System risk assessment method for digital workshop

By implementing system risk assessment methods in digital workshops, combining multiple evaluation methods and algorithms, the problems of complexity and failure risks of digital production lines are solved, and the safe operation and production efficiency of workshop equipment and production lines are guaranteed.

CN119005688APending Publication Date: 2024-11-22AEROSUN CORP
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411068159.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The complexity of digital production lines and the sequence of equipment lead to an increase in the possibility of failure. Traditional timed maintenance and post-maintenance cannot meet the operating requirements, and the lack of an effective risk assessment system has led to uncontrollable project risks.

Method used

Provide a system risk assessment method for digital workshops, including five risk assessment parts: workshop planning and scheduling, production process quality management, workshop equipment management, production logistics management, process execution and management, through knowledge analysis method, genetic algorithm, decision tree algorithm , fuzzy comprehensive evaluation method, FMEA method and hierarchical analysis method, etc., combined with gray correlation, the overall risk assessment decision integration is carried out.

Benefits of technology

The overall risk assessment of the digital workshop production line is realized, ensuring the safe operation of equipment and the continuous and normal operation of the production line. By optimizing the workshop scheduling plan, identifying equipment failures, improving production process quality, optimizing logistics management and reducing process risks, the production efficiency and Security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005688A_ABST
    Figure CN119005688A_ABST
Patent Text Reader

Abstract

The invention discloses a system risk assessment method for a digital workshop. The system risk assessment method comprises five risk assessment parts and overall risk assessment decision fusion. The risk assessment of workshop plan scheduling comprises the steps of inputting workshop plan scheduling information, constructing a genetic algorithm model and analyzing, assessing and visualizing; the workshop equipment management risk assessment comprises equipment operation information acquisition, data preprocessing, decision tree model construction, fault diagnosis, fault type determination and risk assessment; the production process quality management risk assessment comprises quality parameter index acquisition, parameter analysis, statistics and process control chart generation and risk assessment; the production logistics management risk assessment comprises statistics of warehouse-in and warehouse-out information, material coding, logistics planning and risk assessment; the process execution and management risk assessment comprises the steps of creating and perfecting a failure mode and influence analysis information, and carrying out structure, function, failure and risk analysis; and performing overall risk assessment on the digital workshop based on an analytic hierarchy process and a grey relational degree method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a risk assessment method, in particular to a system risk assessment method for a digital workshop, and belongs to the technical field of flexible manufacturing. Background Art

[0002] The system risk assessment of the digital workshop is also called safety evaluation. Its main purpose is to ensure the normal production and equipment safety of the digital production line. With the development of intelligent manufacturing technology, the digital production line is also moving towards high automation and high integration. The increased complexity of the digital production line also increases the possibility of related failures. At the same time, with the introduction of more and more large-scale mechanized equipment in the production line operation, and the relationship between these equipments in the production sequence, their stability and safety directly affect the continuous operation of the entire production line. Therefore, the preventive risk assessment of the production line operation has become an important issue that needs to be solved urgently.

[0003] For digital production lines, traditional "scheduled maintenance" and "after-the-fact maintenance" cannot meet the operational requirements. Once a failure occurs during the production process, it will not only greatly affect production efficiency, but also pose a threat to personal safety. According to the applicant, a complete digital production line risk assessment project is full of various risks during the feasibility study. In the actual digital production line risk assessment project, due to the lack of a large number of actual case references and similar digital production line project risk management experience, an effective and reasonable risk assessment system has not been formed so far. The risk assessment results are often very different from the project implementation process and the actual results of the project, resulting in uncontrollable project risks. Summary of the invention

[0004] Purpose of the invention: In view of the problems and shortcomings existing in the prior art, the present invention provides a system risk assessment method for a digital workshop, thereby completing the overall risk assessment and analysis of the digital workshop production line, ensuring the safe operation of its equipment and the continuous normal operation of the production line.

[0005] Technical solution: A systematic risk assessment method for digital workshops, including five risk assessment parts: workshop planning and scheduling, production process quality management, workshop equipment management, production logistics management, process execution and management, and the integration of overall risk assessment decisions for digital workshops. Risk assessments are conducted on the provided workshop production plan, production process quality management data, workshop equipment characteristic signals, production logistics management information, process execution and management processes, and corresponding risk assessment results are obtained.

