Offshore wind power installation platform
By setting a shrinkable and unfolding anchoring mechanism at the bottom of the pile legs of the offshore wind power installation platform, the problems of anchoring difficulties and large power consumption caused by the small stress area at the tip of the pile boot are solved, and the stability of the offshore wind power installation platform is achieved and The effect of power saving.
Patent Information
- Application Number
- CN202411228603.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
The small force area of the pile boot tip of the existing offshore wind power installation platform, which leads to difficulties in anchoring on the seabed, and reducing the force area to save power will affect the stability of the platform.
It is provided at the bottom of the pile legs that can be retracted and deployed. The anchoring mechanism includes a central pile, a sliding sleeve, a hydraulic rod, a support plate and a mounting pin. The synchronous expansion and contraction of the hydraulic rod and the angle rotation of the support plate are realized. Shrink and unfold to accommodate stress requirements at different depths.
When the pile legs are inserted into the seabed, the anchoring mechanism shrinks to reduce the stress area and easily penetrate into the seabed. After inserting the depth, it expands to increase the stress area to ensure the stability of the platform and save power resources.
Smart Images

Figure CN118992014A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power installation platforms, and in particular to an offshore wind power installation platform. Background Art
[0002] The offshore wind power installation platform is a self-elevating offshore engineering equipment, which is widely used in the offshore construction and marine engineering field. It consists of a hull, pile legs, lifting mechanism and a series of functional equipment, providing a stable, safe and efficient working environment for wind power installation.
[0003] The prior art with publication number CN107571975B provides an offshore wind power installation platform, including pile shoes, pile legs, a platform body, an auxiliary crane, a main crane, a living building and a lifting device. The lifting device connects the platform body and the pile legs so that the platform body can be lifted and lowered by the lifting device. The pile shoes are arranged at the bottom of the pile legs and contact the seabed to provide sufficient support force for the wind power installation platform as a whole.
[0004] However, since the stress-bearing area at the bottom of the pile shoe is relatively large, in actual applications, the pile legs need to be anchored into the seabed to a certain depth for fixation. Pile shoes with insufficient stress-bearing area at the tip have certain difficulties in piercing the seabed, and more power resources are required to achieve the anchoring depth. However, if the stress-bearing area at the tip is simply reduced, the pile shoe will have insufficient supporting force and will not be able to keep the installation platform stable at sea. Therefore, it needs to be improved. Summary of the invention
[0005] The object of the present invention is to provide an offshore wind power installation platform to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions: an offshore wind power installation platform, comprising a hull platform, the hull platform is provided with a plurality of pile legs, the bottom of the pile legs is provided with a pile foundation, the bottom of the pile foundation is provided with an anchoring mechanism, and the anchoring mechanism can be retracted and expanded; The anchoring mechanism comprises a central pile, a sliding sleeve is sleeved on the central pile, a plurality of hydraulic rods are connected to the sliding sleeve, a pile tip is integrally formed at the end of the central pile, a plurality of first mounting seats are arranged at the periphery of the end of the central pile, a connecting rod is hinged on each first mounting seat, a support plate is respectively connected to both sides of the end of the connecting rod, and a rotating shaft is integrally formed on both sides of each supporting plate; The anchoring mechanism comprises a plurality of support plates, each of which has a gap between them, the connecting rods are arranged at intervals between the support plates, and the gaps between the remaining support plates are fixed by mounting pins; The mounting pin comprises a latch portion and a mounting portion, wherein the latch portion is inserted into the rotating shaft; A plurality of second mounting seats extend from the outer wall of the sliding sleeve, each of the second mounting seats is connected to a sliding rod, and the other end of the sliding rod is connected to the mounting portion of the mounting pin.
[0007] Preferably, a fixing plate is integrally formed at the end of the connecting rod, and fixing plates are also provided at both ends of the latch portion.
[0008] Preferably, the support plate can be rotated at a certain angle on the connecting rod and the mounting pin to achieve the contraction and expansion of the anchoring mechanism.
[0009] Preferably, a crane is provided on the hull platform and a propeller is provided at the bottom.
[0010] Preferably, the pile legs are triangular truss structures, with three chords serving as the main frame, symmetrical racks are provided on both sides of each chord, and lifting mechanisms are provided on both sides of the racks.
[0011] Preferably, the lifting mechanism is fixed in the hull platform, and comprises a plurality of lifting units, each lifting unit is connected to a gear, and each gear is meshed with a rack.
[0012] Preferably, the gears on both sides of the rack rotate in opposite directions.
