A carbon emission calculation method and system for construction waste collection, transportation and treatment

By collecting and analyzing carbon emission data during the collection and transportation of construction waste, and calculating the total carbon emissions of construction waste transport vehicles, the problem of inaccurate calculations in the prior art is solved and the accuracy of carbon emission calculation is improved.

CN119003924BActive Publication Date: 2025-04-04QINGDAO GREEN SAIL RECYCLED BUILDING MATERIALS

Patent Information

Application Number
CN202411036470.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-04-04
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The existing carbon emission calculation method for collection, transportation and treatment of construction waste ignores the additional carbon emissions generated by vehicles and construction waste during transportation, resulting in inaccurate calculations.

Method used

By collecting carbon emissions, vehicle speed and carbon emission factors at each monitoring point, the vehicle carbon emission impact factor and overall impact coefficient are calculated, and combining the trend y-directional difference coefficient and trend delay deviation, the total carbon emissions of construction waste transport vehicles on the transportation road are calculated.

Benefits of technology

It improves the accuracy of carbon emission calculation, can more accurately analyze the carbon emissions of construction waste transport vehicles, and solves the problem of inaccurate calculations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119003924B_ABST
    Figure CN119003924B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of electronic digital data processing, and in particular to a carbon emission calculation method and system for the collection, transportation and treatment of construction waste, which collects the carbon emission at a monitoring point and the vehicle speed and carbon emission factor; obtains the vehicle carbon emission impact factor and the overall impact coefficient according to the vehicle speed and the carbon emission factor; obtains the carbon emission of the construction waste transport vehicle according to the overall impact coefficient and the carbon emission, and then obtains the trend delay deviation; obtains the weight of the carbon emission at the monitoring point according to the trend delay deviation; obtains the total carbon emission of the construction waste transport vehicle on the transportation road according to the weight of the carbon emission, and then obtains the carbon emission of the collection, transportation and treatment of construction waste. The present invention solves the problem of inaccurate carbon emission calculation in the process of collection, transportation and treatment of construction waste.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electronic digital data processing, and in particular to a carbon emission calculation method and system for the collection, transportation and treatment of construction waste. Background Art

[0002] my country has a huge stock of construction waste, which is not only difficult to transport and pollutes the environment, but also occupies land area, and even pollutes water resources and air, thus affecting people's normal production and life. Most construction waste is solid waste. The existing technology mainly uses landfill, incineration, recycling and reuse methods to treat solid construction waste. The most common method is landfill, which collects and transports solid construction waste to landfills; and the method with the highest carbon emissions is incineration, which will generate a large amount of carbon emissions during the incineration process. In the process of landfill treatment of construction waste, its collection and transportation will generate additional carbon emissions, such as the consumption of electricity and fuel energy; and the specific treatment methods of construction waste, such as landfill, incineration, recycling, etc., will also generate certain carbon emissions.

[0003] The traditional method of calculating carbon emissions from the collection, transportation and treatment of construction waste is to monitor carbon emissions in landfills or during incineration, but ignores some additional carbon emissions that occur during the transportation of construction waste. For example, during the transportation of construction waste, vehicles will emit carbon dioxide, and the pollution of the surrounding air by construction waste and the subsequent cleaning process will produce invisible carbon emissions, resulting in inaccurate calculation of carbon emissions during the collection, transportation and treatment of construction waste. Summary of the invention

[0004] The present invention provides a carbon emission calculation method and system for the collection, transportation and treatment of construction waste, so as to solve the problem of inaccurate calculation of carbon emission in the process of collection, transportation and treatment of construction waste.

