A climbing formwork system with high lifting and large span
By adding the number-added platform beam and upper support and lower hanging structure of the upper frame to the climbing frame, the safety hazards and material waste of increased lift and larger span in high-rise building construction are solved, and flexible installation and cost saving effects are achieved.
Patent Information
- Application Number
- CN202411255970.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The climbing frames in existing high-rise buildings and super-high-rise buildings have safety hazards and material waste when the lifting force increases and the span increases.
A high-lift and large-span climbing frame system is adopted. By adding a number-added platform beam of the upper frame on the top of the lower frame, and supporting the upper frame columns and connecting the hanger columns on it, forming a structural form of upper support and lower hanging. The hanger layer overlaps the lower frame, achieving flexible staggering of the upper frame and the lower frame.
It effectively avoids the problems of excessive reinforcement strength and waste of materials, and realizes flexible installation and cost savings of the crawler frame.
Smart Images

Figure CN118958658B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of climbing formwork equipment, and in particular relates to a climbing formwork frame system with high lifting and large span. Background Art
[0002] At present, there are more and more high-rise buildings and super-high-rise buildings, which are characterized by basically the same plan layout of the vertical walls of the core tube. The climbing system is used to carry the formwork together for the main construction, which has the characteristics of a high degree of mechanization. The higher the height of the high-rise and super-high-rise buildings, the more advantages the climbing formwork platform has.
[0003] The current climbing frame can refer to the patent with announcement number CN113550557A, which discloses a climbing formwork and hydraulic climbing formwork construction process for high-rise building construction, including guide rails and a climbing frame. The current climbing frame includes an upper frame body, a lower frame body and a hanging frame body. The formwork and the operating frame are installed on the upper frame body, and the jacking device is installed on the lower frame body. The jacking device cooperates with the guide rails to climb alternately, and construction operations can be carried out on the upper frame body, the lower frame body and the hanging frame body.
[0004] The structure of the frame is as follows: the frame includes a lower frame, an upper frame and a hanging frame. The lower frame includes a lower frame top beam, a lower frame inner column, a lower frame outer column, a lower frame bottom beam and a lower frame platform beam. The upper frame includes an upper frame platform beam, an upper frame column, an upper frame beam and an upper frame platform beam. The upper frame platform beam is fixed on the lower frame top beam in a horizontal direction parallel to the wall. The hanging frame includes hanging frame columns, hanging frame beams and hanging frame platform beams. The upper frame, the lower frame and the hanging frame are connected in sequence from top to bottom. The upper frame columns are fixedly installed on the lower frame top beam, the hanging frame columns are installed at the bottom of the lower frame bottom beam, and the upper frame columns, the lower frame columns and the hanging frame columns are directly connected.
[0005] The spacing of the inner columns of the lower frame is adjusted according to the building openings and obstacles. As the size of the building increases and the size of the openings and obstacles increases, the spacing of the columns of the lower frame of the climbing frame needs to be increased accordingly, and the overall width of the climbing frame needs to be increased to reduce the number of spliced climbing frames. The jacking force also increases accordingly, forming a high-lift and large-span climbing frame. However, the spacing between the upper frame columns and the hanging frame columns increases accordingly, resulting in safety hazards. Therefore, the number of upper frame columns and hanging frame columns needs to be increased, and the increase in number will result in too small spacing, waste of materials and increased costs. Summary of the invention
[0006] The present invention provides a high-lift and large-span climbing formwork frame system to solve the technical problems mentioned in the background technology.
