Distributed photovoltaic power station equipment fault diagnosis early warning method and system

By obtaining inverter data in distributed photovoltaic power stations for fault diagnosis and optimization of fault processing strategies, the problem of insufficient data acquisition and processing capabilities in fault diagnosis and early warning technologies and lack of dynamic optimization of fault processing strategies is solved, and efficient Fault detection and early warning reduce operation and maintenance costs and improve power generation efficiency.

CN119009869APending Publication Date: 2024-11-22HUANENG NANJING JINLING POWER GENERATION
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411428574.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Distributed photovoltaic power plant equipment fault diagnosis and early warning technology has insufficient data acquisition and processing capabilities, complexity and diversity of fault types, which affect the accuracy and timeliness of diagnosis. Traditional fault processing strategies lack dynamic optimization, and the early warning mechanism is not intelligent enough, resulting in High operation and maintenance costs and difficult to ensure power generation efficiency.

Method used

By obtaining inverter data for fault diagnosis, creating fault alarm work orders, prioritizing and operation and maintenance personnel allocation, and optimizing fault handling strategies based on power generation data, realizing intelligent management of the entire process from fault detection to early warning.

Benefits of technology

Improve the timeliness and accuracy of fault detection, reduce operation and maintenance costs, ensure timely handling of important faults, improve the professionalism and efficiency of fault handling, realize the automation of fault handling, and optimize fault handling through year-on-year change rate Strategy improves the diagnosis and early warning capabilities of equipment failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119009869A_ABST
    Figure CN119009869A_ABST
Patent Text Reader

Abstract

The invention discloses a distributed photovoltaic power station equipment fault diagnosis early warning method and system, and relates to the technical field of photovoltaic power generation, and the method comprises the steps: obtaining inverter data, carrying out the equipment fault diagnosis, and obtaining an equipment fault type; creating a fault alarm work order based on the equipment fault type, formulating a fault processing strategy, and processing the equipment fault; and performing analysis based on the generating capacity data and the inverter data, and optimizing the fault processing strategy to realize equipment fault diagnosis and early warning. According to the method, the fault code of the inverter and the description of the inverter are combined, so that the accuracy of fault detection is effectively improved, and the operation and maintenance cost is reduced; the overall fault processing efficiency is improved through priority ranking, the fault processing efficiency is improved based on a fault type personnel allocation mechanism, and automation of fault processing is achieved; by introducing the year-on-year change rate as a judgment index, closed-loop optimization of a fault processing strategy is realized, and the diagnosis and early warning capabilities of equipment faults are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to a method and system for diagnosing and warning faults of distributed photovoltaic power station equipment. Background Art

[0002] As the proportion of renewable energy in the global energy structure continues to increase, distributed photovoltaic power generation systems have been widely used due to their flexibility, economy and environmental protection. Distributed photovoltaic power stations are composed of many devices, such as photovoltaic modules, inverters, combiner boxes and transformers. These devices are prone to various faults in complex operating environments. As the scale of photovoltaic power stations expands and the complexity increases, equipment fault diagnosis and early warning technologies are also facing unprecedented challenges. Traditional fault diagnosis methods mainly rely on manual inspections and simple data monitoring. This method is not only inefficient, but also difficult to detect potential equipment failures in a timely manner, resulting in high operation and maintenance costs of photovoltaic power stations, and it is difficult to effectively guarantee power generation efficiency, and it may even cause safety hazards. At present, with the rapid development of the Internet of Things, big data and artificial intelligence technologies, intelligent fault diagnosis and early warning systems have gradually become a research hotspot, but existing technologies still have many shortcomings.

[0003] For equipment fault diagnosis and early warning of distributed photovoltaic power stations, the current common solutions mainly face the following challenges: First, the data collection and processing capabilities are limited, making it difficult to obtain and analyze massive amounts of equipment operation data in real time and comprehensively, which affects the accuracy and timeliness of fault diagnosis; second, the complexity and diversity of fault types make it difficult for traditional diagnostic models to effectively identify and classify them, especially for new types of faults and complex faults. In addition, existing fault handling strategies are often fixed and lack the ability to dynamically optimize according to actual conditions, resulting in low fault handling efficiency; finally, the early warning mechanism is not intelligent enough, making it difficult to make accurate fault predictions based on historical data and current status, thus missing the best maintenance opportunity. These problems have seriously restricted the operational efficiency and economic benefits of distributed photovoltaic power stations, and a more intelligent and efficient fault diagnosis and early warning method is urgently needed. Summary of the invention

[0004] In view of the above-mentioned problems, the present invention is proposed.

