Whole shaft leakage pressure prediction method and device

By correcting the minimum horizontal main stress model and the one-dimensional radial leakage pressure model of crack expansion, combined with statistical method and rock mechanical parameters, the problem of inaccurate prediction of leakage pressure in the existing technology is solved, and the prediction of leakage pressure of deep drilling fluid is improved. reduces drilling costs and safety risks.

CN118965668APending Publication Date: 2024-11-15CHINA NAT PETROLEUM CORP +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410803751.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing leak loss pressure prediction methods have problems with inaccurate prediction when predicting cracked leakage formations, especially in deep drilling operations, which lead to large losses of drilling fluid and safety hazards.

Method used

The corrected minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of crack expansion were used to establish shallow and deep leakage pressure regression equations through regression analysis, and combined with statistical methods and rock mechanical parameters, the accuracy of leakage pressure prediction was improved.

Benefits of technology

It significantly improves the prediction accuracy of the whole wellbore leakage pressure, reduces mud leakage loss and fracturing effect, reduces the risk of well leakage, and provides a more accurate design and optimization basis for drilling projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965668A_ABST
    Figure CN118965668A_ABST
Patent Text Reader

Abstract

The invention provides a whole shaft leakage pressure prediction method and device. The method comprises the following steps: according to a regression relationship between a first minimum horizontal principal stress model and a statistical method leakage pressure model, establishing a shallow leakage pressure regression equation and correcting the first minimum horizontal principal stress model; wherein the depth represented by the shallow layer is smaller than a preset depth; the corrected first minimum horizontal principal stress model is adopted to predict the shallow leakage pressure; according to a regression relationship between the second minimum horizontal principal stress model and the crack propagation one-dimensional radial leakage pressure model, establishing a deep leakage pressure regression equation and correcting the second minimum horizontal principal stress model; wherein the depth represented by the deep layer is greater than or equal to a preset depth; and predicting the deep leakage pressure by adopting the corrected second minimum horizontal principal stress model. According to the method, the prediction accuracy of the leakage pressure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of drilling engineering, and in particular to a method and device for predicting full wellbore leakage pressure. Background Art

[0002] With the continuous development of oil and gas exploration and development technology, drilling engineering has become an important part of oil and gas field development. In the process of downhole operations such as drilling, cementing, and completion, the problem of drilling fluid loss frequently occurs, becoming a key factor restricting the safe and efficient progress of drilling projects. Drilling fluid loss refers to the phenomenon that drilling fluid flows into the formation when the drilling fluid pressure is greater than the formation pressure. This complex situation will not only lead to a large loss of drilling fluid and increase drilling costs, but may also cause serious accidents such as wellbore collapse, blowout, and stuck drill, posing a serious threat to the safety and progress of drilling projects. Especially in deep and ultra-deep drilling operations, the phenomenon of drilling fluid loss is more prominent, and the challenge to drilling technology is also increasing.

[0003] In order to reduce the risk of drilling fluid loss, engineers have been committed to developing effective methods for predicting loss pressure. Before drilling the formation, accurately predicting the loss pressure of each drilling in the entire well section and configuring reasonable mud density parameters accordingly is an important means to avoid leakage. At present, the method for predicting loss pressure is mainly based on the minimum horizontal principal stress model, which improves the accuracy of loss pressure prediction to a certain extent and provides technical support for the safe construction of drilling projects.

[0004] However, the existing lost circulation pressure prediction methods still have the problem of inaccurate prediction when used to predict the lost circulation pressure of fractured lost circulation formations. Summary of the invention

[0005] The present application provides a method and device for predicting the full-wellbore lost pressure, which are used to solve the problem of inaccurate prediction of lost pressure in the prior art.

[0006] In a first aspect, the present application provides a method for predicting full wellbore lost pressure, comprising:

[0007] According to the regression relationship between the first minimum horizontal principal stress model and the statistical method leakage pressure model, a shallow leakage pressure regression equation is established and the first minimum horizontal principal stress model is corrected; wherein the depth represented by the shallow layer is less than the preset depth;

[0008] The modified first minimum horizontal principal stress model is used to predict the shallow leakage pressure;

[0009] According to the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension, a deep layer leakage pressure regression equation is established and the second minimum horizontal principal stress model is corrected; wherein the depth represented by the deep layer is greater than or equal to the preset depth;

[0010] The modified second minimum horizontal principal stress model is used to predict the deep leakage pressure.

[0011] In some embodiments, the method further comprises:

[0012] Obtain the fracture parameters of each layer in the logging section, the drilling engineering parameters of each layer in the entire wellbore, and the rock mechanics parameters; among them, the fracture parameters include fracture length and fracture width, the drilling engineering parameters include drilling fluid density, drilling fluid viscosity, leakage rate and leakage amount of the leakage point, and the wellbore size of each opening, and the rock mechanics parameters include Poisson's ratio and elastic modulus;

[0013] According to the fracture parameters, drilling fluid density, wellbore size and rock mechanics parameters, a fracture aperture prediction model for each layer is constructed;

[0014] According to the drilling fluid viscosity, the loss rate and loss amount of the loss point, the wellbore size and the fracture aperture prediction model of each layer, a one-dimensional radial loss pressure model of fracture extension in each layer is constructed.

