Power distribution network adequacy assessment method considering photovoltaic power generation
By obtaining historical load data, classifying users and calculating photovoltaic output correlation in the distribution network, the impact of photovoltaic power generation on the distribution network margin assessment is solved, the evaluation accuracy is improved, and better for distribution network decision-making in accordance with.
Patent Information
- Application Number
- CN202411111966.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-22
AI Technical Summary
It is difficult to accurately consider the randomness and dispersion of photovoltaic power generation in the existing distribution network margin assessment, resulting in large evaluation errors and increasing the difficulty of evaluation.
By obtaining historical load data of different users in the distribution network, classifying users and forming target areas, calculating the photovoltaic output correlation between each target area, correcting the power supply margin, and then evaluating the overall power supply margin of the distribution network.
It improves the accuracy of distribution network margin assessment, can better consider the impact of photovoltaic power generation, and provides a better reference for distribution network planning and decision-making.
Smart Images

Figure CN119010181A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network elasticity assessment, and in particular to a distribution network adequacy assessment method taking photovoltaic power generation into account. Background Art
[0002] Distribution network adequacy assessment is the process of evaluating whether the power supply capacity can meet the demand under specific time, space or conditions. It has important reference significance for the planning and decision-making of the distribution network.
[0003] Traditional distribution network adequacy assessment usually evaluates the maximum power supply capacity including backup through loss of load probability (LOLP) and loss of load expectation (LOLE). However, with the increasing penetration of renewable energy in the distribution network, distributed energy represented by solar energy is being incorporated into the distribution network on a large scale, bringing more challenges to the reliable operation of the distribution network. At this time, the adequacy assessment of the distribution network should not only consider load changes, unit shutdowns and line disconnections, but also the output characteristics of distributed energy. Photovoltaic power generation has the characteristics of randomness and dispersion, which leads to large output errors and increases the difficulty of distribution network adequacy assessment.
[0004] Therefore, considering the large-scale photovoltaic power generation connected to the distribution network, how to more accurately evaluate the adequacy of the distribution network is of great significance. Summary of the invention
[0005] The embodiments of the present invention provide a method and device for evaluating the adequacy of a distribution network taking photovoltaic power generation into account, so as to solve the problem that it is currently difficult to accurately measure the impact of photovoltaic power generation access on the adequacy evaluation of the distribution network.
[0006] In a first aspect, an embodiment of the present invention provides a method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account, comprising:
[0007] Obtain historical load data of different users in the distribution network;
[0008] Classifying different users in the distribution network according to the historical load data of each user, and recording the area where each type of user is located as a target area in the distribution network;
[0009] Obtaining photovoltaic output correlation between each of the target areas;
[0010] The overall power supply margin of the distribution network is evaluated according to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas.
[0011] In a possible implementation, classifying different users in the distribution network according to the historical load data of each user includes:
[0012] Calculating the load correlation between users in the distribution network based on the historical load data of each user;
[0013] Different users in the distribution network are classified according to the respective load associations.
[0014] In a possible implementation, different users in the distribution network are classified according to the load associations, including:
[0015] Clustering is performed according to the association of each load to obtain an initial classification result for classifying different users in the distribution network;
[0016] Determining whether each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station;
[0017] If each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station, the initial classification result is used as the final classification result;
[0018] If there is a user in the initial classification result that does not belong to the same distribution transformer and the same photovoltaic power station as other users, then the user is recorded as a suspected user;
[0019] For each of the suspected users, the final classification result of the suspected user is re-determined according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
[0020] In a possible implementation, re-determining the final classification result of the suspected user according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs includes:
[0021] Determining a suspected classification of the suspected user from the initial classification result according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs;
[0022] The final classification result of the suspected user is determined according to the distance between the load correlation corresponding to the suspected user and the cluster center of each suspected classification.
