Pole-mounted circuit breaker state early warning method, device and equipment and storage medium
By analyzing the current, vibration and switch operation data of the circuit breaker on the column, combined with arc and vibration characteristics, an automatic state warning of the circuit breaker on the column is achieved, solving the problem of traditional inefficiency and reducing faults and economic losses.
Patent Information
- Application Number
- CN202411202613.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-29
AI Technical Summary
The maintenance of traditional column circuit breakers relies on manual inspection, which is inefficient and difficult to accurately judge internal wear or potential faults, and cannot achieve early warning of faults, which may lead to large-scale power outages.
By obtaining the current data, vibration data and switch operation data of the circuit breaker on the column, the status warning model is used for analysis, the arc duration and spoiler data are determined, and vector processing is performed in combination with the arc and vibration characteristic data to realize aging evaluation and status warning prompts.
It realizes automatic status warning for the circuit breaker on the column, improves the accuracy of fault prediction, and reduces circuit failures and economic losses.
Smart Images

Figure CN118962427A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of big data technology, and in particular to a method, device, equipment and storage medium for early warning of a status of a pole-mounted circuit breaker. Background Art
[0002] In modern power systems, pole-mounted circuit breakers are key components that protect electrical equipment from short circuits and overloads. Their operating status directly affects the safety, stability and reliability of power supply of the power grid. Traditionally, the maintenance and overhaul of pole-mounted circuit breakers mainly rely on regular manual inspections, and this model faces many challenges. First, manual inspections are not only time-consuming and labor-intensive, but also inefficient, and it is difficult to cover widely distributed power facilities, especially in remote or harsh areas. Secondly, it is often difficult to accurately judge the degree of internal wear or potential faults of pole-mounted circuit breakers based solely on visual observation and conventional instrument detection, resulting in many hidden dangers that cannot be discovered in time. More importantly, this post-maintenance method cannot achieve early warning of faults. Once a pole-mounted circuit breaker suddenly fails, it may cause a large-scale power outage and cause economic losses. Summary of the invention
[0003] The present application provides a state warning method, device, equipment and storage medium for a pole-mounted circuit breaker, which are used to analyze data of the pole-mounted circuit breaker and to warn of abnormal states of the pole-mounted circuit breaker in advance.
[0004] In a first aspect, an embodiment of the present application provides a state warning method for a pole-mounted circuit breaker, the method comprising: Obtain current data, vibration data and switch operation data of pole-mounted circuit breakers; Correcting a preset status warning model according to the switch operation data to obtain a corrected status warning model; Inputting the current data into a preset current repair model to obtain current standard data, and determining the current disconnection time according to the current data; Determining arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; Determining arc characteristic data according to the arc duration and the arc disturbance current data, performing vector processing on the arc characteristic data to obtain an arc characteristic vector, and performing vectorization processing on the vibration data to obtain a vibration characteristic vector; The arc characteristic vector and the vibration characteristic vector are input into the corrected state warning model for fusion analysis to obtain an aging assessment value of the pole-mounted circuit breaker, and a state warning prompt is output according to the aging assessment value.
[0005] In a second aspect, an embodiment of the present application provides a state warning device for a pole-mounted circuit breaker, the device comprising: A data acquisition module, used to acquire current data, vibration data and switch operation data of the pole-mounted circuit breaker; A model correction module, used to correct the preset status warning model according to the switch operation data to obtain a corrected status warning model; A data repair module, used for inputting the current data into a preset current repair model to obtain current standard data, and determining the current disconnection moment according to the current data; A data extraction module, used to determine the arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; a vector conversion module, configured to determine arc characteristic data according to the arc duration and the arc disturbance current data, perform vector processing on the arc characteristic data to obtain an arc characteristic vector, and perform vectorization processing on the vibration data to obtain a vibration characteristic vector; The result output module is used to input the arc characteristic vector and the vibration characteristic vector into the corrected state warning model for fusion analysis to obtain the aging evaluation value of the pole-mounted circuit breaker, and output a state warning prompt according to the aging evaluation value.
