Business project data management method and system based on big data

By building data evaluation containers and acquisition devices in commercial projects, real-time evaluation and area division are carried out, the problem of inaccurate user demand positioning in traditional methods is solved, the efficiency and accuracy of project management are improved, and the company's decision-making is provided strongly. data support.

CN119005769AInactive Publication Date: 2024-11-22南昌职业大学
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410887515.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the traditional commercial project data management method, the user demand positioning is not accurate enough, resulting in unreasonable positioning of the commercial project implementation direction and insufficient management efficiency and accuracy.

Method used

Build a commercial project data evaluation container through a cloud data server, collect initial and real-time evaluation indicator data, conduct progress evaluation and regional division, and generate adjustment decisions to optimize project implementation.

Benefits of technology

It has achieved reasonable positioning and management efficiency improvement of commercial projects, providing strong data support for corporate strategic decisions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005769A_ABST
    Figure CN119005769A_ABST
Patent Text Reader

Abstract

The invention relates to the field of business data processing, and discloses a business project data management method and management system based on big data, and the method comprises the steps that a cloud data server constructs a data evaluation container corresponding to a business project according to the business project and an evaluation task, and is connected with a project data collection device; the project data acquisition device acquires initial evaluation index data of the commercial project according to evaluation indexes in the evaluation task to obtain basic evaluation index data and basic evaluation of the commercial project; according to a set evaluation period, evaluation index data in the operation process of the commercial project is collected, real-time evaluation of the evaluation period corresponding to the commercial project is obtained according to the obtained evaluation index data, and the real-time evaluation is compared with basic evaluation to obtain commercial project progress evaluation until commercial project data management is completed. The project management efficiency and accuracy are improved, and powerful data support is provided for strategic decisions of enterprises.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of commercial data management, and in particular to a commercial project data management method and management system based on big data. Background Art

[0002] With the rapid development of information technology, big data has become an important driving force for the development of today's society. In the business field, big data is particularly widely used, especially in the data management of commercial projects. The analysis and processing capabilities of big data play a vital role in the success of the project. However, traditional commercial project data management methods often have the problem of not accurately and intelligently positioning user needs, which leads to unreasonable positioning of the implementation direction of commercial projects. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a commercial project data management method based on big data, which is characterized by comprising the following steps:

[0004] Step 1: The cloud data server constructs a data evaluation container corresponding to the business project according to the business project and the evaluation task, and connects it with the project data collection device;

[0005] Step 2: The project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task, and obtains basic evaluation index data and basic evaluation of the commercial project;

[0006] Step 3: According to the set evaluation cycle, collect the evaluation index data during the operation of the commercial project, obtain the real-time evaluation of the commercial project corresponding to the evaluation cycle according to the obtained evaluation index data, compare the real-time evaluation with the basic evaluation, and obtain the commercial project progress evaluation. If the commercial project progress evaluation does not reach the expected commercial project progress, proceed to step 4, otherwise, proceed to step 6;

[0007] Step 4: According to the sub-region information divided by the regional division module, the commercial project progress evaluation of each region is obtained respectively, and according to the commercial project progress evaluation of each sub-region, the sub-region whose commercial project progress evaluation is less than the expected commercial project progress is located, and the basic indicators of commercial project progress growth of the sub-region whose commercial project progress is less than the expected commercial project progress are obtained;

[0008] Step 5: divide the next assessment cycle into multiple recovery assessment cycles according to the set time granularity, collect the commercial project progress assessment of each recovery assessment cycle of the sub-region with less than expected commercial project progress, if the growth rate of the commercial project progress assessment of each recovery assessment cycle is greater than zero, the sub-region with less than expected commercial project progress is in a recovery trend, otherwise, send the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress to the decision management module, the decision management module generates an adjustment decision according to the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress, and return to step 3;

[0009] Step six: Conduct business project progress assessment for the next assessment cycle until business project data management is completed.

[0010] Furthermore, the project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task to obtain a basic evaluation of the commercial project, including:

[0011] The evaluation indicators include sales and market share; the evaluation indicator data within the area covered by the commercial project is collected according to the set evaluation indicators, and the basic evaluation of the commercial project is obtained according to the initial evaluation indicator data and the area covered by the commercial project.

[0012] Furthermore, the evaluation index data during the operation of the commercial project is collected according to the set evaluation cycle, and the real-time evaluation of the commercial project corresponding to the evaluation cycle is obtained according to the obtained evaluation index data, including:

[0013] The real-time evaluation is the growth rate of the evaluation index. The growth rate of the evaluation index is the difference between the evaluation index data and the basic evaluation index data during the operation of the commercial project, and the ratio of the difference to the basic evaluation index data to obtain the growth rate of the evaluation index.

