Steel rail welding equipment, operation method and steel rail laying construction method
By designing rail welding equipment that can switch between the directions of this line and adjacent line, the dual-line operation mode is realized, and the problems of cumbersome construction and high cost caused by single-line operation of rail welding equipment in the existing technology are solved, and construction efficiency is improved and reduced. cost.
Patent Information
- Application Number
- CN202411438337.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-11-26
AI Technical Summary
The existing rail welding equipment can only be carried out in a single-line operation mode. The construction process is cumbersome and repetitive, resulting in an increase in construction costs. Welding operations can only be carried out after the rail is laid, which affects efficiency.
A rail welding equipment was designed, including a load table, a hanging frame mechanism and a welding device. The hanging frame mechanism can be switched between the direction of this line and the adjacent line to realize a dual-line operation mode, reducing temporary joints, rail fasteners and rollers. Number of installation and removal times.
It improves construction efficiency, reduces the number of installation and disassembly of temporary joints, rail fasteners and rollers, optimizes the construction process, and reduces construction costs.
Smart Images

Figure CN119021046A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of track construction, and in particular to a rail welding device, an operation method and a rail laying construction method. Background Art
[0002] In recent years, with the rapid development of rail transportation in my country, 500-meter-long rails are commonly used for laying during track construction. Existing rail laying equipment can only operate on the track where the equipment is located. The specific construction steps are as follows: (1) Rail laying: The "push-pull method" is usually used for rail laying. Each rail is 500 meters long, and support rollers are used during the laying process. After the laying is completed, the support rollers need to be removed, and the new rails are connected to the laid rails through temporary joints, and then the rail buckle accessories are installed. The long rail train continues to move to the next track laying location and repeats this process until the track laying task is completed. (2) Preparation of rail welding equipment: After the rails are laid, the long rail train and related equipment must be removed from the track, and then the rail welding equipment can enter for welding operations; (3) Rail unit welding: When the rail welding equipment reaches the joint to be welded, it is necessary to remove the temporary joint and the unoccupied rail buckle accessories, install the support rollers, and then weld the two pairs of rails to be welded; after welding is completed, it is necessary to remove the support rollers and install the rail buckle accessories to complete the subsequent welding; (4) Stress relief and locking: Stress relief is achieved through natural temperature relief or rail stretching, followed by removal of the support rollers and installation of rail buckle accessories to complete the stress relief and locking of the rails on the line to be relieved. (5) Rail locking welding: When the rail welding equipment reaches the joint to be welded, the remaining temporary joints and the rail buckle accessories of the line to be stressed out need to be removed, and the support rollers installed; when the rail temperature reaches the designed locking temperature, the support rollers are removed, the rail buckle accessories are installed, the stress release and locking are completed, and locking welding is performed to connect the rail to the locked line rail.
[0003] In summary, the existing rail welding equipment is mainly based on a single-line operation mode, that is, welding operations can only be performed on the line where the rail welding equipment is located, and it needs to be performed after the rails are laid. In addition, in order to ensure the stable and safe operation of the rail welding equipment (rail-mounted equipment) on the track line, it is necessary to connect and fix the newly laid rails with the existing rails through temporary joints, and install rail buckle accessories. When the rail welding equipment is welding, it is necessary to remove the temporary joints and unoccupied rail buckle accessories, and install support rollers, which makes the construction process cumbersome and repetitive, resulting in increased construction costs.
[0004] Therefore, there is an urgent need to improve the existing rail welding equipment to improve construction efficiency and reduce costs. Summary of the invention
[0005] In order to solve the above technical problems, the purpose of the present invention is to provide a rail welding device, an operating method of the rail welding device and a rail laying construction method.
[0006] The technical solution provided by the present invention is as follows: A rail welding device, suitable for welding of the own line and adjacent line, comprises a bearing platform, a hanger mechanism installed on the bearing platform and a welding device connected to the hanger mechanism, wherein the hanger mechanism can drive the welding device to switch between the own line direction and the adjacent line direction; the hanger mechanism comprises: A mounting seat, rotatable relative to the bearing platform; A swivel arm, rotatably connected to the mounting seat; A support arm is rotatably connected to the side wall of the swivel arm and has an unfolded state and a folded state relative to the swivel arm; The telescopic arm is movably connected to one end of the swivel arm away from the mounting seat, and comprises a first telescopic arm and a second telescopic arm which are arranged in sequence.
[0007] Further, when the main line is welded, the mounting seat rotates so that the hanger mechanism faces the main line direction, and the support arm is in the folded state; when the adjacent line is welded, the mounting seat rotates so that the hanger mechanism faces the adjacent line direction, and the support arm is in the unfolded state.
[0008] Further, the adjacent line welding includes proximal end welding and distal end welding; During the proximal end welding, the first telescopic arm is in an extended state, and the second telescopic arm is in a contracted state; during the distal end welding, both the first telescopic arm and the second telescopic arm are in an extended state.