[0005] In a first aspect, an embodiment of the present invention provides a method for calculating carbon emissions for the collection, transportation and treatment of construction waste, the method comprising the following steps:

[0006] The carbon emissions at each monitoring point during the collection period and the speed and carbon emission factor of the vehicles passing through each monitoring point, including construction waste transport vehicles;

[0007] Obtain vehicle carbon emission impact factors based on the vehicle speed and carbon emission factor passing through the monitoring point during the time period; obtain the overall impact coefficient of construction waste transport vehicles at the monitoring point based on the carbon emission impact factors of all vehicles passing through the monitoring point during the time period; obtain the carbon emissions of construction waste transport vehicles at the monitoring point during the time period based on the overall impact coefficient and the carbon emissions at the monitoring point during the time period;

[0008] According to the speed of the construction waste transport vehicles at the monitoring points within the time period and the carbon emissions of the construction waste transport vehicles at the monitoring points within the time period, the trend difference at the monitoring points within the time period is obtained; according to the speed of the construction waste transport vehicles and the carbon emissions of the construction waste transport vehicles, the speed sequence and the carbon emissions sequence are obtained, and then the trend isotropic difference coefficient at the monitoring points is obtained in combination with the trend difference at the monitoring points; according to the speed sequence, the carbon emissions sequence and the trend isotropic difference coefficient, the trend delay deviation at the monitoring points is obtained; the number of monitoring points is obtained, and the weight of the carbon emissions at the monitoring points is obtained according to the trend delay deviation, and then the total carbon emissions of the construction waste transport vehicles on the transportation route are obtained in combination with the number of monitoring points;

[0009] The carbon emissions from the collection and treatment of construction waste are obtained, and the carbon emissions from the collection, transportation and treatment of construction waste are obtained by combining the total carbon emissions from construction waste transport vehicles on the transportation route.

[0010] Furthermore, the specific method of obtaining the vehicle carbon emission impact factor according to the vehicle speed and carbon emission factor of the vehicle passing through the monitoring point within the time period includes:

[0011] The product of the vehicle speed and the carbon emission factor of the vehicles passing the monitoring point during the time period is recorded as the carbon emission impact factor of the vehicles passing the monitoring point during the time period.

[0012] Furthermore, the overall impact coefficient of the construction waste transport vehicles at the monitoring point is obtained according to the carbon emission impact factors of all vehicles passing through the monitoring point within the time period, including the specific method of:

[0013] The sum of the carbon emission impact factors of all vehicles passing through the monitoring point during the time period is recorded as the carbon emission impact factor at the monitoring point during the time period;

[0014] The ratio of the vehicle carbon emission impact factor of the construction waste transport vehicle at the monitoring point within the time period to the carbon emission impact factor at the monitoring point within the time period is recorded as the carbon emission share of the construction waste transport vehicle at the monitoring point within the time period;

[0015] The sum of the carbon emission shares of the construction waste transport vehicles at the monitoring point in all time periods is recorded as the overall impact coefficient of the construction waste transport vehicles at the monitoring point.

[0016] Furthermore, the carbon emissions of the construction waste transport vehicles at the monitoring points within the time period are obtained according to the overall impact coefficient and the carbon emissions at the monitoring points within the time period, including the specific method of:

[0017] The product of the overall impact coefficient of the construction waste transport vehicles at the monitoring point and the carbon emissions at the monitoring point during the time period is recorded as the carbon emissions of the construction waste transport vehicles at the monitoring point during the time period.

[0018] Furthermore, the specific method of obtaining the trend difference at the monitoring point within the time period according to the speed of the construction waste transport vehicle at the monitoring point within the time period and the carbon emissions of the construction waste transport vehicle at the monitoring point within the time period includes:

[0019] Each time period is recorded as the time period to be analyzed;

[0020] The absolute value of the difference between the speed of the construction waste transport vehicle at the monitoring point during the time period to be analyzed and the carbon emissions of the construction waste transport vehicle at the monitoring point during the time period to be analyzed is recorded as the trend difference at the monitoring point during the time period to be analyzed.

