Prestressed concrete beam construction quality control system and method
Through the prestressed concrete beam construction quality control system, the steel bar stress is analyzed using controllers and sensors, and appropriate prestress is calculated and applied, which solves the problems of prestress attenuation and overload, and realizes reliable control of construction quality.
Patent Information
- Application Number
- CN202411082180.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-15
AI Technical Summary
During the construction of existing prestressed concrete beams, the prestressed material attenuates or applies excessive prestress before the concrete is poured, resulting in failure, and the prestress cannot be effectively controlled, affecting the construction quality.
Design a quality control system for prestressed concrete beam construction, including controller, hydraulic device, pressure sensor and stress sensor. Through the characteristic fitting module, analyze the relationship between steel bar stress and working pressure and time, calculate the appropriate initial prestress value, and pass The drive execution module applies and monitors prestresses to ensure that they meet design requirements.
Accurate application of prestresses and real-time monitoring are achieved to ensure reliable control of the construction quality of prestressed concrete beams, and avoid prestress failure and overload problems.
Smart Images

Figure CN118963291A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction quality, and in particular to a prestressed concrete beam construction quality control system and method. Background Art
[0002] Prestressed concrete beams are beams that are pre-applied with a force that creates a negative moment in the mid-span, in order to partially offset the positive moment of the beam during use. Compared with ordinary reinforced concrete beams, prestressed concrete beams have better characteristics: due to the use of high-strength tensile prestressed materials, prestressed concrete beams have a greater load capacity; under the same load, the cross-sectional dimensions of prestressed beams are smaller and their deadweight is lighter; when the prestressed concrete beam is subjected to the tensile force generated by the external load, the prestress in the concrete in the tensile zone is first offset by the application of appropriate prestress, and then the concrete is tensile as the load increases, which limits the elongation of the concrete, delays or prevents the appearance of cracks, and overcomes the biggest disadvantage of ordinary reinforced concrete beams, namely the crack problem.
[0003] Due to the ductility of steel bars, the prestress applied before the casting of prestressed concrete beams is attenuated during the concrete pouring and solidification process and cannot meet the design requirements. Another situation is that excessive prestress is applied during the construction process, causing the concrete materials, prestressed steel bars, etc. to exceed the load, resulting in prestress failure.
[0004] Therefore, it is urgent to design a prestressed concrete beam construction quality control system and method to solve the problems existing in the above-mentioned prior art. Summary of the invention
[0005] In view of the above defects or improvement needs of the prior art, the present invention provides a prestressed concrete beam construction quality control system and method to achieve accurate application of prestress at a specific time point or within a specific time range, thereby controlling the prestressed construction quality.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A first aspect of the present invention provides a prestressed concrete beam construction quality control system, comprising a controller, a hydraulic device, a pressure sensor disposed on the hydraulic device, and a stress sensor disposed on a prestressed steel bar;
[0008] The hydraulic device is used to apply tension to the steel bars that need to be prestressed;
[0009] The pressure sensor is used to detect the working pressure when the hydraulic device applies tension to the steel bar;
[0010] The stress sensor is used to detect the stress borne by the prestressed steel bar during the application of prestress and within a specific time range;
[0011] The controller includes a pressure acquisition module, a drive execution module, a stress acquisition module, a clock recording module, a characteristic fitting module, a setting module, and a prestress calculation module;
[0012] The pressure acquisition module is used to acquire the working pressure when the hydraulic device applies tension to the steel bar through the pressure sensor;
[0013] The driving execution module is used to drive the hydraulic device to execute an action;
[0014] The stress acquisition module is used to acquire the stress of the prestressed steel bar through the stress sensor;
[0015] The clock recording module is used to record the deformation time of stress change after the prestress is applied to the steel bar;
[0016] The characteristic fitting module is used to analyze the relationship between the stress of the steel bar and the working pressure and working time according to the outputs of the pressure acquisition module, the stress acquisition module and the clock recording module;
[0017] The setting module is used to manually set the pouring and curing time of reinforced concrete beams, the steel bar model and key characteristic parameters of the material;
[0018] The prestress calculation module is used to calculate the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module and the setting of the setting module in combination with a preset algorithm.