[0006] In the workshop planning and scheduling management risk assessment, the workshop planning and scheduling related data are evaluated to assess the current workshop planning and scheduling management risks. The assessment methods include:

[0007] Based on the knowledge analysis method, relevant risk indicators for workshop planning and scheduling management risk assessment are found. The main indicators include job plan completion, machine utilization rate (idle rate), and processing completion time.

[0008] Furthermore, the implementation methods of risk assessment for workshop planning and scheduling include:

[0009] By obtaining the workshop scheduling plan information, the original workshop scheduling plan is compared with the workshop scheduling plan optimized by genetic algorithm, the risk level is evaluated, and corresponding optimization and improvement suggestions are generated for the original workshop scheduling plan.

[0010] In the workshop equipment management risk assessment, the workshop scheduling plan information is input, the genetic algorithm model is built, the optimized workshop scheduling plan is output, and the risk assessment is performed.

[0011] The workshop equipment management risk assessment is used to assess the current workshop equipment management and identify the risk of failure of the current workshop equipment. The assessment method includes:

[0012] Based on the decision tree algorithm, the workshop equipment module of the digital workshop system is risk evaluated. The analysis subsystems are determined and the fault types of the subsystems are judged, including the drive system, loading and unloading system, transmission system, execution system, control system, and detection system. The decision tree prediction algorithm is used to diagnose the faults of the collected equipment data for the above subsystems, so as to predict potential safety and danger sources and propose corresponding safety measures to minimize or eliminate possible system failures.

[0013] Furthermore, the working methods of workshop equipment management risk assessment include:

[0014] Based on the collected relevant equipment data, the relevant data is preprocessed to build a basic data support library.

[0015] The normal and faulty equipment data sets are obtained to train the decision tree prediction model, and the characteristic signal data is extracted from the data set. The trained prediction model is used to predict the fault conditions of the characteristic signal data and determine the equipment failure results.

[0016] Furthermore, possible fault phenomena and fault resolution measures are generated based on the determined equipment fault results and combined with the basic data support library to obtain risk assessment results for the workshop equipment.

[0017] Production process quality management risk assessment includes real-time input, parameter analysis, SPC (statistical process control, SPC) control charts, and risk assessment.

[0018] The risk assessment of the quality management in the production process evaluates the current quality management plan in the workshop, identifies the risks in the current quality management plan of the production process, and the assessment methods include:

[0019] Based on the fuzzy comprehensive evaluation method, the risk assessment of the quality management in the production process is carried out. First, the following risk indicators are determined: raw material quality risk, quality inspection and assessment risk, and product design requirement risk.

[0020] Furthermore, the working methods of the risk assessment of the quality management in the production process include:

[0021] According to the various parameter data of the product process quality detected and extracted during the product production process, SPC control charts are generated through the parameter data, including EWMA control charts and X-R control charts (mean-range control charts). According to the control charts, the risk existence points are found to determine the risk levels, and suggestions for product quality improvement are put forward.

[0022] The control limits of the said control charts are:

[0023] μ is estimated when the process is normal, and the control variable is calculated step by step according to the following formula: Estimated, the control variable is calculated step by step according to the following formula:

[0024]

[0025] where μ is the average value of the samples when the process is normal, σ is the standard deviation of the arithmetic mean of the samples, is the average value calculated from samples of size n sequentially drawn from the process, t is the moment in the time series, G t is the control variable at moment t, r is the weighting coefficient, usually 0 < r < 1, and r takes the value of n is the sample size.

[0026] The risk assessment of the production logistics management evaluates the current production logistics management, identifies the risks in the production logistics management, and the assessment methods include:

[0027] Based on the method combining qualitative and quantitative, the risk assessment of the production logistics management module is carried out. First, the following risk indicators are determined: warehousing risk, transportation risk, and scheduling risk.

[0028] Furthermore, the working methods of the risk assessment of the production logistics management include:

[0029] Through the real-time management of the scheduling logistics transportation of raw materials and the produced finished products, timely docking the outbound quantity of the raw material warehouse and the target location of outbound, including the warehousing quantity of the finished product warehouse, it can give early warnings in real time for non-compliance with the actual situation of the logistics warehousing, and formulate the optimal logistics scheduling plan to ensure the normal progress of production.

