A method and device for planning the spatial layout in front of a school gate based on the theory of transportation by motorcycle and electric vehicles
By analyzing the portrait analysis of student travel portraits based on path algorithms and spatial layout planning generated by geographical characteristics, and through layout of simulation model optimization, the problem of unreasonable spatial layout of students in front of the school gate under the influence of the motor vehicle, which improves the efficiency and efficiency of the transfer of delivery and the efficiency of the transfer of delivery and delivery Safety.
Patent Information
- Application Number
- CN202411463620.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2044-10-21
AI Technical Summary
The existing technology has failed to reasonably plan the spatial layout of students who pick up and drop off in front of the school gate under the influence of Motorola vehicles, resulting in traffic congestion and safety hazards.
Through the analysis of the student travel portrait based on path algorithms, the geographical data generation includes the spatial layout planning of motor areas, motor vehicle areas, student activity areas, buffer areas, service areas, and organization areas. , Until you meet the presets of pick -and -drop -learning optimization goals.
A more comprehensive and reasonable school -oriented spatial space layout plan has been realized, the efficiency of shuttle is improved, and traffic congestion and safety hazards have been reduced.
Smart Images

Figure CN119005638B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of traffic planning and design, and in particular to a method and device for planning the spatial layout in front of a school gate based on picking up and dropping off students by motorcycle or electric vehicles. Background Art
[0002] In recent years, traffic congestion and safety hazards caused by picking up and dropping off students have become increasingly prominent. Therefore, it is necessary to plan the layout of the space inside and outside the school to alleviate the traffic congestion problem when picking up and dropping off students.
[0003] There are many methods for solving the traffic congestion problem when picking up and dropping off students in the prior art. The first is to combine the intelligent scheduling scheme for picking up and dropping off students with student cards, school gate gates and school information platforms, which can reduce waiting time by speeding up the efficiency of students entering and exiting gates and the efficiency of parent-student interaction in picking up and dropping off students, thereby indirectly alleviating the traffic congestion problem of picking up and dropping off students. This method does not involve the spatial layout planning in front of the school gate, and it is difficult to ensure the order of parents picking up and dropping off students, and it is easy to lose sight of one thing and it is difficult to improve efficiency; the second is to use the underground parking space in the school to move the motor vehicle pick-up and drop-off mode to the underground to alleviate the ground pick-up and drop-off traffic congestion problem in front of the school gate. This method can separate the impact of motor vehicles, but there is a prerequisite for the implementation that the school must have sufficient underground parking space, and it cannot be widely used; the third is to carry out spatial layout planning for picking up and dropping off students based on the impact of cars used for picking up and dropping off students in front of the school gate, such as CN118133405A, which focuses on the impact of cars on picking up and dropping off students, and pays less attention to or even does not involve other types of vehicles. However, in some primary and secondary schools in some cities, low-cost, convenient and fast motorcycles and electric vehicles have a greater impact on school pick-up and drop-off than cars, but the existing technology has not studied this. Therefore, how to reasonably plan the spatial layout of picking up and dropping off students in front of the school gate under the influence of motorcycles and electric vehicles is an issue that needs to be urgently solved by existing technology. Summary of the invention
[0004] The present application provides a method and device for planning the layout of the space in front of a school gate based on the use of motorcycles and electric vehicles to pick up and drop off students, so as to solve the technical problem in the prior art that the space layout in front of a school gate is not planned reasonably because the influence of motorcycles and electric vehicles on the pick-up and drop-off of students is not considered.
[0005] According to a first aspect of the implementation manner of the present application, a method for planning the layout of space in front of a school gate based on picking up students by motorcycle or electric vehicle is provided, comprising:
[0006] According to the student travel profile of the school to be planned, the road network flow characteristics of the school are obtained based on the path algorithm; wherein the student travel profile includes travel time, travel mode and school route;
[0007] Generate a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics; wherein the geographical feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes a motor vehicle area, a motorcycle and electric vehicle area, a student activity area, a buffer area, a service area and an organization area;
[0008] According to the geographic feature data and the road network traffic characteristics, a layout simulation model is obtained, and the spatial layout plan is input into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation results of the layout simulation model until the simulation results of the layout simulation model meet the preset optimization goals of school pick-up and drop-off, and the final optimized spatial layout plan is output to plan and transform the schools to be planned according to the final optimized spatial layout plan.
[0009] This application first obtains the road network flow characteristics based on the student travel portrait of the school to be planned based on the path algorithm, and then combines the road network flow characteristics and geographical feature data to generate a spatial layout plan including motor vehicle areas, motorcycle and electric vehicle areas, student activity areas, buffer areas, service areas and organization areas. Compared with the existing technology, it not only takes into account the impact of motor vehicles on pick-up and drop-off, but also takes into account the impact of motorcycles and electric vehicles on pick-up and drop-off. It can carry out spatial layout planning for pick-up and drop-off in front of the school gate in a more comprehensive and reasonable manner, and then obtain a layout simulation model and input the spatial layout plan into the layout simulation model for optimization, which can further optimize the spatial layout plan and make the spatial layout plan more adapted to the actual flow conditions of pick-up and drop-off, thereby improving the efficiency of pick-up and drop-off.
[0010] In certain embodiments of the present application, obtaining the road network flow characteristics of the school based on the student travel portrait of the school to be planned and based on the path algorithm specifically includes:
[0011] According to the student travel portrait, based on the path algorithm, each student and the corresponding travel time and travel mode are assigned to the corresponding school route to obtain the school route time series set;
[0012] Cluster statistics are performed on the time series set of the school routes to obtain the road network flow characteristics of the school.
[0013] This application first allocates the school route time series set based on the student travel portrait and the path algorithm, which can match each student with the corresponding travel time and travel mode one by one, and then cluster and count the school route time series set to obtain the road network traffic characteristics, which is more in line with the actual student travel and can improve the accuracy of subsequent spatial layout planning.
[0014] In certain embodiments of the present application, generating a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics specifically includes:
[0015] According to the preset facility size and in combination with the geographic feature data, the planning area of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area is obtained;
[0016] Obtaining a planned area of a motorcycle and electric vehicle zone according to the facility size, the geographic feature data and the road network flow characteristics;
[0017] According to the respective planned areas of the motor vehicle area, motorcycle and electric vehicle area, student activity area, buffer area, service area and organization area, combined with the preset regional layout, the corresponding spatial layout plan is obtained.
