 , the example shows a case where the number of antennas is 4, but the number of antennas is not limited to 4.
[0088] In addition, the receiving process of the mobile terminal 202 is performed as follows. The wireless signal from the base station 203 is received through the antennas 307-1 to 307-4. The received signal is converted from the wireless receiving frequency to a baseband signal in the frequency conversion unit 306, and demodulated in the demodulation unit 308. In the demodulation unit 308, waiting calculation and multiplication processing can be performed. The demodulated data is transmitted to the decoding unit 309 for decoding processing such as error correction. Among the decoded data, the control data is transmitted to the protocol processing unit 301, and the user data is transmitted to the application unit 302. A series of processing of the mobile terminal 202 is controlled by the control unit 310. Therefore, although in Figure 8 Although omitted in FIG. 3 , the control unit 310 is connected to each of the units 301 to 309. Figure 8 In the present invention, the number of antennas used by the mobile terminal 202 for sending may be the same as or different from the number of antennas used for receiving.
[0089] Fig. 9 It is shown Figure 2 The structure of the base station 203 is shown in FIG. Fig. 9 The sending processing of the base station 203 shown is explained. The EPC communication unit 401 performs data transmission and reception between the base station 203 and the EPC (MME unit 204, etc.). The 5GC communication unit 412 performs data transmission and reception between the base station 203 and the 5GC (5GC unit 214, etc.). The other base station communication units 402 perform data transmission and reception with other base stations. The EPC communication unit 401, the 5GC communication unit 412 and the other base station communication units 402 exchange information with the protocol processing unit 403 respectively. The control data from the protocol processing unit 403, and the user data and control data from the EPC communication unit 401, the 5GC communication unit 412 and the other base station communication units 402 are saved in the sending data buffer unit 404.
[0090] The data stored in the transmission data buffer unit 404 is transmitted to the encoding unit 405 to implement encoding processing such as error correction. There may also be data that is directly output from the transmission data buffer unit 404 to the modulation unit 406 without implementing encoding processing. The encoded data is modulated in the modulation unit 406. Precoding in MIMO may also be performed in the modulation unit 406. The modulated data is converted into a baseband signal, and then output to the frequency conversion unit 407, and converted into a wireless transmission frequency. Thereafter, the transmission signal is sent to one or more mobile terminals 202 using antennas 408-1 to 408-4. Fig. 9 , the example shows a case where the number of antennas is 4, but the number of antennas is not limited to 4.
[0091] In addition, the receiving processing of the base station 203 is performed as follows. The wireless signal from one or more mobile terminals 202 is received by the antenna 408. The received signal is converted from the wireless receiving frequency to a baseband signal by the frequency conversion unit 407, and is demodulated in the demodulation unit 409. The demodulated data is transmitted to the decoding unit 410 for decoding processing such as error correction. Among the decoded data, the control data is transmitted to the protocol processing unit 403 or the 5GC communication unit 412 or the EPC communication unit 401, and other base station communication units 402, and the user data is transmitted to the 5GC communication unit 412, the EPC communication unit 401, and other base station communication units 402. A series of processing of the base station 203 is controlled by the control unit 411. Therefore, although in Fig. 9 Although omitted in FIG. 4 , the control unit 411 is connected to each unit 401 to 410. Fig. 9 In the example, the number of antennas used by the base station 203 for sending may be the same as or different from the number of antennas used for receiving.
[0092] Fig. 92 is a block diagram showing the structure of the base station 203, but the same structure can be used for the base station 213. Figure 8 and Fig. 9 The number of antennas of the mobile terminal 202 and the number of antennas of the base station 203 may be the same or different.
[0093] Fig.10 is a block diagram showing the structure of an MME. Fig.10 In the above Figure 2 The structure of MME204a included in the MME unit 204 shown. The PDN GW communication unit 501 performs data transmission and reception between MME204a and PDN GW. The base station communication unit 502 performs data transmission and reception between MME204a and base station 203 via the S1 interface. In the case where the data received from the PDN GW is user data, the user data is transmitted from the PDN GW communication unit 501 to the base station communication unit 502 via the user plane communication unit 503, and is sent to one or more base stations 203. In the case where the data received from the base station 203 is user data, the user data is transmitted from the base station communication unit 502 to the PDN GW communication unit 501 via the user plane communication unit 503, and is sent to the PDN GW.
[0094] When the data received from the PDN GW is control data, the control data is transmitted from the PDN GW communication unit 501 to the control plane control unit 505. When the data received from the base station 203 is control data, the control data is transmitted from the base station communication unit 502 to the control plane control unit 505.
[0095] The control plane control unit 505 includes a NAS security unit 505-1, an SAE bearer control unit 505-2, an idle state mobility management unit 505-3, etc., and performs all processing for the control plane (hereinafter, sometimes also referred to as C-Plane). The NAS security unit 505-1 performs the security of NAS (Non-Access Stratum) messages, etc. The SAE bearer control unit 505-2 performs the management of SAE (System Architecture Evolution) bearers, etc. The idle state mobility management unit 505-3 performs mobility management in the idle state (idle state; LTE-IDLE state, or simply idle), generation and control of paging signals in the idle state, addition, deletion, update, retrieval, and tracking area list management of one or more mobile terminals 202 under coverage, etc.
[0096] MME204a distributes paging signals to one or more base stations 203. In addition, MME204a performs mobility control in the idle state. MME204a manages the tracking area list when the mobile terminal is in the idle state and in the active state. MME204a starts the paging protocol by sending a paging message to the cell belonging to the tracking area registered by the UE. The management of the CSG of the eNB207 connected to MME204a, the management of the CSG ID, and the whitelist management can be performed by the idle state mobility management unit 505-3.
[0097] Fig.11 It is a block diagram showing the structure of 5GC. Fig.11 The above Figure 3 The structure of the 5GC unit 214 is shown. Fig.11 Shown in Figure 5 The 5GC unit 214 shown includes the structure of AMF, the structure of SMF, and the structure of UPF. The data network communication unit 521 performs data transmission and reception between the 5GC unit 214 and the data network. The base station communication unit 522 performs data transmission and reception between the 5GC unit 214 and the base station 203 through the S1 interface, and / or performs data transmission and reception between the 5GC unit 214 and the base station 213 through the NG interface. In the case where the data received from the data network is user data, the user data is transmitted from the data network communication unit 521 to the base station communication unit 522 via the user plane communication unit 523, and is sent to one or more base stations 203 and / or base stations 213. In the case where the data received from the base station 203 and / or the base station 213 is user data, the user data is transmitted from the base station communication unit 522 to the data network communication unit 521 via the user plane communication unit 523, and is sent to the data network.
[0098] In the case where the data received from the data network is control data, the control data is transmitted from the data network communication unit 521 to the session management unit 527 via the user plane control unit 523. The session management unit 527 transmits the control data to the control plane control unit 525. In the case where the data received from the base station 203 and / or the base station 213 is control data, the control data is transmitted from the base station communication unit 522 to the control plane control unit 525. The control plane control unit 525 transmits the control data to the session management unit 527.
[0099] The control plane control unit 525 includes a NAS security unit 525-1, a PDU session control unit 525-2, an idle state (IdleState) mobility management unit 525-3, etc., and performs all processing for the control plane (hereinafter, sometimes also referred to as C-Plane). The NAS security unit 525-1 performs the security of NAS (Non-Access Stratum) messages, etc. The PDU session control unit 525-2 manages the PDU session between the mobile terminal 202 and the 5GC unit 214, etc. The idle state mobility management unit 525-3 performs mobility management in the standby state (idle state (Idle State); RRC_IDLE state, or simply called idle), generation and control of paging signals in the standby state, addition, deletion, update, retrieval, and tracking area list management of one or more mobile terminals 202 under coverage, etc.
[0100] The 5GC unit 214 allocates paging signals to one or more base stations 203 and / or base stations 213. In addition, the 5GC unit 214 performs mobility control in the idle state. The 5GC unit 214 manages the tracking area list when the mobile terminal is in the idle state, in the inactive state, and in the active state. The 5GC unit 214 starts the paging protocol by sending a paging message to the cell belonging to the tracking area registered by the UE.
[0101] Next, an example of a cell search method in a communication system is shown. Fig.12 This is a flowchart showing an overview of the cell search and standby operation performed by a communication terminal (UE) in an LTE communication system. If the communication terminal starts the cell search, in step ST601, the first synchronization signal (P-SS) and the second synchronization signal (S-SS) sent from the surrounding base stations are used to synchronize the slot timing and the frame timing.
[0102] P-SS and S-SS are collectively referred to as synchronization signals (SS). Synchronization codes corresponding to the PCIs assigned to each cell are allocated to the synchronization signal (SS). It is studied to set the number of PCIs to 504. Synchronization is achieved using these 504 PCIs, and the PCI of the synchronized cell is detected (determined).
[0103] Next, in step ST602, the reference signal (reference signal: RS) sent from the base station to each cell, i.e., the cell-specific reference signal (Cell-specific Reference Signal: CRS), is detected for the synchronized cell, and the RS received power (Reference Signal Received Power: RSRP) is measured. The reference signal (RS) uses a code that corresponds to the PCI one-to-one. This code can be used to obtain correlation and separate from other cells. By deriving the RS code for the cell based on the PCI determined in step ST601, the RS can be detected and the RS received power can be measured.
[0104] Next, in step ST603, a cell with the best RS reception quality is selected from the one or more cells detected up to step ST602, for example, a cell with the highest RS reception power, that is, the best cell is selected.
[0105] Then, in step ST604, the PBCH of the best cell is received to obtain the broadcast information, i.e., the BCCH. The MIB (Master Information Block) containing the cell structure information is mapped in the BCCH on the PBCH. Therefore, by receiving the PBCH and obtaining the BCCH, the MIB can be obtained. The information of the MIB includes, for example, the DL (downlink) system bandwidth (also called the transmission bandwidth configuration (transmission bandwidth configuration: dl-bandwidth)), the number of transmitting antennas, and the SFN (System Frame Number: system frame number).
[0106] Then in step ST605, the DL-SCH of the cell is received based on the cell structure information of the MIB, and the SIB (System Information Block) 1 in the broadcast information BCCH is obtained. SIB1 contains information related to accessing the cell, information related to cell selection, and scheduling information of other SIBs (SIBk; k≥2 integer). In addition, SIB1 also contains the Tracking Area Code (TAC).
[0107] Then in step ST606, the communication terminal compares the TAC of SIB1 received in step ST605 with the TAC part of the tracking area identity (TAI) in the tracking area list already held by the communication terminal. The tracking area list is also called the TAI list. TAI is identification information used to identify the tracking area, and is composed of MCC (Mobile Country Code), MNC (Mobile Network Code), and TAC (Tracking Area Code). MCC is the country code. MNC is the network code. TAC is the code number of the tracking area.
[0108] If the result of the comparison in step S606 is that the TAC received in step ST605 is the same as the TAC included in the tracking area list, the communication terminal enters the standby action in the cell. If the TAC received in step ST605 is not included in the tracking area list, the communication terminal passes through the cell and requests the core network (CoreNetwork, EPC) including MME, etc. to change the tracking area to perform TAU (Tracking Area Update).
[0109] exist Fig.12 In the example shown, an example of the action from cell search to standby in the LTE mode is shown, but in the NR mode, in addition to the best cell, the best beam can also be selected in step ST603. In addition, in the NR mode, in step ST604, beam information such as a beam identifier can be obtained. In addition, in the NR mode, in step ST604, scheduling information of the remaining minimum SI (Remaining Minimum SI: RMSI) can be obtained. In the NR mode, in step ST605, it can be set to receive RMSI.
[0110] The device constituting the core network (hereinafter sometimes referred to as the "core network side device") updates the tracking area list based on the TAU request signal and the identification number (UE-ID, etc.) of the communication terminal sent from the communication terminal. The core network side device sends the updated tracking area list to the communication terminal. The communication terminal rewrites (updates) the TAC list held by the communication terminal based on the received tracking area list. Thereafter, the communication terminal enters standby action in the cell.
[0111] Due to the popularity of smartphones and tablet terminals, the volume of cellular wireless communications has exploded, causing concerns about the shortage of wireless resources worldwide. In order to cope with this situation and improve the efficiency of frequency utilization, research has been conducted on miniaturization of cells and promotion of spatial separation.
[0112] In the existing cell structure, a cell formed by an eNB has a wide coverage area. Conventionally, cells are formed so that a certain area is covered by a wide coverage area of a plurality of cells formed by a plurality of eNBs.
[0113] When the cell is miniaturized, the cell formed by the eNB has a narrower coverage area than the coverage area of the cell formed by the existing eNB. Therefore, as in the prior art, a larger number of eNBs with miniaturized cells are required to cover a certain area than the existing eNBs.
[0114] In the following description, a cell with a relatively large coverage, such as a cell composed of existing eNBs, is referred to as a "macro cell", and an eNB constituting a macro cell is referred to as a "macro eNB". In addition, a cell with a relatively small coverage, such as a cell after cell miniaturization, is referred to as a "small cell", and an eNB constituting a small cell is referred to as a "small eNB".
[0115] The macro eNB may be, for example, a wide area base station as described in non-patent document 7.
[0116] Small eNBs may be, for example, low-power nodes, local nodes, and hotspots. In addition, small eNBs may be pico eNBs constituting pico cells, femto eNBs constituting femto cells, HeNBs, RRHs (Remote Radio Heads), RRUs (Remote Radio Units), RREs (Remote Radio Equipment), or RNs (Relay Nodes). In addition, small eNBs may also be "local area base stations" or "home base stations" as described in non-patent document 7.