[0019] As an embodiment of the present application, the characteristic fitting module analyzes the relationship between steel bar stress and working pressure and working time as follows:
[0020] f0=δ+F0
[0021] f=λf0
[0022] Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
[0023] As an embodiment of the present application, the characteristic fitting module performs characteristic analysis on the discretized prestress data and the initial tension applied by the hydraulic device, processes the transition point to calculate δ, analyzes the decay interval, and fits a λ expression.
[0024] As an embodiment of the present application, the controller controls the driving execution module to drive the hydraulic device to perform prestress loading according to the initial prestress value calculated by the prestress calculation module.
[0025] As an embodiment of the present application, the controller further includes a comparison module and a determination module;
[0026] The comparison module is used to compare the actual stress data with the stress characteristics obtained by the characteristic fitting module;
[0027] The determination module is used to provide corresponding qualification information according to the comparison result of the comparison module.
[0028] As an embodiment of the present application, when the comparison result of the comparison module meets the requirements, the determination module outputs qualified information on prestressing; if the comparison result of the comparison module does not meet the requirements, the determination module outputs unqualified information on prestressing, and the system starts the characteristic fitting module to fit again and reload until the determination module gives qualified information on prestressing.
[0029] The present application also provides a method for controlling the construction quality of prestressed concrete beams, using the quality control system as described above, characterized in that the method comprises:
[0030] The working pressure when the hydraulic device applies tension to the steel bar is obtained through the pressure acquisition module;
[0031] The stress on the steel bar subjected to prestressing is obtained through the stress acquisition module;
[0032] The deformation time of stress change after the prestressing of the steel bar is obtained through the clock recording module;
[0033] Analyze the relationship between steel bar stress, working pressure and working time through the characteristic fitting module;
[0034] Set the pouring and curing time of reinforced concrete beams, steel bar type and key characteristic parameters of materials through the setting module;
[0035] The prestress calculation module calculates the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module and the setting of the setting module in combination with a preset algorithm.
[0036] As an embodiment of the present application, when the characteristic fitting module analyzes the relationship between steel bar stress, working pressure and working time, the relationship expression is:
[0037] f0=δ+F0
[0038] f=λf0
[0039] Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
[0040] As an embodiment of the present application, the method further includes: a controller controls the driving execution module to drive the hydraulic device to perform prestress loading according to the initial prestress value calculated by the prestress calculation module.
[0041] As an embodiment of the present application, the method further includes:
[0042] After the prestress loading is completed, the actual stress data is compared with the stress characteristics obtained by the characteristic fitting module through the comparison module; when the comparison result of the comparison module meets the requirements, the determination module outputs qualified information of the prestress application; if the comparison result of the comparison module does not meet the requirements, the determination module outputs unqualified prestress information, and the system starts the characteristic fitting module to fit again and reload until the determination module gives qualified information of the prestress application.