[0015] In some embodiments, using the modified first minimum horizontal principal stress model to predict shallow leakage pressure includes:

[0016] Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each shallow layer;

[0017] The Poisson's ratio, tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each shallow layer are input into the modified first minimum horizontal principal stress model, so that the modified first minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

[0018] In some embodiments, using the modified second minimum horizontal principal stress model to predict deep-layer leakage pressure includes:

[0019] Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each deep layer;

[0020] The Poisson's ratio, tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each deep layer are input into the modified second minimum horizontal principal stress model, so that the modified second minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

[0021] In some embodiments, modifying the first minimum horizontal principal stress model includes:

[0022] The shallow leakage pressure regression equation corresponding to each shallow layer is used to predict the predicted leakage pressure of the corresponding layer;

[0023] Obtain the measured leakage pressure of each shallow layer;

[0024] According to the predicted and measured leakage pressure of each shallow layer, the prediction effect of the first minimum horizontal principal stress model is verified;

[0025] Modified second minimum horizontal principal stress model, including:

[0026] The deep leakage pressure regression equation corresponding to each layer in the deep layer is used to predict the predicted leakage pressure of the corresponding layer;

[0027] Obtain the measured leakage pressure of each layer in the deep layer;

[0028] The prediction effect of the second minimum horizontal principal stress model was verified based on the predicted and measured leakage pressures of each deep layer.

[0029] In some embodiments, after predicting the deep-layer leakage pressure using the modified second minimum horizontal principal stress model, the method further includes:

[0030] According to the leakage pressure of each shallow layer, determine the shallow leakage pressure profile;

[0031] According to the leakage pressure of each layer in the deep layer, determine the deep leakage pressure profile;

[0032] The shallow loss pressure profile and the deep loss pressure profile are combined to obtain the full wellbore loss pressure profile.

[0033] In a second aspect, the present application provides a full wellbore lost pressure prediction device, comprising:

[0034] A construction module is used to establish a shallow layer leakage pressure regression equation and correct the first minimum horizontal principal stress model according to the regression relationship between the first minimum horizontal principal stress model and the statistical method leakage pressure model; wherein the depth represented by the shallow layer is less than the preset depth;

[0035] A prediction module for predicting shallow leakage pressure using a modified first minimum horizontal principal stress model;

[0036] The construction module is also used to establish a deep layer leakage pressure regression equation and correct the second minimum horizontal principal stress model according to the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension; wherein the depth represented by the deep layer is greater than or equal to the preset depth;

[0037] The prediction module is also used to predict the deep leakage pressure by using the modified second minimum horizontal principal stress model.

[0038] In a third aspect, the present application provides an electronic device, including: a memory and a processor;

[0039] The memory is used to store computer programs; the processor is used to execute the computer programs stored in the memory to implement the full wellbore leakage pressure prediction method in the first aspect and any one of the embodiments of the first aspect.

[0040] In a fourth aspect, the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the method for predicting the full wellbore leakage pressure in the first aspect and any one of the embodiments of the first aspect is implemented.

[0041] In a fifth aspect, the present application provides a computer program product, which includes a computer program. When the computer program is executed by a processor, it implements the full wellbore leakage pressure prediction method in the first aspect and any one of the embodiments of the first aspect.

[0042] The method and device for predicting the full-wellbore lost pressure provided in the present application improve the prediction accuracy of the full-wellbore lost pressure by using a statistical lost pressure model to correct the minimum horizontal principal stress model for the prediction of shallow lost pressure, and by using a one-dimensional radial lost pressure model of fracture extension to correct the minimum horizontal principal stress model for the prediction of deep lost pressure. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0044] Figure 1 A flow chart of a method for predicting full wellbore lost pressure provided in one embodiment of the present application;

[0045] Figure 2 A flow chart of another method for predicting full wellbore lost pressure provided in one embodiment of the present application;

[0046] Figure 3 A flow chart of another method for predicting full wellbore lost pressure provided in an embodiment of the present application;

[0047] Figure 4 A schematic diagram of a full wellbore leakage pressure profile provided in an embodiment of the present application;

[0048] Figure 5 A schematic diagram of the structure of a full wellbore leakage pressure prediction device provided in one embodiment of the present application;

[0049] Figure 6 A schematic diagram of the hardware structure of an electronic device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0051] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances. For example, without departing from the scope of this document, first information can also be referred to as second information, and similarly, second information can also be referred to as first information.