[0018] This application obtains the planned area of each zone based on the preset facility size, geographical feature data and road network traffic characteristics, and then obtains the corresponding spatial layout plan, taking into account the impact of motorcycles and electric vehicles on school pick-up and drop-off, which can make the spatial layout plan more suitable for the actual situation of school pick-up and drop-off and improve the accuracy of the spatial layout plan.
[0019] In certain embodiments of the present application, obtaining the planned area of the motorcycle and electric vehicle zone according to the facility size, the geographic feature data and the road network flow characteristics specifically includes:
[0020] The planned area of the motorcycle and electric vehicle area is specifically:
[0021] ;
[0022] ;
[0023] ;
[0024] in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
[0025] This application divides the planned area of the motorcycle and electric vehicle zone into the morning peak period and the evening peak period, and adopts different calculation methods to consider the impact of different factors of the morning peak period and the evening peak period on the pick-up and drop-off of students, and then obtains the planned area of the motorcycle and electric vehicle zone, which is more in line with the actual area required by motorcycles and electric vehicles during pick-up and drop-off, so that the spatial layout planning is more suitable for the actual situation of pick-up and drop-off.
[0026] In certain embodiments of the present application, the layout simulation model is obtained according to the geographic feature data and the road network traffic characteristics, and the spatial layout plan is input into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation result of the layout simulation model until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization target, and the final optimized spatial layout plan is output, which specifically includes:
[0027] According to the geographic feature data and the road network flow characteristics, the preset basic layout simulation model is adjusted to obtain a layout simulation model;
[0028] According to the geographic feature data and the student travel portrait, simulation parameters are calibrated; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters;
[0029] The spatial layout plan and the simulation parameters are input into the layout simulation model for optimization until the simulation results of the layout simulation model meet the preset pick-up and drop-off optimization goals, and the final optimized spatial layout plan is output; wherein, during the optimization, the simulation evaluation results of the spatial layout plan are obtained according to the simulation results of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation results.
[0030] This application first obtains a layout simulation model based on geographic feature data and road network traffic characteristics, and then obtains simulation parameters including various parameters based on geographic feature data and student travel portrait calibration, and then inputs the spatial layout plan into the layout simulation model for optimization, which can further optimize the spatial layout plan and make the spatial layout plan more suitable for the actual traffic conditions of picking up and dropping off students, thereby improving the accuracy of the spatial layout plan.
[0031] According to a second aspect of the implementation of the present application, there is provided a space layout planning device in front of a school gate based on picking up students by motorcycle or electric vehicle, comprising a road network feature acquisition module, a layout planning generation module and a model simulation optimization module;
[0032] The road network feature acquisition module is used to obtain the road network flow characteristics of the school based on the path algorithm according to the student travel portrait of the school to be planned; wherein the student travel portrait includes travel time, travel mode and school route;
[0033] The layout plan generating module is used to generate a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics; wherein the geographical feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes a motor vehicle area, a motorcycle and electric vehicle area, a student activity area, a buffer area, a service area and an organization area;
[0034] The model simulation optimization module is used to obtain a layout simulation model based on the geographic feature data and the road network traffic characteristics, and input the spatial layout plan into the layout simulation model for optimization. During optimization, the spatial layout plan is adjusted according to the simulation results of the layout simulation model until the simulation results of the layout simulation model meet the preset school pick-up and drop-off optimization goals, and the final optimized spatial layout plan is output to plan and transform the schools to be planned according to the final optimized spatial layout plan.
[0035] In certain embodiments of the present application, the road network feature acquisition module includes a time series data acquisition unit and a road network feature acquisition unit;
[0036] The time series data acquisition unit is used to assign each student and the corresponding travel time and travel mode to the corresponding school route based on the student travel portrait and the path algorithm to obtain a school route time series set;
[0037] The road network feature acquisition unit is used to perform cluster statistics on the school route time series set to obtain the road network flow characteristics of the school.
[0038] In certain embodiments of the present application, the layout plan generation module includes a first planning unit, a second planning unit, and a layout planning unit;
[0039] The first planning unit is used to obtain the planning area of each of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area according to the preset facility size and in combination with the geographical feature data;
[0040] The second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics;
[0041] The layout planning unit is used to obtain a corresponding spatial layout plan based on the respective planned areas of the motor vehicle area, the motorcycle and electric vehicle area, the student activity area, the buffer area, the service area and the organization area in combination with a preset regional layout.
[0042] In certain embodiments of the present application, the second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics, specifically:
[0043] The planned area of the motorcycle and electric vehicle area is specifically:
[0044] ;
[0045] ;
[0046] ;
[0047] in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
[0048] In certain embodiments of the present application, the model simulation optimization module includes a model adjustment unit, a parameter calibration unit and a simulation optimization unit;
[0049] The model adjustment unit is used to adjust the preset basic layout simulation model according to the geographical feature data and the road network flow characteristics to obtain a layout simulation model;
[0050] The parameter calibration unit is used to calibrate simulation parameters according to the geographic feature data and the student travel portrait; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters;
[0051] The simulation optimization unit is used to input the spatial layout plan and the simulation parameters into the layout simulation model for optimization until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization goal, and output the final optimized spatial layout plan; wherein, during the optimization, the simulation evaluation result of the spatial layout plan is obtained according to the simulation result of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation result.
