Energy scheduling method and device for multi-phase unbalanced load

By calculating the current given coefficients of each phase based on the inverter power and load power in the grid-connected energy storage system and performing energy scheduling, the load imbalance problem of each phase is solved, and the utilization rate of inverter energy and system benefits are improved.

CN118970978AInactive Publication Date: 2024-11-15GUANGZHOU SANJING ELETRIC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411086666.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There is a problem of load imbalance in the grid-connected energy storage system, which negatively affects the utilization rate of inverter energy and system benefits.

Method used

When the inverting direction of the grid-connected energy storage system is to sell electricity or buy electricity, the power reference of each phase is determined based on the inverting power and load power, and the current reference is determined based on the ratio of the power reference to the grid voltage, and the power supply is calculated. The current is given a coefficient and incorporated into the control loop of the current loop to perform energy scheduling to realize the reallocation of power of each phase.

Benefits of technology

It improves the utilization rate of inverter energy and system efficiency, ensures the reasonable distribution and balanced output of power in each phase, and reduces the energy loss of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970978A_ABST
    Figure CN118970978A_ABST
Patent Text Reader

Abstract

The invention relates to an energy scheduling method and device for a multi-phase unbalanced load, and the method comprises the steps: determining the given power of each phase of a grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system when the inverter direction of the grid-connected energy storage system is a power selling direction; and determining the given current of each phase according to the ratio of the given power of each phase to the network voltage, and determining the maximum value of the given current. And determining a given current coefficient of each phase according to the ratio of the given current of each phase to the maximum value, merging the given current coefficient into a control loop of a current loop of the grid-connected energy storage system, and performing energy scheduling according to the control loop. On the basis, the power of each phase of the grid-connected energy storage system is redistributed, so that the reasonable distribution of the inversion power is realized, and the utilization rate of the inversion energy and the system benefit are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of energy scheduling of energy storage systems, and in particular to a method and device for scheduling energy of multi-phase unbalanced loads. Background Art

[0002] Grid-connected energy storage systems are an important part of the electric energy industry, which can help balance the difference between energy supply and demand, provide stable energy supply, achieve peak load shaving and optimize energy utilization. Grid-connected energy storage systems can also optimize the utilization rate of renewable energy such as photovoltaic energy, overcome the intermittent and volatile nature of some renewable energy, enable better integration into the power grid, and enhance the stability and reliability of the power system.

[0003] The lines between the grid-connected energy storage system and the power grid and load can be divided into single-phase or multi-phase lines according to demand, such as RST three-phase lines. In a multi-phase line network, the actual mounted load equipment may be a single-phase device, and the grid-connected power purchase and power sale of the grid-connected energy storage system are billed independently for each phase. For example, in a certain area, the three-phase power grid purchases and sells electricity separately, and the selling price is only 0.2 times the purchase price. The power equipment used by users is mostly single-phase equipment, and the three-phase grid-connected energy storage system is connected to the grid for balanced output, so there will be a situation where one phase of the system grid sells electricity and one phase buys electricity, resulting in users may need to pay for electricity purchases even if the total energy of the system is sold to the grid. The above problem, that is, the problem of unbalanced loads in each phase of the current grid-connected energy storage system, has a significant negative impact on the utilization rate of inverter energy and system benefits. Summary of the invention

[0004] Based on this, in order to address the problem of unbalanced loads on each phase in current grid-connected energy storage systems, which has a significant negative impact on the utilization rate of inverter energy and system benefits, the embodiments of the present disclosure provide an energy scheduling method and device for multi-phase unbalanced loads.

[0005] The present disclosure provides an energy scheduling method for a multi-phase unbalanced load, comprising the steps of:

[0006] When the inversion direction of the grid-connected energy storage system is the power selling direction, the power setting of each phase of the grid-connected energy storage system is determined according to the inversion power and load power of the grid-connected energy storage system;

[0007] Determine the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determine the maximum value of the current setting;

[0008] Determining a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value;

[0009] The current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy scheduling is performed according to the control loop.

[0010] The energy dispatching method for multi-phase unbalanced loads of the disclosed embodiment, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy dispatch is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency.

[0011] As one of the optional embodiments, the method further includes the steps of:

[0012] When the inversion direction of the grid-connected energy storage system is the power purchasing direction, the current reference coefficient of each phase is set to 1.