[0052] It should be understood that the terms “comprises” and “includes” indicate the existence of features, steps, operations, elements, components, items, types, and / or groups, but do not exclude the existence, occurrence, or addition of one or more other features, steps, operations, elements, components, items, types, and / or groups.

[0053] The terms "or" and "and / or" used herein are interpreted as inclusive, or mean any one or any combination. Thus, "A, B and / or C" means "any of the following: A; B; C; A and B; A and C; B and C; A, B and C". An exception to this definition will only occur when a combination of elements, functions, steps or operations are inherently mutually exclusive in some manner.

[0054] Drilling loss often occurs during drilling, cementing, completion and other downhole operations. The pressure of the drilling fluid is greater than the formation pressure, causing the drilling fluid to flow into the formation. This is a complex situation. The loss begins as leakage, and then manifests as severe loss. If it is not handled and discovered in time, it will not only lose a large amount of drilling fluid and increase drilling costs, but may also cause wellbore collapse, blowouts, and pipe sticking and other serious accidents, ultimately leading to drilling failure and backfilling and sidetracking. In particular, as drilling is currently developing towards deep or even ultra-deep wells of 10,000 meters, the phenomenon of drilling fluid loss in deep well sections occurs more frequently. During the entire drilling and completion process, the time cost of dealing with drilling fluid loss increases by 5-10%, greatly delaying the project progress and drilling costs. Therefore, how to effectively solve the problem of drilling fluid loss is one of the difficulties facing current drilling projects.

[0055] There are three necessary conditions for the occurrence of well leakage: first, there is a positive pressure difference in the formation, that is, the pressure of the wellbore fluid is greater than the pressure of the liquid in the formation pores and cracks (i.e., the formation pore pressure); second, during the sedimentation process, cracks and holes are generated in the formation due to tectonic movement or groundwater dissolution, that is, there are leakage channels and large enough space to accommodate liquids. Only when there is a large enough space in the formation to accommodate fluids can a certain amount of leakage occur; third, the opening size of the leakage channel should be larger than the particle size of the solid phase in the external working fluid. In addition, during drilling construction, human factors such as excessive pumping and drilling too fast will also generate new leakage channels and cause leakage, which usually manifests as induced cracks with a length of tens to hundreds of meters, and most of them are vertical cracks, which have an important impact on well leakage.

[0056] From the perspective of leakage mechanism, the occurrence of well leakage during drilling and completion is mainly related to the drilling fluid column pressure, formation pore pressure, formation leakage pressure, and fracture pressure. When the drilling fluid pressure acting on the well wall formation reaches the formation leakage pressure, the formation has just begun to crack but has not yet broken, and the microcracks generated are not enough to cause leakage; when the drilling fluid exceeds the leakage pressure but is less than the fracture pressure, permeability leakage may occur; when the fracture pressure is exceeded, the formation well will leak, and if there are large leakage channels or cracks, malignant leakage will occur. Therefore, before drilling the formation, accurately predicting the leakage pressure of each opening of the entire well section and configuring reasonable mud density parameters can effectively avoid the occurrence of well leakage.

[0057] At present, conventional formation leakage pressure prediction usually adopts the minimum horizontal principal stress model, but the minimum horizontal principal stress model is only applicable to intact formations. When used in fractured leakage formations, it cannot take into account the influence of weak planes, resulting in inaccurate predicted leakage pressure. Specifically, different types of sedimentary formations have different leakage mechanisms, and differences in sedimentary blocks and sedimentary time will also affect the calculation of leakage pressure, making it difficult to ensure the accuracy of the prediction results.

[0058] In response to the above problems, the present application proposes a method and device for predicting the loss pressure of the entire wellbore. In this method, a statistical loss pressure model and a one-dimensional radial loss pressure model of fracture extension are selected, and through regression analysis, the regression relationship between the minimum horizontal principal stress model and the statistical loss pressure model, and the regression relationship between the minimum horizontal principal stress model and the one-dimensional radial loss pressure model of fracture extension are established respectively, and the shallow correction coefficient and the deep correction coefficient are obtained. The shallow correction coefficient and the deep correction coefficient are used to correct the minimum horizontal principal stress model respectively, and the shallow loss pressure model and the deep loss pressure model are obtained, thereby obtaining the full-wellbore formation loss pressure model. The full-wellbore loss pressure model can provide a loss pressure basis for drilling engineering design schemes, real-time drilling optimization design and fracturing design, reduce mud loss losses and fracturing effects, and provide technical support for a package of drilling and completion services.

[0059] The technical solution of the present application is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0060] In the present application, the electronic device is used as the execution subject to execute the full wellbore lost pressure prediction method of the following embodiment. Specifically, the execution subject can be a hardware device of the electronic device, or a software application that implements the following embodiment in the electronic device, or a computer-readable storage medium installed with the software application that implements the following embodiment, or a code that implements the software application of the following embodiment.

