Power distribution method and device, electronic equipment and computer readable storage medium

Through the phased power distribution method, combining the operating conditions of the energy storage power station and the charge state of the energy storage converter, the power distribution of the energy storage power station is adjusted, and the power distribution of the energy storage power station in the prior art is solved. The problem of uneven distribution improves the efficiency and responsiveness of energy storage power plants.

CN118971074APending Publication Date: 2024-11-15CYG & CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410890442.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing energy storage power stations fail to effectively consider the optimal working efficiency point and charge state of the energy storage converter during the frequency regulation process, resulting in uneven power distribution and seriously reduce the efficiency of the energy storage power station.

Method used

By obtaining the target output power, performing phased power distribution operations, combining the operating conditions of the energy storage power station, the energy storage capacity and charge state of the energy storage converter, the theoretical output power correction and the allocation power adjustment to ensure that Each energy storage converter distributes power at peak efficiency to reduce power deviation.

Benefits of technology

The rapid and accurate allocation of the target output power is achieved, the power deviation of the energy storage converter is reduced, and the efficiency of the energy storage power station and the ability to respond to grid frequency fluctuations is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971074A_ABST
    Figure CN118971074A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of power system stability control, and provides a power distribution method which comprises the following steps: in a frequency modulation process for an energy storage power station, obtaining target output power of the energy storage power station matched with an operation condition; through a first power distribution operation, distributing the target output power to each first energy storage converter of the energy storage power station to obtain the distribution power of each energy storage converter; determining the allocated total power of the first power allocation operation, and determining the to-be-allocated output power based on the target output power and the allocated total power; if at least one second energy storage converter meeting the continuous power distribution condition exists, distributing the to-be-distributed output power to the second energy storage converter through at least one second power distribution operation; and updating the to-be-distributed output power after each second power distribution operation, and stopping power distribution if a distribution ending condition is met. Therefore, rapid and accurate distribution of the target output power is realized, and the power deviation of the energy storage converter is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of power system stability control, and in particular, relates to a power distribution method, device, electronic device and computer-readable storage medium. Background Art

[0002] As the proportion of new energy continues to increase, the new power system will be a new era of smart grids. The fluctuations in the power grid will be more random, and traditional thermal power and hydropower peak and frequency regulation will be unsustainable. The energy storage system, with its fast response, precise tracking, and excellent power, can play a better role in primary frequency regulation on the power generation side.

[0003] The primary frequency regulation of energy storage power stations refers to the process of adjusting the frequency of the power grid by injecting or absorbing electric energy into the power grid. A single energy storage power station is often composed of multiple energy storage units. For a 100-megawatt energy storage power station, it even involves hundreds of energy storage units. The power coordination control of multiple energy storage units is generally implemented by the energy management system and the energy storage coordination controller. Once the frequency of the power grid deviates from the rated value, the energy storage coordination controller calculates the active target value of each energy storage converter in the energy storage power station after comprehensively considering the topological relationship, equipment not involved in the regulation, and various constraints, thereby controlling the increase or decrease of the active power output of the energy storage power station, limiting the change of the power grid frequency, and maintaining the stability of the power grid frequency. The energy storage converter is integrated into the energy management system (EMS) of the energy storage power station, and realizes precise control of the charging and discharging process through intelligent algorithms, including power distribution, fault handling, status monitoring and other functions, to ensure the automation and intelligent operation of the energy storage power station.

[0004] In the related art, the power allocation strategy for primary frequency regulation of energy storage power stations is often to allocate the primary frequency regulation output power target value to all available energy storage converters (Power Conversion System, PCS) in the energy storage power station in equal proportion. The existing method not only fails to take into account the optimal working efficiency point of the energy storage converter, but also fails to take into account the different state of charge (State of Charge, SOC) of each energy storage converter, resulting in a large SOC deviation of the energy storage converter during the frequency regulation process, a large power deviation of the power distribution operation, and a serious reduction in the efficiency of the energy storage power station. Summary of the invention

[0005] In view of this, the embodiments of the present application provide a power allocation method and terminal device, which can achieve fast and accurate allocation of target output power while meeting the target power output, reduce the power deviation of the energy storage inverter, and improve the efficiency of the energy storage power station.

[0006] A first aspect of an embodiment of the present application provides a power allocation method, including:

[0007] In the frequency modulation process for the energy storage power station, obtaining the target output power of the energy storage power station adapted to the current operating conditions;

[0008] Based on the target output power and at least one first energy storage converter of the energy storage power station, a first power distribution operation is performed to obtain a distribution power of each of the energy storage converters;

[0009] Determine the allocated total power of the first power allocation operation, and determine the output power to be allocated based on the target output power and the allocated total power;

[0010] If there is at least one second energy storage converter that meets the power continued distribution condition, then based on the output power to be distributed and the second energy storage converter, at least one second power distribution operation is performed in sequence; wherein at least one second energy storage converter is a subset of at least one first energy storage converter;

[0011] The output power to be allocated is updated after each second power allocation operation, and if the new output power to be allocated meets the allocation termination condition, power allocation is stopped.

[0012] In an implementation of the first aspect, performing a first power allocation operation based on the target output power and at least one first energy storage converter of the energy storage power station to obtain the allocated power of each of the energy storage converters includes:

[0013] For each of the first energy storage converters, determining a power deviation of the first energy storage converter based on the energy storage capacity of the first energy storage converter, the state of charge of the first energy storage converter, the average state of charge of the energy storage power station, and the power allocation interval;

[0014] Determine the power mean of the energy storage power station and the difference of the power deviation to obtain the theoretical output power of the first energy storage converter; wherein the power mean is determined based on the target output power and the number of the first energy storage converter;

[0015] Based on the power constraint condition corresponding to the current operating condition of the first energy storage converter, the theoretical output power of the first energy storage converter is corrected to obtain the allocated power of the first energy storage converter.

[0016] In an implementation of the first aspect, based on the power constraint condition corresponding to the current operating condition of the first energy storage converter, the theoretical output power of the first energy storage converter is corrected to obtain the allocated power of the first energy storage converter, including:

[0017] If the current operating condition is a discharge condition, the theoretical output power of the first energy storage converter is corrected based on the discharge constraint condition to obtain the allocated power of the first energy storage converter; wherein the discharge constraint condition is determined based on zero and the peak value of the dischargeable power of the first energy storage converter;

[0018] If the current operating condition is a charging condition, the theoretical output power of the first energy storage inverter is corrected based on the charging constraint condition to obtain the allocated power of the first energy storage inverter; wherein the charging constraint condition is determined based on zero and the peak value of the chargeable power of the first energy storage inverter.

[0019] In an implementation of the first aspect, a first energy storage converter having the same theoretical output power and allocated power is used as a second energy storage converter that meets the power continued allocation condition; and the execution process of the second power allocation operation includes:

[0020] Determining a power mean of the output power to be allocated based on the number of the second energy storage converters;

[0021] For each of the second energy storage converters, weighted summing the average power and the allocated power of the second energy storage converter is performed to obtain an adjusted output power corresponding to the second energy storage converter;

[0022] Based on the adjusted output power and the power peak value of the second energy storage converter under the current operating condition, a target output power of the second energy storage converter is determined.

