Crushing equipment for building construction projects
By designing adjustable building crushing equipment, the problems of existing equipment in maintenance, transportation and functional applicability are solved, and higher safety, stability and applicability are achieved, meeting the needs of different construction scenarios.
Patent Information
- Application Number
- CN202411490751.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2044-10-24
AI Technical Summary
Existing building crushing equipment has safety risks, poor stability and single functions in terms of maintenance, transportation and functional applicability, and cannot flexibly adjust the conveying structure, resulting in inconvenience in operation, safety hazards and low construction efficiency.
A device including a crusher, a conveying structure and a support structure is designed to achieve height adjustment, stability improvement and functional switching of the conveying structure through the adjustment mechanism, allowing flexible use in different construction scenarios.
It improves the convenience and safety of equipment maintenance, enhances transportation stability and applicability, can be flexibly used in different scenarios, meets construction needs, and reduces construction costs.
Smart Images

Figure CN118988526B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction waste crushing, and more specifically, particularly relates to a crushing device used in building construction projects. Background Art
[0002] In construction projects, crushing equipment is an important tool for handling construction waste. Crushing equipment for handling construction waste generally consists of three main parts: a crushing part, a conveying part, and a support part. The crushing part is used to crush construction waste, the conveying part is used to convey construction waste, and the support part is used to maintain the stability of the conveying part and the crushing part. However, there are some problems in the use of existing crushing equipment for construction projects.
[0003] 1. The installation position and angle of the conveying structure of existing crushing equipment are usually fixed. When the driving equipment on the conveying structure needs to be inspected and repaired, the workers have to climb to a high place to perform the operation because the position of the conveying structure cannot be flexibly adjusted. This is not only extremely inconvenient during the operation, but also poses a great safety risk. For example, workers may fall due to unstable standing, or be injured due to improper use of tools when working at height. In addition, the working environment at height is not conducive to comprehensive and detailed inspection and maintenance of the equipment, which may result in some potential problems not being discovered and solved in time.
[0004] 2. The existing crushing equipment cannot be effectively adjusted due to its conveying structure and overall structure, resulting in a high center of gravity and extremely poor stability during transportation. When the road conditions are poor or there are bumps during transportation, the equipment is prone to shaking or even tipping over, causing equipment damage and safety accidents. Moreover, due to the fixed structure, the overall height and volume of the equipment cannot be effectively reduced, which makes the transportation process restricted by factors such as road height and width restrictions, increasing the difficulty and cost of transportation.
[0005] 3. The conveying structure of traditional crushing equipment has a relatively single function. In most cases, it can only convey the crushed construction waste from the crusher. When it is necessary to convey the uncrushed construction waste into the crusher, the existing conveying structure is often not competent. This functional limitation greatly limits the applicability of crushing equipment in different construction scenarios and needs. In some construction sites with limited space, traditional crushing equipment cannot flexibly change the conveying direction and function, and cannot meet the requirements of actual construction, thus affecting construction efficiency and project progress.
[0006] To sum up, in order to improve the convenience, stability and applicability of crushing equipment during maintenance, transportation and use, it is necessary to improve and innovate the existing crushing equipment. Summary of the invention
[0007] In order to solve the above technical problems, the present invention provides a crushing device for building construction projects to solve the above problems.