[0009] Furthermore, it also includes a front-end container, a rear-end container and a container transfer device, wherein the front-end container and the rear-end container are both installed on the container transfer device, and the bearing platform is arranged at the bottom of the front-end container; The front container is used to store the hanger mechanism and the welding device, the hydraulic pump station, the chiller and the electrical cabinet, and the rear container is used to store the generator set.
[0010] On the other hand, the present invention provides an operation method of the rail welding equipment based on any one of the above embodiments, characterized in that the operation method includes main line welding and adjacent line welding, and the main line welding includes the following steps: Lowering the swivel arm so that the welding device extends along the direction of the main line; Adjusting the first telescopic arm so that the welding device is aligned with the joint of the rail to be welded and then welding; The first telescopic arm and the welding device are retracted to prepare for entering the next rail welding location.
[0011] Furthermore, the adjacent line welding comprises the following steps: Lowering the swivel arm to extend the welding device; Rotating the mounting seat so that the hanger mechanism faces the adjacent line direction; Lowering the support arm to support the swivel arm; Adjusting the first telescopic arm so that the welding device is aligned with the joint of the near-end rail to be welded and welded; Adjusting the second telescopic arm so that the welding device is aligned with the joint of the far end rail to be welded and welded; Retracting the second telescopic arm, the first telescopic arm, and the support arm in sequence; The mounting seat is rotated to make the hanger mechanism face the main line direction, and the welding device is retracted to prepare for entering the next rail welding location.
[0012] In addition, the present invention provides a rail laying construction method, the construction method includes an adjacent-main rail welding construction method, and the adjacent-main rail welding construction method includes the following steps: Construction preparation: rail traction vehicles, rail pushers and rail trains pass through the main line and enter the track-laying operation section, and the rail welding equipment passes through the adjacent line and enters the track-laying operation section; Rail laying: the rail pusher pulls the rails from the rail train and pushes them forward, and the rail tractor locks the rails on the vehicle body and pulls them forward. During the traction process, a pair of rollers are installed at a certain distance to form a roller track to support and transport the rails forward until a pair of rails are laid; Rail welding: The rail welding equipment moves forward along the adjacent line, aligns with the end of the newly laid rail, and carries out rail welding operations according to the adjacent line welding operation method described in the above embodiment.
[0013] Furthermore, the construction method also includes a main-adjacent welding rail construction method, and the main-adjacent welding rail construction method includes the following steps: Construction preparation: Rail trains, rail pushers, cross-line track laying units and the rail welding equipment mentioned above pass through the line and enter the track laying operation section; Rail laying: laying rails from the main line to the adjacent line through the cross-line rail laying unit to complete the laying of rails on the adjacent line; during the track laying process, a pair of rollers are installed at a certain interval to support the rails; Rail welding: The rail welding equipment moves forward along the line, aligns with the end of the newly laid rail, and carries out rail welding operations according to the adjacent line welding operation method described in the above embodiment.
[0014] Furthermore, in the above-mentioned adjacent-welding rail construction method, the step of rail laying and the step of rail welding are carried out simultaneously.
[0015] Furthermore, the cross-line track laying unit includes a plurality of track shifting devices, and the track shifting devices extend from the main line to the adjacent line; In the main-adjacent welding rail construction method, the steps of laying rails from the main line to the adjacent line by the cross-line rail laying unit to complete the adjacent line rail laying are as follows: The rail pushing vehicle pulls the rails out of the rail train and pushes them to the rail pulling device on the cross-line track laying unit; When the rail end is moved to a preset position in the rail bearing groove on the adjacent line by the rail moving device, it is connected to the rail already laid on the adjacent line; The rail train moves forward, driving the rail pushing vehicle and the cross-line track laying unit to move forward until the rails completely fall into the rail bearing grooves of the adjacent lines, thereby completing the laying of the adjacent line rails.
[0016] Compared with the prior art, the rail welding equipment provided by the embodiment of the present invention has at least the following technical effects: The rail welding equipment includes a bearing platform, a hanger mechanism installed on the bearing platform and a welding device connected to the hanger mechanism; the hanger mechanism includes a mounting seat, a rotating arm, a support arm and a telescopic arm; wherein, the mounting seat is rotatable relative to the bearing platform so that the hanger mechanism can drive the welding device to switch between the direction of the main line and the direction of the adjacent line; the rotating connection between the rotating arm and the mounting seat enables the welding equipment to be away from the bearing platform and aligned with the target welding position or to be placed above the bearing platform close to the bearing platform under the action of the rotating arm; the rotation connection between the support arm and the side wall of the rotating arm enables the support arm to have an unfolded state and a folded state relative to the rotating arm; the movably connected arrangement of the telescopic arm and one end of the rotating arm away from the mounting seat enables the telescopic arm to have an extended state and a retracted state relative to the rotating arm, and the telescopic arm includes a first telescopic arm and a second telescopic arm arranged in sequence, which can expand the welding operation range and realize adjacent line welding. In summary, the rail welding equipment can realize both main-line welding and adjacent-line welding, enabling it to have a dual-line operation mode, which improves the flexibility of equipment construction. When adjacent-line welding is used, the number of installation and removal of temporary joints, rail buckle accessories and rollers can be reduced, thereby improving construction efficiency.