[0023] In an implementation of the first aspect, the method further includes: when the target output power is lower than a preset power threshold, determining the output power of each available energy storage converter in the energy storage power station when reaching an efficiency peak;

[0024] Determining the actual output power of the energy storage power station based on the rated power of the energy storage power station and each of the output powers;

[0025] If the actual output power is greater than the absolute value of the target output power, the target processing power is allocated according to the output power and the charge state of each energy storage converter until the power allocation is completed.

[0026] In an implementation of the first aspect, the power distribution of the target processing power according to each of the output powers and the charge state of each of the energy storage converters includes:

[0027] When the operating condition of the energy storage power station is a charging condition, the available energy storage converters in the energy storage power station are sorted according to the charge states of the energy storage converters from small to large;

[0028] Obtaining the output power point of each sorted energy storage converter at the peak efficiency;

[0029] The output powers of the energy storage converters are accumulated in sequence according to the sorting order, and when the difference between any accumulated result and the target output power is a non-positive number, the power distribution is stopped.

[0030] In an implementation of the first aspect, the power distribution of the target processing power according to each of the output powers and the charge state of each of the energy storage converters includes:

[0031] When the operating condition of the energy storage power station is a discharging condition, sorting the available energy storage converters in the energy storage power station according to the order of the charge states of the energy storage converters from large to small;

[0032] The output powers of the energy storage converters are accumulated in sequence according to the sorting order, and when the difference between any accumulated result and the target output power is a non-negative number, the power distribution is stopped.

[0033] In an implementation of the first aspect, determining the output power of each available energy storage converter in the energy storage power station at the peak efficiency includes:

[0034] Acquire an efficiency prediction model, wherein the efficiency prediction model is obtained by training a training sample based on the actual efficiency of the energy storage converter under different operating conditions, different DC side voltages, and different output powers;

[0035] Through the efficiency prediction model, under the current operating conditions and the current DC side voltage, the output power of each energy storage converter when reaching the efficiency peak is determined.

[0036] A second aspect of an embodiment of the present application provides a power distribution device, including:

[0037] An acquisition module, used to acquire a target output power adapted to the current operating condition of the energy storage power station during the frequency modulation process of the energy storage power station;

[0038] A first allocation module, configured to perform a first power allocation operation based on the target output power and at least one first energy storage converter of the energy storage power station to obtain an allocated power of each of the energy storage converters;

[0039] a determination module, configured to determine the total allocated power of the first power allocation operation, and determine the output power to be allocated based on the target output power and the total allocated power;

[0040] The second allocation module, if there is at least one second energy storage converter that meets the power continued allocation condition, performs at least one second power allocation operation in sequence based on the output power to be allocated and the second energy storage converter; wherein the at least one second energy storage converter is a subset of the at least one first energy storage converter;

[0041] The updating module is used to update the output power to be allocated after each second power allocation operation, and stop power allocation if the new output power to be allocated meets the allocation termination condition.

[0042] A third aspect of an embodiment of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method described in the first aspect when executing the computer program.

[0043] A fourth aspect of an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method described in the first aspect are implemented.

[0044] The first aspect of the embodiment of the present application first establishes the required target output power by analyzing the current operating conditions of the energy storage power station. Then, a phased power allocation scheme is adopted. First, a preliminary first power allocation is performed, and a suitable allocation power is allocated to each first energy storage inverter according to the target output power, and the total allocated power is calculated to identify the remaining power to be allocated. On this basis, the second energy storage inverter that meets the conditions for continued power allocation is intelligently identified and selected, and the target output power is gradually allocated through iterative second power allocation operations. After each round of allocation is completed, the remaining power to be allocated is evaluated in real time. Once the preset allocation completion conditions are met, the allocation process is terminated, thereby achieving rapid and accurate allocation of the target output power, reducing the power deviation of the energy storage inverter, enhancing the ability of the energy storage power station to respond to grid frequency fluctuations, and improving the efficiency of the energy storage power station.

[0045] It can be understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0047] Figure 1It is a schematic diagram of the implementation flow of the power allocation method provided in the embodiment of the present application;

[0048] Figure 2 is a schematic diagram of the implementation flow of the first power allocation operation provided in an embodiment of the present application;

[0049] Figure 3 It is a schematic diagram of a flow chart of a method for correcting power allocation provided in an embodiment of the present application;

[0050] Figure 4 is a schematic diagram of the implementation flow of the second power allocation operation provided in an embodiment of the present application;

[0051] Figure 5 is another schematic diagram of a power distribution method provided in an embodiment of the present application;

[0052] Figure 6 It is a schematic diagram of a process for implementing power allocation based on SOC provided in an embodiment of the present application;

[0053] Figure 7 is another schematic diagram of a process for implementing power allocation based on SOC provided in an embodiment of the present application;

[0054] Figure 8 It is a flowchart of a method for determining output power provided in an embodiment of the present application;

[0055] Fig. 9 is a schematic diagram of a power distribution device provided in an embodiment of the present application;

[0056] Fig.10 It is a schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0057] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0058] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0059] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0060] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0061] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0062] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0063] In one embodiment, Figure 1 As shown, a power distribution method is provided, which is described by taking the method applied to an electronic device (which may be an energy storage coordination controller in an energy management system of an energy storage power station) as an example, including the following steps S101 to S105. Among them:

[0064] Step S101, in the frequency modulation process for the energy storage power station, obtaining the target output power of the energy storage power station adapted to the current operating conditions.

[0065] In application, the primary frequency regulation power distribution of energy storage power stations refers to the process in which, in the power system, the energy storage power station quickly adjusts its output power according to slight changes in the grid frequency (usually frequency deviations from the nominal value caused by sudden load changes) to help the grid restore its frequency to a normal range.

[0066] The determination of the preset target output power is explained. First, the energy storage power station monitors the grid frequency in real time through an advanced measurement and control system (such as PMU, phasor measurement unit). Once the frequency is detected to deviate from the preset threshold (for example, ±0.03Hz~±0.05Hz), the primary frequency modulation mechanism is started. Target output power calculation: According to the size of the frequency deviation and the preset primary frequency modulation rate (such as 0.5%~3%), the amount of power to be adjusted is calculated. When the frequency deviation is positive (the frequency increases), the output is reduced or charging is performed. When the frequency deviation is negative (the frequency decreases), the output is increased or charging is stopped and discharged. Each time the energy storage coordination controller performs a frequency modulation operation for the energy storage power station, it first determines the current operating conditions of the energy storage power station. The operating conditions include charging conditions and discharging conditions. The charging condition refers to the working mode in which the energy storage power station absorbs electric energy from the grid to charge the energy storage device (such as a battery, etc.). The discharging condition refers to the working mode in which the energy storage power station discharges to supply power to the grid. Then determine the target output power P that is adapted to the current operating conditions. total The target output power of the energy storage power station refers to the electric energy output power level that the energy storage power station is set to or expected to achieve under specific operating conditions or dispatch instructions. This target power value is usually determined by the power grid dispatch center based on factors such as current grid demand, load forecast, and renewable energy generation. It is used to adjust the frequency and voltage of the grid or meet specific power balance requirements. The target output power can be measured in kilowatts (kW) or megawatts (MW). It can be a positive value (discharging, supplying power to the grid) or a negative value (charging, absorbing power from the grid). If the current operating condition is a charging condition, then P total <0. If the current operating condition is the discharge condition, P total >0.