[0008] A crushing device for building construction engineering, comprising a crusher body and a conveying structure of the crusher, a feeding structure is installed on the crusher body, a fixed frame of the crusher is fixedly installed on the periphery of the crusher body, a supporting structure is arranged below the conveying structure, the supporting mechanism comprises two bottom frames, two short frames, two middle frames and two long frames, an adjusting mechanism is arranged between the two long frames, connecting rods are fixedly connected between the bottoms of the two short frames and between the bottoms of the two long frames, a positioning rod 1 is installed on the two short frames, a positioning rod 2 is installed on the connecting rod between the long frames, a pair of cross beams are fixedly connected between the two short frames and the two middle frames, three pairs of cross beams are fixedly connected between the two long frames and the two middle frames, the bottoms of the short frames, the middle frames and the long frames are all fixed on the bottom frames, the parts of the two bottom frames located between the middle frames and the long frames are all fixedly connected with rails, and the opposite surfaces of the two bottom frames are also fixedly connected with three pairs of limit plates;
[0009] The adjusting mechanism comprises two moving frames and two long rods, the two moving frames are rotatably connected to two moving rollers, a connecting frame is fixedly connected between the two moving frames, two ends of the connecting frame are rotatably connected to the upper ends of the two long rods respectively, the lower ends of the two long rods are rotatably connected to bottom rods, both ends of the bottom rods are rotatably connected to rectangular members, both ends of the bottom rods are also rotatably sleeved with rolling sleeves, gripping rods are fixedly connected to the two rectangular members, bottom surfaces of the two gripping rods are provided with bottom grooves, the middle parts of the two long rods are provided with limiting grooves, vertical rods are rotatably installed on the two bottom grooves, and vertical grooves are provided on the two long frames.
[0010] Preferably, a horizontal rod groove 1 and a vertical positioning groove 1 are provided on the side of the bottom of the fixed frame away from the discharge port of the crusher body, and a positioning screw 1 is threadedly sleeved in the positioning groove 1, and two horizontal rod grooves 2 and two vertical positioning grooves 2 are provided on the side of the bottom of the fixed frame close to the discharge port of the crusher body, the rod groove 1 is movably sleeved with the positioning rod 2, the two rod grooves 2 are movably sleeved with the two positioning rods 1 respectively, and the two positioning grooves 2 are threadedly sleeved with positioning screws 2.
[0011] Preferably, one end of the positioning rod one is a thick end, and the other end is threadedly sleeved with a limiting member. Two circular grooves one and two circular grooves two are provided on the positioning rod one. One end of the positioning rod two is a thick end, and the other end is fixedly connected with two clips. A connecting screw is threadedly sleeved on the two clips. A rotating block is rotatably sleeved between the two clips through the connecting screw. The rotating block is also rotatably connected to a rotating rod. Three circular grooves three are provided on the rod body composed of the rotating rod and the positioning rod two.
[0012] Preferably, the two short frames are both U-shaped frames, and are each provided with an installation groove 1, which are movably connected to two positioning rods 1 respectively, and the inner walls of the two short frames are fixedly connected with positioning plates, and the positioning plates are threadedly connected with positioning screws 3.
[0013] Preferably, the middle part of the connecting rod is movably connected to the second positioning rod, and the middle part of the connecting rod is also threadedly connected with a fourth positioning screw, and the upper surface of the connecting rod is fixedly connected to two fixing rods, and buffer sleeves are movably connected to the two fixing rods, and buffer springs are fixedly connected to the top surfaces of the two buffer sleeves, and the bottoms of the two buffer springs are respectively fixedly connected to the two fixing rods.
[0014] Preferably, the three pairs of cross beams between the long frame and the middle frame are threaded with switching screws, the two tracks are slide rails with concave upper surfaces, two strip grooves are provided on the two tracks, connecting rotating rods are installed on the upper ends of the two middle frames, two support columns are fixedly connected to the connecting rod between the two short frames, and the upper ends of the two middle frames are rotatably connected to the middle part of the conveying structure through the connecting rotating rod.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] In the present invention, the operator can quickly lower the height of the conveying structure and inspect the driving equipment of the conveying structure on the ground without climbing to a high place or disassembling the conveying structure and the supporting structure, thereby improving the convenience and safety of maintenance.
[0017] In the present invention, the moving rollers on the moving frame are driven to continuously lower their height through the deflection of the long rod, so that the right side of the conveying structure is continuously lowered until the conveying structure is in a horizontal state. At this time, the vertical rod is loosened to make it fit between the two middle limit plates, which plays a preliminary limiting effect. At this time, the limiting groove on the long rod is aligned with the switching screw on the middle cross beam, and the switching screw is rotated to insert it into the limiting groove, which plays a second limiting effect, thereby improving the stability during transportation. The state at this time is shown in the figure. The overall height of the conveying structure and the supporting structure is reduced, that is, the overall center of gravity is lowered. The lowered center of gravity will improve stability and safety during transportation, and facilitate transportation and movement.