[0021] Furthermore, the vehicle speed sequence and the carbon emission sequence are obtained according to the vehicle speed of the construction waste transport vehicle and the carbon emission of the construction waste transport vehicle, and then the trend isotropic difference coefficient at the monitoring point is obtained in combination with the trend difference at the monitoring point, including the specific method as follows:

[0022] The speeds of the construction waste transport vehicles at the monitoring points in all time periods are arranged in chronological order to obtain the speed sequence of the construction waste transport vehicles at the monitoring points;

[0023] The carbon emissions of construction waste transport vehicles at the monitoring points in all time periods are arranged in chronological order to obtain the carbon emission sequence of construction waste transport vehicles at the monitoring points;

[0024] The absolute value of the difference between the trend difference at the monitoring point in the time period to be analyzed and the trend difference at the monitoring point in a time period after the time period to be analyzed is recorded as the degree of change of the trend difference at the monitoring point in the time period to be analyzed;

[0025] The average of the trend difference change degree at the monitoring points in all time periods is recorded as the average trend difference change degree at the monitoring points;

[0026] The dynamic time warping distance between the speed sequence of the construction waste transport vehicle at the monitoring point and the carbon emission sequence of the construction waste transport vehicle at the monitoring point is recorded as the change trend synchronization index of the construction waste transport vehicle at the monitoring point;

[0027] The product of the change trend synchronization index of construction waste transport vehicles at the monitoring point and the average trend difference change degree at the monitoring point is recorded as the trend isotropic difference coefficient at the monitoring point.

[0028] Furthermore, the specific method of obtaining the trend delay deviation at the monitoring point according to the vehicle speed sequence, the carbon emission sequence and the trend isotropic difference coefficient includes:

[0029] The morphological distance between the speed series of the construction waste transport vehicles at the monitoring point and the carbon emission series of the construction waste transport vehicles at the monitoring point is recorded as the similarity of the change trend of the construction waste transport vehicles at the monitoring point;

[0030] The product of the similarity of the changing trends of construction waste transport vehicles at the monitoring points and the trend isotropic difference coefficient at the monitoring points is recorded as the trend delay deviation at the monitoring points.

[0031] Furthermore, the method of obtaining the number of monitoring points, obtaining the weight of the carbon emissions at the monitoring points according to the trend delay deviation, and then obtaining the total carbon emissions of the construction waste transport vehicles on the transport road in combination with the number of monitoring points includes the following specific methods:

[0032] The power of the natural constant as the base and the opposite number of the trend delay deviation at the monitoring point as the exponent is recorded as the weight of the carbon emission at the monitoring point;

[0033] The weighted average of carbon emissions at all monitoring points is recorded as the average carbon emissions of construction waste transport vehicles on the transport route;

[0034] The number of monitoring points is counted, and the product of the average carbon emissions of construction waste transport vehicles on the transport route and the number of monitoring points is recorded as the total carbon emissions of construction waste transport vehicles on the transport route.

[0035] Furthermore, the carbon emissions from the collection and treatment of construction waste are obtained by combining the total carbon emissions from the construction waste transport vehicles on the transport route to obtain the carbon emissions from the collection, transportation and treatment of construction waste, including the following specific methods:

[0036] Obtain the carbon emissions during the collection and treatment of construction waste;

[0037] The carbon emissions from the collection and treatment of construction waste and the total carbon emissions from construction waste transport vehicles on the transportation route are recorded as the carbon emissions from construction waste collection, transportation and treatment.

[0038] In the second aspect, an embodiment of the present invention also provides a carbon emission calculation system for the collection, transportation and treatment of construction waste, comprising a memory, a processor and a computer program stored in the memory and running on the processor, wherein the processor implements the steps of any one of the above-mentioned methods when executing the computer program.

[0039] The beneficial effects of the present invention are as follows: the present invention mainly analyzes the vehicles passing through each monitoring point, and according to the different speeds and carbon emission factors of different vehicles, obtains the overall impact coefficient of the construction waste transport vehicles on the carbon emissions measured at the monitoring points, estimates the carbon emissions of the construction waste transport vehicles according to the overall impact coefficient, and extracts the carbon emissions of the construction waste transport vehicles, so as to facilitate accurate analysis of the construction waste transport vehicles; by analyzing the trend relationship between the speed and carbon emissions of the construction waste transport vehicles, the weight of the carbon emissions of the construction waste transport vehicles at each monitoring point is calculated, and the weight of the carbon emissions of the construction waste transport vehicles represents the credibility of the estimated carbon emissions of the construction waste transport vehicles, and then the total carbon emissions of the construction waste transport vehicles on the transportation road are calculated according to the weight, thereby improving the accuracy of the carbon emissions calculation and solving the problem of inaccurate carbon emissions calculation in the collection, transportation and treatment process of construction waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0041] Figure 1 A flowchart of an embodiment of a carbon emission calculation method for the collection, transportation and treatment of construction waste according to the present invention;