[0006] In a third aspect, an embodiment of the present application provides an electronic device, the electronic device comprising a memory and a processor; The memory is used to store computer programs; The processor is used to execute the computer program and implement the state warning method of the pole-mounted circuit breaker as described in any one of the embodiments of the present application when executing the computer program.
[0007] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor implements a status warning method for a pole-mounted circuit breaker as described in any one of the embodiments of the present application.
[0008] An embodiment of the present application provides a state warning method for a pole-mounted circuit breaker, the method comprising: acquiring current data, vibration data and switch operation data of the pole-mounted circuit breaker; correcting a preset state warning model according to the switch operation data to obtain a corrected state warning model; inputting the current data into a preset current repair model to obtain current standard data, and determining a current disconnection moment according to the current data; determining an arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; determining arc feature data according to the arc duration and the arc disturbance current data, performing vector processing on the arc feature data to obtain an arc feature vector, and performing vectorized processing on the vibration data to obtain a vibration feature vector; inputting the arc feature vector and the vibration feature vector into the corrected state warning model for fusion analysis to obtain an aging evaluation value of the pole-mounted circuit breaker, and outputting a state warning prompt according to the aging evaluation value. Through the above method, the status warning model is corrected through the switch motion data, the prediction accuracy of the status warning model is improved, the current disconnection moment is determined through the current data, and the current standard data is obtained by repairing the current data. According to the current standard data, the current data and the current disconnection moment, the current duration can be accurately analyzed to obtain the arc disturbance current data. According to the current duration and the arc disturbance current data, the arc characteristic data for evaluating the arc damage can be obtained. Combined with the vibration data, the corrected status warning model can more accurately evaluate the aging evaluation value of the pole-mounted circuit breaker, realize the automatic status warning of the pole-mounted circuit breaker, help to judge the possible faults of the pole-mounted circuit breaker in advance, so as to prompt manual intervention, reduce circuit failures, and thus reduce economic losses. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0010] Figure 1 A schematic flow chart of a state warning method for a pole-mounted circuit breaker provided in an embodiment of the present application; Figure 2 A schematic diagram of a current waveform provided in an embodiment of the present application; Figure 3 A schematic block diagram of a status warning device for a pole-mounted circuit breaker provided in an embodiment of the present application. DETAILED DESCRIPTION
[0011] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0012] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.
[0013] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0014] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0015] See also Figure 1 , Figure 1 The embodiment of the present application also provides a schematic flow chart of a method for early warning of a status of a pole-mounted circuit breaker. Figure 1 As shown, the specific steps of the state early warning method of the pole-mounted circuit breaker include: S101-S106.
[0016] S101. Acquire current data, vibration data, and switch operation data of a pole-mounted circuit breaker.
[0017] Exemplarily, the current data of the pole-mounted circuit breaker can be collected through a current transformer or a smart meter. For example, the current transformer is installed on the power supply side or load side of the pole-mounted circuit breaker to monitor the current intensity and waveform passing through the circuit breaker in real time. The current transformer converts the large current into a small current (usually 5A or 1A) in proportion, which is convenient for safe measurement and remote transmission to the data acquisition system. The vibration data of the pole-mounted circuit breaker can be collected through an accelerometer. The accelerometer is directly installed on the circuit breaker housing or key components, and can sense and record the vibration data of the equipment during operation. The vibration data includes vibration frequency and amplitude. These vibration data are crucial for detecting mechanical wear, imbalance or looseness. The switch operation data of the pole-mounted circuit breaker is collected through the control unit of the pole-mounted circuit breaker. The current in the power grid is fluctuating. In the process of collecting the original current data, the obvious noise points are removed, the missing values are filled, and the standardization is performed by low-pass filtering, Kalman filtering, wavelet denoising, etc.
[0018] S102: Correcting a preset status warning model according to switch operation data to obtain a corrected status warning model.