[0018] In the present invention, the conveying structure and the supporting structure can be quickly switched to the maintenance state, the transfer state and the normal working state by continuously changing the position of the adjustment mechanism, and the stability is ensured by double limit, which greatly improves the applicability of the entire equipment.
[0019] In the present invention, the conveying structure can be used to convey the crushed construction waste to a higher place for transportation, and can also be used to convey the uncrushed construction waste into the crusher, which further improves the applicability and the adjustment method is simple and quick.
[0020] In the present invention, when the conveying structure is used to convey uncrushed construction waste into the crusher and the driving device needs to be inspected and repaired, after the positioning screw 1 is pulled out, the supporting structure can be moved to drive the rotating rod to move left until the thick end of the right side of the rotating rod is supported, and then the positioning screw 1 is inserted into the circular groove 3 on the rotating rod. At this time, the conveying structure and the supporting structure can be deflected, and then the height of the driving device can be lowered, which can effectively prevent the deflection of the conveying structure from being blocked by the crusher. The deflected conveying structure and the supporting structure can obtain a wider operating space. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0022] Figure 2 It is a schematic diagram of the conveying structure of the present invention when it is in a maintenance state;
[0023] Figure 3 is a schematic diagram of the conveying structure of the present invention when it is in a transport state;
[0024] Figure 4 It is a schematic diagram of the state when the conveying structure of the present invention is used to convey garbage into the crusher;
[0025] Figure 5 It is a structural schematic diagram of the support structure in the present invention;
[0026] Figure 6 It is a left schematic diagram of the fixing frame in the present invention;
[0027] Figure 7 The present invention Figure 6 A schematic diagram of the enlarged structure at A in the middle;
[0028] Figure 8 It is a schematic diagram of the right side of the fixing frame in the present invention;
[0029] Fig. 9 The present invention Figure 8 A schematic diagram of the enlarged structure at B in the middle;
[0030] Fig.10 It is a schematic diagram of the front end structure of the conveying structure in the present invention;
[0031] Fig.11 The present invention Fig.10 Schematic diagram of the enlarged structure at C in the middle;
[0032] Fig.12 It is a structural schematic diagram of the conveying structure and the supporting structure in the present invention;
[0033] Fig.13 The present invention Fig.12 Schematic diagram of the enlarged structure at D in the middle;
[0034] Fig.14 It is a structural schematic diagram of the positioning rod 1 in the present invention;
[0035] Fig.15 It is a structural schematic diagram of the positioning rod 2 in the present invention;
[0036] Fig.16 The present invention Fig.15 Schematic diagram of the enlarged structure at E in the middle;
[0037] Fig.17 It is a structural schematic diagram of the regulating mechanism in the present invention;
[0038] Fig.18 The present invention Fig.17 Schematic diagram of the enlarged structure at F in the middle.