[0007] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a high-lift and large-span climbing formwork frame system, including a lower frame, an upper frame and a hanging frame, the lower frame including a lower frame top crossbeam, a lower frame inner column, a lower frame outer column, a lower frame bottom crossbeam and a lower frame platform beam, the upper frame including an upper frame bottom platform beam, an upper frame column, an upper frame middle crossbeam and an upper frame middle platform beam, the hanging frame including hanging frame columns, hanging frame crossbeams and hanging frame platform beams, the lower frame top crossbeams are arranged in parallel with each other in the horizontal direction and are respectively perpendicular to the wall direction, the lower frame inner column is fixed on the top of the lower frame The end of the bottom of the beam close to the wall, the outer column of the lower frame is fixed to the end of the bottom of the top beam of the lower frame away from the wall, the front end of the top beam of the lower frame exceeds the inner column of the lower frame and a jacking device is fixed at the bottom, the bottom beam of the lower frame is fixed to the bottom ends of the inner column of the lower frame and the outer column of the lower frame, the top of the bottom beam of the lower frame is fixed with a lower frame platform beam, the platform board is laid on the lower frame platform beam, the bottom incremental platform beam of the upper frame is at the top of the top beam of the lower frame and three are arranged side by side, the two ends of the bottom incremental platform beam of the upper frame respectively exceed the two top beams of the lower frame and are fixed to the two top beams of the lower frame, the three bottom incremental platform beams of the upper frame The platform beams correspond to the lower frame inner columns, the lower frame outer columns and the upper frame columns respectively. The upper frame columns far away from the wall correspond to the lower frame outer columns, and the upper frame columns close to the wall correspond to the middle upper frame bottom increased platform beams. The top of the upper frame bottom increased platform beam is paved with a platform board. The upper frame columns are arranged at three locations parallel to the wall. Two upper frame columns are respectively located on the outsides of the two lower frame inner columns, and the other upper frame column is located between the two lower frame inner columns. It is fixedly installed on the upper frame bottom increased platform beam and is staggered with the lower frame inner columns in a direction parallel to the wall. The upper frame columns are also provided with several The middle cross beam of the upper frame is fixed with the middle platform beam of the upper frame, and the platform board is laid on the middle platform beam of the upper frame. The upper half of the hanging frame body covers the lower frame body, and the lower half of the hanging frame body is located below the lower frame body. There are three hanging frame columns parallel to the wall, two hanging frame columns are respectively located on the outside of the upper frame columns, and the other hanging frame column is located between the two lower frame inner columns, and the middle hanging frame column is staggered with the middle upper frame column, the bottom end of the hanging frame column is fixed with a hanging frame cross beam, the top of the hanging frame cross beam is fixed with a hanging platform beam, and the top of the hanging platform beam is laid with a platform board.
[0008] As a further preferred solution of this embodiment, an upper supporting mounting beam is fixed to the top of the platform beam at the bottom of the upper frame, and the upper supporting mounting beam is perpendicular to the wall. The upper frame columns are fixed on the upper supporting mounting beam, and a lower hanging mounting seat is fixed to the bottom end of the platform beam at the bottom of the upper frame, and the hanging frame columns are fixed on the lower hanging mounting seat.
[0009] As a further preferred solution of this embodiment, the lower frame platform beam, the upper frame middle platform beam and the hanging frame platform beam are all I-beams, and the upper frame bottom platform beam is H-beam.
[0010] As a further preferred solution of this embodiment, the bottom platform beam of the upper frame is an H-shaped steel of 300mmX150mm, the platform beam of the lower frame, the platform beam of the hanging frame and the middle platform beam of the upper frame are 14# I-steel from the third one onwards, and the middle platform beam of the upper frame are 16# I-steel from the first and second ones onwards.
[0011] As a further preferred scheme of this embodiment, the upper support mounting beam is composed of two outer channel steels spaced back to back and two upper and lower rows of inner channel steels connecting the two outer channel steels. The upper support mounting beam is a full-length structure supported on three upper frame bottom incremental platform beams. The two sides of the outer channel steel are respectively connected to the upper frame bottom incremental platform beam and the upper frame column through upper support bolts. The bottom end of the upper frame bottom incremental platform beam and the bottom end of the upper frame column are respectively provided with steel connecting pads.