[0013] Compared with the prior art, the present invention has the following beneficial effects: By setting an anchoring mechanism at the bottom of the pile leg, when the pile leg is lowered and inserted into the seabed, the anchoring mechanism is in a contracted state, the end is in a sharp angle shape, the force-bearing area is small, and it is easier to penetrate the seabed, thereby saving power resources; After the pile legs are inserted into the seabed to a certain depth, the anchoring mechanism at the bottom is deployed to increase the force-bearing area at the bottom of the pile base, providing sufficient support for the wind turbine installation platform to ensure the stability of the wind turbine installation platform at sea. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the anchoring mechanism in the present invention; Figure 3 It is a schematic diagram of the structure of the sliding sleeve in the present invention; Figure 4 It is a schematic diagram of the central pile and pile tip structure in the present invention; Figure 5 It is a schematic diagram of the mounting pin structure in the present invention; Figure 6 It is a schematic diagram of the anchoring mechanism of the present invention when it is contracted; Figure 7 It is a schematic diagram of the anchoring mechanism of the present invention when it is deployed; Figure 8It is a cross-sectional view of a pile leg in the present invention; Fig. 9 It is a schematic diagram of the connection between the chord rod and the lifting mechanism in the present invention; Fig.10 It is a cross-sectional view of the connection between the chord rod and the lifting mechanism in the present invention; Among them, the hull platform-1, the pile leg-2, the chord-21, the rack-22, the lifting mechanism-3, the lifting unit-31, the gear-32, the pile foundation-4, the anchoring mechanism-5, the center pile-51, the pile tip-511, the first mounting seat-512, the sliding sleeve-52, the second mounting seat-521, the hydraulic rod-53, the connecting rod-54, the support plate-55, the rotating shaft-551, the fixing plate-56, the mounting pin-57, the latch part-571, the mounting part-572, the sliding rod-58, the crane-6, and the thruster-7. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0016] See also Figure 1 The present invention provides a technical solution: an offshore wind power installation platform, including a hull platform 1, four pile legs 2 passing through the hull platform 1, the pile legs 2 are connected to the hull platform 1 through a lifting mechanism 3, and the pile legs 2 are driven to move up and down by the lifting mechanism 3. A pile foundation 4 is provided at the bottom of the pile leg 2, and the pile foundation 4 is a concrete structure. The bottom of the pile leg 2 is embedded in the pile foundation 4, and an anchoring mechanism 5 is provided at the bottom of the pile foundation 4.
[0017] The hull platform 1 is also provided with a crane 6 for hoisting the wind turbine equipment. A propeller 7 is provided at the bottom of the hull platform 1, and the propeller 7 drives the entire installation platform to move on the sea.
[0018] See also Figure 2-5 The anchoring mechanism 5 includes a center pile 51, which is integrally cast with the pile foundation 4. A sliding sleeve 52 is sleeved on the center pile 51. Lubricating oil can be used to assist sliding between the center pile 51 and the sliding sleeve 52 to reduce the friction coefficient.
[0019] The sliding sleeve 52 is connected to a plurality of hydraulic rods 53, one end of the hydraulic rod 53 is fixed to the sliding sleeve 52, and the other end is fixed to the bottom of the pile foundation 4. The sliding sleeve 52 is displaced on the central pile 51 by the synchronous extension and contraction of the hydraulic rod 53. A pile tip 511 is integrally formed at the end of the central pile 51, and the pile tip 511 is in the shape of an inverted cone. Four first mounting seats 512 are arranged on the periphery of the end of the central pile 51, and a connecting rod 54 is hinged on each of the first mounting seats 512. A supporting plate 55 is connected to both sides of the end of the connecting rod 54, and a rotating shaft 551 is integrally formed on both sides of each supporting plate 55. The center of the rotating shaft 551 is hollow, so that the connecting rod 54 can pass through, and the rotating shafts 551 on the same connecting rod 54 are staggered. A fixing plate 56 is integrally formed at the end of the connecting rod 54, and the diameter of the fixing plate 56 is larger than the diameter of the rotating shaft 551, so as to ensure that the rotating shaft 551 will not fall off the connecting rod 54.
[0020] The anchoring mechanism 5 includes eight support plates 55, each of which has a gap between them. The connecting rods 54 are arranged at intervals between the support plates 55, and there are four of them. The gaps between the remaining support plates 55 are fixed by mounting pins 57. The mounting pins 57 include a latch portion 571 and a mounting portion 572. The latch portion 571 is inserted into the rotating shaft 551, and the rotating shaft 551 on the same latch portion 571 is also staggered. Fixed plates 56 are also provided at both ends of the latch portion 571. The diameter of the fixed plate 56 is larger than the diameter of the rotating shaft 551, so as to ensure that the rotating shaft 551 will not fall off on the latch portion 571.
[0021] Thus, the support plate 55 can be rotated at a certain angle on the connecting rod 54 and the mounting pin 57 to achieve the contraction and expansion of the anchoring mechanism 5.
[0022] A plurality of second mounting seats 521 extend from the outer wall of the sliding sleeve 52, and each second mounting seat 521 is connected to a sliding rod 58, and the other end of the sliding rod 58 is connected to the mounting portion 572 of the mounting pin 57, and the connection method is hinged.
[0023] See also Figure 6-7 When the sliding sleeve 52 is close to the end of the pile leg 2, the entire anchoring mechanism 5 is in a contracted state, and the end is in a sharp angle. When the hydraulic rod 53 receives the signal from the controller, it starts to work, driving the sliding sleeve 52 to move downward on the center pile 51, so that the sliding rod 58 pushes the mounting pin 57, driving the support plate 55 to unfold. After unfolding, the eight support plates 55 are located in the same horizontal plane.