[0005] Therefore, the problem to be solved by the present invention is how to provide a method for realizing intelligent management of the entire process from fault detection to early warning through data collection, fault diagnosis, priority sorting, professional personnel allocation, automatic work order creation and data-driven strategy optimization, thereby reducing operation and maintenance costs and improving power generation efficiency.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: In the first aspect, an embodiment of the present invention provides a distributed photovoltaic power station equipment fault diagnosis and early warning method, which includes obtaining inverter data and performing equipment fault diagnosis to obtain the equipment fault type; creating a fault alarm work order based on the equipment fault type, formulating a fault handling strategy, and handling the equipment fault; analyzing the power generation data and the inverter data, optimizing the fault handling strategy, and realizing equipment fault diagnosis and early warning.

[0007] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method described in the present invention, the equipment fault diagnosis includes the following steps: using an inverter to monitor the distributed photovoltaic power station equipment, when abnormal data is received, the inverter generates a fault code and pushes it; building a virtual collector, setting the collector to connect to the inverter list, and obtaining the fault code; performing equipment fault diagnosis based on the fault code and inverter description to obtain the corresponding equipment fault type.

[0008] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method described in the present invention, wherein: the creation of a fault alarm work order, the formulation of a fault handling strategy, and the handling of equipment failures include the following steps: when the equipment failure type is received, the equipment failure is prioritized; based on the equipment failure type, operation and maintenance personnel are assigned to the equipment failure; based on the priority ranking and the operation and maintenance personnel assignment, a fault alarm work order is created to notify offline professional operation and maintenance personnel to perform maintenance.

[0009] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method described in the present invention, the priority sorting includes: when the equipment fault type is received, the quantity of the equipment fault type is judged, if the number of equipment fault types received at the same time is 1, no priority sorting is required; if the number of equipment fault types received at the same time is greater than 1, the number of faults counted in the historical fault information ledger is obtained, and the failure rate is calculated based on the equipment fault type; based on the equipment fault type and the failure rate, a judgment is made, and in the order of the failure rate from high to low, a higher priority is set for the equipment fault type with a higher failure rate and priority processing is performed.

[0010] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method described in the present invention, wherein: the allocation of operation and maintenance personnel refers to analyzing the equipment fault type based on the historical fault information ledger, judging the equipment fault type as power fault, mechanical fault, component fault or inverter fault, and then allocating it to the corresponding operation and maintenance personnel; the acquisition of inverter data refers to collecting inverter data by prefabricated cabin data docking, and acquiring the fault code and inverter description pushed by the inverter; the equipment fault types include device alarm, device lockout, line voltage alarm, frequency abnormality, PT disconnection, CT disconnection alarm, grounding alarm, overload alarm, zero-sequence overcurrent alarm, low-frequency load reduction action and specific protection action; the specific protection action includes overcurrent stage I action, overcurrent stage II action, overcurrent stage III action, zero-sequence stage I action and zero-sequence stage II action.

[0011] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method described in the present invention, the creation of a fault alarm work order and notifying offline professional operation and maintenance personnel to perform maintenance includes the following steps: if the equipment fault type is a device alarm or a device lockout, the equipment fault is determined to be an inverter fault, the corresponding equipment fault is assigned to the equipment maintenance personnel and a fault alarm work order is created, the equipment maintenance personnel checks the inverter status, determines whether the inverter is in normal operating state, and checks whether there are external factors causing the alarm. If the inverter has an obvious external fault, the equipment maintenance personnel performs corresponding maintenance; if the inverter does not have an obvious external fault, an attempt is made to restart the inverter to restore normal operation. If the restart is effective, the maintenance is terminated; if the restart is ineffective, the inverter manufacturer is contacted for technical support, and the problem is further diagnosed according to the fault code and inverter description; if the equipment fault type is line voltage alarm or frequency abnormality, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to the power engineer and a fault alarm work order is created. The power engineer checks the grid voltage or frequency to determine whether the grid voltage or frequency is within the normal range. If the grid voltage or frequency is not within the normal range, the grid operator is contacted for processing; the inverter input and output lines are checked to determine whether the connection line between the inverter and the grid is intact, whether there is any looseness or short circuit, and if there is any connection line, the grid operator is contacted for processing. If there is an abnormality, the corresponding maintenance is carried out, otherwise the maintenance is terminated; if the grid voltage or frequency is within the normal range, it is judged that the inverter parameters are improperly set, and the voltage or frequency parameters of the inverter are adjusted; if the equipment fault type is a PT disconnection alarm or a CT disconnection alarm, the equipment fault is determined to be a component failure, and the corresponding equipment fault is assigned to the power engineer and a fault alarm work order is created. The power engineer checks the PT / CT equipment to determine whether the voltage transformer PT or the current transformer CT is operating normally, and whether the wiring is loose or damaged. If there is an equipment fault in the voltage transformer PT or the current transformer CT, the damaged parts are replaced in time; if the voltage transformer PT or the current transformer CT is not If there is an equipment failure, re-check the equipment failure to further diagnose the problem; if the equipment failure type is a grounding alarm or an overload alarm, the equipment failure is determined to be a power failure, the corresponding equipment failure is assigned to a power engineer and a fault alarm work order is created. For the grounding alarm, check whether the grounding system of the photovoltaic power station is good, whether the grounding resistance is too large or the grounding wire is loose. If the grounding system is abnormal, the grounding resistance is too large or the grounding wire is loose, perform corresponding maintenance. Otherwise, re-check the equipment failure to further diagnose the problem; for the overload alarm, evaluate the current load situation, appropriately reduce the load or increase the inverter capacity to alleviate the overload;If the equipment fault type is a zero-sequence overcurrent alarm or a low-frequency load shedding action, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. For a zero-sequence overcurrent alarm, by checking whether there is an unbalanced load or fault in the power grid, if there is, the corresponding maintenance is performed, otherwise the equipment fault is re-checked to further diagnose the problem; for a low-frequency load shedding action, the grid-connected configuration of the photovoltaic power station is optimized to ensure stable operation when the grid frequency is abnormal; if the equipment fault type is a specific protection action, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer analyzes the cause of the fault that causes the protection action according to the specific type and fault code of the specific protection action, and investigates and handles the cause of the fault. After confirming that the corresponding equipment fault has been eliminated, the normal operation of the inverter and the photovoltaic power station is restored; when the operation and maintenance personnel receive the fault alarm, they record the fault information and enter the fault information into the historical fault information ledger. ;