[0067] Step S102: performing a first power allocation operation based on the target output power and at least one first energy storage converter of the energy storage power station to obtain the allocated power of each of the energy storage converters.

[0068] In the application, the energy storage power station includes one or more first energy storage converters, which are available energy storage converters participating in the response in the energy storage power station. The energy storage coordination controller determines the appropriate distribution power from the target output power to distribute to each first energy storage converter through the first power distribution operation.

[0069] The first power allocation operation is used to combine the time scale such as the power allocation interval, the SOC average of the energy storage power station, the number of the first energy storage converters, the energy storage capacity E of each first energy storage converter, and the current SOC value of the first energy storage converter under the current operating conditions, and to obtain the target output power P totalDetermine the allocated power adapted to each first energy storage converter. The SOC mean of the energy storage power station refers to the average value of the state of charge of all energy storage units (such as battery packs) in the energy storage power station. The state of charge (SOC) indicates the proportion of the current remaining energy of the energy storage unit to its maximum energy storage capacity, usually expressed as a percentage (0% means completely empty, 100% means fully charged).

[0070] Step S103: determining the total allocated power of the first power allocation operation, and determining the output power to be allocated based on the target output power and the total allocated power.

[0071] In the application, after the first power distribution operation is completed, the energy storage coordination controller determines the allocated total power. The allocated total power refers to the sum of the allocated powers obtained by all the first energy storage converters P sum0 The energy storage coordination controller calculates the difference between the target output power and the allocated total power, that is, P total -P sum0 , and the difference is taken as the remaining output power to be allocated ΔP D-value If P total =P sum0 , that is, the output power to be allocated is zero, indicating that the power allocation operation is completed, that is, the frequency modulation operation is completed. total ≠P sum0 , that is, the output power to be allocated is not zero, indicating that the total allocated power of the first power allocation operation cannot meet the target output power, and the power to be allocated ΔP D-value Perform at least one second power allocation operation until the latest output power to be allocated ΔP D-value is zero.

[0072] In the application, the role of the second power distribution operation is that the energy storage coordination controller selects at least one second energy storage converter that meets the power continued distribution conditions from multiple first energy storage converters, and distributes the output power ΔP to be distributed. D-value Distribute to at least one second energy storage converter again until the latest output power to be distributed ΔP D-value is zero, the power distribution operation ends.

[0073] Step S104: If there is at least one second energy storage converter that meets the conditions for continued power distribution, then based on the output power to be distributed and the second energy storage converter, at least one second power distribution operation is performed in sequence; wherein, at least one second energy storage converter is a subset of at least one first energy storage converter.

[0074] In the application, the condition for continued power distribution means that after the first power distribution operation, the distributed power of the first energy storage converter is the same as its own theoretical output power, then the first energy storage converter meets the condition for continued power distribution. Among them, the theoretical output power of the energy storage converter refers to the power that a single energy storage converter can allocate from the target output power when the SOC deviation of the energy storage system is minimal. The theoretical output power is determined collaboratively based on the number of available energy storage converters in the energy storage power station, the SOC value corresponding to the energy storage converter, and the energy storage capacity corresponding to the energy storage converter. In addition, the distributed power of the first energy storage converter that does not meet the condition for continued power distribution is zero, or the first energy storage converter has reached the maximum power adapted to the current operating conditions, such as reaching the maximum chargeable power under charging conditions or reaching the maximum dischargeable power under discharging conditions. It should be noted that at least one second energy storage converter is screened from at least one first energy storage converter, so at least one second energy storage converter is actually a subset of at least one first energy storage converter.

[0075] Step S105, updating the output power to be allocated after each second power allocation operation, and stopping power allocation if the new output power to be allocated meets the allocation termination condition.

[0076] In the application, after each second power allocation operation is completed, the energy storage coordination controller recalculates the output power to be allocated, that is, the output power to be allocated before the current second power allocation operation is executed minus the output power allocated by the current second power allocation operation to obtain the new output power to be allocated. The output power to be allocated before the first second power allocation operation is executed is the target output power P total The total allocated power P corresponding to the first power allocation operation sum0 The difference P total -P sum0 .

[0077] In this embodiment, the required target output power is first established by analyzing the current operating conditions of the energy storage power station. Next, a phased power allocation scheme is adopted. First, a preliminary first power allocation is performed, and appropriate allocation power is allocated to each first energy storage inverter according to the target output power, and the total allocated power is calculated to identify the remaining power to be allocated. On this basis, the second energy storage inverter that meets the conditions for continued power allocation is intelligently identified and selected, and the allocation of the target output power is gradually completed through iterative second power allocation operations. After each round of allocation is completed, the remaining power to be allocated is evaluated in real time. Once the preset allocation completion conditions are met, the allocation process is terminated, thereby achieving rapid and accurate allocation of the target output power, enhancing the ability of the energy storage power station to respond to grid frequency fluctuations, and improving the overall power quality and scheduling flexibility.

[0078] In one embodiment, Figure 2 As shown, the implementation process of step S102 includes the following steps S201 to S203. Among them:

[0079] Step S201: for each of the first energy storage converters, determine the power deviation of the first energy storage converter based on the energy storage capacity of the first energy storage converter, the state of charge of the first energy storage converter, the average state of charge of the energy storage power station, and the power allocation interval.

[0080] In the application, when the energy storage coordination controller performs the first power distribution operation for each first energy storage inverter, first, the theoretical output power of each first energy storage inverter is determined by a preset mapping relationship for determining the theoretical output power of each energy storage inverter when the SOC deviation of the energy storage system is minimized. The theoretical output power is determined based on the power distribution interval, the SOC mean value of the energy storage power station, the number of first energy storage inverters, the energy storage capacity E of each first energy storage inverter, and the current SOC value of the first energy storage inverter. The mapping relationship for determining the theoretical output power is expressed by the following formula:

[0081]

[0082] Among them, P i-0 is the theoretical output power of the i-th energy storage converter, n is the number of energy storage converters available in the current energy storage power station, SOC i is the SOC value corresponding to the i-th energy storage converter, E i-0 It represents the energy storage capacity corresponding to the i-th energy storage converter, n is the number of available energy storage converters in the energy storage power station, and m is the total number of energy storage converters in the current energy storage power station.