[0023] In a possible implementation, obtaining the photovoltaic output correlation between the target areas includes:
[0024] For each of the target areas, according to the photovoltaic output of each photovoltaic power station included in the target area, a correlation coefficient between the photovoltaic outputs of the photovoltaic power stations included in the target area is calculated, recorded as a first correlation coefficient;
[0025] Classifying each photovoltaic power station included in each of the target areas according to the first correlation coefficient;
[0026] According to the photovoltaic output of each type of photovoltaic power station included in each of the target areas, a correlation coefficient between the photovoltaic output of each type of photovoltaic power station included in the current target area and the photovoltaic output of each type of photovoltaic power station included in other target areas is calculated, recorded as a second correlation coefficient;
[0027] The photovoltaic output correlation between the target areas is obtained according to the second correlation coefficients.
[0028] In a possible implementation, evaluating the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas includes:
[0029] Calculating a correction value of the power supply margin corresponding to each of the target areas according to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas;
[0030] The overall power supply margin of the distribution network is evaluated according to the correction value of the power supply margin corresponding to each target area.
[0031] In a possible implementation, calculating a correction value of the power supply margin corresponding to each target area according to the photovoltaic output correlation and the power supply margin corresponding to each target area includes:
[0032] according to Calculating a correction value of the power supply margin corresponding to each of the target areas;
[0033] Among them, Ei′ is the correction value of the power supply margin corresponding to the i-th target area, Ei is the power supply margin corresponding to the i-th target area, Rij is the photovoltaic output correlation between the i-th target area and the j-th target area, J is the set of target areas in the distribution network except the i-th target area, and N is the number of target areas in the distribution network.
[0034] In a possible implementation, the distribution network adequacy assessment method taking photovoltaic power generation into account further includes:
[0035] Based on the distribution network topology, according to the distribution locations of the photovoltaic power stations in the distribution network, the photovoltaic power station penetration rate corresponding to each of the target areas is obtained;
[0036] According to the correction value of the power supply margin corresponding to each of the target areas, the overall power supply margin of the distribution network is evaluated, including:
[0037] The overall power supply margin of the distribution network is evaluated according to the correction value of the power supply margin corresponding to each target area and the photovoltaic power station penetration rate corresponding to each target area.
[0038] In a possible implementation, based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the photovoltaic power station penetration rate corresponding to each target area includes:
[0039] Based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, the total power generation power of each photovoltaic power station included in the target area is obtained;
[0040] The photovoltaic power station penetration rate corresponding to each target area is obtained according to each of the total generated power and the total load power of the corresponding target area.
[0041] In a possible implementation, based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the photovoltaic power station penetration rate corresponding to each target area includes:
[0042] Based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the total rated capacity of the photovoltaic power stations included in each of the target areas;
[0043] The photovoltaic power station penetration rate corresponding to each target area is obtained according to each total rated capacity and the total rated capacity of the distribution transformers included in the corresponding target area.
[0044] The embodiment of the present invention provides a distribution network adequacy assessment method taking photovoltaic power generation into account, by first obtaining historical load data of different users in the distribution network, classifying different users in the distribution network according to the historical load data of each user, and recording the area where each type of user is located as a target area in the distribution network, and then obtaining the photovoltaic output correlation between the target areas, and then evaluating the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each target area, so that on the basis of the fine-grained power supply margin corresponding to each target area, the influence of the photovoltaic output correlation between different target areas is considered, and then the overall power supply margin of the distribution network is more accurately evaluated in combination with the photovoltaic output and the differences of various types of users at the distribution network end, providing a good reference basis for the planning and decision-making of the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 is a flow chart of an implementation method of a distribution network adequacy assessment method taking photovoltaic power generation into account provided by an embodiment of the present invention;
[0047] Figure 2 It is a structural schematic diagram of a distribution network adequacy assessment device taking photovoltaic power generation into account provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0049] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0050] Figure 1 The implementation flow chart of the distribution network adequacy assessment method taking photovoltaic power generation into account provided by the embodiment of the present invention is detailed as follows:
[0051] Step 101, obtaining historical load data of different users in the distribution network.
[0052] The distribution network refers to the power grid that receives electricity from the transmission network or regional power plants and distributes it locally or step by step according to voltage to various users through distribution facilities. With the advancement of the construction of active distribution networks, the penetration rate of renewable energy represented by photovoltaics in the distribution network continues to increase, which has an impact on the assessment of the adequacy of the distribution network.
