Apartment distribution system of smart park management platform

By designing an apartment allocation system in the smart park management platform and using an automated allocation module to allocate apartments based on personnel information, the unreasonable and unfair distribution problems caused by human interference are solved, and the rationality and fairness of apartment allocation are achieved.

CN118967059AInactive Publication Date: 2024-11-15HANGZHOU SHANGQI TECHNOLOGY CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411418941.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There is a lot of human interference in the distribution process of apartments in smart parks, resulting in unreasonable and unfair distribution.

Method used

A smart park management platform apartment allocation system is designed, including personnel information collection module, information data storage module, data processing and analysis module, processing and analysis result suspension module, apartment automatic allocation module and allocation information transfer module, through collection and Analyzer information, automatically allocate apartments, reduce human interference, and ensure fairness of distribution.

Benefits of technology

The rationality and fairness of apartment distribution are achieved, artificial interference is reduced, unfair distribution caused by undercover operations is avoided, and the transparency and fairness of the distribution process is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967059A_ABST
    Figure CN118967059A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of smart park management, and discloses an apartment distribution system of a smart park management platform, and the system is composed of a personnel information collection module, an information data storage module, a data processing and analysis module, a processing and analysis result temporary hanging module, an apartment automatic distribution module and a distribution information transfer module. Wherein the personnel information acquisition module is used for acquiring information data of personnel participating in apartment allocation, including work and rest time, age, ethnic group, working age limit, working skill level and honor obtaining quantity. When the apartments are distributed, the apartments are automatically distributed directly according to the personal information of the personnel participating in the apartment distribution, so that human interference factors in the apartment distribution process are reduced, the apartment distribution can be more fair, and the situation that the apartment distribution is not fair enough due to camera obscura operation in the apartment distribution process is avoided. And meanwhile, the apartment distribution is unreasonable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart park management, and more specifically discloses an apartment allocation system for a smart park management platform. Background Art

[0002] Park refers to a standard building or group of buildings that are generally planned and constructed by the government, with complete water supply, power supply, gas supply, communication, roads, storage and other supporting facilities, reasonable layout and can meet the production and scientific experiment needs of a specific industry, including industrial parks, industrial parks, logistics parks, urban industrial parks, science and technology parks, creative parks, smart parks, etc. Smart parks have become a hot topic in modern construction and development. With the rapid development and in-depth application of information technology, it has become an inevitable trend for parks to develop from informatization to a higher stage of intelligence. The integration of data and IT systems will realize the collaborative sharing of park data, industry action coordination, and refined operation and management of parks. In order to meet the housing needs of people in the park, apartments are usually built in the park, and then allocated to the staff in the park to meet the housing needs of work. However, at present, when allocating apartments, it is usually through the park leaders to evaluate the staff information and then manually allocate apartments to the staff in the park, which easily leads to unfairness in the allocation of apartments. In addition, when the apartments are allocated manually, there are more human interference factors, which easily leads to unreasonable apartment allocation. Summary of the invention

[0003] The present invention mainly provides an apartment allocation system for a smart park management platform, which can solve the problems of large human interference in the allocation of apartments, unfair apartment allocation and unreasonable apartment allocation.

[0004] To solve the above technical problems, according to one aspect of the present invention, more specifically, an apartment allocation system for a smart park management platform, the system includes a personnel information collection module, an information data storage module, a data processing and analysis module, a processing and analysis result suspension module, an apartment automatic allocation module, and an allocation information transfer module; wherein:

[0005] Personnel information collection module: used to collect information data of personnel involved in apartment allocation, including but not limited to work and rest time, age, ethnicity, years of work experience, work skill level, and number of honors received;

[0006] Information data storage module: used to store the information data of the personnel participating in the apartment allocation collected by the personnel information collection module, and after the apartment allocation is completed, store the allocated apartment and the personnel information in the apartment;

[0007] Data processing and analysis module: used to process and analyze the information data of the persons participating in the apartment allocation stored in the information data storage module, and determine whether the persons participating in the apartment allocation meet the conditions for allocating a single apartment. If it is determined that the conditions for allocating a single apartment are not met, the information data will continue to be processed and analyzed, and persons with similar living habits and ages will be allocated together;

[0008] Processing and analysis result suspension module: used to suspend the processing and analysis results of the data processing and analysis module, and send all the results to the apartment automatic allocation module after the personnel information data processing and analysis is completed;

[0009] Apartment automatic allocation module: used to automatically allocate apartments to personnel based on the results in the processing analysis result suspension module;

[0010] Allocation information transfer module: used to transfer the apartment information allocated by the apartment automatic allocation module and the corresponding personnel information in the apartment after allocation to the information data storage module.