[0042] Figure 2 Flowchart for obtaining carbon emissions from construction waste collection, transportation and treatment. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] An embodiment of a carbon emission calculation method for the collection, transportation and treatment of construction waste according to the present invention is as follows: Figure 1 As shown, including:

[0045] S1. Collect the carbon emissions at each monitoring point in each time period and the carbon emission factors and vehicle speeds of vehicles passing through the monitoring points.

[0046] At present, in order to achieve the carbon emission goals of "carbon peak" and "carbon neutrality", regulatory authorities usually set up carbon emission gas detectors in cities to obtain carbon emission monitoring data of construction waste transport vehicles on their routes; at the same time, the speed of transport vehicles also has an economic speed, that is, the closer the speed is to the economic speed, the lower the vehicle's carbon emissions.

[0047] Based on this, this embodiment sets a monitoring point at each carbon emission gas detector on the route of construction waste transport vehicles, counts the number of monitoring points Z, places vehicle speed meters at the monitoring points to monitor vehicle speed, installs cameras at the monitoring points, obtains the type of vehicle by photographing the vehicle's license plate information, and then obtains the vehicle's carbon emission factor, where each type of vehicle corresponds to a carbon emission factor. The number of vehicles n passing through the monitoring point and the speed of the vehicle when passing through the monitoring point are obtained within a time period T. The empirical value of T is 10 minutes, where the speed of the mth vehicle passing through the ith monitoring point in the ath time period is The carbon emission factor of the mth vehicle passing through the ith monitoring point in the ath time period is At the middle of each time period, the carbon emission is collected once by the carbon emission gas detector to obtain the carbon emission of the i-th monitoring point in the a-th time period.

[0048] At this point, the carbon emissions at each monitoring point within the time period, the speed of vehicles passing through each monitoring point, and the carbon emission factor are obtained.

[0049] S2. Obtain the carbon emission impact factor based on the carbon emission factor and vehicle speed of the vehicles passing through the monitoring point; obtain the overall impact coefficient of the construction waste transport vehicle based on the carbon emission factor of the construction waste transport vehicle compared with the carbon emission impact factor of all vehicles passing through the monitoring point, and then obtain the carbon emissions of the construction waste transport vehicle in combination with the carbon emissions at the monitoring point within the time period.

[0050] Since construction waste transport vehicles are larger than ordinary vehicles, their engines generate larger carbon emissions during operation. At the same time, construction waste releases carbon dioxide during decomposition and accumulation, which increases the carbon emissions at each monitoring point when the construction waste transport vehicles pass through the monitoring points. This embodiment solves the problem that the calculation of carbon emissions from the collection, transportation and treatment of construction waste ignores the additional carbon emissions generated by vehicles and construction waste during transportation. By analyzing the factors affecting the calculation of carbon emissions from construction waste transport vehicles on the transportation route, the total carbon emissions of construction waste transport vehicles on the transportation route are obtained, and then the carbon emissions from the collection, transportation and treatment of construction waste are obtained, such as Figure 2 The figure shows a flow chart for obtaining carbon emissions from the collection, transportation and treatment of construction waste.

[0051] When a construction waste transport vehicle passes through a monitoring point in the ath time period, all vehicles passing through the time period will have a certain impact on the carbon emissions at the monitoring point. The more vehicles passing through, the greater the impact on the carbon emissions monitoring results. Therefore, according to the different types and speeds of vehicles passing through the monitoring point, the impact of vehicles passing through the monitoring point in the time period on the carbon emissions monitoring results at the monitoring point is obtained, where the carbon emission impact factor at the i-th monitoring point in the ath time period is The calculation formula is:

[0052]

[0053] In the formula, is the carbon emission impact factor at the i-th monitoring point in the a-th time period, is the number of vehicles passing through the i-th monitoring point in the a-th time period, is the speed of the mth vehicle passing the ith monitoring point in the ath time period, K is the vehicle carbon emission impact factor of the mth vehicle at the ith monitoring point in the ath time period, is the carbon emission factor of the mth vehicle passing through the ith monitoring point in the ath time period.