[0012] As a further preferred scheme of this embodiment, the lower hanging mounting seat includes two outer channel steels that are spaced back to back and two upper and lower rows of inner channel steels connecting the two outer channel steels, and the bottom ends of the outer channel steels are also welded with mounting channel steels that are back to back to each other. The bracket column is a channel steel, and the bracket column is fixed between the two mounting channel steels by lower hanging bolts. A smaller channel steel pad is provided on the inner side of the two mounting channel steels.
[0013] As a further preferred solution of this embodiment, connecting channel steels are provided at the bottom of the lower platform beam and the hanging platform beam, the connecting channel steels and the hanging frame columns are connected by hanging frame fixing bolts, and the connecting channel steels are respectively connected to the lower platform beam and the hanging frame platform beam by U-shaped bolts.
[0014] As a further preferred solution of this embodiment, a template slide rail is fixed to the top of the incremental platform beam at the bottom of the upper frame, and a template mounting frame is slidably mounted on the template slide rail.
[0015] As a further preferred solution of this embodiment, the upper frame columns and the hanging frame columns are respectively fixedly connected to a plurality of spaced-apart support beam seats on one side away from the wall, support beams are installed on the support beam seats, and steel plate mesh is installed on the support beams.
[0016] The beneficial effects of the present invention are as follows: 1. The climbing frame structure of the present invention has been re-arranged and integrated. Compared with the current structural form in which the columns correspond to each other up and down and are connected in sequence, when the jacking force increases and the number of frames is reduced, the conventional climbing frame structure adds reinforcement in the middle, the reinforcement strength is too high, and too much material is wasted. The climbing frame structure of the present invention has created a new layout. By increasing the model of the upper frame platform beam on the top of the lower frame, an increased platform beam at the bottom of the upper frame is formed, and the upper frame columns are supported above the increased platform beam at the bottom of the upper frame, and the hanging frame columns are connected below to form an upper support and lower hanging structural form. The hanging frame layer is changed from being located below the lower frame to being overlapped with the lower frame at the upper part, so that the upper frame columns and the lower frame columns can be flexibly staggered and the hanging frame columns can be flexibly installed, so that the upper frame columns and the hanging frame columns of the entire climbing formwork can be arranged at a reasonable spacing according to the load, avoiding excessive reinforcement strength and excessive waste of materials, and the overall installation is flexible, saving costs.
[0017] 2. The upper support mounting beam on the bottom platform beam of the upper rack enables the support position of the upper rack columns to be arranged flexibly. The combination of the bottom platform beam of the upper rack and the upper support mounting beam makes it possible to keep the upper rack columns in the original design position, avoiding the redesign of the upper rack body. The structural design of the lower hanging mounting seat ensures the overall stability and safety of the rack.
[0018] Other features and advantages of the present invention will be set forth in the following description, and in part will become apparent from the description, or may be understood by practicing the present invention; the main purpose and other advantages of the present invention may be realized and obtained through the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 is a schematic side view of the overall structure of an embodiment of the present invention;
[0020] Figure 2 is a schematic front view of the overall structure of an embodiment of the present invention;
[0021] Figure 3 It is a side view of the upper support and lower hanging of the increased platform beam at the bottom of the upper frame according to an embodiment of the present invention;
[0022] Figure 4 It is a front view of the upper support and lower hanging of the increased platform beam at the bottom of the upper frame according to an embodiment of the present invention;
[0023] Figure 5 It is a front view of the connection between the rack column and the rack platform beam according to an embodiment of the present invention.