[0017] The operating method of the rail welding equipment adopts the rail welding equipment, so it at least has the technical effect corresponding to the embodiment of the rail welding equipment, which will not be repeated here.
[0018] The rail laying construction method adopts the operation method of the rail welding equipment, so it at least has the technical effect corresponding to the embodiment of the rail welding equipment, which will not be repeated here. In addition, the construction method sets the rail laying and rail welding equipment on different track lines, so that after the rail laying is completed, there is no need to install temporary joints and rail buckle accessories. The rail welding equipment can complete the rail welding across the line, which effectively optimizes the construction process and reduces the number of installation and removal of temporary joints, rail buckle accessories and rollers, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a structural schematic diagram of the rail welding equipment of the present invention; Figure 2 It is a schematic diagram of the top view of the structure of the rail welding equipment of the present invention when welding adjacent lines; Figure 3 It is a schematic diagram of the main structure of the rail welding equipment of the present invention when welding adjacent lines; Figure 4 It is a flow chart of the main line welding in the rail welding equipment operation method of the present invention; Figure 5 It is a flow chart of adjacent line welding in the operation method of rail welding equipment of the present invention; Figure 6 It is a structural schematic diagram of the adjacent-main rail welding construction method of the present invention; Figure 7 It is a schematic flow chart of the adjacent-main rail welding construction method of the present invention; Figure 8 It is a structural schematic diagram of the construction method of welding the adjacent rails of the present invention; Fig. 9 It is a schematic diagram of the process of the construction method of welding the adjacent rails of the present invention; Fig.10 for Fig. 9 Schematic diagram of the process corresponding to step S2 in FIG.
[0021] Reference numerals: 1. Rail welding equipment; 10. Carrying platform; 20. Hanger mechanism; 201. Mounting seat; 202. Rotating arm; 203. Support arm; 204. Telescopic arm; 2041. First telescopic arm; 2042. Second telescopic arm; 205. Telescopic support rod; 30. Welding device; 40. Main line; 50. Adjacent line; 60. Front container; 70. Rear container; 2. Rail train; 3. Rail pusher; 4. Rail traction vehicle; 5. Cross-line track laying unit. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0023] It should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0024] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0026] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0027] Please refer to the attached Figure 1 To Attachment Figure 3 As shown, an embodiment of the present invention provides a rail welding device 1, which is suitable for welding of the main line and the adjacent line, and includes a bearing platform 10, a hanger mechanism 20 installed on the bearing platform 10, and a welding device 30 connected to the hanger mechanism 20, wherein the hanger mechanism 20 can drive the welding device 30 to switch between the main line 40 direction and the adjacent line 50 direction; the hanger mechanism 20 includes a mounting seat 201, a swivel arm 202, a support arm 203, and a telescopic arm 204. Among them, the mounting seat 201 is rotatable relative to the bearing platform 10; the swivel arm 202 is rotatably connected to the mounting seat 201; the support arm 203 is rotatably connected to the side wall of the swivel arm 202, and has an unfolded state and a folded state relative to the swivel arm 202; the telescopic arm 204 is movably connected to one end of the swivel arm 202 away from the mounting seat 201, and includes a first telescopic arm 2041 and a second telescopic arm 2042 arranged in sequence. It can be explained that the main line 40 refers to the track line where the rail train 2 is located, and the adjacent line 50 refers to the track line adjacent to the main line 40. In some optional embodiments, one end of the mounting base 201 is rotatably connected to the swivel arm 202, and the other end is connected to a telescopic support rod 205, the telescopic end of the telescopic support rod 205 is connected to the swivel arm 202, and provides additional support for the telescopic arm 204 after the swivel arm 202 is extended. The support arm 203 includes a first support arm 203 and a second support arm 203, and the second support arm 203 is telescopically arranged relative to the first support arm 203, so as to adjust the height of the welding equipment during operation.
[0028] The rail welding equipment 1 includes a bearing platform 10, a hanger mechanism 20 installed on the bearing platform 10, and a welding device 30 connected to the hanger mechanism 20; the hanger mechanism 20 includes a mounting seat 201, a rotating arm 202, a support arm 203, and a telescopic arm 204; wherein the mounting seat 201 is rotatable relative to the bearing platform 10 so that the hanger mechanism 20 can drive the welding device 30 to switch between the direction of the line 40 and the direction of the adjacent line 50; the rotating arm 202 is rotatably connected to the mounting seat 201 so that the welding device can be moved away from the bearing platform under the action of the rotating arm 202 10 is aligned with the target welding position or is placed above the supporting platform 10 close to the supporting platform 10; the support arm 203 is rotatably connected to the side wall of the rotating arm 202 so that the support arm 203 has an unfolded state and a folded state relative to the rotating arm 202; the telescopic arm 204 is movably connected to the end of the rotating arm 202 away from the mounting seat 201 so that the telescopic arm 204 has an extended state and a contracted state relative to the rotating arm 202, and the telescopic arm 204 includes a first telescopic arm 2041 and a second telescopic arm 2042 arranged in sequence, which can expand the welding operation range and realize adjacent line welding. In summary, the rail welding equipment 1 can realize both the main line welding and the adjacent line welding, so that it has a dual-line operation mode, which improves the flexibility of equipment construction, and when the adjacent line welding is adopted, the number of installation and removal of temporary joints, rail buckle accessories and rollers can be reduced, thereby improving construction efficiency.