[0083] In the application, the energy storage coordination controller reads the energy storage capacity E of the i-th first energy storage converter according to the above mapping relationship. i-0 , the state of charge SOC of the first energy storage converter i , the average state of charge SOC of the energy storage power station avg And the power distribution interval ΔT, determine the theoretical power deviation of each first energy storage converter

[0084] Step S202, determining the power mean of the energy storage power station and the difference of the power deviation, and obtaining the theoretical output power of the first energy storage converter; wherein the power mean is determined based on the target output power and the number of the first energy storage converters.

[0085] In the application, the energy storage coordination controller uses the ratio of the target output power to the number of the first energy storage converter as the power mean value P of the energy storage power station. total / n, and the difference between the power mean of the energy storage power station and the power deviation of the first energy storage converter is calculated to obtain the theoretical output power of the first energy storage converter.

[0086] Step S203: based on the power constraint condition corresponding to the current operating condition of the first energy storage converter, the theoretical output power of the first energy storage converter is corrected to obtain the allocated power of the first energy storage converter.

[0087] In the application, the theoretical output power is calculated under the condition that the SOC deviation of the energy storage system is minimal. It is possible that the theoretical output power of some first energy storage inverters exceeds the maximum dischargeable or chargeable power of the first energy storage inverter under the current operating conditions. In order to obtain the actual allocated power that is adapted to the power constraints of each first energy storage inverter under different operating conditions, the energy storage coordination controller will correct the theoretical output power of the first energy storage inverter in combination with the power constraints of a single energy storage inverter, and obtain the actual output power of the first energy storage inverter after the first power allocation operation, that is, the allocated power allocated from the target output power.

[0088] In the application, the power constraints corresponding to the operating conditions of the energy storage coordination controller include the power constraints P under the charging condition. i-ChargeMax ≤P i ≤0, power constraint condition under discharge condition 0≤P i ≤P i-discMax .P i-ChargeMax is the maximum chargeable power of the i-th energy storage converter, P i-discMax is the maximum dischargeable power of the i-th energy storage converter. Under charging conditions, the energy storage coordination controller controls the energy storage converter to obtain a distribution power greater than 0 and not exceeding the maximum chargeable power. Under discharging conditions, the energy storage coordination controller controls the energy storage converter to obtain a distribution power greater than 0 and not exceeding the maximum dischargeable power.

[0089] In this embodiment, firstly, for each first energy storage converter, its energy storage capacity, current state of charge, average state of charge of the power station and the time interval of power distribution are comprehensively considered to accurately calculate the power deviation, thereby ensuring the accuracy of resource allocation. Then, the average power station power is determined in combination with the target total output power and the number of converters, and compared with the above power deviation, the theoretical output power of each converter is obtained, thereby achieving a reasonable distribution of power. Finally, according to the power limit of each converter under the actual operating conditions, the theoretical power is corrected as necessary to obtain the actual executable distribution power. This dynamic adjustment mechanism not only ensures the safe operation boundary of the system, but also maximizes the efficiency of the energy storage system.

[0090] In one embodiment, Figure 3As shown, the implementation process of step S203 includes the following steps S301 to S302. Among them:

[0091] Step S301: If the current operating condition is a discharge condition, the theoretical output power of the first energy storage inverter is corrected based on the discharge constraint condition to obtain the allocated power of the first energy storage inverter; wherein the discharge constraint condition is determined based on zero and the peak value of the dischargeable power of the first energy storage inverter.

[0092] In the application, if the current operating condition is a discharge condition, the discharge constraint condition is determined based on the zero sum and the peak discharge power of the first energy storage converter, that is, the target output power P total >0, the energy storage coordination controller is based on the discharge constraint 0≤P i ≤P i-discMax , the theoretical output power P of the i-th energy storage converter i Corrected by the following formula:

[0093]

[0094] Among them, P i-0 ′ is the distribution power of the energy storage converter after correction, Pi- discMax is the maximum discharge power of the i-th energy storage converter.

[0095] Step S302: If the current operating condition is a charging condition, the theoretical output power of the first energy storage inverter is corrected based on the charging constraint condition to obtain the allocated power of the first energy storage inverter; wherein the charging constraint condition is determined based on zero and the peak value of the chargeable power of the first energy storage inverter.

[0096] In the application, if the current operating condition is a discharge condition, the charging constraint condition is determined based on the zero sum of the peak chargeable power of the first energy storage converter, that is, the target output power P total <0, the energy storage coordination controller is based on the charging constraint condition P i-ChargeMax ≤P i ≤0, the theoretical output power P of the i-th energy storage converter i Corrected by the following formula:

[0097]

[0098] Among them, P i-0 ′ is the distribution power of the energy storage converter after correction, P i-0-ChargeMax is the maximum chargeable power of the i-th energy storage converter.

[0099] In this embodiment, the operating efficiency and safety of the energy storage system are greatly improved by dynamically adapting to the operating requirements of the energy storage inverter under different operating conditions. Under the discharge condition, the theoretical output power of the inverter is adjusted according to the actual dischargeable power upper limit of the inverter to ensure that the discharge process not only meets the energy output demand, but also does not exceed the safety limit of the equipment, and effectively utilizes the energy storage resources. Conversely, under the charging condition, the theoretical power is corrected according to the rechargeable power limit of the inverter, which not only makes full use of external electrical energy resources for efficient energy storage, but also avoids the risk of overcharging, and protects the battery life and system stability. In short, this power distribution method that is flexibly adjusted according to the operating conditions and constraints realizes the precise control of the energy storage system during the charging and discharging process, optimizes energy management, and enhances the reliability and response speed of the system.

[0100] In one embodiment, the first energy storage converter having the same theoretical output power and allocated power is used as the second energy storage converter that meets the power continued allocation condition, such as Figure 4 As shown, the implementation process of the second power allocation operation in step S103 includes the following steps S401 to S403. Among them:

[0101] Step S401: determining the power mean of the output power to be allocated based on the number of the second energy storage converters.

[0102] In the application, after the first power distribution operation is completed, if the energy storage coordination controller determines that there is remaining power to be distributed, it will continue to select a second energy storage inverter that meets the power continued distribution conditions from multiple first energy storage inverters to perform at least one second power distribution operation. The second energy storage inverter is actually the first energy storage inverter whose theoretical output power is the same as the distributed power after the first power distribution operation. The energy storage coordination controller calculates the power average of all second energy storage inverters, that is, the ratio of the sum of the distributed powers of all second energy storage inverters to the number of second energy storage inverters.

[0103] Step S402: for each of the second energy storage converters, weighted sum is performed on the average power and the allocated power of the corresponding second energy storage converter to obtain an adjusted output power corresponding to the corresponding second energy storage converter.

[0104] In the application, for each second energy storage inverter, the energy storage coordination controller determines the first weight of the currently allocated power of the second energy storage inverter and the second weight of the average power, and then performs weighted summation to obtain the adjusted output power corresponding to the second energy storage inverter.

[0105] Step S403: determining a target output power of the second energy storage converter based on the adjusted output power and the power peak value of the second energy storage converter under the current operating condition.