[0052] This application first obtains the road network flow characteristics based on the student travel portrait of the school to be planned based on the path algorithm, and then combines the road network flow characteristics and geographical feature data to generate a spatial layout plan including motor vehicle areas, motorcycle and electric vehicle areas, student activity areas, buffer areas, service areas and organization areas. Compared with the existing technology, it not only takes into account the impact of motor vehicles on pick-up and drop-off, but also takes into account the impact of motorcycles and electric vehicles on pick-up and drop-off. It can carry out spatial layout planning for pick-up and drop-off in front of the school gate in a more comprehensive and reasonable manner, and then obtain a layout simulation model and input the spatial layout plan into the layout simulation model for optimization, which can further optimize the spatial layout plan and make the spatial layout plan more adapted to the actual flow conditions of pick-up and drop-off, thereby improving the efficiency of pick-up and drop-off. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 : A flow chart of a method for planning the layout of space in front of a school gate based on picking up students by motorcycle or electric vehicle according to certain embodiments of the present application;
[0054] Figure 2: A module structure diagram of a space layout planning device in front of a school gate based on picking up students by motorcycle or electric vehicle, shown in certain embodiments of the present application;
[0055] Figure 3 : A space layout plan for school gates based on the use of motorcycles and electric vehicles to pick up students according to certain embodiments of the present application;
[0056] 311a is a non-pick-up lane, 311b is an opposite non-pick-up lane, 312a is a pick-up lane, 312b is an opposite pick-up lane, 313 is a motor vehicle drop-off area, 314 is a school bus drop-off area, 315 is a pedestrian zebra crossing, and 316 is a sidewalk; 321 is a straight motorcycle and electric vehicle lane, 322 is a U-turn motorcycle and electric vehicle lane, 323 is a centralized motorcycle and electric vehicle drop-off area, and 324 is a decentralized motorcycle and electric vehicle drop-off area; 331 is a school protection passage, and 332 is a school protection connecting passage; 341 is the school gate, and 342 is the buffer space in front of the school gate; 351 is a motor vehicle service area, 352 is a motorcycle and electric vehicle service area, 353 is a school protection passage service area, 354 is a U-turn motorcycle and electric vehicle service area, and 355 is a street crossing service area; 361 is a pick-up point, 362 is a parent waiting area, and 363 is a late waiting area. DETAILED DESCRIPTION
[0057] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals represent the same or similar elements or elements having the same or similar functions from beginning to end. The embodiments described below in conjunction with the accompanying drawings are exemplary and are only used to explain some embodiments of the present application, and should not be construed as limitations on the embodiments of the present application. Based on the embodiments shown in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0058] In the description of this application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, unless otherwise clearly and specifically defined, "multiple" and "several" mean two or more.
[0059] In the existing technologies, the methods for solving the traffic congestion problem when picking up students have different defects: they do not involve the spatial layout planning in front of the school gate, which makes it difficult to ensure the orderliness of parents picking up and dropping off students, and it is easy to lose sight of one thing while focusing on another and it is difficult to improve efficiency; there are certain implementation prerequisites and it cannot be widely used; they mainly focus on the impact of a certain type of vehicle on picking up and dropping off students, and do not study the impact of motorcycles and electric vehicles on picking up and dropping off students, resulting in the failure to reasonably plan the spatial layout of picking up and dropping off students in front of the school gate. Therefore, how to reasonably plan the spatial layout of picking up and dropping off students in front of the school gate under the influence of motorcycles and electric vehicles is a problem that needs to be solved urgently in the existing technology.
[0060] Based on the above technical background, please refer to Figure 1 The embodiment of the present application provides a method for planning the layout of space in front of a school gate based on picking up students by motorcycle or electric vehicle, including steps S101 to S103, each of which is specifically as follows:
[0061] Step S101: According to the student travel profile of the school to be planned, the road network flow characteristics of the school are obtained based on the path algorithm; wherein the student travel profile includes travel time, travel mode and school route.
[0062] In certain embodiments of the present application, obtaining the road network flow characteristics of the school based on the student travel portrait of the school to be planned and based on the path algorithm specifically includes:
[0063] According to the student travel portrait, based on the path algorithm, each student and the corresponding travel time and travel mode are assigned to the corresponding school route to obtain the school route time series set;
[0064] Cluster statistics are performed on the time series set of the school routes to obtain the road network flow characteristics of the school.
[0065] Specifically, the preferred implementation scheme of the school route time series set is a travel route of multiple modes of transportation centered on the school gate; wherein the multiple modes of transportation include motorcycles and pedestrians with two-way flow distribution and motor vehicles with one-way flow distribution; the road network flow characteristics include the proportion of pick-up and drop-off, the scale and proportion of the transportation modes used for pick-up and drop-off, the time period for drop-off and the distribution of parking time, the starting point of the transportation mode used for drop-off, the destination after drop-off, and the time period for pick-up and the distribution of parking time.
[0066] In certain embodiments of the present application, the path algorithm includes but is not limited to Dijkstra algorithm, Floyd algorithm, simulated annealing algorithm, A* algorithm, depth first search (DFS) algorithm and breadth first search (BFS) algorithm, and the preferred scheme is Dijkstra algorithm.
[0067] This application first allocates the school route time series set based on the student travel portrait and the path algorithm, which can match each student with the corresponding travel time and travel mode one by one, and then cluster and count the school route time series set to obtain the road network traffic characteristics, which is more in line with the actual student travel and can improve the accuracy of subsequent spatial layout planning.
[0068] Step S102: Generate a corresponding spatial layout plan based on the school's geographic feature data and the road network traffic characteristics; wherein the geographic feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes motor vehicle areas, motorcycle and electric vehicle areas, student activity areas, buffer areas, service areas and organization areas.
[0069] Specifically, the geographic feature data include terrain features, building design and road organization diagram, including the location of the school gate and the spatial layout of the school gate in the school building design, the road red line width in the road design in front of the school gate, the width of the motor vehicle lane, the width of motorcycles and electric vehicles, the width of the sidewalk and the width and spacing of the tree pits of street trees.
[0070] In certain embodiments of the present application, generating a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics specifically includes:
[0071] According to the preset facility size and in combination with the geographic feature data, the planning area of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area is obtained;
[0072] Obtaining a planned area of a motorcycle and electric vehicle zone according to the facility size, the geographic feature data and the road network flow characteristics;
[0073] According to the respective planned areas of the motor vehicle area, motorcycle and electric vehicle area, student activity area, buffer area, service area and organization area, combined with the preset regional layout, the corresponding spatial layout plan is obtained.
[0074] Specifically, in the spatial layout planning, the motor vehicle area is set up in the motor vehicle lane opposite the school gate, and the motorcycle and electric vehicle areas are set up on the inner roadside and on both sides of the roadside of the motor vehicle area. The sidewalk area between the school gate and the motor vehicle lane opposite the school gate, excluding the motorcycle and electric vehicle area and the motorcycle and electric vehicle service area, the motor vehicle area and the motor vehicle service area, is a buffer zone. The area within a preset width on both sides of the school gate and the motor vehicle lanes is divided into student activity areas and organization areas according to a preset ratio.
