Large-diameter small-branch electric smelting saddle-shaped three-way pipe fitting and preparation method thereof

By designing electrofusion saddle-type tee fittings in large-diameter pipelines, using vent holes to discharge gas and brush head to clean impurities, combined with electrofusion connection, the problems of gas accumulation, impurity accumulation and connection complexity are solved, and the pipeline system is improved Stability and economic benefits.

CN118998487APending Publication Date: 2024-11-22SHANDONG SHENGBANG PLASTIC CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411196637.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Pressure problems caused by gas accumulation in large-diameter pipelines, impurity deposition and foreign matter accumulation on the inner walls and branch pipe saddles of the pipeline, and the complex and costly problems of traditional connection processes.

Method used

A large diameter small branch electric fused saddle type tee pipe fitting is designed, including a branch pipe saddle type installed on the top of the pipe body, a resistive wire and anti-blocking component are installed inside, gas is discharged through the vent hole, and automatic use of a brush head and adaptive frame is achieved. Clean and simplify manufacturing through an electromelt connection process.

Benefits of technology

It effectively reduces the pressure in the pipeline, extends the service life, reduces maintenance costs, improves the firmness and adaptability of the connection, and ensures the stable operation and economic benefits of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118998487A_ABST
    Figure CN118998487A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipeline engineering, and discloses a large-diameter small-branch electric smelting saddle-shaped three-way pipe fitting and a preparation method thereof.The large-diameter small-branch electric smelting saddle-shaped three-way pipe fitting comprises a pipe body, a branch pipe saddle is installed at the top of the pipe body, a first channel and a second channel are formed in the two ends of the pipe body respectively, a resistance wire is arranged in the branch pipe saddle, and an anti-blocking assembly is arranged in the pipe body; the connecting column is mounted in the saddle-shaped interior of the branch pipe, is connected with the resistance wire and is used for providing a convenient electrical connecting point for electric melting connection; and the vent hole is formed in the saddle-shaped interior of the branch pipe to form a vertical third channel, and is used for exhausting the pipe body in the working process to reduce the pressure in the pipeline. The saddle-shaped connection between the pipe body and the branch pipe is firm through the electric melting connection process, high pressure and high flow speed are borne, and the leakage problem is avoided. Air is rapidly exhausted through the vent holes, pressure accumulation and pipe explosion are prevented, the water hammer phenomenon is reduced, pressure balance is kept, the overall stability is improved, pressure fluctuation and material fatigue are reduced, and the service life of a pipeline is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline engineering, in particular to a large-caliber small-branch electric-melting saddle-shaped three-way pipe fitting and a preparation method thereof. Background Art

[0002] In modern pipeline engineering and water supply systems, large-diameter pipelines have become an important component of widespread application due to their strong transportation capacity and wide application range. Large-diameter pipelines can effectively meet various needs such as urban water supply, industrial water use, agricultural irrigation and drainage, and have the advantages of long transportation distance, large flow rate and strong pressure resistance. Especially in urban infrastructure construction, the application of large-diameter pipelines can significantly improve the efficiency and reliability of water supply systems and ensure the water needs of urban residents and industrial enterprises. In the industrial field, large-diameter pipelines are often used to transport raw materials, finished products and wastewater treatment to ensure the continuity of the production process and the achievement of environmental protection requirements. In agricultural irrigation, large-diameter pipelines can quickly transport large It can improve water resources, improve irrigation efficiency, and promote the modernization of agricultural production. In addition, in urban flood control and drainage systems, the use of large-diameter pipes can quickly drain rainwater and sewage, reduce the risk of urban waterlogging, and improve the urban environment. Large-diameter pipes are also widely used in long-distance transportation of oil and natural gas. Their efficient and stable transportation capacity ensures the safe supply of energy and the economy of the transportation process. Due to their good corrosion resistance and pressure resistance, large-diameter pipes can operate stably under various complex geographical and climatic conditions and have strong adaptability. However, traditional large-diameter pipeline systems face multiple challenges in practical applications and are in urgent need of technical improvements to improve their safety, stability and economic benefits.

