Vibrating and percussion drilling machine and construction method thereof

By adopting telescopic conduit and traction rope system in the vibration drilling rig, combining the silo and discharge opening and closing door, the problems of insufficient pile body quality, feeding efficiency and penetration during vibration pile construction are solved, and efficient super-efficiency Deep hole construction and soil extrusion effect.

CN118958859APending Publication Date: 2024-11-15SUNWARD INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202310494672.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

There are pile body quality problems, low feeding efficiency and insufficient penetration of vibrating holes in existing vibrating pile constructions. Especially during ultra-deep hole construction, it is easy to cause hole wall collapse and low construction efficiency.

Method used

A vibration drilling rig is designed, using telescopic conduits and traction rope systems, and the lower conduits of each telescopic unit are continuously extended to meet the design depth requirements. The silo and discharge opening and closing doors are used to achieve smooth drop and vibration of stone. The slimming is combined with a tilt sensor and a bias correction device to ensure the perpendicularity and penetration of the vibrator.

Benefits of technology

It improves the quality of the pile body and feeding efficiency, enhances the penetration of the vibrating hole, ensures the tightening effect of the soil around the pile body, and is suitable for ultra-deep vibrating pile construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958859A_ABST
    Figure CN118958859A_ABST
Patent Text Reader

Abstract

The invention discloses a vibroflotation drilling machine and a construction method thereof, and the vibroflotation drilling machine comprises a pile frame which is provided with a first traction rope and a second traction rope; the telescopic guide pipe comprises at least one telescopic unit comprising an upper guide pipe and a lower guide pipe, and the upper guide pipe is located above the lower guide pipe and sleeved with the lower guide pipe in a sliding mode; all the telescopic units are connected in series in the vertical direction; in every two adjacent telescopic units, the lower guide pipe located on the upper telescopic unit is the upper guide pipe located on the lower telescopic unit. The uppermost upper guide pipe is connected with the stock bin; the lowermost lower guide pipe is connected with a first traction rope and is provided with a discharging opening and closing door capable of being opened and closed; the upper retainer and the lower retainer are arranged on the pile frame in a sliding mode in the axial direction, and the upper retainer is connected with a second traction rope and can fix or loosen each upper guide pipe and each lower guide pipe; the vibroflot is connected with the lowermost lower guide pipe; and the hoop is used for fixing the lower guide pipe and the upper guide pipe when the lower guide pipe of one telescopic unit completely extends out. The vibroflotation drilling machine has high pile body quality, feeding efficiency and vibroflotation pore-forming penetrating power.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of infrastructure construction engineering, and more specifically, to a vibratory drilling machine. In addition, the present invention also relates to a construction method of the vibratory drilling machine. Background Art

[0002] Vibroflotation is a method of foundation treatment: it generally involves lifting a vibrator with a guide rod by a crane or drilling rig, and vibrating the soft foundation soil layer to compact it under the action of the exciting force generated by the vibrator, or vibrating holes in the foundation soil layer, filling the holes with crushed stone, etc., and vibrating and compacting the crushed stone section by section to form vibroflotation gravel piles, so that the vibroflotation gravel piles and the surrounding foundation soil form a composite foundation, thereby achieving the purpose of improving the bearing capacity of the foundation, increasing the stability of the foundation, and improving the foundation's ability to resist earthquake liquefaction.

[0003] In recent years, with the development of urban infrastructure, the application of vibroflotation construction has become more and more extensive, and the problems in vibroflotation construction have become more and more prominent, mainly in terms of the processing depth of vibroflotation piles, construction efficiency and quality control. For example, according to the conventional vibroflotation pile construction method, there is almost no difficulty in the construction of vibroflotation piles with a depth of less than 40 meters. However, when the depth of the vibroflotation pile reaches 75 meters to 100 meters, the construction difficulty increases greatly.

[0004] At present, for ultra-deep vibratory pile construction equipment and methods, those skilled in the art have proposed some improvement schemes, such as the technical scheme of using a telescopic guide rod to suspend the vibrator for construction, which can solve the problem of ultra-deep construction depth. However, the following technical problems still exist:

[0005] 1. Pile body quality issues:

[0006] In the prior art, the construction steps of vibratory piles are generally: vibratory drilling to the designed depth, hole cleaning, material feeding, and vibratory compaction to form piles. The material feeding step is usually performed using the "upper feeding method", that is, crushed stone is fed into the hole through the hole mouth on the ground, and the crushed stone passes through the gap between the telescopic guide rod and the inner wall of the hole and falls to the bottom of the hole. The main problem of the "upper feeding method" is that the crushed stone will cause impact disturbance to the hole wall during the process of falling from the hole mouth to the bottom of the hole. If it is a soft formation, the hole wall will become unstable, especially when the crushed stone is thrown into an ultra-deep hole of more than 75 meters, it will cause the hole wall to collapse, and the crushed stone cannot reach the bottom of the hole smoothly and in full, resulting in insufficient filling of crushed stone in the hole, causing pile body quality defects such as broken piles and shrinkage of the vibratory pile, which directly affects the overall project quality.

[0007] 2. Low feeding efficiency:

[0008] From a structural point of view, the outer guide rod of the telescopic guide rod has a large diameter and is located in the upper part of the hole. Its outer diameter is almost the same as or slightly larger than the outer diameter of the vibrator, and it occupies a considerable space in the hole, making the feeding space for the crushed stone between the hole diameter and the guide rod narrow, resulting in a small amount of material fed each time and low construction efficiency.

[0009] 3. The problem of insufficient penetration of vibratory pore making:

[0010] The outermost guide rod of the telescopic guide rod has a larger diameter, while the innermost guide rod has a smaller diameter and is light in weight. After the telescopic guide rod is extended, the innermost guide rod is at the bottom. The overall weight of the vibrator connected to the innermost guide rod and its front end is light, which is not conducive to vibratory drilling. Especially when encountering hard formations, the penetration force of the vibratory drilling is insufficient and the drilling efficiency is low.

[0011] In summary, how to provide a vibratory drilling rig to improve the pile body quality and material feeding efficiency and solve the problem of insufficient penetration of vibratory drilling is an urgent problem to be solved by technical personnel in this field. Summary of the invention

[0012] In view of this, an object of the present invention is to provide a vibratory drilling rig which can ensure high pile body quality, material feeding efficiency and vibratory hole-making penetration.

[0013] Another object of the present invention is to provide a vibro-drilling construction method applied to the above-mentioned vibro-drilling machine, which can ensure high pile body quality, high material feeding efficiency, and high vibro-drilling penetration.

[0014] In order to achieve the above object, the present invention provides the following technical solutions:

[0015] A vibratory drilling machine, comprising:

[0016] The pile frame is provided with a first hoist and a second hoist, wherein the first hoist has a first traction rope and the second hoist has a second traction rope;

[0017] A telescopic conduit, comprising at least one telescopic unit, each of which comprises an upper conduit and a lower conduit arranged in a vertical direction, wherein the upper conduit is located above the lower conduit, and the upper conduit is slidably sleeved inside the lower conduit; when there are at least two telescopic units, all the telescopic units are connected in series in a vertical direction; of two adjacent telescopic units, the lower conduit of the telescopic unit located above is the upper conduit of the telescopic unit located below; a silo is connected to the top of the uppermost upper conduit; the lowermost lower conduit is connected to the first traction rope and is provided with an openable and closable discharge opening and closing door; the silo is used to pour stones, the upper conduit and the lower conduit are used for stones to pass through the inside thereof, and the discharge opening and closing door is used for stones to enter the hole after coming out;

[0018] An upper retainer is slidably disposed on the pile frame in a vertical direction and is connected to the second traction rope, and can fix or loosen each of the upper guide tube and the lower guide tube;

[0019] A lower retainer is slidably disposed on the pile frame in a vertical direction and is used to guide each of the upper conduits and the lower conduits, and a flexible connector is connected between the lower retainer and the upper retainer;

[0020] A vibrator connected to the lower conduit at the bottom;

[0021] A clamp is used to fix the lower conduit and the upper conduit when the lower conduit of one of the telescopic units is fully extended relative to the upper conduit.

[0022] Optionally, the lowermost downpipe is provided with:

[0023] A tilt sensor, used to detect whether the lowermost downpipe is tilted;

[0024] The deviation correction device is used to correct the position of the lowermost downpipe when the inclination sensor detects that the lowermost downpipe is inclined, so that the verticality of the vibrator vibrating hole meets the requirements.

[0025] Optionally, a connecting plate connected to the lower conduit is provided in the lowermost conduit, and the deviation correction device includes:

[0026] A cylinder seat, fixed between the lower conduit at the bottom and the connecting plate;

[0027] The piston rod is fixedly connected to the cylinder seat and extends into the cylinder seat, and is provided with a control oil circuit and an oil pipe;

[0028] A push rod is slidably connected between the cylinder seat and the piston rod. The piston rod is provided with a piston movably sealed with the inner wall of the push rod. The piston divides the gap between the push rod and the piston rod into two and separates them, so that under the action of the control oil circuit, the push rod can be extended or retracted along the radial direction of the lower guide tube.