[0043] The beneficial effects of the present invention are:
[0044] The present invention first obtains the working pressure when the hydraulic device applies tension to the steel bar through the pressure acquisition module, obtains the stress of the steel bar to which the prestress is applied through the stress acquisition module, records the deformation time of stress change after the steel bar is prestressed through the clock recording module, and then analyzes the relationship between the working pressure when the hydraulic device applies tension to the steel bar, the stress of the steel bar to which the prestress is applied, and the deformation time of stress change after the steel bar is prestressed through the characteristic fitting module. Then, the prestress calculation module calculates the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module and the setting of the setting module in combination with the preset algorithm. After the system loads the prestress, it continues to analyze until it is confirmed that the prestress on the steel bar meets the design requirements, and then the system gives a confirmation message, and then casts the prestressed concrete beam. Through the accurate calculation of the prestress to be applied to the prestressed concrete beam, real-time monitoring and comparative confirmation, reliable control of the construction quality of the prestressed concrete beam is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a structural schematic diagram of a prestressed concrete beam construction quality control system provided in an embodiment of the present invention;
[0046] Figure 2 Another structural schematic diagram of a prestressed concrete beam construction quality control system provided in an embodiment of the present invention;
[0047] Figure 3 A schematic diagram of the classification of prestress during the construction of a prestressed concrete beam provided in an embodiment of the present invention;
[0048] Figure 4 It is a schematic diagram comparing the trend of the tension applied on the steel bars and the prestress on the steel bars by the prestressed concrete beam construction quality control system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0051] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0053] Reference Figure 1-Figure 4 , a first aspect of the present invention provides a prestressed concrete beam construction quality control system, comprising a controller 10, a hydraulic device 30, a pressure sensor 20 disposed on the hydraulic device 30, and a stress sensor 40 disposed on a prestressed steel bar;
[0054] The hydraulic device 30 is used to apply tension to the steel bars that need to be prestressed, and includes a pump station, a valve group, an oil cylinder or a tensioning jack, etc.; the pressure sensor 20 is used to detect the working pressure when the hydraulic device 30 applies tension to the steel bars. Specifically, the detection point of the pressure sensor 20 is the large chamber pressure of the oil cylinder of the hydraulic device 30 or the tensioning jack; specifically, the hydraulic device 30, the pressure sensor 20 and the controller 10 implement closed-loop control, and can provide any required tension value below the maximum pressure that the hydraulic device 30 can provide.
[0055] The stress sensor 40 is used to detect the stress borne by the prestressed steel bar during the application of prestress and within a specific time range. Through compensation, the stress sensor 40 can accurately measure the stress borne by the steel bar during the entire prestressing construction period;
[0056] The controller 10 includes a pressure acquisition module 110, a drive execution module 120, a stress acquisition module 130, a clock recording module 140, a characteristic fitting module 150, a setting module 160, and a prestress calculation module 170;
[0057] The pressure acquisition module 110 is used to acquire the working pressure when the hydraulic device 30 applies tension to the steel bar through the pressure sensor 20;
[0058] The driving execution module 120 is used to drive the hydraulic device 30 to perform an action. The controller 10 controls the driving execution module 120 to generate prestress for stretching the steel bar, or to retract the tensioning execution device for secondary tensioning, etc.;
[0059] The stress acquisition module 130 is used to acquire the stress of the prestressed steel bar through the stress sensor 40, and record and calculate it in the controller 10;
[0060] The clock recording module 140 is used to record the deformation time of stress change after the steel bar is prestressed, and discretize the continuous prestress value;
[0061] The characteristic fitting module 150 is used to analyze the relationship between the stress of the steel bar and the working pressure and working time according to the outputs of the pressure acquisition module 110, the stress acquisition module 130 and the clock recording module 140. The working pressure is the working pressure of the hydraulic device 30 when the steel bar tensioning is terminated, and the working time is the working time of the natural stress change after the steel bar tensioning stops. The characteristic fitting module 150 performs characteristic analysis on the discretized prestress data and the initial tension applied by the hydraulic device 30, processes the transition point to calculate δ, analyzes the decay interval, and fits the λ expression. At this point, the characteristics of the entire prestressing are adjusted.
[0062] The setting module 160 is used to manually set the pouring and curing time of reinforced concrete beams (pre-tensioning method), steel bar model and key characteristic parameters of the material; specifically, in the pre-tensioning method, the expected value of prestress during the concrete pouring and curing process, that is, the design value, this information enters the controller 10 through the setting module 160 and will be involved in subsequent calculations; for the post-tensioning method, the same prestress requirement for a period of time after the prestress is applied is also converted into information through the setting module 160 and enters the controller 10; the setting of the steel bar model and key characteristic parameters of the material determines the upper limit of the prestress that can be applied.
