Method for controlling hoisting precision of full-width block at top of LNG (Liquefied Natural Gas) filling ship

Through finite element analysis and preset support methods, the deformation problem caused by insufficient strength during the lifting of the full-width overall section of the top of the LNG filling ship is solved, and precise lifting and safe docking operation are achieved, which improves construction efficiency and safety. sex.

CN118992050AActive Publication Date: 2024-11-22HUDONG ZHONGHUA SHIPBUILDINGGROUP

Patent Information

Application Number
CN202411221788.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-22
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

During the lifting process, the full-width overall section of the top of the LNG filling ship is insufficient in the overall strength of the single-shell deck section, which leads to large deformation and inaccurate lifting, and the deck may have large-area deformation and water accumulation problems.

Method used

Through finite element analysis, the position of the lifting ring and the deformation amount after the hook is loosened, the preset support is reversely deformed and placed, and the hook is loosened and removed under restricted welding conditions, so that the deformation of the total section is controlled within the accuracy requirements.

Benefits of technology

The precise lifting of the full-width overall section of the top of the LNG filling ship is achieved, reducing deformation, improving lifting efficiency and safety, and shortening the dock construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992050A_ABST
    Figure CN118992050A_ABST
Patent Text Reader

Abstract

The invention discloses a hoisting precision control method for a top full-width block of an LNG (Liquefied Natural Gas) filling ship, which specifically comprises the following steps: S1, establishing a finite element model for the top full-width block, and determining the gravity center position of the top full-width block; s2, according to the determined center-of-gravity position of the top full-width block, hanging rings are arranged on the top full-width block; s3, hook loosening finite element analysis is conducted on the top full-width block, and the position, where constraint welding is conducted, of the top full-width block is determined; s4, supporting cylinders are preset at the positions, corresponding to the rib positions, of the top of the B-type cabin; and S5, the top full-width type block is hoisted, constraint welding construction is conducted on the top full-width type block, a supporting cylinder preset at the top of the B-type cabin is dismantled, and hoisting of the top full-width type block is completed. According to the method, the position of the lifting ring is determined through finite element analysis, the deformation after hook loosening is calculated according to finite elements, the supporting cylinder is preset in advance, hook loosening and reinforced dismantling are conducted under the preset constraint welding condition, and the lifting precision is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shipbuilding, and in particular relates to a method for controlling the hoisting accuracy of a full-width section on the top of an LNG bunkering ship. Background Art

[0002] During the construction of LNG bunkering ships, the top section needs to be hoisted into the B-type tank in the cargo hold before loading. The surface covering material of the B-type tank is flammable, so the amount of open flame operations on the top section needs to be reduced as much as possible.

[0003] In order to reduce the empty ship weight and maximize the load capacity, the deck of the LNG bunkering ship is generally designed as a single-hull deck, with triangular tanks on both sides as ballast tanks. In order to meet the fire protection requirements of the B-type tank, the deck section and the triangular tank sections on both sides are assembled to form a full-width top section. However, due to the single-hull deck section, the overall strength of the deck section is relatively weak. During hoisting and unhooking, it will cause significant deformation due to strength problems. If it is not controlled, it will lead to serious problems such as the inability to hoist the section into place, large-area deformation and water accumulation on the deck. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the above-mentioned prior art and to provide a method for controlling the lifting accuracy of the full-width main section on the top of an LNG bunkering ship. The present invention determines the position of the lifting ring through finite element analysis, controls the deformation during the lifting of the main section, calculates the deformation after loosening the hook based on the finite element, performs anti-deformation and release by pre-setting the support in advance, and finally loosens the hook and strengthens the removal under preset constraint welding conditions, so that the deformation of the main section is controlled within the accuracy requirement range.