[0029] Optionally, the number of the deviation-correcting devices is at least two, all the deviation-correcting devices are evenly distributed along the circumference of the downcomer, and all the deviation-correcting devices are coplanarly arranged or staggered along the axial direction of the downcomer.

[0030] Optionally, a connecting plate connected to the lowermost down conduit is provided in the lowermost down conduit, the bottom of the connecting plate is connected to a transition socket, the transition socket extends out of the bottom of the lowermost down conduit, the vibrator is fixed to the transition socket, and the axis of the vibrator coincides with the axis of the down conduit.

[0031] Optionally, at least one of the upper conduit and the lower conduit is provided with a joint, a seal and a pressure cover, the joint is connected to the upper conduit or the lower conduit, the pressure cover is connected to the joint, and the seal is provided between the pressure cover and the joint for sealing the upper conduit and the lower conduit.

[0032] Optionally, one of the upper conduit and the lower conduit is provided with a key bar, and the other is provided with a key groove that slidably cooperates with the key bar.

[0033] Optionally, the upper conduit is provided with an upper limit ring for limiting the extreme position of retraction of the lower conduit.

[0034] A vibratory drilling machine construction method is applied to any of the above-mentioned vibratory drilling machines, and the vibratory drilling machine construction method comprises:

[0035] When the pile frame reaches the pile position, all the telescopic units are in a fully retracted state, and the upper retainer fixes all the telescopic units; the discharge opening and closing door is in a closed state; the vibrator is started, and the upper retainer, the lower retainer, the telescopic guide tube and the vibrator are driven to descend as a whole by using the first traction rope and the second traction rope, so that the vibrator enters the formation to vibrate and make holes;

[0036] The upper retainer loosens the lower conduit of the lowest telescopic unit, and uses the first traction rope and relies on the deadweight of the lower conduit of the lowest telescopic unit to extend the lower conduit of the lowest telescopic unit downward, so that the vibrator continues to vibrate downward to form a hole; when the lower conduit of the lowest telescopic unit is fully extended, the lower conduit and the upper conduit of the lowest telescopic unit are fixed by the clamp;

[0037] When there are at least two telescopic units, the upper retainer releases the lower conduit of the penultimate telescopic unit from top to bottom, and uses the first traction rope and relies on the gravity of the structural parts below the penultimate telescopic unit to make the lower conduit of the penultimate telescopic unit extend downward, so that the vibrator continues to vibrate downward to form holes; when the lower conduit of the penultimate telescopic unit is fully extended, the clamp is used to fix the lower conduit and the upper conduit of the penultimate telescopic unit;

[0038] This cycle is repeated until the lower guide tubes of all the telescopic units are fully extended;

[0039] The upper retainer, the telescopic guide tube and the vibrator are pulled by the first traction rope and the second traction rope to lower the upper retainer, the telescopic guide tube and the vibrator as a whole, so that the vibrator vibrates downward to form a hole to a designed depth;

[0040] The first traction rope and the second traction rope are used to pull the telescopic guide tube upward by a preset distance as a whole, so that the discharge opening and closing door can be opened;

[0041] Pour stones into the silo, make the stones fall along the inside of the telescopic guide tube, and fall into the bottom of the hole from the discharge opening and closing door; use the vibrator to vibrate and compact the stones;

[0042] The telescopic guide tube and the upper retainer are lifted upward by using the first traction rope and the second traction rope, and stones are continuously poured into the silo, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the uppermost clamp is lifted to above the lower retainer, the lifting is stopped and the uppermost clamp is removed;

[0043] The upper retainer is kept in place by using the second traction rope, at which time, the upper retainer fixes the upper conduit of the telescopic unit at the top; all the upper conduits and the lower conduits except the upper conduit of the telescopic unit at the top are lifted upward as a whole by using the first traction rope, and stones are continuously poured into the silo at the same time, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the lower conduit of the telescopic unit at the top is completely retracted, the lifting is stopped, and the second clamp from the top is removed;

[0044] The upper pipe and the lower pipe of the telescopic unit at the top are fixed by the upper retainer; all the upper pipes and the lower pipes except the upper pipe and the lower pipe of the telescopic unit at the top are lifted upward as a whole by the first traction rope, and stones are continuously poured into the silo at the same time, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the lower pipe of the second telescopic unit located above is completely retracted, the lifting is stopped, and the third clamp from the top is removed;

[0045] This cycle is repeated until the lower guide tube of the telescopic unit at the bottom is completely retracted;

[0046] The upper retainer is used to fix all the telescopic units; the upper retainer and the telescopic guide tube are lifted upward as a whole by the first traction rope and the second traction rope, and stones are continuously poured into the silo so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; until the vibrator is completely lifted to the ground, the vibrator is shut down, and the gravel pile drilling and compaction pile forming operation is completed.

[0047] Optionally, the vibratory drilling machine includes a tilt sensor and a deviation correction device; and the vibratory drilling machine construction method further includes:

[0048] During the process of the vibrator vibrating downward to form a hole, the tilt sensor is used to detect whether the lower guide tube of the telescopic unit at the bottom is tilted;

[0049] If so, the deviation-correcting device is used to correct the position of the lower guide tube of the telescopic unit at the bottom, so that the verticality of the vibrating hole formed by the vibrating device meets the requirements.

[0050] The vibratory drilling machine provided by the present invention can be used for ultra-deep vibratory pile construction by continuously extending the lower guide tube of each telescopic unit to the maximum length during the construction process to meet the design depth requirements of the gravel pile. In addition, when feeding, the stone is put into the silo, so that the stone falls along the inside of the telescopic guide tube, and the stone comes out from the discharge opening and closing door of the lower guide tube at the bottom to reach the bottom of the hole. On the one hand, it can avoid the impact disturbance of the stone on the hole wall, avoid the defects such as broken piles and shrinkage, so as to ensure the quality of the pile body; the internal material discharge space of the telescopic guide tube is large, so that the amount of material fed each time can be large, which is conducive to making the stone reach the bottom of the hole smoothly and in full, thereby improving the construction efficiency. Furthermore, during construction, the lower conduit passing through each telescopic unit is extended relative to its upper conduit, so that the vibrator continuously vibrates downward to make holes. This configuration of small-diameter tubes on top and large-diameter tubes on the bottom makes the cross-sectional area of ​​the discharge port large and the discharge efficiency high. Moreover, during construction, the first to be extended is the lower conduit with the largest diameter. The combined weight of the lower conduit and the vibrator is heavy, the penetration is large, and the hole-making efficiency is high. Moreover, when the lower conduit of a single telescopic unit is fully extended relative to the upper conduit, the lower conduit and the upper conduit are fixed with a clamp, so that the upper conduit and the lower conduit of the telescopic unit are fixed together, so as to avoid the lower conduit of the telescopic unit from retracting during the continued vibration and hole-making process, that is, the telescopic conduit as a whole has a reverse insertion function, which is conducive to ensuring the compaction effect of the soil around the pile body and the quality of the gravel pile.

[0051] It can be seen that the vibratory drilling rig construction method can improve the pile body quality and feeding efficiency, and also solve the problem of insufficient penetration of vibratory drilling. At the same time, it can ensure the compaction effect of the soil around the pile body.

[0052] The vibratory drilling machine construction method provided by the present invention can realize the working process of the above-mentioned vibratory drilling machine and has the above-mentioned beneficial effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0054] Figure 1 It is a structural schematic diagram of a vibratory drilling machine provided by a specific embodiment of the present invention;

[0055] Figure 2 yes Figure 1 A front view of the telescopic guide tube 1 of the vibratory drilling machine in a fully retracted state;

[0056] Figure 3 yes Figure 1 A side view of the telescopic guide tube 1 of the vibratory drilling machine in a fully retracted state;

[0057] Figure 4 yes Figure 2 AA cross-sectional view of the telescopic catheter 1 in the fully retracted state;

[0058] Figure 5 yes Figure 4 A partial enlarged view of middle J;

[0059] Figure 6 yes Figure 4 A partial enlarged view of K in the middle;

[0060] Figure 7 yes Figure 4 A partial enlarged view of L in the middle;

[0061] Figure 8 yes Figure 3 The BB cross-sectional view of the telescopic catheter 1 in the fully retracted state is shown;

[0062] Fig. 9 yes Figure 8 A partial enlarged view of the middle M;

[0063] Fig.10 yes Figure 8 A partial enlarged view of N in the middle;

[0064] Fig.11 yes Figure 8 A partial enlarged view of P in the middle;

[0065] Fig.12 yes Figure 8 The CC cross-sectional view of the telescopic catheter 1 shown;

[0066] Fig.13 yes Figure 8 DD sectional view of the telescopic catheter 1 shown;