[0030] Risk assessment of process execution and management: evaluate the current process execution and management, identify the risks of production execution and management, and the assessment methods include:

[0031] Based on the FMEA (failure mode and effect analysis, FMEA) method, risk assessment is performed on process execution and management. The FMEA method has the following important evaluation indicators: (1) severity (2) frequency (3) detection. It is used to calculate the final process RPN (risk factor) risk value.

[0032] Further, the working methods for process execution and management risk assessment include:

[0033] Each process is analyzed using the seven steps of FMEA in the FMEA table. The seven steps of FMEA are:

[0034] Step 1: Planning and preparation;

[0035] Step 2: Structural analysis;

[0036] Step 3: Functional analysis;

[0037] Step 4: Failure analysis;

[0038] Step 5: Risk analysis;

[0039] Step 6: Optimization;

[0040] Step 7: Document the results;

[0041] The seven steps of FMEA are used to analyze the system, subsystem, part element or process name and process function, process step function and product characteristics, process work element function and process characteristics, failure impact, failure mode, failure cause, current prevention control of failure cause, and current detection control of failure cause or failure mode. The RPN (Risk Priority Number, RPN) risk value is calculated by scoring the severity, frequency, and detection of the process by an expert team. In this way, process optimization suggestions are made based on the risks.

[0042] The risk factor (RPN) in the FMEA is: Severity (S) × Occurrence (O) × Detection (D)

[0043] S—Severity 1-10, the larger the number, the higher the severity level;

[0044] O—Frequency 1-10. The larger the number, the more likely it is to happen.

[0045] D-Detection 1-10. The larger the number, the easier it is to detect.

[0046] Usually, when the S value is above 8 and the RPN value is above 100, compulsory measures need to be taken.

[0047] The digital workshop overall risk assessment decision fusion is used to conduct risk assessment on the current workshop as a whole. The assessment methods include:

[0048] Based on the five risk assessment levels of workshop planning and scheduling management, workshop equipment management, production process quality management, production logistics management, and process execution and management obtained above, the weight of each risk assessment part is calculated using the hierarchical analysis method and the grey correlation method to obtain the overall risk situation of the digital production line, and the comprehensive risk assessment of the production line is completed in combination with the grey correlation method. By combing the five risk assessment processes and results, the digital workshop is evaluated for risk as a whole using the hierarchical analysis method and the grey correlation method. First, the five risk assessment parts (1) workshop planning and scheduling management, (2) workshop equipment management, (3) production process quality management, (4) production logistics management, and (5) process execution and management) are used to construct a hierarchical model for risk assessment of the digital workshop.

[0049] Furthermore, a judgment matrix of the risk assessment system is established based on the constructed hierarchical model, and the weight of each risk assessment part is calculated. The weight is the relative importance of the five risk assessment parts in the risk assessment of the entire digital workshop system.

[0050] Furthermore, the grey correlation analysis method is to determine an analysis method to measure the correlation or degree of change between factors based on a certain similarity or difference in the development trends between two factors.

[0051] The evaluation index is calculated according to the evaluation index calculation method to complete the comprehensive evaluation of the digital workshop. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 A system risk assessment flow chart for an implementation of the present invention;

[0053] Figure 2 A flow chart of risk assessment for workshop planning and scheduling in an embodiment;

[0054] Figure 3 A flow chart of workshop equipment management risk assessment in an embodiment;

[0055] Figure 4 It is a flow chart of the production process quality management risk assessment of the embodiment;

[0056] Figure 5 A flow chart of production logistics management risk assessment in an embodiment;

[0057] Figure 6It is a process execution and management risk assessment flow chart of an embodiment;

[0058] Figure 7 It is a flowchart of overall risk assessment decision fusion of the embodiment;

[0059] Figure 8 A hierarchical structure model diagram of the analytic hierarchy process of the embodiment;

[0060] Fig. 9 Generate a CART decision tree state diagram for an embodiment. DETAILED DESCRIPTION

[0061] The present invention is further explained below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0062] like Figure 1 As shown, the system risk assessment method for the digital workshop of this embodiment includes five parallel risk assessment parts: workshop planning and scheduling, production process quality management, workshop equipment management, production logistics management, and process execution and management, as well as the overall risk assessment decision-making integration of the digital workshop based on this.