[0012] As a preferred solution of the distributed photovoltaic power station equipment fault diagnosis and early warning method of the present invention, wherein: optimizing the fault handling strategy includes the following steps: obtaining the power generation data and the inverter data; storing the power generation data in a database; extracting the power generation data for a specified time period from the database, and comparing it with the power generation data of the same period last year, and calculating the year-on-year change rate of power generation; judging based on the year-on-year change rate, if the year-on-year change rate The first threshold value determines that there is no abnormality in the change of power generation, and there is no need to trigger the message notification function; if the year-on-year change rate If the first threshold is exceeded, it is determined that the power generation change is abnormal, and the system automatically triggers the message notification function to inform the operation and maintenance personnel of the warning information through email, SMS or application push, so that the operation and maintenance personnel can re-obtain the fault code of the inverter and create a fault alarm work order to handle the equipment fault; if the year-on-year change rate is If the value is still greater than the first threshold, the operation and maintenance personnel are notified to re-check the equipment failure, further diagnose the cause of the equipment failure and take corresponding maintenance measures.

[0013] On the second aspect, in order to further solve the safety problems existing in photovoltaic power generation, the present invention provides a distributed photovoltaic power station equipment fault diagnosis and early warning system in an embodiment, which includes: a fault diagnosis module, which is used to diagnose equipment faults according to the fault code and inverter description of the inverter, and obtain the equipment fault type; a fault handling module, which is used to prioritize and assign operation and maintenance personnel according to the equipment fault type, create a fault alarm work order, and handle the equipment fault based on the fault handling strategy; a fault early warning module, which is used to calculate and judge the year-on-year conversion rate based on the power generation data, so as to achieve equipment fault early warning and optimization of fault handling strategy.

[0014] In a third aspect, an embodiment of the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program is executed by the processor, any step of a distributed photovoltaic power station equipment fault diagnosis and early warning method as described in the first aspect of the present invention is implemented.

[0015] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, it implements any step of a distributed photovoltaic power station equipment fault diagnosis and early warning method as described in the first aspect of the present invention.

[0016] Beneficial effects of the present invention: By combining the inverter fault code and inverter description, the present invention can accurately diagnose the type of equipment fault, effectively improve the timeliness and accuracy of fault detection, reduce the need for manual inspections, and reduce operation and maintenance costs; through priority sorting, it ensures that important or urgent faults are handled in a timely manner, improves the efficiency of overall fault handling, and based on the personnel allocation mechanism of the fault type, improves the professionalism and efficiency of fault handling, and realizes the automation of fault handling; by introducing the year-on-year change rate as a judgment indicator, the closed-loop optimization of the fault handling strategy is realized, effectively improving the diagnosis and early warning capabilities of equipment faults. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them: Figure 1 This is an overall flow chart of a distributed photovoltaic power station equipment fault diagnosis and early warning method in Example 1.

[0018] Figure 2 This is a schematic diagram of the structure of the computer device in Example 3.

[0019] Figure 3 This is a schematic diagram showing the software effects in Example 4.

[0020] Figure 4 This is a schematic diagram of the main business in Example 4.

[0021] Figure 5 This is a schematic diagram of a page showing all management rights of a power station possessed by a user in Example 4.

[0022] Figure 6 Schematic diagram of the inverter forwarding table in Example 4.

[0023] Figure 7 This is a schematic diagram of the inverter configuration in Example 4. DETAILED DESCRIPTION

[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0025] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0026] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0027] Example 1 Reference Figure 1 , which is the first embodiment of the present invention, and provides a distributed photovoltaic power station equipment fault diagnosis and early warning method.

