Multi-project access sequence management method and system

By obtaining and filtering project information, judging the urgency and calculating the importance and prioritizing it, it solves the problem that traditional project management methods are difficult to deal with the order of access to multiple projects, improves the overall efficiency and performance of the project, and ensures the realization of project goals.

CN119005881APending Publication Date: 2024-11-22HUANENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410978463.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-20
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Traditional project management methods are difficult to effectively manage the access order between multiple projects, especially in the presence of complex dependencies and resource conflicts, and the precedence cannot be reasonably allocated, resulting in limited overall performance and benefits.

Method used

By obtaining project access requests for multiple projects, extracting project information, filtering important projects, judging urgency and giving weights, calculating importance, sorting priority, determining access order, using machine learning and natural language processing technology to get from text data Extract important information to ensure the legality and security of project information.

Benefits of technology

Reasonable multi-project access sequence management has been achieved, the overall efficiency and performance of the project has been improved, resource arrangement conflicts have been reduced, and project goals have been ensured smoothly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005881A_ABST
    Figure CN119005881A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-project access sequence management method and system, and the method comprises the steps: obtaining a project access request of multiple projects, extracting the project information of each project in the multiple projects, and judging the project access request according to the project information of each project; when it is judged that the project access request of each project passes, project information in each project is screened, and important project information is obtained; judging the emergency degree of the important project information, and giving a corresponding weight according to the emergency degree of the important project information; calculating the importance degree of each project according to the emergency degree of the important project information of each project and the corresponding weight; and sorting the access priorities according to the importance degrees of the items, and determining the access sequence of the multiple items according to the access priorities of the items. By managing the access sequence of multiple projects, the overall efficiency and performance of the projects can be improved, smooth implementation of project targets is ensured, and better project management and results are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a multi-project access sequence management method and system. Background Art

[0002] With the development of information technology, in modern project management, organizations often need to handle multiple projects at the same time, which means accessing multiple projects, but these projects may involve different teams, resources, and goals, so an effective method is needed to manage their access order. And because there may be complex dependencies between multiple projects, some projects may need to be started after other projects are completed, or they may share the same resources and teams, and even some projects may have a higher urgency, while other projects may need to be accessed faster to be processed. Therefore, in multi-project access management, it is necessary to balance the access priority and order of different projects.

[0003] Traditional project management methods are often unable to cope with the challenges of multi-project management because they focus more on the execution of a single project and ignore the interactions and resource conflicts between projects. Therefore, a method is needed to clarify the dependencies between projects, determine the relative priorities of projects, and reasonably allocate the order of access to achieve maximum overall performance and benefits. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a multi-project access sequence management method, comprising: Obtain project access requests for multiple projects, extract project information of each project in the multiple projects, and determine the project access requests according to the project information of each project; When it is determined that the project access request of each project is passed, the project information in each project is screened to obtain important project information; Determine the urgency of important project information and assign corresponding weights based on the urgency of important project information; Calculate the importance of each project based on the urgency of the important project information of each project and its corresponding weight; The access priority of each project is sorted according to its importance, and the access order of multiple projects is determined according to the access priority of each project.

[0005] Further, the obtaining of project access requests for multiple projects, extracting project information of each project in the multiple projects, and determining the project access request according to the project information of each project includes: Obtain project access requests for multiple projects, and extract project user information from project information of the multiple projects respectively, wherein the project information further includes project name, project goal information, project scope information, project description information, project requirement information, project time frame information, project resource information, project risk information, project team information, project communication plan information, project budget information, project deliverable information, and project acceptance criteria information; The project user information is compared with the reserved preset user information, and whether the project access request is allowed is determined based on the comparison result.

[0006] Furthermore, comparing the project user information with the reserved preset user information, and judging whether the project access request is allowed to pass according to the comparison result, includes: The project user information is compared with the reserved preset user information one by one. If the project user information is consistent with the reserved preset user information, the project access request is allowed to pass. If the project user information is inconsistent with the reserved preset user information, the project access request is not allowed to pass.

[0007] Furthermore, when it is determined that the project access request of each project is passed, the project information of each project is screened to obtain important project information, including: After determining that the project access request is passed, obtaining text data of each project information, and obtaining important tag data from the text data; Preprocessing and word embedding the text data to obtain a feature vector of the text data; Training a confirmation model based on the feature vector of the text data and important label data of the text data; Through the confirmation model, the project information in each project is screened and the important project information is screened and confirmed.

[0008] Furthermore, the step of determining the urgency of the important project information and assigning corresponding weights according to the urgency of the important project information includes: Set a preset urgency condition interval based on historical experience, and determine the interval range corresponding to the important project information in the preset urgency condition interval; The urgency of the important project information is determined according to the interval range, and a corresponding weight is assigned according to the urgency of the important project information.