[0117] Fig.13 An example of a cell structure in NR is shown. In a cell in NR, a narrow beam is formed and its direction is changed for transmission. Fig.13In the example shown, the base station 750 uses beam 751-1 at a certain time to transmit and receive with the mobile terminal. At other times, the base station 750 uses beam 751-2 to transmit and receive with the mobile terminal. Similarly, the base station 750 uses one or more of beams 751-3 to 751-8 to transmit and receive with the mobile terminal. Thus, the base station 750 forms a wide range of cells.
[0118] exist Fig.13 In FIG. 1 , an example is shown in which the number of beams used by the base station 750 is set to 8, but the number of beams may be different from 8. Fig.13 In the example shown, the number of beams used simultaneously by the base station 750 is set to one, but it can also be multiple.
[0119] In communications using redundant paths, the same data can be sent and received through each path. The sending host can copy the data and send it to the device on each path. The receiving host can retain one of the data received from the sending host and delete the other data. The sending host can be a host connected to the DN (Data Network) or a host connected to the UE. The receiving host can also be a host connected to the UE or a host connected to the DN.
[0120] Communications using redundant paths may use one UE or multiple UEs.
[0121] In the structure of redundant paths using multiple UEs, each UE can be connected to a different base station. Each base station can be connected to a different UPF. Each UPF can be connected to the same DN or to a different DN. Each base station can be connected to the same AMF or to a different AMF. Each UPF can be connected to the same SMF or to a different SMF. In the structure of this redundant path, a PDU session can be established between each UE and each UPF.
[0122] The structure using redundant paths of multiple UEs can also be used for the transmission and reception of small data (non-patent document 9 (TR38.804)). For example, in uplink communication, multiple paths can be set up for sending data from UE to DN via base station, AMF, SMF, UPF. As another example, in downlink communication, the path for sending data from DN to UE via UPF, SMF, AMF, base station is the same. As described above, the base stations in each path can be different from each other. AMF, SMF, and UPF can also be the same. Thereby, for example, the reliability of small data transmission and reception can be improved.
[0123] In redundant communication using multiple UEs, the following problems occur: When communication is interrupted in one path and the UE on the remaining paths moves, communication stops in all redundant paths, resulting in the inability to ensure communication reliability and the inability to implement TSC (Time Sensitive Communication).
[0124] In the first embodiment, a method for solving the above-mentioned problem is disclosed.
[0125] The base station does not perform the movement of the UE if it cannot communicate on other redundant paths. As another example, in the above situation, the base station may not release the RRC connection with the UE, and may not suspend the RRC connection with the UE.
[0126] The above-mentioned situation of being unable to communicate may be a situation where the UE is moving in other redundant paths, a situation where the UE is not RRC_CONNECTED and / or CM_CONNECTED in other redundant paths, a situation where the power supply of each device of the NW is cut off in other redundant paths, a situation where the UE detects RLF (Radio Link Failure) and / or beam failure (Beam Failure) in other redundant paths, a situation where communication interruption between the base station and the core network and / or communication interruption in the core network occurs in other redundant paths, or a combination of the above. The above-mentioned communication interruption between the base station and the core network may be a communication interruption between the base station and the AMF (for example, a communication interruption on the N2 interface), or a communication interruption between the base station and the UPF (for example, a communication interruption on the N3 interface). The communication interruption in the above-mentioned core network may be a communication interruption between UPF and SMF (for example, a communication interruption on the N4 interface), a communication interruption between UPF and DN (for example, a communication interruption on the N6 interface), a communication interruption between UPFs (for example, a communication interruption on the N9 interface), a communication interruption between AMF and SMF (for example, a communication interruption on the N11 interface), or a combination of the above.
[0127] The base station on the redundant path that cannot communicate (hereinafter sometimes referred to as the communication interruption redundant path) notifies the base station on the other redundant path (hereinafter sometimes referred to as the non-communication interruption redundant path) of information indicating that it cannot communicate with the UE on the path. This information may include, for example, information about the redundant path described later, and may also include the reason why communication cannot be performed. The information about the redundant path may be, for example, an identifier of the path, information about the UE on the path, information about the base station on the path, information about the UPF on the path, information about the PDU session on the path, or a combination of the above. The reason for the inability to communicate may be, for example, that the UE is moving in the other redundant path, that the UE is not RRC_CONNECTED and / or CM_CONNECTED in the other redundant path, that the power supply of each device of the NW in the other redundant path is cut off, that the UE detects RLF (Radio Link Failure) and / or beam failure in the other redundant path, that a communication interruption between the base station and the core network and / or a communication interruption in the core network occurs in the other redundant path, or a combination of the above.
[0128] The base station on the communication interruption redundant path can notify the information indicating that it cannot communicate with the UE on this path via the AMF. The AMF can notify the base station on the non-communication interruption redundant path of this information. The notification from the AMF to the base station on the non-communication interruption redundant path can be made via the AMF on the non-communication interruption redundant path. As another example, the base station on the communication interruption redundant path can notify the base station on the communication interruption redundant path of this information via the AMF on the non-communication interruption redundant path.
[0129] The base station on the non-communication interruption redundant path may not use the information to move (eg, switch) the UE connected to the base station, and may not release or suspend the RRC connection with the UE.
[0130] A new signaling for indicating the stop of measurement reporting may be set. For example, the signaling may include information indicating the measurement that is the object of report stop (e.g., measurement object). This enables, for example, the UE to quickly understand the measurement object for which measurement reporting is to be stopped. The signaling may be, for example, RRC signaling. This enables, for example, the base station to notify the UE of more information. As another example, the signaling may be MAC signaling. This enables, for example, the base station to quickly instruct the UE to stop measurement reporting. As another example, the signaling may be L1 / L2 signaling. This enables, for example, the base station to more quickly instruct the UE to stop measurement reporting.
[0131] Base stations on other paths may instruct UEs connected to this base station to stop measurement reporting. For example, the indication may use the newly set signaling described above, or may use existing signaling. The base station may use this information as an opportunity to instruct the UE to stop measurement reporting. The UE may use this indication as an opportunity to stop sending measurement reports to the base station. The measurement report may be a measurement report triggered by an event disclosed in non-patent document 22 (TS 38.331) and / or non-patent document 23 (TS 36.331). Therefore, for example, measurement reports from the UE can be suppressed during the mobility suppression process of the UE. As a result, the amount of signaling between the base station and the UE can be reduced.
[0132] As another example, the base station on the communication interruption redundant path can release the measurement setting for the UE connected to the base station. The measurement setting can be a setting for the event-triggered measurement disclosed in non-patent document 22 (TS 38.331) and / or non-patent document 23 (TS36.331). The base station can use RRC signaling, MAC signaling, or L1 / L2 signaling to perform the release. The UE can use the released signaling to release the measurement setting for the UE. Therefore, for example, the memory usage in the base station and / or the UE can be reduced.
[0133] The base station on the redundant path that cannot communicate may notify the base station on the other path of information indicating that the communication with the UE on the path has been restored. For example, the information indicating that the communication has been restored may be information indicating that the movement of the UE is completed, or information indicating that the UE returns to RRC_CONNECTED. The base station on the other path may use the information to perform the movement (e.g., handover) of the UE connected to the base station, or may release or suspend the RRC connection of the UE.
[0134] An indication for indicating the start or restart of measurement reporting may be newly set. For example, the signaling may include information indicating the measurement that is the object of report start or report restart (e.g., measurement object). This enables, for example, the UE to quickly understand the measurement object for which measurement reporting is to be restarted. The signaling may be, for example, RRC signaling. This enables, for example, the base station to notify the UE of more information. As another example, the signaling may be MAC signaling. This enables, for example, the base station to quickly instruct the UE to restart measurement reporting. As another example, the signaling may be L1 / L2 signaling. This enables, for example, the base station to quickly instruct the UE to restart measurement reporting.
[0135] The base station may instruct the UE to restart the measurement report. For example, the instruction may use the newly set signaling described above, or may use the existing signaling. The base station may use information indicating that the communication between the base station and the UE on other redundant paths has been restored to instruct the UE to restart the measurement report. The UE may use the instruction as an opportunity to restart sending the measurement report to the base station. Thus, for example, the stability of the communication quality of the redundant path may be improved.
[0136] The signaling for indicating the stop of measurement reporting and the signaling for indicating the start or restart of measurement reporting may be the same signaling. For example, the signaling may include information indicating the stop of measurement reporting, information about the measurement that is the object of the stop of measurement reporting (e.g., measurement object), information indicating the start or restart of measurement reporting, and information about the measurement that is the object of the start or restart of measurement reporting (e.g., measurement object). Thus, for example, the number of additional signaling types can be reduced. As a result, the complexity of the additional functions related to the stop / restart of measurement reporting in the communication system can be alleviated.
[0137] As another example, the base station on the communication interruption redundant path can re-set the measurement settings for the UE connected to this base station. The above-mentioned re-setting can be performed when the base station releases the measurement settings for the UE. The above-mentioned re-setting can be different from the setting before the release. The measurement setting can be a setting for event-triggered measurements disclosed in non-patent document 22 (TS 38.331) and / or non-patent document 23 (TS 36.331). The base station can, for example, use RRC signaling to make the setting. The UE can use the released signaling to re-set the measurement for this UE. Thereby, for example, the flexibility in the measurement setting can be improved.
[0138] The base station may make the measurement report start / stop conditions of the UE using the redundant structure different from the measurement report start / stop conditions of the UE not using the redundant structure. The measurement report may be, for example, a report of measurement triggered by an event disclosed in non-patent document 22 (TS 38.331) and / or non-patent document 23 (TS 36.331). For example, the base station may perform the action of making the start / stop conditions different by making the start / stop thresholds different. For example, the base station may use the information described later (1) as the information of the redundant path to determine whether to make the start / stop conditions different.
[0139] The base station can, for example, make the measurement report start / stop conditions of the UE using the redundant structure more relaxed than the measurement report start / stop conditions of the UE not using the redundant structure. Thus, for example, compared with the case where the redundant structure is not used, switching can be performed before the communication quality deteriorates. As a result, the link disconnection of the redundant structure caused by the deterioration of the communication quality during the switching suppression of the redundant structure can be prevented.
[0140] As another example, the base station may make the measurement report start / stop conditions of the UE using the redundant structure stricter than the measurement report start / stop conditions of the UE not using the redundant structure. Thus, for example, the frequency of switching can be reduced, resulting in improved communication efficiency.
[0141] Before detecting the RLF of the UE using the redundant path, the base station can notify the base stations on other redundant paths that the UE of this base station is about to become RLF, and can also notify that the uplink signal from the UE of this base station cannot be received at a specified time. This notification can be made through AMF. For example, the base station can also make this notification when it cannot receive the uplink signal from the UE at a specified time. The base stations on other redundant paths can use this notification to suppress the switching of the UE, and can also suppress the measurement report for the UE. As a result, it is possible to prevent the redundant path from becoming RLF or beam failure after the switching in other redundant paths is started. As a result, the communication path of both parties can be prevented from being interrupted.
[0142] The prescribed time may be specified by a standard. For example, the prescribed time may be determined as a time shorter than the TSC cycle. As another example, the base station may determine the prescribed time. For example, the base station may determine that the prescribed time is a time shorter than the TSC cycle. The base station may notify the UE of the prescribed time quasi-statically, for example, using RRC signaling. Thus, for example, the reliability of the notification of the prescribed time may be improved. As another example, the base station may notify the UE of the prescribed time dynamically, for example, using MAC signaling. Thus, for example, the base station is able to make quick notifications within the prescribed time. As another example, the base station may use L1 / L2 signaling to notify the prescribed time. Thus, for example, the base station is able to notify more quickly within the prescribed time.
[0143] The above-mentioned base station may also take the reception of an uplink signal from the UE as an opportunity to notify base stations on other redundant paths of information indicating that the communication with the UE of the base station has been restored. The notification may be performed through the AMF. The base station may also perform the notification, for example, when it sends information indicating that the uplink signal from the UE cannot be received within a specified time to base stations on other redundant paths. The base stations on other redundant paths may use the notification to release the switching inhibition of the UE, and may also release the inhibition of measurement reports for the UE. Thus, for example, when the communication path with the UE is restored, it is possible to prevent the UE from continuing to be unable to switch on other redundant paths.
[0144] The base station may notify the base station of the information related to the redundant path. For example, the UE may use RRC signaling to notify the information. The base station may transmit the information to the AMF. For example, the base station may use signaling on the N2 interface to transmit the information to the AMF. As another example, the UE may notify the AMF of the information. The UE may use NAS signaling to transmit the information to the AMF.
[0145] As examples of information on redundant paths, the following (1) to (17) are disclosed.
[0146] (1) Information on the presence or absence of communications using redundant paths.
[0147] (2) Information about the redundant path morphology.
[0148] (3) Information about the number of redundant paths in the sending and receiving hosts.
[0149] (4) The identifier of the redundant path used by this UE.
[0150] (5) Identifier of own UE As an example, the following (5-1) to (5-5) are disclosed.
[0151] (5-1) IMSI (International Mobile Subscriber Identity) of this UE.
[0152] (5-2) MSISDN (Mobile Subscriber Integrated Services Digital Network Number) of this UE.
[0153] (5-3) 5G-S-TMSI (5G S-Temporary Mobile Subscription Identifier) of this UE.
[0154] (5-4) UE-ID of this UE.
[0155] (5-5) A combination of the above (5-1) to (5-4).
[0156] (6) Information about the combination of redundant paths.
[0157] (7) Identifiers of other redundant paths.
[0158] (8) Identifier of UE on other redundant path As an example, the following (8-1) to (8-5) are disclosed.
[0159] (8-1) IMSI (International Mobile Subscriber Identity) of UE on other redundant paths.
[0160] (8-2) MSISDN (Mobile Subscriber Integrated Services Digital Network Number) of UE on other redundant paths.
[0161] (8-3) 5G-S-TMSI (5G S-Temporary Mobile Subscription Identifier) of the UE on other redundant paths.