[0028] The existing methods for fault diagnosis and early warning of distributed photovoltaic power station equipment have the following main problems: first, the data collection and processing capabilities are limited, making it difficult to obtain and analyze massive amounts of equipment operation data in real time and comprehensively, which affects the accuracy and timeliness of fault diagnosis; second, the complexity and diversity of fault types make it difficult for traditional diagnostic models to effectively identify and classify them, especially for new types of faults and complex faults; in addition, existing fault handling strategies are often fixed and lack the ability to dynamically optimize according to actual conditions, resulting in low fault handling efficiency; finally, the early warning mechanism is not intelligent enough, making it difficult to make accurate fault predictions based on historical data and current status, thus missing the best time for maintenance.

[0029] The present application provides an effective solution to the above-mentioned problems. Next, a plurality of embodiments will be combined to explain in detail how to implement the distributed photovoltaic power station equipment fault diagnosis and early warning method.

[0030] Figure 1 The overall flow chart of a distributed photovoltaic power station equipment fault diagnosis and early warning method is shown, including: S1: Obtain inverter data and perform equipment fault diagnosis to obtain the equipment fault type.

[0031] Preferably, obtaining the inverter data refers to collecting the inverter data by means of prefabricated cabin data docking, and obtaining the fault code and inverter description pushed by the inverter.

[0032] Specifically, equipment failure types include device alarm, device lockout, line voltage alarm, frequency anomaly, PT line break, CT line break alarm, grounding alarm, overload alarm, zero-sequence overcurrent alarm, low-frequency load reduction action and specific protection action.

[0033] Furthermore, the specific protection actions include overcurrent stage I action, overcurrent stage II action, overcurrent stage III action, zero sequence stage I action and zero sequence stage II action.

[0034] Specifically, equipment fault diagnosis includes the following steps: using the inverter to monitor the distributed photovoltaic power station equipment, when receiving abnormal data, the inverter generates a fault code and pushes it, wherein the inverter obtains data from the equipment level, including power generation, power generation, DC voltage, DC current, AC voltage, AC current and power.

[0035] Build a virtual collector, set the collector to connect to the inverter list, and obtain the fault code.

[0036] Perform equipment fault diagnosis based on the fault code and inverter description to obtain the corresponding equipment fault type.

[0037] It should be noted that the inverter itself has a fault diagnosis function, which can perform fault diagnosis on the collected distributed photovoltaic power station equipment data and generate a corresponding fault code according to the type of abnormal data received. The present invention obtains the fault code and combines it with the inverter description provided by the inverter manufacturer to obtain the corresponding equipment fault type, so as to perform subsequent processing measures. For example, if the fault code pushed by the inverter is 151, it can be judged according to the content in the inverter description that the equipment fault type is PV2 lightning arrester abnormality (PV2-SPD Fault), and corresponding maintenance measures are taken.

[0038] It should be noted that, depending on the type of inverter, the corresponding fault code and inverter description will also be different. The inverter used in the present invention can identify multiple equipment faults, such as device alarm, device lockout, total accident, TWJ abnormality, line voltage alarm, frequency abnormality, PT line break, control circuit line break, grounding alarm, overload alarm, zero-sequence overcurrent alarm, spring no energy storage, CT line break alarm, remote control low-voltage load reduction, lockout reclosing, low-frequency load reduction, spring no energy storage, signal reset, device maintenance, GPS out of step, reclosing charging, tripping holding signal, closing holding signal, reclosing action, overcurrent stage I action, overcurrent stage II action, overcurrent stage III action, PT line break phase overcurrent action, zero-sequence stage I action, zero-sequence stage II action, overcurrent acceleration action, zero-sequence acceleration action, low-frequency load reduction action, low-voltage load reduction protection action, whole group start-up, circuit breaker position, circuit breaker The present invention can identify different fault types and implement different maintenance measures according to different fault codes, and the fault diagnosis and early warning proposed by the present invention also need to be adjusted and improved according to the types and functions of the inverter, so as to achieve more comprehensive and accurate equipment fault diagnosis and early warning.

[0039] Preferably, the present invention collects inverter data through prefabricated cabin data docking, which not only improves the efficiency of data collection, but also enhances the scalability of the system, allowing the system to flexibly adapt to photovoltaic power stations of different sizes, and solves the limitations of traditional data collection methods in large-scale distributed systems; the use of fault codes simplifies the fault diagnosis process, improves the accuracy and efficiency of diagnosis, helps to quickly locate problems, and reduces human judgment errors, which is particularly important for the management of large-scale distributed systems.

[0040] S2: Create a fault alarm work order based on the equipment fault type, formulate a fault handling strategy, and handle the equipment fault.

[0041] Preferably, creating a fault alarm work order, formulating a fault handling strategy, and handling the equipment fault include the following steps: when receiving the equipment fault type, prioritizing the equipment fault.

[0042] Assign operation and maintenance personnel to equipment failures based on the type of equipment failure.