[0054] It should be noted that the carbon emission factors of various types of vehicles are fixed values, and different types of vehicles have different engine models and different carbon emission levels. Therefore, when the vehicle's driving speed is too high or the vehicle's engine carbon emission factor is large, the carbon emission impact factor of the vehicle passing at that moment will be greater, which will result in a larger carbon emission amount monitored during that time period.

[0055] Based on the above analysis, construction waste transport vehicles have additional carbon emissions from construction waste compared to ordinary vehicles, thereby increasing the carbon emissions at the monitoring point. Therefore, the construction waste transport vehicles passing through the monitoring point are calculated separately to obtain the overall impact coefficient of the construction waste transport vehicles at the monitoring point compared to all vehicles passing through the monitoring point. The calculation formula is:

[0056]

[0057] In the formula, is the overall impact coefficient of the construction waste transport vehicle JZ at the i-th monitoring point, is the vehicle carbon emission impact factor of the construction waste transport vehicle JZ at the i-th monitoring point in the a-th time period, S is the number of time periods, and the empirical value is 200. is the carbon emission influencing factor at the i-th monitoring point in the a-th time period.

[0058] When the vehicle carbon emission impact factor of the construction waste transport vehicle at the monitoring point accounts for a larger proportion of the carbon emission impact factor at the monitoring point, it means that the construction waste transport vehicle at the monitoring point contributes more to the carbon emissions. The greater the overall impact coefficient of the construction waste transport vehicle at the monitoring point, the greater the impact on the carbon emissions detection results.

[0059] Since construction waste transport vehicles will generate greater gas pollution wherever they pass, this embodiment uses the above analysis to obtain the impact of construction waste transport vehicles on carbon emissions, and calculates the carbon emissions of construction waste transport vehicles at the i-th monitoring point in the a-th time period. Expressed as the carbon emissions of the ith monitoring point in the ath time period The overall impact coefficient of the construction waste transport vehicle JZ at the i-th monitoring point The product of .

[0060] At this point, the carbon emissions of construction waste transport vehicles at each monitoring point within the time period are obtained.

[0061] S3. By analyzing the correlation between the speed and carbon emissions of construction waste transport vehicles, the trend isotropic difference coefficient is constructed to evaluate the correlation between the speed and carbon emissions, and then the trend delay deviation is obtained to evaluate the accuracy of the calculation of carbon emissions of construction waste transport vehicles; different weights are set for the carbon emissions of construction waste transport vehicles at the monitoring point according to the trend delay deviation, and the total carbon emissions of construction waste transport vehicles on the transportation route are calculated.

[0062] It should be noted that the different speeds of construction waste transport vehicles in different time periods often affect the changing trend of carbon emissions from construction waste transport vehicles. The change in speed is correlated with the change in carbon emissions. An increase in speed means that more fuel needs to be burned, thereby increasing carbon emissions. The carbon emission data of general construction waste transport vehicles should show a relatively similar trend of change with the change in vehicle speed. That is to say, the fluctuation trend of carbon emissions from construction waste transport vehicles in continuous time periods mainly depends on the correlation with the vehicle's running speed. In order to evaluate the similar changing trends in the speed and carbon emissions data of construction waste transport vehicles, the trend isotropic difference coefficient is calculated. First, the speeds of construction waste transport vehicles passing the i-th monitoring point in all time periods are arranged in chronological order to obtain the speed sequence V of the construction waste transport vehicles at the i-th monitoring point. i ; Arrange the carbon emissions of construction waste transport vehicles passing through the i-th monitoring point in all time periods in chronological order, and obtain the carbon emissions sequence T of the construction waste transport vehicles at the i-th monitoring point i The calculation formula of the trend isotropic difference coefficient is:

[0063]