[0011] Furthermore, the personnel information collection module is composed of a basic information collection module and an advanced information collection module;

[0012] Basic information collection module: used to collect basic information data of personnel, including but not limited to name, contact information, ethnicity, work and rest time, age, and ethnicity;

[0013] Advanced information collection module: used to collect personnel information including but not limited to years of service, work skill level, and number of honors received.

[0014] Furthermore, the information data storage module includes: a database module and a data updating module;

[0015] Database module: used to store the personnel information data collected by the personnel information collection module, and to store the allocated apartment information and the corresponding personnel information in the allocated apartment;

[0016] Data update module: used to update the information data stored in the database module based on the personnel information collected by the personnel information collection module and the information allocated to the apartments by the apartment automatic allocation module.

[0017] Furthermore, the data processing and analysis module is composed of a data calling module, a data pre-processing module and a data post-processing module;

[0018] Data calling module: used to call the personnel information data collected by the personnel information collection module from the information data storage module;

[0019] Data pre-processing module: used to process and analyze the working years, working skill level, and number of honors of the personnel called by the data calling module, so as to determine whether the personnel meet the conditions for allocating a single apartment;

[0020] Data post-processing module: used to process the work and rest time and age information data of the personnel called by the data calling module after the data pre-processing module determines that the personnel do not meet the conditions for allocating a single apartment, so as to allocate personnel with similar work and rest time and age together.

[0021] Furthermore, when the data processing module determines whether a person meets the conditions for allocating a single apartment based on the indicators of the person's years of work, work skill level, and number of honors, it first obtains the comprehensive ability score of the person based on the above indicators:

[0022] ;

[0023] in, The comprehensive ability score of the personnel. is the indicator parameter, is the score coefficient corresponding to the corresponding indicator, and Z is the total number of indicator parameters;

[0024] Then, when the apartments are first allocated, if:

[0025] ;

[0026] If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person p in the current personnel work unit, S is the total number of people in the current personnel work unit, is the weight coefficient, , is the weight parameter threshold, ;

[0027] When allocating apartments to personnel at a later stage, the following conditions must be met in addition to the above conditions:

[0028] ;

[0029] If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person r who has moved into the single apartment, and A is the total number of people who have moved into the single apartment.

[0030] Furthermore, when the data post-processing module allocates people with similar work and rest time and age together, at the beginning of allocating apartments, if:

[0031] ;

[0032] Then the current person n is assigned together with other persons j; , , are the sleeping time, waking time, and age of the current person n, respectively. , , are the bedtime, wake-up time, and age of other person j, respectively. if(x,y,z) means that if condition x is met, then result y is returned, otherwise result z is returned;

[0033] When allocating apartments to personnel at a later stage, if: ;

[0034] Then assign the current person n to apartment g, , , are the sleeping time, waking time, and age of each person f in the current multi-person apartment g, and B is the total number of people in the current multi-person apartment g.

[0035] Furthermore, the apartment automatic allocation module includes: a suspension result acquisition module, an apartment status acquisition module, a personnel contact information acquisition module and an allocation message push module;

[0036] Suspended result acquisition module: used to obtain the results of the temporarily suspended data processing and analysis module from the processing and analysis result suspension module;

[0037] Apartment status acquisition module: used to obtain the status of the apartment, including occupied, unoccupied, fully occupied, and not fully occupied;

[0038] Personnel contact information acquisition module: used to obtain the contact information of personnel involved in apartment allocation;

[0039] Allocation message push module: used to push apartment allocation information to personnel participating in apartment allocation based on the contact information of personnel participating in apartment allocation obtained by the personnel contact information acquisition module.