[0067] Fig.14 yes Figure 8 EE section view of the telescopic guide rod shown;

[0068] Fig.15 yes Figure 8 GG sectional view of the telescopic guide rod shown;

[0069] Fig.16 yes Figure 8 FF section view of the telescopic guide rod shown;

[0070] Fig.17 is a cross-sectional schematic diagram of the structural arrangement when there are three deviation correcting devices 8;

[0071] Fig.18 This is a structural arrangement diagram when there are four deviation correcting devices 8;

[0072] Fig.19 yes Fig.18 Middle II sectional view;

[0073] Fig. 20 yes Figure 1 A schematic diagram of the installation of the clamp when the fourth conduit 5 of the telescopic conduit 1 of the vibratory drilling machine is fully extended;

[0074] Fig.21 yes Fig. 20 The HH cross-sectional view of the telescopic catheter 1 when the fourth catheter 5 is fully extended;

[0075] Fig. 22 It is a schematic diagram of step 1 of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0076] Fig.23 It is a schematic diagram of step 2 of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0077] Fig.24 It is a schematic diagram of step three of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0078] Fig.25 It is a schematic diagram of step 4 of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0079] Fig.26 It is a schematic diagram of step five of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0080] Fig. 27 It is a schematic diagram of step six of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0081] Fig.28It is a schematic diagram of step seven of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0082] Fig.29 It is a schematic diagram of step eight of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0083] Fig.30 It is a schematic diagram of step nine of the vibratory drilling machine construction method provided in a specific embodiment of the present invention;

[0084] Fig.31 It is a schematic diagram of step ten of the vibratory drilling rig construction method provided in a specific embodiment of the present invention.

[0085] Figures 1 to 31 The reference numerals in the figures are as follows:

[0086] 1 is a telescopic conduit; 2 is a first conduit, 2a is a first main sleeve, 2b is an upper flange, 2c is a first upper limit ring, 2d is a first joint, 2e is a first seal, 2f is a first gland, 2g is a first key strip, 2h is a first screw, and 2i is a fastener; 3 is a second conduit, 3a is a second main sleeve, 3b is a second joint, 3c is a second upper limit ring, 3d is a second seal, 3e is a second gland, 3f is a third joint, 3g is a third seal, 3h is a third gland, 3i is a second key strip, 3j is a first keyway, 3k is a second screw, 3m is the third screw; 4 is the third guide tube, 4a is the third main sleeve, 4b is the fourth joint, 4c is the third upper limit ring, 4d is the fourth seal, 4e is the fourth gland, 4f is the fifth joint, 4g is the fifth seal, 4h is the fifth gland, 4i is the third key strip, 4j is the second keyway, 4k is the fourth screw, 4m is the fifth screw; 5 is the fourth guide tube, 5a is the fourth main sleeve, 5b is the sixth joint, 5c is the sixth seal, 5d is the sixth gland, 5e is the crossbeam, 5f is the connecting plate, 5g is the first connecting seat, 5h is the first a fastening device, 5i is a second connecting seat, 5j is a second fastening device, 5k is a first protective cover, 5m is a second protective cover, 5n is a transition seat, 5p is a discharging opening and closing door, 5v is a tilt sensor, 5q is a threaded seat, 5r is a third keyway, 5s is a sixth screw, 5t is a pin, and 5u is a closing device; 6 is a silo; 8 is a deviation correction device, 8a is a cylinder seat, 8b is a piston rod, 8c is a push rod, 8d is a control oil circuit, and 8e is an oil pipe; 11 is an upper retainer, 11a is a guide sleeve, and 11b is a clamping mechanism; 12 is a lower retainer; 13 is a vibrator; 21 is a pile frame, 22 is a first traction rope, 22a is a second traction rope, 23 is a column, 24 is a column guide rail, 25 is a walking chassis, 26 is a goose head frame, 271 is a first winch, 272 is a second winch, 28 is a cable, 29 is a first reel, 30 is a water and gas pipe, 31 is a power pipeline, 32 is a second reel, 33 is a hopper; 41 is a first clamp, 41a is a first clamp arm A, 41b is a first clamp arm B, 41c is a first pin shaft, 41d is a first fastening bolt, 42 is a second clamp, and 43 is a third clamp. DETAILED DESCRIPTION

[0087] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0088] The core of the present invention is to provide a vibro-drilling machine, which can ensure high pile body quality, high feeding efficiency and high penetration of vibro-drilling holes. Another core of the present invention is to provide a vibro-drilling machine construction method applied to the above-mentioned vibro-drilling machine, which can ensure high pile body quality, high feeding efficiency and high penetration of vibro-drilling holes.

[0089] Please refer to Figure 1-Figure 21 The embodiment of the present invention provides a vibratory drilling machine, including a pile frame 21, a telescopic guide tube 1, an upper retainer 11, a lower retainer 12, a vibrator 13 and a clamp. Specifically, the pile frame 21 is provided with a first winch 271 and a second winch 272, the first winch 271 has a first traction rope 22, and the second winch 272 has a second traction rope 22a. The telescopic guide tube 1 includes at least one telescopic unit, each of which includes an upper guide tube and a lower guide tube arranged in the vertical direction, the upper guide tube is located above the lower guide tube, and the upper guide tube can be slidably mounted inside the lower guide tube; when there are at least two telescopic units, all the telescopic units are connected in series in the vertical direction; among two adjacent telescopic units, the lower guide tube of the telescopic unit located above is the upper guide tube of the telescopic unit located below; the top of the upper guide tube of the uppermost telescopic unit is connected to a silo 6; the lower guide tube of the lowermost telescopic unit is connected to the first traction rope 22, and the lower guide tube of the lowermost telescopic unit is provided with an openable and closable discharge opening and closing door 5p; wherein, the silo 6 is used to pour stones, the upper guide tube and the lower guide tube are used for stones to pass through the inside thereof, and the discharge opening and closing door 5p is used for stones to enter the hole after coming out. The telescopic unit is installed on the pile frame 21 through the upper retainer 11 and the lower retainer 12. The upper retainer 11 and the lower retainer 12 can be slidably arranged on the pile frame 21 in the vertical direction, and a flexible connector is connected between the upper retainer 11 and the lower retainer 12. The upper retainer 11 is connected to the second traction rope 22a. The upper retainer 11 can fix or loosen the upper and lower conduits of each telescopic unit. The lower retainer 12 is respectively matched with the upper and lower conduits to allow the lower retainer 12 to guide the upper and lower conduits. The vibrator 13 is connected to the lower conduit of the lowest telescopic unit. The clamp is used to fix the lower and upper conduits when the lower conduit of a telescopic unit is fully extended relative to the upper conduit.

[0090] It can be understood that since the telescopic guide tube 1 of the vibratory drilling rig includes at least one telescopic unit, and the lower guide tube of each telescopic unit can be extended relative to its upper guide tube, therefore, during the construction process, when the lower guide tubes of all the telescopic units are extended, the maximum depth of the vibrator 13 to vibrate downward to form a hole can be reached. Therefore, technical personnel in this field can select an appropriate number of telescopic units according to the design depth requirements of the gravel pile to meet the construction needs of vibratory piles of different depths, so that the vibratory drilling rig can be suitable for ultra-deep vibratory pile construction and reduce the construction difficulty of vibratory piles when the depth reaches 75 meters to 100 meters.

[0091] In addition, the present embodiment utilizes the structure of the telescopic guide tube 1 so that stones can be put into the interior of the telescopic guide tube 1 through the silo 6, and the stones are discharged to the bottom of the hole from the discharge opening and closing door 5p of the lowest lower guide tube. That is, the vibratory drilling rig adopts the bottom discharge method, so that the stones fall along the interior of the telescopic guide tube 1, and reach the bottom of the hole after being discharged from the lowest lower guide tube. On the one hand, it can avoid the impact disturbance of the stones on the hole wall, avoid the defects such as broken piles and reduced diameter, thereby ensuring the quality of the pile body; on the other hand, compared with the prior art in which stones fall from the gap between the telescopic guide rod and the hole, the vibratory drilling rig has a large discharge space, which can make the amount of materials fed each time large, which is conducive to making the stones reach the bottom of the hole smoothly and in full, thereby improving construction efficiency.

[0092] Furthermore, since each telescopic unit is connected in series in the vertical direction, and the upper guide tube of each telescopic unit is located above the lower guide tube, the upper guide tube can be slidably mounted inside the lower guide tube, that is, the diameter of the upper guide tube is smaller than the diameter of the lower guide tube, and the lowest lower guide tube is connected to the vibrator 13, and is provided with a discharge opening and closing door 5p. Therefore, during construction, the lower guide tube passing through each telescopic unit is extended relative to its upper guide tube, so that the vibrator 13 continuously vibrates downward to form holes. This configuration of small-diameter tubes on top and large-diameter tubes on the bottom makes the cross-sectional area of ​​the discharge port large and the discharge efficiency high. Moreover, during construction, the lower guide tube with the largest diameter is extended first. The combined weight of the lower guide tube and the vibrator 13 is heavy, the penetration force is large, and the hole-making efficiency is high.