[0064] Among them, D i is the trend isotropic difference coefficient at the i-th monitoring point, S is the number of time periods, is the speed of the construction waste transport vehicle passing the i-th monitoring point in the k-th time period, is the carbon emission of the construction waste transport vehicle passing through the i-th monitoring point in the k-th time period, is the trend difference when the construction waste transport vehicle passes the i-th monitoring point in the k-th time period, is the trend difference of the construction waste transport vehicle passing through the i-th monitoring point in the k+1th time period, dtw(V i ,T i ) is the speed sequence V of the construction waste transport vehicle at the i-th monitoring point i With carbon emission series T i The distance between them, this embodiment uses the dtw dynamic time warping distance.

[0065] The smaller the DTW distance between the speed series and the carbon emission series of construction waste transport vehicles, the more synchronized the changing trends of the two series are, and the smaller the trend isotropic difference coefficient is; the greater the difference between the speed and carbon emissions in two adjacent time periods, the greater the difference between the changes in the speed series and the carbon emission series, the greater the trend isotropic difference coefficient is, and the lower the credibility of the carbon emissions of construction waste transport vehicles.

[0066] At the same time, there will be a delay in the correlation between the speed sequence and the carbon emission sequence of construction waste transport vehicles at each monitoring point. For example, carbon emissions can only show an increasing trend after the speed increases for a period of time. Therefore, it is also necessary to evaluate the influence relationship between the speed sequence and the carbon emission sequence by calculating the degree of deviation. The trend delay deviation at the monitoring point is calculated as follows:

[0067] E i =D i *SBD(V i ,T i )

[0068] In the formula, E i is the trend delay deviation at the i-th monitoring point, D i is the trend isotropic difference coefficient of the ith monitoring point, SBD(V i ,T i ) is the speed sequence V of the construction waste transport vehicle at the i-th monitoring point i With carbon emission series T i The SBD between them is based on the morphological distance.

[0069] It should be noted that the SBD distance measures the similarity between two sequences. The SBD distance indicates the distance the sequences move when the two sequences reach the most similar state. Therefore, the larger the SBD distance between the vehicle speed sequence and the carbon emission sequence, the greater the delay in carbon emissions as the speed changes, and the greater the trend delay deviation. When the trend isotropic difference coefficient is smaller, it means that the difference in the changing trends of the two sequences is smaller, the possibility of delay in the carbon emission sequence is smaller, and the trend delay deviation is smaller, and the error of the calculated carbon emission data of construction waste transportation vehicles is smaller.

[0070] The trend delay deviation at the monitoring point reflects the credibility of the carbon emission data of the construction waste transport vehicles. Therefore, this embodiment sets different weights for the carbon emission data of the construction waste transport vehicles at the monitoring point according to the trend delay deviation at each monitoring point, and calculates the total carbon emission YS of the construction waste transport vehicles on the transport route. The calculation formula is:

[0071] P i =exp(-E i )

[0072]

[0073] Among them, YS is the total carbon emissions of construction waste transport vehicles on the transport route, E i The trend delay deviation at the i-th monitoring point, exp() is an exponential function with a natural constant as the base, P i is the carbon emission weight at the i-th monitoring point, S is the number of time periods, is the carbon emission of the construction waste transport vehicle passing through the ith monitoring point in the kth time period, and Z is the number of monitoring points.

[0074] At this point, the total carbon emissions of construction waste transport vehicles on the transport route are obtained.

[0075] S4. Count the carbon emissions from the collection and treatment of construction waste, and combine the total carbon emissions from construction waste transport vehicles on the transportation route to obtain the carbon emissions from the collection, transportation and treatment of construction waste.

[0076] The carbon emissions during the collection of construction waste are estimated by the type and composition of construction waste in the construction project, and the carbon emissions during the collection of construction waste are obtained.

[0077] According to the final treatment method of construction waste, the carbon emissions of construction waste during the treatment process are obtained through sensor technology. The carbon emissions of construction waste collection, transportation and treatment are expressed as the sum of the carbon emissions during the collection process of construction waste, the carbon emissions during the treatment process of construction waste and the total carbon emissions of construction waste transportation vehicles on the transportation route.