[0039] In the figure, the corresponding relationship between the names of the components and the numbers of the accompanying drawings is as follows: 1. bottom frame; 2. conveying structure; 3. long frame; 4. positioning rod 2; 5. positioning rod 1; 6. crusher body; 7. fixed frame; 8. feeding structure; 9. intermediate frame; 10. positioning screw 1; 11. rod slot 1; 12. positioning slot 1; 13. positioning slot 2; 14. rod slot 2; 15. positioning screw 2; 16. short frame; 17. mounting slot 1; 18. positioning sheet; 19. positioning screw 3; 20. buffer sleeve; 21. connecting rod; 22. positioning screw 4; 24. fixing rod; 2 5. Buffer spring; 26. Limiting piece; 27. Round groove two; 28. Round groove one; 29. Round groove three; 30. Turning rod; 31. Connecting screw; 32. Clip; 33. Turning block; 34. Connecting turning rod; 35. Vertical groove; 36. Switching screw; 37. Crossbeam; 38. Support column; 39. Track; 40. Limiting piece; 41. Strip groove; 42. Long rod; 43. Limiting groove; 44. Moving roller; 45. Moving frame; 46. Connecting frame; 47. Bottom rod; 48. Rolling sleeve; 49. Rectangular piece; 50. Grip rod; 51. Bottom groove; 52. Vertical rod. DETAILED DESCRIPTION
[0040] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0041] See also Figure 1-Figure 18The present invention provides a crushing device for building construction engineering, including a crusher body 6 and a conveying structure 2 of the crusher, a feeding structure 8 is installed on the crusher body 6, a fixed frame 7 of the crusher is fixedly installed on the periphery of the crusher body 6, and a supporting structure is arranged below the conveying structure 2, wherein the supporting mechanism includes two bottom frames 1, two short frames 16, two middle frames 9 and two long frames 3, an adjusting mechanism is arranged between the two long frames 3, a connecting rod 21 is fixedly connected between the bottoms of the two short frames 16 and between the bottoms of the two long frames 3, a positioning rod 1 5 is installed on the two short frames 16, and a positioning rod 2 4 is installed on the connecting rod 21 between the long frames 3 A pair of cross beams 37 are fixedly connected between the two short frames 16 and the two middle frames 9, and three pairs of cross beams 37 are fixedly connected between the two long frames 3 and the two middle frames 9. The bottoms of the short frames 16, the middle frames 9 and the long frames 3 are all fixed on the bottom frame 1. The parts of the two bottom frames 1 located between the middle frames 9 and the long frames 3 are fixedly connected with rails 39. The opposite surfaces of the two bottom frames 1 are also fixedly connected with three pairs of limit plates 40. The construction waste to be crushed enters the crusher body 6 from the feeding structure 8 for crushing. After crushing, it is discharged from the discharge port of the crusher body 6. The crushed construction waste is thrown through the conveying structure 2 for loading and transportation. When the equipment is in Figure 1 It is in normal working state when in the state of
[0042] A horizontal rod groove 11 and a vertical positioning groove 12 are provided on the bottom of the fixed frame 7 away from the discharge port of the crusher body 6, and a positioning screw 10 is threadedly sleeved in the positioning groove 12. Two horizontal rod grooves 14 and two vertical positioning grooves 13 are provided on the bottom of the fixed frame 7 close to the discharge port of the crusher body 6, wherein the rod groove 11 is movably sleeved with the positioning rod 24, and the two rod grooves 24 are movably sleeved with the two positioning rods 15 respectively, and the two positioning grooves 2 13 are both threadedly sleeved with the positioning screws 15;
[0043] One end of the positioning rod 1 5 is a thick end, and the other end is threadedly sleeved with a limiting member 26. The positioning rod 1 5 is provided with two circular grooves 1 28 and two circular grooves 27. One end of the positioning rod 2 4 is a thick end, and the other end is fixedly connected with two clips 32. The two clips 32 are threadedly sleeved with connecting screws 31. A rotating block 33 is rotatably sleeved between the two clips 32 through the connecting screw 31. The rotating block 33 is also rotatably connected with a rotating rod 30. Among them, three circular grooves 3 29 are provided on the rod body composed of the rotating rod 30 and the positioning rod 2 4. The two positioning rods 1 5 are respectively inserted into the two rod grooves 2 14, and the positioning screw 3 19 on the short frame 16 is inserted into the circular groove 2 27 on the far right. The two positioning screw rods 15 are respectively inserted into the two circular grooves 28 on the right side. At this time, the crushed materials discharged from the discharge port fall into the conveyor belt surface of the conveying structure 2 for conveying. Three sets of universal wheels are installed at the bottom of the chassis 1. When the state of the conveying structure 2 needs to be adjusted, the positioning screw rod 15 is rotated to release the limit of the positioning rod 5. At this time, the universal wheels are used to move the entire conveying structure 2 and the supporting structure until the limit piece 26 on the positioning rod 5 abuts against the fixing frame 7, and the positioning screw rod 15 is reset to be inserted into the circular groove 28 on the left side. At this time, the conveying structure 2 and the supporting structure reach the adjustment state, and the deflection of the conveying structure 2 is not interfered by the crusher body 6;
