Automatic inflation busbar and use method
By designing an automatic filling manifold system, intelligent monitoring and automatic switching of hydrogen supply were achieved, solving the leakage risk problem caused by the rotation of multiple gas tanks in the existing technology, and improving the safety and stability of semiconductor production.
Patent Information
- Application Number
- CN202411260544.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In existing semiconductor manufacturing, hydrogen supply systems require multiple sets of gas tanks to be rotated, resulting in a high probability of leakage, significant safety risks, and the replacement process may increase the number of leakage points.
Design an automatic gas filling manifold system, including a main gas duct and a secondary gas duct. Automatic hydrogen switching is achieved through a one-way valve and a high-pressure series valve. Combined with a tank change early warning module and a leakage early warning module, intelligent monitoring and automatic gas filling of the gas tank are realized.
This reduces the frequency of gas cylinder replacements, lowers the probability of leaks, improves the safety and stability of hydrogen supply, and ensures the continuity and reliability of gas supply.
Smart Images

Figure CN118998631A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of hydrogen busbars in MOCVD equipment, and in particular relates to an automatic inflatable busbar and a use method thereof. Background Art
[0002] In semiconductor production, especially MOCVD production, a large amount of hydrogen is needed. At present, hydrogen is generally transported by hydrogen tanks (such as hydrogen bottles, containers, or torpedo cars). Semiconductor production requires continuous supply of hydrogen, and even if the hydrogen tank is replaced, it will not affect the supply. Therefore, multiple hydrogen tanks are generally required to be used at the same time or as backup (such as Figure 1 As shown, two hydrogen tanks are connected in parallel. When one is in use, the other is on standby. For example, when tank A is in use, tank B is on standby. Once tank A is empty, tank B is automatically switched to use. At the same time, the staff removes tank A, fills it with a full tank of gas and places it in the position of tank A as a standby. In this way, at least two sets of gas tanks are needed to rotate, and if a gas tank is out of gas during use, it needs to be replaced. Each additional gas tank replaced will increase the probability of leakage (each additional gas tank replaced will increase a leakage point that may be caused by installation errors), and the safety risk is relatively large. Summary of the invention
[0003] The present invention provides an automatically inflatable busbar and a method of use thereof, so as to solve at least one of the above-mentioned technical problems.
[0004] In order to solve the above technical problems, the present invention discloses an automatically inflatable busbar, comprising a main airway and a secondary airway, wherein the junction of the main airway and the secondary airway is an air delivery end; The main gas channel is equipped with a main gas tank, a main high-pressure valve, a main pressure reducer and a main low-pressure valve in sequence, and the auxiliary gas tank, an auxiliary high-pressure valve, an auxiliary pressure reducer and an auxiliary low-pressure valve are installed in sequence on the auxiliary gas channel; A connecting airway is provided between an output end of a main high-pressure valve of the main airway and an output end of a secondary high-pressure valve of the secondary airway, and a one-way valve is provided on the connecting airway.
[0005] Preferably, a high-pressure series valve is connected in series in front of the one-way valve on the connecting airway.
[0006] Preferably, the main air passage and the secondary air passage are provided with exhaust valve one and exhaust valve two, respectively.
[0007] Preferably, it also includes a tank replacement warning module, which is used to predict the internal air pressure value of the main gas tank in the next detection cycle and issue a tank replacement prompt in advance based on the prediction result. The tank replacement warning module includes: A data acquisition unit is used to collect physical data in the main gas tank. The data acquisition unit includes a plurality of temperature sensors, a plurality of air pressure sensors and a liquid level sensor. The plurality of temperature sensors, the plurality of air pressure sensors and the liquid level sensor are all installed on the inner wall of the main gas tank, and the plurality of temperature sensors and the plurality of air pressure sensors are evenly arranged on the inner wall of the main gas tank from top to bottom; An air pressure fluctuation coefficient calculation unit, used to calculate the air pressure fluctuation coefficient corresponding to each detection period based on the collection result of the data collection unit; A tank replacement prediction matrix construction unit is used to construct a tank replacement prediction matrix based on the collection results of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The early warning prompt unit is used to predict the internal air pressure value of the main gas tank in the next detection cycle based on the tank change prediction matrix, and compare it with the set value of the main pressure reducer. If the predicted internal air pressure value of the main gas tank in the next detection cycle is greater than the set value of the main pressure reducer, the automatic inflation bus works normally, otherwise, a tank change prompt is issued.