[0040] Furthermore, when allocating apartments to personnel in the later stage, the apartment status is obtained through the apartment status acquisition module. When the personnel meets the conditions for allocation of a single apartment, an unoccupied single apartment is obtained, and the room number and location of the single apartment are pushed to the personnel; when the personnel do not meet the conditions for allocation of a single apartment, a multi-person apartment that is occupied but not fully occupied is first obtained, and the room number and location of the multi-person apartment are pushed to the personnel; when there is no multi-person apartment that is occupied but not fully occupied, an unoccupied multi-person apartment is obtained, and the room number and location of the multi-person apartment are pushed to the personnel.

[0041] The beneficial effects of the apartment allocation system of the smart park management platform of the present invention are:

[0042] (1) When allocating apartments, we first determine the individual's comprehensive ability based on personal indicator parameters, including years of work experience, work skill level, and number of honors received. We then determine whether the individual meets the conditions for a single apartment based on his or her comprehensive ability. If the individual meets the conditions for a single apartment, a single apartment will be allocated to him or her. If the individual does not meet the conditions for a single apartment, people with similar personal conditions will be allocated to the same apartment based on their work and rest schedules, age, and personal conditions, so that the allocation can be more reasonable.

[0043] (2) When allocating apartments, apartments are automatically allocated based on the personal information of the persons involved in the allocation, which reduces human interference in the allocation process, makes the allocation of apartments more fair, and avoids unfair and unreasonable allocation of apartments due to secret operations in the allocation process.

[0044] (3) When allocating single apartments in the later stage, we first judge the individual's comprehensive ability in the current work unit based on personal indicator parameters, including years of work experience, work skill level, and number of honors obtained, and then combine this with the judgment of the individual's comprehensive ability among those who have already moved into single apartments, so that the allocation of single apartments in the later stage can be more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0046] Figure 1 This is a schematic diagram of the system principle. DETAILED DESCRIPTION

[0047] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0048] According to one aspect of the present invention, there is provided an apartment allocation system for a smart park management platform. When allocating apartments, the system first collects information of personnel participating in the allocation of apartments through a personnel information collection module, and uses a basic information collection module to collect basic information data such as the personnel's name, contact information, ethnicity, work and rest time, age, and ethnicity. At the same time, an advanced information collection module is used to collect information data such as the personnel's years of work experience, work skill level, and number of honors received.

[0049] The collected personnel information is then sent to the database module in the information data storage module for storage. In the subsequent use process, the data update module will update the information data stored in the database module through the personnel information collected by the personnel information collection module and the information after the apartment automatic allocation module allocates the apartments.

[0050] When apartments are first allocated (when no one lives in the apartment yet), the data processing and analysis module uses the data calling module to call the personnel information data collected by the personnel information collection module from the information data storage module, and processes and analyzes the personnel's years of service, work skill level, and number of honors obtained by the data calling module through the data processing module, so as to determine whether the personnel meets the conditions for allocating a single apartment: First, the comprehensive ability score of the personnel is obtained based on the above indicators:

[0051] ;

[0052] in, The comprehensive ability score of the personnel. is the indicator parameter, is the score coefficient corresponding to the corresponding indicator, such as the score coefficients corresponding to working years, working skill level, and number of honors are 1 point / year, 2 points / level, and 3 points / honor respectively. The specific score coefficients can be determined by the actual management personnel. Z is the total number of indicator parameters; if:

[0053] ;

[0054] If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person p in the current personnel work unit, S is the total number of people in the current personnel work unit, is the weight coefficient, , is the weight parameter threshold, .

[0055] When it is determined that a person does not meet the conditions for allocating a single apartment, the data post-processing module processes the work and rest time and age information data of the person called by the data calling module, so as to allocate people with similar work and rest time and age together. If:

[0056] ;

[0057] Then the current person n is assigned together with other persons j; , , are the sleeping time, waking time, and age of the current person n, respectively. , , are the sleeping time, waking time and age of other person j respectively. if(x,y,z) means that the condition x ( ), then the result y is returned ( ), otherwise return the result z(0).

[0058] Then the processing and analysis results obtained above are temporarily suspended by the processing and analysis result suspension module. After all the information data are completed, the suspension result acquisition module in the apartment automatic allocation module acquires the processing and analysis results of the temporarily suspended data processing and analysis module.

[0059] At the same time, the apartment status acquisition module obtains the status of the apartment, including occupied, unoccupied, fully occupied, and not fully occupied, and obtains the contact information of the personnel involved in the apartment allocation through the personnel contact information acquisition module.