[0093] Moreover, when the lower conduit of a single telescopic unit is fully extended relative to the upper conduit, a clamp is used to fix the lower conduit and the upper conduit, so that the upper conduit and the lower conduit of the telescopic unit are fixed together, thereby preventing the lower conduit of the telescopic unit from retracting during the continued vibration and hole-making process. That is, the telescopic conduit 1 as a whole has a reverse insertion function, which is beneficial to ensuring the compaction effect of the soil around the pile body and the quality of the gravel pile.

[0094] It can be seen that the vibratory drilling rig not only improves the pile body quality and feeding efficiency, but also solves the problem of insufficient penetration of vibratory drilling, while ensuring the compaction effect of the soil around the pile body.

[0095] It should be noted that the present embodiment does not limit the specific number of telescopic units included in the telescopic catheter 1. Figure 1-3As shown, in some embodiments, the number of telescopic units is three. For the convenience of description, the upper and lower conduits of all telescopic units are named first conduit 2, second conduit 3, third conduit 4 and fourth conduit 5 from top to bottom, wherein the first conduit 2 and the second conduit 3 are sleeved to form a first telescopic unit; the second conduit 3 and the third conduit 4 are sleeved to form a second telescopic unit; the third conduit 4 and the fourth conduit 5 are sleeved to form a fourth telescopic unit. For the first telescopic unit, the first conduit 2 is the upper conduit and the second conduit 3 is the lower conduit; for the second telescopic unit, the second conduit 3 is the upper conduit and the third conduit 4 is the lower conduit; for the third telescopic unit, the third conduit 4 is the upper conduit and the fourth conduit 5 is the lower conduit.

[0096] Furthermore, in order to achieve a sealed connection between the upper conduit and the lower conduit and prevent stones from seeping out to the outside of the upper conduit and the lower conduit during the material dropping process, in some embodiments, at least one of the upper conduit and the lower conduit is provided with a joint, a seal and a gland, the joint is connected to the upper conduit or the lower conduit, the gland is connected to the joint, the seal is provided between the gland and the joint, and the seal is used to seal the upper conduit and the lower conduit. That is, this embodiment utilizes the connection between the gland and the joint, and connects the joint to the upper conduit or the lower conduit, and defines the seal between the upper conduit and the lower conduit, so that the seal can seal the gap between the upper conduit and the lower conduit, ensure the sealing of the sliding sleeve of the upper conduit and the lower conduit, and prevent stones from seeping out from the inside of the upper conduit and the lower conduit to the outside of the upper conduit and the lower conduit.

[0097] It should be noted that the present embodiment does not limit the specific connection method between the joint and the upper conduit or the lower conduit. In some embodiments, the upper conduit or the lower conduit includes a main sleeve, and the joint and the main sleeve are detachably connected.

[0098] In addition, this embodiment does not limit the connection method between the gland and the joint. In some embodiments, the gland is connected to the joint by screws.

[0099] like Figure 4-6As shown in Figures 8-10, in some embodiments, the first conduit 2 includes a first main sleeve 2a, the bottom of the first main sleeve 2a is provided with a first joint 2d, a first seal 2e and a first gland 2f, the first joint 2d is detachably connected to the first main sleeve 2a, the first gland 2f is connected to the first joint 2d by a first screw 2h, so that the first seal 2e is sandwiched between the first joint 2d and the first gland 2f, so that the first seal 2e can achieve the sealing of one end of the first conduit 2 and the second conduit 3. The second conduit 3 includes a second main sleeve 3a, the top of the second main sleeve 3a is provided with a second joint 3b, a second seal 3d and a second gland 3e; the second joint 3b is detachably connected to the second main sleeve 3a, the second gland 3e is connected to the second joint 3b by a second screw 3k, so that the second seal 3d is sandwiched between the second joint 3b and the second gland 3e, so that the second seal 3d can achieve the sealing of the other end of the first conduit 2 and the second conduit 3. The bottom of the second main sleeve 3a is provided with a third joint 3f, a third seal 3g and a third gland 3h; the third joint 3f is detachably connected to the second main sleeve 3a, and the third gland 3h is connected to the third joint 3f by a third screw 3m, so that the third seal 3g is sandwiched between the third joint 3f and the third gland 3h, so that the third seal 3g can achieve the sealing of one end of the second conduit 3 and the third conduit 4. The third conduit 4 includes a third main sleeve 4a, and the top of the third main sleeve 4a is provided with a fourth joint 4b, a fourth seal 4d and a fourth gland 4e; the fourth joint 4b is detachably connected to the third main sleeve 4a, and the fourth gland 4e is connected to the fourth joint 4b by a fourth screw 4k, so that the fourth seal 4d is sandwiched between the fourth joint 4b and the fourth gland 4e, so that the fourth seal 4d can achieve the sealing of the other end of the second conduit 3 and the third conduit 4. The bottom of the third main sleeve 4a is provided with a fifth joint 4f, a fifth seal 4g and a fifth gland 4h; the fifth joint 4f is detachably connected to the third main sleeve 4a, and the fifth gland 4h is connected to the fifth joint 4f by a fifth screw 4m, so that the fifth seal 4g is sandwiched between the fifth joint 4f and the fifth gland 4h, so that the fifth seal 4g can achieve the sealing of one end of the third conduit 4 and the fourth conduit 5. The fourth conduit 5 includes a fourth main sleeve 5a, and the top of the fourth main sleeve 5a is provided with a sixth joint 5b, a sixth seal 5c and a sixth gland 5d, the sixth joint 5b is detachably connected to the fourth main sleeve 5a, and the sixth gland 5d is connected to the sixth joint 5b by a sixth screw 5s, so that the sixth seal 5c is sandwiched between the sixth joint 5b and the sixth gland 5d, so that the sixth seal 5c can achieve the sealing of the other end of the third conduit 4 and the fourth conduit 5.

[0100] In addition, in order to prevent the lower conduit of any telescopic unit from rotating relative to the upper conduit during telescoping, in some embodiments, one of the upper conduit and the lower conduit is provided with a key bar, and the other is provided with a key slot that slidably cooperates with the key bar. That is to say, this embodiment utilizes the cooperation of the key bar and the key slot to achieve circumferential limit between the upper conduit and the lower conduit, and prevents the lower conduit from rotating relative to the upper conduit. Therefore, the telescopic conduit 1 can achieve a non-rotating telescopic movement, so that the telescopic conduit 1 will not rotate even under the horizontal excitation force of the vibrator 13, and avoid the first traction rope 22, the second traction rope 22a, and the cable 28, the water and gas pipe 30, and the power pipeline 31 of the vibratory drilling machine from being entangled, which is conducive to ensuring safe production.

[0101] like Figure 4-6 As shown in Figures 8-10, in some embodiments, the first conduit 2 is provided with a first key bar 2g, and the second joint 3b is provided with a first key groove 3j for slidingly cooperating with the first key bar 2g; the second conduit 3 is provided with a second key bar 3i, and the fourth joint 4b is provided with a second key groove 4j for slidingly cooperating with the second key bar 3i; the third conduit 4 is provided with a third key bar 4i, and the sixth joint 5b is provided with a third key groove 5r for slidingly cooperating with the third key bar 4i. That is to say, in this embodiment, the sliding cooperation between the first key bar 2g and the first key groove 3j is used to prevent the second conduit 3 from rotating relative to the first conduit 2 when it is extended and retracted; the sliding cooperation between the second key bar 3i and the second key groove 4j is used to prevent the third conduit 4 from rotating relative to the second conduit 3 when it is extended and retracted; the sliding cooperation between the third key bar 4i and the third key groove 5r is used to prevent the fourth conduit 5 from rotating relative to the third conduit 4 when it is extended and retracted.

[0102] In addition, when the lower conduit is retracted, in order to limit the position of the lower conduit when it is fully retracted, in some embodiments, the upper conduit is provided with an upper limit ring, which is used to limit the limit position of the lower conduit when it is retracted. That is to say, in this embodiment, the upper limit ring is used to stop and limit the position of the lower conduit when it is fully retracted, and when the lower conduit abuts against the upper limit ring when it is retracted, it indicates that the lower conduit is fully retracted.

[0103] It should be noted that the present embodiment does not limit the specific connection method between the upper limit ring and the upper conduit. In some embodiments, the upper limit ring is detachably connected to the upper conduit.

[0104] like Figure 5 and 9As shown, in some embodiments, the first conduit 2 is provided with a first upper limit ring 2c, which is detachably connected to the first conduit 2; the second conduit 3 is provided with a second upper limit ring 3c, which is detachably connected to the second conduit 3; the third conduit 4 is provided with a third upper limit ring 4c, which is detachably connected to the third conduit 4. That is, in this embodiment, the first upper limit ring 2c is used to limit the position of the second conduit 3 when it is fully retracted; the second upper limit ring 3c is used to limit the position of the third conduit 4 when it is fully retracted; and the third upper limit ring 4c is used to limit the position of the fourth conduit 5 when it is fully retracted.