[0009] Furthermore, the importance of each project is calculated according to the urgency of the important project information of each project and its corresponding weight, including: The urgency of the important project information of each project and its corresponding weight are accumulated and calculated to obtain the importance of each project. The specific formula is as follows:

[0010] Among them, A is the importance of each project, Bi is the urgency of the i-th important project information in each project, and ai is the corresponding weight of the urgency of the i-th important project information in each project.

[0011] Further, the access priority is sorted according to the importance of each project, and the access order of multiple projects is determined according to the access priority of each project, including: Arrange the importance of each project from largest to smallest, and mark them with numbers from 1 to n; A higher access priority is sequentially allocated to each project according to the order of the tag serial number from large to small, and the access order of multiple projects is determined according to the access priority allocated to each project from high to low.

[0012] The present invention also provides a multi-project access sequence management system, comprising: An acquisition unit, configured to acquire project access requests of multiple projects, extract project information of each project in the multiple projects, and determine the project access requests according to the project information of each project; A screening unit, configured to screen the project information of each project to obtain important project information when it is determined that the project access request of each project is passed; A judgment unit, used to judge the urgency of important project information and assign corresponding weights according to the urgency of the important project information; A calculation unit, used to calculate the importance of each project according to the urgency of the important project information of each project and its corresponding weight; The sorting unit is used to sort the access priority of each project according to the importance of each project, and determine the access order of multiple projects according to the access priority of each project.

[0013] Compared with the prior art, the multi-project access sequence management method and system according to the embodiment of the present invention have the following beneficial effects: The present invention determines the importance of each project based on the project information of multiple projects, and determines the access priority and access order according to the importance of each project. This can help project teams and managers to reasonably arrange and manage the access order of multiple projects, thereby improving the overall efficiency and performance of the project, reducing the impact of subsequent project resource scheduling conflicts and cross-influences, and ensuring the smooth realization of project goals, thereby achieving better project management and results. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a flowchart of a method for managing access order of multiple projects in an embodiment of the present invention; Figure 2 It is a schematic diagram of the composition of a multi-project access sequence management system in an embodiment of the present invention. DETAILED DESCRIPTION

[0015] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0016] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred system or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0017] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0018] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0019] like Figure 1 As shown, in an embodiment of the present application, a method for managing access order of multiple projects is provided, including: S100: obtaining project access requests of multiple projects, extracting project information of each project in the multiple projects, and judging the project access requests according to the project information of each project; S200: when it is judged that the project access request of each project is passed, screening the project information of each project in each project to obtain important project information; S300: judging the urgency of the important project information, and assigning corresponding weights according to the urgency of the important project information; S400: calculating the importance of each project according to the urgency of the important project information of each project and its corresponding weight; S500: sorting the access priority according to the importance of each project, and determining the access order of multiple projects according to the access priority of each project.

[0020] Furthermore, the present invention can help project teams and managers to reasonably arrange and manage the access order of multiple projects by judging the importance of each project based on the project information of multiple projects, and determining the access priority and access order according to the importance of each project, thereby improving the overall efficiency and performance of the project, reducing the impact of subsequent project resource scheduling conflicts and cross-influences, and ensuring the smooth realization of project goals to achieve better project management and results.

[0021] In an embodiment of the present application, a method for managing access sequence of multiple projects is provided, wherein project access requests of multiple projects are obtained, project information of each project in the multiple projects is extracted, and the project access requests are judged according to the project information of each project, including: obtaining project access requests of multiple projects, respectively extracting project user information from the project information of the multiple projects, wherein the project information also includes project name, project goal information, project scope information, project description information, project requirement information, project time frame information, project resource information, project risk information, project team information, project communication plan information, project budget information, project deliverable information, and project acceptance standard information; comparing the project user information with reserved preset user information, and judging whether the project access request is allowed to pass according to the comparison result.

[0022] Specifically, the project access requests of multiple projects are obtained, and the project user information in the project information of multiple projects is extracted respectively, including project name, project goal information, project scope information, project description information, project requirement information, project time frame information, project resource information, project risk information, project team information, project communication plan information, project budget information, project deliverable information, and project acceptance standard information; the extracted project user information is compared with the reserved preset user information, and it is determined whether the project access request is allowed to pass based on the comparison results. This process mainly involves information extraction, comparison, and decision-making to ensure the legitimacy and security of project access requests.

[0023] In an embodiment of the present application, a multi-project access sequence management method is provided, wherein the project user information is compared with the reserved preset user information, and whether the project access request is allowed to pass is determined based on the comparison result, including: comparing the project user information with the reserved preset user information one by one, if the project user information is consistent with the reserved preset user information, the project access request is allowed to pass, and if the project user information is inconsistent with the reserved preset user information, the project access request is not allowed to pass.