[0106] In application, there is a situation where the adjusted output power of the corrected second energy storage inverter exceeds the power peak under the current operating conditions, that is, it exceeds the maximum chargeable power under charging conditions, or exceeds the maximum dischargeable power under discharging conditions. In this case, the energy storage coordination controller uses the power peak as the target output power for the second energy storage inverter. In other cases, the adjusted output power is used as the target output power for the second energy storage inverter.

[0107] It should be noted that steps S401 to S403 are sequentially performed at least once until the power to be allocated is zero, and the power allocation is terminated. In addition, after a round of power allocation (i.e., steps S101 to S105) is performed, a new round of power allocation operation is periodically and automatically performed based on the power allocation interval △T, so as to effectively reduce the SOC difference between each energy storage converter as much as possible.

[0108] In this embodiment, the existing allocated power of the second energy storage converter that meets the continued power allocation is dynamically adjusted by the power mean of the power to be allocated, so as to obtain the target output power of the second energy storage converter. In this way, the average value of the power to be allocated is calculated according to the number of energy storage converters, ensuring the initial balance of power distribution. Subsequently, only the overall power balance of the system is considered, while the characteristics and potential of individual equipment are also taken into account. It not only avoids the risk of overload, but also maximizes the use of energy storage resources, thereby achieving efficient use of electric energy and optimal allocation of energy storage resources under the premise of ensuring system stability.

[0109] In one embodiment, Figure 5 As shown, the method of implementing power allocation when the target output power is lower than the preset power threshold includes the following steps S501 to S503. Among them:

[0110] Step S501, when the target output power is lower than a preset power threshold, determining the output power of each available energy storage converter in the energy storage power station when reaching the efficiency peak.

[0111] In the application, the scenario where the target output power is lower than the preset power threshold is called a small target power scenario. In this scenario, since there may be a fixed energy storage inverter response each time, which is not friendly to the service life of the energy storage unit, the energy storage coordination controller can prioritize ensuring that the energy storage inverter operates at the peak efficiency and improve it. Through the polling mechanism, the energy storage inverter with a larger SOC deviation is selected to give priority to output, ensuring that the power deviation and SOC of the energy storage power station are balanced.

[0112] In the application, the energy storage coordination controller determines the output power of each available energy storage converter in the energy storage power station when it reaches the peak efficiency through a target method. The peak efficiency refers to the optimal efficiency point of the energy storage converter, and the power output error of the energy storage converter is small at the peak efficiency. Among them, the target method can be predicted by an efficiency prediction model based on artificial intelligence. The specific implementation process of the efficiency prediction model will be described later.

[0113] In application, for the energy storage converter, when the output power is X%P N When X%P N Indicates X% and rated power P N The output efficiency is the highest when the product of X = 20 to 30, that is, the output power of the energy storage converter is the rated power P. N When the output efficiency is 20% to 30%, the output efficiency is the highest, and the energy storage converter reaches its efficiency peak.

[0114] Step S502: determining the actual output power of the energy storage power station based on the rated power of the energy storage power station and each of the output powers.

[0115] In the application, before power distribution, the energy storage coordination controller calculates the DC side voltage V corresponding to each energy storage converter according to the operating conditions of the energy storage converter. dc , Rated power of energy storage converter P N Through the efficiency prediction model, the output power X%P of each energy storage converter at the peak efficiency can be obtained. N That is, X% and rated power P N If there are m energy storage converters, the output power of the energy storage converter at the peak efficiency is determined to be X1%P N , ..., X m %P N . Energy storage coordination controller from X1%P N , ..., X m %P N Get the minimum output power X min %P N , output power average value X avg %P N , maximum output power X max %P N .

[0116] In the application, the energy storage coordination controller obtains the preset initial output coefficient X, which can be configured through the energy management system interface. In actual situations, X can be 30 to 100. The setting of the output coefficient mainly considers that the energy storage converter has a small active power regulation deviation and high efficiency in the range of 30% to 100% rated power. However, due to the differences in active power regulation deviations of different energy storage converter companies, the output coefficients corresponding to the active power regulation deviations are also different. Therefore, the energy storage coordination controller compares the initial output coefficient with the average output coefficient X when the output power is the mean. avg , from the initial output coefficient and the average output coefficient X avg Determine the target output coefficient X. If X<X avg , X=X; if X≥X avg , X=X avg The energy storage coordination controller determines the rated power P of the energy storage station. N-bess The product of the target output coefficient X is taken as the actual output power of the energy storage power station X%P N-bess , that is, X% and P N-bess The product of .

[0117] Step S503: if the actual output power is greater than the absolute value of the target output power, the target processing power is allocated according to the output power and the charge state of each energy storage converter until the power allocation is completed.

[0118] In the application, the energy storage coordination controller determines the target output power P total Is it less than the actual output power X%*P N-bess If |P total |≥X avg %P N-bess , then the power allocation operation is performed according to steps S101 to S105. total |<X avg %P N-bess , the energy storage coordination controller controls each available energy storage converter to allocate its own output power at the peak efficiency under the current operating conditions of the energy storage power station until the target output power is allocated. In fact, the energy storage coordination controller performs the power allocation operation based on the output power of the energy storage converter at the peak efficiency and the current SOC value of each energy storage converter.

[0119] In this embodiment, for small target power scenarios, the number of energy storage inverters participating in the output response is optimized based on the three boundary conditions of the target power value, the number of available energy storage inverters in the existing energy storage power station, and ensuring that a single energy storage inverter operates in the optimal power output mode (i.e., the power output error is small); the purpose is to reduce the number of energy storage inverters participating in the output, so as to enable the energy storage inverter to operate in the optimal efficiency output mode, reduce the output power deviation of the energy storage inverter, and reduce the SOC deviation between energy storage units through polling output.

[0120] In one embodiment, Figure 6 As shown, when the operating condition of the energy storage power station is the charging condition, the implementation process of step S503 includes the following steps S601 to S603. Among them:

[0121] Step S601, when the operating condition of the energy storage power station is a charging condition, sort the available energy storage converters in the energy storage power station according to the charge states of the energy storage converters from small to large.

[0122] In the application, if the energy storage power station is in a charging condition, the energy storage coordination controller sorts the N PCSs from small to large in N (N is the available number of energy storage converters in the energy storage power station) with reference to the SOC value of each energy storage converter.

[0123] Step S602, obtaining the output power of each sorted energy storage converter at the peak efficiency.

[0124] In the application, the output power of each energy storage converter after sorting at its respective efficiency peak is determined as P p1 ~P pn , the output power under charging condition is negative, such as P p1 The corresponding energy storage converter numbered 1 has an output power of X at peak efficiency. p1 %P N , P N is the rated power of the energy storage converter, X p1 is the output coefficient of the energy storage converter at its peak efficiency.

[0125] Step S603, accumulating the output powers of the energy storage converters in sequence according to the sorting order, and stopping power distribution when the difference between any accumulation result and the target output power is a non-positive number.