[0044] The two short frames 16 are both U-shaped frames, and the two short frames 16 are both provided with mounting grooves 17, and the two mounting grooves 17 are respectively movably connected with the two positioning rods 5, and the inner walls of the two short frames 16 are fixedly connected with positioning pieces 18, and the positioning screws 3 19 are threadedly connected on the positioning pieces 18, and the middle part of the connecting rod 21 is movably connected with the positioning rods 24, and the middle part of the connecting rod 21 is also threadedly connected with the positioning screws 4 22, and the upper surface of the connecting rod 21 is fixedly connected with two fixing rods 24, wherein the two fixing rods 24 are both movably connected with buffer sleeves 20, and the inner top surfaces of the two buffer sleeves 20 are both fixedly connected with buffer springs 25, and the bottoms of the two buffer springs 25 are respectively fixedly connected with the two fixing rods 24, and the conveying structure 2 and the supporting structure can be quickly switched to the maintenance state, the transportation state and the normal working state through the continuous change of the position of the adjustment mechanism, and the stability is ensured by double limit, which greatly improves the applicability of the whole equipment;
[0045] The three pairs of cross beams 37 between the long frame 3 and the middle frame 9 are all threadedly sleeved with switching screws 36, the two rails 39 are both slide rails with concave upper surfaces, and the two rails 39 are provided with two strip grooves 41, the upper ends of the two middle frames 9 are both installed with connecting rods 34, and the connecting rod 21 between the two short frames 16 is fixedly connected with two support columns 38, wherein the upper ends of the two middle frames 9 are rotatably connected to the middle part of the conveying structure 2 through the connecting rod 34, and the adjustment mechanism includes two moving frames 45 and two long rods 42, and the two moving frames 45 are connected to the middle part of the conveying structure 2. The movable frame 45 is rotatably connected to two moving rollers 44, and a connecting frame 46 is fixedly connected between the two moving frames 45. The two ends of the connecting frame 46 are rotatably connected to the upper ends of the two long rods 42, wherein the lower ends of the two long rods 42 are rotatably connected to the bottom rod 47, and the two ends of the bottom rod 47 are rotatably connected to rectangular members 49, and the two ends of the bottom rod 47 are also rotatably sleeved with rolling sleeves 48, and the two rectangular members 49 are fixedly connected to the gripping rods 50, and the bottom surfaces of the two gripping rods 50 are provided with bottom grooves 51, and the middle parts of the two long rods 42 are provided with limited The two bottom grooves 51 are rotatably mounted with vertical rods 52, and the two long frames 3 are provided with vertical grooves 35. The long frame 3 is an inner concave frame, and the end of the moving roller 44 is a thick end, which is stuck in the inner groove of the long frame 3, and the roller body of the moving roller 44 is sleeved in the vertical groove 35. When it is necessary to use the conveying structure 2 to convey the construction waste to be crushed into the crusher, the limiting member 26 can be rotated to disengage the positioning rod 5, and the positioning rod 5 can be pulled out, so that the conveying structure 2 and the supporting structure are separated from the fixed frame 7. At this time, the mobile conveying structure 2 and the supporting structure are separated from the fixed frame 7. The support structure is moved to the left side of the fixed frame 7, and the rotating rod 30 is inserted into the rod groove 11 and then rotatably connected with the positioning rod 2 4. The positioning screw 10 is inserted into the circular groove 3 29 in the middle, and the positioning screw 4 22 is inserted into the circular groove 3 29 on the left side, so that the raised right end of the conveying structure 2 is aligned with its feeding structure 8 and maintains a stable position, so that the conveying structure 2 can be used to convey the crushed construction waste to a higher place for transportation, and can also be used to convey the uncrushed construction waste into the crusher, which further improves the applicability and the adjustment method is simple and quick.