[0008] Preferably, based on the collection results of the data collection unit, the air pressure fluctuation coefficient corresponding to each detection cycle is calculated: (1); among which, is the air pressure fluctuation coefficient corresponding to the kth detection period, is the detection value of the liquid level sensor in the kth detection cycle, e is a natural number, and its value is 2.71. is the detection value of the i-th temperature sensor from top to bottom in the k-th detection cycle, is the preset calculation reference temperature, n is the total number of temperature sensors, is the detection value of the jth air pressure sensor from top to bottom in the kth detection cycle, To preset the calculation reference pressure, is the total number of air pressure sensors.
[0009] Preferably, the tank prediction matrix construction unit includes: A reference element determination subunit, used to determine the reference element of each detection cycle of the tank replacement prediction matrix based on the collection result of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The benchmark element of the kth detection cycle of the tank replacement prediction matrix is: (2); A row element determination subunit is used to determine the elements of each row of the tank changing prediction matrix based on the reference elements of each detection cycle of the tank changing prediction matrix, arrange the reference elements of each detection cycle of the tank changing prediction matrix in time sequence to form the first row elements of the tank changing prediction matrix, use the difference between the element on the right side of each first row element of the tank changing prediction matrix and the first row element as the middle row element corresponding to the first row element, and use the difference between the element on the left side of each first row element of the tank changing prediction matrix and the first row element as the last row element corresponding to the first row element; The middle row element corresponding to the last first row element is set to the same value as the middle row element corresponding to each first row element, and the last row element corresponding to the first first row element is set to the same value as the last row element corresponding to the last first row element; The tank change prediction matrix construction execution subunit is used to construct the tank change prediction matrix based on the determination results of the row element determination subunit: (3); among which, is the tank replacement prediction matrix corresponding to the kth detection cycle, is the first row element corresponding to the first detection cycle, is the first row element corresponding to the second detection cycle, is the first row element corresponding to the kth detection cycle, is the middle row element corresponding to the first row element of the first detection cycle, is the middle row element corresponding to the first row element of the second detection cycle, is the middle row element corresponding to the first row element of the kth detection period, is the last row element corresponding to the first row element of the first detection cycle, is the last row element corresponding to the first row element of the second detection cycle, It is the last row element corresponding to the first row element of the kth detection period.
[0010] Preferably, the internal air pressure value of the main gas tank in the next detection cycle is predicted based on the tank replacement prediction matrix: Get the mean of all the last row elements of the third row in the tank change prediction matrix corresponding to the k-th detection cycle, and set the value of the last column in the tank change prediction matrix corresponding to the k-th detection cycle to a value equal to the mean of the last row elements, so as to obtain a new matrix, and use the rank of the new matrix as the internal air pressure value of the k+1-th detection cycle.
[0011] Preferably, a leakage warning module is also included, and the leakage warning module includes: A Schlieren imaging acquisition unit, used for acquiring Schlieren images around the main gas tank; A hydrogen concentration collection unit, used to collect the concentration of hydrogen in the environment surrounding the main gas tank through hydrogen concentration sensors arranged from bottom to top along the axis of the main gas tank; A leakage coefficient calculation unit, used to calculate the actual leakage coefficient of the main gas tank based on the collection results of the schlieren imaging collection unit and the hydrogen concentration collection unit; The leakage judgment unit is used to compare the actual leakage coefficient of the main gas tank with the critical leakage coefficient of the main gas tank. If the actual leakage coefficient of the main gas tank is greater than the critical leakage coefficient of the main gas tank, a leakage alarm prompt is issued.
[0012] Preferably, based on the collection results of the schlieren imaging collection unit and the hydrogen concentration collection unit, the actual leakage coefficient of the main gas tank is calculated: (4); among which, is the actual leakage coefficient of the main gas tank in the uth detection cycle, is the acquisition error coefficient of the Schlieren imaging acquisition unit, is the acquisition error coefficient of the hydrogen concentration sensor, is the logarithm with base e, where e is a natural number and takes the value of 2.71. The schlieren image around the main gas tank (11) is divided into piece, is the schlieren image around the main gas tank (11) in the uth detection cycle. The gray value of an image, is the schlieren image around the main gas tank (11) in the uth detection cycle. The reference grayscale value of an image is determined by the air flow condition around the main gas tank (11) in the uth detection cycle, t is the total working time of the leakage warning module, To preset the detection cycle length, is the average detection value of several hydrogen concentration sensors in the uth detection cycle.