[0029] When welding the main line, the mounting base 201 rotates so that the hanger mechanism 20 faces the main line 40, and the support arm 203 is in a folded state to facilitate welding operations. It should be further explained that the state of the telescopic arm 204 can be flexibly adjusted according to the distance of the target welding position. Specifically, when the target welding position is relatively close, the telescopic arm 204 can remain in a retracted state to facilitate convenient and stable operation; and when the distance to the target welding position is relatively far, the operator can adjust the length of the telescopic arm 204 to extend it to the required distance. This flexible telescopic design not only enhances the adaptability of the rail welding equipment 1, but also improves the efficiency of operation.
[0030] In some special cases, such as when the welding device 30 needs to be extended to a further position, the arm 203 can be adjusted to an extended state. In this state, the arm 203 will provide additional support and stability for the swivel arm 202 and the welding device 30, thereby ensuring that the equipment can withstand greater forces and loads during the welding process, and avoiding welding quality problems caused by unstable equipment.
[0031] During adjacent line welding, the mounting seat 201 rotates so that the hanger mechanism 20 faces the adjacent line 50, and the arm 203 is in an expanded state to provide necessary support to ensure the stability of the welding device 30. Since the target welding position of the adjacent line welding is usually far away from the support platform 10, it is necessary to adjust the telescopic arm 204 to the expanded state so that the welding equipment can perform welding operations on the target position to be welded. In order to achieve this, it is necessary to open the arm 203. The opened arm 203 is erected on the ground and can withstand the load from the swivel arm 202 and the welding device 30, thereby enhancing the stability of the entire welding system and preventing tilting or shaking during operation.
[0032] Adjacent line welding includes proximal welding and distal welding; during proximal welding, the first telescopic arm 2041 is in an extended state, and the second telescopic arm 2042 is in a retracted state; during distal welding, the first telescopic arm 2041 and the second telescopic arm 2042 are both in an extended state. It can be explained that proximal welding refers to welding operations on a track on the adjacent line 50 that is closer to the main line 40, while distal welding refers to welding operations on a track on the adjacent line 50 that is farther from the main line 40. During proximal welding, the first telescopic arm 2041 is in an extended state to bring the welding device 30 closer to the proximal welding position, while the second telescopic arm 2042 is in a retracted state to reduce the equipment's occupation of the surrounding space and to avoid unnecessary vibration or offset during the welding process. During distal welding, the first telescopic arm 2041 and the second telescopic arm 2042 are both in an extended state so that the welding device 30 is close to the distal welding position, ensuring that the distal welding operation can proceed smoothly.
[0033] In some optional embodiments, the rail welding equipment 1 is a double container structure, including a front container 60, a rear container 70 and a container transfer equipment, the front container 60 and the rear container 70 are both installed on the container transfer equipment, the bearing platform 10 is arranged at the bottom of the front container 60, the front container 60 is used to store the hanger mechanism 20 and welding equipment, hydraulic pump station, chiller and electrical cabinet, and the rear container 70 is used to store the generator set. Among them, the container transfer equipment can be a railway vehicle or a road vehicle, which is not specifically limited here. The bearing platform 10 can be the bottom of the front container 60, and the mounting seat 201 is a rotatable structure, which is installed on the bottom of the front container 60. The hydraulic pump station can provide power to the telescopic arm 204, the slewing arm 202, the support arm 203, etc. The chiller is used to cool the welding part to prevent overheating, the electrical cabinet is responsible for the power management and control of the equipment, and the generator set provides the required power for the entire equipment.
[0034] In the operation method of the existing rail welding equipment 1, the operation of the rail welding equipment 1 and the rail welding operation are performed on the same track line, that is, single-line operation, and need to be performed after the rails are laid. In order to ensure the stable and safe operation of the rail welding equipment 1 on the track line, it is necessary to connect and fix the newly laid rails with the existing rails through temporary joints, and install rail buckle accessories. When the rail welding equipment 1 is in welding operation, it is necessary to remove the temporary joints and unoccupied rail buckle accessories, and install support rollers, which makes the construction process cumbersome and repetitive, resulting in increased construction costs.
[0035] For the above technical issues, please refer to the attached Figure 4 As shown, an embodiment of the present invention provides an operation method of a rail welding device 1 based on any one of the above embodiments, the operation method includes main line welding and adjacent line welding, and the main line welding includes the following steps: S1: lowering the rotating arm 202 so that the welding device 30 extends in the direction of the line 40; S2: Adjust the first telescopic arm 2041 to align the welding device 30 with the joint of the rail to be welded and weld; S3: retract the first telescopic arm 2041 and the welding device 30 to prepare for entering the next rail welding location.
[0036] In the above process, there is no need to open the support arm 203 to support the swivel arm 202 , and there is no need to adjust the second telescopic arm 2042 .