[0053] In order to more accurately evaluate the adequacy of the distribution network, considering that the different locations of photovoltaic power stations in the distribution network have different impacts on the evaluation of the adequacy of the distribution network, the historical load data of different users in the distribution network within a certain period of time are first obtained, so as to classify the users in the distribution network according to the historical load data of each user in the distribution network, and then divide the distribution network into regions according to the categories of users in the distribution network, and record the area where each type of user is located as a target area in the distribution network, so as to subsequently evaluate the power supply adequacy of each target area in a fine-grained manner.
[0054] Step 102: Classify different users in the distribution network according to the historical load data of each user, and record the area where each type of user is located as a target area in the distribution network.
[0055] Optionally, classifying different users in the distribution network according to each user's historical load data may include: calculating the load correlation between each user in the distribution network according to each user's historical load data; and classifying different users in the distribution network according to each load correlation.
[0056] In this embodiment, in order to facilitate the subsequent fine-grained evaluation of the power supply adequacy of different areas in the distribution network, each user in the distribution network is first classified.
[0057] Among them, users in the distribution network can generally be divided into three categories: industrial users, commercial users, and residential users. Each category can also be subdivided into more subcategories according to the power consumption pattern. For example, industrial users can be divided into chemical users, electrical and electronic users, mechanical manufacturing users, etc. according to the power consumption pattern. Among them, the power consumption patterns of different users can be characterized by load correlation. Therefore, based on the historical load data of each user, the load correlation between each user in the distribution network can be calculated, and then different users in the distribution network can be classified according to the load correlation between each user.
[0058] Exemplarily, the load correlation between the users in the distribution network may be obtained by calculating the correlation coefficient between the historical load data of each user, such as the Pearson correlation coefficient, which is not limited in this embodiment.
[0059] Exemplarily, classifying different users in the distribution network according to the relevance of each load may include:
[0060] Clustering is performed according to the correlation of each load to obtain the initial classification results for different users in the distribution network.
[0061] Determine whether each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station.
[0062] If each user in the initial classification result belongs to the same distribution transformer and / or the same PV power station, the initial classification result is taken as the final classification result.
[0063] If there is a user in the initial classification result who does not belong to the same distribution transformer and the same photovoltaic power station as other users, the user will be recorded as a suspected user.
[0064] For each suspected user, the final classification result of the suspected user is re-determined according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
[0065] In this embodiment, in order to facilitate quantification of the impact of photovoltaic power stations in different regions on the power supply adequacy, when dividing the distribution network into multiple target areas, in addition to considering the power consumption patterns of users in the area, it is also considered whether the users in the area belong to the same distribution transformer and / or the same photovoltaic power station. Therefore, after clustering according to the correlation of each load and obtaining the initial classification results for classifying different users in the distribution network, it is also determined whether each user in the initial classification results belongs to the same distribution transformer and / or the same photovoltaic power station. If each user in the initial classification results belongs to the same distribution transformer and / or the same photovoltaic power station, it means that the initial classification results are relatively accurate and reasonable, and the initial classification results can be directly used as the final classification results. If there is a user in the initial classification results who does not belong to the same distribution transformer as other users, and the user does not belong to the same photovoltaic power station as other users, it means that the classification of the user in the initial classification results is questionable, and the user can be recorded as a suspected user, so that each suspected user can be reclassified later.
[0066] Exemplarily, when reclassifying each suspected user, the final classification result of the suspected user may be re-determined according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
[0067] Optionally, re-determining the final classification result of the suspected user according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs may include:
[0068] The suspected classification of the suspected user is determined from the initial classification result according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
[0069] The final classification result of the suspected user is determined according to the distance between the load correlation corresponding to the suspected user and the cluster center of each suspected classification.
[0070] In this embodiment, considering that the same transformer or the same photovoltaic power station may contain multiple users of different categories, multiple classification results may be obtained by directly determining the category to which the suspected user belongs based on the distribution transformer to which the suspected user belongs or the photovoltaic power station to which the suspected user belongs. Therefore, on this basis, the multiple classification results obtained are used as the suspected categories of the suspected user, and further based on the distance between the load association of the suspected user and the cluster center of each suspected category, the suspected category with the closest distance is determined as the final classification result of the suspected user, thereby accurately classifying each user in the distribution network, and then accurately determining the target area corresponding to each category of users.