[0105] In addition, in order to facilitate the connection between the upper conduit at the top and the silo 6, as shown in FIG. Figure 4 and 5 As shown, in some embodiments, the uppermost upper conduit (e.g., the first conduit 2) is provided with an upper flange 2b, and the upper flange 2b is connected to the silo 6 via a fastener 2i (e.g., Figure 3 shown).

[0106] Considering that the telescopic guide tube 1 drives the silo 6 to continuously descend during the process of the vibratory drilling machine continuously vibrating downward to make holes, in order to ensure the stability of the silo 6 descending, in some embodiments, the silo 6 can be slidably connected to the pile frame 21 in the vertical direction. For example, the pile frame 21 is provided with a column 23, the column 23 is provided with a column guide rail 24, and the silo 6 is slidably connected to the column guide rail 24.

[0107] In addition, in order to facilitate the connection between the lowermost downpipe and the vibrator 13, as shown in FIG. Figure 2 , 4 As shown in FIG. 7 , in some embodiments, a connecting plate 5f connected thereto is provided in the lowermost lower conduit, and a transition socket 5n is connected to the bottom of the connecting plate 5f, and the transition socket 5n extends out of the bottom of the lowermost lower conduit, and the vibrator 13 is fixed to the transition socket 5n, and the axis of the vibrator 13 coincides with that of the lower conduit. It can be understood that when the center of gravity of the telescopic conduit 1 and the center of gravity of the vibrator 13 are not collinear, it is easy to cause deviation in the verticality of the hole making, affecting the construction quality. Therefore, in this embodiment, the vibrator 13 is connected to the lowermost lower conduit through the transition socket 5n and the connecting plate 5f to ensure that the axis of the vibrator 13 can coincide with the axis of the lower conduit, that is, to make the center of gravity of the telescopic conduit 1 and the center of gravity of the vibrator 13 collinear, avoiding affecting the verticality of the hole making and ensuring the construction quality. In addition, this arrangement of the vibrator 13 can also avoid interference between the vibrator 13 and the discharge opening and closing door 5p arranged at the bottom of the lowermost downpipe, which is conducive to the smooth discharge of stones from the discharge opening and closing door 5p.

[0108] Further, in order to facilitate the control of the discharge opening and closing door 5p to open or close, as shown in FIG. Figure 4 and7 As shown, in some embodiments, the discharge opening and closing door 5p is rotatably arranged on the connecting plate 5f through a pin shaft 5t, and the lowermost lower conduit (such as the fourth conduit 5) is provided with a closing device 5u, and the closing device 5u is used to control the opening or closing of the discharge opening and closing door 5p. For example, when the discharge opening and closing door 5p is closed, the closing device 5u is engaged with the discharge opening and closing door 5p, and when the vibrator 13 vibrates downward with the telescopic conduit 1 to make a hole, the closing device 5u is used to keep the discharge opening and closing door 5p in a closed state; when the hole is made, stones are put into the telescopic conduit 1, so that the discharge opening and closing door 5p is separated from the closing device 5u and opened under the impact of the gravity of the stones. Of course, the closing device 5u can also be a magnetic suction device, and by controlling the magnetic force of the closing device 5u, the closing device 5u is made to absorb and fix the discharge opening and closing door 5p, or release the discharge opening and closing door 5p, thereby realizing the opening and closing of the discharge opening and closing door 5p.

[0109] In addition, when the stone hits the connecting plate 5f, in order to facilitate the stone to fall smoothly, Figure 4 and 7 As shown, in some embodiments, a crossbeam 5e is provided on the top of the connecting plate 5f, and the crossbeam 5e has a slope from the top to both sides thereof. When the stone hits the crossbeam 5e, it is conducive to making the stone fall smoothly and avoiding the stone from piling up on the top of the connecting plate 5f.

[0110] In addition, considering that when constructing ultra-deep vibro-impact piles, after the lower guide tubes of each telescopic unit are extended, the overall length of the telescopic guide tube 1 can reach 100 meters. In order to avoid the problem of guide tube deflection during vibro-impact drilling, which causes the verticality of the drilling to be uncontrollable, such as Figure 4 , 7 , 8 and 11, in some embodiments, a tilt sensor 5v and a correction device 8 are provided in the lowermost downcomer, and the tilt sensor 5v is used to detect whether the lowermost downcomer is tilted; the correction device 8 is used to correct the position of the lowermost downcomer when the tilt sensor 5v detects that the lowermost downcomer is tilted, so that the verticality of the vibrating hole made by the vibrator 13 meets the requirements. That is to say, during the construction process, the tilt sensor 5v is used to detect in real time whether the lowermost downcomer is tilted. When the lowermost downcomer is tilted, the correction device 8 is used to correct the deflection of the lowermost downcomer, so that it drives the telescopic conduit 1 to return to the normal position as a whole, thereby ensuring that the verticality of the hole meets the design requirements and avoiding the defect that the verticality of the hole cannot be controlled.

[0111] It should be noted that the present embodiment does not limit the specific model and detection principle of the tilt sensor 5v, as long as it can detect whether the lowermost downpipe is tilted.

[0112] In addition, the present embodiment does not limit the specific structure of the deviation correcting device 8, as long as it can correct the position of the lowermost downpipe.

[0113] like Figure 16-19 As shown, in some embodiments, a connecting plate 5f connected thereto is provided in the lowermost lower conduit, and the deviation correction device 8 includes a cylinder seat 8a, a piston rod 8b and a push rod 8c, the cylinder seat 8a is fixed between the lowermost lower conduit and the connecting plate 5f; the piston rod 8b is fixedly connected to the cylinder seat 8a, and the piston rod 8b extends into the cylinder seat 8a, and the piston rod 8b is provided with a control oil circuit 8d and an oil pipe 8e; the push rod 8c is slidably connected between the cylinder seat 8a and the piston rod 8b, and the piston rod 8b is provided with a piston that is movably sealed with the inner wall of the push rod 8c, and the piston divides the gap between the push rod 8c and the piston rod 8b into two and separates them, so that the push rod 8c can be extended or retracted along the radial direction of the lower conduit under the action of the control oil circuit 8d. During construction, when it is necessary to correct the position of the lowermost lower conduit, the control oil circuit 8d is switched to make the push rod 8c extend radially, so that the push rod 8c pushes the inner wall of the lower conduit, thereby driving the lower conduit to perform position fine adjustment, so as to achieve the purpose of adjusting the deflection of the lowermost lower conduit. When the adjustment is in place, the push rod 8c can be radially retracted by switching the control oil circuit 8d.

[0114] In addition, the above embodiment does not limit the specific arrangement of the correction device 8. In some embodiments, the number of the correction devices 8 is at least two, all the correction devices 8 are evenly distributed along the circumference of the downcomer, and all the correction devices 8 are coplanarly arranged or staggered along the axial direction of the downcomer. In other words, the present embodiment uses more than two correction devices 8 to work together to adjust the deflection of the lowermost downcomer, which is conducive to adjusting the inclination of the lowermost downcomer in different directions.

[0115] In some embodiments, Fig.17 As shown, when the number of the correcting devices 8 is three, the three correcting devices 8 are arranged in the same plane along the axial direction of the downcomer, that is, the three correcting devices 8 are located on the same horizontal plane. When the number of the correcting devices 8 is four, the four correcting devices 8 can be located on the same horizontal plane or on different horizontal planes, that is, the four correcting devices 8 are staggered along the axial direction of the downcomer (such as Fig.18 , 19 As shown), for example, four correcting devices 8 are symmetrically arranged in pairs, the symmetrically arranged correcting devices 8 are located in the same horizontal plane, and the asymmetrically arranged correcting devices 8 are located in different horizontal planes.

[0116] In addition, in order to facilitate the connection between the first traction rope 22 and the lowermost downpipe, as shown in FIG. Fig. 9 , 12 As shown in FIG. 13 , in some embodiments, the lowest lower conduit is provided with a threaded seat 5q, and one end of the first traction rope 22 is provided with a screw rod, and the first traction rope 22 is connected to the lowest lower conduit through the connection between the screw rod and the threaded seat 5q. The connection structure is simple and easy to implement. Fig. 9 As shown, in some embodiments, the threaded seat 5q is disposed on the sixth joint 5b of the fourth conduit 5.