[0014] Furthermore, the comparing the real-time assessment with the basic assessment to obtain the commercial project progress assessment includes: obtaining the commercial project progress assessment according to the difference between the real-time assessment and the basic assessment.

[0015] Furthermore, the sub-regions where the commercial project progress assessment is less than the expected commercial project progress are located according to the commercial project progress assessment of each sub-region, including:

[0016] The commercial project progress evaluation of each sub-region is obtained respectively, and the corresponding sub-region range is obtained according to the sub-region whose commercial project progress evaluation is less than the preset expected commercial project progress.

[0017] Furthermore, the next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the commercial project progress assessment of each recovery assessment cycle of the sub-region whose commercial project progress is less than the expected commercial project progress is collected respectively, including:

[0018] In the next assessment cycle, the next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the business project progress assessment in each recovery assessment cycle of the sub-area where the business project progress assessment is less than the expected business project progress is collected respectively.

[0019] Furthermore, the growth rate of the business project progress assessment during the recovery assessment cycle is:

[0020] If the difference between the commercial project progress assessments in two adjacent recovery assessment cycles is greater than zero, it means that the economy is recovering; otherwise, it means that the economy has not recovered.

[0021] A business project data management system based on big data, applying the business project data management method based on big data described in any one of claims 1 to 8, comprising: a cloud data server, a business project data acquisition device, a communication module, a business project evaluation module, a regional division module and a data processing module;

[0022] The commercial project data acquisition device, communication module, commercial project evaluation module, and area division module are respectively connected to the data processing module; the cloud data server is communicatively connected to the communication module.

[0023] The beneficial effects of the present invention are: solving the problem that the user demand positioning in traditional methods is not accurate and intelligent enough, achieving reasonable positioning of the implementation direction of commercial projects, improving the efficiency and accuracy of project management, and providing strong data support for the strategic decision-making of enterprises. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a flowchart of the data management method for commercial projects based on big data;

[0025] Figure 2 This is a schematic diagram of the principle of a commercial project data management system based on big data. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.

[0027] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0028] like Figure 1 As shown, the commercial project data management method based on big data includes the following steps:

[0029] Step 1: The cloud data server constructs a data evaluation container corresponding to the business project according to the business project and the evaluation task, and connects it with the project data collection device;

[0030] Step 2: The project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task, and obtains basic evaluation index data and basic evaluation of the commercial project;

[0031] Step 3: According to the set evaluation cycle, collect the evaluation index data during the operation of the commercial project, obtain the real-time evaluation of the commercial project corresponding to the evaluation cycle according to the obtained evaluation index data, compare the real-time evaluation with the basic evaluation, and obtain the commercial project progress evaluation. If the commercial project progress evaluation does not reach the expected commercial project progress, proceed to step 4, otherwise, proceed to step 6;

[0032] Step 4: According to the sub-region information divided by the regional division module, the commercial project progress evaluation of each region is obtained respectively, and according to the commercial project progress evaluation of each sub-region, the sub-region whose commercial project progress evaluation is less than the expected commercial project progress is located, and the basic indicators of commercial project progress growth of the sub-region whose commercial project progress is less than the expected commercial project progress are obtained;

[0033] Step 5: divide the next assessment cycle into multiple recovery assessment cycles according to the set time granularity, collect the commercial project progress assessment of each recovery assessment cycle of the sub-region with less than expected commercial project progress, if the growth rate of the commercial project progress assessment of each recovery assessment cycle is greater than zero, the sub-region with less than expected commercial project progress is in a recovery trend, otherwise, send the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress to the decision management module, the decision management module generates an adjustment decision according to the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress, and return to step 3;

[0034] Step six: Conduct business project progress assessment for the next assessment cycle until business project data management is completed.

[0035] The project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task to obtain the basic evaluation of the commercial project, including:

[0036] The evaluation indicators include sales and market share; the evaluation indicator data within the area covered by the commercial project is collected according to the set evaluation indicators, and the basic evaluation of the commercial project is obtained according to the initial evaluation indicator data and the area covered by the commercial project.

[0037] The method of collecting evaluation index data during the operation of the commercial project according to the set evaluation cycle and obtaining a real-time evaluation of the commercial project corresponding to the evaluation cycle according to the obtained evaluation index data includes:

[0038] The real-time evaluation is the growth rate of the evaluation index. The growth rate of the evaluation index is the difference between the evaluation index data and the basic evaluation index data during the operation of the commercial project, and the ratio of the difference to the basic evaluation index data to obtain the growth rate of the evaluation index.