[0071] Step 103: Obtain the photovoltaic output correlation between each target area.
[0072] In this embodiment, on the basis of a fine-grained assessment of the power supply margin corresponding to each target area, the impact of photovoltaic power generation on the margin of the distribution network is considered, and the photovoltaic output correlation between each target area in the distribution network is obtained, and the photovoltaic output correlation between different target areas in the distribution network is combined to measure the degree of influence between the power supply margins of different target areas.
[0073] It is understandable that if the photovoltaic output correlation between the two target areas is greater, the influence between the power supply margins of the two target areas is also greater. Conversely, if the photovoltaic output correlation between the two target areas is smaller, the influence between the power supply margins of the two target areas is also smaller.
[0074] Optionally, obtaining the photovoltaic output correlation between each target area may include:
[0075] For each target area, according to the photovoltaic output of each photovoltaic power station included in the target area, a correlation coefficient between the photovoltaic outputs of each photovoltaic power station included in the target area is calculated, which is recorded as a first correlation coefficient.
[0076] The photovoltaic power plants included in each target area are classified according to the first correlation coefficient.
[0077] According to the photovoltaic output of each type of photovoltaic power station included in each target area, the correlation coefficient between the photovoltaic output of each type of photovoltaic power station included in the current target area and the photovoltaic output of each type of photovoltaic power station included in other target areas is calculated, which is recorded as the second correlation coefficient.
[0078] The photovoltaic output correlation between the target areas is obtained according to the second correlation coefficients.
[0079] In this embodiment, considering that each target area may include one, two or more photovoltaic power stations, and different photovoltaic power stations may exhibit different output characteristics due to different locations, different equipment characteristics, etc., when measuring the influence between the power supply margins of the two target areas according to the photovoltaic output correlation between the two target areas, the correlation coefficient between the photovoltaic outputs of each photovoltaic power station included in the target area can be calculated to classify the photovoltaic power stations in the target area. On this basis, when calculating the photovoltaic output correlation between the two target areas, the calculation is performed based on the photovoltaic output of each type of photovoltaic power station in each target area.
[0080] For example, if there are five photovoltaic power stations A, B, C, D, and E in target area 1, by calculating the correlation coefficients of the photovoltaic outputs of photovoltaic power stations AB, BC, CD, etc., it is determined that photovoltaic power stations A and B belong to the first category (recorded as the first category photovoltaic power station in target area 1), and photovoltaic power stations C, D, and E belong to the first category (recorded as the second category photovoltaic power station in the target area). And there are three photovoltaic power stations F, G, and H in target area 2. By calculating the correlation coefficients of the photovoltaic outputs of photovoltaic power stations FG, GH, FH, etc., it is determined that photovoltaic power stations F and H belong to the first category (recorded as the first category photovoltaic power station in target area 2), and photovoltaic power station G belongs to the first category (recorded as the second category photovoltaic power station in target area 2). When obtaining the photovoltaic output correlation between target area 1 and target area 2, the correlation coefficients between the photovoltaic outputs of the first type photovoltaic power station in target area 1 and the first type photovoltaic power station and the second type photovoltaic power station in target area 2, as well as the correlation coefficients between the photovoltaic outputs of the second type photovoltaic power station in target area 1 and the first type photovoltaic power station and the second type photovoltaic power station in target area 2 can be calculated respectively, so as to more accurately obtain the photovoltaic output correlation between target area 1 and target area 2.
[0081] Step 104 , evaluating the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each target area.
[0082] Exemplarily, the power supply adequacy provided in this embodiment may be traditional adequacy assessment indicators such as LOLP, LOLE and their variations, or it may be indicators such as the system average power outage frequency, the system average power outage duration, the user average power outage duration, the average power supply availability rate, the average power supply unavailability rate and the system average power shortage amount considered from the user's perspective, which are not limited in this embodiment.
[0083] Optionally, based on the photovoltaic output correlation and the power supply adequacy corresponding to each target area, the overall power supply adequacy of the distribution network is evaluated, which may include:
[0084] According to the photovoltaic output correlation and the power supply margin corresponding to each target area, a correction value of the power supply margin corresponding to each target area is calculated.