[0013] As one of the optional embodiments, the process of determining the power given for each phase of the grid-connected energy storage system according to the inverter power and the load power comprises the steps of:

[0014] When the inverter power is less than the load power, the load factor of each phase is determined according to the ratio of the load power of each phase to the load power;

[0015] The power setting of each phase is determined according to the product of the load factor of each phase and the inverter power.

[0016] As one of the optional embodiments, the process of determining the power given for each phase of the grid-connected energy storage system according to the inverter power and the load power comprises the steps of:

[0017] When the inverter power is greater than the load power, the difference between the inverter power and the load power is evenly divided and superimposed with the load power of each phase to obtain the power setting of each phase.

[0018] As one of the optional embodiments, before the process of determining the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage and determining the maximum value of the current setting, the step of:

[0019] When the power given by a specific phase is greater than the maximum power limit of the phase, the power portion of the specific phase exceeding the maximum power limit is compensated to other phases.

[0020] As one of the optional embodiments, the control loop of the current loop is a control loop based on an SPWM algorithm.

[0021] As one of the optional embodiments, the process of incorporating the given current coefficient into the control loop of the current loop of the grid-connected energy storage system and performing energy scheduling according to the control loop includes the steps of:

[0022] SPWM modulation is performed according to the current setting coefficient of each phase, the grid angle, the current setting, the current sampling and the grid feedforward.

[0023] The present disclosure also provides an energy scheduling device for a multi-phase unbalanced load, including:

[0024] A power setting module, used to determine the power setting of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system when the inversion direction of the grid-connected energy storage system is the power selling direction;

[0025] The current setting module is used to determine the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determine the maximum value of the current setting;

[0026] A coefficient setting module, used for determining a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value;

[0027] The energy scheduling module is used to incorporate the current given coefficient into the control loop of the current loop of the grid-connected energy storage system and perform energy scheduling according to the control loop.

[0028] The energy dispatching device for multi-phase unbalanced loads of the disclosed embodiment, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy dispatch is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency.

[0029] At least one embodiment of the present disclosure further provides a data control device, including:

[0030] one or more memories non-transitorily storing computer-executable instructions;

[0031] One or more processors are configured to execute computer executable instructions, wherein the computer executable instructions, when executed by the one or more processors, implement the energy scheduling method for multi-phase unbalanced loads according to any embodiment of the present disclosure.

[0032] The above-mentioned data control device, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy scheduling is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency.

[0033] At least one embodiment of the present disclosure further provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are executed by a processor, an energy scheduling method for a multi-phase unbalanced load according to any embodiment of the present disclosure is implemented.

[0034] The above-mentioned non-transient computer-readable storage medium, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy scheduling is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A flow chart of an energy scheduling method for multi-phase unbalanced loads according to a disclosed embodiment;

[0036] Figure 2 A flow chart of an energy scheduling method for multi-phase unbalanced loads according to a preferred embodiment;

[0037] Figure 3 A flow chart of an energy dispatching method for multi-phase unbalanced loads of a three-phase grid-connected energy storage system;

[0038] Figure 4 It is the flow chart of SPWM control loop;

[0039] Figure 5 A module structure diagram of an energy dispatching device for multi-phase unbalanced loads according to a disclosed embodiment;

[0040] Figure 6 A schematic block diagram of a data control device provided for at least one embodiment of the present disclosure;

[0041] Figure 7 A schematic diagram of a non-transitory computer-readable storage medium provided for at least one embodiment of the present disclosure. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings of the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the described embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0043] Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0044] In order to keep the following description of the embodiments of the present disclosure clear and concise, the present disclosure omits detailed descriptions of some known functions and known components.

[0045] The embodiment of the present disclosure provides an energy scheduling method for a multi-phase unbalanced load.

[0046] Figure 1 FIG. 1 is a flow chart of an energy scheduling method for a multi-phase unbalanced load according to a disclosed embodiment. Figure 1 As shown, a method for energy scheduling of a multi-phase unbalanced load in a disclosed embodiment includes steps S100 to S103:

[0047] S100, when the inversion direction of the grid-connected energy storage system is the power selling direction, determining the power setting of each phase of the grid-connected energy storage system according to the inversion power and load power of the grid-connected energy storage system;

[0048] S101, determining the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determining the maximum value of the current setting;

[0049] S102, determining a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value;

[0050] S103, incorporating the given current coefficient into a control loop of the current loop of the grid-connected energy storage system, and performing energy scheduling according to the control loop.