[0013] A method for using an automatically inflatable busbar comprises the following steps: When in use, adjust the main pressure reducer to a value higher than the preset value of the auxiliary pressure reducer, and open the main airway and the auxiliary airway at the same time. Since the value of the main pressure reducer of the main airway is larger, the gas in the main airway will be used first under the effect of pressure; As hydrogen is used, the gas pressure in the main gas tank becomes lower and lower. When the main gas tank is not enough to provide the pressure set by the main pressure reducer, the auxiliary gas channel will automatically provide hydrogen. At this time, the main gas tank needs to be removed and replaced, and the auxiliary gas tank in the auxiliary gas channel does not need to be replaced. Each time the main gas tank in the main gas channel is replaced, open the main high-pressure valve in the main gas channel. The hydrogen in the main gas channel will automatically inflate the auxiliary gas tank through the one-way valve until the air pressure on both sides of the main gas tank and the auxiliary gas tank is balanced.
[0014] Compared with the prior art, the present invention has the following beneficial effects: The present invention solves the technical problem that the existing inflation system requires at least two groups of gas cylinders to rotate, and when a gas cylinder is out of gas during use, it needs to be replaced, and each additional gas cylinder replaced increases the probability of leakage, which poses a greater safety risk. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a schematic diagram of bus connection of conventional automatic inflation in the prior art; Figure 2 Schematic diagram of the bus connection of the automatic inflation of the present invention Figure 1 ; Figure 3 Schematic diagram of the automatic inflatable bus connection of the present invention Figure 2 .
[0016] In the figure: 1. main air duct; 11. main air tank; 12. main high-pressure valve; 13. main pressure reducer; 14. main low-pressure valve; 15. exhaust valve one; 2. auxiliary air duct; 21. auxiliary air tank; 22. auxiliary high-pressure valve; 23. auxiliary pressure reducer; 24. auxiliary low-pressure valve; 25. exhaust valve two; 31. one-way valve; 32. high-pressure series valve. DETAILED DESCRIPTION
[0017] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0018] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions and technical features between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0019] The present invention provides the following embodiments Example 1 The embodiment of the present invention provides a self-inflating busbar, such as Figure 1-3As shown, it includes a main airway 1 and a secondary airway 2, and the junction of the main airway 1 and the secondary airway 2 is the air delivery end; The main gas channel is provided with a main gas tank 11, a main high-pressure valve 12, a main pressure reducer 13 and a main low-pressure valve 14 in sequence, and the auxiliary gas tank 21, an auxiliary high-pressure valve 22, an auxiliary pressure reducer 23 and an auxiliary low-pressure valve 24 are provided with an auxiliary gas tank 21, an auxiliary high-pressure valve 22, an auxiliary pressure reducer 23 and an auxiliary low-pressure valve 24 in sequence; A communicating airway is provided between the output end of the main high-pressure valve 12 of the main airway and the output end of the secondary high-pressure valve 22 of the secondary airway, and a one-way valve 31 is provided on the communicating airway.
[0020] A method for using an automatically inflatable busbar comprises the following steps: When in use, the main pressure reducer 13 is adjusted to a value higher than the preset value of the auxiliary pressure reducer 23, and the main airway and the auxiliary airway are opened at the same time. Since the value of the main pressure reducer 13 of the main airway is large, the gas in the main airway will be used first under the action of pressure; As hydrogen is used, the gas pressure in the main gas tank 11 becomes lower and lower. When the main gas tank 11 is insufficient to provide the pressure set by the main pressure reducer 13, the secondary gas passage will automatically provide hydrogen. At this time, the main gas tank 11 needs to be removed for replacement, and the auxiliary gas tank 21 of the auxiliary gas channel does not need to be replaced. Each time the main gas tank 11 in the main gas channel is replaced, the main high-pressure valve 12 in the main gas channel is opened, and the hydrogen in the main gas channel will automatically inflate the auxiliary gas tank 21 through the one-way valve 31 until the air pressure on both sides of the main gas tank 11 and the auxiliary gas tank 21 is balanced.
[0021] Preferably, the main gas tank 11 is a torpedo truck, and the auxiliary gas tank 21 is one or several groups of containers. It is necessary to ensure that the capacity of the auxiliary gas tank 21 is sufficient to supply gas when the main gas tank 11 is replaced. At the same time, it is necessary to ensure that the maximum filling pressure of the torpedo truck and the container is equal. The maximum filling pressure of the torpedo truck and the container can be 20MPa or 200Bar.