[0063] like Figure 2 As shown in the figure, the workshop planning and scheduling management risk assessment can achieve the relevant risk assessment of the planning and scheduling, production scheduling and continuous production of the digital workshop through the following steps:

[0064] Step A1, obtain the required workshop scheduling information according to the enterprise production department of the digital workshop, automatically receive the production order of the enterprise resource planning (ERP) system through the interface, obtain the name of the product to be processed and the production quantity; and obtain the number of production equipment and the number that each equipment can produce at the same time, as well as the production plan output according to the original production plan;

[0065] Step A2, inputting the acquired product name, production quantity, number of production equipment and the quantity that each equipment can produce at the same time, and production plan output as workshop scheduling information into the genetic algorithm model;

[0066] Step A3, the genetic algorithm model arranges the workpieces of the manufactured products through the possible processes of the production equipment according to the workshop scheduling information to form a population composed of multiple production scheduling plans; the completion time of the production scheduling plan to complete the manufacturing of all products is used as its fitness (the shorter the completion time, the higher the fitness), and several workshop scheduling plans with better fitness are randomly selected for genetic crossover and mutation until the predetermined number of iterations is reached, and the optimal solution is obtained as the output of the optimized workshop scheduling plan; then, according to the optimized workshop scheduling plan, the processing completion time of all workpieces reflected in the production plan information and the processing time of each equipment are obtained, and the total equipment utilization rate (idle rate) and processing completion time are calculated; thereby, it is determined whether the optimized workshop scheduling plan meets the workshop production plan requirements. If so, the production plan is updated. If not, the workshop scheduling plan is re-optimized until it is satisfied.

[0067] Step A4: Analyze and evaluate the results

[0068] The analytic hierarchy process is used to conduct risk assessment on workshop planning and scheduling. First, a hierarchical model is constructed. There are target layer, criterion layer and factor layer. The target layer is the risk assessment of workshop planning and scheduling, the criterion layer is the workshop planning and scheduling plan, and the factor layer is defined according to the criterion layer as follows:

[0069] The corresponding risk factor assessment values ​​T1, T2, and T3 of the scheduling plan’s job plan completion rate, equipment utilization rate, and maximum processing completion time.

[0070]

[0071]

[0072]

[0073] The completion rates of the original scheduling plan and the job plan after genetic algorithm optimization are e1 and e2 respectively; the equipment utilization rates are k1 and k2 respectively; the maximum processing completion times are g1 and g2 respectively; the job plan completion rate is expressed as the completion rate of the scheduling plan within the planned time.

[0074] Furthermore, the weight of each factor is determined, and the weight is the relative importance of the evaluation result in the planning and scheduling risk assessment of the entire workshop. The evaluation result of the planning and scheduling risk assessment of the workshop is obtained based on the evaluation index, and the calculation method of the index is:

[0075]

[0076] In the formula, p b It is the weight factor of the factor layer of workshop planning and scheduling.

[0077] p1 is the weight factor of the risk factor assessment value T1 of the job plan completion rate, p2 is the weight factor of the risk factor assessment value T2 of the equipment utilization rate, and p3 is the weight factor of the risk factor assessment value T3 of the maximum processing completion time.

[0078] According to the risk assessment results, corresponding improvement measures and suggestions are proposed. A Gantt chart is used to show the comparison of the timeline and specific progress of the workshop scheduling plan before and after optimization; the evaluation value obtained from the risk assessment results is further notified to the enterprise production department or ERP system, and the workshop scheduling plan and scheduling suggestions optimized by the risk assessment system are given. The digital workshop can be adjusted according to the optimized workshop scheduling plan, re-optimize the production schedule of the workshop scheduling plan that needs to be executed, and inform the enterprise production department or ERP system of the operation plan completion rate, equipment utilization rate, and maximum processing completion time, so as to improve production efficiency and reduce planning risks, and complete the risk assessment of the planning and scheduling of the digital workshop.