[0051] The grid-connected energy storage system used in the embodiment of the present disclosure includes two-phase or more than two-phase lines for connecting load equipment or power grids. In the grid-connected energy storage system, each phase line is independent and has corresponding power, voltage, current, etc. At the same time, in the grid-connected energy storage system, it itself has a control loop for output control. In order to facilitate the explanation of the embodiment of the present disclosure, the following uses a three-phase grid-connected energy storage system with R phase, S phase and T phase as an example to explain each process.

[0052] Among them, when the grid-connected energy storage system is buying or selling electricity, the inverter INV needs to be used between the grid and the energy storage system for inversion processing. The grid-connected energy storage system can determine the inversion direction of the grid-connected energy storage system based on the overall behavior of buying or selling electricity. When the overall behavior is selling electricity, the inversion direction is the selling direction; when the overall behavior is buying electricity, the inversion direction is the buying direction.

[0053] As one of the embodiments, Figure 1 As shown, a method for energy scheduling of a multi-phase unbalanced load in a disclosed embodiment includes step S104:

[0054] S104, when the inversion direction of the grid-connected energy storage system is the power purchasing direction, the current reference coefficient of each phase is set to 1.

[0055] When the current given coefficient is 1, it is fed back to the subsequent control loop, that is, the output of each phase of the grid-connected energy storage system is not adjusted. At this time, the grid-connected energy storage system as a whole purchases electricity from the grid and does not output inverter energy, so there is no need to adjust the utilization rate of inverter energy.

[0056] When the inversion direction of the grid-connected energy storage system is the power selling direction, the power setting of each phase of the grid-connected energy storage system is determined according to the inverter power Pinv and the load power Pload of the grid-connected energy storage system. The power setting is a transitional value used to calculate the current setting coefficient.

[0057] As one of the preferred embodiments, Figure 2 FIG. 1 is a flow chart of an energy scheduling method for multi-phase unbalanced loads according to a preferred embodiment. Figure 2 As shown, the process of determining the given power of each phase of the grid-connected energy storage system according to the inverter power and the load power in step S100 includes steps S200 and S201:

[0058] S200, when the inverter power is less than the load power, determining the load factor of each phase according to the ratio of the load power of each phase to the load power;

[0059] S201, determining the power setting of each phase according to the product of the load factor of each phase and the inverter power.

[0060] Among them, the load of each phase is independent. Taking the three-phase grid-connected energy storage system as an example, the load power of each phase is PRload, PSload and PTload respectively. According to the ratio of the load power PXload of each phase to the load power Pload, the load factor PXload / Pload of each phase is determined (where X is R / S / T).

[0061] According to the product of the inverter power Pinv and the load factor PXload / Pload, the power reference PXload / Pload*Pinv of the X phase is determined.

[0062] As one of the preferred embodiments, Figure 2 As shown, the process of determining the given power of each phase of the grid-connected energy storage system according to the inverter power and the load power in step S100 also includes step S202:

[0063] S202, when the inverter power is greater than the load power, evenly divide the difference between the inverter power and the load power, and add the difference with the load power of each phase to obtain the power setting of each phase.

[0064] Taking the three-phase grid-connected energy storage system as an example, when the inverter power Pinv is greater than the load power Pload, the difference between the inverter power Pinv and the load power Pload is evenly divided, that is, the average value Psurplus = (Pinv-Pload) / 3. Among them, 3 is the number of phases, which can be adjusted according to the actual number of phases of the grid-connected energy storage system. Superimposed with the load power PXload of each phase, that is, the power reference of each phase PXRef = PXload + Psurplus. Among them, X is R / S / T. PXRef represents the power reference of phase X.

[0065] As one of the preferred embodiments, Figure 2 As shown, before the process of determining the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage in step S101 and determining the maximum value of the current setting, the process further includes step S203:

[0066] S203: When the power given by a specific phase is greater than the maximum power limit of the phase, the power portion of the specific phase exceeding the maximum power limit is compensated to other phases.

[0067] In a multi-phase grid-connected energy storage system, according to the actual power management, each phase has a maximum power limit as an operating parameter. After completing the power setting, since the power setting is a transition value calculated by the algorithm, there is a case where the power setting is greater than the maximum power limit. If the power setting of a phase is greater than the maximum power limit, the phase is a specific phase. The power setting of the specific phase is set to the maximum power limit, and the power exceeding the maximum power limit is partially compensated to other phases. Among them, the power setting of other phases is less than the maximum power limit.