[0024] Specifically, the project user information is compared with the reserved preset user information one by one to determine whether the project access request is allowed. If all project user information is consistent with the reserved preset user information, the project access request will be allowed; otherwise, if there is an inconsistency, the project access request will be rejected. This process helps ensure that only authorized users can obtain project access permissions.

[0025] In an embodiment of the present application, a multi-project access sequence management method is provided, wherein when it is determined that the project access request of each project is passed, the project information in each project is screened to obtain important project information, including: after determining that the project access request is passed, obtaining text data of each project information, and obtaining important label data from the text data; preprocessing and word embedding the text data to obtain a feature vector of the text data; training a confirmation model based on the feature vector of the text data and the important label data of the text data; and screening the project information in each project through the confirmation model to screen and confirm the important project information.

[0026] Specifically, the text data of each project information is obtained, and important label data is obtained from the text data; the text data is preprocessed and word embedded to obtain the feature vector of the text data; based on the feature vector of the text data and the important label data of the text data, the confirmation model is trained; the project information in each project is screened through the confirmation model to screen and confirm the important project information. These steps are aimed at using machine learning and natural language processing technology to extract important information from text data, and to screen and confirm the project information through the confirmation model for further processing and decision-making.

[0027] In an embodiment of the present application, a multi-project access order management method is provided, wherein the urgency of important project information is determined and a corresponding weight is assigned according to the urgency of the important project information, including: setting a preset urgency condition interval according to historical experience, and determining an interval range corresponding to the important project information in the preset urgency condition interval; confirming the urgency of the important project information according to the interval range, and assigning a corresponding weight according to the urgency of the important project information.

[0028] Specifically, the steps of setting a preset urgency condition interval based on historical experience are used to determine the interval range corresponding to the important project information in the preset urgency condition interval; the urgency of the important project information is determined based on the interval range, and a corresponding weight is assigned to it. This step is intended to assign priorities to projects based on their urgency so that these weights can be taken into account in the subsequent decision-making process.

[0029] In an embodiment of the present application, a method for managing the access order of multiple projects is provided, wherein the importance of each project is calculated according to the urgency of the important project information of each project and its corresponding weight, including: accumulating the urgency of the important project information of each project and its corresponding weight to obtain the importance of each project, and the specific formula is as follows:

[0030] Among them, A is the importance of each project, Bi is the urgency of the i-th important project information in each project, and ai is the corresponding weight of the urgency of the i-th important project information in each project.

[0031] In an embodiment of the present application, a method for managing access order of multiple projects is provided, wherein access priorities are sorted according to the importance of each project, and the access order of multiple projects is determined according to the access priority of each project, including: arranging the importance of each project in order from large to small, and marking the serial numbers 1-n in sequence; allocating higher access priorities to each project in order from large to small according to the marked serial numbers, and determining the access order of multiple projects according to the access priorities allocated to each project from high to low.

[0032] Specifically, the steps of ranking the importance of each project and assigning access priorities to them according to the ranking results; specifically, firstly arranging the importance of each project from large to small, and marking the serial numbers 1-n in sequence, then assigning higher access priorities to each project in sequence from large to small according to the marked serial numbers, and finally, determining the access order of multiple projects according to the access priorities assigned to each project from high to low. This process is intended to determine the access order of the projects according to their importance, and ensure effective priority processing of access requests for multiple projects.

[0033] like Figure 2 As shown, in an embodiment of the present application, a multi-project access order management system is provided, including: an acquisition unit, used to acquire project access requests for multiple projects, extract project information of each project in the multiple projects, and judge the project access requests according to the project information of each project; a screening unit, used to screen the project information in each project when it is judged that the project access request of each project is passed, so as to obtain important project information; a judgment unit, used to judge the urgency of the important project information, and assign corresponding weights according to the urgency of the important project information; a calculation unit, used to calculate the importance of each project according to the urgency of the important project information of each project and its corresponding weight; a sorting unit, used to sort the access priority according to the importance of each project, and determine the access order of multiple projects according to the access priority of each project.

[0034] In summary, the embodiments of the present invention provide a method and system for managing the access order of multiple projects, which include: obtaining project access requests of multiple projects, extracting project information of each project in the multiple projects, and judging the project access request according to the project information of each project; when judging that the project access request of each project is passed, screening the project information of each project in each project to obtain important project information; judging the urgency of the important project information, and assigning corresponding weights according to the urgency of the important project information; calculating the importance of each project according to the urgency of the important project information of each project and its corresponding weight; sorting the access priority according to the importance of each project, and determining the access order of multiple projects according to the access priority of each project. The present invention can improve the overall efficiency and performance of the project by managing the access order of multiple projects, ensure the smooth realization of project goals, and achieve better project management and results.