[0003] First, the pressure problem caused by gas accumulation in the pipeline is a common hidden danger. Since gas is inevitably entrained during fluid transportation, these gases will accumulate in the pipeline over time, forming local high pressure. If the pressure is not released in time, it may cause the pipeline to rupture or even burst, endangering the safe operation of the entire system. In addition, gas accumulation will also cause water hammer phenomenon, causing vibration and pressure fluctuations in the pipeline system, further aggravating the fatigue and wear of the pipeline and shortening its service life. Therefore, how to effectively discharge the gas in the pipeline and maintain the balance of internal pressure has become an important issue to ensure the stable operation of the pipeline system; Secondly, the impurity deposition and large-volume foreign matter accumulation on the inner wall of the pipeline and the saddle of the branch pipe are also important factors affecting the operating efficiency and reliability of the pipeline system. The traditional pipeline cleaning method relies on manual cleaning. Frequent manual maintenance is not only time-consuming and labor-intensive, but also causes system downtime and increases operating costs. If cleaning is not timely, the accumulation of impurities and foreign matter will cause pipeline blockage, affect flow and exhaust functions, and further affect the normal operation of the entire system. Therefore, how to achieve automatic and efficient pipeline cleaning and reduce manual intervention and maintenance costs is the key to improving the operating efficiency of the pipeline system; Finally, the traditional pipe connection process is complicated and costly, especially in the connection of large-diameter pipes. The development and use of injection molds is not only costly, but also difficult to adapt to the needs of different specifications and sizes. The traditional connection method is prone to being unstable and easily causes leakage problems in high-pressure and high-flow working environments, reducing the safety and reliability of the system. Therefore, finding a connection technology that can ensure a firm and reliable connection while reducing production costs and simplifying the manufacturing process is of great significance to improving the economic benefits and adaptability of the pipeline system. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a large-diameter small-branch electric-melted saddle-type three-way pipe fitting and a preparation method thereof, which solves the problem of excessive pressure in the pipeline causing the pipe to burst easily.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a large-diameter small-branch electric-melted saddle-shaped three-way pipe fitting and a preparation method thereof, comprising: The tube body has a branch pipe saddle installed on the top, and a first channel and a second channel are respectively arranged at both ends of the tube body. A resistance wire is arranged inside the branch pipe saddle, and an anti-blocking component is arranged inside the tube body. A connection post, which is installed inside the branch pipe saddle and connected to the resistance wire, is used to provide a convenient electrical connection point for the electric fusion connection; The vent hole is opened inside the branch pipe saddle to form a vertical third channel, which is used to exhaust the pipe body during operation and reduce the pressure in the pipeline.

[0006] Preferably, the anti-blocking component includes a mounting plate having holes and grooves distributed in a rectangular array formed inside the mounting plate, a rotating shaft is arranged in the middle of the mounting plate, and fan blades distributed in a circular array with the rotating shaft as the center are installed on one side of the outer wall of the rotating shaft.

[0007] Preferably, a vertically symmetrical connecting frame is installed in the middle of the outer wall of the rotating shaft, a sliding column is slidably connected inside the connecting frame, a limiting plate is fixed to one end of the sliding column, and an adaption frame is installed at the other end of the sliding column.

[0008] Preferably, a spring is sleeved on the outer wall of the sliding column, one end of the spring is fixed to the surface of the connecting frame, and the other end of the spring is fixed to the inner wall of the adapting frame.

[0009] Preferably, the surface of the adaptation frame is provided with brush heads that are closely distributed in a rectangular array, and the brush heads are of different lengths and are generally wavy.

[0010] Preferably, a second filter plate is installed inside the tube body, a first filter plate is arranged on the top of the second filter plate, and a surface of the first filter plate fits with the saddle-shaped bottom of the branch pipe.

[0011] Preferably, filter screens are disposed inside the first filter plate and the second filter plate, and the density of the filter screens of the first filter plate is greater than the density of the filter screens of the second filter plate.

[0012] A method for preparing a large-caliber small-branch electric-melted saddle-shaped tee pipe fitting comprises the following steps: S1. Preparation: prepare polyethylene pipes, branch pipe saddles, resistance wires and connecting columns; S2. Preparation of the main body: using a cutting machine to cut the polyethylene pipe into a pipe body of the required standard size, and at the same time trimming and opening both sides of the pipe body to form a first channel and a second channel, and using a cutting machine to cut a mounting hole of a suitable size in the middle of the outer wall of the pipe body; S3, preparation of the third channel: embed the resistance wire into the inner groove of the branch pipe saddle, clamp it with a clamp, and drill three holes with internal threads on the outside of the branch pipe saddle with a drill, screw the connecting column into the corresponding holes through the threads, and connect the connecting column with the resistance wire. At the same time, drill another hole on the outside of the branch pipe saddle for observation; S4, electric fusion installation: align the installation holes of the branch pipe saddle and the pipe body, and then use the electric fusion equipment to connect the column heating resistance wire to melt the polyethylene pipe at the connection between the pipe body and the branch pipe saddle, and then wait for the melted part of the polyethylene pipe to cool and solidify the installation position of the pipe body and the branch pipe saddle to form a third channel; S5. Inspection and testing: Observe the quality of the electric fusion connection at the connection point through the observation hole, and then use the pressure testing equipment to perform a pressure test to ensure that the entire equipment has no leakage under high pressure environment and can be exhausted normally. Preferably, in step S4, the temperature of the electric melting heating resistance wire is between 180° C. and 230° C., and the heating time is between 1 min and 3 min.

