Ground test system for verifying pre-cooling performance of engine
By designing the engine precooling performance verification ground test system, simulating natural cycles and helium-induced forced cycles, the emission and circulation precooling performance is verified, and the problem of difficulty in comprehensively verifying the precooling mechanism in the existing technology is solved, and the determination is provided. Support for pre-cooling system solutions.
Patent Information
- Application Number
- CN202411310998.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-11-22
AI Technical Summary
The prior art is difficult to verify both emission pre-cooling performance and circulating pre-cooling performance through ground tests, and cannot fully simulate the pre-cooling mechanism of rocket engines, making it difficult to determine the pre-cooling system scheme on the arrow.
A ground test system for engine precooling performance verification is designed, including test storage tank, exhaust pipe, filling pipeline, conveying pipeline, precooling return pipeline, sensor and other components, through simulated natural circulation and helium injection Forced cycle, record pressure and temperature data, and verify the performance of different pre-cooling methods.
It has realized the verification of emission pre-cooling and circulating pre-cooling performance in ground tests, and obtained test data under different pre-cooling methods, providing support for studying the pre-cooling mechanism and determining the pre-cooling system scheme on the arrow.
Smart Images

Figure CN118997954A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of liquid rocket technology, and in particular to a ground test system for verifying engine precooling performance. Background Art
[0002] Before ignition of rocket engines using cryogenic liquid propellants, the engine and its delivery system must be precooled. Precooling refers to the use of cryogenic propellants or other cryogenic media to cool the engine (mainly the turbopump) and its delivery system before ignition to reach the allowable temperature for engine start-up and ensure the reliability of the turbopump. If precooling is not performed or precooling is insufficient, the temperature of the engine and its delivery system will be higher than the temperature of the liquid propellant, causing the engine to not work properly.
[0003] When cryogenic propellant enters an engine at room temperature or in an overheated state, it will boil violently, generating a gas-liquid two-phase flow. Because the propellant is heated and strongly vaporized in the delivery system and the engine flow path, during the engine startup process, when the gas-liquid two-phase flow enters the engine's turbopump, the droplets will impact the turbopump, causing cavitation, idling, stall, etc. of the turbopump. The cavitation of the turbopump will affect the inducer profile, reduce the efficiency of the turbopump, and bring additional engine vibration, causing fluctuations in pressure and flow. In severe cases, the turbopump will be damaged. Idling will cause the turbopump to rotate too high, the bearings to wear, and in severe cases, the turbopump will collide, resulting in extended engine startup time and thrust ramp time. In severe cases, it may also cause the engine to fail completely.
[0004] Therefore, for cryogenic rocket engines that use cryogenic propellants such as liquid oxygen, it is essential to pre-cool the engine (especially key components such as turbopumps) and its delivery system before engine ignition, so as to reduce the temperature of the engine (especially key components such as turbopumps) and its delivery system to a reasonable temperature range and avoid the occurrence of gas-liquid two-phase flow in the engine during startup.
[0005] Rocket engine precooling is divided into immersion precooling, discharge precooling and circulation precooling according to the precooling method; it is divided into two stages: ground precooling and air precooling according to the precooling time. Ground precooling refers to the precooling of the engine when the carrier rocket is in a flight-ready state before leaving the launch pad; air precooling refers to the precooling of the engine before high-altitude ignition or secondary start after the rocket takes off. The first-stage engine of the rocket only has ground stage precooling, while the second, third and other upper stages use high-altitude ignition engines. In addition to ground precooling, air precooling is also required after the rocket takes off. Some engines use a combined precooling method to precool the engine.
[0006] At present, the main precooling methods for rocket engines at home and abroad include circulation precooling and exhaust precooling, and both precooling methods have their own advantages and disadvantages. The precooling method of the engine determines the pre-launch operation procedures of the cryogenic rocket. To determine the best precooling plan, it is necessary to comprehensively consider factors such as the engine precooling conditions, the type of propellant, the sub-stage where the engine is located, the pre-launch process, the impact of delayed launch, and adaptability.
[0007] However, due to the complexity of the precooling mechanism, which involves gas-liquid two-phase flow and non-steady-state heat exchange between gas-liquid two-phase flow and engine components, it is difficult to accurately analyze the precooling performance of the engine through simulation or theory, and it is bound to be verified through ground tests. At present, there are also some precooling performance verification test systems in the existing technology, but most of them use scaled models and cannot fully simulate the precooling of the engine.
[0008] Therefore, how to verify both the emission precooling performance and the cycle precooling performance through ground tests, obtain test data under different precooling methods, provide support for studying the precooling mechanism, and determine the on-rocket precooling system solution, is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0009] The present application provides a ground test system for verifying the engine precooling performance, which can verify both the emission precooling performance and the cycle precooling performance (including natural circulation and helium injection forced circulation). Through experiments, test data under different precooling methods are obtained to provide support for studying the precooling mechanism and determining the on-rocket precooling system solution.
[0010] In order to solve the above technical problems, this application provides the following technical solutions:
[0011] An engine precooling performance verification ground test system comprises: a test tank, an exhaust pipeline, an exhaust valve, a filling pipeline, a filling and discharge valve, a delivery pipeline, a precooling reflux pipeline, a precooling reflux flowmeter, a two-position three-way valve, an ejector, a discharge pipeline, an ejector pipeline, a He gas flowmeter, a first orifice plate, a pressure reducing valve and a He gas cylinder; wherein the exhaust pipeline is connected to the top of the test tank, and the exhaust valve is connected to the exhaust pipeline; the filling pipeline is connected to the bottom of the test tank, and the filling and discharge valve is connected to the filling pipeline; the delivery pipeline The inlet end of the pipeline is connected to the bottom of the test tank, and the outlet end of the delivery pipeline is connected to the first port of the two-position three-way valve; the inlet end of the precooling return pipeline is connected to the second port of the two-position three-way valve, and the precooling return pipeline end is connected to the bottom of the test tank and extends into the test tank to a certain height; and the upstream section of the delivery pipeline extends from top to bottom, the downstream section of the delivery pipeline extends horizontally, and the precooling return pipeline extends from bottom to top; the precooling return flow meter is connected to the downstream section of the delivery pipeline, and the precooling return flow meter is located at the two-position three-way valve. The third port of the two-position three-way valve is connected to the discharge pipeline. When the two-position three-way valve is in the first working position, the delivery pipeline is connected to the precooling return pipeline. When the two-position three-way valve is in the second working position, the delivery and discharge pipelines are connected. The ejector is connected to the precooling return pipeline, and the insulation degree of the delivery pipeline is higher than that of the precooling return pipeline. The ejector pipeline is connected between the ejector and the He gas cylinder, and the He gas flowmeter, the first orifice plate and the pressure reducing valve are connected to the ejector pipeline, and the He gas flowmeter is located between the ejector and the first orifice plate, and the pressure reducing valve is located between the first orifice plate and the He gas cylinder. A plurality of pressure sensors and temperature sensors are arranged at the delivery pipeline, the precooling return pipeline and the ejector pipeline to record the pressure and temperature data at the pipeline during the test. A plurality of temperature sensors are arranged at the test tank to record the temperature data at the test tank during the test. A pressure sensor is arranged at the top of the test tank to record the pressure data in the test tank during the test.