[0078] At this point, the carbon emissions from the collection, transportation and treatment of construction waste have been obtained.

[0079] Based on the same inventive concept as the above method, an embodiment of the present invention also provides a carbon emission calculation system for the collection, transportation and treatment of construction waste, including a memory, a processor and a computer program stored in the memory and running on the processor. When the processor executes the computer program, the steps of any one of the above-mentioned carbon emission calculation methods for the collection, transportation and treatment of construction waste are implemented.

[0080] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A carbon emission calculation method for the collection, transportation and treatment of construction waste, characterized in that: include: The carbon emissions at each monitoring point during the collection period and the speed and carbon emission factor of the vehicles passing through each monitoring point, including construction waste transport vehicles; Obtain vehicle carbon emission impact factors based on the vehicle speed and carbon emission factor passing through the monitoring point within a time period; The overall impact coefficient of the construction waste transport vehicles at the monitoring point is obtained based on the carbon emission impact factors of all vehicles passing through the monitoring point during the time period; the carbon emissions of the construction waste transport vehicles at the monitoring point during the time period are obtained based on the overall impact coefficient and the carbon emissions at the monitoring point during the time period; The trend difference at the monitoring point within the time period is obtained according to the speed of the construction waste transport vehicle at the monitoring point within the time period and the carbon emissions of the construction waste transport vehicle at the monitoring point within the time period; According to the speed of the construction waste transport vehicles and the carbon emissions of the construction waste transport vehicles, the speed sequence and the carbon emissions sequence are obtained, and then the trend isotropic difference coefficient at the monitoring point is obtained in combination with the trend difference at the monitoring point; the trend delay deviation at the monitoring point is obtained according to the speed sequence, the carbon emissions sequence and the trend isotropic difference coefficient; the number of monitoring points is obtained, and the weight of the carbon emissions at the monitoring point is obtained according to the trend delay deviation, and then the total carbon emissions of the construction waste transport vehicles on the transport route are obtained in combination with the number of monitoring points; The carbon emissions from the collection and treatment of construction waste are obtained, and the carbon emissions from the collection, transportation and treatment of construction waste are obtained by combining the total carbon emissions from construction waste transport vehicles on the transportation route.

2. A carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1, characterized in that: The specific method of obtaining the vehicle carbon emission impact factor according to the vehicle speed and carbon emission factor of the vehicle passing through the monitoring point within the time period includes: The product of the vehicle speed and the carbon emission factor of the vehicles passing the monitoring point during the time period is recorded as the carbon emission impact factor of the vehicles passing the monitoring point during the time period.

3. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The specific method of obtaining the overall impact coefficient of the construction waste transport vehicles at the monitoring point according to the carbon emission impact factors of all vehicles passing through the monitoring point within the time period includes: The sum of the carbon emission impact factors of all vehicles passing through the monitoring point during the time period is recorded as the carbon emission impact factor at the monitoring point during the time period; The ratio of the vehicle carbon emission impact factor of the construction waste transport vehicle at the monitoring point within the time period to the carbon emission impact factor at the monitoring point within the time period is recorded as the carbon emission share of the construction waste transport vehicle at the monitoring point within the time period; The sum of the carbon emission shares of the construction waste transport vehicles at the monitoring point in all time periods is recorded as the overall impact coefficient of the construction waste transport vehicles at the monitoring point.

4. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The specific method of obtaining the carbon emissions of construction waste transport vehicles at the monitoring point within the time period according to the overall impact coefficient and the carbon emissions at the monitoring point within the time period includes: The product of the overall impact coefficient of the construction waste transport vehicles at the monitoring point and the carbon emissions at the monitoring point during the time period is recorded as the carbon emissions of the construction waste transport vehicles at the monitoring point during the time period.

5. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The specific method of obtaining the trend difference at the monitoring point within the time period according to the speed of the construction waste transport vehicle at the monitoring point within the time period and the carbon emissions of the construction waste transport vehicle at the monitoring point within the time period includes: Each time period is recorded as the time period to be analyzed; The absolute value of the difference between the speed of the construction waste transport vehicle at the monitoring point during the time period to be analyzed and the carbon emissions of the construction waste transport vehicle at the monitoring point during the time period to be analyzed is recorded as the trend difference at the monitoring point during the time period to be analyzed.