[0019] Exemplarily, the switch operation data includes: the number of switch operations, the switch time, the switch speed, the switch operation record, etc., and in order to simplify the correction process, in the present application, the preset state warning model is corrected by the number of switch operations in the switch operation data. In the process of correction, the activation function of the state warning model is mainly corrected. By correcting the activation function of the state warning model, the output result of the state warning model is affected, and the warning accuracy of the state warning model for each pole circuit breaker is improved. In this process, it is necessary to analyze the correspondence between different switch operation times and the expected remaining life or failure probability of the pole circuit breaker. For example, as the number of switch operations increases, the expected life of the pole circuit breaker may gradually decrease, and after reaching a certain number of times, the failure probability increases significantly. Therefore, the greater the number of switch operations of the pole circuit breaker, the smaller the coefficient used to calculate the remaining life in the activation function of the state warning model.
[0020] Correcting the status warning model through switch operation data is helpful to improve the accuracy of the status warning model in evaluating each pole-mounted circuit breaker.
[0021] S103, inputting the current data into a preset current repair model to obtain current standard data, and determining the current disconnection time according to the current data.
[0022] For example, in conventional methods, the time when the arc occurs is confirmed by devices such as temperature sensors and sound sensors, but the accuracy of such measurements is low, and when the arc duration needs to be accurately analyzed, the resulting error is very large. Since the arc phenomenon is short-lived, the arc current generated by it usually introduces some abnormal high-frequency components into the current data, and these abnormal high-frequency components cause distortion points in the original current data. By comparing the generated simulated arc standard data with the current data, the time when the arc occurs can be accurately determined, thereby improving the accuracy of calculating the arc duration.
[0023] S104: Determine arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection time, current data and current standard data.
[0024] Exemplarily, the moment when the AC current amplitude in the current data passes through zero is not the current disconnection moment. The current disconnection moment is: the beginning moment when the current amplitude in the current data continues to be at zero. After the switch of the pole-mounted circuit breaker is turned on, the arc will still cause arc current in the circuit. Only after the amplitude of the arc current returns to zero will the current in the circuit disappear. The current amplitude of the current data will continue to be at zero until the next closing of the pole-mounted circuit breaker. An arc occurrence moment is determined based on the current disconnection moment. When determining the arc occurrence moment, the current data needs to be compared with the standard current data to determine the current distortion moment, that is, the arc occurrence moment. The duration between the arc occurrence moment and the current disconnection moment is the arc duration, that is, the duration of the arc existence. The current data between the arc occurrence moment and the current disconnection moment is the arc disturbance current data.
[0025] S105, determining arc characteristic data according to arc duration and arc disturbance current data, performing vector processing on the arc characteristic data to obtain an arc characteristic vector, and performing vectorization processing on the vibration data to obtain a vibration characteristic vector.
[0026] Exemplarily, in order to reduce the amount of data analysis of the model, the data before and after the arc occurs are usually used for analysis, wherein the arc duration data and arc disturbance current data have been extracted based on the arc occurrence time. The generation of the arc often causes abnormal vibration of the pole-mounted circuit breaker along with the release of energy, while vibration data is usually not generated during normal power-on. Therefore, when analyzing the vibration data, the data is also intercepted with reference to the arc occurrence time and the current disconnection time, and then vectorized. Data vectorization is the process of converting raw data into a numerical form that can be understood and processed by machine learning and data mining algorithms. For numerical data, it is generally necessary to perform normalization processing to reduce the differences between the data, and then combine them into a feature matrix or vector. For example, the arc feature data is a multidimensional feature matrix determined based on the arc duration and arc disturbance current data.
[0027] S106, inputting the arc characteristic vector and the vibration characteristic vector into the corrected state warning model for fusion analysis, obtaining an aging assessment value of the pole-mounted circuit breaker, and outputting a state warning prompt according to the aging assessment value.
[0028] Exemplarily, in the corrected state warning model, the arc feature vector and the vibration feature vector are merged at the feature level to form a composite feature vector containing information of both. This step may include simple splicing or creating a more efficient and representative feature combination through feature engineering means (such as feature interaction, principal component analysis, etc.). The corrected state warning model processes and analyzes the composite feature vector to generate one or a series of prediction outputs, including an aging assessment value. The aging assessment value reflects the current health status and potential aging degree of the circuit breaker. The higher the value, the closer the circuit breaker state is to or has reached the stage where maintenance or replacement is required. According to the comparison between the calculated aging assessment value and the preset threshold, the corresponding state warning prompt is generated. For example, if the assessment value exceeds the mild aging threshold but is lower than the moderate aging threshold, the system may issue a maintenance suggestion; if it exceeds the severe aging threshold, an emergency maintenance or replacement warning is immediately triggered. Through the above steps, combined with the comprehensive analysis of arc and vibration characteristics, the aging degree of the pole-mounted circuit breaker can be effectively evaluated, accurate state warning can be achieved, and strong support can be provided for the safe and stable operation of the power system.