[0060] Then, a single-person apartment with an unoccupied status is randomly allocated to a person who meets the requirements for a single-person apartment, and multiple people who do not meet the requirements for a single-person apartment and have similar schedules and ages are randomly allocated to a multi-person apartment with an unoccupied status.

[0061] Finally, the allocation information (including apartment number and apartment location) is pushed to the people involved in the apartment allocation through the allocation message push module.

[0062] When the apartment is subsequently allocated (when the apartment is already occupied), if the following conditions are met:

[0063] ;

[0064] If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person r who has moved into the single apartment, and A is the total number of people who have moved into the single apartment. This can make the subsequent allocation of single apartments more fair.

[0065] When it is determined that a person does not meet the conditions for allocating a single apartment, if: ;

[0066] Then assign the current person n to apartment g, , , are the sleeping time, waking time, and age of each person f in the current multi-person apartment g, and B is the total number of people in the current multi-person apartment g.

[0067] Then the processing and analysis results obtained above are temporarily suspended by the processing and analysis result suspension module. After all the information data are completed, the suspension result acquisition module in the apartment automatic allocation module acquires the processing and analysis results of the temporarily suspended data processing and analysis module.

[0068] At the same time, the apartment status acquisition module obtains the status of the apartment, including occupied, unoccupied, fully occupied, and not fully occupied, and obtains the contact information of the personnel involved in the apartment allocation through the personnel contact information acquisition module.

[0069] Then, a single-person apartment in the unoccupied state is randomly allocated to a person who meets the requirements for allocating a single-person apartment. When the person does not meet the requirements for allocating a single-person apartment, a multi-person apartment that is occupied but not fully occupied is first obtained, and the room number and location of the multi-person apartment are pushed to the person through the allocation message push module. When there is no multi-person apartment that is occupied but not fully occupied, an unoccupied multi-person apartment is obtained, and the room number and location of the multi-person apartment are pushed to the person.

[0070] Finally, the allocated apartments and the corresponding personnel information of the allocated apartments (including apartment number, apartment location, names of people in the apartment, contact information, nationality, etc.) are stored in the information data storage module through the allocation information transfer module.

[0071] Specifically, in this embodiment, at the beginning of apartment allocation, there are three employees A, B, and C in a certain work unit. Among them, employee A has worked for 3 years, his assessed work skill level is 2 (the higher the level, the more skilled the work skills), and he has won 1 excellent employee honor during his work. Employee B has worked for 5 years, his assessed work skill level is 4, and he has won 2 excellent employee honors and 1 work progress honor during his work. Employee C has worked for 1 year, his assessed work skill level is 1, and he has not won any honors during his work. Based on the above indicator information of each employee, the comprehensive ability score of employee A can be obtained = . Employee B's comprehensive ability score = . Employee C's comprehensive ability score = From this, we can get the weight parameter threshold for judging whether a person meets the conditions for allocating a single apartment. .

[0072] In summary:

[0073] , therefore, employee A does not meet the conditions for allocation of a single apartment.

[0074] , therefore, employee B meets the conditions for allocation of a single apartment.

[0075] , therefore, employee C does not meet the conditions for allocation of a single apartment.

[0076] After determining that employees A and C do not meet the conditions for allocating a single apartment, obtain the record of employee A's wake-up time of 8:30, bedtime of 10:45, and age of 26. Obtain the record of employee C's wake-up time of 9:00, bedtime of 11:15, and age of 23. At this time, we can get:

[0077] .

[0078] Then assign employees A and C together.

[0079] If the record of employee A's wake-up time is 8:30, bedtime is 10:45, and age is 26. The record of employee C's wake-up time is 9:30, bedtime is 11:30, and age is 23, then we can get:

[0080]

[0081] Then employees A and C are not assigned together.

[0082] When apartments are allocated later, there are three employees in a certain work unit, A, B, and C. Employee A has worked for 3 years, and his work skill level is 2 (the higher the level, the more skilled the work skills are), and he has won 1 excellent employee honor during his work. Employee B has worked for 5 years, and his work skill level is 4, and he has won 2 excellent employee honors and 1 work progress honor during his work. Employee C has worked for 1 year, and his work skill level is 1, and he has not won any honors during his work. Based on the above indicator information of each employee, the comprehensive ability score of employee A can be obtained = . Employee B's comprehensive ability score = . Employee C's comprehensive ability score = From this, we can get the weight parameter threshold for judging whether a person meets the conditions for allocating a single apartment. .