[0162] (8-4) UE-ID of UE on other redundant paths.
[0163] (8-5) A combination of the above (8-1) to (8-4).
[0164] (9) Information about the base stations connected in this redundant path.
[0165] (10) Information about the AMF connected in this redundant path.
[0166] (11) Information about the UPF connected in this redundant path.
[0167] (12) Information about the SMF connected in this redundant path.
[0168] (13) Information about base stations connected in other redundant paths.
[0169] (14) Information about AMFs connected in other redundant paths.
[0170] (15) Information about UPFs connected in other redundant paths.
[0171] (16) Information about SMFs connected in other redundant paths.
[0172] (17) A combination of the above (1) to (16).
[0173] The information in (1) above may be, for example, information indicating whether the UE constitutes redundant communication. The NW device may use this information for measurement settings for the UE. Thus, for example, for UEs constituting redundant paths, the number of movements can be reduced, and as a result, the number of communication interruptions caused by the movement can be reduced.
[0174] The information in (2) above may be, for example, information indicating that a redundant path is formed by connecting each of a plurality of UEs to a different base station or UPF, information indicating that a redundant path is formed by connecting one UE to a plurality of base stations or UPFs, or information indicating that a redundant path is formed by connecting one UE to a base station or one or more UPFs. The UE may store information about the structure that the UE can obtain as UE capabilities, which may be stored in the SIM. The core NW device may use the information in (2) above to determine the redundant structure of the UE. Thus, for example, an optimal redundant path may be formed between the transceiver hosts according to the communication environment, etc.
[0175] The redundant paths related to (3) above may be, for example, 2 or more than 3. The NW device may also use this information to inquire other NWs about information related to other redundant paths. Thus, for example, the NW device can perform inquiries about information about other redundant paths as many times as necessary. As a result, the signaling efficiency in the communication system can be improved.
[0176] The information in (4) above can be represented by, for example, a sequence number starting from 0 or 1, can be represented by a flag using a bitmap, or can be represented by other forms. The NW device can use this information to determine whether the signaling (for example, inquiry) from other NW devices is related to the redundant path. This can improve the signaling efficiency in the communication system, for example.
[0177] For example, the information of (5-1) and / or (5-2) can be used as the information of (5) above. This makes it possible to determine the UE on other paths even when the NW (for example, PLMN) used in each redundant path is different, as a result, the complexity of controlling the redundant paths can be avoided. As another example, the information of (5-3) and / or (5-4) can be used. Thus, the UE can be quickly determined. The information of (5) above can also include information related to the category of the identifier. Thus, for example, the NW device can quickly grasp the category of the identifier, as a result, the processing in the communication system can be quickly performed.
[0178] The information in (6) above may be, for example, an identifier for identifying a redundant path group. Thus, for example, the NW device can quickly identify the redundant path that forms a group with the redundant path. As another example, the identifier of the UE constituting the redundant path group may be used, such as (5-1), (5-2), (8-1), (8-2) or a combination thereof. Thus, for example, the same effect as described above can be obtained.
[0179] The information in (7) above may be the same as the information in (4) above. Thus, for example, the same effect as that in (4) above can be obtained.
[0180] The information in (8) above may be the same as the information in (5) above. Thus, for example, the same effect as in (5) above can be obtained.
[0181] The information in (9) above may be, for example, the gNB-ID disclosed in non-patent document 16 (TS 38.300), the NR cell global ID, the global gNB-ID, or the network address of the base station (e.g., IP address).
[0182] The base station can notify the information (9) about this redundant path to each device in other redundant paths. The notification can include the information (5) above. The notification can be performed by AMF or SMF. Each device in other redundant paths, such as a base station in other redundant paths, can use the information (9) to point to this base station, or, if the UE to be connected is the UE shown in the information (5), to reject the connection request from the UE. Therefore, for example, it is possible to prevent the redundancy from being reduced due to the duplication of base stations in multiple redundant paths.
[0183] The information in (10) above may be, for example, the AMF name (AMFName) disclosed in non-patent document 16 (TS 38.300), or the GUAMI (Globally Unique AMFIdentifier: Globally Unique AMF Identifier) disclosed in non-patent document 24 (TS23.501), or the network address of the AMF (e.g., IP address). Alternatively, the information in (10) above may be, for example, an identifier consisting of one or more of the AMF area ID, AMF set ID, and AMF pointer disclosed in non-patent document 24.
[0184] The base station can notify the information (10) about the redundant path to each device in the other redundant path. The notification can be performed by the AMF or the SMF. Each device in the other redundant path, for example, the base station in the other redundant path can be connected to the same AMF as the information (10). Thus, for example, communication using redundant paths can be effectively performed. As another example, the base station in the other redundant path can be connected to an AMF different from the information (10). Thus, for example, the redundancy in the C layer can be improved, as a result of which the robustness of the communication system can be improved.
[0185] The information in (11) above may be, for example, the UPFID disclosed in non-patent document 25 (TS23.502), or the network address of the SMF (for example, IP address).
[0186] The base station may notify each device in other redundant paths of the information (11) about this redundant path. The notification may be performed by the AMF or the SMF. Each device in other redundant paths, such as the SMF in other redundant paths, may be limited to the UPF used in the redundant path of this SMF. For example, the SMF may not be connected to the UPF included in the information. Therefore, for example, it is possible to prevent redundancy from being reduced due to duplication of UPFs in multiple redundant paths.
[0187] The information in (12) above may be, for example, the SMFID disclosed in non-patent document 25 (TS23.502), or the network address of the base station (for example, IP address).
[0188] The base station can notify the information (12) about the redundant path to each device in the other redundant path. The notification can be performed by the AMF or the SMF. Each device in the other redundant path, for example, the AMF in the other redundant path can be connected to the same SMF as the information (12). Thus, for example, the communication using the redundant path can be effectively controlled. As another example, the AMF can be connected to an SMF different from the information (12). Thus, for example, the redundancy in the C layer can be improved, as a result of which the robustness of the communication system can be improved.
[0189] The information in (13) may be the same as the information in (9). The UE may use the information in (13) to determine the connection destination base station. Therefore, for example, it is possible to prevent redundancy from being reduced due to duplication of base stations in multiple redundant paths.
[0190] The information in (14) above may be the same as the information in (10) above, for example. The base station may use the information in (14) above to determine the AMF to be the connection destination on the N1 interface of the UE. For example, the base station may determine the connection destination AMF of the UE to be the same AMF as the above (14). Thus, for example, communication using redundant paths can be effectively performed. As another example, the base station may determine the connection destination AMF of the UE to be an AMF different from the above (14). Thus, for example, the redundancy in the C layer can be improved, and as a result, the robustness of the communication system can be improved.
[0191] The information of (15) above may be the same as the information of (11) above, for example. The SMF may use the information of (15) above to limit the UPF used in the redundant path of this SMF, for example, it may not be connected to the UPF included in the information. Therefore, for example, it is possible to prevent the redundancy from being reduced due to the duplication of UPF in multiple redundant paths.
[0192] The information in (16) above may be the same as the information in (12) above, for example. The AMF may be connected to the SMF having the same information as that in (16) above. Thus, for example, communications using redundant paths may be effectively controlled. As another example, the AMF may be connected to an SMF different from the information in (16). Thus, for example, the redundancy in the C-plane may be improved, with the result that the robustness of the communication system may be improved.
[0193] For example, the information (1) to (8) above may be included in the UE capabilities or in the SIM of the UE.
[0194] The UE may notify the information about the redundant path when registering with the NW. The UE may, for example, notify the base station of the information. For example, the UE may include the information in the signaling of the registration request and notify the information. As another example, the UE may notify the information when establishing a PDU session. As another example, the UE may notify the information when requesting a service. As another example, the UE may notify the information when establishing a connection with the AMF. For example, the UE may notify the AMF of the information.
[0195] The base station can use this information to determine the AMF of the UE's connection destination. The AMF can use this information to determine the SMF. The SMF can use this information to determine the UPF of the UE's connection destination. The decision of the AMF, SMF and / or UPF can be made during the registration process with the NW, during the establishment of the PDU session, or during the service request process. This can reduce the possibility of changing the AMF, SMF and / or UPF after the decision of the AMF, SMF and / or UPF. As a result, the amount of signaling caused by the occurrence of processes in the communication system can be reduced.
[0196] As another example of the decision about the AMF, SMF and / or UPF, there may be an AMF, SMF and / or UPF that becomes the default connection destination. For example, the UE may have information about the default connection destination, the base station may have information about the default connection destination, the AMF may have information about the default connection destination, and the SMF may have information about the default connection destination. For example, the base station may have an AMF that becomes the default connection destination, the AMF may have an SMF that becomes the default connection destination, and the SMF may have an UPF that becomes the default connection destination. The above-mentioned devices may use the information about the redundant path to re-determine the AMF, SMF and / or UPF of the connection destination. Thereby, for example, complexity in the communication system can be avoided.
[0197] As another example of information about redundant paths, the NW device may derive information about redundant paths. The NW device may be a base station, an AMF, an SMF, or a UDM. For example, the AMF may notify the base station or the SMF of the derived information. As another example, the UDM may notify the AMF or the SMF of the derived information. The AMF may notify the base station or the SMF of the information derived by the UDM. Therefore, for example, the amount of signaling between the UE and the base station may be reduced.
[0198] As another example, notification of information about redundant paths from the UE and derivation of the information in the NW device may be used in combination. For example, the UE may notify the NW device of (1) to (8) or a combination thereof disclosed as examples of information about redundant paths. The above-mentioned (8) information notified from the UE to the NW device may be, for example, (8-1) and / or (8-2). The NW device may use the information from the UE to derive (8) to (16) or a combination thereof disclosed as examples of information about redundant paths. The above-mentioned (8) information derived by the NW device may also be, for example, (8-3) and / or (8-4). Thus, for example, the amount of signaling between the UE and the base station can be reduced, while the amount of processing in the NW device can be reduced.
[0199] The base station can obtain information about other redundant paths. The information obtained by the base station can be, for example, (8) to (16) disclosed as examples of the above-mentioned information about redundant paths, or a combination thereof. The base station can use this information, such as information about base stations used in other redundant paths, to switch the base station to which the UE in this redundant path is connected, and can also select the switching destination base station of the UE. For example, when determining the switching destination of the UE in this redundant path, the base station can exclude the base stations used in other redundant paths from the switching destination. Thereby, for example, UEs on multiple redundant paths can be connected to different base stations, and as a result, the robustness of the redundant paths can be improved.
[0200] The base station may request the information from the AMF. The base station may make the request, for example, using the case where the information of (1) disclosed as an example of information about a redundant path is yes. The base station may include a portion of the information about the redundant path in the request, for example, including (1) to (8) or a combination thereof disclosed as examples of information about the above-mentioned redundant path. The AMF may derive the information using the request. The AMF may use the request as a trigger to notify the base station of the information. Thus, for example, the amount of processing related to deriving the information in the base station can be reduced.
[0201] The AMF may request the information from the UDM. The AMF may, for example, make the request using the case where the information of (1) disclosed as an example of information about a redundant path is yes. The AMF may include a portion of the information about the redundant path in the request, for example, (8-1) and / or (8-2) disclosed above as an example of information about a redundant path. The UDM may use the information from the AMF to derive information about the redundant path. For example, the UDM may use the information of (8-1) and / or (8-2) notified from the AMF to derive information about the AMF connected in other redundant paths, such as an identifier of the AMF. The UDM may notify the AMF of the derived information. The AMF may use the information to request information about other redundant paths from the AMF on other redundant paths. The AMF on other redundant paths may use the request to derive information about the redundant path to which the AMF is connected, such as the base station used by the redundant path. The AMF on other redundant paths may notify the AMF of the derived information. The AMF may notify the base station of the notified information. As a result, for example, even when the AMF used in other redundant paths is different from the current AMF, the NW device in the current redundant path can obtain information related to the other redundant paths.
[0202] The base station can request this information when the UE registers with the NW. For example, the base station can request this information based on the signaling of the registration request received from the UE. The base station can include this request in the signaling of the registration request sent from the base station to the AMF. The AMF can request this information when the UE registers with the NW. For example, the AMF can request this information based on the signaling of the registration request received from the base station.
[0203] As another example, the base station may request the information at the time of the UE's service request. For example, the base station may request the information based on the signaling of the service request received from the UE. The AMF may request the information when the UE registers with the NW. The base station may include the request in the signaling of the service request sent from the base station to the AMF. The AMF may request the information at the time of the UE's service request. For example, the AMF may request the information based on the signaling of the service request received from the base station.
[0204] As another example, the AMF may request the information when the UE's PDU session is established. For example, the AMF may request the information upon receiving a PDU Session Establishment Request from the UE.
[0205] The UE, base station, AMF and / or SMF may notify the NW devices on other redundant paths of the information about the redundant path. The information notified by the UE, base station, AMF and / or SMF may be, for example, part or all of (1) to (17) disclosed above as examples of information about redundant paths (for example, (1) to (6), (9) to (12) or a combination thereof). The notification of this information may be performed by the AMF or SMF. The NW devices on other redundant paths may use this information to determine or switch the base station, UPF, AMF and / or SMF connected to the redundant path. For example, the NW devices on other redundant paths may exclude the base station and / or UPF included in the information to determine the base station and / or UPF used in the redundant path. As a result, for example, UEs on multiple redundant paths may be connected to different base stations and / or UPFs, thereby improving the robustness of the redundant paths.
[0206] For example, in UE handover, the UE may be set to be unable to connect to a base station on a redundant path different from the redundant path of the UE. The base station may notify the mobile source base station of the content of rejecting the handover request (HandoverRequest) from the mobile source base station of the UE. For example, the notification of the rejection content may be made using the signaling of HANDOVER PREPARATION FAILURE (handover preparation failure). The notification of the rejection content may include a reason. The reason may include, for example, information indicating that the UE is already connected to another redundant path.