[0063] Specifically, the prestressing loading of prestressed concrete beams is divided into two categories: pre-tensioning method and post-tensioning method. The same part requires applying tension to the prestressed steel bars and anchoring them so that the steel bars bear a certain prestress. The size of this prestress is provided as a set value in the construction drawings of the prestressed concrete beams. It should be noted that no matter what method is used to stretch the steel bars to produce prestress, the locking process of the mechanical structure during the anchoring process will cause prestress loss, such as Figure 4 As shown in the figure, the anchoring action is performed at time t0, and the prestressing step is reduced once in a very short time; after anchoring, the structure of the anchoring device connecting the two ends of the steel bar will also undergo slow and weak deformation due to the existence of prestress, which also leads to prestressing loss, such as Figure 4 As shown in Figure 2, after the anchoring action is performed at time t0, the prestress gradually decreases and tends to be stable.
[0064] The prestress calculation module 170 is used to calculate the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module 150 and the setting of the setting module, combined with a preset algorithm. The preset algorithm uses the fitting relationship (i.e., a relationship) to substitute the expected value into the relationship and back-calculate the initial value to be applied. The prestress calculation module 170 uses the two sets of parameters set by the setting module 160, i.e., the prestress required for a certain period of time and the maximum prestress that can be set, and back-calculates with the parameters fitted by the characteristic fitting module 150 to calculate the initial prestress f0 to be applied and the tension F0 that the hydraulic device 30 needs to provide.
[0065] As an embodiment of the present application, the characteristic fitting module 150 analyzes the relationship between the stress of the steel bar and the working pressure and working time as follows:
[0066] f0=δ+F0
[0067] f=λf0
[0068] Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
[0069] Specifically, during the construction process, a prestress exceeding the set value is generally loaded, and it is expected to reach the set value after stabilization, such as Figure 3 As shown, overloading or underloading cannot meet the design requirements. Therefore, this application designs a prestressed concrete beam construction quality control system and method to achieve the goal of ideal prestressing over-tensioning.
[0070] As an embodiment of the present application, the characteristic fitting module 150 performs characteristic analysis on the discretized prestress data and the initial tension applied by the hydraulic device, processes the jump point to calculate δ, analyzes the decay interval, and fits the λ expression, or compares the data at time T with the data at time T-1 at a fixed time interval. If the rate of change is <0, it is a decay zone; if |rate of change|>>1, it is determined to be a step point. The difference between the two moments can also be taken, and then directly compared with the tested value to directly obtain the step point or decay zone. In the present application, there are many algorithms for analyzing stress data and calculating step points and decay zones, which will not be repeated here.
[0071] As an embodiment of the present application, the controller 10 controls the driving execution module 120 to drive the hydraulic device 30 to perform prestress loading according to the initial prestress value calculated by the prestress calculation module 170 .
[0072] As an embodiment of the present application, the controller 10 further includes a comparison module 180 and a determination module 190;
[0073] The comparison module 180 is used to compare the actual stress data with the stress characteristics obtained by the characteristic fitting module 150;
[0074] The determination module 190 is used to provide corresponding qualification information according to the comparison result of the comparison module 180.
[0075] Specifically, after the above-mentioned prestress loading process is executed, data tracking continues. When the comparison module 180 collects the data obtained by the stress sensor 40 after prestress loading and discretizes the data obtained by the stress acquisition module 130, it is compared with the characteristic relationship fitted by the characteristic fitting module 150 according to time advancement to detect whether the current prestress loading is correct; specifically, when the comparison module 180 compares the actual stress data with the stress characteristic comparison data obtained by fitting and the degree of fit meets the requirements, the determination module 190 outputs prestress application qualified information. If the comparison result of the comparison module 180 does not meet the requirements, the determination module 190 outputs prestress unqualified information, and the system starts the characteristic fitting module 150 to fit again and reload until the determination module 190 gives prestress application qualified information.