[0024] : 1. lower frame body; 11. lower frame top beam; 12. lower frame inner column; 13. lower frame outer column; 14. lower frame bottom beam; 15. lower frame platform beam; 2. upper frame body; 21. upper frame bottom plus platform beam; 211. upper support mounting beam; 212. lower hanging mounting seat; 213. upper support bolt; 214. steel connecting pad; 215. mounting channel steel; 216. lower hanging bolt; 217. channel steel pad; 218. formwork mounting frame; 22. upper frame column; 23. upper frame middle beam; 24. upper frame middle platform beam; 3. hanging frame body; 31. hanging frame column; 32. hanging frame beam; 33. hanging frame platform beam; 34. connecting channel steel; 35. fixing bolt; 36. U-shaped bolt; 4. supporting beam. DETAILED DESCRIPTION
[0025] The technical solution of the present invention is described in detail below through examples. The following examples are merely exemplary and can only be used to explain and illustrate the technical solution of the present invention, but cannot be interpreted as limiting the technical solution of the present invention.
[0026] Combination Figure 1-5A climbing formwork frame system with high lifting and large span includes a lower frame body 1, an upper frame body 2 and a hanging frame body 3. The lower frame body 1 includes a lower frame top crossbeam 11, a lower frame inner column 12, a lower frame outer column 13, a lower frame bottom crossbeam 14 and a lower frame platform beam 15. The upper frame body 2 includes an upper frame bottom increased platform beam 21, an upper frame column 22, an upper frame middle crossbeam 23 and an upper frame middle platform beam 24. The hanging frame body 3 includes a hanging frame column 31, a hanging frame crossbeam 32 and a hanging frame platform beam 33. Two lower frame top crossbeams 11 are arranged side by side in a horizontal direction and are respectively perpendicular to the wall direction. The lower frame inner column 12 is fixed to the end of the lower frame top crossbeam 11 close to the wall. The lower frame outer column 13 is fixed to the end of the lower frame top crossbeam 11 close to the wall. The column 13 is fixed to the end of the bottom of the lower frame top cross beam 11 away from the wall, the front end of the lower frame top cross beam 11 exceeds the lower frame inner column 12 and a jacking device is fixed at the bottom, the lower frame bottom cross beam 14 is fixed to the bottom ends of the lower frame inner column 12 and the lower frame outer column 13, the top of the lower frame bottom cross beam 14 is fixed with a lower frame platform beam 15, and a platform board is laid on the lower frame platform beam 15, the upper frame bottom increased platform beam 21 is at the top of the lower frame top cross beam 11 and three are arranged side by side, the two ends of the upper frame bottom increased platform beam 21 respectively exceed the two lower frame top cross beams 11 and are fixed to the two lower frame top cross beams 11, the three upper frame bottom increased platform beams 21 are respectively connected to the lower frame inner column 1 2. The lower frame outer column 13 corresponds to the upper frame column 22. The upper frame column 22 far from the wall corresponds to the lower frame outer column 13. The upper frame column 22 close to the wall corresponds to the middle upper frame bottom increased platform beam 21. The top of the upper frame bottom increased platform beam 21 is paved with a platform board. The upper frame column 22 is arranged at three locations parallel to the wall. Two upper frame columns 22 are respectively located on the outside of the two lower frame inner columns 12. The other upper frame column 22 is located between the two lower frame inner columns 12, fixedly installed on the upper frame bottom increased platform beam 21 and staggered with the lower frame inner column 12 in the direction parallel to the wall. The upper frame column 22 is also provided with a plurality of upper frame middle beams 2 3. An upper frame middle platform beam 24 is fixed on the upper frame middle cross beam 23, and a platform board is laid on the upper frame middle platform beam 24. The upper half of the hanger body 3 covers the lower frame body 1, and the lower half of the hanger body 3 is located below the lower frame body 1. Three hanger columns 31 are arranged in a direction parallel to the wall. Two hanger columns 31 are respectively located on the outside of the upper frame columns 22, and the other hanger column 31 is located between the two lower frame inner columns 12, and the middle hanger column 31 is staggered with the middle upper frame column 22. A hanger cross beam 32 is fixed to the bottom end of the hanger column 31, a hanger platform beam 33 is fixed to the top end of the hanger cross beam 32, and a platform board is laid on the top end of the hanger platform beam 33.