[0043] Create fault alarm work orders based on priority sorting and operation and maintenance personnel allocation, and notify offline professional operation and maintenance personnel to perform maintenance.

[0044] Specifically, the priority sorting includes: when receiving the device fault type, determining the quantity of the device fault type; if the quantity of the device fault type received at the same time is 1, no priority sorting is required.

[0045] If the number of equipment fault types received at the same time is greater than 1, the fault rate is calculated based on the equipment fault type by obtaining the number of faults counted in the historical fault information ledger. The calculation formula for the fault rate is as follows: , in, For the Failure rate of each equipment failure type; The first Number of failures of each equipment failure type; It is the total number of faults counted in the historical fault information ledger.

[0046] Based on the equipment failure type and failure rate, the judgment is made, and the equipment failure type with a higher failure rate is set with a higher priority and processed first, in order from high to low failure rates.

[0047] Specifically, the allocation of operation and maintenance personnel refers to analyzing the equipment failure type based on the historical fault information ledger, determining whether the equipment failure type is a power failure, mechanical failure, component failure or inverter failure, and then allocating them to the corresponding operation and maintenance personnel.

[0048] It should be noted that the allocation of operation and maintenance personnel needs to be adjusted and adapted according to the actual personnel configuration and needs. The power failure, mechanical failure, component failure and inverter failure proposed in the present invention need to be adjusted according to the actual environment, and the subsequent allocation to the corresponding operation and maintenance personnel can also be combined with the actual operation and maintenance personnel. Other types of allocation methods may be adopted. For example, based on the professional background and work experience of the operation and maintenance personnel, work orders may be assigned to the personnel who are best at handling this type of failure, or maintenance tasks may be allocated on the basis of balancing the workload of different operation and maintenance personnel to ensure that work orders can be processed in a timely manner and will not cause excessive fatigue to personnel, thereby allocating different equipment failures to the most suitable operation and maintenance personnel to reduce the losses caused by equipment failures.

[0049] Specifically, creating a fault alarm work order and notifying offline professional operation and maintenance personnel to perform maintenance includes the following steps: If the equipment fault type is device alarm or device lockout, the equipment fault is determined to be an inverter fault, and the corresponding equipment fault is assigned to the equipment maintenance personnel and a fault alarm work order is created. The equipment maintenance personnel first checks the inverter status to determine whether the inverter is in normal operating condition and whether there are external factors causing the alarm, including overload or overheating. If the inverter has obvious external faults, the equipment maintenance personnel will perform corresponding maintenance.

[0050] If there is no obvious external fault of the inverter, try to restart the inverter to restore normal operation. If the restart is effective, the maintenance is completed.

[0051] If restarting does not work, contact the inverter manufacturer for technical support and further diagnose the problem based on the fault code and inverter instructions.

[0052] If the equipment fault type is line voltage alarm or frequency abnormality, the equipment fault is determined to be a power fault, the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer checks the grid voltage or frequency to determine whether the grid voltage or frequency is within the normal range. If the grid voltage or frequency is not within the normal range, the grid operator is contacted for processing.

[0053] Check the input and output lines of the inverter to determine whether the connection lines between the inverter and the grid are intact, loose or short-circuited. If there are any abnormalities in the connection lines, perform corresponding maintenance, otherwise terminate the maintenance.

[0054] If the grid voltage or frequency is within the normal range, it is determined that the inverter parameters are improperly set, and the voltage or frequency parameters of the inverter are adjusted.

[0055] If the equipment fault type is a PT disconnection alarm or a CT disconnection alarm, the equipment fault is determined to be a component fault, the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer inspects the PT / CT equipment to determine whether the voltage transformer PT or current transformer CT is operating normally and whether the wiring is loose or damaged. If there is an equipment fault in the voltage transformer PT or current transformer CT, the damaged parts are replaced in time.

[0056] If there is no equipment fault in the voltage transformer PT or the current transformer CT, re-check the equipment fault to further diagnose the problem.

[0057] If the equipment fault type is a grounding alarm or an overload alarm, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. For the grounding alarm, check whether the grounding system of the photovoltaic power station is in good condition, whether the grounding resistance is too large or the grounding wire is loose. If the grounding system is abnormal, the grounding resistance is too large or the grounding wire is loose, perform corresponding maintenance. Otherwise, re-check the equipment fault and further diagnose the problem.

[0058] For overload alarm, the overload can be alleviated by evaluating the current load situation and appropriately reducing the load or increasing the inverter capacity.

[0059] If the equipment fault type is a zero-sequence overcurrent alarm or a low-frequency load reduction action, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. For the zero-sequence overcurrent alarm, since the zero-sequence overcurrent may be related to the unbalanced current in the power grid, check whether there is an unbalanced load or fault in the power grid. If so, perform corresponding maintenance. Otherwise, re-check the equipment fault and further diagnose the problem.