[0085] According to the correction value of the power supply margin corresponding to each target area, the overall power supply margin of the distribution network is evaluated.
[0086] In this embodiment, taking into account the characteristics that the greater the photovoltaic output correlation between the two target areas, the greater the influence between the power supply margins of the two target areas, and the smaller the photovoltaic output correlation between the two target areas, the smaller the influence between the power supply margins of the two target areas, first, according to the photovoltaic output correlation between the two target areas and the power supply margin corresponding to each target area, the correction value of the power supply margin corresponding to each target area is calculated, and then according to the correction value of the power supply margin corresponding to each target area, the overall power supply margin of the distribution network is evaluated.
[0087] Exemplarily, the overall power supply margin of the distribution network may be evaluated according to the mean or weighted mean of the corrected values of the power supply margin corresponding to each target area, which is not limited in this embodiment.
[0088] Optionally, calculating the correction value of the power supply margin corresponding to each target area according to the photovoltaic output correlation and the power supply margin corresponding to each target area may include:
[0089] according to Calculate the correction value of the power supply margin corresponding to each target area.
[0090] Among them, Ei′ is the correction value of the power supply margin corresponding to the i-th target area, Ei is the power supply margin corresponding to the i-th target area, Rij is the photovoltaic output correlation between the i-th target area and the j-th target area, J is the set of target areas in the distribution network except the i-th target area, and N is the number of target areas in the distribution network.
[0091] In this embodiment, by calculating the average value of the photovoltaic output correlation between each target area and the i-th target area, the influence of other target areas on the power supply margin of the i-th target area is measured, and the power supply margin corresponding to each target area is corrected from the perspective of the correlation degree of photovoltaic output between different target areas, so as to obtain a more accurate correction value of the power supply margin corresponding to each target area.
[0092] Optionally, the distribution network adequacy assessment method taking photovoltaic power generation into account provided in this embodiment may further include: based on the distribution network topology, according to the distribution locations of photovoltaic power stations in the distribution network, obtaining the photovoltaic power station penetration rate corresponding to each target area.
[0093] Accordingly, according to the correction value of the power supply adequacy corresponding to each target area, the overall power supply adequacy of the distribution network is evaluated, which may include:
[0094] The overall power supply margin of the distribution network is evaluated based on the corrected value of the power supply margin corresponding to each target area and the penetration rate of the photovoltaic power station corresponding to each target area.
[0095] In this embodiment, considering that the penetration rate of photovoltaic power stations can improve the power supply reliability and resilience of the distribution network on the one hand, but may also have a negative impact on the safety, stability and power quality of the distribution network on the other hand, therefore, the correction value of the power supply margin corresponding to each target area is further corrected in combination with the penetration rate of photovoltaic power stations corresponding to each target area, so as to comprehensively evaluate the impact of photovoltaic power generation on the power supply margin from two aspects: the relevance of photovoltaic output and the penetration rate of photovoltaic power stations.
[0096] Exemplarily, based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the photovoltaic power station penetration rate corresponding to each target area may include:
[0097] Based on the distribution network topology and the distribution locations of the photovoltaic power stations in the distribution network, the total power generation power of the photovoltaic power stations included in each target area is obtained;
[0098] According to each total generated power and the total load power of the corresponding target area, the PV power station penetration rate corresponding to each target area is obtained.
[0099] In this embodiment, considering that the total load power of the target area generally represents the load demand of the target area, and usually, the power supply capacity of the target area is greater than or equal to its load demand, therefore, the penetration rate of the photovoltaic power station corresponding to the target area can be more accurately measured by the ratio of the total power generation power of the photovoltaic power station included in the target area and the total load power of the target area.
[0100] Exemplarily, based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the photovoltaic power station penetration rate corresponding to each target area may include:
[0101] Based on the distribution network topology and the distribution locations of the photovoltaic power stations in the distribution network, the total rated capacity of the photovoltaic power stations included in each target area is obtained.