[0013] Preferably, in step S5, the pressure of the pressure testing equipment is 1.0 MPa to 3.2 MPa, and the testing time is 0.5 h to 2 h.

[0014] Working principle: When the equipment is operating normally, water passes through the pipe body. When the pressure in the pipe body is too high, the gas in the pipe body can be discharged through the vent hole to reduce the pressure in the pipe and prevent the pipe from bursting during operation. When the corresponding water passes through the pipe body, the fan blades will be driven by the water flow, and then driven by the water flow to rotate with the rotating shaft as the center, thereby driving the rotation of the rotating shaft, driving the connecting frame, and the connecting frame drives the adapting frame to move synchronously through the sliding column, so that the brush head moves with the adapting frame while cleaning the position of the branch pipe saddle installed on the inner wall of the pipe body. At this time, the large foreign matter blocked at the second filter plate position will be cleaned away by the cleaning.

[0015] The present invention provides a large-caliber small-branch electric-melted saddle-shaped three-way pipe fitting and a preparation method thereof. It has the following beneficial effects: 1. The present invention quickly discharges the gas in the pipeline through the vent hole to prevent pressure accumulation and ensure that the pressure in the pipeline is always within a safe range, thereby avoiding the risk of pipe bursting due to excessive pressure. The stable exhaust function helps to maintain the balance of pressure in the pipeline, reduce the water hammer phenomenon caused by gas retention, improve the operating stability and reliability of the pipeline system, and discharge the gas in the pipeline in time, reduce the internal pressure fluctuation, and protect the fatigue and wear of the pipeline material, thereby significantly extending the service life of the pipeline.

[0016] 2. The present invention uses the brush head to move with the adaptive frame to effectively remove deposited impurities and large foreign matter on the inner wall of the pipeline and the saddle of the branch pipe, keep the inside of the pipeline clean, and ensure smooth water flow. The automatic cleaning function reduces the frequency of manual cleaning required due to impurity accumulation, reduces maintenance costs and workload, and improves the operating efficiency and reliability of the system. Regular cleaning prevents impurity accumulation, reduces flow reduction and poor exhaust caused by foreign matter blockage, and ensures the normal operation of the pipeline system.

[0017] 3. The present invention ensures that the pipe body and the branch pipe saddle are firmly connected through the electric fusion connection process, can withstand high pressure and high flow rate working environment, and avoids leakage problems caused by loose connection. The use of electric fusion connection technology also avoids the high cost of developing injection molds, simplifies the manufacturing process, reduces production costs, and improves economic benefits. The electric fusion connection process is suitable for pipes of different specifications and sizes, especially large-diameter pipes, which increases the flexibility and scope of application of processing and meets various engineering needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A perspective view of the present invention; Figure 2 is a cross-sectional view of the tube body of the present invention; Figure 3 for Figure 2 Enlarged view of point A in the middle; Figure 4 The present invention is a flow chart of the preparation method steps.

[0019] Among them, 1. pipe body; 2. branch pipe saddle type; 3. connecting column; 4. vent; 5. mounting plate; 6. rotating shaft; 7. fan blades; 8. connecting frame; 9. sliding column; 10. limit plate; 11. spring; 12. adaptation frame; 13. brush head; 14. first filter plate; 15. second filter plate. DETAILED DESCRIPTION

[0020] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Embodiment 1: Please refer to the attached Figure 1 The embodiment of the present invention provides a large-diameter small-branch electric-melted saddle-shaped three-way pipe fitting, comprising: The pipe body 1 has a branch pipe saddle 2 installed on the top, and a first channel and a second channel are respectively arranged at both ends of the pipe body 1. A resistance wire is arranged inside the branch pipe saddle 2, and an anti-blocking component is arranged inside the pipe body 1. A connecting post 3, which is installed inside the branch pipe saddle 2 and connected to the resistance wire, and is used to provide a convenient electrical connection point for the electric fusion connection; The vent hole 4 is provided inside the branch pipe saddle 2 to form a vertical third channel, which is used to exhaust the pipe body 1 during operation to reduce the pressure in the pipeline.