[0037] The present invention provides an operating method of a rail welding device 1, which adopts the rail welding device 1, and therefore has at least the technical effect corresponding to the embodiment of the rail welding device 1, which will not be repeated here. In addition, the operating method not only has the function of welding on the main line, but also has the function of welding on the adjacent line, thereby enhancing the flexibility of construction. During the welding operation on the main line, the position of the welding device 30 can be flexibly adjusted according to the distance of the rail joint to be welded, thereby increasing the coverage range of the welding device 30; during the welding operation on the adjacent line, there is no need to install temporary joints and rail buckle accessories, and the rail welding equipment 1 can complete the rail welding across the line, reducing the number of installation and removal of temporary joints, rail buckle accessories and rollers, thereby improving construction efficiency.
[0038] For further explanation, please refer to the attached Figure 5 As shown, the above operation method also includes adjacent line welding, and the adjacent line welding includes the following steps: S1: lowering the swivel arm 202 to extend the welding device 30; S2: Rotate the mounting seat 201 so that the hanger mechanism 20 faces the adjacent line 50; S3: lowering the support arm 203 to support the swivel arm 202; S4: adjusting the first telescopic arm 2041 so that the welding device 30 is aligned with the joint of the near-end rail to be welded and then welded; S5: Adjust the second telescopic arm 2042 to align the welding device 30 with the joint of the far end rail to be welded and weld; S6: retract the second telescopic arm 2042, the first telescopic arm 2041, and the support arm 203 in sequence; S7: Rotate the mounting seat 201 to make the hanger mechanism 20 face the direction of the line 40, retract the welding device 30, and prepare to enter the next rail welding location.
[0039] The operation method provided in this embodiment sets the operation of the rail welding equipment 1 and the rail welding operation on different track lines. During the rail welding operation, there is no need to install temporary joints and rail buckle accessories. The rail welding equipment 1 can complete the rail welding across the line, reducing the number of installation and removal of temporary joints, rail buckle accessories and rollers, thereby improving construction efficiency.
[0040] At present, domestic railway construction basically adopts seamless lines. After the rails are laid, rail welding is required to complete the connection of the rails. In the existing rail laying construction methods, they are all based on single-line operations. The processes of rail laying, rail welding and stress relief are usually carried out step by step. This causes the previous process to occupy the track line, thereby hindering the subsequent processes. In addition, in the existing construction methods, temporary joints and rail buckle accessories need to be installed during the rail laying process to ensure the normal passage of the track line. However, in the subsequent processes such as rail welding, stress relief and locking, these temporary joints and rail buckle accessories need to be removed. This repeated disassembly and installation not only increases the workload, but also affects the construction efficiency. The existing rail laying construction methods are as follows: (1) Rail laying: The "push-pull method" is usually used for rail laying. Each rail is 500 meters long and rollers are used during the laying process. After the laying is completed, the rollers need to be removed and the newly laid rails are connected to the laid rails through temporary joints, and then the rail buckle accessories are installed. The long rail train continues to move to the next rail laying location and repeats this process until the rail laying task is completed. (2) Preparation of rail welding equipment: After the rails are laid, the long rail train and related equipment must be removed from the track, and then the rail welding equipment can enter for welding operations; (3) Rail unit welding: When the rail welding equipment reaches the joint to be welded, it is necessary to remove the temporary joint and the unoccupied rail buckle accessories, install the rollers, and then weld the two pairs of rails to be welded; after the welding is completed, the rollers need to be removed and the rail buckle accessories need to be installed to complete the subsequent welding; (4) Stress relief and locking: Stress relief and locking of the rails on the line to be relieved are completed by natural temperature relief or rail stretching, followed by removal of the support rollers and installation of rail buckle accessories. Natural temperature relief means that when the rail temperature reaches the designed relief rail temperature, the rails are directly relieved and locked to complete stress relief. Rail stretching relief means that when the rail temperature does not reach the designed relief rail temperature, the rail stretching length is determined through theoretical calculation (rail temperature rises by 1°C, and rail length elongates by 11.8 mm per kilometer), and stress relief is completed by stretching. (5) Rail locking welding: When the rail welding equipment reaches the joint to be welded, the remaining temporary joints and the rail buckle accessories of the line to be stressed out need to be removed, and the support rollers installed; when the rail temperature reaches the designed locking temperature, the support rollers are removed, the rail buckle accessories are installed, the stress release and locking are completed, and locking welding is performed to connect the rail to the locked line rail.
[0041] Through the existing rail laying construction methods, it can be seen that due to the problem of track line occupation, the processes of rail laying, rail welding and stress relief must be carried out in sequence and distributed. The construction flexibility is insufficient, and the various processes are difficult to combine and optimize, resulting in reduced overall work efficiency. In addition, in order to ensure the stability of the track line structure and the safety of equipment operation, the rails need to be fixed with temporary joints and rail buckle accessories. During the construction of each process, the temporary joints, rail buckle accessories and rollers need to be installed and removed repeatedly, which is cumbersome and increases the construction cost.