[0117] Further, in order to facilitate the fixing of the cable 28, the water and gas pipe 30 and the power pipeline 31 of the vibratory drilling machine, as shown in FIG. Fig.10 and 14 As shown, in some embodiments, the lowest lower conduit is provided with a first connecting seat 5g and a second connecting seat 5i, the cable 28 is fixed to the first connecting seat 5g by a first fastening device 5h, and the water and gas pipe 30 and the power pipeline 31 are fixed to the second connecting seat 5i by second fastening devices 5j respectively; at the same time, the cable 28, the water and gas pipe 30 and the power pipeline 31 all pass through the lowest lower conduit and the transition seat 5n, so that the cable 28, the water and gas pipe 30 and the power pipeline 31 are respectively connected to the vibrator 13 and the correcting device 8, so as to ensure that the vibrator 13 and the correcting device 8 can work normally.

[0118] It is understandable that, since the stone material falls from the inside of the telescopic guide tube 1, in order to prevent the stone material from damaging the cable 28, the water and gas pipe 30 and the power pipeline 31, the cable 28, the water and gas pipe 30 and the power pipeline 31 are located outside the telescopic guide tube 1, in order to prevent the vibrator 13 from vibrating and punching holes to affect the cable 28, the water and gas pipe 30 and the power pipeline 31 near the bottom of the hole, such as Figure 2 As shown, in some embodiments, the lowest downconduit (eg, the fourth conduit 5 ) is provided with a first protective cover 5k for shielding the cable 28 , the water and gas pipe 30 , and the power pipeline 31 , so as to protect the cable 28 , the water and gas pipe 30 , and the power pipeline 31 .

[0119] In addition, considering that the cable 28, the water and gas pipe 30 and the power pipeline 31 all pass through the lowermost downcomer and the transition socket 5n, it is necessary to open a perforation in the lowermost downcomer to avoid the perforation being exposed to the outside. Figure 8 and 10 As shown, in some embodiments, the lowermost downcomer is provided with a second protective cover 5m for shielding the opening of the lowermost downcomer.

[0120] It should be noted that the above embodiments do not limit the specific structure of the upper retainer 11, as long as it can fix or loosen the upper and lower guide tubes of each telescopic unit. Figure 1 As shown, in some embodiments, the upper retainer 11 includes a guide sleeve 11a and two clamping mechanisms 11b respectively arranged at both ends of the guide sleeve 11a, the guide sleeve 11a is used to allow each upper conduit and lower conduit to pass through, and the clamping mechanism 11b can rotate relative to the guide sleeve 11a to clamp or loosen the upper conduit and lower conduit of each telescopic unit, thereby achieving clamping and limiting of each upper conduit and lower conduit separately or simultaneously.

[0121] In addition, the above-mentioned embodiments do not limit the specific structure of the lower retainer 12, as long as the lower retainer 12 can be matched with each upper conduit and each lower conduit to guide each upper conduit and each lower conduit.

[0122] Further, the above embodiments do not limit the specific connection methods of the upper retainer 11 and the lower retainer 12 to the pile frame 21, as long as the upper retainer 11 and the lower retainer 12 can be slidably arranged on the pile frame 21 in the vertical direction. In some embodiments, the pile frame 21 is provided with a column guide rail 24 arranged in the vertical direction, and the upper retainer 11 and the lower retainer 12 are slidably connected to the column guide rail 24 respectively.

[0123] In addition, in order to facilitate the movement of the vibratory drilling rig to the pile position, Figure 1 As shown, in some embodiments, the pile frame 21 is provided with a walking chassis 25. In order to ensure that the vibratory drilling machine can work normally, in some embodiments, the pile frame 21 is provided with a first reel 29, a second reel 32 and a third reel, the first reel 29 is used to roll up the cable 28, the second reel 32 is used to roll up the water and gas pipe 30, and the third reel is used to roll up the power pipeline 31. In order to facilitate the support of the first traction rope 22, the second traction rope 22a, the cable 28, the water and gas pipe 30 and the power pipeline 31, in some embodiments, the pile frame 21 is provided with a goose head frame 26.

[0124] In addition, it should be noted that the above embodiments do not limit the specific structure of the clamp. In some embodiments, the clamp includes a first clamp 41, a second clamp 42 and a third clamp 43. Fig.21 As shown, the first clamp 41 includes a first clamp arm armor 41a, a first clamp arm B 41b, a first pin 41c and a first fastening bolt 41d; the second clamp 42 includes a second clamp arm armor, a second clamp arm B, a second pin and a second fastening bolt; the third clamp 43 includes a third clamp arm armor, a third clamp arm B, a third pin and a third fastening bolt.

[0125] In addition to the above-mentioned vibro-drilling machine, the present invention also provides a vibro-drilling machine construction method applied to the vibro-drilling machine disclosed in the above-mentioned embodiment, and the vibro-drilling machine construction method comprises:

[0126] When the pile frame 21 reaches the pile position, all telescopic units are in a fully retracted state, and the upper retainer 11 fixes all telescopic units; the discharge opening and closing door 5p is in a closed state; the vibrator 13 is started, and the upper retainer 11, the lower retainer 12, the telescopic guide tube 1 and the vibrator 13 are driven to descend as a whole by using the first traction rope 22 and the second traction rope 22a, so that the vibrator 13 enters the formation to vibrate and make holes;

[0127] The upper retainer 11 loosens the lower conduit of the lowest telescopic unit, and uses the first traction rope 22 and the weight of the lower conduit of the lowest telescopic unit to extend the lower conduit downward, so that the vibrator 13 continues to vibrate downward to form a hole; when the lower conduit of the lowest telescopic unit is fully extended, the lower conduit and the upper conduit of the lowest telescopic unit are fixed by a clamp;

[0128] When there are at least two telescopic units, the upper retainer 11 releases the lower conduit of the penultimate telescopic unit from the top to the bottom, and uses the first traction rope 22 and relies on the gravity of the structural parts below the penultimate telescopic unit to make the lower conduit of the penultimate telescopic unit extend downward, so that the vibrator 13 continues to vibrate downward to form holes; when the lower conduit of the penultimate telescopic unit is fully extended, the lower conduit and the upper conduit of the penultimate telescopic unit are fixed by a clamp;

[0129] This cycle is repeated until the downpipes of all telescopic units are fully extended;

[0130] The upper retainer 11, the telescopic guide tube 1 and the vibrator 13 are pulled downward by the first traction rope 22 and the second traction rope 22a, so that the vibrator 13 vibrates downward to form a hole to the designed depth;

[0131] The first traction rope 22 and the second traction rope 22a are used to pull the telescopic guide tube 1 upward by a preset distance so that the discharge opening and closing door 5p can be opened;

[0132] Pour the stone into the silo 6, let the stone fall along the inside of the telescopic guide tube 1, and fall into the bottom of the hole through the discharge opening and closing door 5p; use the vibrator 13 to vibrate and compact the stone;

[0133] The telescopic guide tube 1 and the upper retainer 11 are lifted upward by the first traction rope 22 and the second traction rope 22a, and stones are continuously poured into the silo 6, so that the stones continuously pass through the discharge opening and closing door 5p and fall into the hole; the vibrator 13 is continuously vibrated to vibrate and compact the stones; when the uppermost hoop is lifted above the lower retainer 12, the lifting is stopped and the uppermost hoop is removed;

[0134] The upper retainer 11 is kept in place by the second traction rope 22a. At this time, the upper retainer 11 fixes the upper conduit of the uppermost telescopic unit; the first traction rope 22 is used to lift all the upper conduits and lower conduits except the upper conduit of the uppermost telescopic unit upward as a whole, and at the same time, stones are continuously poured into the silo 6 so that the stones continue to fall into the hole through the discharge opening and closing door 5p; the vibrator 13 is used to continuously vibrate and compact the stones; when the lower conduit of the uppermost telescopic unit is completely retracted, the lifting is stopped, and the second clamp from the top is removed;

[0135] The upper and lower conduits of the top telescopic unit are fixed by the upper retainer 11; all the upper and lower conduits except the upper and lower conduits of the top telescopic unit are lifted upward as a whole by the first traction rope 22, and stones are continuously poured into the silo 6 so that the stones continuously fall into the hole through the discharge opening and closing door 5p; the stones are vibrated and compacted by the vibrator 13; when the lower conduit of the second telescopic unit above is completely retracted, the lifting is stopped, and the third clamp from the top is removed;

[0136] This cycle is repeated until the lower guide tube of the lowest telescopic unit is fully retracted;

[0137] Use the upper retainer 11 to fix all the telescopic units; use the first traction rope 22 and the second traction rope 22a to lift the upper retainer 11 and the telescopic guide tube 1 upward as a whole, and at the same time continue to pour stones into the silo 6, so that the stones continue to fall into the hole through the discharge opening and closing door 5p; use the vibrator 13 to continuously vibrate and compact the stones; until the vibrator 13 is completely lifted to the ground, shut down the vibrator 13, and the gravel pile drilling and compacting operation is completed.