[0079] like Figure 3 As shown, the workshop equipment management risk assessment implements the risk assessment of the equipment subsystems of the digital workshop including the drive system, loading and unloading system, transmission system, execution system, control system, and detection system through the following steps:

[0080] Step B1, collect key data reflecting the equipment status including control parameters, data types, sampling time, sampled workshops, sampled equipment, and fault types through the collection channel (equipment with standard communication interfaces such as Ethernet directly collects data according to the corresponding interface protocol, and equipment without communication interfaces collects data through additional collection terminals), and use the data to build a basic data support library;

[0081] Step B2, arrange the characteristic frequencies of the key data time domain or frequency domain signals collected in the form of m rows and n columns, with the first n-1 columns being the numerical values ​​of the characteristic frequencies and the last column being the fault type, with a total of m groups of data arranged in sequence. The processed data training set and prediction set are used, wherein the training set is used to train the decision tree prediction model, and the prediction set is used to predict the equipment subsystem fault judgment of the trained decision tree prediction model;

[0082] Step B3, create a device failure knowledge base. The device failure knowledge base is a database that records the possible failure types, causes and solutions of the equipment through historical data. It contains various failure cases and related information that the equipment has encountered in history. The equipment failure knowledge base provides centralized storage and management of failure information. When similar failures occur in the equipment, it can quickly find and apply existing solutions to improve the efficiency and accuracy of troubleshooting. Regularly maintain and update the failure library to ensure that new failure cases and solutions are recorded in a timely manner, and perform data cleanup to delete outdated or invalid records. Establish the following equipment failure knowledge base:

[0083] Power supply failure classification: (1) Failure caused by power supply phase loss

[0084] (2) Fault caused by a bad ON circuit of the system power module

[0085] (3) The system displays a fault caused by a poor power supply

[0086] PLC fault classification: (1) Fault caused by PLC not running

[0087] (2) Faults caused by PLC mutual control

[0088] (3) Faults caused by PLC address errors

[0089] Causes of power failure:

[0090] (1) Collision during rapid movement causes sudden stop of equipment

[0091] (2) The incoming line fuse is blown or the voltage regulator in the ON circuit is defective

[0092] (3) There is a cold solder joint on the output rectifier capacitor of the power module

[0093] PLC fault corresponding cause:

[0094] (1) The external contact of the input unit's ON / OFF control circuit is open

[0095] (2) PLC output interlock or workbench exceeds limit

[0096] (3) Module address setting error

[0097] Power failure corresponding solutions:

[0098] (1) Replace the fuse with a new one after confirming that the drive is not damaged.

[0099] (2) Replace the incoming line fuse and voltage regulator tube under the premise that there is no short circuit.

[0100] (3) Reinstall the power module

[0101] PLC fault corresponding solution measures:

[0102] (1) Check the contact closure conditions and restart the PLC to close the interlock contacts.

[0103] (2) Check the PLC program provided

[0104] (3) Restore address settings

[0105] Step B4, generating a decision tree prediction model by training the training set, and then using the trained model to perform fault diagnosis and prediction on the equipment data, thereby identifying the equipment fault point;

[0106] The Classification and Regression Tree (CART) is a binary decision tree. The decision process needs to start from the root node of the decision tree, compare the test data with the feature nodes in the decision tree, and select the next comparison branch according to the comparison result until the leaf node is the final decision result. The attribute of the root node is obtained based on the Gini coefficient index, and then the model is built recursively from top to bottom until each sample set is completely pure after division, then stop building the tree. The Gini coefficient index is used to measure the impurity of the sample. For the sample set D, it is defined as follows:

[0107]

[0108] Where Gini is the Gini coefficient, N is the number of fault class labels, and p i is the probability of category i appearing in sample set D. The smaller the value of the Gini coefficient, the lower the impurity of the sample and the purer the sample. Therefore, in the process of tree building, the attributes with small Gini coefficient are preferred. When there are more than two types of attributes, the Gini coefficient is calculated for each combination of two categories, and the combination that minimizes the Gini coefficient is automatically selected.

[0109] The data points are classified into binary trees according to whether they are within a given threshold. By classifying the data of different types of faults, the decision tree prediction model is trained and the trained decision tree model is used for fault prediction.

[0110] The sample data are 500 groups of normal data, 20 groups of power supply failure data, and 50 groups of PLC failure data. The training sample set includes 80% of the normal data and 20% of the failure data. The remaining feature data is used to establish a test sample set to detect the recognition effect of the fault diagnosis tree.