[0083] Employees C, D, and E have already moved into the single apartment, and the comprehensive ability scores of employees C, D, and E are 4.6, 4.7, and 5 respectively.

[0084] In summary:

[0085] , therefore, employee A does not meet the conditions for allocation of a single apartment.

[0086] , therefore, employee B meets the conditions for allocation of a single apartment.

[0087] , therefore, employee C does not meet the conditions for allocation of a single apartment.

[0088] When employees A and C do not meet the conditions for allocating a single apartment, the record of employee A's wake-up time is 8:45, bedtime is 10:45, and age is 26. The record of employee C's wake-up time is 9:00, bedtime is 11:15, and age is 23. At the same time, get the other apartments G1 and G2 that are not fully occupied. Apartment G1 has 2 people living in it, whose ages are 28 and 30 respectively, and apartment G2 has 3 people living in it, whose ages are 22, 21, and 24 respectively. Therefore, the average age of apartment G1 is 29, and the average age of apartment G2 is 22. The bedtimes of each person in apartment G1 are 10:30 and 11:00 respectively, and the wake-up times are 9:00 and 8:45. Therefore, it can be obtained that the lights-out and bedtime of apartment G1 are , Apartment G1's wake-up time is , since the time is rounded up to 60, we can get the lights-out time for Apartment G1 to go to bed is 11:05, and the wake-up time is 9:12. The sleep time for each person in Apartment G2 is 11:00, 11:15, and 11:25, and the wake-up time for each person in Apartment G2 is 9:00, 8:50, and 9:15. Similarly, we can get the lights-out time for Apartment G2 to go to bed is 11:13, and the wake-up time for Apartment G2 is 9:28.

[0089] When assigning employees A and C

[0090] .

[0091] .

[0092] Therefore, it can be concluded that employee A's working and rest age is more consistent with apartment G1, so employee A is assigned to apartment G1.

[0093] .

[0094] .

[0095] Therefore, it can be concluded that the working and resting age of employee C is more in line with apartment G2, so employee C is assigned to apartment G2.

[0096] The electrical components that appear in this article are all electrical components that exist in reality.

[0097] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. An apartment allocation system for a smart park management platform, characterized in that: The system includes a personnel information collection module, an information data storage module, a data processing and analysis module, a processing and analysis result suspension module, an apartment automatic allocation module, and an allocation information transfer module; wherein: Personnel information collection module: used to collect information data of personnel involved in apartment allocation, including work and rest time, age, nationality, years of work experience, work skill level, and number of honors received; Information data storage module: used to store the information data of the personnel participating in the apartment allocation collected by the personnel information collection module, and after the apartment allocation is completed, store the allocated apartment and the personnel information in the apartment; Data processing and analysis module: used to process and analyze the information data of the persons participating in the apartment allocation stored in the information data storage module, and determine whether the persons participating in the apartment allocation meet the conditions for allocating a single apartment. If it is determined that the conditions for allocating a single apartment are not met, the information data will continue to be processed and analyzed, and persons with similar living habits and ages will be allocated together; Processing and analysis result suspension module: used to suspend the processing and analysis results of the data processing and analysis module, and send all the results to the apartment automatic allocation module after the personnel information data processing and analysis is completed; Apartment automatic allocation module: used to automatically allocate apartments to personnel based on the results in the processing analysis result suspension module; Allocation information transfer module: used to transfer the apartment information allocated by the apartment automatic allocation module and the corresponding personnel information in the apartment after allocation to the information data storage module.

2. The apartment allocation system of the smart park management platform according to claim 1 is characterized by: The personnel information collection module is composed of a basic information collection module and an advanced information collection module; Basic information collection module: used to collect basic information data of personnel including name, contact information, ethnicity, work and rest time, age, and ethnicity; Advanced information collection module: used to collect personnel information including years of work experience, work skill level, and number of honors received.