[0012] The engine precooling performance verification ground test system as described above, wherein, preferably, the control end of the exhaust valve is connected to the exhaust control pipeline, the inlet of the exhaust control pipeline is connected to the solenoid valve DQ3, and the outlet of the exhaust control pipeline is connected to the solenoid valve DQ4; the solenoid valve DQ3 is opened, the solenoid valve DQ4 is closed, and the control gas is introduced into the exhaust control pipeline, so that the exhaust valve is opened; the solenoid valve DQ3 is closed, the solenoid valve DQ4 is opened, and the control gas in the exhaust control pipeline is discharged, so that the exhaust valve is closed; the control end of the charging and discharging valve is connected to the charging and discharging control pipeline, the inlet of the charging and discharging control pipeline is connected to the solenoid valve DQ6, and the outlet of the charging and discharging control pipeline is connected to the solenoid valve DQ5; the solenoid valve DQ6 is opened, the solenoid valve DQ5 is closed, and the control gas is introduced into the charging and discharging control pipeline, so that the charging and discharging valve is opened; the solenoid valve DQ6 is closed, the solenoid valve DQ5 is opened, and the control gas in the charging and discharging control pipeline is discharged, so that the charging and discharging valve is closed.
[0013] In the engine precooling performance verification ground test system as described above, preferably, the control end of the two-position three-way valve is connected to the working position control pipeline, the inlet of the working position control pipeline is connected to the solenoid valve DQ8, and the outlet of the working position control pipeline is connected to the solenoid valve DQ7; the solenoid valve DQ8 is opened, the solenoid valve DQ7 is closed, and the control gas is introduced into the working position control pipeline, so that the two-position three-way valve is in the second working position; the solenoid valve DQ8 is closed, the solenoid valve DQ7 is opened, and the control gas in the working position control pipeline is discharged, so that the two-position three-way valve is in the first working position.
[0014] In the engine precooling performance verification ground test system as described above, preferably, the downstream section of the delivery pipeline is also connected to a third orifice plate, and the third orifice plate is located upstream of the precooling return flow meter.
[0015] In the engine precooling performance verification ground test system as described above, preferably, the top of the test tank is also connected to a boost pipeline, and the boost pipeline is connected to a solenoid valve DQ1.
[0016] In the engine precooling performance verification ground test system as described above, preferably, a pressure sensor P1 and a temperature sensor T1 are arranged on the delivery pipeline, and the pressure sensor P1 and the temperature sensor T1 are respectively used for the pressure and temperature of the cryogenic fluid at the inlet end of the delivery pipeline; a pressure sensor P2 and a temperature sensor T2 are also arranged on the delivery pipeline, and the pressure sensor P2 and the temperature sensor T2 are respectively used for recording the pressure and temperature of the cryogenic fluid at the end of the upstream section of the delivery pipeline; a pressure sensor P3 and a temperature sensor T3 are arranged on the precooling return pipeline, and The pressure sensor P3 and the temperature sensor T3 are respectively used to record the pressure and temperature of the low-temperature fluid at the lowest end of the pre-cooling return pipeline; a pressure sensor P6 and a temperature sensor T6 are also provided on the pre-cooling return pipeline, and the pressure sensor P6 and the temperature sensor T6 are respectively used to record the pressure and temperature of the low-temperature fluid at the return end of the pre-cooling return pipeline; and the pressure sensor P1 and the temperature sensor T1 are at the same height as the pressure sensor P6 and the temperature sensor T6, and the pressure sensor P2 and the temperature sensor T2 are at the same height as the pressure sensor P3 and the temperature sensor T3.
[0017] In the engine precooling performance verification ground test system as described above, preferably, a pressure sensor P4 and a temperature sensor T4 are also provided on the precooling return pipeline, and the pressure sensor P4 and the temperature sensor T4 are respectively used to record the pressure and temperature of the cryogenic fluid at the ejector inlet; a pressure sensor P5 and a temperature sensor T5 are also provided on the precooling return pipeline, and the pressure sensor P5 and the temperature sensor T5 are respectively used to record the pressure and temperature of the cryogenic fluid at the ejector outlet.
[0018] The engine precooling performance verification ground test system as described above, wherein, preferably, a patch temperature sensor T10 is provided on the delivery pipeline for recording the temperature of the outer wall of the precooling return pipeline at the inlet end of the delivery pipeline; a patch temperature sensor T11 is provided on the delivery pipeline for recording the temperature of the insulated outer wall of the precooling return pipeline at the inlet end of the delivery pipeline; and the patch temperature sensor T10 and the patch temperature sensor T11 are at the same position and height as the pressure sensor P1 and the temperature sensor T1; a patch temperature sensor T12 is also provided on the delivery pipeline for recording the temperature of the outer wall of the delivery pipeline at the end of the upstream section of the delivery pipeline; a patch temperature sensor T13 is provided on the delivery pipeline for recording the temperature of the insulated outer wall of the delivery pipeline at the end of the upstream section of the delivery pipeline; and the patch temperature sensor T12 and the patch temperature sensor T13 are at the same position and height; a chip temperature sensor T14 is arranged on the pre-cooling return pipeline, which is used to record the temperature of the outer wall of the pre-cooling return pipeline at the lowest end of the pre-cooling return pipeline; a chip temperature sensor T15 is arranged on the pre-cooling return pipeline, which is used to record the temperature of the insulated outer wall of the pre-cooling return pipeline at the lowest end of the pre-cooling return pipeline; and the chip temperature sensor T14 and the chip temperature sensor T15 are at the same position and height as the pressure sensor P3 and the temperature sensor T3; a chip temperature sensor T16 is also arranged on the pre-cooling return pipeline, which is used to record the temperature of the outer wall of the pre-cooling return pipeline at the return end of the pre-cooling return pipeline; a chip temperature sensor T17 is arranged on the pre-cooling return pipeline, which is used to record the temperature of the insulated outer wall of the pre-cooling return pipeline at the return end of the pre-cooling return pipeline; and the chip temperature sensor T16 and the patch temperature sensor T17 are at the same position and height as the pressure sensor P6 and the temperature sensor T6.