[0068] As one of the optional embodiments, the maximum power limit of the phase is calculated according to the maximum current limit of the multi-phase grid-connected energy storage system. The maximum power limit is taken as the product of the maximum current limit of each phase and the grid voltage of the phase. Taking the three-phase grid-connected energy storage system as an example, the maximum power limit of phase X is PXMax=XGridVolt*CurrentMax (where X is R / S / T), where XGridVolt represents the grid voltage of phase X, and CurrentMax represents the maximum current limit.

[0069] Taking a three-phase grid-connected energy storage system as an example, when the power reference PXRef of phase X is greater than the maximum power limit PXMax, the power portion of phase X that exceeds the maximum power limit is compensated to other phases.

[0070] As one of the preferred embodiments, the power portion of a specific phase that exceeds the maximum power limit is evenly distributed and compensated to other phases.

[0071] Preferably, taking a three-phase grid-connected energy storage system as an example, Figure 3 The flow chart of the energy dispatching method for multi-phase unbalanced load of three-phase grid-connected energy storage system is as follows: Figure 3 As shown, after determining the power reference PXRef of each phase, the current reference of the X phase is determined according to the ratio of the power reference PXRef to the grid voltage XGridVolt, that is, IXCurrentRef = PXRef / XGridVolt. The current references of the three phases of RST (IRCurrentRef, ISCurrentRef, ITCurrentRef) are determined, and the maximum value thereof is selected, that is, MAX(IRCurrentRef, ISCurrentRef, ITCurrentRef).

[0072] As one of the preferred embodiments, Figure 3As shown, the current reference IXCurrentRef of the X phase is divided by the maximum value MAX to obtain the current reference coefficient IXCurrentCoff of the X phase (where X is R / S / T).

[0073] As one of the preferred embodiments, the control loop of the current loop is a control loop based on the SPWM algorithm. The current given coefficient is input into the control loop, and the output of each phase of the multi-phase grid-connected energy storage system is modulated according to the SPWM modulation output.

[0074] As one of the preferred embodiments, Figure 2 As shown, in step S103, the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and the process of energy scheduling is performed according to the control loop, including step S204:

[0075] S204, performing SPWM modulation according to the current setting coefficient of each phase, the grid angle, the current setting, the current sampling and the grid feedforward.

[0076] Figure 4 This is the SPWM control loop flow chart, such as Figure 4 As shown in the figure, taking the three-phase grid-connected energy storage system as an example, the current reference coefficient IXCurrentCoff is used as input, and the modulated current reference is output in conjunction with the grid angle. Among them, sinΘ is the R-phase grid angle, sin(Θ+2 / 3*Π) is the S-phase grid angle, and sin(Θ-2 / 3*Π) is the T-phase grid angle. IRRef is the R-phase current reference, ISRef is the S-phase current reference, and ITRef is the T-phase current reference. The modulated current reference is output to the PR controller together with the current sampling IX of each phase, and the output of the PR controller and the grid feedforward VXgrid of the X phase act on the SPWM controller together.

[0077] The energy dispatching method for multi-phase unbalanced load of any embodiment of the present disclosure, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy dispatch is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency.

[0078] The disclosed embodiment also provides an energy scheduling device for a multi-phase unbalanced load.

[0079] Figure 5 FIG. 1 is a block diagram of an energy dispatching device for a multi-phase unbalanced load according to a disclosed embodiment. Figure 5 As shown, an energy dispatching device for a multi-phase unbalanced load in one embodiment includes:

[0080] The power setting module 100 is used to determine the power setting of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system when the inversion direction of the grid-connected energy storage system is the power selling direction;

[0081] The current setting module 101 is used to determine the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determine the maximum value of the current setting;

[0082] A coefficient setting module 102, used to determine a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value;

[0083] The energy scheduling module 103 is used to incorporate the current given coefficient into the control loop of the current loop of the grid-connected energy storage system and perform energy scheduling according to the control loop.