[0061] Figure 1 FIG. 1 is a flow chart of a method for predicting full wellbore leakage pressure provided by an embodiment of the present application. Figure 1 As shown, with the electronic device as the execution subject, the method of this embodiment may include the following steps:

[0062] S101. According to the regression relationship between the first minimum horizontal principal stress model and the statistical method leakage pressure model, a shallow leakage pressure regression equation is established and the first minimum horizontal principal stress model is corrected.

[0063] In this embodiment, the shallow layer refers to a depth less than a preset depth. For example, a layer at a depth of 50% from the surface to the wellbore is a shallow layer.

[0064] The first minimum horizontal principal stress model is shown in formula (1):

[0065]

[0066] Among them, P L is the formation leakage pressure, MPa;

[0067] v is Poisson’s ratio;

[0068] w2 is the tectonic stress coefficient;

[0069] σ z is the overlying formation pressure;

[0070] τ is the effective stress coefficient, ranging from 0.7 to 1;

[0071] P P is the pore pressure;

[0072] α is the trend control coefficient, and its value range is 0.4-0.7.

[0073] The statistical leakage pressure model is shown in formula (2):

[0074] P L =P P+KQlossn (2)

[0075] Among them, P L is the formation leakage pressure;

[0076] K is the leakage coefficient;

[0077] n is the drilling fluid related factor;

[0078] Q loss is the leakage rate, in m 3 / s.

[0079] In this embodiment, the formation leakage pressure predicted by the first minimum horizontal principal stress model can be corrected according to the formation leakage pressure predicted by the statistical leakage pressure model to determine the correction coefficient, which is used to correct the first horizontal principal stress model.

[0080] For example, the statistical leakage pressure model predicts the first leakage pressure, the first minimum horizontal principal stress model predicts the second leakage pressure, and the second leakage pressure is divided by the first leakage pressure to obtain the correction coefficient. When the first minimum horizontal principal stress model is used to predict the formation leakage pressure, the correction coefficient is used to correct the prediction result.

[0081] S102. Use the modified first minimum horizontal principal stress model to predict shallow leakage pressure.

[0082] In this embodiment, the corrected first minimum horizontal principal stress model is the first minimum horizontal principal stress model corrected by using the correction coefficient, which is mainly used for predicting shallow leakage pressure.

[0083] S103, based on the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension, establish a deep leakage pressure regression equation and correct the second minimum horizontal principal stress model.

[0084] In this embodiment, the depth represented by the deep layer is greater than or equal to the preset depth. For example, the stratum at 50% of the wellbore depth and away from the bottom of the wellbore is the deep layer.

[0085] The formula of the second minimum horizontal principal stress model is the same as that of the first minimum horizontal principal stress model, and can be referred to formula (1).

[0086] The one-dimensional radial leakage pressure model of fracture extension is shown in formula (3):

[0087] P L =P P +ΔP (3)

[0088]

[0089] K=Qloss×10-4 / w(x) 3 (5)

[0090] Among them, ΔP is the leakage positive pressure difference, the unit is MPa;

[0091] K is the leakage coefficient;

[0092] μ is the drilling fluid viscosity coefficient, in Pa·s;

[0093] V is the total loss of drilling fluid, in m 3 ;

[0094] w(x) is the crack width, in m;

[0095] r w1 is the wellbore radius, in m.

[0096] In this embodiment, the formation leakage pressure predicted by the second minimum horizontal principal stress model can be corrected according to the formation leakage pressure predicted by the one-dimensional radial leakage pressure model of fracture extension to determine the correction coefficient, which is used to correct the second horizontal principal stress model.

[0097] For example, the fracture extension one-dimensional radial leakage pressure model predicts the first leakage pressure, the second minimum horizontal principal stress model predicts the second leakage pressure, and the second leakage pressure is divided by the first leakage pressure to obtain the correction coefficient. When the second minimum horizontal principal stress model is used to predict the formation leakage pressure, the correction coefficient is used to correct the prediction result.

[0098] S104. Use the modified second minimum horizontal principal stress model to predict the deep leakage pressure.

[0099] In this embodiment, the corrected second minimum horizontal principal stress model is the second minimum horizontal principal stress model corrected by using the correction coefficient, which is mainly used for predicting the deep leakage pressure.

[0100] The method for predicting the whole wellbore lost pressure provided in this embodiment adopts a statistical lost pressure model to correct the minimum horizontal principal stress model for predicting the shallow lost pressure, and adopts a one-dimensional radial lost pressure model of fracture extension to correct the minimum horizontal principal stress model for predicting the deep lost pressure. By predicting the shallow and deep lost pressures in layers, the prediction accuracy of the whole wellbore lost pressure is improved, which is convenient for effectively guiding the drilling engineering design and the completion fracturing design plan, greatly reducing the risk of well leakage and improving the fracturing effect.