[0042] Based on the above technical problems, the present invention proposes a new rail laying construction method, which aims to realize a double-line operation mode for rail laying and rail welding, reduce the number of installation and removal of temporary joints, rail buckle accessories and rollers, thereby simplifying the construction process, reducing construction costs and improving construction efficiency. The specific embodiment of the rail laying construction method provided by the present invention is detailed in the following content.
[0043] Please refer to the attached Figure 6 and attached Figure 7 As shown, an embodiment of the present invention provides a rail laying construction method, which includes an adjacent-main rail welding construction method, and the adjacent-main rail welding construction method includes the following steps: S1: Construction preparation: The rail tractor 4, rail pusher 3 and rail train 2 pass through the main line 40 and enter the rail laying operation section, and the rail welding equipment 1 passes through the adjacent line 50 and enters the rail laying operation section; S2: Rail laying: The rail pusher 3 pulls the rails from the rail train 2 and pushes them forward, and the rail tractor 4 locks the rails on the vehicle body and pulls them forward. During the traction process, a pair of rollers are installed at a certain distance to form a roller track to support and transport the rails forward until the laying of a pair of rails is completed; S3: Rail welding: The rail welding equipment 1 moves forward along the adjacent line 50, aligns with the end of the newly laid rail, and carries out the rail welding operation according to the adjacent line welding operation method in the above embodiment.
[0044] The rail train 2 includes a railway flat car and a long rail transport bracket, and different numbers of long rail transport brackets can be combined according to the length of the long rail. The rail pusher 3 has the function of dragging and pushing the rails, and is usually placed at the rear of the rail train 2, responsible for dragging the long rails from the rail train 2 and pushing them forward. The rail tractor 4 is specifically responsible for traction of long rails on the roadbed where no rails are laid, and cooperates to complete the rail laying task.
[0045] In the adjacent rail welding method, the rail pusher 3, the rail tractor 4 and the rail train 2 are all performing rail laying operations on the same track, while the rail welding equipment 1 performs welding operations from the adjacent track. In order to achieve smooth movement of the rails, rollers are installed as roller tracks for the rails to slide forward. The roller track is installed in place before the rails arrive, ensuring that the rails do not touch the ground during the sliding process, thereby reducing friction and improving efficiency.
[0046] In the adjacent-main rail welding method, the rail laying in step S2 and the rail welding in step S3 are performed alternately. After a pair of long rails are laid, the rail welding operation is performed. After the welding is completed, the next operation cycle is performed. In this embodiment, the rail welding equipment 1 welds the rails of the main line 40 by running on the adjacent line 50, so that the rail laying and the rail welding equipment 1 are each on a track line. After the rails are laid, there is no need to install temporary joints and rail buckle accessories. The rail unit welding on the main line 40 can be completed directly through the rail welding equipment 1 on the adjacent line 50, which optimizes the construction process and reduces the number of installation and removal of temporary joints, rail buckle accessories and rollers.
[0047] In summary, the present invention provides a rail laying construction method, which adopts the operation method of the rail welding equipment 1, and therefore at least has the technical effect corresponding to the embodiment of the rail welding equipment 1, which will not be repeated here. In addition, the construction method sets the rail laying and the rail welding equipment 1 on different track lines, so that after the rail laying is completed, there is no need to install temporary joints and rail buckle accessories, and the rail welding equipment 1 can complete the rail welding across the line, which effectively optimizes the construction process, while reducing the number of installation and removal of temporary joints, rail buckle accessories and rollers, thereby improving construction efficiency.
[0048] Please refer to the attached Figure 8 and attached Fig. 9 As shown, in some optional embodiments, the rail laying construction method further includes a current-adjacent rail welding construction method, and the current-adjacent rail welding construction method includes the following steps: S1: Construction preparation: Rail train 2, rail pusher 3, cross-line rail laying unit and rail welding equipment 1 pass through line 40 and enter the rail laying operation section; S2: Rail laying: The cross-line rail laying unit is used to lay rails from the main line 40 to the adjacent line 50, and the adjacent line 50 rails are laid. During the rail laying process, a pair of rollers are installed at a certain interval to support the rails. S3: Rail welding: The rail welding equipment 1 moves forward along the line 40, aligns with the end of the newly laid rail, and carries out the rail welding operation according to the adjacent line welding operation method in the above embodiment.
[0049] It should be further explained that, in the present adjacent rail welding construction method, the step of rail laying and the step of rail welding are carried out simultaneously.
[0050] In this embodiment, the rail welding equipment 1 welds the rails of the adjacent line 50 while running on the main line 40, so that the rail laying and the rail welding equipment 1 are each on the same track line. After the rail laying is completed, there is no need to install temporary joints and rail buckle accessories. The rail unit welding and rail locking welding on the adjacent line 50 can be completed directly by the rail welding equipment 1 on the main line 40, thereby optimizing the construction process and reducing the number of installation and removal of temporary joints, rail buckle accessories and rollers.