[0046] Working principle: A crushing device used in construction projects. The construction waste to be crushed enters the crusher body 6 from the feeding structure 8 for crushing. After crushing, it is discharged from the discharge port of the crusher body 6. The crushed construction waste is thrown through the conveying structure 2 for easy loading and transportation. When the equipment is in Figure 1 The state is a normal working state, the two positioning rods 1 5 are respectively inserted into the two rod grooves 2 14, the positioning screw 3 19 on the short frame 16 is inserted into the rightmost circular groove 27, and the two positioning screws 2 15 are respectively inserted into the two circular grooves 1 28 on the right side. At this time, the crushed material discharged from the discharge port falls onto the conveyor belt surface of the conveying structure 2 for conveying;
[0047] Three sets of universal wheels are installed at the bottom of the chassis 1. When the state of the conveying structure 2 needs to be adjusted, the positioning screw rod 15 is rotated to release the limit of the positioning rod 5. At this time, the universal wheels are used to move the entire conveying structure 2 and the supporting structure until the limit piece 26 on the positioning rod 5 abuts against the fixing frame 7, and the positioning screw rod 15 is reset to be inserted into the circular groove 28 on the left side. At this time, the conveying structure 2 and the supporting structure reach the adjustment state, and the deflection of the conveying structure 2 is not interfered by the crusher body 6;
[0048] When the driving device on the conveying structure 2 needs to be repaired, two operators hold the two gripping rods 50 respectively, and move the vertical rod 52 to make the vertical rod 52 disengage from the rightmost limit plate 40. At this time, the operator holds the gripping rod 50 and moves it to the left continuously. The roller sleeve 48 is stuck in the groove of the track 39, and the rectangular member 49 is stuck in the strip groove 41. As the gripping rod 50 moves to the left, the moving roller 44 on the moving frame 45 is driven to continuously decrease in height through the deflection of the long rod 42, so that the right side of the conveying structure 2 is continuously decreased in height. Since the conveying structure 2 is rotatably installed on the two middle frames 9 to form a structure similar to a seesaw, the right side of the conveying structure 2 is higher than the left side. The conveying structure 2 is slightly heavy, and the force required to support the right side when maintaining balance is within the strength of the two operators. When the right side of the conveying structure 2 drops to contact the buffer sleeve 20, it drops with the buffer sleeve 20 until it contacts the fixed rod 24. At this time, the vertical rod 52 is released, and the vertical rod 52 is stuck between the two limiting pieces 40 on the leftmost side, which plays a preliminary limiting effect. At this time, the limiting groove 43 on the long rod 42 is aligned with the switching screw 36 on the lowest crossbeam 37, and the switching screw 36 on the lowest crossbeam 37 is rotated to insert it into the limiting groove 43, which plays a second limiting effect, thereby improving the stability during maintenance. The state at this time is as follows Figure 2 As shown, in the maintenance state, the operator can perform maintenance on the driving equipment of the conveying structure 2 on the ground without climbing to a high place or disassembling the conveying structure 2 and the supporting structure, thereby improving the convenience and safety of maintenance;
[0049] When transportation is required, the gripping rod 50 is moved in the same steps, and the moving roller 44 on the moving frame 45 is driven to continuously descend in height through the deflection of the long rod 42, so that the right side of the conveying structure 2 is continuously lowered in height until the conveying structure 2 is in a horizontal state. At this time, the vertical rod 52 is loosened to make it fit between the two middle limiting pieces 40, which plays a preliminary limiting effect. At this time, the limiting groove 43 on the long rod 42 is aligned with the switching screw 36 on the middle cross beam 37, and the switching screw 36 is rotated to be inserted into the limiting groove 43, which plays a second limiting effect, thereby improving the stability during transportation. The state at this time is as follows Figure 3 As shown, the overall height of the conveying structure 2 and the supporting structure is reduced, that is, the overall center of gravity is lowered. The lowered center of gravity will improve stability and safety during transportation and facilitate transfer and movement;
[0050] The conveying structure 2 and the supporting structure can be quickly switched to the maintenance state, the transfer state and the normal working state by continuously changing the position of the adjustment mechanism, and the stability is ensured by double limit, which greatly improves the applicability of the whole equipment;