[0060] For low-cycle load shedding actions, since low-cycle load shedding actions may be caused by too low grid frequency, the grid-connected configuration of the photovoltaic power station is optimized to ensure stable operation when the grid frequency is abnormal.

[0061] If the equipment fault type is a specific protection action, i.e., overcurrent stage I action, overcurrent stage II action, overcurrent stage III action, zero-sequence stage I action or zero-sequence stage II action, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer analyzes the cause of the fault that leads to the protection action based on the specific type and fault code of the specific protection action, and investigates and handles the cause of the fault, such as clearing the short circuit fault or replacing damaged components. After confirming that the corresponding equipment fault has been eliminated, the normal operation of the inverter and photovoltaic power station is restored.

[0062] When the operation and maintenance personnel receive a fault alarm, they record the fault information, including the fault code, alarm time and alarm content, and enter the fault information into the historical fault information ledger to enrich the fault register.

[0063] Preferably, by introducing the failure rate calculation, a dynamic priority sorting mechanism based on historical data can more accurately reflect the importance and urgency of the failure, significantly improve the processing efficiency in the case of multiple concurrent failures, reduce system downtime, and thus improve the overall power generation efficiency of the photovoltaic power station; by subdividing the fault types and the corresponding operation and maintenance personnel allocation mechanism, it is ensured that each fault is handled by the most appropriate professional, which not only improves the maintenance efficiency but also reduces the risk of misoperation.

[0064] S3: Analyze the power generation data and inverter data, optimize the fault handling strategy, and implement equipment fault diagnosis and early warning.

[0065] Preferably, optimizing the fault handling strategy includes the following steps: acquiring power generation data and inverter data based on an inverter, an electric meter or other data acquisition equipment of the power station.

[0066] The power generation data is stored in a database, wherein the database supports the storage of time series data, and thus the data can be retrieved according to the time dimension.

[0067] The power generation data of the specified time period is extracted from the database and compared with the power generation data of the same period last year to calculate the year-on-year change rate of power generation. The calculation formula of the year-on-year change rate is as follows: , in, is the year-on-year change rate; is the electricity generated in this period; This is the electricity generation in the same period last year.

[0068] Based on the year-on-year change rate, if the year-on-year change rate If the first threshold is exceeded, it is determined that there is no abnormality in the change of power generation and there is no need to trigger the message notification function.

[0069] If the year-on-year change rate If the first threshold is exceeded, it is determined that the power generation change is abnormal, and the system automatically triggers the message notification function, and informs the operation and maintenance personnel of the warning information through email, SMS or application push, so as to realize the distributed photovoltaic power station equipment failure warning, enable the operation and maintenance personnel to re-obtain the inverter fault code and create a fault alarm work order to handle the equipment failure.

[0070] If the equipment failure is handled, the year-on-year change rate If the value is still greater than the first threshold, the operation and maintenance personnel are notified to re-check the equipment failure, further diagnose the cause of the equipment failure and take corresponding maintenance measures.

[0071] Preferably, by introducing the year-on-year change rate as an early warning indicator, the impact of seasonal factors on power generation is taken into account, thereby improving the accuracy of the early warning; by setting thresholds to trigger early warnings, the system can detect potential problems in a timely manner before failures lead to a significant drop in power generation, which is of great significance for preventive maintenance and improving system reliability; by using a database that supports time series data storage, it provides a basis for long-term data analysis and trend prediction, playing an important role in the long-term optimization and predictive maintenance of the system.

[0072] In summary, the present invention can accurately diagnose the type of equipment fault by combining the inverter fault code and inverter description, effectively improving the timeliness and accuracy of fault detection, reducing the need for manual inspections, and reducing operation and maintenance costs; through priority sorting, it ensures that important or urgent faults are handled in a timely manner, improves the efficiency of overall fault handling, and based on the personnel allocation mechanism of fault type, improves the professionalism and efficiency of fault handling, and realizes the automation of fault handling; by introducing the year-on-year change rate as a judgment indicator, the closed-loop optimization of the fault handling strategy is realized, effectively improving the diagnosis and early warning capabilities of equipment faults.

[0073] Embodiment 2 is an embodiment of the present invention, which provides a distributed photovoltaic power station equipment fault diagnosis and early warning system, including: a fault diagnosis module, which is used to diagnose equipment faults according to the fault code and inverter description of the inverter to obtain the equipment fault type; a fault handling module, which is used to prioritize and assign operation and maintenance personnel according to the equipment fault type, create a fault alarm work order, and handle the equipment fault based on the fault handling strategy; a fault early warning module, which is used to calculate and judge the year-on-year conversion rate based on the power generation data, so as to achieve equipment fault early warning and optimization of fault handling strategy.

[0074] Embodiment 3 is an embodiment of the present invention, which is different from the previous embodiment in that: like Figure 2 As shown, if the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0075] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0076] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0077] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0078] Example 4 is an embodiment of the present invention, which provides a distributed photovoltaic power station equipment fault diagnosis and early warning method. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.