[0101] In some embodiments, the process of constructing a one-dimensional radial leakage pressure model of fracture propagation includes the following steps:

[0102] S201, obtaining fracture parameters of each layer in the logging section, drilling engineering parameters of each layer in the entire wellbore, and rock mechanics parameters.

[0103] Among them, the fracture parameters include fracture length and fracture width, the drilling engineering parameters include drilling fluid density, drilling fluid viscosity, leakage rate and leakage amount of leakage points and the wellbore size of each opening, and the rock mechanics parameters include Poisson's ratio and elastic modulus.

[0104] Specifically, the fracture parameters can be processed by fracture imaging logging of the leaking layer section to identify and interpret the fracture characteristics of the leaking layer section and obtain the fracture parameters of the imaging logging section. First, the resistivity scanning imaging data of the leaking layer section is obtained by the imaging logging instrument, and then the imaging map is carefully analyzed to identify the occurrence, width, distribution and other characteristics of the fractures. According to the morphology, cause and type of the fractures, true fractures and false fractures, as well as natural fractures and induced fractures are distinguished. Combined with other geological and engineering data, the causes of the fractures and their effects on formation stability and fluid fluidity are explained, and finally the physical parameters of the fractures that cause the leak are determined, such as fracture inclination, azimuth, mechanical width, etc. Fracture imaging interpretation helps to understand the impact of fractures on formation stability and fluid fluidity, and thus guide the drilling and completion process.

[0105] S202. Construct a fracture aperture prediction model for each layer based on fracture parameters, drilling fluid density, wellbore size, and rock mechanics parameters.

[0106] The crack aperture prediction model is shown in formula (6):

[0107]

[0108] Where, v is Poisson’s ratio;

[0109] E is the elastic modulus;

[0110] L is the crack length, in m;

[0111] x is the distance between the fracture and the wellbore center, in m;

[0112] Pw is the drilling fluid pressure, in MPa;

[0113] φ(x,r w1 ) represents the wellbore radius r w1 The crack opening displacement parameter is dimensionless.

[0114] In the formula, the drilling fluid pressure is related to the drilling fluid density. Specifically, the drilling fluid pressure and pore pressure of each layer can be calculated according to the drilling fluid density.

[0115] S203, constructing a one-dimensional radial leakage pressure model for fracture extension at each layer according to the drilling fluid viscosity, leakage rate of the leakage point, leakage amount, wellbore size and fracture aperture prediction model at each layer.

[0116] The viscosity of the drilling fluid can be monitored by a mud detection system to obtain a circulating viscosity value. The borehole size is obtained by measuring the borehole size of each opening of the entire wellbore using a caliper logging instrument.

[0117] In some embodiments, the specific implementation of step S102 includes:

[0118] S1021. Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each shallow layer.

[0119] S1022. Input the Poisson's ratio, tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each shallow layer into the modified first minimum horizontal principal stress model, so that the modified first minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

[0120] Specifically, when it is necessary to predict the leakage pressure of a certain shallow layer, the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of the layer are obtained, so that the corrected first minimum horizontal principal stress model can predict the leakage pressure of the layer according to the above parameters.

[0121] For multiple shallow layers, predictions can be made separately to obtain the leakage pressure of multiple shallow layers.

[0122] Similarly, the specific implementation of step S104 includes:

[0123] S1041. Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each deep layer.

[0124] S1042, input the Poisson's ratio, tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each deep layer into the modified second minimum horizontal principal stress model, so that the modified second minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

[0125] Specifically, when it is necessary to predict the leakage pressure of a certain deep layer, the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of the layer are obtained, so that the revised second minimum horizontal principal stress model can predict the leakage pressure of the layer according to the above parameters.

[0126] For multiple layers in the deep layer, predictions can be made separately to obtain the leakage pressure of multiple layers in the deep layer.

[0127] Figure 2 A flowchart of another method for predicting full wellbore leakage pressure provided in one embodiment of the present application. Figure 1 Based on the embodiment shown, Figure 2 As shown, after step S104, the electronic device may further perform the following steps:

[0128] S301. Determine the shallow layer leakage pressure profile according to the leakage pressure of each shallow layer.

[0129] S302. Determine the deep layer leakage pressure profile according to the leakage pressure of each layer in the deep layer.

[0130] S303. Combine the shallow layer leakage pressure profile and the deep layer leakage pressure profile to obtain the whole wellbore leakage pressure profile.

[0131] It should be understood that after predicting the leakage pressure of multiple shallow layers, the shallow leakage pressure profile can be obtained; after predicting the leakage pressure of multiple deep layers, the deep leakage pressure profile can be obtained.

[0132] The method for predicting the leakage pressure of the entire wellbore provided in this embodiment can accurately predict the pressure conditions of each layer. By predicting the leakage pressure of multiple shallow layers and the leakage pressure of multiple deep layers respectively, the shallow leakage pressure profile and the deep leakage pressure profile are obtained, and then the leakage pressure profile of the entire wellbore is obtained, which provides a guiding basis for the real-time optimization of the drilling project, warns of the leakage layer in advance, adjusts the drilling fluid formula in time, and saves costs.