[0005] In order to achieve the above invention purpose, the technical solution provided by the present invention is as follows:

[0006] A method for controlling the hoisting accuracy of a full-width section on the top of an LNG bunkering ship, the method specifically comprising the following steps:

[0007] S1, establish a finite element model for the top full-width type total section, and perform finite element analysis on the top full-width type total section; determine the center of gravity position of the top full-width type total section according to the finite element analysis results;

[0008] S2, setting the lifting rings for the top full-width type section according to the determined center of gravity position of the top full-width type section, and performing a weight load analysis on the lifting ring setting to determine whether the lifting ring position meets the requirements;

[0009] S3, perform loose hook finite element analysis on the top full width section to determine the position of restraint welding of the top full width section;

[0010] S4, according to the deformation obtained by the loose hook finite element analysis of the top full-width section, before the top full-width section is hoisted, the supporting cylinder is preset at the corresponding rib position on the top of the B-type cabin;

[0011] S5, hoist the top full-width section. After the hoisting is completed, perform restraint welding on the top full-width section, and remove the preset supporting columns on the top of the B-type cabin to complete the hoisting of the top full-width section.

[0012] Furthermore, the finite element model of the top full-width section is established as follows: a finite element model of the top full-width section is established by using MSC / Patran software, the finite element grid size is set to 2 for each rib position along the ship length direction, and 2 for each longitudinal bone spacing in the ship width; the plates in the finite element model are all plane plates, the plates, longitudinal girders and strong transverse beam webs are simulated by shell units, the transverse and longitudinal bulb flat steels are simulated by beam units, and the material is ordinary carbon steel, and its density is 7850Kg / m 3 The three-dimensional coordinate system adopts the right-hand coordinate system, with the X-axis pointing toward the bow as the positive direction, the Z-axis pointing upward as the positive direction, and the Y-axis pointing to the port side as the positive direction.

[0013] Furthermore, the positions of the lifting rings of the top full-width type section are arranged as follows: the lifting rings are arranged front and rear on the 3rd, 6th, 9th and 12th solid ribs from the stern to the bow of the top full-width type section, and the lifting rings on the solid ribs are arranged symmetrically front and rear; the lifting rings are set left and right on the upper oblique side and on the strong longitudinal bones, and the left and right lifting rings are symmetrical and located at the strong frame.

[0014] Furthermore, the restraint welds are arranged at both ends of the triangular cabin ribs, and a restraint weld is arranged at every other level.

[0015] Furthermore, the height of the support column preset on the top of the B-type cabin is the sum of the distance between the top full-width section and the top of the B-type cabin and the deformation of the top full-width section.

[0016] Based on the above technical solution, the hoisting accuracy control method of the full-width main section on the top of the LNG bunkering ship in the present invention has achieved the following technical advantages through practical application:

[0017] 1. A method for controlling the hoisting accuracy of a full-width section on the top of an LNG bunkering ship of the present invention determines the position of the lifting ring through finite element analysis, controls the deformation of the section during hoisting, calculates the deformation after unhooking according to the finite element, performs anti-deformation release through pre-set supports, and finally unhooks and strengthens the removal under preset constraint welding conditions, so that the deformation of the section is controlled within the accuracy requirement range. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 The invention discloses a lifting ring arrangement diagram of a top full-width type bulk section in a method for controlling the lifting accuracy of a top full-width type bulk section of an LNG bunkering ship.

[0019] Figure 2 The invention discloses a constrained welding arrangement diagram of a top full-width section of an LNG bunkering ship in a method for controlling the hoisting accuracy of the top full-width section.

[0020] Figure 3 The invention discloses a support cylinder arrangement diagram in a method for controlling the hoisting accuracy of a full-width section on the top of an LNG bunkering ship. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific examples shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0022] The present invention can not only realize the pre-outfitting integrity of the segment and block stages, greatly reduce the outfitting workload in the engine room bilge area during the dock construction stage, and improve the dock operating environment and safe production environment, but also eliminate the interference between the structure and the outfitting in the original dock hoisting process, thereby greatly improving the segment hoisting efficiency and further shortening the dock construction period.