[0084] The energy dispatching device for multi-phase unbalanced loads of the disclosed embodiment, when the inversion direction of the grid-connected energy storage system is the power selling direction, determines the power given of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system, determines the current given of each phase according to the ratio of the power given of each phase to the grid voltage, and determines the maximum value of the current given. According to the ratio of the current given of each phase to the maximum value, the current given coefficient of each phase is determined, and the current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy dispatch is performed according to the control loop. Based on this, the power of each phase of the grid-connected energy storage system is redistributed to achieve the reasonable distribution of the inverter power, and improve the utilization rate of the inverter energy and the system efficiency.

[0085] At least one embodiment of the present disclosure further provides a data control device. Figure 6 A schematic block diagram of a data control device provided by at least one embodiment of the present disclosure. Figure 6 As shown, the data control device 20 may include one or more memories 200 and one or more processors 201. The memory 200 is used to store computer executable instructions non-transiently; the processor 201 is used to run the computer executable instructions, and when the computer executable instructions are run by the processor 201, the processor 201 may execute one or more steps in the energy scheduling method for multi-phase unbalanced loads according to any embodiment of the present disclosure.

[0086] The specific implementation and related explanation of each step of the energy scheduling method for multi-phase unbalanced loads can be found in the relevant contents of the embodiment of the energy scheduling method for multi-phase unbalanced loads mentioned above, which will not be elaborated here. Figure 6 The components of the data control device 20 shown are merely exemplary and non-limiting. The data control device 20 may also have other components according to actual application requirements.

[0087] In one embodiment, the processor 201 and the memory 200 can communicate with each other directly or indirectly. For example, the processor 201 and the memory 200 can communicate via a network connection. The network may include a wireless network, a wired network, and / or any combination of a wireless network and a wired network, and the present disclosure does not limit the type and function of the network. For another example, the processor 201 and the memory 200 can also communicate via a bus connection. The bus may be a peripheral component interconnect standard (PCI) bus or an extended industrial standard architecture (EISA) bus, etc. For example, the processor 201 and the memory 200 may be arranged at a remote data server end (cloud) or a distributed energy system end (local end), or may be arranged at a client end (e.g., a mobile device such as a mobile phone). For example, the processor 201 may be a device having data processing capability and / or instruction execution capability such as a central processing unit (CPU), a tensor processor (TPU), or a graphics processor GPU, and may control other components in the data prediction device 20 to perform desired functions. The central processing unit (CPU) may be an X86 or ARM architecture, etc.

[0088] In one embodiment, the memory 200 may include any combination of one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. Volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. Non-volatile memory may include, for example, read-only memory (ROM), hard disk, erasable programmable read-only memory (EPROM), portable compact disk read-only memory (CD-ROM), USB memory, flash memory, etc. One or more computer executable instructions may be stored on the computer-readable storage medium, and the processor 201 may execute the computer executable instructions to implement various functions of the data prediction device 20. Various applications and various data, as well as various data used and / or generated by the application, etc. may also be stored in the memory 200.

[0089] It should be noted that the data control device 20 can achieve technical effects similar to those of the aforementioned energy scheduling method for multi-phase unbalanced loads, and the repeated parts will not be repeated.

[0090] At least one embodiment of the present disclosure also provides a non-transitory computer-readable storage medium. Figure 7 A schematic diagram of a non-transitory computer-readable storage medium provided for at least one embodiment of the present disclosure. Figure 7 As shown, one or more computer executable instructions 301 may be non-transitory stored on a non-transitory computer readable storage medium 30. For example, when the computer executable instructions 301 are executed by a computer, the computer may execute one or more steps in the energy scheduling method for a multi-phase unbalanced load according to any embodiment of the present disclosure.

[0091] In one embodiment, the non-transitory computer-readable storage medium 30 may be applied to the above-mentioned data control device 20 , for example, it may be the memory 200 in the data control device 20 .

[0092] In one embodiment, the description of the non-transitory computer-readable storage medium 30 may refer to the description of the memory 200 in the embodiment of the data control device 20, and the repeated parts will not be repeated.

[0093] It should be noted that the memory 200 stores different non-transiently stored computer executable instructions, and the data control device 20 corresponds to a firmware upgrade device. When the computer executable instructions are executed by the processor 201, the processor 201 can execute one or more steps in the energy scheduling method for multi-phase unbalanced loads according to any embodiment of the present disclosure.

[0094] There are a few points to note about this disclosure:

[0095] (1) The drawings of the embodiments of the present disclosure only relate to the structures related to the embodiments of the present disclosure, and other structures may refer to the general design.