[0075] Furthermore, the motor vehicle area includes non-pickup lanes 311a and 311b, pick-up lanes 312a and 312b, continuous machine-machine separation facilities, intermittent machine-machine separation facilities, motor vehicle drop-off area 313, school bus drop-off area 314, pedestrian zebra crossing 315, movable human-machine separation facilities and fixed human-machine separation facilities; the motorcycle and electric vehicle area includes a straight motorcycle and electric vehicle lane 321, a U-turn motorcycle and electric vehicle lane 322, a centralized motorcycle and electric vehicle drop-off area 323, a decentralized motorcycle and electric vehicle drop-off area 324, continuous machine-non-separation facilities, intermittent machine- Non-separation facilities, human-non-separation facilities and barrier-free ramps; the student activity area includes a school protection passage 331, student-parent separation facilities, a school protection connection passage 332 and a wind and rain corridor; the buffer zone includes a school gate 341, a buffer space in front of the school gate 342 and inside-outside separation facilities of the school gate; the service area includes a motorcycle and electric vehicle service area 352, a motor vehicle service area 351, a school protection passage service area 353, a U-turn motorcycle and electric vehicle service area 354 and a street crossing service area 355; the organization area includes a pick-up point 361, a parent waiting area 362 and a late waiting area 363.
[0076] Furthermore, the preferred implementation scheme of the design of the motor vehicle zone is as follows: with the school gate as the center, the outer lane in front of the school gate is a non-pick-up lane 311a, and the inner lane in front of the school gate is a pick-up lane 312a, which is separated from the opposite traffic, including the opposite non-pick-up lane 311b and the opposite pick-up lane 312b, by a continuous machine-machine separation facility, and separated by an interval machine-machine separation facility at the pedestrian zebra crossing 315 and the U-turn motorcycle lane 322; wherein, a motor vehicle drop-off area is set up on the pick-up lane 312a with the school gate as the center and close to the school side. A motor vehicle drop-off area 313 is set on the opposite pick-up lane 312b and is connected to the school side side side side 316 through a pedestrian zebra crossing 315; a motor vehicle service area 351 is set up close to the school and the roadside of the motor vehicle drop-off area 313, which is separated by movable man-machine separation facilities and fixed man-machine separation facilities respectively; the motor vehicle service area 351 near the school side is connected to the buffer space 342 in front of the school gate by a small pedestrian zebra crossing across the straight motorcycle and electric vehicle lane 321 and the decentralized motorcycle and electric vehicle drop-off area 324.
[0077] Specifically, both non-pickup lanes and pick-up lanes are marked with the words "non-pickup lane" and "pick-up lane" on the ground; the continuous machine-machine separation facilities are continuous railings or concrete piers, the intermittent machine-machine separation facilities and fixed human-machine separation facilities are yellow-black safety warning columns, with a height of not less than 0.8m; the continuous machine-non-separation facilities in the motorcycle and tram lanes are continuous railings, the intermittent machine-non-separation facilities and human-non-separation facilities are yellow-black safety warning columns or red-white elastic isolation columns, with a height of not less than 0.5m; the inside-outside separation facilities of the school gate and the movable human-machine separation facilities close to the school gate are ice cream cones or electric lifting piles; the layout interval width of each separation facility shall not be less than 1.5m / piece, and not more than 2.0m / piece.
[0078] Specifically, the motor vehicle drop-off area and school bus drop-off area are marked with the words "Motor Vehicle Drop-off Area" and "School Bus Drop-off Area" on the ground paved with different colors of asphalt. The width of each is 2.5m-3.5m. The length should be determined based on the size of the motor vehicles picking up and dropping off students and the road space. It should be able to accommodate at least 2 motor vehicles or 1 school bus and should not be less than 12m.
[0079] Furthermore, the preferred implementation scheme of the design of the motorcycle and electric vehicle area is as follows: a straight motorcycle and electric vehicle lane 321 is set along the roadside on both sides of the road in front of the school, and the straight motorcycle and electric vehicle lane 321 is separated from the motor vehicle lane by a continuous machine-non-separation facility; a decentralized motorcycle and electric vehicle drop-off area 324 is set inside the motor vehicle drop-off area 313 close to the school side, and the decentralized motorcycle and electric vehicle drop-off area 324 and the centralized motorcycle and electric vehicle drop-off area 323 are arranged outward on both sides in sequence, the decentralized motorcycle and electric vehicle drop-off area 324 is arranged in the space outside the buffer space 342 in front of the school gate and in the gap space between the tree pits of the roadside trees on the sidewalk, and the vertical elevation is flush with the straight motorcycle and electric vehicle lane 321, and the centralized motorcycle and electric vehicle drop-off area 323 is arranged in the sidewalk space, and the height is the same as the sidewalk 3 16, higher than the straight motorcycle and tram lane 321 and the motor vehicle lane, connected to the straight motorcycle and tram lane 321 and the motor vehicle lane through a barrier-free ramp, the inner sides of the centralized motorcycle and tram drop-off area 323 and the decentralized motorcycle and tram drop-off area 324 are connected to the motorcycle and tram service area 352, and are separated by human-non-separation facilities; the straight motorcycle and tram lane 321 is connected to a U-turn motorcycle and tram lane on both sides of the motor vehicle drop-off area 313, the U-turn motorcycle and tram lane 322 is connected to the motorcycle and tram lanes on both sides in front of the school gate, and the U-turn motorcycle and tram lane 322 is separated by interval-type machine-non-separation facilities and interval-type machine-machine separation facilities at the intersection with the pick-up lane 312a, the non-pick-up lane 311a, the opposite pick-up lane 312b and the opposite non-pick-up lane 311b.
[0080] Specifically, the width of the straight motorcycle and electric vehicle lane on the school side shall not be less than 2.5m, the width of the straight motorcycle and electric vehicle lane on the opposite side of the school shall not be less than 1.5m, and the width of the U-turn motorcycle and electric vehicle lane shall not be less than 2.5m; the length of the decentralized motorcycle and electric vehicle drop-off area shall not be less than 2.0m; the centralized motorcycle and electric vehicle drop-off area shall also include a pole sign with the words "Motorcycle and Electric Vehicle Drop-off Area"; the unit area of motorcycles and electric vehicles is 2.2㎡ / vehicle.