[0019] In the engine precooling performance verification ground test system as described above, preferably, a pressure sensor P7 and a temperature sensor T7 are provided on the injection pipeline, and the pressure sensor P7 and the temperature sensor T7 are respectively used to record the pressure and temperature of the He gas before the first orifice plate; a pressure sensor P8 and a temperature sensor T8 are provided on the injection pipeline, and the pressure sensor P8 and the temperature sensor T8 are respectively used to record the pressure and temperature of the He gas after the first orifice plate; a pressure sensor P9 and a temperature sensor T9 are provided on the injection pipeline, and the pressure sensor P9 and the temperature sensor T9 are respectively used to record the pressure and temperature of the injection gas.
[0020] In the engine precooling performance verification ground test system as described above, preferably, tank temperature sensors T20 to T25 are arranged in sequence from top to bottom in the test tank; and a tank air pillow pressure sensor P10 is arranged on the top of the test tank.
[0021] Compared with the above-mentioned background technology, the present application can verify both the emission precooling performance and the cycle precooling performance through ground tests, and can obtain test data under different precooling methods, providing support for studying the precooling mechanism and determining the on-rocket precooling system solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0023] Figure 1 is a schematic diagram of an engine precooling performance verification ground test system provided in an embodiment of the present application;
[0024] Figure 2 It is a flow chart of the ejection cycle precooling test provided in the embodiment of the present application. DETAILED DESCRIPTION
[0025] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. In addition, spatial relationship terms such as "upper", "lower", "left", "right", "front", "rear", etc. are used to facilitate description to explain the positional relationship between two components. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and are not to be construed as limitations on the present invention.
[0026] like Figure 1 As shown, the present application provides a ground test system for verifying engine precooling performance, including: a test tank 110, an exhaust line 121, an exhaust valve 122, a filling line 131, a filling and discharge valve 132, a delivery line 140, a precooling return line 141, a precooling return flowmeter 142, a two-position three-way valve 143, an ejector 144, a discharge line 151, an ejector line 161, a He gas flowmeter 162, a first orifice plate 163, a pressure reducing valve 164 and a He gas cylinder 165.
[0027] The exhaust pipe 121 is connected to the top of the test tank 110, and the exhaust valve 122 is connected to the exhaust pipe 121. When the exhaust valve 122 is opened, the gas in the test tank 110 is discharged to the outside through the exhaust pipe 121. After the exhaust is completed, the exhaust valve 122 is closed.
[0028] Since the test tank 110 contains cryogenic fluid, after the exhaust valve 122 is closed, the exhaust outlet of the exhaust valve 122 needs to be sealed to prevent condensed water in the air from adhering to the exhaust outlet of the exhaust valve 122. Therefore, the exhaust outlet of the exhaust valve 122 is also connected to the exhaust gas sealing pipeline 123. The exhaust gas sealing pipeline 123 is connected to the electromagnetic valve DQ2. When the electromagnetic valve DQ2 is opened, dry gas (dry nitrogen, dry helium, etc.) can be introduced into the exhaust gas sealing pipeline 123. After a predetermined amount of dry gas is introduced, the electromagnetic valve DQ2 is closed to isolate the exhaust outlet of the exhaust valve 122 from the outside air. Optionally, the exhaust gas sealing pipeline 123 is a DN8 pipe. Optionally, the pressure of the dry gas introduced into the exhaust gas sealing pipeline 123 is 4.5-5MPa.
[0029] In addition, the exhaust gas sealing pipeline 123 is also connected to a second orifice plate 124, and the second orifice plate 124 is located between the solenoid valve DQ2 and the exhaust valve 122 to limit the flow of dry gas entering the exhaust gas sealing pipeline 123. Optionally, the diameter of the hole of the second orifice plate 124 is 2 mm.
[0030] On the basis of the above, the control end of the exhaust valve 122 is connected to the exhaust control pipeline 125, the inlet of the exhaust control pipeline 125 is connected to the solenoid valve DQ3, and the outlet of the exhaust control pipeline 125 is connected to the solenoid valve DQ4. Open the solenoid valve DQ3, close the solenoid valve DQ4, and pass the control gas into the exhaust control pipeline 125, so that the exhaust valve 122 is opened; close the solenoid valve DQ3, open the solenoid valve DQ4, and the control gas in the exhaust control pipeline 125 is discharged, so that the exhaust valve 122 is closed. Optionally, the exhaust control pipeline 125 is a DN8 pipe. Also optionally, the pressure of the control gas passed into the exhaust control pipeline 125 is 4.5-5MPa.
[0031] The filling pipeline 131 is connected to the bottom of the test tank 110, and the filling and discharging valve 132 is connected to the filling pipeline 131. The filling and discharging valve 132 is opened to fill the low-temperature fluid into the test tank 110. After a predetermined amount of low-temperature fluid is filled, the filling and discharging valve 132 is closed to stop filling the low-temperature fluid into the test tank 110.