[0207] As another example, in the cell selection and / or cell reselection of the UE, the UE may be set to be unable to connect to a base station on a redundant path different from the redundant path of the UE. The base station may notify the UE of the fact that it cannot connect to the base station in the random access process between the UE and the UE. For example, the notification may be made through message 4 of the random access or through message 2. The notification may include a reason. The reason may, for example, include information indicating that the UE has been connected to another redundant path.
[0208] As another example, in UE switching, the base station that becomes the new connection destination of the UE on the other redundant path can instruct the switching to the other UE in the connection. The base station can use RRC signaling, such as RRC reconfiguration, to make the instruction to the other UE in the connection. The instruction can include a reason. The reason can include, for example, information indicating that the UE is already connected to the other redundant path.
[0209] The base station can determine whether to reject the handover of the UE to the base station or to indicate the handover of the connected UE. For example, the base station can use the measurement report from each UE to make the judgment. The mobile source base station can notify the base station of the UE measurement report. The base station requests the mobile source base station for the UE measurement report. Thus, for example, the stability of the communication quality in the two redundant paths can be improved.
[0210] In the measurement setting for the UE, the base station may set the base station or cell that can be connected in the redundant path as the base station or cell of the measurement object, or may set it as the base station or cell of the measurement result report object. The above-mentioned base station or cell that can be connected in the redundant path may be, for example, a base station or cell that is not used in other redundant paths. Therefore, for example, it is possible to prevent the redundancy from being reduced due to the duplication of base stations in multiple redundant paths. As another example, the base station or cell used in other redundant paths may be included in the base station or cell that can be connected in the redundant path. Thus, for example, even if a candidate for the switching destination base station in the redundant path is not found other than the base station used in other redundant paths, switching can be performed. Thus, the stability of the communication quality in the redundant paths of both parties can be improved.
[0211] As another example of measurement settings from the base station to the UE, the base station or cell that cannot be connected in the redundant path can be excluded from the base station or cell of the measurement object, and can also be excluded from the base station or cell of the measurement result report object. Thus, for example, when the number of connectable base stations or cells is small, the amount of signaling related to the measurement settings can be reduced. The above-mentioned base station or cell that cannot be connected in the redundant path can be, for example, a base station or cell used in other redundant paths.
[0212] Notifications from UE, base station, AMF and / or SMF to NW devices on other redundant paths may be made via a host on the UE side or UE-to-UE communication (e.g., side link). As another example, the notification may be made via a base station, for example, via an Xn interface. As another example, the notification may be made via an AMF, for example, via a base station, an AMF, a base station on other redundant paths, or via an AMF-to-AMF interface. An AMF-to-AMF interface may be set. As another example, the notification may be made via an SMF, for example, using an SMF-to-SMF interface. As another example, the notification may be made from an AMF via an SMF on other redundant paths. As another example, the notification may be made via a UPF or a DN. The notification may be a notification of information indicating that communication with a UE on this path is unavailable, a notification of information indicating that communication with a UE on this path has been restored, or a notification of information about redundant paths.
[0213] The base station may separately notify or broadcast information about cells or base stations that the UE cannot connect to (e.g., a blacklist of cells or base stations). The broadcast may be performed, for example, using system information. The base station may use information about the redundant path notified from other redundant paths to construct information about cells that the UE cannot connect to. The base station may include information about the UE that cannot connect to the cell, such as an identifier of the UE, in the information notified or broadcasted to the UE. The UE may use this information to connect to the base station. Thus, for example, the UE can quickly grasp the cell that cannot be connected.
[0214] The base station may notify or broadcast information related to the redundant path including the base station to the UE. The information may be information about the redundant path to which the base station can connect. The broadcast may be performed, for example, using system information. The information may be, for example, information about the reliability group (Reliability Group) including the base station (refer to non-patent document 24 (TS 23.501)), or information about (1) to (17) or a combination thereof about the redundant path including the base station. The UE may use the information to connect to the base station. For example, the UE may connect to the base station if the base station can connect in the redundant path. Thus, for example, the UE can quickly grasp the base stations to which it can connect.
[0215] Figure 14 to Figure 16 is a timing diagram showing establishment of communications using redundant paths for multiple UEs. Figure 14 to Figure 16 Connected at the locations of boundaries BL1415 and BL1516. Figure 14 to Figure 16 The following situation is shown: two redundant paths are used, UE#1, base station #1, AMF#1, UPF#1, SMF#1 are used in one redundant path (hereinafter sometimes referred to as redundant path #1), and UE#2, base station #2, AMF#2, UPF#2, SMF#2 are used in another redundant path (hereinafter sometimes referred to as redundant path #2), and UE#1 and UE#2, which are different from each other in the host on the terminal side, are connected to base station #1 and base station #2, respectively, and are used for communication with the host on the network side. In addition, in Figures 14 to 16 In the figure, “base station #1” and “base station #2” are labeled as “BS#1” and “BS#2”. Figure 14 to Figure 16 PDU session establishment at UE#1 and UE#2 is shown.
[0216] exist Fig.14 In step ST1401, UE#1 requests AMF#1 to establish a PDU session. The request may include information about using redundant paths of UE#1 and / or UE#2.
[0217] exist Fig.14 In the process 1402 shown, a PDU session is established.
[0218] exist Fig.14 In step ST1403 shown, AMF#1 performs SMF selection. In step ST1405, AMF#1 requests SMF#1 to generate a PDU session. In step ST1407, SMF#1 inquires and obtains user information with UDM#1. In step ST1409, SMF#1 notifies AMF#1 of the response to the PDU session creation request. In step ST1411, authentication / authorization of the PDU session is performed.
[0219] exist Fig.14 In step ST1413 shown, SMF#1 selects a PCF for connection with UE#1. In step ST1415, session management policy related information is established between SMF#1 and PCF#1. In step ST1417, SMF#1 selects a UPF for communication with UE#1. In step ST1418, session management policy related information may be changed between SMF#1 and PCF#1. In step ST1418, for example, SMF#1 may send information about an IP address assigned to the UE to PCF#1. Fig.15 In step ST1419 shown, SMF#1 requests UPF#1 to establish an N4 session. In step ST1419, UPF#1 notifies SMF#1 of the response to the request in step ST1421.
[0220] exist Fig.15 In step ST1423 shown, RAN parameters derived in the core NW are sent and received between SMF#1 and AMF#1. In step ST1425, AMF#1 sends a PDU session request on the N2 interface to base station#1. The request of step ST1425 may include the parameters sent and received in step ST1423. In step ST1427, base station#1 sends a RAN setting request to UE#1. The request may include a response to the PDU session establishment request. For example, step ST1427 can be performed using signaling of RRC Reconfiguration. In step ST1429, base station#1 notifies AMF#1 of the response to the PDU session request on the N2 interface.
[0221] exist Fig.15 In step ST1431 shown, UE#1 sends the initial uplink data to UPF#1.
[0222] exist Fig.15 In step ST1433, AMF#1 may request SMF#1 to update the PDU session. The request may include the session management information received from base station#1.
[0223] exist Fig.15 In step ST1435 shown, SMF#1 may request UPF#1 to modify the N4 session. In step ST1437, UPF#1 may respond to the N4 session modification request to SMF#1.
[0224] exist Fig.16 In step ST1439 shown, UPF#1 sends the initial downlink data to UE#1.
[0225] exist Fig.16 In step ST1441 shown, SMF#1 may notify AMF#1 of the response to the PDU session update request.
[0226] exist Fig.16 In steps ST1443 and ST1444 shown, SMF#1 notifies UE#1 of the IPv6 router advertisement via UPF#1.
[0227] exist Fig.16 In step ST1450 shown, AMF#1 notifies AMF#2 of information about redundant path #1. The notification may be, for example, a notification about a PDU session of redundant path #1. Signaling for the notification may be newly set. The information may include information (1) to (17) disclosed as information about the redundant path. In step ST1452, AMF#2 may transmit the information to base station #2. In step ST1454, base station #2 may transmit the information to UE#2.
[0228] exist Fig.16 In step ST1456, UE#2 requests AMF#2 to establish a PDU session. The request may include information about using redundant paths of UE#1 and / or UE#2.
[0229] exist Fig.16 In the process 1460 shown, the same processing as the process 1402 is performed.
[0230] exist Fig.16 In step ST1470 shown, AMF#2 notifies AMF#1 of information about redundant path #2. This notification may be, for example, the same notification as step ST1450. This information may include information (1) to (17) disclosed as information about redundant paths. In step ST1472, AMF#1 may transmit this information to base station #1. In step ST1474, base station #1 may transmit this information to UE#1.
[0231] exist Figure 14 to Figure 16, the case where AMF#1 used in redundant path #1 and AMF#2 used in redundant path #2 are different is shown, but the same AMF may be used. Thus, for example, complexity in the control of redundant paths #1 and #2 can be avoided.
[0232] exist Figure 14 to Figure 16 In FIG. 1 , although the case where information about redundant path #1 from AMF #1 is notified to base station #2 via AMF #2 is shown, the information may be directly notified from AMF #1 to base station #2. Thus, for example, notification about redundant paths can be performed quickly.
[0233] exist Figure 14 to Figure 16 In FIG. 1 , although AMF#1 is shown notifying information about redundant path #1, base station #1 may also notify the information. Base station #1 may make the notification to AMF#2, may make the notification to base station #2 via AMF#2, or may make the notification directly to base station #2. Thus, for example, flexibility in the communication system may be improved.
[0234] Figure 17 to Figure 19 The diagram shows an operation of suppressing the handover of UE#2 using redundant path #2 when UE#1 is switched on redundant path #1, and an operation of releasing the suppression. Figure 17 to Figure 19 Connected at the locations of boundaries BL 1718 and BL 1819. Figure 17 to Figure 19 UE#1 is switched from base station #1-1 to base station #1-2. Figure 17 to Figure 19 In the example, "base station #1-1", "base station #1-2" and "base station #2" are labeled as "BS#1-1", "BS#1-2" and "BS#2"
[0235] exist Fig.17 In steps ST1501 and ST1502 shown, user data is transmitted and received between UPF#1 and UE#1. Step ST1501 shows data transmission and reception between UE#1 and base station #1-1, and step ST1502 shows data transmission and reception between base station #1-1 and UPF#1.
[0236] exist Fig.17 In step ST1504 shown, AMF#1 notifies base station #1-1 of mobility control information. In step ST1506, base station #1-1 notifies UE#1 of measurement control information, and UE#1 uses the control information to perform measurements and sends a measurement report to base station #1-1. In step ST1510, base station #1-1 decides to handover UE#1 to base station #1-2.
[0237] exist Fig.17In step ST1512 shown, base station #1-1 notifies AMF #1 that UE #1 is switching. The notification may include information (1) to (17) disclosed as information related to redundant paths in Implementation 1. Base station #1-1 can determine whether UE #1 is communicating using a redundant path based on whether there is a notification in step ST1512. In step ST1514, AMF #1 transmits the information of step ST1512 to AMF #2. In step ST1516, AMF #2 transmits the information of step ST1512 to base station #2.
[0238] exist Fig.17 In process 1520 shown by the dotted line, the switching decision suppression of base station #2 and the measurement report suppression of UE #2 are performed.
[0239] exist Fig.17 In step ST1522 shown, base station #2 suppresses the handover of UE #2. This suppression can also be performed using step ST1516. In step ST1524, base station #2 instructs UE #2 to suppress the measurement report. This instruction can be performed, for example, using RRC signaling, such as RRC reconfiguration. In step ST1526, UE #2 suppresses the measurement report.
[0240] exist Fig.17 In step ST1512 shown, base station #1-1 makes a handover request for UE #1 to base station #1-2. In step ST1532, base station #1-2 performs acceptance control (grant control) for UE #1. In step ST1534, base station #1-2 sends a positive response to the handover request to base station #1-1.
[0241] exist Fig.17 In step ST1536 shown, the handover between base station #1-1 and UE #1 begins. In step ST1536, base station #1-1 instructs UE #1 to perform the handover. This instruction can be performed, for example, using RRC reconfiguration. In step ST1538, UE #1 uses this instruction to release the connection with the cell of base station #1-1 and synchronize with the cell of base station #1-2.
[0242] exist Fig.17 In step ST1540 shown in FIG. 15, base station #1-1 transmits to base station #1-2 a status related to the sequence number of the packet sent and received between UE #1. Fig.18In steps ST1542 and ST1543 shown, base station #1-1 transmits the user data received from UPF #1 to base station #1-2. Step ST1542 shows the transmission of user data from UPF #1 to base station #1-1, and step ST1543 shows the transmission of user data from base station #1-1 to base station #1-2. In step ST1545, base station #1-2 retains the data in ST1543.
[0243] exist Fig.18 In step ST1550 shown, UE#1 notifies base station #1-2 that the handover is completed. In steps ST1552 and ST1553, data is transmitted and received between UE#1 and UPF#1 via base station #1-2. Step ST1552 shows uplink data transmission between UE#1 and base station #1-2 and downlink data transmission maintained in step ST1543, and step ST1553 shows uplink data transmission from base station #1-2 to UPF#1.
[0244] exist Fig.18 In step ST1555 shown, base station #1-2 sends a path switch request to AMF #1. In step ST1557, UPF #1 switches the path for UE #1 from base station #1-1 to base station #1-2. In step ST1559, UPF #1 sends an end marker packet to base station #1-1. In step ST1560, base station #1-1 transmits an end marker packet to base station #1-2. In step ST1562, packets after the end marker packet are sent and received between UPF #1 and base station #1-2.
[0245] exist Fig.18 In step ST1565 shown, AMF#1 sends a positive response to the path switch request to base station #1-2. In step ST1567, base station #1-2 instructs base station #1-1 to release the UE context. Base station #1-1 uses the instruction to release the UE context of UE#1.