[0027] The climbing frame structure of the present application has been re-arranged and integrated. Compared with the current structural form in which the columns correspond to each other up and down and are connected in sequence, when the jacking force increases and the number of frames is reduced, the conventional climbing frame structure adds reinforcement in the middle, the reinforcement strength is too high, and too much material is wasted. The climbing frame structure of the present application has created a new layout. By increasing the model of the platform beam of the upper frame 2 on the top of the lower frame 1, an increased platform beam 21 is formed at the bottom of the upper frame, and the upper frame columns 22 are supported above the increased platform beam 21 at the bottom of the upper frame, and the hanging frame columns 31 are connected below to form an upper support and lower hanging structure. The hanging frame layer is changed from being located below the lower frame 1 to the upper part overlapping the lower frame 1, so that the upper frame columns 22 and the lower frame columns can be flexibly staggered and the hanging frame columns 31 can be flexibly installed, so that the upper frame columns 22 and the hanging frame columns 31 of the entire climbing formwork can be arranged at a reasonable spacing according to the load, avoiding excessive reinforcement strength and excessive waste of materials, and the overall installation is flexible, saving costs.
[0028] As a further preferred scheme of this embodiment, an upper support mounting beam 211 is fixed to the top end of the upper frame bottom incremental platform beam 21, the upper support mounting beam 211 is perpendicular to the wall direction, the upper frame column 22 is fixed on the upper support mounting beam 211, and a lower hanging mounting seat 212 is fixed to the bottom end of the upper frame bottom incremental platform beam 21, and the hanging frame column 31 is fixedly mounted on the lower hanging mounting seat 212.
[0029] The upper support mounting beam 211 on the upper frame bottom incremental platform beam 21 enables the support position of the upper frame column 22 to be flexibly arranged. The combination of the upper frame bottom incremental platform beam 21 and the upper support mounting beam 211 makes it possible for the upper frame column 22 to remain in the original design position, thus avoiding the redesign of the upper frame body 2. The structural design of the lower hanging mounting seat 212 ensures the overall stability and safety of the rack.
[0030] As a further preferred solution of this embodiment, the lower frame platform beam 15, the upper frame middle platform beam 24 and the hanging frame platform beam 33 are all I-beams, and the upper frame bottom plus platform beam 21 is an H-shaped steel.
[0031] As a further preferred solution of this embodiment, the upper frame bottom increased platform beam 21 is a 300mmX150mm H-shaped steel, the lower frame platform beam 15, the hanging frame platform beam 33 and the upper frame middle platform beam 24 are 14# I-shaped steel from the third one, and the upper frame middle platform beam 24 is 16# I-shaped steel from the first and second one. This model is the specific model of this embodiment, and it can be designed according to the principle in practice.
[0032] As a further preferred scheme of this embodiment, the upper support mounting beam 211 is composed of two outer channel steels spaced back to back and two upper and lower rows of inner channel steels connecting the two outer channel steels. The upper support mounting beam 211 is a full-length structure supported on three upper frame bottom incremental platform beams 21. The two sides of the outer channel steel are respectively connected to the upper frame bottom incremental platform beam 21 and the upper frame column 22 through upper support bolts 213. The bottom end of the upper frame bottom incremental platform beam 21 and the bottom end of the upper frame column 22 are respectively provided with steel connecting pads 214.
[0033] As a further preferred embodiment of the present invention, the lower hanging mounting seat 212 includes two outer channel steels which are spaced apart and facing each other, and two rows of inner channel steels which connect the two outer channel steels. The bottom ends of the outer channel steels are also welded with mounting channel steels 215 which are facing each other. The bracket column 31 is a channel steel. The bracket column 31 is fixed between the two mounting channel steels 215 by means of lower hanging bolts 216. A smaller channel steel pad 217 is provided on the inner side of the two mounting channel steels 215.