[0022] Specifically, the two ends of the pipe body 1 form a first channel and a second channel respectively to ensure smooth water flow. The middle mounting hole is connected to the branch pipe saddle 2. During normal operation, water flows through the pipe body 1 to maintain stable operation of the pipeline system. When the pressure in the pipe body 1 is too high, the gas in the pipe body 1 can be discharged through the position of the vent 4, avoiding pipeline rupture caused by excessive pressure, thereby ensuring that the pressure in the pipeline is always within a safe range, greatly improving the safety and reliability of the pipe body 1.

[0023] Please refer to the attached Figure 2 -Attached Figure 3The anti-blocking component includes a mounting plate 5, the mounting plate 5 is provided with holes and grooves distributed in a rectangular array, a rotating shaft 6 is rotatably arranged in the middle of the mounting plate 5, and a fan blade 7 is arranged in a circular array with the rotating shaft 6 as the center on one side of the outer wall of the rotating shaft 6, and a connecting frame 8 symmetrically arranged in the middle of the outer wall of the rotating shaft 6 is installed, and a sliding column 9 is slidably connected inside the connecting frame 8, and a limiting plate 10 is fixed at one end of the sliding column 9, and an adaption frame 12 is installed at the other end of the sliding column 9, and a spring 11 is sleeved on the outer wall of the sliding column 9, and one end of the spring 11 is fixed to the connecting frame 8 surface, the other end of the spring 11 is fixed to the inner wall of the adaptation frame 12, the surface of the adaptation frame 12 is provided with brush heads 13 closely distributed in a rectangular array, the brush heads 13 are of different lengths and are generally wavy, a second filter plate 15 is installed inside the tube body 1, a first filter plate 14 is arranged on the top of the second filter plate 15, the surface of the first filter plate 14 is fitted with the bottom of the branch pipe saddle 2, the first filter plate 14 and the second filter plate 15 are both provided with filter screens, and the filter screen density of the first filter plate 14 is greater than that of the second filter plate 15.

[0024] Specifically, when water passes through the position of the tube body 1, the water flow will push the fan blades 7 installed in the tube body 1, so that the fan blades 7 rotate with the rotating shaft 6 as the center. As the fan blades 7 rotate, the kinetic energy of the water flow is effectively converted into mechanical energy, driving the rotation of the rotating shaft 6. This process ensures that the power of the water flow is fully utilized, further driving the movement of the connecting frame 8. The connecting frame 8 is connected to the adaptation frame 12 through the sliding column 9. Driven by the rotating shaft 6, the adaptation frame 12 can be synchronously displaced. This design not only achieves the simplicity and efficiency of the structure, but also ensures that the brush head 13 moves with the adaptation frame 12. During the movement of the brush head 13 in the tube body 1, it continuously brushes the inner wall of the tube body 1 and the installation The position of the branch pipe saddle 2 is cleaned, and this automatic cleaning function greatly reduces the accumulation of impurities in the pipe body 1, and prevents the blockage of the pipe body 1 due to the accumulation of impurities; during the cleaning process, large foreign matter blocked at the position of the second filter plate 15 will be swept away with the movement of the brush head 13, which not only effectively prevents the large foreign matter from blocking the air vent 4 and other important parts of the pipe body 1, but also ensures that the internal pressure of the pipe body 1 can be smoothly discharged through the air vent 4. The continuous cleaning action of the brush head 13, combined with the automatic design driven by water flow, significantly improves the self-cleaning ability and operation efficiency of the pipe body 1, reduces the frequency of manual maintenance, and ensures long-term stable operation.