[0029] An embodiment of the present application provides a state warning method for a pole-mounted circuit breaker, the method comprising: acquiring current data, vibration data and switch operation data of the pole-mounted circuit breaker; correcting a preset state warning model according to the switch operation data to obtain a corrected state warning model; inputting the current data into a preset current repair model to obtain current standard data, and determining a current disconnection moment according to the current data; determining an arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; determining arc feature data according to the arc duration and the arc disturbance current data, performing vector processing on the arc feature data to obtain an arc feature vector, and performing vectorized processing on the vibration data to obtain a vibration feature vector; inputting the arc feature vector and the vibration feature vector into the corrected state warning model for fusion analysis to obtain an aging evaluation value of the pole-mounted circuit breaker, and outputting a state warning prompt according to the aging evaluation value. Through the above method, the status warning model is corrected through the switch motion data, the prediction accuracy of the status warning model is improved, the current disconnection moment is determined through the current data, and the current standard data is obtained by repairing the current data. According to the current standard data, the current data and the current disconnection moment, the current duration can be accurately analyzed to obtain the arc disturbance current data. According to the current duration and the arc disturbance current data, the arc characteristic data for evaluating the arc damage can be obtained. Combined with the vibration data, the corrected status warning model can more accurately evaluate the aging evaluation value of the pole-mounted circuit breaker, realize the automatic status warning of the pole-mounted circuit breaker, help to judge the possible faults of the pole-mounted circuit breaker in advance, so as to prompt manual intervention, reduce circuit failures, and thus reduce economic losses.
[0030] In order to more clearly introduce the technical solution of the present application, the technical solution of the present application will be introduced through specific embodiments below. It should be noted that the specific embodiments are used to expand the technical solution of the present application, but are not intended to limit the present application.
[0031] In some embodiments, the arc duration and arc disturbance current data of the pole-mounted circuit breaker are determined according to the current disconnection moment, current data and current standard data, including: determining the current distortion interval according to the current disconnection moment and the preset interval duration; in the current distortion interval, comparing the current data and the current standard data, and setting the moment when the current data deviates from the current standard data as the arc occurrence moment; determining the arc duration according to the current disconnection moment and the arc occurrence moment; and using the current data corresponding to the current distortion interval as the arc disturbance current data.
[0032] For example, see Figure 2 , Figure 2 A schematic diagram of a current waveform provided by an embodiment of the present application is shown. Figure 2As shown in the figure, in the current data, the starting moment when the current amplitude is continuously at zero is the current disconnection moment (t2). The intersection of the waveform of the current data and the waveform of the current standard data is the arc occurrence moment (t1). The above schematic diagram is used to display and explain the data. In actual applications, the control unit can directly compare the values to determine the current disconnection moment and the arc occurrence moment. The current value corresponding to the current disconnection moment is the initial current value of the arc.
[0033] In some embodiments, arc characteristic data is determined based on arc duration and arc disturbance current data, including: determining the arc initial current value from the arc disturbance current data based on the arc occurrence moment; and obtaining the arc characteristic data by calculation based on a preset characteristic calculation formula, arc duration and arc initial current value.
[0034] Exemplarily, in the embodiment of the present application, the arc characteristic data includes arc energy, and the arc energy is used to evaluate the arc suppression effect of the pole-mounted circuit breaker, thereby evaluating the state of the pole-mounted circuit breaker. The arc energy is calculated by a preset characteristic calculation formula, arc duration, and arc initial current value, wherein the characteristic calculation formula is specifically: ; Where E is the arc energy, C is the constant coefficient, C is determined by the type of the pole-mounted circuit breaker, β is the arc extinguishing medium coefficient of the circuit breaker, β is determined by the type of arc extinguishing medium of the pole-mounted circuit breaker, t is the arc duration, is the initial arc current value.