[0081] Furthermore, the preferred implementation scheme of the design of the student activity area is as follows: a plurality of school protection connecting passages 332 connect the school protection passage 331 and the motorcycle and electric vehicle service area 352 close to the school side; the school protection passage 331 is arranged on the sidewalk 316 close to the school side and is separated from the sidewalk by student-parent separation facilities; the school protection passage 331 is connected to the school gate 341; a plurality of school protection passage service areas 353 are arranged corresponding to the connection points of the plurality of school protection connecting passages 332 and the school protection passage 331 and the connection points of the school protection passage 331 and the buffer space 342 in front of the school gate; a wind and rain corridor is arranged above the school protection passage 331, the plurality of school protection connecting passages 332, the motorcycle and electric vehicle service area 352 and the school protection passage service area 353.
[0082] Specifically, the school protection passage is marked with the words "School Protection Passage" on the ground, with a width of not less than 1m and a length of 15m-100m. It is centered on the school gate and extends to both sides along the school wall; the school protection connecting passage is marked with the words "School Protection Connecting Passage" on the ground, with a width of not less than 1m, and the spacing between multiple school protection connecting passages is 10m-15m; the wind and rain corridor is a fixed canopy facility with a width of not less than 2m.
[0083] Furthermore, the preferred implementation scheme of the design of the service area is: in addition to the service areas set up in the motor vehicle area, motorcycle and electric vehicle area, and student activity area, it also includes a U-turn motorcycle and electric vehicle service area and a street crossing service area; the U-turn motorcycle and electric vehicle service area is set at the connection between the U-turn motorcycle and electric vehicle lane and the straight motorcycle and electric vehicle lane, and the street crossing service area is set at the connection between the pedestrian zebra crossing and the sidewalk, the straight motorcycle and electric vehicle lane, and the interval-type machine-machine separation facility.
[0084] Specifically, the length of the motor vehicle service area is consistent with that of the motor vehicle drop-off area, the length of the motorcycle and electric vehicle service area is consistent with that of the centralized motorcycle and electric vehicle drop-off area and the decentralized motorcycle and electric vehicle drop-off area. The width is not less than 1m, and it is marked with the words "Volunteer Service Area" on the ground; the school protection passage service area, U-turn motorcycle and electric vehicle service area and the crossing service area are all marked with a 60cm diameter ground marking circle containing the word "Volunteer", and the color is consistent with the ground text signs of the motor vehicle service area and the motorcycle and electric vehicle service area.
[0085] Furthermore, the preferred implementation scheme of the buffer zone design is as follows: the school gate 341 and the buffer space 342 in front of the school gate are separated by inside-outside separation facilities of the school gate, and a decentralized motorcycle and electric vehicle drop-off area 324 is arranged in the buffer space 342 in front of the school gate, and is separated by movable human-non-separation facilities.
[0086] Specifically, the buffer zone in front of the school gate is filled with yellow grid lines, and is separated from the school gate and the decentralized motorcycle and electric vehicle drop-off areas by gate machines, ice cream cones, isolation columns or electric lifting piles, as well as movable human-machine separation facilities.
[0087] Furthermore, the preferred implementation scheme of the design of the organizing area is as follows: a plurality of pick-up points 361 are arranged at preset intervals on the inner side of the school protection passage 331 close to the school side; a parent waiting area 362 is arranged close to the sidewalk 316 side of the student-parent separation facility used to separate the school protection passage 331 from the sidewalk 316; and a late waiting area 363 is arranged on both sides or one side of the school near the school gate 341.
[0088] Specifically, the intervals between multiple pick-up points are 5-10m; the width of the parent waiting area is not less than 1.5m, and its length is consistent with the length of the school protection channel; when the distance between the school protection channel and the motor vehicle service area and the motorcycle and electric vehicle service area does not exceed 2m, the settings of the school protection connecting channel and the school protection channel service area will be cancelled.
[0089] In certain embodiments of the present application, the setting of the U-turn motorcycle lane is related to the proportion of U-turn motorcycles that pick up and drop off during the morning peak, specifically:
[0090] Determine the layout of the U-turn motorcycle lanes based on the proportion of U-turn motorcycles and electric vehicles picking up and dropping off passengers during the morning peak hours and the demand for motor vehicle traffic;
[0091] The ratio of U-turn motorcycles and electric vehicles is specifically:
[0092] ;
[0093] in, They are the total volume of motorcycle and electric vehicle traffic during the morning peak hours and the volume of motorcycle and electric vehicle traffic that turns around after dropping off students;
[0094] The configuration method of the U-turn tramway is specifically as follows:
[0095]
[0096] This application obtains the planned area of each zone based on the preset facility size, geographical feature data and road network traffic characteristics, and then obtains the corresponding spatial layout plan, taking into account the impact of motorcycles and electric vehicles on school pick-up and drop-off, which can make the spatial layout plan more suitable for the actual situation of school pick-up and drop-off and improve the accuracy of the spatial layout plan.
[0097] In certain embodiments of the present application, obtaining the planned area of the motorcycle and electric vehicle zone according to the facility size, the geographic feature data and the road network flow characteristics specifically includes:
[0098] The planned area of the motorcycle and electric vehicle area is specifically:
[0099] ;
[0100] ;
[0101] ;
[0102] in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
[0103] This application divides the planned area of the motorcycle and electric vehicle zone into the morning peak period and the evening peak period, and adopts different calculation methods to consider the impact of different factors of the morning peak period and the evening peak period on the pick-up and drop-off of students, and then obtains the planned area of the motorcycle and electric vehicle zone, which is more in line with the actual area required by motorcycles and electric vehicles during pick-up and drop-off, so that the spatial layout planning is more suitable for the actual situation of pick-up and drop-off.
[0104] Step S103: According to the geographic feature data and the road network traffic characteristics, a layout simulation model is obtained, and the spatial layout plan is input into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation results of the layout simulation model until the simulation results of the layout simulation model meet the preset optimization goals for school pick-up and drop-off, and the final optimized spatial layout plan is output to plan and transform the schools to be planned according to the final optimized spatial layout plan.
[0105] In certain embodiments of the present application, the layout simulation model is obtained according to the geographic feature data and the road network traffic characteristics, and the spatial layout plan is input into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation result of the layout simulation model until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization target, and the final optimized spatial layout plan is output, which specifically includes:
[0106] According to the geographic feature data and the road network flow characteristics, the preset basic layout simulation model is adjusted to obtain a layout simulation model;
[0107] According to the geographic feature data and the student travel portrait, simulation parameters are calibrated; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters;
[0108] The spatial layout plan and the simulation parameters are input into the layout simulation model for optimization until the simulation results of the layout simulation model meet the preset pick-up and drop-off optimization goals, and the final optimized spatial layout plan is output; wherein, during the optimization, the simulation evaluation results of the spatial layout plan are obtained according to the simulation results of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation results.