[0022] Preferably, a high-pressure series valve 32 is connected in series in front of the one-way valve 31 on the communicating air passage.
[0023] Preferably, an exhaust valve 15 and an exhaust valve 2 25 are respectively provided on the main air passage and the secondary air passage.
[0024] The working principle and beneficial effects of the above technical solution are as follows: when in use, the main pressure reducer 13 of the main airway 1 is adjusted to a value slightly higher than the value of the auxiliary pressure reducer 23 of the auxiliary airway 2, such as the adjustment value of the main pressure reducer 13 of the main airway 1 is 9Bar, and the adjustment value of the auxiliary pressure reducer 23 of the auxiliary airway 2 is 7Bar. At this time, the auxiliary pressure reducer 23 is in an automatically closed state. The structural principle of the pressure reducer: when the downstream pressure is greater than the set value, the gas supply is automatically reduced or even stopped. Only when the value of the main pressure reducer 13 in the main airway 1 cannot reach the set value due to insufficient pressure of the main gas tank 11 in the main airway, resulting in a pressure lower than 7Bar, the auxiliary gas tank 21 in the auxiliary airway 2 will automatically supply gas to the outside. At this time, the airways on both sides are opened at the same time. Since the value of the main pressure reducer 13 of the main airway 1 is large, the gas in the main airway is automatically used first. Only when the pressure in the main gas tank 11 is getting lower and lower, the main pressure reducer 13 of the main airway 1 is not enough to provide sufficient pressure, the auxiliary airway 2 will automatically provide gas. Each time the main gas tank 11 in the main gas channel 1 is replaced, the auxiliary gas tank 21 in the auxiliary gas channel 2 does not need to be replaced. The auxiliary gas tank 21 is equivalent to a gas storage tank. Each time the main gas tank 11 in the main gas channel 1 is replaced, the main high-pressure valve 12 in the main gas channel 1 is opened, and the high-pressure series valve 32 is opened. The gas in the main gas channel 1 automatically inflates the auxiliary gas tank 21 through the one-way valve 31 until the air pressure on both sides of the main gas tank 11 and the auxiliary gas tank 21 is balanced. The main gas channel and the auxiliary gas channel are respectively provided with an exhaust valve 15 and an exhaust valve 25. The residual gas in the main gas channel and the auxiliary gas channel is discharged to facilitate the replacement of the air pipe; Therefore, the present invention solves the technical problem that the existing inflation system requires at least two groups of gas cylinders to rotate, and when a gas cylinder is out of gas during use, it needs to be replaced. Each additional gas cylinder replaced will increase the probability of leakage, which poses a greater safety risk.
[0025] Example 2 On the basis of embodiment 1, a tank replacement warning module is also included. The tank replacement warning module is used to predict the internal air pressure value of the main gas tank 11 in the next detection cycle, and issue a tank replacement prompt in advance based on the prediction result. The tank replacement warning module includes: A data acquisition unit is used to collect physical data in the main gas tank 11. The data acquisition unit includes a plurality of temperature sensors, a plurality of air pressure sensors and a liquid level sensor. The plurality of temperature sensors, the plurality of air pressure sensors and the liquid level sensor are all installed on the inner wall of the main gas tank 11, and the plurality of temperature sensors and the plurality of air pressure sensors are evenly arranged on the inner wall of the main gas tank 11 from top to bottom; An air pressure fluctuation coefficient calculation unit, used to calculate the air pressure fluctuation coefficient corresponding to each detection period based on the collection result of the data collection unit; A tank replacement prediction matrix construction unit is used to construct a tank replacement prediction matrix based on the collection results of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The early warning prompt unit is used to predict the internal air pressure value of the main gas tank 11 in the next detection cycle based on the tank change prediction matrix, and compare it with the set value of the main pressure reducer 13. If the predicted internal air pressure value of the main gas tank 11 in the next detection cycle is greater than the set value of the main pressure reducer 13, the automatic inflation bus works normally, otherwise, a tank change prompt is issued.