[0035] In some embodiments, current data is input into a preset current repair model to obtain current standard data, including: obtaining regional maximum and regional minimum values corresponding to the current data; dividing the current data into multiple current analysis data according to adjacent regional maximum and regional minimum values; performing data decomposition on the current analysis data to obtain current amplitude data and current frequency data; calculating a first amplitude mean and an amplitude standard deviation of the current amplitude data; determining an amplitude distortion point from the current amplitude data according to the first amplitude mean and the amplitude standard deviation; obtaining current amplitude reference data on both sides of the amplitude distortion point with the amplitude distortion point as the center; calculating a second amplitude mean of the current amplitude reference data, and using the second amplitude mean as the repair amplitude; repairing the amplitude distortion point according to the current frequency data and the repair amplitude to obtain current standard data.
[0036] By identifying the regional maxima and minima in the current data and using them as boundaries, the original current data is divided into multiple segments of more manageable "current analysis data". This method can effectively distinguish different modes or cycles of current changes, facilitating subsequent detailed analysis. By calculating the first amplitude mean of the current amplitude data and amplitude standard deviation , the concentration trend and fluctuation degree of the current signal can be quantified. For example, if the current amplitude at a certain time point or time period exceeds ±3 , then the time point or time period can be considered as an amplitude distortion point. When processing the amplitude distortion point, the amplitude distortion point is reconstructed through the current amplitude reference data on both sides of the amplitude distortion point, the average amplitude of the current amplitude reference data is used as the amplitude reconstruction of the amplitude distortion point, the original current frequency of the amplitude distortion point is used as the reconstruction frequency, or the average frequency of the current amplitude reference data is used as the reconstruction frequency, so as to obtain the current standard data.
[0037] In some embodiments, the status warning model includes a first activation function, and the preset status warning model is corrected according to the switch operation data to obtain the corrected status warning model, including: matching the switch operation data in a preset switch life assessment table to obtain a switch life assessment value, the switch life assessment table including: the number of switch operations and its corresponding switch life assessment value; correcting the first activation function according to the switch life assessment value to obtain a second activation function; and using the status warning model corresponding to the second activation function as the corrected status warning model.
[0038] Exemplarily, the life of a switch is closely related to its operation times. By collecting and analyzing historical data, the relationship between the number of switch operations and the life of the pole-mounted circuit breaker is obtained, and the number of switch operations includes the number of openings and closings. Then, based on industry standards or equipment-specific degradation models, these operation times are converted into life assessment values for the switch. This may involve considering the effects of factors such as material fatigue and arc wear in order to more accurately reflect the current health status of the switch. The status warning model usually uses an activation function to map the monitoring data of the switch to a predefined warning interval. It should be noted that the activation function in this application is a Sigmoid function.
[0039] By introducing the life evaluation value of the switch, the "first activation function" in the status warning model is dynamically adjusted, that is, "corrected", so that the status warning model is more suitable for the specific pole-mounted circuit breaker, so that the warning model can better reflect the performance degradation of the switch due to long-term use, thereby improving the accuracy of the results of the status warning model. This correction can improve the timeliness and accuracy of the warning and avoid issuing maintenance alarms too early or too late.
[0040] In some embodiments, the state warning model includes a state warning network and a decision network, the state warning network includes a first long short-term memory network, a second long short-term memory network and a threshold recurrent network, the decision network includes a fully connected layer and a second activation function, and the arc feature vector and the vibration feature vector are input into the corrected state warning model for fusion analysis to obtain an aging assessment value of the pole-mounted circuit breaker, including: extracting hidden state features of the arc feature vector through the first long short-term memory network in the state warning network to obtain a first hidden state feature vector; extracting hidden state features of the switch feature vector through the second long short-term memory network in each state warning network to obtain a second hidden state feature vector; inputting the first hidden state feature vector and the second hidden state feature vector into the threshold recurrent network for feature integration to generate an aging feature vector; inputting the aging feature vector into the decision network, and performing fault cause analysis on the aging feature vector through the fully connected layer and the Sigmoid function in the decision network to obtain the fault cause and the credibility of the fault cause.