[0138] It can be seen from this that the construction method of the vibratory drilling rig can realize the working process of the vibratory drilling rig disclosed in the above embodiment. During the construction process, by continuously extending the lower guide tube of each telescopic unit, the telescopic guide tube 1 is extended to the maximum length to meet the design depth requirements of the gravel pile, which can be used for ultra-deep vibratory pile construction. In addition, when feeding, the stone is put into the silo 6, so that the stone falls along the inside of the telescopic guide tube 1, and the stone comes out from the discharge opening and closing door 5p of the lower guide tube at the bottom to reach the bottom of the hole. On the one hand, it can avoid the impact disturbance of the stone on the hole wall, avoid the defects such as broken piles and shrinkage, so as to ensure the quality of the pile body; the internal material discharge space of the telescopic guide tube 1 is large, which can make the feeding amount each time large, which is conducive to making the stone reach the bottom of the hole smoothly and in full, and improve the construction efficiency. Furthermore, during construction, the lower conduit passing through each telescopic unit is extended relative to its upper conduit, so that the vibrator 13 continuously vibrates downward to make holes. This configuration of small-diameter tubes on top and large-diameter tubes on the bottom makes the cross-sectional area of ​​the discharge port large and the discharge efficiency high. Moreover, during construction, the first to be extended is the lower conduit with the largest diameter. The combined weight of the lower conduit and the vibrator 13 is heavy, the penetration force is large, and the hole-making efficiency is high. Moreover, when the lower conduit of a single telescopic unit is fully extended relative to the upper conduit, the lower conduit and the upper conduit are fixed with a clamp, so that the upper conduit and the lower conduit of the telescopic unit are fixed together, so as to avoid the lower conduit of the telescopic unit from retracting during the continuous vibration and hole-making process, that is, the telescopic conduit 1 as a whole has a reverse insertion function, which is conducive to ensuring the compaction effect of the soil around the pile body and the quality of the gravel pile.

[0139] It can be seen that the vibratory drilling rig construction method can improve the pile body quality and feeding efficiency, and also solve the problem of insufficient penetration of vibratory drilling. At the same time, it can ensure the compaction effect of the soil around the pile body.

[0140] During the construction process, in order to facilitate timely correction of the verticality of the telescopic guide tube 1, in some embodiments, the vibratory drilling machine includes a tilt sensor 5v and a correction device 8; the vibratory drilling machine construction method also includes:

[0141] During the process of vibrating and punching holes downwardly by the vibrator 13, the tilt sensor 5v is used to detect whether the lowermost downpipe is tilted;

[0142] If so, the deviation correction device 8 is used to correct the position of the lowermost downpipe so that the verticality of the vibrating hole made by the vibrator 13 meets the requirements.

[0143] Below Figure 1 Taking the vibratory drilling rig shown in the figure as an example, the construction steps are introduced.

[0144] Please refer to Fig. 22 Step 1: Move the vibratory drilling rig to the pile position. At this time, the telescopic guide tube 1 is in a fully retracted state, the discharge opening and closing door 5p is in a closed state, the upper retainer 11 clamps the first guide tube 2, the second guide tube 3, the third guide tube 4 and the fourth guide tube 5, the vibrator 13 is started, and the first traction rope 22 and the second traction rope 22a are used to make the upper retainer 11, the lower retainer 12, the telescopic guide tube 1, the vibrator 13 and the silo 6 descend as a whole, so that the vibrator 13 enters the formation to vibrate and make holes.

[0145] Please refer to Fig.23 , step 2: the upper retainer 11 clamps the first conduit 2, the second conduit 3 and the third conduit 4, and releases the fourth conduit 5, so that the fourth conduit 5 is pulled downward relative to the third conduit 4 by the first traction rope 22 and relying on its own weight, and then the vibrator 13 vibrates downward to form a hole. When the fourth conduit 5 is fully extended, the first clamp 41 is installed at the junction of the fourth conduit 5 and the third conduit 4 for limiting.

[0146] Please refer to Fig.24 Step three: The upper retainer 11 clamps the first conduit 2 and the second conduit 3, and releases the third conduit 4, so that the third conduit 4 and the fourth conduit 5 are pulled by the first traction rope 22, so that the third conduit 4 extends downward relative to the second conduit 3, and then the fourth conduit 5 and the vibrator 13 vibrate downward to form a hole. When the third conduit 4 is fully extended, a second clamp 42 is installed at the junction of the third conduit 4 and the second conduit 3 for limiting.

[0147] Please refer to Fig.25Step 4: The upper retainer 11 clamps the first conduit 2 and releases the second conduit 3, so that the second conduit 3, the third conduit 4 and the fourth conduit 5 are pulled by the first traction rope 22, so that the second conduit 3 extends downward relative to the first conduit 2, and then the third conduit 4, the fourth conduit 5 and the vibrator 13 vibrate downward to form a hole. When the second conduit 3 is fully extended, a third clamp 43 is installed at the junction of the second conduit 3 and the first conduit 2 for limiting.

[0148] Please refer to Fig.26 Step five: The upper retainer 11 clamps the first conduit 2, and with the help of the first traction rope 22 and the second traction rope 22a, the first conduit 2, the second conduit 3, the third conduit 4, the fourth conduit 5 and the silo 6 are lowered together, and the vibrator 13 vibrates downward to make a hole to the designed depth; at this time, the hopper 33 filled with stone is in place.

[0149] Please refer to Fig. 27 Step six: With the help of the first traction rope 22 and the second traction rope 22a, the telescopic guide tube 1 is first slightly lifted upward as a whole (for example, lifted upward by about 1 meter), and then the stones in the hopper 33 are poured into the silo 6, so that the stones fall along the inside of the telescopic guide tube 1, and the discharge opening and closing door 5p is opened with the help of the gravity of the stones. After the stones come out of the discharge opening and closing door 5p, they fall to the bottom of the hole, and the vibrator 13 vibrates and compacts the stones.

[0150] Please refer to Fig.28 Step seven: With the help of the first traction rope 22 and the second traction rope 22a, the telescopic guide tube 1 and the upper retainer 11 are lifted upward as a whole, and at the same time, the hopper 33 is used to continuously pour the stone into the silo 6, and the stone continues to enter the hole through the discharge opening and closing door 5p. The vibrator 13 continues to vibrate to compact the stone. When the third clamp 43 is lifted to the top of the lower retainer 12 along with the telescopic guide tube 1, the lifting is stopped and the third clamp 43 is removed.

[0151] Please refer to Fig.29 , Step 8: The upper retainer 11 clamps the first conduit 2 in the original position and keeps it still. The second conduit 3, the third conduit 4 and the fourth conduit 5 are lifted upward together with the help of the first traction rope 22. At the same time, the hopper 33 is used to pour the stone into the silo 6. The stone continues to pass through the discharge opening and closing door 5p and enters the hole. The vibrator 13 continues to vibrate to compact the stone. When the second conduit 3 is completely retracted relative to the first conduit 2 and the second clamp 42 is also lifted to the top of the lower retainer 12, the lifting is stopped and the second clamp 42 is removed.

[0152] Please refer to Fig.30, Step nine: The upper retainer 11 clamps the first conduit 2 and the second conduit 3 in the original position and keeps them stationary. With the help of the first traction rope 22, the third conduit 4 and the fourth conduit 5 are lifted upward together. At the same time, the hopper 33 is used to pour the stone into the silo 6. The stone continues to enter the hole through the discharge opening and closing door 5p. The vibrator 13 continues to vibrate to compact the stone. When the third conduit 4 is completely retracted relative to the second conduit 3 and the first clamp 41 is also lifted to the top of the lower retainer 12, the lifting is stopped and the first clamp 41 is removed.

[0153] Please refer to Fig.31 , step ten: the upper retainer 11 clamps the first conduit 2, the second conduit 3 and the third conduit 4, and with the help of the first traction rope 22 and the second traction rope 22a, the fourth conduit 5 and the upper retainer 11 are lifted upward, and at the same time, the hopper 33 is continuously used to pour the stone into the silo 6, and the stone continues to enter the hole through the discharge opening and closing door 5p, and the vibrator 13 continues to vibrate and compact the stone; when the fourth conduit 5 is completely retracted relative to the third conduit 4, the upper retainer 11 also clamps the fourth conduit 5, and with the help of the first traction rope 22 and the second traction rope 22a, the telescopic conduit 1, the upper retainer 11 and the lower retainer 12 are continuously lifted upward together, and at the same time, the hopper 33 is continuously used to pour the stone into the silo 6, and the stone continues to enter the hole through the discharge opening and closing door 5p, and the vibrator 13 continues to vibrate and compact the stone until the vibrator 13 is completely lifted to the ground, and the vibrator 13 is shut down, and the stone pile hole making and compacting operation is completed.

[0154] During the above steps 1 to 5, when the tilt sensor 5v detects that the telescopic catheter 1 is deflected, the correction device 8 is started to correct the deflection of the telescopic catheter 1 to ensure that the verticality of the hole is within the design allowable range.

[0155] It should also be noted that, in this specification, relational terms such as first and second, etc. are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations.