[0032] In addition, the control end of the adding and discharging valve 132 is connected to the adding and discharging control pipeline 133, the entrance of the adding and discharging control pipeline 133 is connected with the solenoid valve DQ6, and the outlet of the adding and discharging control pipeline 133 is connected with the solenoid valve DQ5. The solenoid valve DQ6 is opened, the solenoid valve DQ5 is closed, and the control gas is introduced into the adding and discharging control pipeline 133, so that the adding and discharging valve 132 is opened; the solenoid valve DQ6 is closed, the solenoid valve DQ5 is opened, and the control gas in the adding and discharging control pipeline 133 is discharged, so that the adding and discharging valve 132 is closed. Optionally, the adding and discharging control pipeline 133 is a DN8 pipe. Also optionally, the pressure of the control gas introduced into the adding and discharging control pipeline 133 is 4.5-5MPa.
[0033] The inlet end of the delivery pipeline 140 is connected to the bottom of the test tank 110, and the outlet end of the delivery pipeline 140 is connected to the first port of the two-position three-way valve 143; the inlet end of the precooling return pipeline 141 is connected to the second port of the two-position three-way valve 143, and the return end of the precooling return pipeline 141 is connected to the bottom of the test tank 110 and extends into the test tank to a certain height; and the upstream section of the delivery pipeline 140 extends from top to bottom, the downstream section of the delivery pipeline 140 extends horizontally, and the precooling return pipeline 141 extends from bottom to top; the precooling return flowmeter 142 is connected to the downstream section of the delivery pipeline 140, and the precooling return flowmeter 142 is in the position Upstream of the two-position three-way valve 143, the flow data of the low-temperature fluid in the delivery pipeline 140 is recorded by the precooling reflux flowmeter 142; the third port of the two-position three-way valve 143 is connected to the discharge pipeline 151. When the two-position three-way valve 143 is in the first working position, the first port and the second port of the two-position three-way valve 143 are connected, that is, the delivery pipeline 140 is connected to the precooling reflux pipeline 141; when the two-position three-way valve 143 is in the second working position, the first port and the third port of the two-position three-way valve 143 are connected, that is, the delivery pipeline 140 is connected to the discharge pipeline 151; the ejector 144 is connected to the precooling reflux pipeline 141.
[0034] In addition, the degree of insulation of the delivery pipeline 140 is higher than that of the precooling return pipeline 141, so that when the low-temperature fluid flows through the precooling return pipeline 141, the temperature of the low-temperature fluid will increase and the density will decrease, so that the upstream section of the delivery pipeline 140 and the low-temperature fluid at the same height of the precooling return pipeline 141 have a certain pressure difference, and then the low-temperature fluid in the test tank 110 can flow through the delivery pipeline 140 and the precooling return pipeline 141 in turn, and then flow back to the test tank 110 again to complete the natural circulation. Optionally, the precooling return pipeline 141 may not be provided with an insulation layer. Also optionally, different insulation verifications can be performed by replacing the insulation layer of the precooling return pipeline 141. Also optionally, the delivery pipeline 140 is a DN83 pipe, the precooling return pipeline 141 is a DN60 pipe, and the DN83 pipe and the DN60 pipe are connected at the two-position three-way valve 143.
[0035] The control end of the two-position three-way valve 143 is connected to the working position control pipeline 145, and the inlet of the working position control pipeline 145 is connected to the solenoid valve DQ8, and the outlet of the working position control pipeline 145 is connected to the solenoid valve DQ7. Open the solenoid valve DQ8, close the solenoid valve DQ7, and pass the control gas into the working position control pipeline 145, so that the two-position three-way valve 143 is in the second working position, the delivery pipeline 140 is connected to the discharge pipeline 151, and the low-temperature fluid is discharged outward; close the solenoid valve DQ8, open the solenoid valve DQ7, and the control gas in the working position control pipeline 145 is discharged, so that the two-position three-way valve 143 is in the first working position, the delivery pipeline 140 is connected to the pre-cooling return pipeline 141, and the low-temperature fluid refluxes. Optionally, the working position control pipeline 145 is a DN8 pipe. Also optionally, the pressure of the control gas passed into the working position control pipeline 145 is 4.5~5MPa.
[0036] Since the test tank 110 contains cryogenic fluid, after the two-position three-way valve 143 is closed, the discharge port of the two-position three-way valve 143 needs to be sealed to prevent condensed water in the air from adhering to the discharge port of the two-position three-way valve 143. Therefore, the third port of the two-position three-way valve 143 is also connected to the discharge gas seal pipeline 146. The discharge gas seal pipeline 146 is connected to the electromagnetic valve DQ10. When the electromagnetic valve DQ10 is opened, dry gas (dry nitrogen, dry helium, etc.) can be introduced into the discharge gas seal pipeline 146. After a predetermined amount of dry gas is introduced, the electromagnetic valve DQ10 is closed to isolate the third port of the two-position three-way valve 143 from the outside air. Optionally, the discharge gas seal pipeline 146 is a DN8 pipe. Optionally, the pressure of the dry gas introduced into the discharge gas seal pipeline 146 is 4.5-5MPa.
[0037] On the basis of the above, the delivery pipeline 140 is connected to a first switch valve 147 near the inlet end, and the pre-cooling return pipeline 141 is connected to a second switch valve 148 near the return end. When the first orifice plate 163 in the injection pipeline 161 is replaced, the first switch valve 147 and the second switch valve 148 need to be closed to facilitate the replacement of the first orifice plate 163. At other times, the first switch valve 147 and the second switch valve 148 are both in a normally open state.
[0038] In addition, the downstream section of the delivery pipeline 140 is also connected to a third orifice plate 149 , and the third orifice plate 149 is located upstream of the pre-cooling reflux flowmeter 142 for adjusting the flow rate of the cryogenic fluid in the delivery pipeline 140 .
[0039] The ejection line 161 is connected between the ejector 144 and the He gas cylinder 165, the He gas flowmeter 162, the first orifice plate 163 and the pressure reducing valve 164 are connected to the ejection line 161, and the He gas flowmeter 162 is located between the ejector 144 and the first orifice plate 163, and the pressure reducing valve 164 is located between the first orifice plate 163 and the He gas cylinder 165. The He gas in the He gas cylinder 165 flows into the ejector 144 through the pressure reducing valve 164, the first orifice plate 163 and the He gas flowmeter 162 in sequence, and then enters the pre-cooling return line 141, so that the low-temperature fluid in the pre-cooling return line 141 quickly flows back to the test tank 110 driven by the high-speed He gas. In this process, the flow data of the He gas in the ejection line 161 is recorded by the He gas flowmeter 162. In addition, by adjusting the size of the pressure reducing valve 164 and the first orifice plate 163, the flow rate of different induced He gases can be adjusted. By adjusting the size of the first orifice plate 163, the flow resistance characteristics of different engines can be simulated. The He gas flowmeter 162 can be used to check whether the He gas in the induced pipe 161 reaches the predetermined flow rate.