[0126] In the application, the energy storage coordination controller follows the sorting order from P p1 The output power accumulation starts. If the accumulated sum reaches the target output power after any output power is accumulated, the allocation ends. That is, the energy storage coordination controller calculates P sum =P1+P2+…+Pn , P sum is the allocated power, P sum The initial value of P is 0. sum -P total When ≤0, the calculation ends, n is recorded, and P is corrected at the same time n , get the final allocated power value, ΔP = P sum -P total , P n =-X n %ΔP.

[0127] In this embodiment, under charging conditions, through the energy storage inverter selection mechanism based on SOC sorting, it is achieved that when the primary frequency modulation is frequently operated, the energy storage inverters can be polled for output, avoiding the constant calling of one or several fixed energy storage inverters, thereby improving the SOC balance between the energy storage units of the entire energy storage power station and increasing the overall service life of the energy storage power station.

[0128] In one embodiment, Figure 7 As shown, when the operating condition of the energy storage power station is the discharging condition, the implementation process of step S503 includes the following steps S701 to S702. Among them:

[0129] Step S701, when the operating condition of the energy storage power station is a discharging condition, sorting the available energy storage converters in the energy storage power station according to the order of the charge states of the energy storage converters from large to small.

[0130] In the application, if the energy storage power station is in a discharging condition, the energy storage coordination controller sorts the N PCSs from large to small in N (N is the available number of energy storage converters in the energy storage power station) with reference to the SOC value of each energy storage converter.

[0131] Step S702, obtaining the output power of each sorted energy storage converter at the peak efficiency.

[0132] In the application, the output power of each energy storage converter after sorting at its respective efficiency peak is determined as P p1 ~P pn , the output power under discharge condition is negative, such as P p1 The corresponding energy storage converter numbered 1 has an output power of X at peak efficiency. p1 %P N , P N is the rated power of the energy storage converter, X p1 is the output coefficient of the energy storage converter at its peak efficiency.

[0133] Step S703, accumulating the output powers of the energy storage converters in sequence according to the sorting order, and stopping power distribution when the difference between any accumulation result and the target output power is a non-negative number.

[0134] In the application, the energy storage coordination controller follows the sorting order from P p1 The output power accumulation starts. If the accumulated sum reaches the target output power after any output power is accumulated, the allocation ends. That is, the energy storage coordination controller calculates P sum =P1+P2+…+P n , P sum is the allocated power, P sum The initial value of P is 0. sum -P total ≥0, end the calculation, record n, and correct P n , get the final allocated power value, ΔP = P sum -P total , P n =X n %ΔP.

[0135] In this embodiment, under the discharge condition, through the energy storage inverter selection mechanism based on SOC sorting, it is achieved that when the primary frequency modulation is frequently operated, the energy storage inverters can be polled for output, avoiding the constant calling of one or several fixed energy storage inverters, thereby improving the SOC balance between the energy storage units of the entire energy storage power station and increasing the overall service life of the energy storage power station.

[0136] In one embodiment, Figure 8 As shown, the implementation process of step S501 includes the following steps S801 to S802. Among them:

[0137] Step S801, obtaining an efficiency prediction model, wherein the efficiency prediction model is obtained by training training samples based on actual efficiencies of energy storage converters under different operating conditions, different DC side voltages, and different output powers.

[0138] In applications, the output power of the PCS at the peak efficiency (optimal efficiency point) refers to the output power point at which the energy storage converter (PCS) can achieve the highest conversion efficiency under specific working conditions, that is, under specific DC side voltage and output power level. This power point is the most economical and energy-saving state in the operation of the energy storage system, because at this point, the conversion loss per unit of electrical energy is the smallest and the overall efficiency of the system is the highest.

[0139] In order to find this optimal efficiency point, it is usually necessary to build an efficiency prediction model through experimental measurement or based on the characteristic data of the energy storage converter, and use data analysis or machine learning methods (such as BP neural network model) for prediction and optimization. This process includes entering the initial efficiency value of the energy storage converter at different DC side voltages and output power levels, and continuously correcting the model through actual operation data, and finally determining the output power (such as X%P) corresponding to the optimal efficiency point of each energy storage converter under different operating conditions and corresponding to different DC side voltages. N , where P N is the rated power of the energy storage converter).

[0140] The creation process of the efficiency prediction model is explained, and a human-computer interaction interface is provided. On-site professional technicians can manually enter the minimum, middle and maximum values ​​of the voltage range of the energy storage converter in the rectification and inversion states according to the characteristics of the energy storage converter. N ~100%P N (Step size is 10%P N ) The initial efficiency value of the power point; rectification corresponds to the charging process, and inversion corresponds to the discharging process.

[0141] First, the corresponding table format of different DC side voltages, different output powers (power points) and efficiency values ​​under different operating conditions is as follows:

[0142]

[0143] Secondly, based on the initial efficiency value, an equivalent mathematical model of the energy storage converter efficiency value, DC side voltage, and power point is established: its input parameters include: 1) DC side voltage V dc , V dc The range is consistent with the rated voltage range of PCS. At present, the voltage range of energy storage converters commonly used in energy storage power stations is 1000V~1500V. 2) Output power P = X%P N ; P range: 0~100%P N , P N is the rated power of the energy storage converter, and X is the output coefficient. 3) The operating conditions of the energy storage converter, including charging conditions and discharging conditions. The output value is the efficiency of the energy storage converter

[0144] Thirdly, based on the BP neural network model, combined with the initial input parameters and output efficiency, preliminary training is carried out to obtain the efficiency prediction model under different modes, different voltages and power points.

[0145] Furthermore, during the actual operation, the actual efficiency value of each energy storage converter in the above-mentioned mode, DC side voltage, and power point is calculated and counted, and a corresponding table between the power point and efficiency value of each energy storage converter can be obtained.

[0146] Finally, for each energy storage inverter, based on the initial efficiency prediction model, regular training is performed according to statistical data, such as a training frequency of 1 week / time, to obtain an optimized efficiency prediction model.

[0147] Step S802, determining the output power of each energy storage converter when it reaches the efficiency peak under the current operating condition and the current DC side voltage through the efficiency prediction model.

[0148] In the application, before power distribution, according to the working mode of the energy storage converter and the DC side voltage corresponding to each energy storage converter, the output power (also called power point) X%P corresponding to each energy storage converter at the peak efficiency (i.e. the optimal efficiency point) can be obtained through the efficiency prediction model. N m energy storage converters, determine the output power of the energy storage converter at the peak efficiency as X1%P N , ..., X m %P N .

[0149] In this embodiment, in practical applications, understanding and utilizing these optimal efficiency points is crucial to optimizing the operation of energy storage power stations, because it helps reduce operating costs, improves power conversion efficiency, and ensures that the energy storage system can charge and discharge in the most efficient way while meeting the needs of the power grid. Through intelligent power allocation strategies, energy storage power stations can ensure that when needed, energy storage converters work at their respective optimal efficiency points as much as possible, thereby improving the economic and environmental benefits of the entire energy storage system.