[0051] In some optional embodiments, the cross-line rail laying unit includes a plurality of rail shifting devices, and the rail shifting devices extend from the line 40 to the adjacent line 50; Please see attached Fig.10 As shown, in the construction method for welding the adjacent rails, the steps for laying the adjacent rails 50 from the main line 40 to the adjacent line 50 are as follows: S201: The rail pushing vehicle 3 pulls the rails from the rail train 2 and pushes them to the rail pulling device on the cross-line rail laying unit; S202: When the rail end is moved to a preset position in the rail bearing groove on the adjacent line 50 by the rail moving device, it is connected with the laid rail on the adjacent line 50; S203: The rail train 2 moves forward, driving the rail pusher 3 and the cross-line rail laying unit to move forward until the rails completely fall into the rail bearing grooves of the adjacent line 50, thereby completing the laying of the rails of the adjacent line 50.
[0052] In a specific embodiment, the cross-line rail laying unit is mainly composed of five sets of rail shifting devices, which are organized at the rear end of the rail pushing vehicle 3 and are responsible for shifting the long rails pushed by the rail pushing vehicle 3 to the adjacent track line to complete the laying of the long rails of the adjacent track line. Specific rail laying process: First, the rail pushing vehicle 3 pulls the long rails from the rail train 2 and pushes them to the rail shifting device of the cross-line rail laying unit; when the end of the long rail passes through the five sets of rail shifting devices of the cross-line rail laying unit in turn and reaches the position of the laid rails on the adjacent line 50, the operator fixes the end of the long rail on the roadbed; then, the rail train 2 runs forward, continuously dragging out the long rails, and laying the rails to the adjacent line 50 through the cross-line rail laying unit, and finally realizes the laying of the rails of the adjacent line 50.
[0053] In order to further illustrate the technical effect of the rail laying construction method provided in this application compared with the prior art, we have counted the number of installation and disassembly of rail buckle accessories and rollers during the actual construction process. The specific data is shown in Table 1.
[0054] Table 1 Comparison of existing construction methods, adjacent-main rail welding construction methods and main-adjacent rail welding construction methods
[0055] It can be explained that in the existing construction method, the processes of rail laying, rail unit welding and rail locking welding are carried out in steps. After each process is completed, the passage of the track line needs to be restored, which means that the rollers must be removed and the rail buckle accessories must be installed. Before the next process begins, these rail buckle accessories and support rollers need to be removed. Due to this series of operations, the installation and disassembly of rail buckle accessories and rollers is particularly cumbersome. When welding and locking the rails, the rail buckle accessories and support rollers need to be removed again to reduce the friction resistance of the rails. When the preparations before driving are completed, the rollers must be removed again and the rail buckle accessories must be installed. This process is not only time-consuming, but also increases the complexity and workload of the construction.
[0056] However, in the adjacent-original rail welding construction method, the rail laying and rail welding processes are carried out on different track lines. The rail welding operation is carried out from the adjacent line 50 to the rail laying line, and traffic can be restored after the rail unit welding is completed. This can reduce the removal and installation of the rail buckle accessories and rollers by one each. The specific operation is: when laying the rails, it is only necessary to install the support rollers once, and the rail unit welding can be started immediately after the rail laying is completed. After the welding is completed, it is only necessary to remove the rollers once and install the rail buckle accessories once, and then the track line will resume traffic and enter the next operation cycle. Furthermore, in the present adjacent rail welding construction method, the rail laying and rail welding processes are carried out on adjacent track lines. Long rails are laid from the running track line to the adjacent track line, and the rail welding equipment 1 is welded from the running track line to the adjacent track line. During the rail laying stage, the support rollers only need to be installed once, and the adjacent track line does not need to be driven, so there is no need to install rail buckle accessories. When the rail unit is welded, the rollers have been installed and the operation can proceed normally. For the rail locking welding process, it is necessary to remove the rollers once and install the rail buckle accessories once to complete the stress release and rail locking welding. This method effectively simplifies the construction process and reduces unnecessary equipment disassembly and time consumption.
[0057] It should be further explained that whether driving needs to be considered between each process determines whether rollers and rail buckle accessories need to be installed or removed. In the existing construction method, each process is carried out on the train running line, so rollers and rail buckle accessories need to be installed and removed repeatedly. The adjacent-main rail welding construction method realizes the restoration of track traffic after unit welding, reducing the installation and removal of rail buckle accessories by 1 time and the installation and removal of rollers by 1 time. In the adjacent-main rail welding construction method, the adjacent track lines no longer consider driving needs, so all processes can be completed at one time, reducing the installation and removal of rail buckle accessories by 2 times and the installation and removal of rollers by 2 times.
[0058] In summary, the rail laying construction method using the rail welding device 1 can effectively optimize the construction process compared to the existing construction method, and solve the problems of insufficient construction flexibility and low construction efficiency caused by the step-by-step advancement of each process. At the same time, the construction method reduces the number of installation and disassembly of rail buckle accessories and rollers, thereby reducing the demand for construction personnel and reducing the construction cost of rail laying.