[0109] In certain embodiments of the present application, the vehicle type distribution parameters include the proportion of transit vehicle types and the proportion of school pick-up and drop-off vehicle types, specifically:
[0110] The proportion of transit vehicle types is specifically as follows:
[0111] ;
[0112] in, It is the number of the type of transit vehicle, and its value is 1, 2, or 3. For cars, For buses, For trucks; They are the first The proportion of vehicles of the same type and the number of border crossing surveys;
[0113] The specific proportions of vehicle types for picking up and dropping off students are as follows:
[0114] ;
[0115] in, It is the number of the vehicle type for picking up students. The value is 1, 2, 3, 4. For cars, For motorcycles and electric vehicles, For school buses, For pedestrians; They are the first The proportion of this type of vehicle and the number of students picked up and dropped off were surveyed.
[0116] In certain embodiments of the present application, the vehicle arrival distribution parameters include the arrival ratio of transit vehicles and the arrival ratio of school pick-up vehicles, specifically:
[0117] The transit vehicle arrival ratio is specifically:
[0118] ;
[0119] in, is the sequence number of the peak period, The total value is the ratio of the total duration of the survey peak period to the time window; Respectively Among the vehicles passing through the border during peak hours, The sample proportion and total sample size of the vehicle category;
[0120] The arrival ratio of vehicles for picking up and dropping off students is as follows:
[0121] ;
[0122] in, is the sequence number of the peak period, The total value is the ratio of the total duration of the survey peak period to the time window; Respectively Among the vehicles picking up and dropping off students during peak hours, The sample proportion and total sample size of this type of vehicles.
[0123] In certain embodiments of the present application, the vehicle speed distribution parameter is calibrated by correcting the speed distribution parameter curves of different types of vehicles. Specifically, with the school gate as the center, the road section in front of the school gate is divided into three areas: the left side of the school gate, the school gate section, and the right side of the school gate. One typical section is selected in each of the three areas to collect instantaneous vehicle speed data. The instantaneous vehicle speeds of three types of vehicles (cars, buses, and trucks) passing through each section and four types of vehicles for picking up and dropping off students (cars, motorcycles and electric vehicles, pedestrians, and school buses) are collected and arranged in ascending order. With 1 km / h as the segmentation standard, the proportion of the number of vehicles in each speed section is counted respectively, and a vehicle speed distribution model suitable for various vehicle types is established at the three sections; wherein the instantaneous vehicle speed is obtained by a speedometer.
[0124] In certain embodiments of the present application, the vehicle parking time distribution parameter is calibrated by modifying the parking time distribution function curve of different types of school pick-up and drop-off vehicles. Specifically, the parking time data of different types of school pick-up and drop-off vehicles are arranged in ascending order, and segmented with a time window of 5s-10s as the segmentation standard, and the proportion of the number of vehicles in each segment is counted.
[0125] In certain embodiments of the present application, the service time distribution parameter is calibrated by modifying the parking time distribution function curves of the corresponding different types of school pick-up and drop-off vehicles.
[0126] In certain embodiments of the present application, the obtaining of a simulation evaluation result of the space layout plan according to the simulation result of the layout simulation model, and adjusting the space layout plan according to the simulation evaluation result, are specifically as follows:
[0127] Acquire a simulation evaluation result of the space layout planning according to the simulation result of the layout simulation model; wherein the simulation evaluation result includes an overall service level optimization rate and a vehicle time consumption reduction rate;
[0128] The overall service level optimization rate is specifically:
[0129] ;
[0130] in, Optimize the rate for overall service level, are the average traffic delay values of the previous iteration and the current iteration respectively;
[0131] The vehicle time consumption reduction rate includes the time consumption reduction rate of transit vehicles and the time consumption reduction rate of school pick-up and drop-off vehicles; the transit vehicle time consumption reduction rate is specifically:
[0132] ;
[0133] in, is the reduction rate of transit vehicle time consumption, are the transit vehicle time consumption of the previous iteration and the current iteration respectively, The time consumed by transit vehicles, is the total number of vehicles crossing the border, For the The time taken by a vehicle to cross the border;
[0134] The specific reduction rate of time consumption of vehicles for picking up and dropping off students is:
[0135] ;
[0136] in, The time consumption reduction rate of vehicles picking up and dropping off students is are the previous iteration and the current iteration respectively. Time spent on transporting students to and from school, For the Time spent on transporting students to and from school, For the The total number of vehicles picking up and dropping off students. For the Class 1 school transport vehicle The time consumption of a vehicle.
[0137] The spatial layout planning is adjusted according to the simulation evaluation results.
[0138] In certain embodiments of the present application, the preferred implementation of the preset pick-up and drop-off optimization target is the overall service level optimization rate. , the time consumption of transit vehicles decreased , the time consumption of car for picking up and dropping off students decreased , the time consumption of motorcycles and electric vehicles for picking up and dropping off students decreased , the time consumption reduction rate of car pick-up and drop-off of schools and the time consumption reduction rate of pedestrian pick-up and drop-off of schools .
[0139] This application first obtains a layout simulation model based on geographic feature data and road network traffic characteristics, and then obtains simulation parameters including various parameters based on geographic feature data and student travel portrait calibration, and then inputs the spatial layout plan into the layout simulation model for optimization, which can further optimize the spatial layout plan and make the spatial layout plan more suitable for the actual traffic conditions of picking up and dropping off students, thereby improving the accuracy of the spatial layout plan.
[0140] Compared with the prior art, the present application first obtains the road network traffic characteristics based on the student travel portrait of the school to be planned based on the path algorithm, and then combines the road network traffic characteristics and geographical feature data to generate a spatial layout plan including motor vehicle areas, motorcycle and electric vehicle areas, student activity areas, buffer areas, service areas and organization areas. Compared with the prior art, it not only takes into account the impact of motor vehicles on pick-up and drop-off, but also takes into account the impact of motorcycles and electric vehicles on pick-up and drop-off. It can carry out a more comprehensive and reasonable spatial layout planning for pick-up and drop-off in front of the school gate, and then obtain a layout simulation model and input the spatial layout planning into the layout simulation model for optimization, which can further optimize the spatial layout planning and make the spatial layout planning more adapted to the actual traffic conditions of pick-up and drop-off, thereby improving the efficiency of pick-up and drop-off.