[0079] like Figure 3The figure shows the software effect display diagram. This example collects photovoltaic power generation data from the existing data prefabricated warehouse. The protocol adopts 104 power protocol to realize data collection of terminal equipment such as combiner boxes, inverters, distribution cabinets and environmental meteorological instruments. It also uses the photovoltaic power station cloud data center to provide users with professional photovoltaic monitoring, data processing analysis and configuration display, which perfectly solves the management problems of photovoltaic power stations for users. At the same time, the system is connected to video monitoring, relay protection monitoring, power remote dispatching and other functions to realize power system fault warning and intelligent control. Figure 4 shown.

[0080] like Figure 5 The following is a schematic diagram of the page with all management rights of the power station that the user has. Based on the collected inverter data, the user can view the details of the specific power station by displaying the operating status, power generation overview, alarm center and power station list on the page with all management rights of the power station that the user has. The inverter forwarding table is as follows Figure 6 As shown, including the inverter fault code and inverter description.

[0081] Based on the acquired fault code and inverter description, the system obtains the corresponding equipment fault type and automatically creates a fault alarm work order. At the same time, the power station operation and maintenance personnel need to check the alarm information every day and pay attention to the operation of the equipment. Figure 7 The figure shows the setting diagram of the inverter. From the figure, we can see the name of the power station where the inverter is located and the relevant data collected, which provides a data basis for subsequent maintenance and early warning.

[0082] Finally, based on the acquired equipment failure type and the relevant data collected by the inverter, a fault alarm work order is created and the equipment failure task is assigned to the corresponding operation and maintenance personnel, thereby performing equipment fault diagnosis and early warning for distributed photovoltaic power stations, realizing automated fault handling, and reducing the need for manual inspections.

[0083] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A distributed photovoltaic power station equipment fault diagnosis and early warning method, characterized by: include: Obtain inverter data and perform equipment fault diagnosis to obtain the equipment fault type; Create a fault alarm work order based on the equipment fault type, formulate a fault handling strategy, and handle the equipment fault; Based on the analysis of the power generation data and the inverter data, the fault handling strategy is optimized to achieve equipment fault diagnosis and early warning.

2. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 1, characterized in that: The device fault diagnosis comprises the following steps: Use the inverter to monitor the distributed photovoltaic power station equipment. When receiving abnormal data, the inverter generates a fault code and pushes it; Construct a virtual collector, set the collector to connect to the inverter list, and obtain the fault code; The device fault diagnosis is performed based on the fault code and the inverter description to obtain the corresponding device fault type.

3. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 2, characterized in that: The creation of a fault alarm work order, formulation of a fault handling strategy, and handling of equipment faults include the following steps: When receiving the device fault type, prioritizing the device fault; Allocating operation and maintenance personnel to the equipment failure based on the equipment failure type; A fault alarm work order is created based on the priority sorting and the operation and maintenance personnel allocation, and offline professional operation and maintenance personnel are notified to perform maintenance.

4. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 3, characterized in that: The prioritization process includes: When the device fault type is received, the number of the device fault types is determined. If the number of the device fault types received at the same time is 1, no priority sorting is required; If the number of equipment failure types received at the same time is greater than 1, the failure rate is calculated based on the equipment failure type by obtaining the number of failures counted in the historical failure information ledger; A judgment is made based on the equipment failure type and the failure rate, and in descending order of the failure rate, a higher priority is set for the equipment failure type with a higher failure rate and the device failure type with a higher failure rate is processed preferentially.

5. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 4, characterized in that: The allocation of operation and maintenance personnel refers to analyzing the equipment failure type based on the historical fault information ledger, determining whether the equipment failure type is a power failure, a mechanical failure, a component failure or an inverter failure, and then allocating the equipment to the corresponding operation and maintenance personnel; Acquiring inverter data refers to collecting inverter data by means of prefabricated cabin data docking to obtain the fault code and inverter description pushed by the inverter; The equipment fault types include device alarm, device lockout, line voltage alarm, frequency anomaly, PT disconnection, CT disconnection alarm, grounding alarm, overload alarm, zero-sequence overcurrent alarm, low-frequency load reduction action and specific protection action; The specific protection actions include overcurrent stage I action, overcurrent stage II action, overcurrent stage III action, zero sequence stage I action and zero sequence stage II action.

6. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 5, characterized in that: The creation of a fault alarm work order and notification of offline professional operation and maintenance personnel to perform maintenance includes the following steps: If the equipment fault type is device alarm or device lockout, the equipment fault is determined to be an inverter fault, the corresponding equipment fault is assigned to the equipment maintenance personnel and a fault alarm work order is created. The equipment maintenance personnel checks the inverter status, determines whether the inverter is in normal operation, and checks whether there are external factors causing the alarm. If the inverter has an obvious external fault, the equipment maintenance personnel performs corresponding maintenance; If there is no obvious external fault in the inverter, try to restart the inverter to restore normal operation. If the restart is effective, the maintenance is ended; If restarting does not work, contact the inverter manufacturer for technical support and further diagnose the problem based on the fault code and inverter instructions; If the equipment fault type is line voltage alarm or frequency abnormality, the equipment fault is determined to be a power fault, the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer checks the grid voltage or frequency to determine whether the grid voltage or frequency is within the normal range. If the grid voltage or frequency is not within the normal range, the grid operator is contacted for processing; Check the input and output lines of the inverter to determine whether the connection lines between the inverter and the grid are intact and whether there is any looseness or short circuit. If there is any abnormality in the connection lines, perform corresponding maintenance, otherwise terminate the maintenance; If the grid voltage or frequency is within the normal range, it is judged that the inverter parameters are improperly set, and the voltage or frequency parameters of the inverter are adjusted; If the equipment fault type is a PT disconnection alarm or a CT disconnection alarm, the equipment fault is determined to be a component fault, the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created, the power engineer inspects the PT / CT equipment to determine whether the voltage transformer PT or current transformer CT is operating normally, and whether the wiring is loose or damaged. If there is an equipment fault in the voltage transformer PT or current transformer CT, the damaged parts are replaced in time; If there is no equipment fault in the voltage transformer PT or current transformer CT, re-check the equipment fault to further diagnose the problem; If the equipment fault type is a grounding alarm or an overload alarm, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. For the grounding alarm, check whether the grounding system of the photovoltaic power station is in good condition, whether the grounding resistance is too large or the grounding wire is loose. If the grounding system is abnormal, the grounding resistance is too large or the grounding wire is loose, perform corresponding maintenance. Otherwise, re-check the equipment fault and further diagnose the problem. For overload alarm, the overload can be alleviated by evaluating the current load situation and appropriately reducing the load or increasing the inverter capacity; If the equipment fault type is a zero-sequence overcurrent alarm or a low-frequency load shedding action, the equipment fault is determined to be a power fault, and the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. For a zero-sequence overcurrent alarm, check whether there is an unbalanced load or fault in the power grid. If so, perform corresponding maintenance. Otherwise, re-check the equipment fault and further diagnose the problem. For low-frequency load shedding, the grid-connected configuration of the photovoltaic power station is optimized to ensure stable operation when the grid frequency is abnormal; If the equipment fault type is a specific protection action, the equipment fault is determined to be a power fault, the corresponding equipment fault is assigned to a power engineer and a fault alarm work order is created. The power engineer analyzes the fault cause that leads to the protection action according to the specific type and fault code of the specific protection action, and investigates and handles the fault cause. After confirming that the corresponding equipment fault has been eliminated, the normal operation of the inverter and photovoltaic power station is restored; When the operation and maintenance personnel receive the fault alarm, they record the fault information and enter the fault information into the historical fault information ledger.

7. The distributed photovoltaic power station equipment fault diagnosis and early warning method according to claim 6, characterized in that: Optimizing the fault handling strategy includes the following steps: Acquiring the power generation data and the inverter data; storing the power generation data in a database; Extracting power generation data for a specified time period from the database, and comparing it with the power generation data for the same period last year, to calculate the year-on-year change rate of power generation; Based on the year-on-year change rate, if the year-on-year change rate If the first threshold is exceeded, it is determined that there is no abnormality in the change of power generation, and there is no need to trigger the message notification function; If the year-on-year change rate If the first threshold is exceeded, it is determined that the power generation change is abnormal, and the system automatically triggers the message notification function to inform the operation and maintenance personnel of the warning information through email, SMS or application push, so that the operation and maintenance personnel can re-obtain the fault code of the inverter and create a fault alarm work order to handle the equipment fault; If the equipment failure is handled, the year-on-year change rate If the value is still greater than the first threshold, the operation and maintenance personnel are notified to re-check the equipment failure, further diagnose the cause of the equipment failure and take corresponding maintenance measures.

8. A distributed photovoltaic power station equipment fault diagnosis and early warning system, based on a distributed photovoltaic power station equipment fault diagnosis and early warning method according to any one of claims 1 to 7, characterized in that: include, A fault diagnosis module is used to diagnose equipment faults according to the fault code and description of the inverter to obtain the equipment fault type; The fault handling module is used to prioritize and assign maintenance personnel according to the equipment fault type, create fault alarm work orders, and handle equipment faults based on the fault handling strategy; The fault warning module is used to calculate the year-on-year conversion rate based on the power generation data and make judgments to achieve equipment fault warning and optimization of fault handling strategies.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of a distributed photovoltaic power station equipment fault diagnosis and early warning method as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of a distributed photovoltaic power station equipment fault diagnosis and early warning method as described in any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Data acquisition control method and system for photovoltaic module power generation system

    CN119276017A

  • Old power station electric quantity real-time monitoring, optimizing and adjusting system based on large model analysis

    CN120710228A