[0133] In some embodiments, the step S101 of correcting the first minimum horizontal principal stress model includes:

[0134] S1011. Use the shallow leakage pressure regression equation corresponding to each shallow layer to predict the predicted leakage pressure of the corresponding layer.

[0135] S1012. Obtain the measured leakage pressure of each shallow layer.

[0136] S1013. Verify the prediction effect of the first minimum horizontal principal stress model based on the predicted leakage pressure and the measured leakage pressure of each shallow layer.

[0137] In this embodiment, the measured leakage pressure can be measured by a drilling fluid pressure monitoring instrument. When the difference between the predicted leakage pressure and the measured leakage pressure is less than a preset threshold, it can be considered that the prediction effect of the revised first minimum horizontal principal stress model is better and can be used to predict the shallow leakage pressure. If the difference between the predicted leakage pressure and the measured leakage pressure is greater than or equal to the preset threshold, the first minimum horizontal principal stress model needs to be repeatedly corrected.

[0138] In some embodiments, the step S103 of correcting the second minimum horizontal principal stress model includes:

[0139] S1031. Use the deep leakage pressure regression equation corresponding to each deep layer to predict the predicted leakage pressure of the corresponding layer.

[0140] S1032. Obtain the measured leakage pressure of each layer in the deep layer.

[0141] S1033. Verify the prediction effect of the second minimum horizontal principal stress model based on the predicted leakage pressure and the measured leakage pressure of each deep layer.

[0142] In this embodiment, when the difference between the predicted leakage pressure and the measured leakage pressure is less than the preset threshold, it can be considered that the prediction effect of the revised second minimum horizontal principal stress model is better and can be used to predict the deep leakage pressure. If the difference between the predicted leakage pressure and the measured leakage pressure is greater than or equal to the preset threshold, the second minimum horizontal principal stress model needs to be repeatedly revised.

[0143] Figure 3 A flowchart of another method for predicting full wellbore leakage pressure provided in an embodiment of the present application. Figure 3 As shown, the electronic equipment can obtain the imaging fracture parameters, drilling engineering parameters, comprehensive logging parameters, rock mechanics parameters and geological sedimentation parameters of the imaging logging section, and construct the fracture aperture prediction model and the minimum horizontal principal stress model of each deep layer according to the above parameters, and then construct the one-dimensional radial loss pressure model of fracture extension according to the fracture aperture prediction model; and construct the statistical loss pressure model and the minimum horizontal principal stress model of each shallow layer according to the above parameters.

[0144] For each shallow layer, the statistical method of leakage pressure model is used to correct the minimum horizontal principal stress model and determine the shallow regression correction coefficient. When the minimum horizontal principal stress model predicts the shallow leakage pressure, the shallow regression correction coefficient is used to correct the prediction result.

[0145] For each deep layer, the minimum horizontal principal stress model is corrected by using the one-dimensional radial leakage pressure model of fracture extension to determine the deep regression correction coefficient. When the minimum horizontal principal stress model predicts the deep leakage pressure, the deep regression correction coefficient is used to correct the prediction result.

[0146] The corrected prediction results can also be compared with the field measured leakage pressure to verify whether the prediction results are accurate. If inaccurate, the prediction model and correction coefficient need to be adjusted in real time to improve the prediction accuracy; if accurate, the full wellbore leakage pressure profile can be output.

[0147] Table 1 shows the calculation results of the leakage pressure at the leakage point calculated by the full wellbore leakage pressure prediction method in the above embodiment. The corresponding full wellbore leakage pressure profile is as follows: Figure 4 shown.

[0148] from Figure 4 It can be seen that the well lost circulation at a depth of 3010m. The reason for the loss was that the mud density was greater than the equivalent density of the loss pressure. Through fine pressure control drilling, the leakage prevention materials were added, and the plugging was reconstructed. For the location where the loss pressure was low, the mud viscosity and leakage prevention materials were increased. According to the prediction structure of the loss pressure of the whole wellbore, the mud density was reasonably configured, which effectively reduced the frequency of leakage and shortened the drilling cycle.

[0149] The prediction of lost pressure can also be used in the fracturing design process, such as simulating crack expansion and predicting production. During acid fracturing construction, the fracturing fluid and proppant can also be reasonably selected based on the prediction of lost pressure.