[0023] like Figure 1-3 The present invention relates to a method for controlling the hoisting accuracy of a full-width section at the top of an LNG bunkering ship, and the method specifically comprises the following steps:

[0024] S1, establish a finite element model for the top full-width type total section, and perform finite element analysis on the top full-width type total section; determine the center of gravity position of the top full-width type total section according to the finite element analysis results;

[0025] S2, setting the lifting ring 1 on the top full-width type section according to the determined center of gravity position of the top full-width type section, and performing a weight load analysis on the setting of the lifting ring 1 to determine whether the position of the lifting ring 1 meets the requirements;

[0026] S3, perform a loose hook finite element analysis on the top full width type segment to determine the position of the top full width type segment for constrained welding 2;

[0027] S4, according to the deformation obtained by the loose hook finite element analysis of the top full-width type section, before the top full-width type section is hoisted, the support column 3 is preset at the corresponding rib position on the top of the B-type cabin;

[0028] S5, hoist the top full-width section. After the hoisting is completed, perform restraint welding 2 on the top full-width section, and remove the preset supporting column 3 on the top of the B-type cabin to complete the hoisting of the top full-width section.

[0029] The finite element model of the top full-width section is established as follows: the finite element model of the top full-width section is established by using MSC / Patran software, the finite element grid size is set to 2 for each rib position along the ship length direction, and the ship width is set to 2 for each longitudinal bone spacing; the plates in the finite element model are all plane plates, the plates, longitudinal girders and strong transverse beam webs are simulated by shell units, the transverse and longitudinal bulb flat steels are simulated by beam units, and the material is ordinary carbon steel, and its density is 7850Kg / m 3 The three-dimensional coordinate system adopts the right-hand coordinate system, with the X-axis pointing toward the bow as the positive direction, the Z-axis pointing upward as the positive direction, and the Y-axis pointing to the port side as the positive direction.

[0030] The positions of the lifting rings 1 of the top full-width type section are arranged as follows: the lifting rings 1 are arranged front and rear on the 3rd, 6th, 9th and 12th solid ribs from the stern to the bow of the top full-width type section, and the lifting rings 1 on the solid ribs are arranged symmetrically front and rear; the lifting rings 1 are set left and right on the upper oblique side and the strong longitudinal bone, and the left and right lifting rings 1 are symmetrical and located at the strong frame.

[0031] The position of lifting ring 1 is set according to the center of gravity of the full-width top section. The lifting ring 1 is arranged in a symmetrical manner in front, back, left and right. The distance between the lifting rings 1 is as uniform as possible to ensure that the lifting ring 1 is evenly stressed and the deformation of the lifting of the section is controllable. The lifting ring 1 is arranged according to the above principles. The front and rear are set on the 3rd, 6th, 9th and 12th solid ribs from the stern to the bow, so that the front and rear lifting points are symmetrical relative to the center of gravity. The left and right lifting points are set on L8 and the strong longitudinal bone L11 located beside the upper slope. The left and right lifting points are symmetrical and located at the strong frame to reduce the amount of lifting deformation. The total weight of the section structure is 209.6T. It is assumed that the section is stationary during lifting. Therefore, the load is calculated according to the section weight load during strength analysis. The weight of the section is defined by applying an inertia load. The inertia load is taken as a in the depth direction. z =g = 9.8Kg m / s 2 , the other directions are 0; the boundary constraint condition of the finite element model is selected at the node of the lifting ring 1 position for translation constraint. The left rear lifting ring 1 node is subject to translation constraint in three directions <0,0,0>, the left front lifting ring 1 node is subject to translation constraint in two directions <,0,0>, and the other lifting ring 1 nodes are subject to translation constraint in the Z direction <,,0>. After analysis, the results show that the maximum deformation is 4.32mm and the maximum stress is 49.1MPa. The lifting state meets the accuracy requirements.

[0032] The restraint welds 2 are arranged at both ends of the triangular cabin ribs, and a restraint weld 2 is arranged at every other level.

[0033] Since the overall strength of the block is relatively weak, it will deform greatly after the hook is released. Therefore, the restraint weld 2 is set at both ends of the triangular cabin rib plate, and a restraint weld 2 is set every other level to maximize the transverse and longitudinal bending resistance of the block. Based on this, the inertial load is applied to the finite element model of the block to define the weight of the block. The inertial load is a in the depth direction. z =g = 9.8Kg m / s 2 , the other directions are 0; the nodes applied by constraint welding 2 are fully constrained in translation and rotation of 6 degrees of freedom. Under this boundary condition, the finite element analysis of the loose hook of the total section is carried out. The results show that the deformation of the total section is the largest in the longitudinal direction, showing a sinking state, with values ​​ranging from 7mm to 12mm, and the maximum stress of the total section is 111MPa, so the deformation is all elastic deformation. If this deformation is not corrected, after the total section is loosened, it will cause water accumulation on the deck and the clearance between the deck and the B-type tank will not meet the specifications.