[0246] exist Fig.19 In the process 1570 indicated by the dot-dash line, the notification of the handover completion of UE#1, the re-opening of the handover decision of base station #2, and the re-opening of the measurement report of UE#2 are performed.
[0247] exist Fig.19 In step ST1572 shown, base station #1-2 notifies AMF #1 of the handover completion of UE #1. In step ST1574, AMF #1 notifies AMF #2 of the handover completion of UE #1. In step ST1576, AMF #2 notifies base station #2 of the handover completion of UE #1.
[0248] exist Fig.19In process 1577 shown by the double-dotted line, the switching decision of base station #2 and the measurement report of UE #2 are restarted.
[0249] exist Fig.19 In step ST1578 shown, base station #2 releases the handover suppression of UE #2. This release can also be performed using step ST1576. In step ST1580, base station #2 notifies UE #2 to release the suppression of measurement reports. This notification can be performed, for example, using RRC signaling, such as RRC reconfiguration. In step ST1582, UE #2 releases the suppression of measurement reports.
[0250] The AMF may decide or arbitrate the base stations and / or UPFs to which UEs on multiple redundant paths are connected. The base station may request the AMF to decide or arbitrate the base stations to which UEs on multiple redundant paths are connected. The base station may make the request when it receives a connection request (e.g., signaling established by RRC) from UEs on multiple redundant paths. Alternatively, the base station may make the request when it receives a connection request from a UE on another redundant path during a connection with a UE on a certain redundant path. The base station may include information about the redundant path used by the UE in the request. The AMF may, for example, use part or all of (1) to (17) (e.g., (5), (8), (9) and / or (13)) of the information disclosed as the information about the redundant path to make the decision or arbitration. As another example, the SMF may request the AMF to decide or arbitrate the UPF to which UEs on multiple redundant paths are connected. The SMF may include information about the redundant path used by the UE in the request. The AMF may make the decision or arbitration, for example, using part or all of (1) to (17) (for example, (5), (8), (11) and / or (15)) of the information disclosed as the information about the redundant path. The decision or arbitration may be made, for example, when the same AMF is used in multiple redundant paths. For example, the AMF may give priority to the UE that first made a connection request to the AMF.
[0251] The AMF may notify the base station of information related to the priority UE, and may also notify the information related to the non-priority UE. The base station may use the notification to establish a connection with the priority UE, and may also reject the connection request from the non-priority UE. The non-prioritized UE may use the rejection notification to try to connect with other base stations. As another example, the AMF may notify the SMF of information related to the priority UE, and may also notify the SMF of information related to the non-priority UE. The SMF may use the notification to determine the UPF used by the priority UE, and may also re-determine the UPF used by the non-priority UE.
[0252] As another example, the base station itself may determine the base station to which the UE on the multiple redundant paths is connected. The base station may make the determination, for example, using part or all of the information (1) to (17) disclosed as the information about the redundant paths (e.g., (5), (8), (9) and / or (13)). For example, the base station may give priority to the UE that first connects to the base station.
[0253] As another example, the SMF may determine the UPF to which the UE on multiple redundant paths is connected. The SMF may make this determination, for example, using the information of (5), (8), (11), and / or (15) disclosed as the information about the redundant paths. This determination may be made, for example, when the same SMF is used in multiple redundant paths.
[0254] As another example, the AMF may inquire other AMFs about information about base stations and / or UPFs to which UEs on multiple redundant paths are connected. Other AMFs may notify the AMF of information about base stations, SMFs, and / or UPFs to which UEs on multiple redundant paths are connected. The AMF may use the notification to determine the base stations, SMFs, and / or UPFs to which subordinate UEs are connected.
[0255] As another example, the SMF may inquire other SMFs about information about the UPFs to which UEs on multiple redundant paths are connected. Other SMFs may notify the SMF about information about the UPFs to which UEs on multiple redundant paths are connected. The SMF may use the notification to determine the UPF to which the subordinate UE is connected.
[0256] As another example, a priority order may be set on multiple redundant paths. For example, a primary redundant path and a secondary redundant path may be set. The priority order may be given statically. For example, the priority order may be stored in the SIM of the UE. As another example, the priority order may be determined by a NW device, such as an AMF, or may be determined by a base station.
[0257] Regarding switching among multiple redundant paths, the first switching can be prioritized. The base station can notify the base stations on other redundant paths about the UE's switching. The notification can be made via the AMF.
[0258] As another example, regarding handovers on multiple redundant paths, the handover that starts first may be prioritized. The base station may notify base stations on other redundant paths of information about the handover of the UE. The notification may be made via the AMF.
[0259] As another example, UE switching in the primary redundant path may be prioritized over UE switching in the secondary redundant path.
[0260] The notification of the information about the redundant path disclosed in this embodiment 1 to the devices of other redundant paths can be performed when the redundant path is changed, for example, the switching of the base station, AMF, SMF and / or UPF. The notification can be performed by the base station, AMF or SMF. Thus, for example, information about the devices used in each redundant path can be shared between the redundant paths. As a result, the reduction of redundancy due to the use of the same device in multiple redundant paths can be prevented.
[0261] According to the first embodiment, while communication is not possible on a certain redundant path, switching on other redundant paths can be suppressed. As a result, communication interruption on all redundant paths can be prevented.
[0262] Modification 1 of Implementation Example 1. After switching occurs in a redundant path, if RLF, beam failure, communication interruption between the base station and the core network, power outage of each NW device in other redundant paths and / or communication interruption between core networks occur in other redundant paths, communication interruption will occur in any redundant path, resulting in the problem of reliability not being guaranteed.
[0263] In this modification 1, a method for solving the above-mentioned problem is disclosed.
[0264] The base station that is in the process of performing the handover cancels the handover.
[0265] The base station on the communication interruption redundant path notifies the base station on the non-communication interruption redundant path of information about the communication interruption. This information may be the same as the information indicating that communication cannot be performed between the UE on the present path disclosed in Implementation Example 1. The base station on the communication interruption redundant path notifies the base station on the non-communication interruption redundant path of information about the present redundant path. This information may include the information (1) to (17) disclosed as an example of information related to the redundant path in Implementation Example 1. The base station on the non-communication interruption redundant path may be a base station before movement with respect to the connected UE.
[0266] The base station on the non-communication interruption redundant path uses information from the base station on the communication interruption redundant path to determine whether the handover cancellation is possible. The base station notifies the handover cancellation to the mobile destination base station. The handover cancellation notification from the base station can be performed when the handover request (Handover Request) is notified to the mobile destination base station.
[0267] The reason may be included in the handover cancellation notification from the base station to the mobile destination base station. The reason may be, for example, information about the interruption of communication in other redundant paths. For example, the mobile destination base station may use the reason to maintain information about the UE involved in the handover. Thus, for example, it is possible to quickly perform the processing when the handover to the mobile destination base station is restarted. As another example, the relevant information of the UE involved in the handover may be released. Thus, for example, the memory usage in the mobile destination base station may be reduced.
[0268] The base station on the non-communication interruption redundant path may suppress switching. The base station may instruct the UE to suppress measurement reporting. The UE may use the instruction to suppress measurement reporting. The above-mentioned actions at the base station and / or the UE may be performed on the occasion of receiving information about communication interruption from the base station on the communication interruption redundant path. The switching suppression and measurement report suppression may be the same as in Embodiment 1. Thus, for example, the power consumption at the UE may be reduced, and the amount of signaling at the interface between the UE and the base station may be reduced.
[0269] As another example, the UE on the non-communication interruption redundant path can continue to send measurement reports to the base station. The base station can ignore the measurement reports. Thus, for example, complexity in the communication system can be avoided.
[0270] The base station on the communication interruption redundant path may also notify the base station on the non-communication interruption redundant path of information about recovery from communication interruption. The base station on the communication interruption redundant path notifies the base station on the non-communication interruption redundant path of information about the redundant path. The information may be part or all of the information (1) to (17) disclosed as examples of information related to the redundant path in Implementation Example 1. The base station on the non-communication redundant path may be the previous base station for the connected UE to move.
[0271] The base station on the non-communication interruption redundant path can release the suppression of switching. The base station can instruct the UE to release the suppression of measurement reporting. The UE can use the instruction to release the suppression of measurement reporting. The above-mentioned actions at the base station and / or the UE can be performed on the occasion of receiving information about recovery from communication interruption from the base station on the communication interruption redundant path. The handover suppression release and measurement report suppression release can be the same as implementation mode 1. As a result, for example, the UE can quickly resume measurement.
[0272] As another example, the base station may restart receiving the measurement report. The restart process may be applied to the above example where the base station ignores the measurement report. Thus, for example, complexity in the communication system can be avoided.
[0273] The base station on the non-communication interruption redundant path can start switching using information from the base station on the communication interruption redundant path. The base station can select the mobile destination base station before cancellation or a different base station as the mobile destination base station. Therefore, for example, the base station before the movement can select a base station with good communication quality with the UE as the destination base station. As a result, the communication quality between the base station and the UE can be maintained.
[0274] The base station on the non-communication interruption redundant path is set to not cancel the UE's handover before the UE's handover process reaches a predetermined step. That is, the UE's handover can continue. This can avoid the complexity of the communication system, for example.
[0275] The above-mentioned predetermined step may be, for example, a step in which the base station sends a handover instruction to the UE. Therefore, for example, it is not necessary to send a handover cancel from the base station to the UE, and as a result, signaling between the UE and the base station can be reduced.
[0276] As another example, the above-mentioned prescribed step may be, for example, a time point at which a prescribed time has passed after a switching indication is sent from the base station to the UE. The prescribed time may be statically specified by a standard. Alternatively, the prescribed time may be determined by the base station and notified or broadcast to the UE separately. The base station may notify the prescribed time through RRC signaling. For example, the base station may include the prescribed time in the switching indication to the UE for notification. Therefore, for example, the amount of signaling between the UE and the base station may be reduced. As another example, the base station may use MAC signaling to notify the prescribed time. Thus, for example, the base station is able to quickly notify the prescribed time. As another example, the base station may use L1 / L2 signaling to notify the time. Thus, for example, the base station is able to notify the time more quickly.
[0277] The base station may instruct the UE to cancel the handover. For example, the base station may also notify the indication before a specified time has passed after the handover indication is sent from the base station to the UE. The base station may notify the indication of cancellation through RRC signaling. Thus, for example, the reliability of the indication of cancellation can be improved. As another example, the base station may use MAC signaling to notify the indication. Thus, for example, the base station can notify the indication more quickly. As another example, the base station may use L1 / L2 signaling to notify the indication. Thus, for example, the base station can notify the indication more quickly.
[0278] The UE can use the indication of handover cancellation to cancel the handover process to the mobile destination base station. The UE can continue the connection with the mobile source base station.
[0279] The handover of the UE on the redundant path without communication interruption may be continued. For example, the handover may be continued when a predetermined time has passed after the base station sends a handover instruction to the UE. The handover source base station may transmit downlink data to the handover destination base station.
[0280] The UE may maintain synchronization with the mobile source base station until the specified time has passed, or may receive a synchronization signal from the mobile destination base station. The UE may start connection processing with the mobile destination base station after the specified time has passed. The connection processing may be reception of a synchronization signal or random access processing.
[0281] The handover instruction from the mobile source base station to the UE may include information about the beam available at the mobile destination base station. This information may be, for example, an identifier of the beam or information about the timing of sending the beam. The handover instruction may include information about the location of the mobile destination base station. The UE may use this information to start a connection with the mobile destination base station. As a result, for example, the UE can quickly connect to the mobile destination base station, and as a result, the time it takes to become unable to communicate can be shortened.
[0282] In the connection from the UE to the mobile destination base station, a two-step random access can be performed. The mobile source base station can instruct the mobile destination base station to perform a two-step random access process. The mobile source base station can instruct the UE to perform a two-step random access process. The instruction from the mobile source base station to the UE can be included in a handover instruction to the UE, for example. The UE can use the instruction to perform a two-step random access with the mobile destination base station. As a result, for example, the UE can quickly connect to the mobile destination base station, and as a result, the time when communication becomes impossible can be shortened.
[0283] Figure 20-21 The diagram shows an operation of canceling the switching on the redundant path #1 as the communication of UE #2 on the redundant path #2 is interrupted, and an operation of starting the switching on the redundant path #1 as UE #2 recovers from the communication interruption. Figure 20-21 Connect at the position of boundary line BL2021. Figure 20-21 UE#1 is switched from base station #1-1 to base station #1-2. Figure 20-21 In the example, "base station #1-1", "base station #1-2" and "base station #2" are marked as "BS#1-1", "BS#1-2" and "BS#2". Figure 20-21 In, with Figures 17 to 19 The same processes are denoted by the same step numbers, and the same descriptions are omitted.
[0284] Fig. 20 Steps ST1501 to ST1532 in Fig.17same.
[0285] exist Fig. 20 In step ST1634, UE#2 detects RLF. In step ST1636, base station #2 detects that RLF has occurred at UE#2. RLF detection of UE#2 in base station #2 can be performed, for example, using a situation where a signal, such as a reference signal, cannot be received from UE#2.
[0286] exist Fig. 20 In step ST1638 of UE#2, base station #2 notifies AMF #2 that UE #2 becomes RLF. In step ST1640, AMF #2 transmits the notification to AMF #1. In step ST1642, AMF #1 transmits the notification to base station #1-1. Base station #1-1 uses step ST1642 to decide to cancel the handover of UE #1.
[0287] exist Fig.21 In the process 1643 shown in FIG. 1644 , base station #1-1 and UE #1 are connected. Fig.17 The same process as process 1520 shown in FIG.