[0150] Table 1 Example of calculation results of leakage pressure at leakage point

[0151]

[0152] Figure 5 FIG. 1 shows a schematic diagram of a full wellbore leakage pressure prediction device provided by an embodiment of the present application. Figure 5 As shown, the whole wellbore leakage pressure prediction device 10 of this embodiment is used to implement the operation corresponding to the electronic device in any of the above method embodiments. The whole wellbore leakage pressure prediction device 10 of this embodiment includes:

[0153] A construction module 11 is used to establish a shallow layer leakage pressure regression equation and correct the first minimum horizontal principal stress model according to the regression relationship between the first minimum horizontal principal stress model and the statistical leakage pressure model; wherein the depth represented by the shallow layer is less than a preset depth;

[0154] Prediction module 12, used for predicting shallow leakage pressure by using the modified first minimum horizontal principal stress model;

[0155] The construction module 11 is also used to establish a deep layer leakage pressure regression equation and correct the second minimum horizontal principal stress model according to the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension; wherein the depth represented by the deep layer is greater than or equal to the preset depth;

[0156] The prediction module 12 is also used to predict the deep-layer leakage pressure by using the modified second minimum horizontal principal stress model.

[0157] The whole wellbore lost pressure prediction device 10 provided in the embodiment of the present application can execute the above method embodiment. Its specific implementation principle and technical effects can be found in the above method embodiment, which will not be described in detail in this embodiment.

[0158] Figure 6 FIG. 1 shows a hardware structure diagram of an electronic device provided in an embodiment of the present application. Figure 6 As shown, the electronic device 20 is used to implement the operations corresponding to the electronic device in any of the above method embodiments. The electronic device 20 of this embodiment may include: a memory 21, a processor 22 and a communication interface 24.

[0159] The memory 21 is used to store computer programs. The memory 21 may include a high-speed random access memory (RAM), and may also include a non-volatile memory (NVM), such as at least one disk memory, and may also be a USB flash drive, a mobile hard disk, a read-only memory, a disk or an optical disk.

[0160] The processor 22 is used to execute the computer program stored in the memory to implement the method in the above embodiment. For details, please refer to the relevant description in the above method embodiment. The processor 22 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the invention can be directly embodied as being executed by a hardware processor, or executed by a combination of hardware and software modules in the processor.

[0161] Optionally, the memory 21 may be independent or integrated with the processor 22 .

[0162] When the memory 21 is a device independent of the processor 22, the electronic device 20 may further include a bus 23. The bus 23 is used to connect the memory 21 and the processor 22. The bus 23 may be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus. The bus may be divided into an address bus, a data bus, a control bus, and the like. For ease of representation, the bus in the drawings of the present application is not limited to only one bus or one type of bus.

[0163] The communication interface 24 may be connected to the processor 22 via the bus 23. The processor 22 may control the communication interface 24 to implement the functions of receiving and sending signals.

[0164] The electronic device provided in this embodiment can be used to execute the above-mentioned full wellbore leakage pressure prediction method. Its implementation method and technical effect are similar, and this embodiment will not be repeated here.

[0165] The present application also provides a computer-readable storage medium, in which a computer program / instruction is stored. When the computer program / instruction is executed by a processor, it is used to implement the methods provided in the various embodiments described above.

[0166] Among them, the computer-readable storage medium can be a computer storage medium or a communication medium. The communication medium includes any medium that facilitates the transmission of a computer program from one place to another. The computer storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer. For example, a computer-readable storage medium is coupled to a processor so that the processor can read information from the computer-readable storage medium and write information to the computer-readable storage medium. Of course, the computer-readable storage medium can also be a component of the processor. The processor and the computer-readable storage medium can be located in an application-specific integrated circuit (ASIC). In addition, the ASIC can be located in a user device. Of course, the processor and the computer-readable storage medium can also exist in a communication device as discrete components.

[0167] Specifically, the computer-readable storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk. The storage medium can be any available medium that can be accessed by a general or special-purpose computer.

[0168] The present application also provides a computer program product, which includes a computer program / instruction, and the computer program / instruction is stored in a computer-readable storage medium. At least one processor of the device can read the computer program / instruction from the computer-readable storage medium, and at least one processor executes the computer program / instruction so that the device implements the methods provided in the various embodiments described above.

[0169] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of modules is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or modules, which can be electrical, mechanical or other forms.

[0170] Among them, each module can be physically separated, for example, installed in different locations of a device, or installed on different devices, or distributed on multiple network units, or distributed on multiple processors. Each module can also be integrated together, for example, installed in the same device, or integrated in a set of codes. Each module can exist in the form of hardware, or can also exist in the form of software, or can also be implemented in the form of software plus hardware. The present application can select some or all of the modules according to actual needs to achieve the purpose of the present embodiment.

[0171] It should be understood that, although the various steps in the flowcharts in the above-described embodiments are sequentially displayed according to the indications of the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and they can be executed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily to be carried out sequentially, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.

[0172] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the above embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the above embodiments can still be modified, or some or all of the technical features can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for predicting full wellbore lost pressure, characterized in that: The method comprises: According to the regression relationship between the first minimum horizontal principal stress model and the statistical method leakage pressure model, a shallow leakage pressure regression equation is established and the first minimum horizontal principal stress model is corrected; wherein the depth represented by the shallow layer is less than the preset depth; The modified first minimum horizontal principal stress model is used to predict the shallow leakage pressure; According to the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension, a deep layer leakage pressure regression equation is established and the second minimum horizontal principal stress model is corrected; wherein the depth represented by the deep layer is greater than or equal to the preset depth; The modified second minimum horizontal principal stress model is used to predict deep leakage pressure.