[0096] (2) For the sake of clarity, the thickness and size of layers or structures are exaggerated in the drawings used to describe the embodiments of the present invention. It is understood that when an element such as a layer, film, region, or substrate is referred to as being "on" or "under" another element, the element may be "directly" "on" or "under" the other element, or there may be intervening elements.

[0097] (3) In the absence of conflict, the embodiments of the present disclosure and the features in the embodiments may be combined with each other to obtain new embodiments. The above are only specific implementations of the present disclosure, but the protection scope of the present disclosure is not limited thereto. The protection scope of the present disclosure shall be subject to the protection scope of the claims.

[0098] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0099] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A method for energy scheduling of multi-phase unbalanced loads, characterized in that: Includes steps: When the inversion direction of the grid-connected energy storage system is the power selling direction, the power setting of each phase of the grid-connected energy storage system is determined according to the inversion power and load power of the grid-connected energy storage system; Determine the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determine the maximum value of the current setting; Determining a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value; The current given coefficient is incorporated into the control loop of the current loop of the grid-connected energy storage system, and energy scheduling is performed according to the control loop.

2. The energy scheduling method for multi-phase unbalanced load according to claim 1, characterized in that: Also includes the steps: When the inversion direction of the grid-connected energy storage system is the power purchasing direction, the current reference coefficient of each phase is set to 1.

3. The energy dispatching method for multi-phase unbalanced load according to claim 1, characterized in that: The process of determining the power given for each phase of the grid-connected energy storage system according to the inverter power and the load power comprises the steps of: When the inverter power is less than the load power, the load factor of each phase is determined according to the ratio of the load power of each phase to the load power; The power setting of each phase is determined according to the product of the load factor of each phase and the inverter power.

4. The energy dispatching method for multi-phase unbalanced load according to claim 1, characterized in that: The process of determining the power given for each phase of the grid-connected energy storage system according to the inverter power and the load power comprises the steps of: When the inverter power is greater than the load power, the difference between the inverter power and the load power is evenly divided and superimposed with the load power of each phase to obtain the power setting of each phase.

5. The energy dispatching method for multi-phase unbalanced load according to claim 1, characterized in that: Before the process of determining the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage and determining the maximum value of the current setting, the method further includes the following steps: When the power given by a specific phase is greater than the maximum power limit of the phase, the power portion of the specific phase exceeding the maximum power limit is compensated to other phases.

6. The energy dispatching method for multi-phase unbalanced load according to claim 1, characterized in that: The control loop of the current loop is a control loop based on an SPWM algorithm.

7. The energy dispatching method for multi-phase unbalanced load according to claim 6, characterized in that: The process of incorporating the given current coefficient into the control loop of the current loop of the grid-connected energy storage system and performing energy scheduling according to the control loop comprises the steps of: SPWM modulation is performed according to the current setting coefficient of each phase, the grid angle, the current setting, the current sampling and the grid feedforward.

8. An energy dispatching device for multi-phase unbalanced loads, characterized in that: include: A power setting module, used to determine the power setting of each phase of the grid-connected energy storage system according to the inverter power and load power of the grid-connected energy storage system when the inversion direction of the grid-connected energy storage system is the power selling direction; The current setting module is used to determine the current setting of each phase according to the ratio of the power setting of each phase to the grid voltage, and determine the maximum value of the current setting; A coefficient setting module, used for determining a current setting coefficient of each phase according to a ratio of the current setting of each phase to the maximum value; The energy scheduling module is used to incorporate the current given coefficient into the control loop of the current loop of the grid-connected energy storage system and perform energy scheduling according to the control loop.

9. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are executed by a processor, the energy scheduling method for a multi-phase unbalanced load as described in any one of claims 1 to 7 is implemented.

10. A data control device, characterized in that: include: one or more memories non-transitorily storing computer-executable instructions; One or more processors are configured to run computer executable instructions, wherein the computer executable instructions, when executed by the one or more processors, implement the energy scheduling method for multi-phase unbalanced loads as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method and system for dynamic management of electricity distribution grid

    CN103138292A

  • Electric energy quality treatment method based on AC / DC hybrid power supply network

    CN105429168A

  • Electric power company response power grid control method based on industrial park load aggregation

    CN110880772A

  • Three-phase current imbalance compensation method for medium-voltage photovoltaic power generation system

    CN112909993A

  • Optical storage system anti-reflux control method, control equipment, system and medium

    CN116488263A