[0288] Fig.21 Step ST1534 in Fig.17 In step ST1645, base station #1-1 notifies base station #1-2 to cancel the handover of UE #1. The notification of step ST1645 may include information on the RLF of UE #2.
[0289] exist Fig.21 In step ST1650, the connection between UE#2 and base station #2 is restored. In step ST1652, base station #2 notifies AMF#2 that the connection between UE#2 and AMF#2 has been restored. In step ST1654, AMF#2 transmits the notification to AMF#1. In step ST1656, AMF#1 transmits the notification to base station #1-1.
[0290] Fig.21 The process 1577 and Fig.19 In process 1577, the handover decision by base station #1-1 and the measurement report by UE #1 are restarted.
[0291] exist Fig.21 In step ST1660 shown in the figure, handover of UE#1 from base station #1-1 to base station #1-2 is started. The processing of step ST1660 may be the same as that of steps ST1530 to ST1565.
[0292] Fig.21 Step ST1570 shown is the same as Fig.19 same.
[0293] Similar to Implementation 1, the base station can make the measurement report start / stop conditions of the UE using the redundant structure different from the measurement report start / stop conditions of the UE not using the redundant structure. For example, by making the measurement report start / stop conditions of the UE using the redundant structure more relaxed than the measurement report start / stop conditions of the UE not using the redundant structure, switching can be performed before the communication quality deteriorates. As a result, the link interruption of the redundant structure caused by the deterioration of the communication quality in the switching suppression of the redundant structure can be prevented. As another example, by making the measurement report start / stop conditions of the UE using the redundant structure more stringent than the measurement report start / stop conditions of the UE not using the redundant structure, the frequency of switching can be reduced, thereby improving communication efficiency.
[0294] According to this modification 1, after the switching process starts, even if communication interruption occurs on a redundant path, the switching can be canceled. As a result, communication interruption on all redundant paths can be prevented.
[0295] Implementation Method 2 In a structure using a redundant path of a UE, the UE may be connected to a plurality of base stations or to a single base station.
[0296] In a redundant path structure where a UE is connected to multiple base stations, the UE can form multi-connectivity with multiple base stations. The multiple base stations can be two or more than three. For example, when the UE is connected to two base stations, the UE can form DC (Dual Connectivity) with the two base stations.
[0297] In a redundant path structure where a UE is connected to multiple base stations, each base station can be connected to a different UPF. Different PDU sessions can be established in the connection between the UE and each UPF via each base station. Each UPF can be connected to a different SMF or the same SMF. Each UPF can be connected to the same DN or a different DN.
[0298] For example, a redundant path structure for connecting a UE to multiple base stations may be set when establishing a DC. The setting may be set to be performed when the UE performs communications using redundant paths. The setting may be performed using UE capabilities or by a decision of a base station. The setting may be performed, for example, using signaling of a request to increase a secondary base station from a primary base station to a secondary base station. The setting may also include, for example, part or all of (1) to (17) disclosed as information related to the redundant structure in Implementation Example 1. Thus, for example, the secondary base station can quickly obtain information about the structure of the redundant path, and as a result, the structure of the redundant path can be quickly executed.
[0299] The notification of setting the structure of a redundant path for connecting a UE to multiple base stations may be made from the primary base station to the UE, or from the secondary base station to the UE. The notification may include information indicating the use of the redundant path. The UE may use the information to set the structure of the redundant path. Thus, for example, the UE can quickly identify whether a DC using a redundant path or a normal DC is used, and as a result, the DC establishment process can be quickly performed.
[0300] The structure of redundant paths for connecting one UE to multiple base stations can also be used for the transmission and reception of small data (non-patent document 9 (TR38.804)). For example, in uplink communication, a path for sending data from UE to DN via the main base station, AMF, SMF, UPF, and a path for sending data from UE to DN via the secondary base station, main base station, main base station, AMF, SMF, UPF can be set. As another example, in downlink communication, a path for sending data from DN to UE via UPF, SMF, AMF, main base station, and a path for sending data from DN to UE via UPF, SMF, AMF, main base station, and secondary base station can be set. As a result, for example, the reliability of small data transmission and reception can be improved.
[0301] In the above, the following problems occur. That is, the security key (S-KgNB) of the secondary base station is derived from the primary base station. When the primary base station is switched, the S-KgNB is switched, resulting in a problem that the communication is interrupted for a period of time in both the primary base station and the secondary base station.
[0302] In this second embodiment, a method for solving the above-mentioned problem is disclosed.
[0303] The security key of the secondary base station is set to remain unchanged before and after the handover of the primary base station. The mobile destination primary base station can directly use the security key of the secondary base station before the handover. The mobile source primary base station can notify the mobile destination primary base station of information about the security key of the secondary base station. The information can include the value of the security key of the secondary base station, and can also include information indicating that the security key of the secondary base station is maintained. The mobile source primary base station can include the information in the handover request (Handover Request) signaling and notify the mobile destination primary base station.
[0304] The mobile source main base station may include information about the UE constituting a redundant path in the signaling of the handover request and notify the mobile destination main base station. This information may also be part or all of the information about the redundant path disclosed in Implementation 1, for example. For example, the information (2) about the redundant path disclosed in Implementation 1 may be information indicating the structure of a redundant path in which a UE is connected to multiple base stations. The mobile destination main base station may use this information to understand that the UE constitutes a redundant path. The mobile destination main base station may use this information to determine to directly use the security key of the secondary base station before the handover. Therefore, for example, the mobile destination main base station can quickly perform the above-mentioned judgment, and as a result, the handover processing of the main base station can be quickly performed.
[0305] The handover source master base station can determine whether to perform the notification to the handover destination master base station based on whether the UE is communicating using the redundant path. This can avoid complication of the handover operation in the UE that does not use the redundant path, for example.
[0306] The security key of the secondary base station may be changed after the primary base station is switched, thereby, for example, avoiding the complexity of managing the security key after the switch.
[0307] The secondary base station may notify the change of the security key of the secondary base station. Thus, for example, the communication rate of the user data in the primary base station after the move can be improved. As another example, the primary base station after the move may notify the change of the security key of the secondary base station. Thus, for example, a base station with a good radio wave environment just after the switch may be used, and as a result, the reliability of the signaling may be improved.
[0308] Figure 22-23 It is a timing diagram showing the action of a UE using a redundant path of DC to maintain the security key of a secondary base station before and after the switching of the primary base station. Figure 22-23 Connect at the position of boundary line BL2223. Figure 22-23 An example is shown in which a secondary base station (SN) remains unchanged and a primary base station switches from an S-MN to a T-MN.
[0309] exist Fig. 22In step ST1705 shown, the S-MN notifies the T-MN of the switching request. The S-MN may include in the notification information indicating that the secondary base station is not changed. The S-MN may include in the notification information indicating that the security key of the secondary base station is maintained. When the UE performs communication using a redundant path, the S-MN may maintain the security key of the secondary base station. The T-MN may use the information included in the notification of step ST1705 to maintain the secondary base station after the switch as the SN without changing it, or may maintain the security key of the secondary base station.
[0310] exist Fig. 22 In step ST1707 shown, T-MN requests SN to add a secondary base station. T-MN may include the security key of the secondary base station before the handover in the request, and may also include information indicating that the security key of the secondary base station is maintained. In step ST1709, SN notifies T-MN of a positive response to the request to add the secondary base station. In step ST1711, T-MN notifies S-MN of a positive response to the handover request in step ST1705.
[0311] exist Fig. 22 In step ST1713 shown, the S-MN requests the SN to release the secondary base station. In step ST1715, the SN notifies the S-MN of a positive response to step ST1713.
[0312] exist Fig. 22 In step ST1720 shown, the S-MN notifies the UE of an instruction to switch the primary base station to the T-MN. The S-MN may include information indicating the security key of the secondary base station in the notification. The UE uses the information included in the notification of step ST1720 to release the connection with the S-MN and establish downlink synchronization with the T-MN. The UE uses the information included in the notification of step ST1720 to maintain the SCG bearer.
[0313] exist Fig. 22 In step ST1725, the UE and the T-MN perform random access processing to establish uplink synchronization between the UE and the T-MN. In step ST1727, the UE notifies the T-MN that the handover of the primary base station is completed. In step ST1729, the T-MN notifies the SN that the reconfiguration of the secondary base station is completed.
[0314] exist Fig.23 In step ST1731 shown, the S-MN transmits the status related to the sequence number of the packet sent and received between the UE to the T-MN. In steps ST1733 and ST1734, the S-MN transmits the user data received from the UPF to the T-MN. Step ST1733 shows the transmission of user data from the UPF to the S-MN, and step ST1734 shows the transmission of user data from the S-MN to the T-MN.
[0315] exist Fig.23 In step ST1735 shown, T-MN notifies AMF of the path switching request. In step ST1737, the bearer involved in data transmission and reception between AMF and UPF and UE is changed. In step ST1739, the path of downlink data from UPF to the master base station side is switched from S-MN to T-MN. In step ST1741, AMF notifies T-MN of the positive response to step ST1735.
[0316] exist Fig.23 In step ST1743 shown, the T-MN indicates the UE context release to the S-MN. The S-MN uses the indication to release the UE context. In step ST1745, the S-MN indicates the UE context release related to the S-MN to the SN. The SN uses the indication to release the UE context.
[0317] After the switching of the primary base station is completed, the security key of the secondary base station can be changed. Fig.23 In step ST1750 shown, the T-MN derives a new security key for the secondary base station. In step ST1752, the T-MN notifies the SN of the change in the security key of the secondary base station. In step ST1754, the SN notifies the UE of the change in the security key of the secondary base station. The notification may be made, for example, using RRC Reconfiguration. The notification may be made, for example, using a signaling bearer (e.g., SRB 3) between the SN and the UE. In step ST1756, the UE notifies the SN that the change in the security key of the secondary base station is complete. The notification may be made, for example, using RRC Reconfiguration Complete. The notification may be made, for example, using a signaling bearer (e.g., SRB 3) between the SN and the UE. In step ST1758, the SN notifies the T-MN of a positive response to step ST1752.
[0318] Figure 22-23 An example of the SN notifying the secondary base station of a security key change is shown, but the T-MN may also notify the secondary base station of a security key change. Thus, for example, after a handover, the T-MN having a good radio wave environment with the UE can be used to send signaling to the UE. As a result, the reliability of the signaling can be improved.
[0319] Other solutions are disclosed. The security key of the secondary base station can be changed before the primary base station is switched. The primary base station at the mobile destination can derive the changed security key of the secondary base station.
[0320] The mobile destination primary base station may notify the secondary base station of the changed security key. The notification may be included in a secondary base station addition request (SN Addition Request) from the mobile destination primary base station to the secondary base station, for example.
[0321] The secondary base station may notify the UE of the changed security key of the base station. For example, the notification from the secondary base station to the UE may be included in the RRC reconfiguration. The secondary base station may make the notification to the UE based on the secondary base station addition request (SN Addition Request) from the mobile destination primary base station. The signaling of the RRC reconfiguration may include information about the reason. The information about the reason may be information about the switching of the primary base station, such as the change of the security key of the secondary base station before the switching of the primary base station. Thus, for example, the UE can grasp the situation of the primary base station sending the switching, and as a result, the switching process can be smoothly performed in the communication system.
[0322] As another example, the primary base station of the mobile source can notify the UE of the change of the security key of the secondary base station. The primary base station of the mobile destination can notify the primary base station of the mobile source of the changed security key of the secondary base station. Thus, for example, the communication rate of user data between the secondary base station and the UE can be improved.
[0323] The UE may use the notification to change the security key used by the secondary base station. The UE may notify the secondary base station that the security key change is complete. The notification from the UE may be included in RRC Reconfiguration Complete, for example. As another example, the UE may notify the primary base station of the mobile source that the security key change is complete.
[0324] The secondary base station may notify the primary base station of the mobile destination that the change of the security key in the UE is completed. The notification may be included in the signaling of the secondary base station addition request positive response (SN Addition Request Acknowledgement). The mobile destination primary base station may take the receipt of the notification as an opportunity to notify the mobile source primary base station of the handover request positive response (Handover Request Acknowledgement). The mobile source primary base station may take the receipt of the notification as an opportunity to release the secondary base station. The mobile source primary base station may take the release of the secondary base station as an opportunity to instruct the UE to switch.
[0325] Figure 24-25 It shows the action of a UE using a redundant path of DC changing the security key of a secondary base station before switching the primary base station. Figure 24-25 Connect at the position of boundary line BL2425. Figure 24-25An example is shown in which the secondary base station (SN) remains unchanged and the primary base station switches from the S-MN to the T-MN. Figure 24-25 In, with Figure 22-23 The same processing is assigned the same step number, and the common description is omitted.
[0326] Fig.24 Step ST1705 shown is the same as Fig. 22 same.
[0327] exist Fig.24 In step ST1806, the T-MN derives the security key of the secondary base station. In step ST1807, the T-MN requests the SN to add a secondary base station. The T-MN includes the security key derived in step ST1806 in the request and notifies the request.
[0328] Fig.24 Steps ST1809 and ST1811 are shown in Fig.23 The same processing is performed as steps ST1754 and ST1756.
[0329] Fig.24 Steps ST1709~ Fig.25 Step ST1745 shown is the same as Figure 22-23 same.
[0330] Figure 24-25 The example of the SN notifying the secondary base station of the security key change is shown, but the S-MN may also notify the secondary base station of the security key change. Thus, for example, the communication rate of user data in the SN may be increased.
[0331] As to whether to change the security key of the secondary base station before the handover or after the handover, it can be set to be able to switch. For example, the handover can be determined by the mobile source main base station. For example, the mobile source main base station can use the communication quality (for example, wireless quality) between the mobile source main base station and the UE to make the determination. For example, in the case where the wireless quality between the mobile source main base station and the UE deteriorates rapidly, it can be set to change the security key of the secondary base station after the handover. As another example, in the case where the deterioration of the wireless quality between the mobile source main base station and the UE is alleviated, it can be set to change the security key of the secondary base station before the handover. Thus, for example, in the case where the wireless quality deteriorates rapidly, the handover can be performed quickly, and as a result, the communication quality between the UE and the base station can be maintained.