[0051] like Figure 4 As shown, when it is necessary to use the conveying structure 2 to convey the construction waste to be crushed into the crusher, the limiter 26 can be rotated to disengage the positioning rod 15, and the positioning rod 15 can be pulled out, so that the conveying structure 2 and the supporting structure are completely separated from the fixed frame 7. At this time, the conveying structure 2 and the supporting structure are moved to the left side of the fixed frame 7, and the rotating rod 30 is inserted into the rod groove 11 and then rotatably connected with the positioning rod 24, and the positioning screw 10 is inserted into the circular groove 3 29 in the middle, and the positioning screw 4 22 is inserted into the circular groove 3 29 on the left side, so that the raised right end of the conveying structure 2 is aligned with the feeding structure 8 and keeps the position stable, so that the conveying structure 2 can be used to convey the crushed construction waste to a high place for transportation, and can also be used to convey the uncrushed construction waste into the crusher, which further improves the applicability, and the adjustment method is simple and fast;
[0052] When the conveying structure 2 is used to convey the uncrushed construction waste into the crusher and the driving device needs to be repaired, after the positioning screw 10 is pulled out, the supporting structure can be moved to drive the rotating rod 30 to move to the left until the thick end of the right side of the rotating rod 30 is supported, and then the positioning screw 10 is inserted into the circular groove 3 29 on the rotating rod 30. At this time, the conveying structure 2 and the supporting structure can be deflected, and then the height of the driving device can be lowered, which can effectively prevent the deflection of the conveying structure 2 from being blocked by the crusher. The deflected conveying structure 2 and the supporting structure can obtain a wider operating space.
[0053] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A crushing device for use in a building construction project, comprising a crusher body (6) and a conveying structure (2) of the crusher, wherein a feeding structure (8) is installed on the crusher body (6), characterized in that: A fixed frame (7) of the crusher is fixedly installed on the periphery of the crusher body (6); a support structure is arranged below the conveying structure (2); the support structure comprises two bottom frames (1), two short frames (16), two middle frames (9) and two long frames (3); an adjustment mechanism is arranged between the two long frames (3); A connecting rod (21) is fixedly connected between the bottoms of the two short frames (16) and between the bottoms of the two long frames (3); a first positioning rod (5) is installed on each of the two short frames (16); a second positioning rod (4) is installed on the connecting rod (21) between the long frames (3); a pair of cross beams (37) is fixedly connected between the two short frames (16) and the two intermediate frames (9); three pairs of cross beams (37) are fixedly connected between the two long frames (3) and the two intermediate frames (9); the bottoms of the short frames (16), the intermediate frames (9) and the long frames (3) are fixedly connected to the bottom frame (1); the portions of the two bottom frames (1) located between the intermediate frames (9) and the long frames (3) are fixedly connected to rails (39); and three pairs of limit plates (40) are fixedly connected to the opposite surfaces of the two bottom frames (1); The adjustment mechanism comprises two moving frames (45) and two long rods (42). The two moving frames (45) are rotatably connected to two moving rollers (44). A connecting frame (46) is fixedly connected between the two moving frames (45). Two ends of the connecting frame (46) are rotatably connected to the upper ends of the two long rods (42). The lower ends of the two long rods (42) are rotatably connected to bottom rods (47). Both ends of the bottom rods (47) are rotatably connected to rectangular members (49). Both ends of the bottom rods (47) are rotatably sleeved with rolling sleeves (48). The two rectangular members (49) are fixedly connected to gripping rods (50). The bottom surfaces of the two gripping rods (50) are provided with bottom grooves (51). The middle parts of the two long rods (42) are provided with limiting grooves (43). The two bottom grooves (51) are rotatably mounted with vertical rods (52). The two long frames (3) are provided with vertical grooves (35). The roller body of the moving roller (44) is sleeved in the vertical groove (35), and the conveying structure (2) and the supporting structure can be quickly switched to the maintenance state, the transfer state and the normal working state by continuously changing the position of the adjustment mechanism. The three pairs of crossbeams (37) located between the long frame (3) and the middle frame (9) are all threadedly sleeved with switching screws (36). By moving the vertical rod (52) to make the vertical rod (52) disengage from the rightmost limit plate (40), the long rod (42) is deflected to drive the moving roller (44) on the moving frame (45) to continuously descend in height, thereby causing the right side of the conveying structure (2) to continuously descend in height until the conveying structure (2) is in the transfer state or the maintenance state; The vertical rod (52) is loosened, and the vertical rod (52) is stuck between the two limiting pieces (40) on the leftmost side, achieving a preliminary limiting effect. The limiting groove (43) on the long rod (42) is aligned with the switching screw (36) on the lowest cross beam (37), and the switching screw (36) on the lowest cross beam (37) is rotated to be inserted into the limiting groove (43), achieving a secondary limiting effect. Alternatively, the limiting groove (43) on the long rod (42) is aligned with the switching screw (36) on the middle cross beam (37), and the switching screw (36) is rotated to be inserted into the limiting groove (43), achieving a secondary limiting effect.