2. The method according to claim 1, characterized in that The method further comprises: Obtain fracture parameters of each layer in the logging section, drilling engineering parameters of each layer in the entire wellbore, and rock mechanics parameters; wherein the fracture parameters include fracture length and fracture width, the drilling engineering parameters include drilling fluid density, drilling fluid viscosity, leakage rate and leakage amount of leakage points, and wellbore dimensions of each opening, and the rock mechanics parameters include Poisson's ratio and elastic modulus; Constructing a fracture aperture prediction model for each layer according to the fracture parameters, the drilling fluid density, the wellbore size and the rock mechanics parameters; According to the drilling fluid viscosity, the leakage rate and leakage amount of the leakage point, the wellbore size and the fracture aperture prediction model of each layer, a one-dimensional radial leakage pressure model of the fracture extension of each layer is constructed.

3. The method according to claim 2, characterized in that The method of predicting shallow leakage pressure by using the modified first minimum horizontal principal stress model includes: Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each shallow layer; The Poisson's ratio, the tectonic stress coefficient, the overlying formation pressure, the pore pressure and the effective stress coefficient of each shallow layer are input into the revised first minimum horizontal principal stress model, so that the revised first minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

4. The method according to claim 2, characterized in that: The method of predicting deep leakage pressure by using the modified second minimum horizontal principal stress model includes: Obtain the tectonic stress coefficient, overlying formation pressure, pore pressure and effective stress coefficient of each deep layer; The Poisson's ratio, the tectonic stress coefficient, the overlying formation pressure, the pore pressure and the effective stress coefficient of each deep layer are input into the modified second minimum horizontal principal stress model, so that the modified second minimum horizontal principal stress model outputs the leakage pressure of the corresponding layer.

5. The method according to claim 1, characterized in that The modifying the first minimum horizontal principal stress model comprises: The shallow layer leakage pressure regression equation corresponding to each shallow layer is used to predict the predicted leakage pressure of the corresponding layer; Obtain the measured leakage pressure of each shallow layer; Verifying the prediction effect of the first minimum horizontal principal stress model according to the predicted leakage pressure and the measured leakage pressure of each shallow layer; The modified second minimum horizontal principal stress model comprises: Using the deep layer leakage pressure regression equation corresponding to each layer in the deep layer, the predicted leakage pressure of the corresponding layer is predicted; Obtain the measured leakage pressure of each layer in the deep layer; The prediction effect of the second minimum horizontal principal stress model is verified based on the predicted leakage pressure and the measured leakage pressure of each deep layer.

6. The method according to claim 4, characterized in that After predicting the deep-layer leakage pressure by using the modified second minimum horizontal principal stress model, the method further includes: According to the leakage pressure of each shallow layer, determine the shallow leakage pressure profile; According to the leakage pressure of each layer in the deep layer, determine the deep leakage pressure profile; The shallow layer leakage pressure profile and the deep layer leakage pressure profile are combined to obtain the full wellbore leakage pressure profile.

7. A whole wellbore lost pressure prediction device, characterized in that: The device comprises: A construction module is used to establish a shallow layer leakage pressure regression equation and correct the first minimum horizontal principal stress model according to the regression relationship between the first minimum horizontal principal stress model and the statistical leakage pressure model; wherein the depth represented by the shallow layer is less than a preset depth; A prediction module, used for predicting shallow leakage pressure by using the modified first minimum horizontal principal stress model; The construction module is further used to establish a deep layer leakage pressure regression equation and correct the second minimum horizontal principal stress model according to the regression relationship between the second minimum horizontal principal stress model and the one-dimensional radial leakage pressure model of fracture extension; wherein the depth represented by the deep layer is greater than or equal to the preset depth; The prediction module is also used to predict the deep leakage pressure by using the modified second minimum horizontal principal stress model.

8. An electronic device, characterized in that: The device comprises: a memory and a processor; The memory is used to store computer programs; The processor is used to execute the computer program stored in the memory to implement the full wellbore lost pressure prediction method according to any one of claims 1-6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, it is used to implement the method for predicting the full wellbore lost pressure according to any one of claims 1 to 6.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the method for predicting the full wellbore lost pressure according to any one of claims 1 to 6 is implemented.

Citation Information

Cited By

  • Pump pressure prediction method and device, equipment, storage medium and program product

    CN120951887A

  • Method and system for acquiring stratum leakage pressure aiming at fractured stratum and natural fracture development characteristics of fractured stratum

    CN121960298A

  • Fractured formation and its natural fracture development characteristics of formation leakage pressure acquisition method and system

    CN121960298B