[0111] The characteristic frequency value of the signal is X. When X≤0.082, the Gini coefficient is 0.742. Traversing the entire CART decision tree from the root node, the following classification rules can be obtained:

[0112] (1) When 0≤X≤0.039, the Gini coefficient is 0.756. If -0.050≤X≤0, the Gini coefficient is 0.0, and the equipment is normal and fault-free.

[0113] (2) When -0.060≤X≤0 and the Gini coefficient is 0.0, the device has a power failure;

[0114] (3) When 0≤X≤0.053, the Gini coefficient is 0.733. If -0.069≤X4≤0 and the Gini coefficient is 0.592, a PLC failure occurs in the device.

[0115] Generate a CART decision tree state diagram as follows Fig. 9 shown.

[0116] Step B5, combine the identified equipment fault point with the equipment fault knowledge base to generate possible fault phenomena and corresponding solutions. After the decision tree fault prediction model determines the fault type, the corresponding fault classification, the fault cause and the corresponding fault solution can be quickly indexed and searched through the equipment fault knowledge base. In this way, the fault analysis of subsystems including drive system, loading and unloading system, transmission system, execution system, control system and detection system is completed, and the fault type of the subsystem is determined; an alarm is issued for abnormal or faulty situations, and the fault phenomenon is described, and improvement and maintenance measures are proposed for the fault, and the faulty equipment is repaired in time, etc., to complete the risk assessment of digital workshop equipment.

[0117] Risk assessment of production logistics management: evaluate the current production logistics management and identify the risks of production logistics management. The assessment methods include:

[0118] Based on the combination of qualitative and quantitative methods, the risk assessment of production logistics management module is carried out. The following risk indicators are first determined: warehousing risk, transportation risk, and scheduling risk.

[0119] The working methods of production logistics management risk assessment include:

[0120] Through real-time management of logistics and transportation scheduling of raw materials and finished products, timely connection with the raw material warehouse outbound quantity and the target location of the outbound shipment, including the storage quantity of the finished product warehouse, it is possible to issue real-time early warnings for failure to meet the actual logistics and warehousing conditions, and formulate the optimal logistics scheduling plan to ensure normal production.

[0121] Based on qualitative and quantitative methods, logistics management risks were analyzed, and the raw material storage risk R1, finished product storage risk R2 and transportation logistics risk R3 were determined;

[0122] Raw material storage and finished product storage can be built from the storage system to record the raw material name, inbound and outbound quantity and type, inbound and outbound time and other information in real time. In order to ensure that the production line can run efficiently and meet the requirements of sales order delivery, the raw material storage risk and finished product storage risk can be determined according to the following methods:

[0123]

[0124]

[0125] Among them, w1 and w2 are the existing inventory quantities of raw material warehousing and finished product warehousing respectively, and f1 and f2 are the total inventory limits of raw material warehousing and finished product warehousing respectively.

[0126] The risk level is further determined based on the calculated raw material storage risk R1 and finished product storage risk R2.

[0127] Low risk: The raw material storage risk R1 and finished product storage risk R2 values ​​are in the range of 0-0.25, and the risk level is significant risk.

[0128] Medium risk: Raw material storage risk R1 and finished product storage risk R2 are in the range of 0.25-0.5, and the risk level is high risk.

[0129] High risk: Raw material storage risk R1 and finished product storage risk R2 are in the range of 0.5-0.75, and the risk level is medium risk.

[0130] Major risks: Raw material storage risk R1 and finished product storage risk R2 are in the range of 0.75-1, and the risk level is low risk.

[0131] The transport logistics risk R3 can be analyzed from multiple logistics activities in workshop transport logistics, including packaging, warehousing, transportation, loading and unloading. These activities will lead to certain safety risks in transport logistics. In these logistics activities, the inspection and maintenance of transport tools, the safety training of loading and unloading, and the safety training of drivers are scored to obtain the transport logistics risk R3, and improvement measures are proposed for the risks that have occurred.

[0132] Risk assessment of process execution and management: evaluate the current process execution and management, identify the risks of production execution and management, and the assessment methods include:

[0133] Conduct risk assessment on process execution and management based on FMEA method. FMEA method has the following important evaluation indicators: (1) severity (2) frequency (3) detection. It is used to calculate the final process RPN (risk factor) risk value.