[0026] The working principle and beneficial effects of the above technical solution are as follows: under normal circumstances, when the main gas tank 11 is insufficient to supply gas, the auxiliary gas tank 21 supplies gas. When the main gas tank 11 is replaced, the auxiliary gas tank 21 needs to be inflated to ensure that the auxiliary gas tank 21 is full, thereby ensuring that only one tank body of the main gas tank 11 needs to be replaced during the entire use process. However, if the tank replacement is only prompted every time the main gas tank 11 is insufficient to supply gas, the longer the tank replacement time is, the more gas needs to be inflated to the auxiliary gas tank 21, and the less hydrogen remaining in the main gas tank 11. In order to ensure the remaining hydrogen amount in the main gas tank 11, the internal situation of the main gas tank 11 is predicted in advance through the tank replacement warning module, thereby realizing the timely replacement of the main gas tank 11. The tank change warning module realizes intelligent monitoring and prediction of the internal air pressure of the main gas tank 11, which significantly improves the safety and stability of the gas supply. The data acquisition unit obtains the temperature, air pressure and liquid level information in the gas tank in real time to ensure the accuracy of the monitoring data. The air pressure fluctuation coefficient calculation unit analyzes the air pressure fluctuation trend based on historical data to provide a scientific basis for tank change prediction. The tank change prediction matrix construction unit uses the collection results and the air pressure fluctuation coefficient to form a dynamic prediction model, which can accurately predict the air pressure changes in the next detection cycle. The early warning prompt unit compares the prediction results with the set value of the main pressure reducer 13 to promptly judge the safety status of the gas tank. Once the predicted air pressure is lower than the set value, the system immediately issues a tank change prompt, thereby achieving the effect of predicting and replacing in advance, ensuring the continuity and stability of the gas supply.
[0027] Example 3 On the basis of Example 2, based on the collection results of the data collection unit, the air pressure fluctuation coefficient corresponding to each detection cycle is calculated: (1); among which, is the air pressure fluctuation coefficient corresponding to the kth detection period, is the detection value of the liquid level sensor in the kth detection cycle, e is a natural number, and its value is 2.71. is the detection value of the i-th temperature sensor from top to bottom in the k-th detection cycle, is the preset calculation reference temperature, n is the total number of temperature sensors, is the detection value of the jth air pressure sensor from top to bottom in the kth detection cycle, To preset the calculation reference pressure, is the total number of air pressure sensors.
[0028] The working principle and beneficial effects of the above technical solution are: the higher the temperature in the main gas tank 11, the greater the air pressure, the higher the gas supply efficiency of the main gas tank 11, the greater the air pressure fluctuation coefficient, the smaller the air pressure in the main gas tank 11, the smaller the air pressure fluctuation coefficient, and the calculation of the air pressure fluctuation coefficient corresponding to the kth detection period provides a scientific basis for the construction of the subsequent air pressure fluctuation coefficient to construct a tank replacement prediction matrix.
[0029] Example 4 On the basis of Example 3, the tank replacement prediction matrix construction unit includes: A reference element determination subunit, used to determine the reference element of each detection cycle of the tank replacement prediction matrix based on the collection result of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The benchmark element of the kth detection cycle of the tank replacement prediction matrix is: (2); A row element determination subunit is used to determine the elements of each row of the tank changing prediction matrix based on the reference elements of each detection cycle of the tank changing prediction matrix, arrange the reference elements of each detection cycle of the tank changing prediction matrix in time sequence to form the first row elements of the tank changing prediction matrix, use the difference between the element on the right side of each first row element of the tank changing prediction matrix and the first row element as the middle row element corresponding to the first row element, and use the difference between the element on the left side of each first row element of the tank changing prediction matrix and the first row element as the last row element corresponding to the first row element; The middle row element corresponding to the last first row element is set to the same value as the middle row element corresponding to each first row element, and the last row element corresponding to the first first row element is set to the same value as the last row element corresponding to the last first row element; The tank change prediction matrix construction execution subunit is used to construct the tank change prediction matrix based on the determination results of the row element determination subunit: (3); among which, is the tank replacement prediction matrix corresponding to the kth detection cycle, is the first row element corresponding to the first detection cycle, is the first row element corresponding to the second detection cycle, is the first row element corresponding to the kth detection cycle, is the middle row element corresponding to the first row element of the first detection cycle, is the middle row element corresponding to the first row element of the second detection cycle, is the middle row element corresponding to the first row element of the kth detection period, is the last row element corresponding to the first row element of the first detection cycle, is the last row element corresponding to the first row element of the second detection cycle, It is the last row element corresponding to the first row element of the kth detection period.