[0039] The comparing the real-time assessment with the basic assessment to obtain the commercial project progress assessment includes: obtaining the commercial project progress assessment according to the difference between the real-time assessment and the basic assessment.

[0040] The sub-regions where the commercial project progress assessment is less than the expected commercial project progress are located according to the commercial project progress assessment of each sub-region, including:

[0041] The commercial project progress evaluation of each sub-region is obtained respectively, and the corresponding sub-region range is obtained according to the sub-region whose commercial project progress evaluation is less than the preset expected commercial project progress.

[0042] The next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the commercial project progress assessment of each recovery assessment cycle of the sub-region whose commercial project progress is less than the expected commercial project progress is collected respectively, including:

[0043] In the next assessment cycle, the next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the business project progress assessment in each recovery assessment cycle of the sub-area where the business project progress assessment is less than the expected business project progress is collected respectively.

[0044] The growth rates for the commercial project progress assessments for the stated recovery assessment cycle are:

[0045] If the difference between the commercial project progress assessments in two adjacent recovery assessment cycles is greater than zero, it means that the economy is recovering; otherwise, it means that the economy has not recovered.

[0046] like Figure 2 As shown, a business project data management system based on big data, applying the business project data management method based on big data, includes: a cloud data server, a business project data acquisition device, a communication module, a business project evaluation module, a regional division module and a data processing module;

[0047] The commercial project data acquisition device, communication module, commercial project evaluation module, and area division module are respectively connected to the data processing module; the cloud data server is communicatively connected to the communication module.

[0048] Specifically, build data evaluation containers and data collection

[0049] The core of step one is to build a data evaluation container that matches the business project. This container is not only a data storage and processing center, but also the basis for subsequent data analysis. The cloud data server customizes such an evaluation container based on the characteristics and evaluation requirements of the project. At the same time, through the connection with the project data collection device, real-time and accurate data collection is achieved.

[0050] This data collection device is designed according to the specific evaluation indicators in the evaluation task. For example, if the evaluation indicators include sales and market share, the collection device will collect data for these two indicators. It not only collects data from various regions of the business project, but also performs preliminary processing and analysis on these raw data to obtain a basic evaluation of the business project.

[0051] In step 2, we have obtained the basic evaluation of the business project. Next, the focus of step 3 is to conduct real-time project progress evaluation. This requires regular collection of evaluation indicator data during the project operation, such as sales, market share, etc., and calculating real-time evaluation results based on these data. Real-time evaluation is usually expressed in the form of growth rate, which can intuitively reflect the progress of the project compared with the basic evaluation.

[0052] The comparison between real-time evaluation and basic evaluation is the key to judging whether the project is progressing as expected. If the real-time evaluation results do not meet expectations, it means that there may be problems in some aspects of the project and further analysis and adjustment are needed.

[0053] When it is found that the project progress is not as expected, step 4 will further locate the problem through the regional division module. The purpose of this step is to subdivide the project area into several sub-areas and evaluate the progress of each sub-area separately. In this way, it is possible to accurately find those sub-areas that are not progressing as expected, so as to formulate targeted adjustment strategies.

[0054] Step 5 is to closely monitor the recovery of these areas by setting smaller time granularity after identifying the problem areas, such as dividing the next assessment cycle into multiple recovery assessment cycles. If the business project progress assessment of the problem area shows a continuous growth trend during these recovery assessment cycles, then it can be considered that the area is recovering. On the contrary, if the growth is weak or even negative, then intervention and adjustment through the decision management module is required.

[0055] The decision management module will generate corresponding adjustment decisions based on the specific evaluation of the problem area and the overall project strategy and goals. These decisions may include changing market strategies, adjusting resource allocation, optimizing product portfolio, etc., aiming to help the project return to the expected progress track as soon as possible.

[0056] Step 6 marks the end of one evaluation cycle, but also the beginning of the next one. By continuously executing the above steps, continuous monitoring and optimization of business projects can be achieved. This periodic evaluation mechanism not only helps to identify problems and make adjustments in a timely manner, but also continuously accumulates experience and data during project execution, providing valuable reference and reference for subsequent projects.

[0057] In order to support the implementation of the above data management method, a fully functional commercial project data management system is essential. The system should include key components such as cloud data server, commercial project data collection device, communication module, commercial project evaluation module, regional division module and data processing module. These components can achieve comprehensive and accurate management of commercial project data through efficient data interaction and collaborative work.

[0058] In summary, the business project data management method based on big data not only improves the efficiency and accuracy of project management, but also provides strong data support for the company's strategic decision-making. Through continuous data collection, real-time evaluation and precise adjustment, companies can more calmly respond to market changes and challenges and achieve long-term and stable development of business projects.