[0034] As a further preferred solution of this embodiment, a connecting channel steel 34 is provided at the bottom of the lower platform beam 15 and the hanging platform beam 33, the connecting channel steel 34 and the hanging frame column 31 are connected by a hanging frame fixing bolt 35, and the connecting channel steel 34 is respectively connected to the lower platform beam 15 and the hanging frame platform beam 33 by U-shaped bolts 36.
[0035] As a further preferred solution of this embodiment, a template slide rail is fixed to the top of the bottom plus-number platform beam 21 of the upper frame, and a template mounting frame 218 slides on the template slide rail.
[0036] As a further preferred solution of this embodiment, the upper frame column 22 and the hanging frame column 31 are respectively fixedly connected to a plurality of spaced-apart support beam seats on one side away from the wall, the support beams 4 are installed on the support beam seats, and the support beams 4 are installed on the steel plate mesh.
[0037] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field can think of within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.
Claims
1. A high-lift and large-span climbing formwork frame system, comprising a lower frame (1), an upper frame (2) and a hanging frame (3), characterized in that: The lower frame body (1) comprises a lower frame top cross beam (11), a lower frame inner column (12), a lower frame outer column (13), a lower frame bottom cross beam (14) and a lower frame platform beam (15); the upper frame body (2) comprises an upper frame bottom platform beam (21), an upper frame column (22), an upper frame middle cross beam (23) and an upper frame middle platform beam (24); the hanging frame body (3) comprises a hanging frame column (31), a hanging frame cross beam (32) and a hanging frame platform beam (33); two lower frame top cross beams (11) are arranged side by side in a horizontal direction at intervals and are respectively perpendicular to the wall direction; the lower frame inner column (12) is fixed to the end of the bottom of the lower frame top cross beam (11) close to the wall; the lower frame outer column (13) is fixed to the lower frame top cross beam ( 11) at the end of the bottom away from the wall, the front end of the lower frame top cross beam (11) exceeds the lower frame inner column (12) and a jacking device is fixed at the bottom, the lower frame bottom cross beam (14) is fixed to the bottom ends of the lower frame inner column (12) and the lower frame outer column (13), the top end of the lower frame bottom cross beam (14) is fixed with a lower frame platform beam (15), a platform board is laid on the lower frame platform beam (15), the upper frame bottom increased platform beam (21) is at the top end of the lower frame top cross beam (11) and three are arranged side by side, the two ends of the upper frame bottom increased platform beam (21) respectively exceed the two lower frame top cross beams (11) and are fixed to the two lower frame top cross beams (11), the three upper frame bottom increased platform beams (21) are respectively connected to the lower frame inner column (12), the lower frame The outer columns (13) correspond to the upper frame columns (22), the upper frame columns (22) away from the wall correspond to the lower frame outer columns (13), the upper frame columns (22) close to the wall correspond to the middle upper frame bottom increased platform beam (21), the top of the upper frame bottom increased platform beam (21) is paved with a platform board, the upper frame columns (22) are arranged at three locations parallel to the wall, two upper frame columns (22) are respectively located on the outside of the two lower frame inner columns (12), the other upper frame column (22) is located between the two lower frame inner columns (12), fixedly installed on the upper frame bottom increased platform beam (21) and staggered with the lower frame inner columns (12) in the direction parallel to the wall, and a plurality of upper frame middle portions are also arranged on the upper frame columns (22). A crossbeam (23), a middle platform beam (24) of the upper frame is fixed on the middle crossbeam (23) of the upper frame, a platform board is laid on the middle platform beam (24) of the upper frame, the upper half of the hanger body (3) covers the lower frame body (1), the lower half of the hanger body (3) is located below the lower frame body (1), three hanger columns (31) are arranged in a direction parallel to the wall, two hanger columns (31) are respectively located outside the upper frame columns (22), another hanger column (31) is located between two lower frame inner columns (12), and the middle hanger column (31) is staggered with the middle upper frame column (22), a hanger crossbeam (32) is fixed at the bottom end of the hanger column (31), and a hanger platform beam (33) is fixed at the top end of the hanger crossbeam (32),The top of the rack platform beam (33) is paved with a platform plate.