[0030] The working principle and beneficial effects of the above technical solution: The design of the tank change prediction matrix construction unit further optimizes the accuracy and reliability of the air pressure prediction. The benchmark element determination subunit accurately determines the benchmark elements of each detection cycle by integrating the real-time data of the data acquisition unit and the air pressure fluctuation coefficient, providing a solid foundation for tank change prediction. The row element determination subunit uses these benchmark elements to arrange them in time series to form the first row elements, and calculates the middle row elements and the last row elements by the difference with other elements, thereby constructing a more complete tank change prediction matrix. The clarity of the logical relationship between the elements of the matrix makes the prediction matrix remain stable under extreme situations, enhances the robustness of the model, and ensures the safety and stability of the gas supply system.
[0031] Example 5 On the basis of Example 2, the internal air pressure value of the main air tank 11 in the next detection cycle is predicted based on the tank replacement prediction matrix: Get the mean of all the last row elements of the third row in the tank change prediction matrix corresponding to the k-th detection cycle, and set the value of the last column in the tank change prediction matrix corresponding to the k-th detection cycle to a value equal to the mean of the last row elements, so as to obtain a new matrix, and use the rank of the new matrix as the internal air pressure value of the k+1-th detection cycle.
[0032] The working principle and beneficial effects of the above technical solution are as follows: through in-depth analysis and processing of the tank change prediction matrix, the prediction accuracy of the internal air pressure value of the main gas tank 11 in the next detection cycle is further improved. First, the mean of all the last row elements of the third row in the tank change prediction matrix corresponding to the kth detection cycle is calculated as the key reference indicator for predicting the air pressure. By applying the mean to the last column of the tank change prediction matrix, a new matrix is formed to make the prediction result more stable and representative. The rank of the new matrix is used as the internal air pressure value of the k+1th detection cycle, thereby realizing dynamic prediction based on historical data and effectively integrating the information of multiple detection cycles, which not only enhances the reliability of air pressure prediction, but also improves the system's sensitivity to air pressure changes.
[0033] Example 6 On the basis of embodiment 1, a leakage warning module is also included, and the leakage warning module includes: A Schlieren imaging acquisition unit, used to acquire Schlieren images around the main gas tank 11; A hydrogen concentration collection unit, used to collect the concentration of hydrogen in the environment surrounding the main gas tank 11 through hydrogen concentration sensors arranged from bottom to top along the axis direction of the main gas tank 11; A leakage coefficient calculation unit, used to calculate the actual leakage coefficient of the main gas tank based on the collection results of the schlieren imaging collection unit and the hydrogen concentration collection unit; The leakage judgment unit is used to compare the actual leakage coefficient of the main gas tank with the critical leakage coefficient of the main gas tank. If the actual leakage coefficient of the main gas tank is greater than the critical leakage coefficient of the main gas tank, a leakage alarm prompt is issued.
[0034] The working principle and beneficial effects of the above technical solution are as follows: the leakage warning module enhances the monitoring capability of the safety of the main gas tank 11. First, the Schlieren imaging acquisition unit obtains the Schlieren image around the main gas tank to capture the unevenness of the airflow and potential signs of leakage. At the same time, the hydrogen concentration acquisition unit arranges the hydrogen concentration sensor along the axis of the main gas tank to monitor the changes in hydrogen concentration in the surrounding environment in real time. The leakage coefficient calculation unit combines the data of the two to accurately calculate the actual leakage coefficient of the main gas tank to evaluate the severity of the gas leakage. Finally, the leakage judgment unit compares the actual leakage coefficient with the set critical leakage coefficient. If the actual leakage coefficient detected exceeds the critical value, the system will immediately issue a leakage alarm prompt, realizing comprehensive monitoring of the hydrogen tank, and can provide timely warning in the early stage of leakage, effectively reducing potential safety risks, and ensuring the safety and reliability of the production environment.
[0035] Example 7 On the basis of Example 6, preferably, the actual leakage coefficient of the main gas tank is calculated based on the collection results of the schlieren imaging collection unit and the hydrogen concentration collection unit: (4); among which, is the actual leakage coefficient of the main gas tank in the uth detection cycle, is the acquisition error coefficient of the Schlieren imaging acquisition unit, is the acquisition error coefficient of the hydrogen concentration sensor, is the logarithm with base e, where e is a natural number and takes the value of 2.71. The schlieren image around the main gas tank (11) is divided into piece, is the schlieren image around the main gas tank (11) in the uth detection cycle. The gray value of an image, is the schlieren image around the main gas tank (11) in the uth detection cycle. The reference grayscale value of an image is determined by the air flow condition around the main gas tank (11) in the uth detection cycle, t is the total working time of the leakage warning module, To preset the detection cycle length, is the average detection value of several hydrogen concentration sensors in the uth detection cycle.