3. The apartment allocation system of the smart park management platform according to claim 1 is characterized by: The information data storage module includes: a database module and a data updating module; Database module: used to store the personnel information data collected by the personnel information collection module, and to store the allocated apartment information and the corresponding personnel information in the allocated apartment; Data update module: used to update the information data stored in the database module based on the personnel information collected by the personnel information collection module and the information allocated to the apartments by the apartment automatic allocation module.

4. The apartment allocation system of the smart park management platform according to claim 1 is characterized by: The data processing and analysis module is composed of a data calling module, a data pre-processing module and a data post-processing module; Data calling module: used to call the personnel information data collected by the personnel information collection module from the information data storage module; Data pre-processing module: used to process and analyze the working years, working skill level, and number of honors of the personnel called by the data calling module, so as to determine whether the personnel meet the conditions for allocating a single apartment; Data post-processing module: used to process the work and rest time and age information data of the personnel called by the data calling module after the data pre-processing module determines that the personnel do not meet the conditions for allocating a single apartment, so as to allocate personnel with similar work and rest time and age together.

5. The apartment allocation system of the smart park management platform according to claim 4 is characterized by: When the data processing module determines whether a person meets the conditions for allocating a single apartment based on the person's years of work, work skill level, and number of honors, it first obtains the person's comprehensive ability score based on the above indicators: ; in, The comprehensive ability score of the personnel. is the indicator parameter, is the score coefficient corresponding to the corresponding indicator, and Z is the total number of indicator parameters; Then, when the apartments are first allocated, if: ; If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person p in the current personnel work unit, S is the total number of people in the current personnel work unit, is the weight coefficient, , is the weight parameter threshold, ; When allocating apartments to personnel at a later stage, the following conditions must be met in addition to the above conditions: ; If the current person meets the conditions for allocating a single apartment, otherwise, he / she does not meet the conditions; is the comprehensive ability score of each person r who has moved into the single apartment, and A is the total number of people who have moved into the single apartment.

6. The apartment allocation system of the smart park management platform according to claim 4 is characterized by: When the data post-processing module allocates people with similar schedules and ages together, at the beginning of allocating apartments, if: ; Then the current person n is assigned together with other persons j; , , are the sleeping time, waking time, and age of the current person n, respectively. , , are the bedtime, wake-up time, and age of other person j, respectively. if(x,y,z) means that if condition x is met, then result y is returned, otherwise result z is returned; When allocating apartments to personnel at a later stage, if: ; Then assign the current person n to apartment g, , , are the sleeping time, waking time, and age of each person f in the current multi-person apartment g, and B is the total number of people in the current multi-person apartment g.

7. The apartment allocation system of the smart park management platform according to claim 6 is characterized by: The apartment automatic allocation module includes: a suspension result acquisition module, an apartment status acquisition module, a personnel contact information acquisition module and an allocation message push module; Suspended result acquisition module: used to obtain the results of the temporarily suspended data processing and analysis module from the processing and analysis result suspension module; Apartment status acquisition module: used to obtain the status of the apartment, including occupied, unoccupied, fully occupied, and not fully occupied; Personnel contact information acquisition module: used to obtain the contact information of personnel involved in apartment allocation; Allocation message push module: used to push apartment allocation information to personnel participating in apartment allocation based on the contact information of personnel participating in apartment allocation obtained by the personnel contact information acquisition module.

8. The apartment allocation system of the smart park management platform according to claim 7 is characterized by: When an apartment is allocated to a person in a later stage, the apartment status is obtained through the apartment status acquisition module. When the person meets the conditions for allocating a single-person apartment, an unoccupied single-person apartment is obtained, and the room number and location of the single-person apartment are pushed to the person; when the person does not meet the conditions for allocating a single-person apartment, a multi-person apartment that is occupied but not fully occupied is first obtained, and the room number and location of the multi-person apartment are pushed to the person; when there is no multi-person apartment that is occupied but not fully occupied, an unoccupied multi-person apartment is obtained, and the room number and location of the multi-person apartment are pushed to the person.

Citation Information

Patent Citations

  • Labor worker dormitory distribution method and system thereof

    CN106886854A

  • Group-based guest room allocation method and device, computer equipment and storage medium

    CN112907053A

  • Identity recognition and action task-based accommodation room distribution system and method

    CN115481934A

  • Dormitory management system and accommodation management method

    CN116151523A

  • Student dormitory allocation method and device, electronic device and storage medium

    CN116894552A