[0024] See also Figure 8-10 The pile leg 2 is a triangular truss structure, with three chords 21 as the main frame. Both sides of each chord 21 are provided with symmetrical racks 22, and both sides of the racks 22 are provided with lifting mechanisms 3.
[0025] The lifting mechanism 3 is fixed in the hull platform 1, and includes a plurality of lifting units 31, each of which is connected to a gear 32, and each gear 32 is meshed with the rack 22. The gear 32 is driven to rotate by the lifting unit 31, thereby driving the rack 22 to move, and the gears 32 on both sides of the rack 22 rotate in opposite directions.
[0026] When the gear 32 on the left side of the rack 22 rotates clockwise and the gear 32 on the right side of the rack 22 rotates counterclockwise, the hull platform 1 rises and the pile leg 2 falls; when the gear 32 on the left side of the rack 22 rotates counterclockwise and the gear 32 on the right side of the rack 22 rotates clockwise, the hull platform 1 falls and the pile leg 2 rises.
[0027] Process flow: The propeller moves the entire offshore wind power installation platform to the wind power installation position. The lifting unit controls the gears on the left side of each rack to rotate clockwise and the gears on the right side of the rack to rotate counterclockwise. At this time, the pile legs descend and the pile foundation gradually approaches the seabed. At this time, the anchoring mechanism is in a contracted state and is in a sharp angle. As the pile legs further descend, the anchoring mechanism slowly penetrates into the seabed. After penetrating to a certain depth, the lifting unit stops running, and then the anchoring mechanism gradually unfolds. All support plates unfold synchronously to form a plane. After stabilizing the position of the pile legs, the lifting unit operates again to lift the hull platform away from the sea level to achieve the stability of the hull platform. Then the offshore wind power can be hoisted and installed; After the installation is completed, the lifting unit controls the gears on the left side of each rack to rotate counterclockwise and the gears on the right side of the rack to rotate clockwise. At this time, the hull platform begins to descend. At the same time, the anchoring mechanism contracts. After the hull platform descends to the sea surface and meets the draft depth, the hull platform will no longer continue to descend due to buoyancy. At this time, the pile legs are gradually pulled out from the seabed. After the pile legs are pulled out, the lifting unit stops operating.
[0028] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered in all respects as exemplary and non-restrictive, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all changes within the meaning and range of equivalents of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An offshore wind power installation platform, comprising a hull platform (1), wherein the hull platform (1) is provided with a plurality of pile legs (2), and the bottom of the pile legs (2) is provided with a pile foundation (4), Features: An anchoring mechanism (5) is provided at the bottom of the pile foundation (4), and the anchoring mechanism (5) can be retracted and expanded; The anchoring mechanism (5) comprises a central pile (51), a sliding sleeve (52) is sleeved on the central pile (51), a plurality of hydraulic rods (53) are connected to the sliding sleeve (52), a pile tip (511) is integrally formed at the end of the central pile (51), a plurality of first mounting seats (512) are arranged on the periphery of the end of the central pile (51), a connecting rod (54) is hingedly connected to each first mounting seat (512), two sides of the end of the connecting rod (54) are respectively connected to a supporting plate (55), and a rotating shaft (551) is integrally formed on both sides of each supporting plate (55); The anchoring mechanism (5) comprises a plurality of support plates (55), each of which has a gap between two of the support plates (55); the connecting rods (54) are arranged at intervals between the support plates (55); the gaps between the remaining support plates (55) are fixed by mounting pins (57); the mounting pins (57) comprise a latch portion (571) and a mounting portion (572); the latch portion (571) is inserted into the rotating shaft (551); A plurality of second mounting seats (521) extend from the outer wall of the sliding sleeve (52), each second mounting seat (521) is connected to a sliding rod (58), and the other end of the sliding rod (58) is connected to the mounting portion (572) of the mounting pin (57).
2. An offshore wind power installation platform according to claim 1, Features: A fixing plate (56) is integrally formed at the end of the connecting rod (54), and fixing plates (56) are also provided at both ends of the latch portion (571).
3. An offshore wind power installation platform according to claim 2, Features: The support plate (55) can be rotated at a certain angle on the connecting rod (54) and the mounting pin (57) to achieve the contraction and expansion of the anchoring mechanism (5).
4. An offshore wind power installation platform according to claim 1, Features: The hull platform (1) is also provided with a crane (6) and a propeller (7) at the bottom.
5. An offshore wind power installation platform according to claim 1, Features: The pile leg (2) is a triangular truss structure, with three chords (21) serving as a main frame, symmetrical racks (22) being provided on both sides of each chord (21), and lifting mechanisms (3) being provided on both sides of the racks (22).
6. An offshore wind power installation platform according to claim 5, Features: The lifting mechanism (3) is fixed in the hull platform (1), and comprises a plurality of lifting units (31), each lifting unit (31) is connected to a gear (32), and each gear (32) is meshed with a rack (22).
7. An offshore wind power installation platform according to claim 6, Features: The gears (32) on both sides of the rack (22) rotate in opposite directions.