[0059] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A rail welding device, characterized in that: Suitable for welding of the main line and the adjacent line, comprising a bearing platform, a hanger mechanism installed on the bearing platform and a welding device connected to the hanger mechanism, wherein the hanger mechanism can drive the welding device to switch between the main line direction and the adjacent line direction; the hanger mechanism comprises: A mounting seat, rotatable relative to the bearing platform; A swivel arm, rotatably connected to the mounting seat; A support arm is rotatably connected to the side wall of the swivel arm and has an unfolded state and a folded state relative to the swivel arm; The telescopic arm is movably connected to one end of the swivel arm away from the mounting seat, and comprises a first telescopic arm and a second telescopic arm which are arranged in sequence.
2. The rail welding equipment according to claim 1, characterized in that: When the main line is welded, the mounting seat rotates so that the hanger mechanism faces the main line direction, and the support arm is in the folded state; when the adjacent line is welded, the mounting seat rotates so that the hanger mechanism faces the adjacent line direction, and the support arm is in the unfolded state.
3. The rail welding equipment according to claim 1 or 2, characterized in that: The adjacent line welding includes proximal end welding and distal end welding; During the proximal end welding, the first telescopic arm is in an extended state, and the second telescopic arm is in a contracted state; during the distal end welding, both the first telescopic arm and the second telescopic arm are in an extended state.
4. The rail welding equipment according to claim 1, characterized in that: It also includes a front-end container, a rear-end container and a container transfer device, wherein the front-end container and the rear-end container are both installed on the container transfer device, and the bearing platform is arranged at the bottom of the front-end container; The front container is used to store the hanger mechanism and the welding device, the hydraulic pump station, the chiller and the electrical cabinet, and the rear container is used to store the generator set.
5. An operating method based on the rail welding equipment according to any one of claims 1 to 4, characterized in that: The operation method includes main line welding and adjacent line welding, and the main line welding includes the following steps: Lowering the swivel arm so that the welding device extends along the direction of the main line; Adjusting the first telescopic arm so that the welding device is aligned with the joint of the rail to be welded and then welding; The first telescopic arm and the welding device are retracted to prepare for entering the next rail welding location.
6. The operation method according to claim 5, characterized in that: The adjacent line welding comprises the following steps: Lowering the swivel arm to extend the welding device; Rotating the mounting seat so that the hanger mechanism faces the adjacent line direction; Lowering the support arm to support the swivel arm; Adjusting the first telescopic arm so that the welding device is aligned with the joint of the near-end rail to be welded and welded; Adjusting the second telescopic arm so that the welding device is aligned with the joint of the far end rail to be welded and welded; Retracting the second telescopic arm, the first telescopic arm, and the support arm in sequence; The mounting seat is rotated to make the hanger mechanism face the main line direction, and the welding device is retracted to prepare for entering the next rail welding location.
7. A rail laying construction method, characterized in that: The construction method includes an adjacent-main rail welding construction method, and the adjacent-main rail welding construction method includes the following steps: Construction preparation: rail traction vehicles, rail pushers and rail trains pass through the main line and enter the track-laying operation section, and the rail welding equipment passes through the adjacent line and enters the track-laying operation section; Rail laying: the rail pusher pulls the rails from the rail train and pushes them forward, and the rail tractor locks the rails on the vehicle body and pulls them forward. During the traction process, a pair of rollers are installed at a certain distance to form a roller track to support and transport the rails forward until a pair of rails are laid; Rail welding: The rail welding equipment moves forward along the adjacent line, aligns with the end of the newly laid rail, and carries out rail welding operations in accordance with the adjacent line welding operation method according to claim 6.
8. The rail laying method according to claim 7, characterized in that: The construction method also includes a main-adjacent welding rail construction method, and the main-adjacent welding rail construction method includes the following steps: Construction preparation: Rail trains, rail pushers, cross-line track laying units and the rail welding equipment mentioned above pass through the line and enter the track laying operation section; Rail laying: laying rails from the main line to the adjacent line through the cross-line rail laying unit to complete the laying of rails on the adjacent line; during the track laying process, a pair of rollers are installed at a certain interval to support the rails; Rail welding: The rail welding equipment moves forward along the line, aligns with the end of the newly laid rail, and carries out rail welding operations in accordance with the adjacent line welding operation method as described in claim 6.
9. The rail laying method according to claim 8, characterized in that: In the adjacent-welding rail construction method, the step of rail laying and the step of rail welding are carried out simultaneously.
10. The rail laying method according to claim 8, characterized in that: The cross-line track laying unit comprises a plurality of track shifting devices, and the track shifting devices extend from the main line to the adjacent line; In the main-adjacent welding rail construction method, the steps of laying rails from the main line to the adjacent line by the cross-line rail laying unit to complete the adjacent line rail laying are as follows: The rail pushing vehicle pulls the rails from the rail train and pushes them to the rail pulling device on the cross-line track laying unit; When the rail end is moved to a preset position in the rail bearing groove on the adjacent line by the rail moving device, it is connected to the rail already laid on the adjacent line; The rail train moves forward, driving the rail pusher and the cross-line track laying unit to move forward until the rails completely fall into the rail bearing grooves of the adjacent lines, thus completing the laying of the adjacent line rails.
Citation Information
Cited By
Container type adjacent line flash welding and heat treatment equipment
CN224487953U