[0035] Finally, it should be noted that it is obvious that those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

[0036] The above is only an example of implementation of the present invention, but it cannot be used to limit the scope of the present invention. Any structural changes made according to the present invention, as long as they do not lose the essence of the present invention, should be regarded as falling within the scope of protection of the present invention and being restricted. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working process and related instructions of the system described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0037] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus / system that comprises a list of elements includes not only those elements but also other elements not expressly listed or inherent to such process, method, article, or apparatus / system.

[0038] So far, the technical solutions of the present invention have been described in conjunction with the further embodiments shown in the accompanying drawings, but it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.

Claims

1. A method for managing the access sequence of multiple projects, characterized in that: include: Obtain project access requests for multiple projects, extract project information of each project in the multiple projects, and determine the project access requests according to the project information of each project; When it is determined that the project access request of each project is passed, the project information in each project is screened to obtain important project information; Determine the urgency of important project information and assign corresponding weights based on the urgency of important project information; Calculate the importance of each project based on the urgency of the important project information of each project and its corresponding weight; The access priority of each project is sorted according to its importance, and the access order of multiple projects is determined according to the access priority of each project.

2. A method for managing multi-project access order according to claim 1, characterized in that: The obtaining of project access requests for multiple projects, extracting project information of each project in the multiple projects, and determining the project access request according to the project information of each project, includes: Obtain project access requests for multiple projects, and extract project user information from project information of the multiple projects respectively, wherein the project information further includes project name, project goal information, project scope information, project description information, project requirement information, project time frame information, project resource information, project risk information, project team information, project communication plan information, project budget information, project deliverable information, and project acceptance criteria information; The project user information is compared with the reserved preset user information, and whether the project access request is allowed is determined based on the comparison result.

3. A method for managing multi-project access order according to claim 2, characterized in that: The comparing the project user information with the reserved preset user information, and judging whether the project access request is allowed to pass according to the comparison result, includes: The project user information is compared with the reserved preset user information one by one. If the project user information is consistent with the reserved preset user information, the project access request is allowed to pass. If the project user information is inconsistent with the reserved preset user information, the project access request is not allowed to pass.

4. A method for managing multi-project access order according to claim 1, characterized in that: When it is determined that the project access request of each project is passed, the project information of each project is screened to obtain important project information, including: After determining that the project access request is passed, obtaining text data of each project information, and obtaining important tag data from the text data; Preprocessing and word embedding the text data to obtain a feature vector of the text data; Training a confirmation model based on the feature vector of the text data and important label data of the text data; Through the confirmation model, the project information in each project is screened and the important project information is screened and confirmed.

5. A method for managing multi-project access order according to claim 1, characterized in that: The step of determining the urgency of the important project information and assigning corresponding weights according to the urgency of the important project information includes: Set a preset urgency condition interval based on historical experience, and determine the interval range corresponding to the important project information in the preset urgency condition interval; The urgency of the important project information is determined according to the interval range, and a corresponding weight is assigned according to the urgency of the important project information.

6. A method for managing multi-project access sequence according to claim 1, characterized in that: The importance of each project is calculated based on the urgency of the important project information of each project and its corresponding weight, including: The urgency of the important project information of each project and its corresponding weight are accumulated and calculated to obtain the importance of each project. The specific formula is as follows: ; Among them, A is the importance of each project, Bi is the urgency of the i-th important project information in each project, and ai is the corresponding weight of the urgency of the i-th important project information in each project.

7. A method for managing multi-project access order according to claim 1, characterized in that: The step of sorting the access priorities according to the importance of each project and determining the access order of multiple projects according to the access priorities of each project includes: Arrange the importance of each project from largest to smallest, and mark them with numbers from 1 to n; A higher access priority is sequentially allocated to each project according to the order of the tag serial number from large to small, and the access order of multiple projects is determined according to the access priority allocated to each project from high to low.

8. A multi-project access order management system, characterized in that: include: An acquisition unit, configured to acquire project access requests of multiple projects, extract project information of each project in the multiple projects, and determine the project access requests according to the project information of each project; A screening unit, configured to screen the project information of each project to obtain important project information when it is determined that the project access request of each project is passed; A judgment unit, used to judge the urgency of important project information and assign corresponding weights according to the urgency of the important project information; A calculation unit, used to calculate the importance of each project according to the urgency of the important project information of each project and its corresponding weight; The sorting unit is used to sort the access priority of each project according to the importance of each project, and determine the access order of multiple projects according to the access priority of each project.