[0150] In one embodiment, for a 5MW / 10MWh (maximum output power of 5 megawatts and capable of storing 10 megawatt-hours of electrical energy) energy storage power station, a scenario of configuring four 1250kW energy storage inverters illustrates the power allocation method of this application. If the target output power of the current frequency modulation operation is 0.8MW (essentially a small target power scenario), when the corresponding SOCs of each energy storage inverter are consistent, if the target power is evenly distributed to the energy storage inverter, the output power of each energy storage inverter is 200kW (0.8MW / 4), and the output coefficient is 200kW divided by 1250kW, which is equal to 16%, which has not yet reached the output coefficient of optimal efficiency. Through the energy storage converter optimal efficiency point power output optimization method of the present application, the output coefficient of each energy storage converter at the peak efficiency can be obtained, such as 25%, 25%, 30%, 30%, and the output power of each energy storage converter (output coefficient * rated power of the energy storage power station) can be obtained as follows: 250kW, 250kW, 300kW, 0kW. It should be noted that although the above allocation method cannot guarantee the consistency of SOC after each round of power allocation, the SOC will be polled in each round of power allocation, and the PCS with a larger SOC deviation will be given priority to output, so that after multiple rounds of power allocation, the SOC deviation of each energy storage unit is smaller.

[0151] In the application, if the target power value is 2MW (non-small target power scenario), it is impossible to make each energy storage converter work at the optimal efficiency point. The power distribution method is mainly to reduce the SOC deviation between energy storage units. If the initial SOC corresponding to each energy storage converter is 10%, 30%, 60%, 100%; the SOC average value is 50% and the maximum SOC difference is 90%, for the convenience of calculation, the power distribution interval △T = 1h, the effect of using this method and the traditional SOC equal proportion distribution is as follows:

[0152]

[0153] After △T, the corresponding SOC of each energy storage converter is as follows:

[0154]

[0155] It can be seen that the method of the present application can effectively reduce the SOC differences between the energy storage units after power distribution, and the standard deviation of each SOC is smaller.

[0156] In this embodiment, when distributing power in the energy storage power station, different power distribution strategies are selected according to the target power size. When the target power is large and the output at the highest efficiency output point of the energy storage converter cannot meet the target power output requirement, the time scale is combined during power distribution, with reducing the SOC deviation of the energy storage unit as the primary consideration; when the target power is small, the small target power distribution optimization method proposed in this application can not only realize the energy storage converter working in the best efficiency output mode, but also reduce the output power deviation of the energy storage converter, and also reduce the SOC deviation between energy storage units through polling output.

[0157] The present application also provides a power distribution device for executing the steps in the above power distribution method embodiment. Fig. 9 As shown, the power distribution device 900 provided in the embodiment of the present application includes:

[0158] The acquisition module 910 is used to acquire the target output power of the energy storage power station adapted to the current operating conditions during the frequency modulation process of the energy storage power station.

[0159] The first allocation module 920 is used to perform a first power allocation operation based on the target output power and at least one first energy storage converter of the energy storage power station to obtain the allocated power of each of the energy storage converters.

[0160] The determination module 930 is configured to determine the total allocated power of the first power allocation operation, and determine the output power to be allocated based on the target output power and the total allocated power.

[0161] The second allocation module 940 performs at least one second power allocation operation in sequence based on the output power to be allocated and the second energy storage inverter if there is at least one second energy storage inverter that meets the conditions for continued power allocation; wherein, at least one second energy storage inverter is a subset of at least one first energy storage inverter.

[0162] The updating module 950 is used to update the output power to be allocated after each second power allocation operation, and stop power allocation if the new output power to be allocated meets the allocation termination condition.

[0163] In one embodiment, the first allocation module is also used to determine, for each of the first energy storage inverters, the power deviation of the first energy storage inverter based on the energy storage capacity of the first energy storage inverter, the charge state of the first energy storage inverter, the charge state average of the energy storage power station, and the power allocation interval; determine the power average of the energy storage power station and the difference between the power deviation to obtain the theoretical output power of the first energy storage inverter; wherein the power average is determined based on the target output power and the number of the first energy storage inverters; based on the power constraint condition corresponding to the first energy storage inverter and the current operating condition, correct the theoretical output power of the first energy storage inverter to obtain the allocated power of the first energy storage inverter.

[0164] In one embodiment, the first allocation module is also used for, if the current operating condition is a discharging condition, then based on the discharge constraint condition, correcting the theoretical output power of the first energy storage inverter to obtain the allocated power of the first energy storage inverter; wherein the discharge constraint condition is determined based on zero and the peak value of the dischargeable power of the first energy storage inverter; if the current operating condition is a charging condition, then based on the charging constraint condition, correcting the theoretical output power of the first energy storage inverter to obtain the allocated power of the first energy storage inverter; wherein the charging constraint condition is determined based on zero and the peak value of the chargeable power of the first energy storage inverter.

[0165] In one embodiment, the second allocation module is also used to use the first energy storage inverter whose theoretical output power is the same as the allocated power as the second energy storage inverter that meets the conditions for continued power allocation; the execution process of the second power allocation operation includes: based on the number of the second energy storage inverters, determining the power mean of the output power to be allocated; for each of the second energy storage inverters, weightedly summing the average power and the allocated power of the second energy storage inverter to obtain the adjusted output power corresponding to the second energy storage inverter; based on the adjusted output power and the power peak value of the second energy storage inverter under the current operating conditions, determining the target output power of the second energy storage inverter.

[0166] In one embodiment, the first allocation module is also used to determine the output power of each available energy storage inverter in the energy storage power station when the efficiency peak is reached when the target output power is lower than a preset power threshold; determine the actual output power of the energy storage power station based on the rated power of the energy storage power station and each output power; if the actual output power is greater than the absolute value of the target output power, then according to each output power and the charge state of each energy storage inverter, the target processing power is allocated until the power allocation is completed.

[0167] In one embodiment, the first allocation module is also used to sort the available energy storage inverters in the energy storage power station according to the charge state of the energy storage inverters from small to large when the operating condition of the energy storage power station is a charging condition; obtain the output power of each sorted energy storage inverter at the efficiency peak; accumulate the output power of the energy storage inverters in turn according to the sorting order, and stop power allocation when the difference between any accumulated result and the target output power is not a positive number.

[0168] In one embodiment, the first allocation module is also used to sort the available energy storage inverters in the energy storage power station according to the charge state of the energy storage inverter from large to small when the operating condition of the energy storage power station is a discharge condition; obtain the output power of each sorted energy storage inverter at the efficiency peak; accumulate the output power of the energy storage inverter in turn according to the sorting order, and stop power allocation when the difference between any accumulated result and the target output power is a non-negative number.

[0169] In one embodiment, the first allocation module is also used to obtain an efficiency prediction model, which is obtained by training training samples based on the actual efficiency of the energy storage inverter under different operating conditions, different DC side voltages and different output powers; through the efficiency prediction model, under the current operating conditions and the current DC side voltage, the output power of each energy storage inverter when it reaches the peak efficiency is determined.