[0041] In some embodiments, the status warning prompt includes: a maintenance prompt and a replacement prompt, and the status warning prompt is output according to the aging assessment value, including: if the aging assessment value is greater than a preset first aging threshold, a maintenance prompt is output; if the aging assessment value is greater than a preset second aging threshold, a replacement prompt is output, and the second aging threshold is greater than the first aging threshold.
[0042] See also Figure 3 , Figure 3 The embodiment of the present application also provides a schematic block diagram of a state warning device for a pole-mounted circuit breaker, wherein the state warning device 300 for a pole-mounted circuit breaker is used to execute the state warning method for a pole-mounted circuit breaker described above. The state warning device 300 for a pole-mounted circuit breaker can be configured in a server.
[0043] Among them, the server can be an independent server or a server cluster, or it can be a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (Content Delivery Network, CDN) and big data and artificial intelligence platforms.
[0044] like Figure 3 As shown, the state warning device 300 for a pole-mounted circuit breaker includes: a data acquisition module 301 , a model correction module 302 , a data repair module 303 , a data extraction module 304 , a vector conversion module 305 and a result output module 306 .
[0045] The data acquisition module 301 is used to acquire current data, vibration data and switch operation data of the pole-mounted circuit breaker.
[0046] The model correction module 302 is used to correct the preset status warning model according to the switch operation data to obtain a corrected status warning model.
[0047] In some embodiments, the model correction module 302 is used to implement a status warning model including a first activation function, and the preset status warning model is corrected according to the switch operation data to obtain the corrected status warning model. Specifically, it is used to implement: matching the switch operation data in a preset switch life assessment table to obtain a switch life assessment value, the switch life assessment table including: the number of switch operations and the corresponding switch life assessment value; correcting the first activation function according to the switch life assessment value to obtain a second activation function; and using the status warning model corresponding to the second activation function as the corrected status warning model.
[0048] The data repair module 303 is used to input the current data into a preset current repair model to obtain current standard data, and determine the current disconnection time according to the current data.
[0049] In some embodiments, when the data repair module 303 is used to input current data into a preset current repair model to obtain current standard data, it is specifically used to implement: obtaining regional maximum and regional minimum values corresponding to the current data; dividing the current data into multiple current analysis data according to adjacent regional maximum and regional minimum values; performing data decomposition on the current analysis data to obtain current amplitude data and current frequency data; calculating a first amplitude mean and an amplitude standard deviation of the current amplitude data; determining an amplitude distortion point from the current amplitude data according to the first amplitude mean and the amplitude standard deviation; taking the amplitude distortion point as the center, obtaining current amplitude reference data on both sides of the amplitude distortion point to calculate a second amplitude mean of the current amplitude reference data, and using the second amplitude mean as the repair amplitude; repairing the amplitude distortion point according to the current frequency data and the repair amplitude to obtain current standard data.
[0050] The data extraction module 304 is used to determine the arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection time, current data and current standard data.
[0051] In some embodiments, when the data extraction module 304 is used to determine the arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, current data and current standard data, it is specifically used to implement: determining the current distortion interval according to the current disconnection moment and the preset interval duration; in the current distortion interval, comparing the current data with the current standard data, and setting the moment when the current data deviates from the current standard data as the arc occurrence moment; determining the arc duration according to the current disconnection moment and the arc occurrence moment; and using the current data corresponding to the current distortion interval as the arc disturbance current data.
[0052] The vector conversion module 305 is used to determine arc characteristic data according to arc duration and arc disturbance current data, perform vector processing on the arc characteristic data to obtain an arc characteristic vector, and perform vector processing on the vibration data to obtain a vibration characteristic vector.
[0053] In some embodiments, when the vector conversion module 305 is used to determine the arc characteristic data based on the arc duration and the arc disturbance current data, it is specifically used to implement: determining the arc initial current value from the arc disturbance current data based on the arc occurrence time; and obtaining the arc characteristic data by calculating according to a preset characteristic calculation formula, the arc duration and the arc initial current value.
[0054] The result output module 306 is used to input the arc feature vector and the vibration feature vector into the corrected state warning model for fusion analysis to obtain the aging evaluation value of the pole-mounted circuit breaker, and output the state warning prompt according to the aging evaluation value.