[0059] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.

Claims

1. A commercial project data management method based on big data, characterized in that: The steps include: Step 1: The cloud data server constructs a data evaluation container corresponding to the business project according to the business project and the evaluation task, and connects it with the project data collection device; Step 2: The project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task, and obtains basic evaluation index data and basic evaluation of the commercial project; Step 3: According to the set evaluation cycle, collect the evaluation index data during the operation of the commercial project, obtain the real-time evaluation of the commercial project corresponding to the evaluation cycle according to the obtained evaluation index data, compare the real-time evaluation with the basic evaluation, and obtain the commercial project progress evaluation. If the commercial project progress evaluation does not reach the expected commercial project progress, proceed to step 4, otherwise, proceed to step 6; Step 4: According to the sub-region information divided by the regional division module, the commercial project progress evaluation of each region is obtained respectively, and according to the commercial project progress evaluation of each sub-region, the sub-region whose commercial project progress evaluation is less than the expected commercial project progress is located, and the basic indicators of commercial project progress growth of the sub-region whose commercial project progress is less than the expected commercial project progress are obtained; Step 5: divide the next assessment cycle into multiple recovery assessment cycles according to the set time granularity, collect the commercial project progress assessment of each recovery assessment cycle of the sub-region with less than expected commercial project progress, if the growth rate of the commercial project progress assessment of each recovery assessment cycle is greater than zero, the sub-region with less than expected commercial project progress is in a recovery trend, otherwise, send the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress to the decision management module, the decision management module generates an adjustment decision according to the commercial project progress assessment and sub-region information of the sub-region with less than expected commercial project progress, and return to step 3; Step six: Conduct business project progress assessment for the next assessment cycle until business project data management is completed.

2. The business project data management method based on big data according to claim 1 is characterized in that: The project data collection device collects initial evaluation index data of the commercial project according to the evaluation index in the evaluation task to obtain the basic evaluation of the commercial project, including: The evaluation indicators include sales and market share; the evaluation indicator data within the area covered by the commercial project is collected according to the set evaluation indicators, and the basic evaluation of the commercial project is obtained according to the initial evaluation indicator data and the area covered by the commercial project.

3. The business project data management method based on big data according to claim 2 is characterized in that: The method of collecting evaluation index data during the operation of the commercial project according to the set evaluation cycle and obtaining a real-time evaluation of the commercial project corresponding to the evaluation cycle according to the obtained evaluation index data includes: The real-time evaluation is the growth rate of the evaluation index. The growth rate of the evaluation index is the difference between the evaluation index data and the basic evaluation index data during the operation of the commercial project, and the ratio of the difference to the basic evaluation index data to obtain the growth rate of the evaluation index.

4. The business project data management method based on big data according to claim 3 is characterized in that: The comparing the real-time assessment with the basic assessment to obtain the commercial project progress assessment includes: obtaining the commercial project progress assessment according to the difference between the real-time assessment and the basic assessment.

5. The business project data management method based on big data according to claim 4 is characterized in that: The sub-regions where the commercial project progress assessment is less than the expected commercial project progress are located according to the commercial project progress assessment of each sub-region, including: The commercial project progress evaluation of each sub-region is obtained respectively, and the corresponding sub-region range is obtained according to the sub-region whose commercial project progress evaluation is less than the preset expected commercial project progress.

6. The business project data management method based on big data according to claim 5 is characterized in that: The next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the commercial project progress assessment of each recovery assessment cycle of the sub-region whose commercial project progress is less than the expected commercial project progress is collected respectively, including: In the next assessment cycle, the next assessment cycle is divided into multiple recovery assessment cycles according to the set time granularity, and the business project progress assessment in each recovery assessment cycle of the sub-area where the business project progress assessment is less than the expected business project progress is collected respectively.

7. The business project data management method based on big data according to claim 6 is characterized in that: The growth rates for the commercial project progress assessments for the stated recovery assessment cycle are: If the difference between the commercial project progress assessments in two adjacent recovery assessment cycles is greater than zero, it means that the economy is recovering; otherwise, it means that the economy has not recovered.

8. A business project data management system based on big data, characterized in that: The commercial project data management method based on big data according to any one of claims 1 to 7 is applied, comprising: a cloud data server, a commercial project data acquisition device, a communication module, a commercial project evaluation module, a regional division module and a data processing module; The commercial project data acquisition device, communication module, commercial project evaluation module, and area division module are respectively connected to the data processing module; the cloud data server is communicatively connected to the communication module.