[0036] The working principle and beneficial effect of the above technical solution are: the schlieren image around the main gas tank 11 is divided into By comparing the grayscale value of each Schlieren image in each detection period with its corresponding reference grayscale value, the chaotic state of the airflow around the main gas tank 11 in the detection period can be reflected, wherein, The accuracy of the calculation result is increased by the air flow condition around the main gas tank 11 in the uth detection cycle. It reflects the change degree of hydrogen concentration around the main gas tank 11 during the total working time of the leakage warning module. The larger the main gas tank 11 is, the greater the degree of change in the hydrogen concentration around it is, and the more likely the main gas tank 11 is to leak.
[0037] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An automatically inflatable busbar, characterized in that: It comprises a main airway (1) and a secondary airway (2), wherein the junction of the main airway (1) and the secondary airway (2) is an air delivery end; A main gas tank (11), a main high-pressure valve (12), a main pressure reducer (13) and a main low-pressure valve (14) are installed in sequence on the main gas channel, and a secondary gas tank (21), a secondary high-pressure valve (22), a secondary pressure reducer (23) and a secondary low-pressure valve (24) are installed in sequence on the secondary gas channel; A connecting airway is provided between the output end of the main high-pressure valve (12) of the main airway and the output end of the secondary high-pressure valve (22) of the secondary airway, and a one-way valve (31) is provided on the connecting airway.
2. The self-inflating busbar according to claim 1, characterized in that: A high-pressure serial valve (32) is connected in series in front of the one-way valve (31) on the communicating air passage.
3. The self-inflating busbar according to claim 1, characterized in that: The main air passage and the auxiliary air passage are respectively provided with an exhaust valve 1 (15) and an exhaust valve 2 (25).
4. The self-inflating busbar according to claim 1, characterized in that: The system also includes a tank replacement warning module, which is used to predict the internal air pressure value of the main gas tank (11) in the next detection cycle and issue a tank replacement prompt in advance based on the prediction result. The tank replacement warning module includes: A data acquisition unit, used to collect physical data in the main gas tank (11), the data acquisition unit comprising a plurality of temperature sensors, a plurality of air pressure sensors and a liquid level sensor, the plurality of temperature sensors, the plurality of air pressure sensors and the liquid level sensor are all installed on the inner wall of the main gas tank (11), and the plurality of temperature sensors and the plurality of air pressure sensors are evenly arranged on the inner wall of the main gas tank (11) from top to bottom; An air pressure fluctuation coefficient calculation unit, used to calculate the air pressure fluctuation coefficient corresponding to each detection period based on the collection result of the data collection unit; A tank replacement prediction matrix construction unit is used to construct a tank replacement prediction matrix based on the collection results of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The early warning prompt unit is used to predict the internal air pressure value of the main gas tank (11) in the next detection cycle based on the tank replacement prediction matrix, and compare it with the set value of the main pressure reducer (13); if the predicted internal air pressure value of the main gas tank (11) in the next detection cycle is greater than the set value of the main pressure reducer (13), the automatic inflation bus works normally; otherwise, a tank replacement prompt is issued.
5. The self-inflating busbar according to claim 4, characterized in that: Based on the data collected by the data acquisition unit, the air pressure fluctuation coefficient corresponding to each detection cycle is calculated: (1); among which, is the air pressure fluctuation coefficient corresponding to the kth detection period, is the detection value of the liquid level sensor in the kth detection cycle, e is a natural number, and its value is 2.
71. is the detection value of the i-th temperature sensor from top to bottom in the k-th detection cycle, is the preset calculation reference temperature, n is the total number of temperature sensors, is the detection value of the jth air pressure sensor from top to bottom in the kth detection cycle, To preset the calculation reference pressure, is the total number of air pressure sensors.