6. A carbon emission calculation method for construction waste collection, transportation and treatment according to claim 5, characterized in that: The specific method of obtaining the speed sequence and the carbon emission sequence according to the speed of the construction waste transport vehicle and the carbon emission of the construction waste transport vehicle, and then obtaining the trend isotropic difference coefficient at the monitoring point in combination with the trend difference at the monitoring point includes: The speeds of the construction waste transport vehicles at the monitoring points in all time periods are arranged in chronological order to obtain the speed sequence of the construction waste transport vehicles at the monitoring points; The carbon emissions of construction waste transport vehicles at the monitoring points in all time periods are arranged in chronological order to obtain the carbon emission sequence of construction waste transport vehicles at the monitoring points; The absolute value of the difference between the trend difference at the monitoring point in the time period to be analyzed and the trend difference at the monitoring point in a time period after the time period to be analyzed is recorded as the degree of change of the trend difference at the monitoring point in the time period to be analyzed; The average of the trend difference change degree at the monitoring points in all time periods is recorded as the average trend difference change degree at the monitoring points; The DTW dynamic time warping distance between the speed sequence of the construction waste transport vehicle at the monitoring point and the carbon emission sequence of the construction waste transport vehicle at the monitoring point is recorded as the change trend synchronization index of the construction waste transport vehicle at the monitoring point; The product of the change trend synchronization index of construction waste transport vehicles at the monitoring point and the average trend difference change degree at the monitoring point is recorded as the trend isotropic difference coefficient at the monitoring point.

7. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The trend delay deviation at the monitoring point is obtained according to the vehicle speed sequence, the carbon emission sequence and the trend isotropic difference coefficient, The specific methods included are: The SBD distance between the speed sequence of the construction waste transport vehicle at the monitoring point and the carbon emission sequence of the construction waste transport vehicle at the monitoring point is recorded as the similarity of the change trend of the construction waste transport vehicle at the monitoring point; The product of the similarity of the changing trends of construction waste transport vehicles at the monitoring points and the trend isotropic difference coefficient at the monitoring points is recorded as the trend delay deviation at the monitoring points.

8. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The method of obtaining the number of monitoring points, obtaining the weight of the carbon emissions at the monitoring points according to the trend delay deviation, and then obtaining the total carbon emissions of the construction waste transport vehicles on the transport road in combination with the number of monitoring points includes: The power of the natural constant as the base and the opposite number of the trend delay deviation at the monitoring point as the exponent is recorded as the weight of the carbon emission at the monitoring point; The weighted average of carbon emissions at all monitoring points is recorded as the average carbon emissions of construction waste transport vehicles on the transport route; The number of monitoring points is counted, and the product of the average carbon emissions of construction waste transport vehicles on the transport route and the number of monitoring points is recorded as the total carbon emissions of construction waste transport vehicles on the transport route.

9. The carbon emission calculation method for construction waste collection, transportation and treatment according to claim 1 is characterized in that: The carbon emissions from the collection and treatment of construction waste are obtained by combining the total carbon emissions from the construction waste transport vehicles on the transportation route to obtain the carbon emissions from the collection, transportation and treatment of construction waste, including the following specific methods: Obtain the carbon emissions during the collection and treatment of construction waste; The carbon emissions from the collection and treatment of construction waste and the total carbon emissions from construction waste transport vehicles on the transportation route are recorded as the carbon emissions from construction waste collection, transportation and treatment.

10. A carbon emission calculation system for the collection, transportation and treatment of construction waste, comprising a memory, a processor and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 9 are implemented.

Citation Information

Patent Citations

  • Method suitable for quantifying and evaluating carbon emission of public building in design stage

    CN113283799A

  • Carbon emission level calculation system and method based on block chain

    CN114528678A

Cited By

  • Building waste intelligent prediction, classification and recycling treatment system based on multi-mode AI

    CN121073459A