[0141] Corresponding to the previous method, see Figure 2 , the embodiment of the present application provides a space layout planning device in front of a school gate based on picking up students by motorcycle or electric vehicle, including a road network feature acquisition module 210, a layout planning generation module 220 and a model simulation optimization module 230;
[0142] The road network feature acquisition module 210 is used to obtain the road network flow characteristics of the school based on the path algorithm according to the student travel profile of the school to be planned; wherein the student travel profile includes travel time, travel mode and school route;
[0143] The layout plan generating module 220 is used to generate a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics; wherein the geographical feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes a motor vehicle area, a motorcycle and electric vehicle area, a student activity area, a buffer area, a service area and an organization area;
[0144] The model simulation optimization module 230 is used to obtain a layout simulation model based on the geographic feature data and the road network traffic characteristics, and input the spatial layout plan into the layout simulation model for optimization. During optimization, the spatial layout plan is adjusted according to the simulation results of the layout simulation model until the simulation results of the layout simulation model meet the preset school pick-up optimization goals, and the final optimized spatial layout plan is output to plan and transform the schools to be planned according to the final optimized spatial layout plan.
[0145] In certain embodiments of the present application, the road network feature acquisition module 210 includes a time series data acquisition unit and a road network feature acquisition unit;
[0146] The time series data acquisition unit is used to assign each student and the corresponding travel time and travel mode to the corresponding school route based on the student travel portrait and the path algorithm to obtain a school route time series set;
[0147] The road network feature acquisition unit is used to perform cluster statistics on the school route time series set to obtain the road network flow characteristics of the school.
[0148] In certain embodiments of the present application, the layout plan generation module 220 includes a first planning unit, a second planning unit, and a layout planning unit;
[0149] The first planning unit is used to obtain the planning area of each of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area according to the preset facility size and in combination with the geographical feature data;
[0150] The second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics;
[0151] The layout planning unit is used to obtain a corresponding spatial layout plan based on the respective planned areas of the motor vehicle area, the motorcycle and electric vehicle area, the student activity area, the buffer area, the service area and the organization area in combination with a preset regional layout.
[0152] In certain embodiments of the present application, the second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics, specifically:
[0153] The planned area of the motorcycle and electric vehicle area is specifically:
[0154] ;
[0155] ;
[0156] ;
[0157] in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
[0158] In certain embodiments of the present application, the model simulation optimization module 230 includes a model adjustment unit, a parameter calibration unit, and a simulation optimization unit;
[0159] The model adjustment unit is used to adjust the preset basic layout simulation model according to the geographical feature data and the road network flow characteristics to obtain a layout simulation model;
[0160] The parameter calibration unit is used to calibrate simulation parameters according to the geographic feature data and the student travel portrait; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters;
[0161] The simulation optimization unit is used to input the spatial layout plan and the simulation parameters into the layout simulation model for optimization until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization goal, and output the final optimized spatial layout plan; wherein, during the optimization, the simulation evaluation result of the spatial layout plan is obtained according to the simulation result of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation result.
[0162] This application first obtains the road network flow characteristics based on the student travel portrait of the school to be planned based on the path algorithm, and then combines the road network flow characteristics and geographical feature data to generate a spatial layout plan including motor vehicle areas, motorcycle and electric vehicle areas, student activity areas, buffer areas, service areas and organization areas. Compared with the existing technology, it not only takes into account the impact of motor vehicles on pick-up and drop-off, but also takes into account the impact of motorcycles and electric vehicles on pick-up and drop-off. It can carry out spatial layout planning for pick-up and drop-off in front of the school gate in a more comprehensive and reasonable manner, and then obtain a layout simulation model and input the spatial layout plan into the layout simulation model for optimization, which can further optimize the spatial layout plan and make the spatial layout plan more adapted to the actual flow conditions of pick-up and drop-off, thereby improving the efficiency of pick-up and drop-off.
[0163] It should be understood that the device provided in the embodiment of the present application corresponds to the aforementioned method. The device for planning the spatial layout in front of the school gate based on motorcycle and electric vehicle pick-up and drop-off of students provided in the embodiment of the present application can realize the method for planning the spatial layout in front of the school gate based on motorcycle and electric vehicle pick-up and drop-off of students provided in any embodiment of the present application.
[0164] Adaptively, the embodiments of the present application also provide a computer device and a computer-readable storage medium.
[0165] The computer device comprises: a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor;
[0166] Among them, when the processor executes the computer program, a method for planning the spatial layout in front of a school gate based on motorcycle and electric vehicle pick-up and drop-off is implemented in the present application.
[0167] The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor to execute a school gate space layout planning method based on motorcycle and electric vehicle pick-up and drop-off of students in the present application.
[0168] The above are some implementation methods of the present application, and the purpose, technical scheme and beneficial effects of the present application are further described in detail. It should be clear that the above-mentioned partial implementation methods of the present application cannot be understood as limiting the present application. It is particularly pointed out that for those skilled in the art, any changes, modifications, equivalent substitutions and variations made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A space layout planning method for school gate based on motorcycle and electric vehicle pick-up and drop-off, characterized in that: include: According to the student travel profile of the school to be planned, the road network flow characteristics of the school are obtained based on the path algorithm; wherein the student travel profile includes travel time, travel mode and school route; Generate a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics; wherein the geographical feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes a motor vehicle area, a motorcycle and electric vehicle area, a student activity area, a buffer area, a service area and an organization area; According to the geographic feature data and the road network traffic characteristics, a layout simulation model is obtained, and the spatial layout plan is input into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation result of the layout simulation model until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization goal, and the final optimized spatial layout plan is output, so as to plan and transform the school to be planned according to the final optimized spatial layout plan; The generating of a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics specifically includes: According to the preset facility size and in combination with the geographic feature data, the planning area of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area is obtained; Obtaining a planned area of a motorcycle and electric vehicle zone according to the facility size, the geographic feature data and the road network flow characteristics; According to the respective planned areas of the motor vehicle area, the motorcycle and electric vehicle area, the student activity area, the buffer area, the service area and the organization area, combined with the preset regional layout, the corresponding spatial layout plan is obtained; The step of obtaining the planned area of the motorcycle and electric vehicle zone according to the facility size, the geographical feature data and the road network flow characteristics specifically includes: The planned area of the motorcycle and electric vehicle area is specifically: ; ; ; in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
2. The space layout planning method in front of the school gate based on the transportation of students by motorcycle or electric vehicle according to claim 1 is characterized in that: The method of obtaining the road network flow characteristics of the school based on the student travel portrait of the school to be planned and the path algorithm specifically includes: According to the student travel portrait, based on the path algorithm, each student and the corresponding travel time and travel mode are assigned to the corresponding school route to obtain the school route time series set; Cluster statistics are performed on the time series set of the school routes to obtain the road network flow characteristics of the school.