[0040] In addition, the ejection line 161 is also connected to a He gas filter 166, and the He gas filter 166 is located between the pressure reducing valve 164 and the He gas cylinder 165 to filter impurities in the He gas. In addition, the ejection line 161 is also connected to a hand valve 167, and the hand valve 167 is located between the filter 166 and the pressure reducing valve 164. By manually opening / closing the hand valve 167, the He gas in the ejection line 161 is manually controlled. On this basis, the ejection line 161 is also connected to a solenoid valve DQ9, and the solenoid valve DQ9 is located between the pressure reducing valve 164 and the first orifice plate 163 to realize automatic control of the He gas in the ejection line 161.
[0041] On the basis of the above, the top of the test tank 110 is also connected to a pressurizing pipeline 171, and the pressurizing pipeline 171 is connected to a solenoid valve DQ1. When the solenoid valve DQ1 is opened, pressurized gas can be introduced into the test tank 110 through the pressurizing pipeline 171. When the pressure in the test tank 110 reaches a predetermined value, the solenoid valve DQ1 is closed. Optionally, the pressurizing pipeline 171 is a DN8 pipe. Optionally, the pressure of the pressurized gas introduced into the pressurizing pipeline 171 is 10 MPa.
[0042] In addition, the boosting pipeline 171 is also connected to a gas filter 172, and the gas filter 172 is located between the solenoid valve DQ1 and the test tank 110. The boosting gas introduced is filtered through the gas filter 172 to prevent impurities from entering the test tank 110. In addition, the boosting pipeline 171 is also connected to a fourth orifice plate 173, and the fourth orifice plate 173 is located between the gas filter 172 and the test tank 110 to limit the flow of the boosting gas introduced into the boosting pipeline 171. Optionally, the diameter of the hole of the fourth orifice plate 173 is 2.5 mm.
[0043] On the basis of the above, a plurality of pressure sensors and temperature sensors are provided at the delivery pipeline 140, the precooling return pipeline 141 and the injection pipeline 161 to record the pressure and temperature data at the pipeline during the test.
[0044] A pressure sensor P1 and a temperature sensor T1 are provided on the delivery pipeline 140, and the pressure sensor P1 and the temperature sensor T1 are respectively used to record the pressure and temperature of the cryogenic fluid at the inlet end of the delivery pipeline 140. Optionally, the pressure sensor P1 and the temperature sensor T1 are provided downstream of the first switch valve 147. A pressure sensor P2 and a temperature sensor T2 are also provided on the delivery pipeline 140, and the pressure sensor P2 and the temperature sensor T2 are respectively used to record the pressure and temperature of the cryogenic fluid at the end of the upstream section of the delivery pipeline 140. Optionally, the pressure sensor P2 and the temperature sensor T2 are provided downstream of the pressure sensor P1 and the temperature sensor T1 and upstream of the third orifice plate 149.
[0045] A pressure sensor P3 and a temperature sensor T3 are provided on the precooling return line 141, and the pressure sensor P3 and the temperature sensor T3 are respectively used to record the pressure and temperature of the cryogenic fluid at the lowest end of the precooling return line 141. Optionally, the pressure sensor P3 and the temperature sensor T3 are provided downstream of the two-position three-way valve 143. A pressure sensor P6 and a temperature sensor T6 are also provided on the precooling return line 141, and the pressure sensor P6 and the temperature sensor T6 are respectively used to record the pressure and temperature of the cryogenic fluid at the return end of the precooling return line 141. Optionally, the pressure sensor P6 and the temperature sensor T6 are provided upstream of the second switch valve 148.
[0046] In addition, the pressure sensor P1 and the temperature sensor T1 are at the same height as the pressure sensor P6 and the temperature sensor T6, and the pressure sensor P2 and the temperature sensor T2 are at the same height as the pressure sensor P3 and the temperature sensor T3. Since the insulation degrees of the delivery pipeline 140 and the precooling return pipeline 141 are different, the temperature of the low-temperature fluid in the precooling return pipeline 141 at the same height is higher than the temperature of the low-temperature fluid in the delivery pipeline 140, and thus the density of the low-temperature fluid in the precooling return pipeline 141 at the same height is lower than the density of the low-temperature fluid in the delivery pipeline 140. In this way, there will be a certain pressure difference between the low-temperature fluid in the precooling return pipeline 141 and the low-temperature fluid in the delivery pipeline 140 at the same height, and such temperature difference and pressure difference can be known through the pressure sensor and the temperature sensor.
[0047] In addition, a pressure sensor P4 and a temperature sensor T4 are also provided on the precooling return line 141, and the pressure sensor P4 and the temperature sensor T4 are respectively used to record the pressure and temperature of the cryogenic fluid at the inlet of the ejector 144. Optionally, the pressure sensor P4 and the temperature sensor T4 are located upstream of the ejector 144 and downstream of the pressure sensor P3 and the temperature sensor T3. A pressure sensor P5 and a temperature sensor T5 are also provided on the precooling return line 141, and the pressure sensor P5 and the temperature sensor T5 are respectively used to record the pressure and temperature of the cryogenic fluid at the outlet of the ejector 144. Optionally, the pressure sensor P5 and the temperature sensor T5 are located downstream of the ejector 144 and upstream of the pressure sensor P6 and the temperature sensor T6.
[0048] In addition, a patch temperature sensor T10 is provided on the delivery pipeline 140, which is used to record the temperature of the outer wall of the delivery pipeline 140 at the inlet end of the delivery pipeline 140; a patch temperature sensor T11 is provided on the delivery pipeline 140, which is used to record the temperature of the insulated outer wall of the delivery pipeline 140 at the inlet end of the delivery pipeline 140, where the insulation is the insulation layer; and the patch temperature sensor T10 and the patch temperature sensor T11 are at the same position and height as the pressure sensor P1 and the temperature sensor T1. Optionally, the patch temperature sensor T10 is attached to the outer wall surface at the inlet end of the delivery pipeline 140, and the patch temperature sensor T11 is attached to the insulated outer wall surface at the inlet end of the delivery pipeline 140.