[0076] The present application also provides a method for controlling the construction quality of prestressed concrete beams, using the quality control system as described above, characterized in that the method comprises:
[0077] The working pressure when the hydraulic device 30 applies tension to the steel bar is obtained by the pressure acquisition module 110;
[0078] The stress to which the prestressed steel bar is subjected is obtained through the stress obtaining module 130;
[0079] The clock recording module 140 is used to obtain the deformation time of stress change after the prestress is applied to the steel bar;
[0080] Analyze the relationship between steel bar stress, working pressure and working time through the characteristic fitting module 150;
[0081] Setting the pouring and curing time of reinforced concrete beams, the steel bar type and key characteristic parameters of the materials through the setting module 160;
[0082] The prestress calculation module 170 calculates the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module 150 and the setting of the setting module 160 in combination with a preset algorithm.
[0083] As an embodiment of the present application, when the characteristic fitting module 150 analyzes the relationship between the stress of the steel bar and the working pressure and working time, the relationship expression is:
[0084] f0=δ+F0
[0085] f=λf0
[0086] Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
[0087] As an embodiment of the present application, the method further includes: the controller 10 controls the driving execution module 120 to drive the hydraulic device 30 to perform prestress loading according to the initial prestress value calculated by the prestress calculation module 170 .
[0088] As an embodiment of the present application, the method further includes:
[0089] After the prestress loading is completed, the actual stress data is compared with the stress characteristics obtained by the characteristic fitting module 150 through the comparison module 180; when the comparison result of the comparison module 180 meets the requirements, the determination module 190 outputs the prestress application qualified information, if the comparison result of the comparison module 180 does not meet the requirements, the determination module 190 outputs the prestress unqualified information, the system starts the characteristic fitting module 150 to fit again, and reloads until the determination module 190 gives the prestress application qualified information.
[0090] The present invention obtains the working pressure when the hydraulic device applies tension to the steel bar through the pressure acquisition module, obtains the stress of the steel bar to which the prestress is applied through the stress acquisition module, records the deformation time of stress change after the steel bar is prestressed through the clock recording module, and then analyzes the relationship between the working pressure when the hydraulic device applies tension to the steel bar, the stress of the steel bar to which the prestress is applied, and the deformation time of stress change after the steel bar is prestressed through the characteristic fitting module, and then calculates the appropriate initial value of the prestress to be applied through the prestress calculation module according to the relationship obtained by the characteristic fitting module and the setting of the setting module, combined with the preset algorithm, and the system continues to analyze after loading the prestress until it is confirmed that the prestress on the steel bar meets the design requirements, and then the system gives a confirmation message, and then casts the prestressed concrete beam. Through the accurate calculation of the prestress to be applied to the prestressed concrete beam, real-time monitoring and comparative confirmation, reliable control of the construction quality of the prestressed concrete beam is achieved.
[0091] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.
Claims
1. A prestressed concrete beam construction quality control system, characterized in that: It includes a controller, a hydraulic device, a pressure sensor arranged on the hydraulic device, and a stress sensor arranged on the prestressed steel bar; The hydraulic device is used to apply tension to the steel bars that need to be prestressed; The pressure sensor is used to detect the working pressure when the hydraulic device applies tension to the steel bar; The stress sensor is used to detect the stress borne by the prestressed steel bar during the application of prestress and within a specific time range; The controller includes a pressure acquisition module, a drive execution module, a stress acquisition module, a clock recording module, a characteristic fitting module, a setting module, and a prestress calculation module; The pressure acquisition module is used to acquire the working pressure when the hydraulic device applies tension to the steel bar through the pressure sensor; The driving execution module is used to drive the hydraulic device to execute an action; The stress acquisition module is used to acquire the stress of the prestressed steel bar through the stress sensor; The clock recording module is used to record the deformation time of stress change after the prestress is applied to the steel bar; The characteristic fitting module is used to analyze the relationship between the stress of the steel bar and the working pressure and working time according to the outputs of the pressure acquisition module, the stress acquisition module and the clock recording module; The setting module is used to manually set the pouring and curing time of reinforced concrete beams, the steel bar model and key characteristic parameters of the material; The prestress calculation module is used to calculate the initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module and the setting of the setting module in combination with a preset algorithm.