[0170] In application, each module in the power distribution device may be a software program module, or may be implemented by different logic circuits integrated in a processor, or may be implemented by multiple distributed processors.

[0171] Fig.10 This is a schematic diagram of the structure of an electronic device for implementing a power distribution method provided in an embodiment of the present application. Fig.10 As shown, the electronic device 1000 of this embodiment includes: at least one processor 1010 ( Fig.10 Only one is shown in the figure) a processor, a memory 1020, and a computer program 1030 stored in the memory 1020 and executable on the at least one processor 1010, wherein when the processor 1010 executes the computer program 1030, the steps in any of the above-mentioned power allocation method embodiments are implemented.

[0172] The electronic device 1000 may include, but is not limited to, a processor 1010 and a memory 1020. Those skilled in the art will appreciate that Fig.10This is merely an example of the electronic device 1000 and does not constitute a limitation on the electronic device 1000 . The electronic device 1000 may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the electronic device 1000 may also include input and output devices, network access devices, etc.

[0173] The processor 1010 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0174] In some embodiments, the memory 1020 may be an internal storage unit of the electronic device 1000, such as a hard disk or memory of the electronic device 1000. In other embodiments, the memory 1020 may also be an external storage device of the electronic device 1000, such as a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 1000. Further, the memory 1020 may also include both an internal storage unit of the power distribution device / terminal device 1110 and an external storage device. The memory 1020 is used to store an operating system, an application program, a boot loader (BootLoader), data and other programs, such as the program code of the computer program, etc. The memory 1020 may also be used to temporarily store data that has been output or is to be output.

[0175] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0176] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0177] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0178] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0179] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the device / terminal device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0180] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0181] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0182] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0183] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0184] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A power distribution method, characterized in that: include: In the frequency modulation process for the energy storage power station, obtaining the target output power of the energy storage power station adapted to the current operating conditions; Based on the target output power and at least one first energy storage converter of the energy storage power station, a first power distribution operation is performed to obtain a distribution power of each of the energy storage converters; Determine the allocated total power of the first power allocation operation, and determine the output power to be allocated based on the target output power and the allocated total power; If there is at least one second energy storage converter that meets the power continued distribution condition, then based on the output power to be distributed and the second energy storage converter, at least one second power distribution operation is performed in sequence; wherein at least one second energy storage converter is a subset of at least one first energy storage converter; The output power to be allocated is updated after each second power allocation operation, and if the new output power to be allocated meets the allocation termination condition, power allocation is stopped.

2. The power distribution method according to claim 1, characterized in that: The step of performing a first power distribution operation based on the target output power and at least one first energy storage converter of the energy storage power station to obtain the distribution power of each energy storage converter includes: For each of the first energy storage converters, determining a power deviation of the first energy storage converter based on the energy storage capacity of the first energy storage converter, the state of charge of the first energy storage converter, the average state of charge of the energy storage power station, and the power allocation interval; Determine the power mean of the energy storage power station and the difference of the power deviation to obtain the theoretical output power of the first energy storage converter; wherein the power mean is determined based on the target output power and the number of the first energy storage converter; Based on the power constraint condition corresponding to the current operating condition of the first energy storage converter, the theoretical output power of the first energy storage converter is corrected to obtain the allocated power of the first energy storage converter.

3. The power distribution method according to claim 2, characterized in that: The method of correcting the theoretical output power of the first energy storage converter based on the power constraint condition corresponding to the current operating condition of the first energy storage converter to obtain the allocated power of the first energy storage converter includes: If the current operating condition is a discharge condition, the theoretical output power of the first energy storage converter is corrected based on the discharge constraint condition to obtain the allocated power of the first energy storage converter; wherein the discharge constraint condition is determined based on zero and the peak value of the dischargeable power of the first energy storage converter; If the current operating condition is a charging condition, the theoretical output power of the first energy storage inverter is corrected based on the charging constraint condition to obtain the allocated power of the first energy storage inverter; wherein the charging constraint condition is determined based on zero and the peak value of the chargeable power of the first energy storage inverter.

4. The power distribution method according to claim 2, characterized in that: The first energy storage converter having the same theoretical output power and allocated power is used as the second energy storage converter meeting the power continued allocation condition; The execution process of the second power allocation operation includes: Determining a power mean of the output power to be allocated based on the number of the second energy storage converters; For each of the second energy storage converters, weighted summing the average power and the allocated power of the second energy storage converter is performed to obtain an adjusted output power corresponding to the second energy storage converter; Based on the adjusted output power and the power peak value of the second energy storage converter under the current operating condition, a target output power of the second energy storage converter is determined.

5. The power distribution method according to claim 1, characterized in that: The method further comprises: When the target output power is lower than a preset power threshold, determining the output power of each available energy storage converter in the energy storage power station when reaching the peak efficiency; Determining the actual output power of the energy storage power station based on the rated power of the energy storage power station and each of the output powers; If the actual output power is greater than the absolute value of the target output power, the target processing power is allocated according to the output power and the charge state of each energy storage converter until the power allocation is completed.

6. The power distribution method according to claim 5, characterized in that: The power distribution of the target processing power according to each of the output powers and the charge state of each of the energy storage converters includes: When the operating condition of the energy storage power station is a charging condition, the available energy storage converters in the energy storage power station are sorted according to the charge states of the energy storage converters from small to large; Obtain the output power of each sorted energy storage converter at the peak efficiency; The output powers of the energy storage converters are accumulated in sequence according to the sorting order, and when the difference between any accumulated result and the target output power is a non-positive number, the power distribution is stopped.

7. The power distribution method according to claim 5, characterized in that: The power distribution of the target processing power according to each of the output powers and the charge state of each of the energy storage converters includes: When the operating condition of the energy storage power station is a discharging condition, sorting the available energy storage converters in the energy storage power station according to the order of the charge states of the energy storage converters from large to small; Obtain the output power of each sorted energy storage converter at the peak efficiency; The output powers of the energy storage converters are accumulated in sequence according to the sorting order, and when the difference between any accumulated result and the target output power is a non-negative number, the power distribution is stopped.

8. The power distribution method according to claim 5, characterized in that: The determining the output power of each available energy storage converter in the energy storage power station at the peak efficiency comprises: Acquire an efficiency prediction model, wherein the efficiency prediction model is obtained by training a training sample based on the actual efficiency of the energy storage converter under different operating conditions, different DC side voltages, and different output powers; The efficiency prediction model is used to determine the output power of each energy storage converter when it reaches the peak efficiency under the current operating conditions and the current DC side voltage.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the power allocation method according to any one of claims 1 to 8 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the power allocation method according to any one of claims 1 to 8 is implemented.

Citation Information

Cited By

  • Energy storage node scheduling optimization method, system and equipment and storage medium

    CN120767904A

  • An energy storage node scheduling optimization method, system, device and storage medium

    CN120767904B