[0049] A patch temperature sensor T12 is also provided on the delivery pipeline 140, which is used to record the temperature of the outer wall of the delivery pipeline 140 at the end of the upstream section of the delivery pipeline 140; a patch temperature sensor T13 is provided on the delivery pipeline 140, which is used to record the temperature of the insulated outer wall of the delivery pipeline 140 at the end of the upstream section of the delivery pipeline 140, where the insulation is the insulation layer; and the patch temperature sensor T12 and the patch temperature sensor T13 are at the same position and height as the pressure sensor P2 and the temperature sensor T2. Optionally, the patch temperature sensor T12 is attached to the outer wall surface at the end of the upstream section of the delivery pipeline 140, and the patch temperature sensor T13 is attached to the insulated outer wall surface at the end of the upstream section of the delivery pipeline 140.
[0050] A chip temperature sensor T14 is provided on the precooling return line 141, which is used to record the temperature of the outer wall of the precooling return line 141 at the lowest end of the precooling return line 141; a chip temperature sensor T15 is provided on the precooling return line 141, which is used to record the temperature of the insulated outer wall of the precooling return line 141 at the lowest end of the precooling return line 141, where the insulation is the insulation layer; and the chip temperature sensor T14 and the chip temperature sensor T15 are at the same position and height as the pressure sensor P3 and the temperature sensor T3. Optionally, the chip temperature sensor T14 is attached to the outer wall surface at the lowest end of the precooling return line 141, and the chip temperature sensor T15 is attached to the insulated outer wall surface at the lowest end of the precooling return line 141.
[0051] A chip temperature sensor T16 is also provided on the precooling return line 141, which is used to record the temperature of the outer wall of the precooling return line 141 at the return end of the precooling return line 141; a chip temperature sensor T17 is provided on the precooling return line 141, which is used to record the temperature of the insulated outer wall of the precooling return line 141 at the return end of the precooling return line 141, where the insulation is the insulation layer; and the chip temperature sensor T16 and the chip temperature sensor T17 are at the same position and height as the pressure sensor P6 and the temperature sensor T6. Optionally, the chip temperature sensor T16 is attached to the outer wall surface at the return end of the precooling return line 141, and the chip temperature sensor T17 is attached to the insulated outer wall surface at the return end of the precooling return line 141.
[0052] A high-precision temperature sensor T30 is also provided on the delivery pipeline 140, which is used to record the temperature of the cryogenic fluid at the end of the upstream section of the delivery pipeline 140. Optionally, the high-precision temperature sensor T30 is provided at the end of the upstream section of the delivery pipeline 140. A high-precision temperature sensor T31 is also provided on the precooling return pipeline 141, which is used to record the temperature of the cryogenic fluid at the inlet end of the precooling return pipeline 141. Optionally, the high-precision temperature sensor T31 is provided at the inlet end of the precooling return pipeline 141.
[0053] A pressure sensor P7 and a temperature sensor T7 are provided on the ejection pipeline 161, and the pressure sensor P7 and the temperature sensor T7 are respectively used to record the pressure and temperature of the He gas before the first orifice plate 163. Optionally, the pressure sensor P7 and the temperature sensor T7 are located between the first orifice plate 163 and the solenoid valve DQ9. A pressure sensor P8 and a temperature sensor T8 are provided on the ejection pipeline 161, and the pressure sensor P8 and the temperature sensor T8 are respectively used to record the pressure and temperature of the He gas after the first orifice plate 163. Optionally, the pressure sensor P8 and the temperature sensor T8 are located between the first orifice plate 163 and the He gas flowmeter 162. A pressure sensor P9 and a temperature sensor T9 are provided on the ejection pipeline 161, and the pressure sensor P9 and the temperature sensor T9 are respectively used to record the pressure and temperature of the ejection gas. Optionally, the pressure sensor P9 and the temperature sensor T9 are located between the He gas flowmeter 162 and the ejector 144. Among them, the temperature sensors T7 to T9 are gas pipeline patch temperature sensors.
[0054] In addition, a plurality of temperature sensors are provided at the test tank 110 for recording temperature data at the test tank during the test; a pressure sensor is provided at the top of the test tank 110 for recording pressure data in the test tank during the test.
[0055] In the test tank 110, the tank temperature sensors T20 to T25 are arranged from top to bottom. Optionally, the distances between two adjacent tank temperature sensors T20 to T25 are the same. A tank air cushion pressure sensor P10 is arranged on the top of the test tank 110. The liquid level height is indirectly obtained by combining the difference between the pressure data detected by the tank air cushion pressure sensor P10 and the pressure data detected by the pressure sensor P1 with the density of the cryogenic fluid.
[0056] The test process is as follows:
[0057] 1. Natural circulation precooling test process:
[0058] (1) Before the test begins, close the solenoid valve DQ8 and open the solenoid valve DQ7 for 30 seconds to ensure that the two-position three-way valve 143 is in the first position, and the delivery pipeline 140 is connected to the precooling return pipeline 141, so that the low-temperature fluid is in a reflux state;
[0059] (2) When the filling conditions are met, close the solenoid valve DQ5 and the solenoid valve DQ4, open the solenoid valve DQ6, and open the solenoid valve DQ3 after 10 seconds to start filling the test tank 110 with cryogenic fluid;
[0060] (3) When the cryogenic fluid in the test tank 110 reaches a predetermined liquid level (2.5 m), close the solenoid valve DQ6, open the solenoid valve DQ5, and close the solenoid valve DQ5 after 30 seconds to stop adding cryogenic fluid to the test tank 110;
[0061] (4) Start natural circulation precooling. During the natural circulation precooling process, if the liquid level of the cryogenic fluid in the test tank 110 is lower than 1.6 m, it needs to be replenished to 2.5 m, and then repeat steps (1) to (3);
[0062] (5) After the natural circulation precooling is stable, first close the exhaust valve 122, then close the solenoid valve DQ3, open the solenoid valve DQ4, and then close the solenoid valve DQ4 after 30 seconds. Then open the solenoid valve DQ1 to increase the pressure in the test tank 110, set the pressure range to 0.33-0.36MPa, and continue for 10 minutes to observe the natural circulation precooling under the increased pressure condition;
[0063] (6) Open the manual valve 167 and the solenoid valve DQ9, start the ejection cycle, verify the ejection cycle under the pressurized condition, stop the ejection after the pressure in the test tank 110 reaches 0.75 MPa, and close the solenoid valve DQ9 and the manual valve 167.