[0102] According to each total rated capacity and the total rated capacity of distribution transformers included in the corresponding target area, the photovoltaic power station penetration rate corresponding to each target area is obtained.
[0103] In this embodiment, considering that in a distribution network containing a photovoltaic power station, the power supply party is the photovoltaic power station and the distribution transformer in the distribution network, the photovoltaic power station penetration rate corresponding to the target area can be measured from the perspective of the power supply capacity that can be provided by the photovoltaic power station and the distribution transformer, that is, the photovoltaic power station penetration rate corresponding to the target area is obtained according to the ratio of the total rated capacity of the photovoltaic power stations included in the target area to the total rated capacity of the distribution transformers included in the target area.
[0104] Exemplarily, considering that the power supply capacity that a photovoltaic power station can provide is not necessarily the power supply capacity actually provided by the photovoltaic power station, the basic photovoltaic power station penetration rate corresponding to each target area can be obtained based on each total rated capacity and the total rated capacity of the distribution transformers included in the corresponding target area, and then the actual photovoltaic output and actual power generation power of the photovoltaic power stations included in each target area are obtained, and the fluctuation coefficient of the photovoltaic power station penetration rate is calculated based on the actual photovoltaic output and the actual power generation power. The photovoltaic power station penetration rate corresponding to each target area is obtained based on the fluctuation coefficient and the corresponding basic photovoltaic power station penetration rate, thereby more accurately measuring the photovoltaic power station penetration rate corresponding to each target area.
[0105] Optionally, in order to take into account both the positive and negative impacts of the photovoltaic power station after being connected to the distribution network, when evaluating the overall power supply margin of the distribution network based on the corrected value of the power supply margin corresponding to each target area and the penetration rate of the photovoltaic power station corresponding to each target area, the power supply reliability contribution corresponding to each target area and the power supply stability influence coefficient of each target area can be calculated based on the penetration rate of the photovoltaic power station corresponding to each target area, so as to further correct the corrected value of the power supply margin corresponding to each target area based on the power supply reliability contribution and the power supply stability influence coefficient.
[0106] The embodiment of the present invention first obtains historical load data of different users in the distribution network, classifies different users in the distribution network according to the historical load data of each user, and records the area where each type of user is located as a target area in the distribution network, then obtains the photovoltaic output correlation between the target areas, and then evaluates the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each target area. Therefore, on the basis of the fine-grained power supply margin corresponding to each target area, the influence of the photovoltaic output correlation between different target areas is considered, and then the overall power supply margin of the distribution network is more accurately evaluated in combination with the photovoltaic output and the differences of various types of users at the distribution network end, providing a good reference basis for the planning and decision-making of the distribution network.
[0107] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0108] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.
[0109] Figure 2 The schematic diagram of the structure of the distribution network adequacy assessment device taking into account photovoltaic power generation provided by an embodiment of the present invention is shown. For the convenience of explanation, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:
[0110] like Figure 2 As shown, the distribution network adequacy assessment device taking photovoltaic power generation into account includes: a first acquisition module 21 , a processing module 22 , a second acquisition module 23 and an assessment module 24 .
[0111] The first acquisition module 21 is used to acquire historical load data of different users in the distribution network.
[0112] The processing module 22 is used to classify different users in the distribution network according to the historical load data of each user, and record the area where each type of user is located as a target area in the distribution network.
[0113] The second acquisition module 23 is used to acquire the photovoltaic output correlation between each target area.
[0114] The evaluation module 24 is used to evaluate the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each target area.
[0115] The embodiment of the present invention first obtains historical load data of different users in the distribution network, classifies different users in the distribution network according to the historical load data of each user, and records the area where each type of user is located as a target area in the distribution network, then obtains the photovoltaic output correlation between the target areas, and then evaluates the overall power supply margin of the distribution network according to the photovoltaic output correlation and the power supply margin corresponding to each target area. Therefore, on the basis of the fine-grained power supply margin corresponding to each target area, the influence of the photovoltaic output correlation between different target areas is considered, and then the overall power supply margin of the distribution network is more accurately evaluated in combination with the photovoltaic output and the differences of various types of users at the distribution network end, providing a good reference basis for the planning and decision-making of the distribution network.