2. A high-lift and large-span climbing formwork system according to claim 1, characterized in that: An upper support mounting beam (211) is fixed to the top of the upper frame bottom increasing platform beam (21), and the upper support mounting beam (211) is perpendicular to the wall surface. The upper frame column (22) is fixed on the upper support mounting beam (211), and a lower hanging mounting seat (212) is fixed to the bottom end of the upper frame bottom increasing platform beam (21), and the hanging frame column (31) is fixedly mounted on the lower hanging mounting seat (212).
3. A high-lift and large-span climbing formwork frame system according to claim 2, characterized in that: The lower frame platform beam (15), the upper frame middle platform beam (24) and the hanging frame platform beam (33) are all I-shaped steels, and the upper frame bottom increased platform beam (21) is an H-shaped steel.
4. A high-lift and large-span climbing formwork system according to claim 3, characterized in that: The bottom platform beam (21) of the upper frame is an H-shaped steel of 300mmX150mm, the lower frame platform beam (15), the hanging frame platform beam (33) and the upper frame middle platform beam (24) are 14# I-shaped steel from the third one onwards, and the upper frame middle platform beam (24) is 16# I-shaped steel from the first and second ones onwards.
5. A high-lift and large-span climbing formwork system according to claim 4, characterized in that: The upper support mounting beam (211) is composed of two outer channel steels spaced apart and facing each other, and two rows of inner channel steels connecting the two outer channel steels. The upper support mounting beam (211) is a full-length structure supported on three upper frame bottom increasing platform beams (21). Both sides of the outer channel steel are connected to the upper frame bottom increasing platform beam (21) and the upper frame column (22) respectively through upper support bolts (213). The bottom ends of the upper frame bottom increasing platform beam (21) and the upper frame column (22) are respectively provided with steel connection pads (214).
6. A high-lift and large-span climbing formwork system according to claim 5, characterized in that: The lower hanging mounting seat (212) comprises two outer channel steels which are spaced apart and facing each other, and two rows of inner channel steels which connect the two outer channel steels, and the bottom ends of the outer channel steels are respectively welded with mounting channel steels (215) which are facing each other, the hanging frame column (31) is a channel steel, and the hanging frame column (31) is fixed between the two mounting channel steels (215) by means of lower hanging bolts (216), and the inner sides of the two mounting channel steels (215) are respectively provided with smaller channel steel pads (217).
7. A high-lift and large-span climbing formwork system according to claim 6, characterized in that: A connecting channel steel (34) is provided at the bottom of the lower frame platform beam (15) and the hanging frame platform beam (33); the connecting channel steel (34) and the hanging frame column (31) are connected via hanging frame fixing bolts (35); and the connecting channel steel (34) is respectively connected to the lower frame platform beam (15) and the hanging frame platform beam (33) via U-shaped bolts (36).
8. The high-lift and large-span climbing formwork system according to claim 7 is characterized in that: A template slide rail is fixed to the top of the increased platform beam (21) at the bottom of the upper frame, and a template mounting frame (218) is slidably mounted on the template slide rail.
9. A high-lift and large-span climbing formwork system according to claim 8, characterized in that: A plurality of spaced-apart supporting beam seats are fixedly connected to the upper frame column (22) and the hanging frame column (31) on the side away from the wall, and the supporting beam seats are provided with supporting beams (4), and the supporting beams (4) are provided with steel plate mesh.
Citation Information
Patent Citations
Creeping formwork for high-rise building construction and hydraulic climbing formwork construction process
CN113550557A
Full-automatic hydraulic climbing formwork system and using method thereof
CN106049856A
Automatic creeping formwork system
CN217759993U