[0332] The mobile source main base station may notify the mobile destination main base station of the judgment result. The notification may be included in the signaling of the handover request (Handover Request) from the mobile source main base station to the mobile destination main base station. The mobile destination main base station may use the notification to determine the timing of deriving the security key of the secondary base station. The mobile destination main base station may derive the security key at the timing. Thus, for example, it is possible to improve the efficiency of the processing related to deriving the security key of the secondary base station in the mobile destination main base station.
[0333] As another example, the mobile destination main base station can determine the handover. The mobile destination main base station can, for example, use the security key of the secondary base station derived from the mobile source main base station to make the determination. For example, in the case where any UE connected to the mobile destination main base station is using the security key derived from the mobile source main base station, it can be set to change the security key of the secondary base station before the handover. As another example, in the case where any UE connected to the mobile destination main base station is not using the security key derived from the mobile source main base station, it can be set to change the security key of the secondary base station after the handover. Thus, for example, it is possible to prevent the security key from being repeated between UEs, and as a result, the possibility of erroneous reception by the UE can be reduced.
[0334] The source primary base station may notify the target primary base station of the security key. This notification may be included in the signaling of a handover request (Handover Request) from the source primary base station to the target primary base station, for example.
[0335] The actions disclosed in this embodiment 2 can be applied to UEs using redundant paths. The master base station can also use (1) to (17) disclosed as information related to redundant paths in embodiment 1 to determine whether the security key in the UE can be maintained. This makes it possible, for example, to continue to use the previous UE in the communication system, and as a result, it is possible to avoid complexity in the communication system.
[0336] According to the second embodiment, it is possible to prevent the communication between the secondary base station and the UE from being interrupted during the switching of the primary base station. As a result, the reliability can be improved.
[0337] Modification 1 of Implementation Method 2. Even in the case of MCG Failure, the connection with the secondary base station is released, resulting in a problem of communication interruption between the UE and the NW device.
[0338] In this modification 1, a method for solving the above-mentioned problem is disclosed.
[0339] When the MCG fails, it is set to enable data transmission and reception with the SN. When performing communication using a redundant path, data transmission and reception with the SN can be performed when the MCG fails. When the MCG fails, it is set to enable data transmission and reception only with the SN. Data transmission and reception with the SN can be, for example, data transmission and reception carried by the SCG.
[0340] The setting of being able to send and receive data between the MCG and the SN when the MCG fails can be performed, for example, when the DC is established. The setting can be performed when the UE communicates using a redundant path. The setting can be performed using the UE capability or by the decision of the base station.
[0341] The UE may notify the secondary base station of information related to the MCG failure. The secondary base station may transmit the information to the primary base station. The primary base station may use the information to perform actions related to connection recovery between the UE, such as sending a reference signal to the UE. Thus, for example, the UE can quickly recover from the MCG failure.
[0342] Fig.26 1 is a timing diagram showing a first example of an operation of continuing to communicate with a secondary base station after an MCG failure. Fig.26 In the present invention, the UE communicates using a path through the MN and UPF#1 and a path through the SN and UPF#2. Fig.26 An example is shown in which the UE reopens the connection with the same MN after an MCG failure.
[0343] exist Fig.26 In steps ST1905 and ST1906 shown in FIG. 1 , user data is transmitted and received between the UE and UPF#1. Step ST1905 shows the transmission and reception of user data between the UE and the MN, and step ST1906 shows the transmission and reception of user data between the MN and UPF#1. In steps ST1908 and ST1909, user data is transmitted and received between the UE and UPF#2. Step ST1908 shows the transmission and reception of user data between the UE and the SN, and step ST1909 shows the transmission and reception of user data between the SN and UPF#2.
[0344] exist Fig.26 In step ST1911 shown, the UE detects a MCG failure. In steps ST1913 and ST1914, the UE maintains communication with UPF#2 via the SN. Steps ST1913 and ST1914 are the same as steps ST1908 and ST1909, respectively.
[0345] exist Fig.26In step ST1916 shown, the UE may notify the SN that an MCG failure has occurred. The notification may be made, for example, using RRC signaling. The notification may be made, for example, using a signaling bearer (e.g., SRB 3) between the SN and the UE. In step ST1918, the SN may notify the MN that an MCG failure has occurred in the UE. In step ST1920, the MN sends a synchronization signal to the UE. The MN may also perform step ST1920 based on the reception of step ST1918.
[0346] exist Fig.26 In step ST1921 shown, the UE sends a PRACH to the MN. In step ST1923, the MN sends a random access response (Random Access Response; RAR) to the UE.
[0347] exist Fig.26 In step ST1925 shown, the UE requests the MN to start the RRC. For this request, RRC signaling may also be used, such as the RRC Setup Request disclosed in non-patent document 22 (TS 38.331). In step ST1927, the MN instructs the UE to start the RRC. For this instruction, RRC signaling may also be used, such as the RRC Setup in non-patent document 22 (TS38.331).
[0348] exist Fig.26 In step ST1929 shown, the UE notifies the MN that the RRC setup is complete. For this notification, RRC signaling may also be used, such as RRC Setup Complete in Non-Patent Document 22 (TS 38.331).
[0349] exist Fig.26 In step ST1931 shown, the MN notifies the SN that the UE has recovered from the MCG failure. In steps ST1935 and ST1936, user data is sent and received between the UE and UPF#1. Steps ST1935 and ST1936 are the same as steps ST1905 and ST1906, respectively. In steps ST1938 and ST1939, user data is sent and received between the UE and UPF#2. Steps ST1938 and ST1939 are the same as steps ST1908 and ST1909, respectively.
[0350] A UE after detecting an MCG failure may reconnect to a primary base station different from the primary base station at the time of detection.
[0351] The UE may exclude the secondary base station from the candidates of the primary base station to be reconnected. Thus, for example, redundancy in the redundant path can be maintained.
[0352] Fig. 27 2 is a timing diagram showing a second example of the operation of continuing to communicate with the secondary base station after an MCG failure. Fig. 27 In the present invention, the UE communicates using a path through MN#1 and UPF#1 and a path through SN and UPF#2. Fig. 27 FIG. 4 shows an example of the UE re-establishing the connection with MN#2 after an MCG failure. Fig. 27 In, with Fig.26 The same step numbers are assigned to the same processes, and common descriptions are omitted.
[0353] Fig. 27 Steps ST1905 to ST1920 shown are Fig.26 The steps are the same as in .
[0354] exist Fig. 27 In step ST2020 shown in FIG. 1 , MN#2 sends a synchronization signal to the UE. Fig. 27 In the example shown, the UE uses the reception results of steps ST1920 and ST2020 to decide to reconnect to MN#2.
[0355] exist Fig. 27 In steps ST2021 to ST2025 shown in FIG. 1 , communication is performed between the UE and MN#2. Fig.26 The same actions as steps ST1921 to ST1925 in step ST2025. The RRC start request in step ST2025 may include information about the MCG failure. This information may include, for example, information indicating recovery from the MCG failure, and may also include information about the base station where the MCG failure occurred.
[0356] exist Fig. 27 In step ST2026, MN#2 requests MN#1 for a UE context. MN#2 may use the information about the MCG failure included in the RRC start request in step ST2025 to make a UE context request to MN#1. In step ST2027, MN#1 notifies MN#2 of the UE context.
[0357] exist Fig. 27 In steps ST1927 to ST1929 shown in FIG. 19, the UE and MN#2 perform the Fig.26 The same actions as steps ST1927 to ST1929. Fig. 27 In step ST2031 shown in the figure, MN#2 and SN are connected. Fig.26 The same actions as step ST1931.
[0358] exist Fig. 27In step ST2033 shown, MN#2 requests MN#1 to release the UE context. MN#1 releases the UE context according to the request of step ST2033.
[0359] When the MCG fails, the UE's RRC state may be maintained at RRC_CONNECTED if data transmission and reception with the SCG is enabled. As another example, the UE's RRC state may be changed to RRC_INACTIVE or to RRC_IDLE.
[0360] The actions disclosed in this variant 1 can also be applied to UEs using redundant paths. For example, the secondary base station can also use (1) to (17) disclosed as information related to redundant paths in implementation example 1 to determine whether communication with the UE can continue after an MCG failure is detected. As a result, for example, the previous UE can continue to be used in the communication system, and as a result, complexity in the communication system can be avoided.
[0361] The method disclosed in this variation 1 can be used when the power of each NW device on the main base station side is turned off, and can also be used when communication is interrupted between the main base station and the core network (for example, UPF) and / or communication is interrupted in the core network (for example, UPF and SMF). Thus, for example, the same effect as above can be obtained.
[0362] According to the first variation, even when the MCG fails, the secondary base station can be used to transmit and receive data, and as a result, the TSC can be maintained.
[0363] Implementation 3 In the structure of a redundant path for a UE to connect to a base station, the base station can be connected to one UPF or multiple UPFs. In the structure of the redundant path, there can be one PDU session. The PDU session can include multiple N3 tunnels.
[0364] The structure of a redundant path connecting one UE to one base station can also be used for the transmission and reception of small data (non-patent document 9 (TR38.804)). For example, in uplink communication, in the path of sending data from the UE to the DN via the base station, AMF, SMF, and UPF, multiple N2 interfaces, multiple N11 interfaces, multiple N4 interfaces, and / or multiple N9 interfaces can be used. For example, when the path to the DN has multiple UPFs, multiple N9 interfaces can be used. As a result, for example, the reliability of the transmission and reception of small data can be improved.
[0365] In addition, the redundant path structure in which each of the multiple UEs is connected to a different base station disclosed in Embodiment 1 may be used, or the redundant path structure in which one UE is connected to multiple base stations disclosed in Embodiment 2 may be used.
[0366] In the above, the following problems occur. That is, due to changes in propagation conditions and NW load conditions, it may become difficult to maintain reliability and / or TSC under the current redundant path form. However, the switching of the redundant path form has not been disclosed. As a result, the redundant path form cannot be switched, and the reliability and / or TSC cannot be maintained.
[0367] In this third embodiment, a method for solving the above-mentioned problem is disclosed.
[0368] A structure capable of switching from a redundant path in which a UE is connected to a base station to a structure capable of switching from a redundant path in which a UE is connected to multiple base stations. The switching may be performed using secondary base station addition (SN Addition), PDU session establishment (PDU session establishment) and PDU session modification (PDU session modification). For example, during the switching of the redundant path structure, secondary base stations may be added (SN Addition), PDU session establishment (PDU session establishment) and PDU session modification (PDU session modification) may be performed in sequence. Alternatively, after the secondary base station is added, PDU session establishment and PDU session modification may be performed simultaneously. Alternatively, secondary base station addition, PDU session establishment and PDU session modification may be performed simultaneously.
[0369] The base station can decide to switch the redundant path structure. The base station can use the measurement report from the UE, the information about the QoS of the communication between the base station and the UPF, and / or the information about the QoS of the backhaul communication between the base stations to decide the redundant path structure switching. The information about the QoS of the communication between the base station and the UPF may include, for example, information about the transmission rate, information about the delay, and information about the packet loss rate. The information about the QoS of the backhaul communication between the base stations may include, for example, information about the communication medium (e.g., wired, wireless), and the same information as the information about the QoS of the communication between the base station and the UPF. By deciding to switch the redundant path structure through the base station, for example, changes in the communication environment between the UE and the base station and / or between the base station and the UPF can be quickly reflected, and the redundant path structure can be switched.
[0370] The base station can obtain the above information about the QoS of the communication between the base station and the UPF. For example, the base station can obtain the information by monitoring the communication between the base station and the UPF. The base station can obtain the above information about the QoS of the backhaul communication between the base stations. For example, the base station can obtain the information by monitoring the backhaul communication between the base station and other base stations. The base station can use the obtained information to decide on the redundant path structure switching. Thereby, for example, the amount of signaling required for the notification of the information can be reduced.
[0371] The base station can notify the AMF of information about the redundant path structure switching. The AMF can notify the SMF of the information. The base station can include information about the reason for the redundant path structure switching in the information. The reason can be, for example, a reason about the QoS of the wireless communication path (for example, the communication path between the UE and the base station), a reason about the QoS of the wired communication path (for example, the communication path between the base station and the UPF), or a reason about the QoS of the backhaul between base stations. The SMF can use the information to determine the UPF added with the redundant path structure switching. Thereby, for example, it is possible to ensure the QoS in the communication system after the redundant path structure is switched.
[0372] As another example, AMF can decide to switch the redundant path structure. AMF can also use the same information as the decision of the base station to decide the redundant path structure switching. AMF can request the information from the base station. The base station can notify AMF of the information. AMF can notify the base station of information about the redundant path structure switching. The base station can use the information to perform actions related to adding a secondary base station to the UE. AMF can notify SMF of the information. SMF can use the information to decide the UPF added with the redundant path structure switching. By deciding the redundant path structure switching by AMF, for example, control in the communication system can be easily performed.
[0373] As another example, SMF can decide the redundant path structure switching. SMF can also use the same information as the above-mentioned decision of the base station to decide the redundant path structure switching. SMF can request the information from the base station via AMF. The base station can notify SMF of the information via AMF. SMF can notify AMF of the information about the redundant path structure switching. AMF can notify the base station of the information. The base station can use the information to perform actions related to the UE adding a secondary base station. SMF can use the information to decide the UPF added with the redundant path structure switching. By deciding the redundant path structure switching through SMF, for example, it is possible to quickly decide the UPF used in the redundant path, resulting in the ability to quickly switch the redundant path structure.