[0134] Further, the working methods for process execution and management risk assessment include:

[0135] First, a structural analysis of process execution and management is conducted, including the system, subsystem, part elements or process names of the process, to determine the process elements that need attention.

[0136] Further functional analysis is carried out, which includes the functions of the process system, subsystem, part elements or processes, to determine the process functions, process step functions and product characteristics, process work element functions and process characteristics that the product process needs to achieve.

[0137] Further analysis is performed on failure effects, failure modes, failure causes, current preventive controls for failure causes, and current detection controls for failure causes or failure modes.

[0138] Based on the above structural analysis, functional analysis and failure analysis of process execution and management, the expert team can score the severity, frequency and detection of the process, and then calculate the RPN risk value, so as to make process optimization suggestions based on the risks.

[0139] The risk factor (RPN) in the FMEA is: Severity (S) × Occurrence (O) × Detection (D)

[0140] S—Severity 1-10, the larger the number, the higher the severity level;

[0141] O—Frequency 1-10. The larger the number, the more likely it is to happen.

[0142] D-Detection 1-10. The larger the number, the easier it is to detect.

[0143] Usually, when the S value is above 8 and the RPN value is above 100, compulsory measures need to be taken.

[0144] like Figure 7 As shown in the figure, the overall risk assessment decision fusion is the decision fusion of the five risk assessment parts: workshop planning and scheduling management, workshop equipment management, production process quality management, production logistics management, and process execution and management. The specific process is as follows:

[0145] The analytic hierarchy process and grey correlation method are used to evaluate the overall risk of the digital workshop by using the five risk assessment results. First, the analytic hierarchy process is used to construct a hierarchical model of the five risk assessment parts: (1) workshop planning and scheduling management (2) workshop equipment management (3) production process quality management (4) production logistics management (5) process execution and management. Figure 8 As shown in the figure, there are target layer, criterion layer and factor layer. The target layer is the risk assessment of the digital workshop, the criterion layer is the five modules of room planning and scheduling management, workshop equipment management, production process quality management, production logistics management, and process execution and management. The factor layer is defined as follows according to the criterion layer:

[0146] The completion rate of the operation plan is T1, the utilization rate of the equipment is T2, and the maximum processing completion time is T3;

[0147] Drive system S1, loading and unloading system S2, transmission system S3, execution system S4, control system S5, detection system S6;

[0148] Raw material quality Q1, quality inspection and assessment Q2 and product design requirements Q3;

[0149] Raw material storage risk R1, finished product storage risk R2 and transportation logistics risk R3;

[0150] Severity D1, frequency D2, detection D3;

[0151] The five systems are constructed into a hierarchical model and a judgment matrix is ​​established to calculate the weight of each module. The weight is the relative importance of the evaluation results of the five modules in the risk assessment of the entire digital workshop system. The calculation method of the evaluation index is:

[0152]

[0153] In the formula, p b 、n g 、u h 、m j 、z k They are the weight factors of the factor layer of each part, namely, room planning and scheduling management, workshop equipment management, production process quality management, production logistics management, process execution and management. C1, C2, C3, C4, and C5 are the weight factors of the five parts of the overall risk assessment decision fusion module.

[0154] The evaluation index is calculated according to the evaluation index calculation method to complete the comprehensive evaluation of the digital workshop.

Claims

1. A systematic risk assessment method for digital workshops, It is characterized in that It includes five risk assessment parts: workshop planning and scheduling, production process quality management, workshop equipment management, production logistics management, process execution and management, as well as the integration of overall risk assessment and decision-making in the digital workshop; The risk assessment of workshop scheduling includes inputting workshop scheduling information, building a genetic algorithm model, analyzing and evaluating the results, and visualizing them. The genetic algorithm is used to optimize the workshop scheduling plan, and risk assessment is performed based on the optimized workshop scheduling plan. The workshop equipment management risk assessment includes equipment operation information collection, data preprocessing, building a decision tree model, fault diagnosis, determining the fault type, and risk assessment. The risk assessment of the workshop equipment module of the digital workshop system is performed based on the decision tree algorithm. The risk assessment of production process quality management includes collecting quality parameter indicators, parameter analysis, generating statistics and process control charts, risk assessment, and using SPC control charts to conduct risk assessment of production process quality management; Production logistics management risk assessment includes statistics of inbound and outbound information, material coding, logistics planning using scheduling algorithms, and risk assessment. Production logistics management risk assessment is conducted based on a combination of qualitative and quantitative methods. Process execution and management risk assessment includes creating and improving failure mode and effect analysis information, as well as performing structural, functional, failure and risk analysis, and using FMEA methods for risk assessment; The overall risk assessment decision of the digital workshop is integrated, and the overall risk assessment of the digital workshop is carried out based on the analytic hierarchy process and grey correlation method.

2. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the workshop planning and scheduling management risk assessment, the workshop planning and scheduling related data are evaluated to assess the current workshop planning and scheduling management risks. The assessment methods include: Obtain workshop scheduling information and find relevant risk indicators for workshop scheduling management risk assessment, including job plan completion, machine utilization rate, and processing completion time; By obtaining the workshop scheduling plan information, the original workshop scheduling plan is compared with the workshop scheduling plan optimized by genetic algorithm, the risk level is assessed, and corresponding optimization and improvement suggestions are generated for the original workshop scheduling plan.

3. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the workshop equipment management risk assessment, based on the collected relevant equipment data, the relevant data is preprocessed to build a basic data support library; the normal and faulty equipment data sets are obtained to train the decision tree prediction model, and the trained prediction model is used to predict the fault conditions of the characteristic signal data and judge the equipment failure results; based on the judged equipment failure results and combined with the basic data support library, possible fault phenomena and fault solutions are generated.

4. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the production process quality management risk assessment, based on the various parameter data of the product process quality extracted during the product production process, the SPC control chart is generated through the parameter data, and the risk points are found according to the control chart to determine the risk level, and product quality rectification suggestions are put forward; The control limits of the control chart are: Usually, μ is estimated when the process is normal, and the control variables are calculated step by step as follows: where r is a weighting coefficient, 0 < r < 1, usually taken as n is the sample size.

5. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the risk assessment of production logistics management, through real-time management of the logistics and transportation of raw materials and finished products, timely connection with the outbound quantity of raw materials warehouse and the target location of outbound delivery, including the storage quantity of finished product warehouse, it is possible to issue early warnings in real time for failure to meet the actual logistics and warehousing conditions, and formulate the optimal logistics scheduling plan to ensure normal production.

6. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the risk assessment of process execution and management, the risk assessment of process execution and management is carried out based on the FMEA method. The severity, frequency and detection of the process are scored by an expert team and the RPN risk value is calculated, so as to put forward process optimization suggestions based on the risks. The risk factor (RPN) in the FMEA is: Severity (S) × Occurrence (O) × Detection (D) S—Severity 1-10, the larger the number, the higher the severity level; O—Frequency 1-10. The larger the number, the more likely it is to happen. D-Detection 1-10. The larger the number, the easier it is to detect. When the S value is above 8 and the RPN value is above 100, compulsory measures need to be taken.

7. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that The digital workshop overall risk assessment decision fusion is used to conduct risk assessment on the current workshop as a whole. The assessment methods include: Through the five risk assessment levels of workshop planning and scheduling management, workshop equipment management, production process quality management, production logistics management, and process execution and management, the hierarchical analysis method and grey correlation method are used to calculate the weight of each risk assessment part to obtain the overall risk situation of the digital production line, and the comprehensive risk assessment of the production line is completed in combination with the grey correlation.

8. The system risk assessment method for a digital workshop according to claim 1, It is characterized in that In the workshop equipment management risk assessment, the risk assessment of the workshop equipment module of the digital workshop system is carried out based on the decision tree algorithm; Determine the analysis subsystem of workshop equipment management and judge the fault type of the subsystem. The analysis subsystem includes the drive system, loading and unloading system, transmission system, execution system, control system and detection system. Use the decision tree prediction algorithm to diagnose the faults of the collected equipment data of the above subsystems, so as to predict potential safety and danger sources and propose corresponding safety measures.

Citation Information

Cited By

  • Digitized workshop risk assessment method and system based on multivariate vector product

    CN120125026A

  • Vehicle production quality risk multi-source data collaborative evaluation full-chain optimization method

    CN120509746A