[0055] In some embodiments, the state warning model includes a state warning network and a decision network, the state warning network includes a first long short-term memory network, a second long short-term memory network and a threshold recurrent network, the decision network includes a fully connected layer and a second activation function, and the result output module 306 is used to input the arc feature vector and the vibration feature vector into the corrected state warning model for fusion analysis to obtain the aging assessment value of the pole-mounted circuit breaker, and is specifically used to implement: extracting hidden state features of the arc feature vector through the first long short-term memory network in the state warning network to obtain a first hidden state feature vector; extracting hidden state features of the switch feature vector through the second long short-term memory network in each state warning network to obtain a second hidden state feature vector; inputting the first hidden state feature vector and the second hidden state feature vector into the threshold recurrent network for feature integration to generate an aging feature vector; inputting the aging feature vector into the decision network, and performing aging valuation and aging cause analysis on the aging feature vector through the fully connected layer and the Sigmoid function in the decision network to obtain an aging assessment value and an aging cause.
[0056] In some embodiments, the status warning prompt includes: a maintenance prompt and a replacement prompt. When the result output module 306 is used to output the status warning prompt according to the aging assessment value, it is specifically used to implement: if the aging assessment value is greater than a preset first aging threshold, output a maintenance prompt; if the aging assessment value is greater than a preset second aging threshold, output a replacement prompt, and the second aging threshold is greater than the first aging threshold.
[0057] An embodiment of the present application provides an electronic device, which includes a memory and a processor; the memory is used to store a computer program; the processor is used to execute the computer program and implement a state warning method for a pole-mounted circuit breaker as described in any one of the embodiments of the present application when executing the computer program.
[0058] An embodiment of the present application provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the processor implements a state warning method for a pole-mounted circuit breaker as described in any one of the embodiments of the present application.
[0059] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and these modifications or replacements should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A status warning method for a pole-mounted circuit breaker, It is characterized in that The method comprises: Obtain current data, vibration data and switch operation data of pole-mounted circuit breakers; Correcting a preset status warning model according to the switch operation data to obtain a corrected status warning model; Inputting the current data into a preset current repair model to obtain current standard data, and determining the current disconnection time according to the current data; Determining arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; Determining arc characteristic data according to the arc duration and the arc disturbance current data, performing vector processing on the arc characteristic data to obtain an arc characteristic vector, and performing vectorization processing on the vibration data to obtain a vibration characteristic vector; The arc characteristic vector and the vibration characteristic vector are input into the corrected state warning model for fusion analysis to obtain an aging assessment value of the pole-mounted circuit breaker, and a state warning prompt is output according to the aging assessment value.
2. The method for early warning of a status of a pole mounted circuit breaker according to claim 1, It is characterized in that The step of determining the arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data comprises: Determining a current distortion interval according to the current disconnection moment and a preset interval duration; In the current distortion interval, the current data is compared with the current standard data, and the time when the current data deviates from the current standard data is set as the time when the arc occurs; Determine the arc duration according to the current disconnection moment and the arc occurrence moment; The current data corresponding to the current distortion interval is used as the arc disturbance current data.
3. The method for early warning of the status of a pole mounted circuit breaker according to claim 2, It is characterized in that The determining arc characteristic data according to the arc duration and the arc disturbance current data comprises: According to the arc occurrence time, determining the arc initial current value from the arc disturbance current data; The arc characteristic data is obtained by calculating according to a preset characteristic calculation formula, the arc duration and the initial arc current value.
4. The method for early warning of a status of a pole mounted circuit breaker according to claim 1, It is characterized in that The step of inputting the current data into a preset current repair model to obtain current standard data includes: Obtaining a regional maximum value and a regional minimum value corresponding to the current data; Dividing the current data into a plurality of current analysis data according to adjacent regional maximum values and regional minimum values; Decomposing the current analysis data to obtain current amplitude data and current frequency data; Calculating a first amplitude mean and an amplitude standard deviation of the current amplitude data; determining an amplitude distortion point from the current amplitude data according to the first amplitude mean and the amplitude standard deviation; Taking the amplitude distortion point as the center, obtaining current amplitude reference data on both sides of the amplitude distortion point; Calculating a second amplitude mean of the current amplitude reference data, and using the second amplitude mean as a repair amplitude; The amplitude distortion point is repaired according to the current frequency data and the repair amplitude to obtain current standard data.