[0034] The height of the support column 3 preset on the top of the B-type cabin is the sum of the distance between the top full-width section and the top of the B-type cabin and the deformation of the top full-width section.

[0035] The main section is hoisted to the theoretical position for positioning. After positioning, the restraint weld 2 is constructed according to the main section restraint weld 2 drawing. After all the construction is completed, the deck back support column 3 is removed. At this time, the main section is affected by its own gravity and restraint weld 2, and the levelness of the main section deck approaches the theoretical value. At the same time, the overall size is guaranteed to be within the accuracy requirements.

[0036] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for controlling the hoisting accuracy of the full-width section on the top of an LNG bunkering ship. It is characterized in that The method specifically comprises the following steps: S1, establish a finite element model for the top full-width type total section, and perform finite element analysis on the top full-width type total section; determine the center of gravity position of the top full-width type total section according to the finite element analysis results; S2, setting the lifting rings for the top full-width type section according to the determined center of gravity position of the top full-width type section, and performing a weight load analysis on the lifting ring setting to determine whether the lifting ring position meets the requirements; S3, perform loose hook finite element analysis on the top full width section to determine the position of restraint welding of the top full width section; S4, according to the deformation obtained by the loose hook finite element analysis of the top full-width section, before the top full-width section is hoisted, the supporting cylinder is preset at the corresponding rib position on the top of the B-type cabin; S5, hoist the top full-width section. After the hoisting is completed, perform restraint welding on the top full-width section, and remove the preset supporting columns on the top of the B-type cabin to complete the hoisting of the top full-width section.

2. According to claim 1, a method for controlling the hoisting accuracy of a full-width section at the top of an LNG bunkering ship, It is characterized in that The finite element model of the top full-width section is established as follows: the finite element model of the top full-width section is established by using MSC / Patran software, the finite element grid size is set to 2 for each rib position along the ship length direction, and the ship width is set to 2 for each longitudinal bone spacing; the plates in the finite element model are all plane plates, the plates, longitudinal girders and strong transverse beam webs are simulated by shell units, the transverse and longitudinal bulb flat steels are simulated by beam units, and the material is ordinary carbon steel, and its density is 7850Kg / m 3 The three-dimensional coordinate system adopts the right-hand coordinate system, with the X-axis pointing toward the bow as the positive direction, the Z-axis pointing upward as the positive direction, and the Y-axis pointing to the port side as the positive direction.

3. The method for controlling the hoisting accuracy of the full-width section at the top of an LNG bunkering ship according to claim 1, It is characterized in that The positions of the lifting rings of the top full-width type section are arranged as follows: the lifting rings are arranged front and rear on the 3rd, 6th, 9th and 12th solid ribs from the stern to the bow of the top full-width type section, and the lifting rings on the solid ribs are arranged symmetrically front and rear; the lifting rings are set on the upper oblique side and the strong longitudinal bones on the left and right, and the left and right lifting rings are symmetrical and located at the strong frame.

4. The method for controlling the hoisting accuracy of the full-width section at the top of an LNG bunkering ship according to claim 1, It is characterized in that The restraint welds are arranged at both ends of the triangular cabin ribs, and a restraint weld is arranged at every other level.

5. The method for controlling the hoisting accuracy of the full-width top section of an LNG bunkering ship according to claim 1, It is characterized in that The height of the support column preset on the top of the B-type cabin is the sum of the distance between the top full-width section and the top of the B-type cabin and the deformation of the top full-width section.

Citation Information

Patent Citations

  • Large ship superstructure hoisting method

    CN102452603A

  • Automatic design method for ship segmental hoisting scheme

    CN104504201A

  • Method for hoisting transverse compartment sectioned complete cross section for ultra-large container carrier

    CN107010171A

  • Hoisting method for ultra-large container ship stern axle tube segments

    CN110937511A

  • Hoisting method for hoisting steel truss

    CN115072544A

Cited By

  • Construction method for preventing deformation of full-width superstructure

    CN119796438A