2. A prestressed concrete beam construction quality control system according to claim 1, characterized in that: The relationship between the steel bar stress, working pressure and working time is expressed as: f0=δ+F0 f=λf0 Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
3. A prestressed concrete beam construction quality control system according to claim 2, characterized in that: The characteristic fitting module performs characteristic analysis on the discretized prestress data and the initial tension applied by the hydraulic device, processes the transition point to calculate δ, analyzes the decay interval, and fits the λ expression.
4. A prestressed concrete beam construction quality control system according to claim 1, characterized in that: The controller controls the driving execution module to drive the hydraulic device to execute prestress loading according to the initial prestress value calculated by the prestress calculation module.
5. A prestressed concrete beam construction quality control system according to claim 1, characterized in that: The controller also includes a comparison module and a determination module; The comparison module is used to compare the actual stress data with the stress characteristics obtained by the characteristic fitting module; The determination module is used to provide corresponding qualification information according to the comparison result of the comparison module.
6. A prestressed concrete beam construction quality control system according to claim 5, characterized in that: When the comparison result of the comparison module meets the requirements, the determination module outputs qualified information on prestressing; if the comparison result of the comparison module does not meet the requirements, the determination module outputs unqualified information on prestressing, and the system starts the characteristic fitting module to fit again and reload until the determination module gives qualified information on prestressing.
7. A method for controlling the construction quality of prestressed concrete beams, using the quality control system according to claim 1, characterized in that: The method comprises: The working pressure when the hydraulic device applies tension to the steel bar is obtained through the pressure acquisition module; The stress on the steel bar subjected to prestressing is obtained through the stress acquisition module; The deformation time of stress change after the prestressing of the steel bar is obtained through the clock recording module; Analyze the relationship between steel bar stress, working pressure and working time through the characteristic fitting module; Set the pouring and curing time of reinforced concrete beams, steel bar type and key characteristic parameters of materials through the setting module; The prestress calculation module calculates the appropriate initial value of the prestress to be applied according to the relationship obtained by the characteristic fitting module and the setting of the setting module in combination with a preset algorithm.
8. A method for controlling the construction quality of prestressed concrete beams according to claim 7, characterized in that: When the characteristic fitting module analyzes the relationship between the stress of the steel bar and the working pressure and working time, the relationship expression is: f0=δ+F0 f=λf0 Among them, f0 is the prestress on the steel bar at t0, when the steel bar is initially anchored; F0 is the tension applied by the system to the steel bar at t0; δ is the prestress loss value on the steel bar at the moment of anchoring, which is negatively correlated with the anchoring action speed and positively correlated with F0; f is the prestress on the steel bar after t0; λ is the attenuation coefficient of f, which is related to the steel bar material, f0 and time.
9. A method for controlling the construction quality of prestressed concrete beams according to claim 8, characterized in that: The method further includes: a controller controls the driving execution module to drive the hydraulic device to execute prestress loading according to the initial prestress value calculated by the prestress calculation module.
10. A method for controlling the construction quality of prestressed concrete beams according to claim 9, characterized in that: The method further comprises: After the prestress loading is completed, the actual stress data is compared with the stress characteristics obtained by the characteristic fitting module through the comparison module; when the comparison result of the comparison module meets the requirements, the determination module outputs qualified information of the prestress application; if the comparison result of the comparison module does not meet the requirements, the determination module outputs unqualified prestress information, and the system starts the characteristic fitting module to fit again and reload until the determination module gives qualified information of the prestress application.