2. A crushing device for building construction engineering as claimed in claim 1, characterized in that: A horizontal rod groove (11) and a vertical positioning groove (12) are provided on a side of the bottom of the fixed frame (7) away from the discharge port of the crusher body (6); a positioning screw (10) is internally threadedly sleeved on the positioning groove (12); and two horizontal rod grooves (14) and two vertical positioning grooves (13) are provided on a side of the bottom of the fixed frame (7) close to the discharge port of the crusher body (6); The rod groove one (11) is movably sleeved with the positioning rod two (4), the two rod grooves two (14) are movably sleeved with the two positioning rods one (5) respectively, and the two positioning grooves two (13) are both threadedly sleeved with positioning screws two (15).
3. A crushing device for building construction engineering as claimed in claim 2, characterized in that: One end of the first positioning rod (5) is a thick end, and the other end is threadedly sleeved on the limiting member (26). The first positioning rod (5) is provided with two first circular grooves (28) and two second circular grooves (27). One end of the second positioning rod (4) is a thick end, and the other end is fixedly connected to two clamping pieces (32). The two clamping pieces (32) are threadedly sleeved with connecting screws (31). A rotating block (33) is rotatably sleeved between the two clamping pieces (32) via the connecting screw (31), and the rotating block (33) is also rotatably connected to the rotating rod (30); Among them, three circular grooves (29) are formed on the rod body composed of the rotating rod (30) and the second positioning rod (4).
4. A crushing device for building construction engineering as claimed in claim 3, characterized in that: The two short frames (16) are both U-shaped frames. The two short frames (16) are both provided with a mounting groove (17). The two mounting grooves (17) are respectively movably sleeved with the two positioning rods (5). The inner walls of the two short frames (16) are both fixedly connected with a positioning piece (18). The positioning piece (18) is threadedly sleeved with a positioning screw (19).
5. A crushing device for building construction engineering as claimed in claim 4, characterized in that: The middle part of the connecting rod (21) is movably sleeved with the second positioning rod (4), and the middle part of the connecting rod (21) is also threadedly sleeved with the fourth positioning screw (22), and the upper surface of the connecting rod (21) is fixedly connected with two fixing rods (24); The two fixed rods (24) are both movably sleeved with a buffer sleeve (20), the inner top surfaces of the two buffer sleeves (20) are both fixedly connected with a buffer spring (25), and the bottoms of the two buffer springs (25) are respectively fixedly connected to the two fixed rods (24).
6. A crushing device for building construction engineering as claimed in claim 5, characterized in that: The two rails (39) are both slide rails with concave upper surfaces. Two strip grooves (41) are provided on the two rails (39). A connecting rod (34) is installed on the upper ends of the two intermediate frames (9). Two supporting columns (38) are fixedly connected to the connecting rod (21) between the two short frames (16). The upper ends of the two intermediate frames (9) are rotatably connected to the middle part of the conveying structure (2) via a connecting rotating rod (34).