[0374] New signaling for notifying the above information about the QoS of communication between the base station and the UPF may be set. The signaling may be, for example, signaling on the N3 interface, signaling on the N4 interface, signaling notified between the base station and the SMF via the AMF, signaling notified between the UPF and the base station via the SMF and the AMF, signaling notified between the UPF and the AMF via the SMF, signaling notified between the UPF and the AMF via the base station, and signaling notified between the UPF and the SMF via the base station and the AMF. Thus, for example, the complexity of the communication system design in the notification of the information can be avoided.
[0375] The UPF can obtain the above information about the QoS of the communication between the base station and the UPF. For example, the UPF can obtain the information by monitoring the communication between the base station and the UPF. The UPF can notify the base station, AMF or SMF of the acquired information. For example, the notification of the information from the UPF to the base station can be done directly using the N3 interface, or from the UPF via the SMF and AMF. The notification of the information from the UPF to the AMF can be done via the SMF or the base station. The notification of the information from the UPF to the SMF can be done directly using the N4 interface, or from the UPF via the base station and AMF. Thus, for example, the base station does not need to obtain the information, as a result of which the processing volume of the base station can be reduced.
[0376] In the switching of the redundant path structure, a secondary base station can be added. The addition of the secondary base station can be performed using, for example, the process disclosed in Section 10.2.2 of non-patent document 12 (TS 37.340). The base station before the redundant path structure is switched can be the main base station after the change. The secondary base station addition request notified from the base station to the secondary base station can include information indicating the reason. The reason can be, for example, a change in the redundant structure, or a reason for the change in the redundant structure (for example, ensuring QoS in the wireless section, and / or ensuring QoS in the wired section). The secondary base station can use the notification to set up an SCG bearer with the UE. As a result, for example, the redundant path structure can be quickly switched in the communication system.
[0377] For example, the added secondary base station may be a base station in the same reliability group as the primary base station. Thus, for example, the redundant path structure may be quickly switched. As another example, the added secondary base station may be a base station in a different reliability group from the primary base station. Thus, for example, the flexibility in switching the redundant path structure may be improved.
[0378] The base station may notify the UE of information about the redundant path structure switching. The information may be, for example, included in an indication of an increase of the secondary base station notified from the base station to the UE. For example, the information may be included as a reason for the indication. The indication from the base station to the UE may be performed using RRC signaling (e.g., RRC reconfiguration). The information may include information about the reason for the redundant path structure switching. The information about the reason for the redundant path structure switching may be, for example, ensuring QoS in the wireless interval and / or ensuring QoS in the wired interval. The UE may use the information about the redundant path structure switching to request the AMF to increase the PDU session. Thus, for example, the process of redundant path structure switching can be performed quickly.
[0379] In the switching of the redundant path structure, a PDU session may be established. The establishment of the PDU session may be performed, for example, using the process disclosed in Section 4.3.2.2.1 of Non-Patent Document 25 (TS23.502). The newly established PDU session may be, for example, a PDU session through a secondary base station.
[0380] The base station may request the UE to start the PDU session establishment process. The request may be made, for example, using RRC signaling. The RRC signaling used for the request may be, for example, the same as the RRC signaling of the indication added from the base station to the secondary base station of the UE, or may be different RRC signaling. The UE may use the request to request the AMF to establish a PDU session. Thus, for example, the redundant path structure in the communication system can be quickly switched.
[0381] As another example, the AMF may initiate a PDU session establishment procedure. For example, even without a PDU session establishment request from the UE disclosed in Section 4.3.2.2.1 of Non-Patent Document 25 (TS23.502), the AMF may initiate a PDU session establishment procedure. The AMF may initiate a PDU session establishment procedure using a procedure added by the secondary base station. Thus, for example, a redundant path structure can be quickly switched in a communication system.
[0382] In the switching of the redundant path structure, a PDU session modification may be performed. The PDU session modification may also be performed, for example, using the process disclosed in Section 4.3.3.2 of non-patent document 25 (TS23.502). The PDU session modification may be, for example, an action of releasing information about the N3 tunnel and / or QoS flow passing through the PDU session set on the secondary base station side from the PDU session set on the primary base station side.
[0383] According to the third embodiment, even when the propagation condition or the NW load condition changes, the reliability and / or TSC can be maintained.
[0384] Modification 1 of Implementation Method 3. In implementation example 3, switching from a redundant path structure in which one UE is connected to one base station to a redundant path structure in which one UE is connected to multiple base stations is disclosed. In this variant example 1, switching from a redundant path structure in which one UE is connected to multiple base stations to a redundant path structure in which one UE is connected to one base station is disclosed.
[0385] The switching from a redundant path structure in which a UE is connected to multiple base stations to a redundant path structure in which a UE is connected to one base station can be performed using PDU session modification, PDU session release, and secondary base station release (SN Release). For example, during the redundant path structure switching process, PDU session modification, PDU session release, and secondary base station release can be performed in sequence. Alternatively, the secondary base station can be released after the PDU session modification and PDU session release are performed simultaneously. Alternatively, the PDU session release and the secondary base station release can be performed simultaneously after the PDU session modification. Alternatively, the PDU session modification, PDU session release, and secondary base station release can be performed simultaneously.
[0386] Similar to Implementation 3, the redundant path structure switching may be determined by the base station, by the AMF, or by the SMF. The measurement report from the UE, the information on the QoS of the communication between the base station and the UPF, and / or the information on the QoS of the backhaul communication between the base stations may be used for the decision. The above information is the same as Implementation 3. Similar to Implementation 3, the base station may obtain the information, and the base station may also notify the AMF of the information. The notification of the information on the redundant path structure switching may also be the same as Implementation 3.
[0387] In the switching of the redundant path structure, a PDU session modification may be performed. The PDU session modification may also be performed, for example, using the process disclosed in Section 4.3.3.2 of Non-Patent Document 25 (TS23.502). The PDU session modification may, for example, be an action of adding information about the N3 tunnel and / or QoS flow passing through the PDU session set on the secondary base station side to the PDU session set on the primary base station side.
[0388] The base station may notify the AMF of the PDU session change request. The AMF may notify the SMF of the PDU session change request. The notification may include information indicating the reason. The reason may be, for example, a change in the redundant structure, or a reason for changing the redundant structure (for example, ensuring QoS in the wireless section, and / or ensuring QoS in the wired section). The SMF may use the notification to perform actions related to the PDU session release, such as preparation for the PDU session release. Thus, for example, it is possible to quickly switch the redundant path structure in the communication system.
[0389] In the switching of the redundant path structure, the PDU session may be released. The release of the PDU session may also be performed using, for example, the process disclosed in Section 4.3.4.2 of Non-Patent Document 25 (TS23.502). The released PDU session may be, for example, a PDU session through a secondary base station.
[0390] In the switching of the redundant path structure, the secondary base station may be released. The release of the secondary base station may be performed using, for example, the procedure disclosed in Section 10.4.2 of Non-Patent Document 12 (TS 37.340).
[0391] The base station may notify the UE of information about the redundant path structure switching. The information may be, for example, included in a release indication of the secondary base station notified from the base station to the UE. For example, the information may be included as a reason for the indication. The indication from the base station to the UE may be performed using RRC signaling (e.g., RRC reconfiguration). The information may include information about the reason for the redundant path structure switching. The information about the reason for the redundant path structure switching may be, for example, ensuring QoS in the wireless interval and / or ensuring QoS in the wired interval. The UE may use the information about the redundant path structure switching to release the secondary base station, or may make a bearer setting change (e.g., a setting change from the SCG bearer to the bearer of the base station after the redundant path structure switching). Thus, for example, the redundant path structure switching process can be performed quickly.
[0392] The method disclosed in this variation 1 can be used in the case where the power of each NW device on the secondary base station side is turned off, and can also be used in the case where communication is interrupted between the secondary base station and the core network (for example, UPF) and / or communication is interrupted in the core network (for example, UPF and SMF). Thus, for example, the same effect as above can be obtained.
[0393] According to the first modification, even when the propagation condition or the NW load condition changes, the reliability and / or TSC can be maintained.
[0394] Implementation 4 In a communication system requiring low latency, the base station and UPF may be composed of one device. For example, the gNB-CU-UP and UPF disclosed in non-patent document 26 (TS 38.401) may be one device (hereinafter sometimes referred to as an integrated UPF). Other base stations may be connected to the integrated UPF.
[0395] In the above, the following problems arise. The delay of C-layer signaling still exists. In addition, research on using C-layer to send and receive small data is also underway. As a result, the problem of being unable to reduce delays will arise for small data.
[0396] In this fourth embodiment, a method for solving the above-mentioned problem is disclosed.
[0397] The base station and AMF are composed of one device. For example, the gNB-CU-CP and AMF are composed of one device (sometimes referred to as an integrated AMF hereinafter). Other base stations can be connected to the integrated AMF.
[0398] The integrated AMF can include functions related to the SMF. Thus, for example, the time required for processes related to the PDU session can be shortened.
[0399] The integrated AMF can include functions related to the UPF. Thus, for example, the time to transfer small data from the C-level to the U-level can be shortened.
[0400] The integrated AMF can broadcast or individually notify the UE that the device is an integrated AMF. The broadcast can be performed, for example, using system information. The UE can use this information to identify that the base station to be connected is an integrated AMF. For example, the UE can use this information to connect to the integrated AMF in a manner that takes precedence over other cells. For example, the above-mentioned UE may be a UE requesting low-latency communication. The UE can use information about the QoS supported by the UE to determine whether to give priority to the connection. Thereby, for example, congestion caused by multiple other UEs being connected to the integrated AMF can be prevented from occurring, and as a result, delay can be reduced.
[0401] The integrated UPF can broadcast or individually notify the UE that the device is an integrated UPF. The UE can use this information to identify that the base station to be connected is an integrated UPF. For example, the UE can use this information to connect to the integrated UPF in a manner that takes precedence over other cells. For example, the above-mentioned UE may be a UE requesting low-latency communication. The UE can use information about the QoS supported by the UE to determine whether to give priority to the connection. Thus, for example, congestion caused by multiple other UEs being connected to the integrated UPF can be prevented from occurring, and as a result, the delay at the U layer can be reduced.
[0402] A priority may also be set between the integrated AMF and the integrated UPF. The UE may use information related to the QoS supported by the UE to decide which one to connect to first between the integrated AMF and the integrated UPF. For example, when the size of data requiring low-latency communication is small and the frequency of sending the data is low, the UE may preferentially connect to the integrated AMF. As another example, when the size of data requiring low-latency communication is large or the frequency of sending the data is high, the UE may preferentially connect to the integrated UPF. Thus, for example, the QoS in the UE's communication can be ensured.
[0403] According to the fourth embodiment, the delay of C-layer signaling can be reduced, and as a result, the delay in sending and receiving small data can be reduced.
[0404] The above-mentioned embodiments and their modifications are merely examples of the present invention, and the embodiments and their modifications can be freely combined within the scope of the present invention. In addition, arbitrary components of the embodiments and their modifications can be appropriately changed or omitted.
[0405] For example, in each of the above embodiments and their variations, a subframe is an example of a time unit for communication in a fifth-generation base station communication system. It may also be a scheduling unit. In each of the above embodiments and their variations, processing recorded in subframe units may be performed in TTI units, time slot units, sub-time slot units, and mini-time slot units.
[0406] The present invention has been described in detail, but the above description is only illustrative in all aspects and the present invention is not limited thereto. Numerous modifications not shown by way of example are contemplated without departing from the scope of the present invention.
Claims
1. A terminal device, which is the terminal device in a communication system, the communication system comprising the terminal device and a plurality of base station devices for wireless communication with the terminal device, the plurality of base station devices comprising a primary base station constituting a primary cell group and a secondary base station constituting a secondary cell group, the terminal device being characterized in that: The terminal device is configured to perform dual connectivity with the primary base station and the secondary base station, The terminal device is configured to communicate with the secondary base station via the secondary cell group when a primary cell group failure occurs.
2. The terminal device according to claim 1, characterized in that The terminal device is configured to send RRC signaling including information related to the primary cell group failure to the secondary base station when the primary cell group failure occurs.
3. The terminal device according to claim 2, characterized in that The terminal device is configured to send the RRC signaling to the secondary base station using SRB3.
4. The terminal device according to claim 2, characterized in that The terminal device is configured to send the RRC signaling to the secondary base station while maintaining an RRC connection state when a failure of the primary cell group occurs.
5. The terminal device according to claim 2, characterized in that The information related to the primary cell group failure is sent from the secondary base station to the primary base station.
6. The terminal device according to claim 5, characterized in that The terminal device is configured to receive signaling for recovering from the primary cell group failure, which is transmitted from the primary base station in response to reception of the information related to the primary cell group failure.
7. The terminal device according to claim 1, characterized in that The terminal device is configured to be connected to a primary base station different from the primary base station after the primary cell group failure occurs.
8. A secondary base station, which is the secondary base station in a communication system, the communication system comprising a terminal device and a plurality of base station devices for wireless communication with the terminal device, the plurality of base station devices comprising a primary base station constituting a primary cell group and the secondary base stations constituting a secondary cell group, the secondary base station being characterized in that: The primary base station and the secondary base station are configured to support dual connectivity for the terminal device, When a primary cell group failure occurs in the terminal device, the secondary base station is configured to communicate with the terminal device via the secondary cell group.
9. A communication system, comprising a terminal device and a plurality of base station devices for wirelessly communicating with the terminal device, wherein the plurality of base station devices include a primary base station constituting a primary cell group and a secondary base station constituting a secondary cell group, wherein the communication system is characterized in that: The terminal device is configured to perform dual connectivity with the primary base station and the secondary base station, The terminal device is configured to communicate with the secondary base station via the secondary cell group when a primary cell group failure occurs.