[0025] Embodiment 2: Please refer to the attached Figure 4 A method for preparing a large-diameter small-branch electric-melted saddle-shaped tee pipe fitting comprises the following steps: S1. Preparation: prepare polyethylene pipe, branch pipe saddle 2, resistance wire and connecting column 3; S2. Preparation of the main body: using a cutting machine to cut the polyethylene pipe into a pipe body 1 of the required standard size, and at the same time, trimming and opening both sides of the pipe body 1 to form a first channel and a second channel, and using a cutting machine to cut a mounting hole of a suitable size in the middle of the outer wall of the pipe body 1; S3, preparation of the third channel: embed the resistance wire into the inner groove of the branch pipe saddle 2, clamp it with a clamp, and drill three holes with internal threads on the outer side of the branch pipe saddle 2 with a drill, screw the connecting column 3 into the corresponding holes through the threads, and connect the connecting column 3 with the resistance wire, and drill another hole on the outer side of the branch pipe saddle 2 for observation; S4, electric fusion installation: align the branch pipe saddle 2 with the installation hole opened in the pipe body 1, and then use the electric fusion equipment connecting column 3 to heat the resistance wire to melt the polyethylene pipe at the connection between the pipe body 1 and the branch pipe saddle 2, and then wait for the melted part of the polyethylene pipe to cool and solidify the installation position of the pipe body 1 and the branch pipe saddle 2 to form a third channel; S5. Inspection and testing: Observe the quality of the electric fusion connection at the connection point through the observation hole, and then use the pressure testing equipment to perform a pressure test to ensure that the entire equipment has no leakage under high pressure environment and can be exhausted normally; In step S4, the temperature of the electric melting heating resistance wire is 180°C to 230°C, and the heating time is 1min to 3min; In step S5, the pressure of the pressure testing equipment is 1.0MPa to 3.2MPa, and the testing time is 0.5h to 2h.

[0026] Specifically, first, prepare the required polyethylene pipe, which will serve as the main part of the pipe body 1. The branch pipe saddle 2 is a key component used to connect and support the third channel. The resistance wire is an indispensable heating element in the electric fusion connection process. It will melt the polyethylene material by heating to ensure a firm connection with the pipe body 1. The connecting column 3 is used to connect the resistance wire and the electric fusion equipment to ensure that the current passes smoothly through the resistance wire to achieve heating. Then, the polyethylene pipe is cut into the pipe body 1 of the required standard size by a cutting machine, and both sides of the pipe body 1 are trimmed and opened to form the first channel and the second channel. A channel is formed, and a mounting hole of suitable size is cut out in the middle of the outer wall of the pipe body 1 by using a cutting machine. Through precise cutting and trimming, it is ensured that the pipe body 1 has a good water flow channel. At the same time, a mounting hole is reserved for the subsequent installation of the branch pipe saddle type 2. Then, the resistance wire is embedded in the inner groove of the branch pipe saddle type 2, and clamped with a clamp to ensure that the resistance wire is firmly fixed in the groove. At the same time, three holes with internal threads are drilled on the outside of the branch pipe saddle type 2 by using a drill, and the connecting column 3 is screwed into the corresponding opening through the thread, and the connecting column 3 is connected to the resistance wire to ensure that the resistance wire and the external power supply can be smoothly connected. Connect, provide a heating source, and open another hole on the outside of the branch pipe saddle 2 as an observation hole to facilitate subsequent observation of the quality of the electric fusion connection; then align the branch pipe saddle 2 with the installation hole opened in the pipe body 1 to ensure accurate positioning. At this time, use the electric fusion equipment connection column 3 to heat the resistance wire to raise its temperature to 180℃~230℃. The heating time is 1min~3min. After the resistance wire is heated, the polyethylene material at the connection between the pipe body 1 and the branch pipe saddle 2 is melted and fully fused to form a firm electric fusion connection. After the polyethylene material cools and solidifies, the pipe body 1 and the branch pipe saddle 2 are installed. Install to form the third channel, so as to achieve efficient and reliable connection through electric fusion connection technology, avoiding the high cost of developing injection molds; finally, observe the quality of electric fusion connection at the connection through the observation hole to ensure that there is no cold weld or bad connection, and then use pressure testing equipment to perform pressure test. The test pressure is set to 1.0MPa ~ 3.2MPa, and the test time is 0.5h ~ 2h. Check whether the whole equipment is leak-free under high pressure environment to ensure the normal operation of the exhaust function. Verify through pressure test to confirm the safety and reliability of the pipe fittings in actual use.

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting, It is characterized in that include: A pipe body (1) is provided with a branch pipe saddle (2) on the top thereof, and a first channel and a second channel are provided at each of the two ends thereof; a resistance wire is provided inside the branch pipe saddle (2); and an anti-blocking component is provided inside the pipe body (1); A connecting post (3) is installed inside the branch pipe saddle (2) and connected to the resistance wire, and is used to provide a convenient electrical connection point for the electric fusion connection; The vent hole (4) is provided inside the branch pipe saddle (2) to form a vertical third channel, which is used to exhaust air from the pipe body (1) during operation and reduce the pressure in the pipe.

2. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting according to claim 1, It is characterized in that The anti-blocking component comprises a mounting plate (5), the mounting plate (5) is provided with holes and slots distributed in a rectangular array, a rotating shaft (6) is rotatably arranged in the middle of the mounting plate (5), and fan blades (7) distributed in a circular array with the rotating shaft (6) as the center are mounted on one side of the outer wall of the rotating shaft (6).

3. A large-diameter small-branch electric-melted saddle-shaped three-way pipe fitting according to claim 2, It is characterized in that A vertically symmetrical connecting frame (8) is installed in the middle of the outer wall of the rotating shaft (6), a sliding column (9) is slidably connected inside the connecting frame (8), a limiting plate (10) is fixed at one end of the sliding column (9), and an adaption frame (12) is installed at the other end of the sliding column (9).

4. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting according to claim 3, It is characterized in that The outer wall of the sliding column (9) is sleeved with a spring (11), one end of the spring (11) is fixed to the surface of the connecting frame (8), and the other end of the spring (11) is fixed to the inner wall of the adaptable frame (12).

5. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting according to claim 3, It is characterized in that The surface of the adaptable frame (12) is provided with bristle brush heads (13) that are closely distributed in a rectangular array, and the bristle brush heads (13) are of different lengths and are generally wavy in shape.

6. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting according to claim 1, It is characterized in that A second filter plate (15) is installed inside the tube body (1), a first filter plate (14) is arranged on the top of the second filter plate (15), and a surface of the first filter plate (14) is in contact with the bottom of the branch pipe saddle (2).

7. A large-diameter small-branch electric-fusion saddle-type three-way pipe fitting according to claim 6, It is characterized in that The first filter plate (14) and the second filter plate (15) are both provided with filter screens inside, and the filter screen density of the first filter plate (14) is greater than the filter screen density of the second filter plate (15).

8. A method for preparing a large-diameter small-branch electric-fused saddle-shaped tee pipe fitting, according to the large-diameter small-branch electric-fused saddle-shaped tee pipe fitting according to claim 1, It is characterized in that The following steps are involved: S1. Preparation: prepare polyethylene pipes, branch pipe saddles (2), resistance wires and connecting columns (3); S2. Preparation of the main body: using a cutting machine to cut the polyethylene pipe into a pipe body (1) of a required standard size, and at the same time trimming and opening both sides of the pipe body (1) to form a first channel and a second channel, and using a cutting machine to cut a mounting hole of a suitable size in the middle of the outer wall of the pipe body (1); S3, preparation of the third channel: embed the resistance wire into the inner groove of the branch pipe saddle (2), clamp it with a clamp, and drill three holes with internal threads on the outer side of the branch pipe saddle (2) with a drill, screw the connecting column (3) into the corresponding holes through the threads, and connect the connecting column (3) with the resistance wire. At the same time, drill another hole on the outer side of the branch pipe saddle (2) with a drill for observation; S4, electric fusion installation: align the installation holes of the branch pipe saddle (2) and the pipe body (1), and then use the electric fusion equipment connecting column (3) to heat the resistance wire to melt the polyethylene pipe at the connection between the pipe body (1) and the branch pipe saddle (2), and then wait for the melted part of the polyethylene pipe to cool and solidify the installation position of the pipe body (1) and the branch pipe saddle (2), so as to form a third channel; S5. Inspection and testing: Observe the quality of the electric fusion connection at the connection point through the observation hole, and then use the pressure testing equipment to perform a pressure test to ensure that the entire equipment has no leakage under high pressure environment and can be exhausted normally.

9. A method for preparing a large-diameter small-branch electric fusion saddle-shaped tee pipe fitting according to claim 8, It is characterized in that In step S4, the temperature of the electric melting heating resistance wire is between 180° C. and 230° C., and the heating time is between 1 minute and 3 minutes.

10. A method for preparing a large-diameter small-branch electric fusion saddle-shaped tee pipe fitting according to claim 8, It is characterized in that In the step S5, the pressure of the pressure testing equipment is 1.0 MPa to 3.2 MPa, and the testing time is 0.5 h to 2 h.

Citation Information

Patent Citations

  • Novel T-branch pipe

    CN104033682A

  • Liquefied gas Y-shaped filter and method for filtering particles in liquefied gas

    CN111544978A

  • Novel PE three-way pipe

    CN210462109U

  • Three-way rotary joint structure

    CN213809407U

  • Novel irrigation balance compensation type rotary tee joint

    CN214064230U