3. The space layout planning method in front of the school gate based on the transportation of students by motorcycle or electric vehicle according to claim 1 is characterized in that: The method of obtaining a layout simulation model according to the geographic feature data and the road network flow characteristics, and inputting the spatial layout plan into the layout simulation model for optimization, adjusting the spatial layout plan according to the simulation result of the layout simulation model during optimization, until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization target, and outputting the final optimized spatial layout plan, specifically includes: According to the geographic feature data and the road network flow characteristics, the preset basic layout simulation model is adjusted to obtain a layout simulation model; According to the geographic feature data and the student travel portrait, simulation parameters are calibrated; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters; The spatial layout plan and the simulation parameters are input into the layout simulation model for optimization until the simulation results of the layout simulation model meet the preset pick-up and drop-off optimization goals, and the final optimized spatial layout plan is output; wherein, during the optimization, the simulation evaluation results of the spatial layout plan are obtained according to the simulation results of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation results.
4. A space layout planning device in front of a school gate based on the transportation of students by motorcycles and electric vehicles, characterized in that: It includes a road network feature acquisition module, a layout planning generation module and a model simulation optimization module; The road network feature acquisition module is used to obtain the road network flow characteristics of the school based on the path algorithm according to the student travel portrait of the school to be planned; wherein the student travel portrait includes travel time, travel mode and school route; The layout plan generating module is used to generate a corresponding spatial layout plan according to the geographical feature data of the school and the road network flow characteristics; wherein the geographical feature data includes terrain features, building design and road organization diagram; the spatial layout plan includes a motor vehicle area, a motorcycle and electric vehicle area, a student activity area, a buffer area, a service area and an organization area; The model simulation optimization module is used to obtain a layout simulation model according to the geographic feature data and the road network traffic characteristics, and input the spatial layout plan into the layout simulation model for optimization. During the optimization, the spatial layout plan is adjusted according to the simulation result of the layout simulation model until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization target, and the final optimized spatial layout plan is output, so as to plan and transform the school to be planned according to the final optimized spatial layout plan; The layout planning generation module includes a first planning unit, a second planning unit and a layout planning unit; The first planning unit is used to obtain the planning area of each of the motor vehicle area, the student activity area, the buffer area, the service area and the organization area according to the preset facility size and in combination with the geographical feature data; The second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics; The layout planning unit is used to obtain a corresponding spatial layout plan based on the respective planned areas of the motor vehicle area, the motorcycle and electric vehicle area, the student activity area, the buffer area, the service area and the organization area in combination with the preset regional layout; The second planning unit is used to obtain the planned area of the motorcycle and electric vehicle area according to the facility size, the geographical feature data and the road network flow characteristics, specifically: The planned area of the motorcycle and electric vehicle area is specifically: ; ; ; in, They are the planned area of the motorcycle and electric vehicle area, the calculated area of the motorcycle and electric vehicle area during the morning peak, and the calculated area of the motorcycle and electric vehicle area during the evening peak. The time window number for each minute within 30 minutes before the end of the school schedule. For the The number of motorcycles and electric vehicles stranded in front of the school gate within the time window, For the The number of motorcycles and electric vehicles that arrive at the school gate to drop off students within the time window, For the The number of motorcycles and electric vehicles leaving the school gate after dropping off students within a time window; Number the school's staggered dismissal periods. For the The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, For the and The number of students who were picked up by motorcycles and electric vehicles during the staggered school dismissal period, Respectively The number of students who should leave during the staggered school dismissal period, the pick-up ratio, and the proportion of motorcycles and electric vehicles used for pick-up. For the The proportion of students waiting during the staggered school dismissal period, For the The proportion of students waiting during the staggered school dismissal period, For the Students who should leave during the staggered dismissal period are The proportion of students picked up during staggered school dismissal periods.
5. The space layout planning device in front of a school gate based on picking up students by motorcycle or electric vehicle according to claim 4 is characterized in that: The road network feature acquisition module includes a time series data acquisition unit and a road network feature acquisition unit; The time series data acquisition unit is used to assign each student and the corresponding travel time and travel mode to the corresponding school route based on the student travel portrait and the path algorithm to obtain a school route time series set; The road network feature acquisition unit is used to perform cluster statistics on the school route time series set to obtain the road network flow characteristics of the school.
6. The space layout planning device in front of a school gate based on picking up students by motorcycle or electric vehicle according to claim 4 is characterized in that: The model simulation optimization module includes a model adjustment unit, a parameter calibration unit and a simulation optimization unit; The model adjustment unit is used to adjust the preset basic layout simulation model according to the geographical feature data and the road network flow characteristics to obtain a layout simulation model; The parameter calibration unit is used to calibrate simulation parameters according to the geographic feature data and the student travel portrait; wherein the simulation parameters include vehicle type distribution parameters, vehicle arrival distribution parameters, vehicle speed distribution parameters, vehicle stop time distribution parameters and service time distribution parameters; The simulation optimization unit is used to input the spatial layout plan and the simulation parameters into the layout simulation model for optimization until the simulation result of the layout simulation model meets the preset pick-up and drop-off optimization goal, and output the final optimized spatial layout plan; wherein, during the optimization, the simulation evaluation result of the spatial layout plan is obtained according to the simulation result of the layout simulation model, and the spatial layout plan is adjusted according to the simulation evaluation result.
Citation Information
Patent Citations
Spatial layout design method suitable for picking up and sending students in front of primary school door
CN118133405A
A roadside parking planning method based on VISUM simulation software
CN109543949A
Campus two-wheeled electric vehicle charging pile re-layout optimization method and system
CN118114826A