[0064] 2. Helium injection cycle precooling test process:
[0065] The helium injection cycle test mainly verifies the injection capability under different injection parameters. The test process of each working condition is the same, including normal pressure injection and pressurized injection (exhaust valve 122 is closed). After each test, if the liquid level of the cryogenic fluid in the test tank 110 is lower than the predetermined height, it needs to be replenished.
[0066] like Figure 2 The specific test process is as follows:
[0067] Open the exhaust valve 122, close the solenoid valve DQ8, open the solenoid valve DQ7 for 30 seconds, ensure that the two-position three-way valve 143 is in the first working position, open the manual valve 167 and the solenoid valve DQ9, and keep it open for more than 500 seconds, then close the exhaust valve 122, close the solenoid valve DQ3, open the solenoid valve DQ4, close the solenoid valve DQ4 after keeping it open for 30 seconds, start the ejection cycle, stop the ejection after the pressure in the test tank 110 reaches 0.75MPa, and close the solenoid valve DQ9 and the manual valve 167.
[0068] 3. Discharge precooling test process:
[0069] (1) Before the test begins, close the solenoid valve DQ7 and open the solenoid valve DQ8 for 30 seconds to ensure that the two-position three-way valve 143 is in the second position, the delivery pipeline 140 is connected to the discharge pipeline 151, and the cryogenic fluid is discharged to the outside;
[0070] (2) When the filling conditions are met, close the solenoid valve DQ5 and the solenoid valve DQ4, open the solenoid valve DQ6, and open the solenoid valve DQ3 after 10 seconds to start filling the test tank 110 with cryogenic fluid. ;
[0071] (3) When the cryogenic fluid in the test tank 110 reaches a predetermined liquid level (2.5 m), close the solenoid valve DQ6, open the solenoid valve DQ5, and close the solenoid valve DQ5 after 30 seconds to stop adding cryogenic fluid to the test tank 110;
[0072] (4) Close the exhaust valve 122, close the solenoid valve DQ3, open the solenoid valve DQ4, and close the solenoid valve DQ4 after 30 seconds; then open the solenoid valve DQ1 to pressurize the test tank 110, set the pressure band according to the parameters, and continue the pressurization and discharge for 3 minutes.
[0073] During the above test, the data of each sensor is recorded, and the outlet pressure of the pressure reducing valve 164 and the size of the first orifice plate 163 are adjusted to adjust the flow rate of different induced He gases. Adjusting the size of the first orifice plate 163 can simulate the flow resistance characteristics of different engines.
[0074] This application can verify both the emission precooling performance and the cycle precooling performance through ground tests, and can obtain test data under different precooling methods, providing support for studying the precooling mechanism and determining the onboard precooling system solution.
[0075] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0076] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. An engine precooling performance verification ground test system, characterized in that: include: Test tank, exhaust pipeline, exhaust valve, filling pipeline, filling and discharge valve, delivery pipeline, precooling reflux pipeline, precooling reflux flowmeter, two-position three-way valve, ejector, discharge pipeline, ejector pipeline, He gas flowmeter, first orifice plate, pressure reducing valve and He gas cylinder; The exhaust pipeline is connected to the top of the test tank, and the exhaust valve is connected to the exhaust pipeline; The filling pipeline is connected to the bottom of the test tank, and the filling and discharge valve is connected to the filling pipeline; The inlet end of the delivery pipeline is connected to the bottom of the test tank, and the outlet end of the delivery pipeline is connected to the first port of the two-position three-way valve; the inlet end of the precooling return pipeline is connected to the second port of the two-position three-way valve, and the end of the precooling return pipeline is connected to the bottom of the test tank and extends into the test tank to a certain height; and the upstream section of the delivery pipeline extends from top to bottom, the downstream section of the delivery pipeline extends horizontally, and the precooling return pipeline extends from bottom to top; The precooling reflux flowmeter is connected to the downstream section of the delivery pipeline, and the precooling reflux flowmeter is located upstream of the two-position three-way valve; the third port of the two-position three-way valve is connected to the discharge pipeline, when the two-position three-way valve is in the first working position, the delivery pipeline is connected to the precooling reflux pipeline, and when the two-position three-way valve is in the second working position, the delivery pipeline is connected to the discharge pipeline; the ejector is connected to the precooling reflux pipeline, and the insulation degree of the delivery pipeline is higher than that of the precooling reflux pipeline; The ejection pipeline is connected between the ejector and the He gas cylinder, the He gas flowmeter, the first orifice plate and the pressure reducing valve are connected to the ejection pipeline, and the He gas flowmeter is located between the ejector and the first orifice plate, and the pressure reducing valve is located between the first orifice plate and the He gas cylinder; A plurality of pressure sensors and temperature sensors are provided at the delivery pipeline, precooling return pipeline and injection pipeline for recording the pressure and temperature data at the pipeline during the test; a plurality of temperature sensors are provided at the test tank for recording the temperature data at the test tank during the test; a pressure sensor is provided at the top of the test tank for recording the pressure data in the test tank during the test.
2. The engine precooling performance verification ground test system according to claim 1, characterized in that: The control end of the exhaust valve is connected to the exhaust control pipeline, the inlet of the exhaust control pipeline is connected to the solenoid valve DQ3, and the outlet of the exhaust control pipeline is connected to the solenoid valve DQ4; Open the solenoid valve DQ3, close the solenoid valve DQ4, and introduce the control gas into the exhaust control pipeline, so that the exhaust valve opens; close the solenoid valve DQ3, open the solenoid valve DQ4, and the control gas in the exhaust control pipeline is discharged, so that the exhaust valve closes; The control end of the adding and discharging valve is connected to the adding and discharging control pipeline, the inlet of the adding and discharging control pipeline is connected to the solenoid valve DQ6, and the outlet of the adding and discharging control pipeline is connected to the solenoid valve DQ5; Open the solenoid valve DQ6, close the solenoid valve DQ5, and introduce the control gas into the adding and discharging control pipeline to open the adding and discharging valve; close the solenoid valve DQ6, open the solenoid valve DQ5, and discharge the control gas in the adding and discharging control pipeline to close the adding and discharging valve.
3. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: The control end of the two-position three-way valve is connected to the working position control pipeline, the inlet of the working position control pipeline is connected to the solenoid valve DQ8, and the outlet of the working position control pipeline is connected to the solenoid valve DQ7; Open the solenoid valve DQ8, close the solenoid valve DQ7, and introduce control gas into the working position control pipeline, so that the two-position three-way valve is in the second working position; close the solenoid valve DQ8, open the solenoid valve DQ7, and discharge the control gas in the working position control pipeline, so that the two-position three-way valve is in the first working position.
4. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: The downstream section of the delivery pipeline is also connected to a third orifice plate, and the third orifice plate is located upstream of the pre-cooling reflux flow meter.
5. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: The top of the test tank is also connected to a boost pipeline, and the boost pipeline is connected to a solenoid valve DQ1.
6. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: A pressure sensor P1 and a temperature sensor T1 are provided on the delivery pipeline, and the pressure sensor P1 and the temperature sensor T1 are used for the pressure and temperature of the cryogenic fluid at the inlet end of the delivery pipeline respectively; A pressure sensor P2 and a temperature sensor T2 are also provided on the delivery pipeline, and the pressure sensor P2 and the temperature sensor T2 are used to record the pressure and temperature of the cryogenic fluid at the end of the upstream section of the delivery pipeline, respectively; A pressure sensor P3 and a temperature sensor T3 are provided on the precooling return pipeline, and the pressure sensor P3 and the temperature sensor T3 are used to record the pressure and temperature of the cryogenic fluid at the lowest end of the precooling return pipeline respectively; A pressure sensor P6 and a temperature sensor T6 are also provided on the precooling return pipeline, and the pressure sensor P6 and the temperature sensor T6 are used to record the pressure and temperature of the cryogenic fluid at the return end of the precooling return pipeline respectively; Furthermore, the pressure sensor P1 and the temperature sensor T1 are located at the same height as the pressure sensor P6 and the temperature sensor T6 , and the pressure sensor P2 and the temperature sensor T2 are located at the same height as the pressure sensor P3 and the temperature sensor T3 .
7. The engine precooling performance verification ground test system according to claim 6, characterized in that: A pressure sensor P4 and a temperature sensor T4 are also provided on the precooling return pipeline, and the pressure sensor P4 and the temperature sensor T4 are used to record the pressure and temperature of the cryogenic fluid at the ejector inlet, respectively; A pressure sensor P5 and a temperature sensor T5 are also provided on the pre-cooling return pipeline, and the pressure sensor P5 and the temperature sensor T5 are used to record the pressure and temperature of the cryogenic fluid at the ejector outlet, respectively.
8. The engine precooling performance verification ground test system according to claim 6, characterized in that: A patch temperature sensor T10 is provided on the delivery pipeline to record the temperature of the outer wall of the precooling return pipeline at the inlet end of the delivery pipeline; a patch temperature sensor T11 is provided on the delivery pipeline to record the temperature of the insulated outer wall of the precooling return pipeline at the inlet end of the delivery pipeline; and the patch temperature sensor T10 and the patch temperature sensor T11 are at the same position and height as the pressure sensor P1 and the temperature sensor T1; A patch temperature sensor T12 is also provided on the conveying pipeline, which is used to record the temperature of the outer wall of the conveying pipeline at the end of the upstream section of the conveying pipeline; a patch temperature sensor T13 is provided on the conveying pipeline, which is used to record the temperature of the insulated outer wall of the conveying pipeline at the end of the upstream section of the conveying pipeline; and the patch temperature sensor T12 and the patch temperature sensor T13 are at the same position and the same height as the pressure sensor P2 and the temperature sensor T2; A chip temperature sensor T14 is provided on the precooling return pipeline to record the temperature of the outer wall of the precooling return pipeline at the lowest end of the precooling return pipeline; a chip temperature sensor T15 is provided on the precooling return pipeline to record the temperature of the insulated outer wall of the precooling return pipeline at the lowest end of the precooling return pipeline; and the chip temperature sensor T14 and the chip temperature sensor T15 are at the same position and the same height as the pressure sensor P3 and the temperature sensor T3; A chip temperature sensor T16 is also provided on the pre-cooling return pipeline, which is used to record the temperature of the outer wall of the pre-cooling return pipeline at the return end of the pre-cooling return pipeline; a chip temperature sensor T17 is provided on the pre-cooling return pipeline, which is used to record the temperature of the insulated outer wall of the pre-cooling return pipeline at the return end of the pre-cooling return pipeline; and the chip temperature sensor T16 and the chip temperature sensor T17 are at the same position and height as the pressure sensor P6 and the temperature sensor T6.
9. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: A pressure sensor P7 and a temperature sensor T7 are provided on the ejection pipeline, and the pressure sensor P7 and the temperature sensor T7 are used to record the pressure and temperature of the He gas before the first orifice plate respectively; A pressure sensor P8 and a temperature sensor T8 are provided on the ejection pipeline, and the pressure sensor P8 and the temperature sensor T8 are used to record the pressure and temperature of the He gas after the first orifice plate respectively; A pressure sensor P9 and a temperature sensor T9 are provided on the injection pipeline, and the pressure sensor P9 and the temperature sensor T9 are used to record the pressure and temperature of the injection gas respectively.
10. The engine precooling performance verification ground test system according to claim 1 or 2, characterized in that: In the test tank, there are temperature sensors T20 to T25 arranged from top to bottom. A tank air pillow pressure sensor P10 is installed on the top of the test tank.
Citation Information
Cited By
Combined type pre-cooling system for ground ejection and pressurization coupled liquid rocket basic-stage engine
CN119778120A
Online control system and method for intermittent emission of low-temperature engine
CN121382470A
Soaking pre-cooling system and method for low-temperature liquid rocket engine
CN122345070A