[0156] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0157] The vibratory drilling machine and the construction method thereof provided by the present invention are introduced in detail above. Specific examples are used herein to illustrate the principle and implementation mode of the present invention. The description of the above embodiments is only used to help understand the method and the core idea of ​​the present invention. It should be pointed out that for ordinary technicians in this technical field, the present invention can also be improved and modified without departing from the principle of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A vibratory drilling machine, characterized in that: include: The pile frame (21) is provided with a first hoist (271) and a second hoist (272), wherein the first hoist (271) has a first traction rope (22), and the second hoist (272) has a second traction rope (22a); A telescopic conduit (1) comprises at least one telescopic unit, each of the telescopic units comprises an upper conduit and a lower conduit arranged in a vertical direction, the upper conduit is located above the lower conduit, and the upper conduit is slidably sleeved inside the lower conduit; when there are at least two telescopic units, all the telescopic units are connected in series in a vertical direction; of two adjacent telescopic units, the lower conduit of the telescopic unit located above is the upper conduit of the telescopic unit located below; the top of the uppermost upper conduit is connected to a silo (6); the lowermost lower conduit is connected to the first traction rope (22) and is provided with an openable and closable discharge opening and closing door (5p); the silo (6) is used for pouring stones, the upper conduit and the lower conduit are used for allowing stones to pass through the inside thereof, and the discharge opening and closing door (5p) is used for allowing stones to enter a hole after coming out; An upper retainer (11) is slidably disposed on the pile frame (21) in a vertical direction and is connected to the second traction rope (22a) to fix or release each of the upper guide tube and the lower guide tube; A lower retainer (12) is slidably disposed on the pile frame (21) in a vertical direction and is used to guide each of the upper conduits and the lower conduits, and a flexible connector is connected between the lower retainer (12) and the upper retainer (11); A vibrator (13) connected to the lower conduit at the bottom; A clamp is used to fix the lower conduit and the upper conduit when the lower conduit of one of the telescopic units is fully extended relative to the upper conduit.

2. The vibratory drilling machine according to claim 1, characterized in that: The lowermost downpipe is provided with: A tilt sensor (5v), used to detect whether the lowermost downpipe is tilted; The deviation correction device (8) is used to correct the position of the lowermost downpipe when the inclination sensor (5v) detects that the lowermost downpipe is tilted, so that the verticality of the vibrating hole made by the vibrator (13) meets the requirements.

3. The vibratory drilling machine according to claim 2, characterized in that: A connecting plate (5f) connected to the lower conduit is provided in the lowermost conduit, and the deviation correcting device (8) comprises: A cylinder seat (8a) is fixed between the lower conduit at the bottom and the connecting plate (5f); A piston rod (8b) is fixedly connected to the cylinder seat (8a) and extends into the cylinder seat (8a), and is provided with a control oil circuit (8d) and an oil pipe (8e); A push rod (8c) is slidably connected between the cylinder seat (8a) and the piston rod (8b), and the piston rod (8b) is provided with a piston that is movably sealed with the inner wall of the push rod (8c). The piston divides the gap between the push rod (8c) and the piston rod (8b) into two and separates them, so that under the action of the control oil circuit (8d), the push rod (8c) can be extended or retracted along the radial direction of the lower guide tube.

4. The vibratory drilling machine according to claim 3, characterized in that: The number of the deviation-correcting devices (8) is at least two, all the deviation-correcting devices (8) are evenly distributed along the circumference of the downcomer, and all the deviation-correcting devices (8) are coplanarly arranged or staggered along the axial direction of the downcomer.

5. The vibratory drilling machine according to claim 1, characterized in that: A connecting plate (5f) connected to the lower duct is provided in the lower duct, and a transition socket (5n) is connected to the bottom of the connecting plate (5f). The transition socket (5n) extends out of the bottom of the lower duct, and the vibrator (13) is fixed to the transition socket (5n). The axis of the vibrator (13) coincides with the axis of the lower duct.

6. The vibratory drilling machine according to any one of claims 1 to 5, characterized in that: At least one of the upper conduit and the lower conduit is provided with a joint, a seal and a pressure cover, the joint is connected to the upper conduit or the lower conduit, the pressure cover is connected to the joint, and the seal is provided between the pressure cover and the joint for sealing the upper conduit and the lower conduit.

7. The vibratory drilling machine according to any one of claims 1 to 5, characterized in that: One of the upper conduit and the lower conduit is provided with a key bar, and the other is provided with a key groove which is slidably matched with the key bar.

8. The vibratory drilling machine according to any one of claims 1 to 5, characterized in that: The upper conduit is provided with an upper limit ring for limiting the ultimate position of the retraction of the lower conduit.

9. A vibratory drilling machine construction method, characterized in that: Applied to the vibratory drilling machine according to any one of claims 1 to 8, the vibratory drilling machine construction method comprises: When the pile frame reaches the pile position, all the telescopic units are in a fully retracted state, and the upper retainer fixes all the telescopic units; the discharge opening and closing door is in a closed state; the vibrator is started, and the upper retainer, the lower retainer, the telescopic guide tube and the vibrator are driven to descend as a whole by using the first traction rope and the second traction rope, so that the vibrator enters the formation to vibrate and make holes; The upper retainer loosens the lower conduit of the lowest telescopic unit, and uses the first traction rope and relies on the deadweight of the lower conduit of the lowest telescopic unit to extend the lower conduit of the lowest telescopic unit downward, so that the vibrator continues to vibrate downward to form a hole; when the lower conduit of the lowest telescopic unit is fully extended, the lower conduit and the upper conduit of the lowest telescopic unit are fixed by the clamp; When there are at least two telescopic units, the upper retainer releases the lower conduit of the penultimate telescopic unit from top to bottom, and uses the first traction rope and relies on the gravity of the structural parts below the penultimate telescopic unit to make the lower conduit of the penultimate telescopic unit extend downward, so that the vibrator continues to vibrate downward to form holes; when the lower conduit of the penultimate telescopic unit is fully extended, the lower conduit and the upper conduit of the penultimate telescopic unit are fixed by the clamp; This cycle is repeated until the lower guide tubes of all the telescopic units are fully extended; The upper retainer, the telescopic guide tube and the vibrator are pulled by the first traction rope and the second traction rope to lower the upper retainer, the telescopic guide tube and the vibrator as a whole, so that the vibrator vibrates downward to form a hole to a designed depth; The first traction rope and the second traction rope are used to pull the telescopic guide tube upward by a preset distance as a whole, so that the discharge opening and closing door can be opened; Pour stones into the silo, make the stones fall along the inside of the telescopic guide tube, and fall into the bottom of the hole from the discharge opening and closing door; use the vibrator to vibrate and compact the stones; The telescopic guide tube and the upper retainer are lifted upward by using the first traction rope and the second traction rope, and stones are continuously poured into the silo, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the uppermost clamp is lifted to above the lower retainer, the lifting is stopped and the uppermost clamp is removed; The upper retainer is kept in place by using the second traction rope, at which time, the upper retainer fixes the upper conduit of the telescopic unit at the top; all the upper conduits and the lower conduits except the upper conduit of the telescopic unit at the top are lifted upward as a whole by using the first traction rope, and stones are continuously poured into the silo at the same time, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the lower conduit of the telescopic unit at the top is completely retracted, the lifting is stopped, and the second clamp from the top is removed; The upper pipe and the lower pipe of the telescopic unit at the top are fixed by the upper retainer; all the upper pipes and the lower pipes except the upper pipe and the lower pipe of the telescopic unit at the top are lifted upward as a whole by the first traction rope, and stones are continuously poured into the silo at the same time, so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; when the lower pipe of the second telescopic unit located above is completely retracted, the lifting is stopped, and the third clamp from the top is removed; This cycle is repeated until the lower guide tube of the telescopic unit at the bottom is completely retracted; The upper retainer is used to fix all the telescopic units; the upper retainer and the telescopic guide tube are lifted upward as a whole by the first traction rope and the second traction rope, and stones are continuously poured into the silo so that the stones continuously fall into the hole through the discharge opening and closing door; the vibrator is continuously vibrated to vibrate and compact the stones; until the vibrator is completely lifted to the ground, the vibrator is shut down, and the gravel pile drilling and compaction pile forming operation is completed.

10. The vibratory drilling machine construction method according to claim 9, characterized in that: The vibratory drilling machine includes a tilt sensor and a deviation correction device; the vibratory drilling machine construction method also includes: During the process of the vibrator vibrating downward to form a hole, the tilt sensor is used to detect whether the lower guide tube of the telescopic unit at the bottom is tilted; If so, the deviation-correcting device is used to correct the position of the lower guide tube of the lowest telescopic unit, so that the verticality of the vibratory hole-making by the vibrator meets the requirement.

Citation Information

Cited By

  • Equipment for constructing vibro-replacement stone column by adopting sealed telescopic guide pipe under height limiting condition

    CN121183734A

  • Equipment for constructing vibro-compacted stone piles using sealed expansion joints under height restrictions

    CN121183734B