5. The method for early warning of the status of a pole mounted circuit breaker according to claim 1, It is characterized in that The state warning model includes a first activation function, and the preset state warning model is corrected according to the switch operation data to obtain a corrected state warning model, including: According to the switch operation data, a switch life evaluation table is matched to obtain a switch life evaluation value, wherein the switch life evaluation table includes: the number of switch operations and the corresponding switch life evaluation value; Correcting the first activation function according to the switch life evaluation value to obtain a second activation function; The state warning model corresponding to the second activation function is used as the corrected state warning model.
6. The method for early warning of the status of a pole mounted circuit breaker according to claim 5, It is characterized in that The state warning model includes a state warning network and a decision network, the state warning network includes a first long short-term memory network, a second long short-term memory network and a threshold recurrent network, the decision network includes a fully connected layer and a second activation function, and the arc feature vector and the vibration feature vector are input into the corrected state warning model for fusion analysis to obtain the aging assessment value of the pole-mounted circuit breaker, including: Performing hidden state feature extraction on the arc feature vector through a first long short-term memory network in the state warning network to obtain a first hidden state feature vector; Performing hidden state feature extraction on the switch feature vector through a second long short-term memory network in each state warning network to obtain a second hidden state feature vector; Inputting the first hidden state feature vector and the second hidden state feature vector into the threshold recurrent network for feature integration to generate an aging feature vector; The aging feature vector is input into the decision network, and aging valuation and aging cause analysis are performed on the aging feature vector through the fully connected layer and the Sigmoid function in the decision network to obtain the aging assessment value and aging cause.
7. The method for early warning of a status of a pole mounted circuit breaker according to claim 1, It is characterized in that The status warning prompt includes: maintenance prompt and replacement prompt, and the status warning prompt is output according to the aging evaluation value, including: If the aging assessment value is greater than a preset first aging threshold, outputting the maintenance prompt; If the aging assessment value is greater than a preset second aging threshold, the replacement prompt is output, and the second aging threshold is greater than the first aging threshold.
8. A status warning device for a pole-mounted circuit breaker, It is characterized in that The state warning device of the column-mounted circuit breaker comprises: A data acquisition module, used to acquire current data, vibration data and switch operation data of the pole-mounted circuit breaker; A model correction module, used to correct the preset status warning model according to the switch operation data to obtain a corrected status warning model; A data repair module, used for inputting the current data into a preset current repair model to obtain current standard data, and determining the current disconnection moment according to the current data; A data extraction module, used to determine the arc duration and arc disturbance current data of the pole-mounted circuit breaker according to the current disconnection moment, the current data and the current standard data; a vector conversion module, configured to determine arc characteristic data according to the arc duration and the arc disturbance current data, perform vector processing on the arc characteristic data to obtain an arc characteristic vector, and perform vectorization processing on the vibration data to obtain a vibration characteristic vector; The result output module is used to input the arc characteristic vector and the vibration characteristic vector into the corrected state warning model for fusion analysis to obtain the aging evaluation value of the pole-mounted circuit breaker, and output a state warning prompt according to the aging evaluation value.
9. An electronic device, It is characterized in that The electronic device comprises a memory and a processor; The memory is used to store computer programs; The processor is used to execute the computer program and implement the status warning method for the pole-mounted circuit breaker according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor implements the status warning method for a pole-mounted circuit breaker according to any one of claims 1 to 7.
Citation Information
Patent Citations
On-line detection method for mechanical characteristics of metal-enclosed switchgear
CN110553830A
Vacuum circuit breaker electrical life evaluation method based on arc energy
CN111505496A
High-voltage circuit breaker characteristic parameter prediction method and system based on multi-source signal fusion
CN113671361A
Method and device for evaluating health state of circuit breaker in high-altitude environment, and medium
CN117269742A
Intelligent agricultural monitoring and early warning system and method
CN118521164A