6. The self-inflating busbar according to claim 5, characterized in that: The tank change prediction matrix building unit includes: A reference element determination subunit, used to determine the reference element of each detection cycle of the tank replacement prediction matrix based on the collection result of the data collection unit and the air pressure fluctuation coefficient corresponding to each detection cycle; The benchmark element of the kth detection cycle of the tank replacement prediction matrix is: (2); A row element determination subunit is used to determine the elements of each row of the tank changing prediction matrix based on the reference elements of each detection cycle of the tank changing prediction matrix, arrange the reference elements of each detection cycle of the tank changing prediction matrix in time sequence to form the first row elements of the tank changing prediction matrix, use the difference between the element on the right side of each first row element of the tank changing prediction matrix and the first row element as the middle row element corresponding to the first row element, and use the difference between the element on the left side of each first row element of the tank changing prediction matrix and the first row element as the last row element corresponding to the first row element; The middle row element corresponding to the last first row element is set to the same value as the middle row element corresponding to each first row element, and the last row element corresponding to the first first row element is set to the same value as the last row element corresponding to the last first row element; The tank change prediction matrix construction execution subunit is used to construct the tank change prediction matrix based on the determination results of the row element determination subunit: (3); among which, is the tank replacement prediction matrix corresponding to the kth detection cycle, is the first row element corresponding to the first detection cycle, is the first row element corresponding to the second detection cycle, is the first row element corresponding to the kth detection cycle, is the middle row element corresponding to the first row element of the first detection cycle, is the middle row element corresponding to the first row element of the second detection cycle, is the middle row element corresponding to the first row element of the kth detection period, is the last row element corresponding to the first row element of the first detection cycle, is the last row element corresponding to the first row element of the second detection cycle, It is the last row element corresponding to the first row element of the kth detection period.
7. The self-inflating busbar according to claim 4, characterized in that: Based on the tank replacement prediction matrix, the internal air pressure value of the main gas tank (11) in the next detection cycle is predicted: Get the mean of all the last row elements of the third row in the tank change prediction matrix corresponding to the k-th detection cycle, and set the value of the last column in the tank change prediction matrix corresponding to the k-th detection cycle to a value equal to the mean of the last row elements, so as to obtain a new matrix, and use the rank of the new matrix as the internal air pressure value of the k+1-th detection cycle.
8. The self-inflating busbar according to claim 1, characterized in that: It also includes a leakage warning module, which includes: A schlieren imaging acquisition unit, used for acquiring schlieren images around the main gas tank (11); A hydrogen concentration collection unit, used to collect the concentration of hydrogen in the environment surrounding the main gas tank (11) through hydrogen concentration sensors arranged from bottom to top along the axis of the main gas tank (11); A leakage coefficient calculation unit, used to calculate the actual leakage coefficient of the main gas tank based on the collection results of the schlieren imaging collection unit and the hydrogen concentration collection unit; The leakage judgment unit is used to compare the actual leakage coefficient of the main gas tank with the critical leakage coefficient of the main gas tank. If the actual leakage coefficient of the main gas tank is greater than the critical leakage coefficient of the main gas tank, a leakage alarm prompt is issued.
9. The self-inflating busbar according to claim 8, characterized in that: Based on the acquisition results of the Schlieren imaging acquisition unit and the hydrogen concentration acquisition unit, the actual leakage coefficient of the main gas tank is calculated: (4); among which, is the actual leakage coefficient of the main gas tank in the uth detection cycle, is the acquisition error coefficient of the Schlieren imaging acquisition unit, is the acquisition error coefficient of the hydrogen concentration sensor, is the logarithm with base e, where e is a natural number and takes the value of 2.
71. The schlieren image around the main gas tank (11) is divided into piece, is the schlieren image around the main gas tank (11) in the uth detection cycle. The gray value of an image, is the schlieren image around the main gas tank (11) in the uth detection cycle. The reference grayscale value of an image is determined by the air flow condition around the main gas tank (11) in the uth detection cycle, t is the total working time of the leakage warning module, To preset the detection cycle length, is the average detection value of several hydrogen concentration sensors in the uth detection cycle.
10. A method for using an automatically inflatable busbar, for automatically inflating using an automatically inflatable busbar as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: When in use, the main pressure reducer (13) is adjusted to a value higher than the preset value of the auxiliary pressure reducer (23), and the main airway and the auxiliary airway are opened at the same time. Since the value of the main pressure reducer (13) of the main airway is larger, the gas in the main airway will be used first under the effect of pressure; As hydrogen is used, the gas pressure in the main gas tank (11) becomes lower and lower. When the main gas tank (11) is insufficient to provide the pressure set by the main pressure reducer (13), the secondary gas passage will automatically provide hydrogen. At this time, the main gas tank (11) needs to be removed and replaced, and the auxiliary gas tank (21) of the auxiliary gas channel does not need to be replaced. Each time the main gas tank (11) in the main gas channel is replaced, the main high-pressure valve (12) in the main gas channel is opened, and the hydrogen in the main gas channel is automatically inflated to the auxiliary gas tank (21) through the one-way valve (31) until the air pressure on both sides of the main gas tank (11) and the auxiliary gas tank (21) is balanced.