[0116] In a possible implementation, the processing module 22 may be used to calculate the load correlation between various users in the distribution network according to the historical load data of each user; and classify different users in the distribution network according to the various load correlations.
[0117] In one possible implementation, the processing module 22 can be used to perform clustering according to the correlation of each load to obtain an initial classification result for classifying different users in the distribution network; determine whether each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station; if each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station, the initial classification result is used as the final classification result; if there is a user in the initial classification result who does not belong to the same distribution transformer and the same photovoltaic power station as other users, the user is recorded as a suspected user; for each suspected user, the final classification result of the suspected user is re-determined according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
[0118] In one possible implementation, the processing module 22 can be used to determine the suspected classification of the suspected user from the initial classification results based on the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs; and determine the final classification result of the suspected user based on the distance between the load correlation corresponding to the suspected user and the cluster center of each suspected classification.
[0119] In one possible implementation, the second acquisition module 23 can be used to calculate, for each target area, the correlation coefficient between the photovoltaic outputs of each photovoltaic power station included in the target area based on the photovoltaic output of each photovoltaic power station included in the target area, which is recorded as the first correlation coefficient; classify the photovoltaic power stations included in each target area based on the first correlation coefficient; calculate the correlation coefficient between the photovoltaic output of each type of photovoltaic power station included in the current target area and the photovoltaic output of each type of photovoltaic power station included in other target areas based on the photovoltaic output of each type of photovoltaic power station included in each target area, which is recorded as the second correlation coefficient; and obtain the photovoltaic output correlation between each target area based on each second correlation coefficient.
[0120] In one possible implementation, the evaluation module 24 can be used to calculate the correction value of the power supply margin corresponding to each target area based on the photovoltaic output correlation and the power supply margin corresponding to each target area; and evaluate the overall power supply margin of the distribution network based on the correction value of the power supply margin corresponding to each target area.
[0121] In a possible implementation, the evaluation module 24 may be used to Calculate the correction value of the power supply margin corresponding to each target area.
[0122] Among them, Ei′ is the correction value of the power supply margin corresponding to the i-th target area, Ei is the power supply margin corresponding to the i-th target area, Rij is the photovoltaic output correlation between the i-th target area and the j-th target area, J is the set of target areas in the distribution network except the i-th target area, and N is the number of target areas in the distribution network.
[0123] In a possible implementation, the second acquisition module 23 can also be used to obtain the photovoltaic power station penetration rate corresponding to each target area based on the distribution network topology and the distribution locations of the photovoltaic power stations in the distribution network; the evaluation module 24 can be used to evaluate the overall power supply margin of the distribution network based on the correction value of the power supply margin corresponding to each target area and the photovoltaic power station penetration rate corresponding to each target area.
[0124] In one possible implementation, the second acquisition module 23 can be used to obtain the total power generation power of the photovoltaic power stations included in each target area based on the distribution network topology and the distribution locations of the photovoltaic power stations in the distribution network; and obtain the photovoltaic power station penetration rate corresponding to each target area based on each total power generation power and the total load power of the corresponding target area.
[0125] In one possible implementation, the second acquisition module 23 can be used to obtain the total rated capacity of the photovoltaic power stations included in each target area based on the distribution network topology and the distribution locations of the photovoltaic power stations in the distribution network; and obtain the photovoltaic power station penetration rate corresponding to each target area based on each total rated capacity and the total rated capacity of the distribution transformers included in the corresponding target area.
[0126] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0127] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0128] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, it can implement the steps of the above-mentioned distribution network adequacy assessment method embodiments taking into account photovoltaic power generation. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electrical carrier signal, telecommunication signal and software distribution medium.
[0129] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A distribution network adequacy assessment method taking photovoltaic power generation into account, characterized in that: include: Obtain historical load data of different users in the distribution network; Classifying different users in the distribution network according to the historical load data of each user, and recording the area where each type of user is located as a target area in the distribution network; Obtaining photovoltaic output correlation between each of the target areas; The overall power supply margin of the distribution network is evaluated according to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas.
2. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 1, characterized in that: The classifying different users in the distribution network according to the historical load data of each user includes: Calculating the load correlation between users in the distribution network based on the historical load data of each user; Different users in the distribution network are classified according to the respective load associations.
3. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 2, characterized in that: Different users in the distribution network are classified according to the load associations, including: Clustering is performed according to the association of each load to obtain an initial classification result for classifying different users in the distribution network; Determining whether each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station; If each user in the initial classification result belongs to the same distribution transformer and / or the same photovoltaic power station, the initial classification result is used as the final classification result; If there is a user in the initial classification result that does not belong to the same distribution transformer and the same photovoltaic power station as other users, then the user is recorded as a suspected user; For each of the suspected users, the final classification result of the suspected user is re-determined according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs.
4. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 2, characterized in that: The re-determining the final classification result of the suspected user according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs includes: Determining a suspected classification of the suspected user from the initial classification result according to the distribution transformer to which the suspected user belongs and / or the photovoltaic power station to which the suspected user belongs; The final classification result of the suspected user is determined according to the distance between the load correlation corresponding to the suspected user and the cluster center of each suspected classification.
5. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 1, characterized in that: Obtaining the photovoltaic output correlation between the target areas, including: For each of the target areas, according to the photovoltaic output of each photovoltaic power station included in the target area, a correlation coefficient between the photovoltaic outputs of the photovoltaic power stations included in the target area is calculated, recorded as a first correlation coefficient; Classifying each photovoltaic power station included in each of the target areas according to the first correlation coefficient; According to the photovoltaic output of each type of photovoltaic power station included in each of the target areas, a correlation coefficient between the photovoltaic output of each type of photovoltaic power station included in the current target area and the photovoltaic output of each type of photovoltaic power station included in other target areas is calculated, recorded as a second correlation coefficient; The photovoltaic output correlation between the target areas is obtained according to the second correlation coefficients.
6. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 1, characterized in that: According to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas, the overall power supply margin of the distribution network is evaluated, including: Calculating a correction value of the power supply margin corresponding to each of the target areas according to the photovoltaic output correlation and the power supply margin corresponding to each of the target areas; The overall power supply margin of the distribution network is evaluated according to the correction value of the power supply margin corresponding to each target area.
7. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 6, characterized in that: Calculating a correction value of the power supply margin corresponding to each target area according to the photovoltaic output correlation and the power supply margin corresponding to each target area includes: according to Calculating a correction value of the power supply margin corresponding to each of the target areas; Among them, Ei′ is the correction value of the power supply margin corresponding to the i-th target area, Ei is the power supply margin corresponding to the i-th target area, Rij is the photovoltaic output correlation between the i-th target area and the j-th target area, J is the set of target areas in the distribution network except the i-th target area, and N is the number of target areas in the distribution network.
8. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 6, characterized in that: Also includes: Based on the distribution network topology, according to the distribution locations of the photovoltaic power stations in the distribution network, the photovoltaic power station penetration rate corresponding to each of the target areas is obtained; According to the correction value of the power supply margin corresponding to each of the target areas, the overall power supply margin of the distribution network is evaluated, including: The overall power supply margin of the distribution network is evaluated according to the correction value of the power supply margin corresponding to each target area and the photovoltaic power station penetration rate corresponding to each target area.
9. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 8, characterized in that: The method of obtaining the photovoltaic power station penetration rate corresponding to each target area based on the distribution network topology and according to the distribution positions of the photovoltaic power stations in the distribution network includes: Based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, the total power generation power of each photovoltaic power station included in the target area is obtained; The photovoltaic power station penetration rate corresponding to each target area is obtained according to each of the total generated power and the total load power of the corresponding target area.
10. The method for evaluating the adequacy of a distribution network taking photovoltaic power generation into account according to claim 8, characterized in that: The method of obtaining the photovoltaic power station penetration rate corresponding to each target area based on the distribution network topology and according to the distribution positions of the photovoltaic power stations in the distribution network includes: Based on the distribution network topology and according to the distribution locations of the photovoltaic power stations in the distribution network, obtaining the total rated capacity of the photovoltaic power stations included in each of the target areas; The photovoltaic power station penetration rate corresponding to each target area is obtained according to each total rated capacity and the total rated capacity of the distribution transformers included in the corresponding target area.