Through the advanced transformation method of high-porosity aquifers, the problem of groundwater resource loss caused by coal seam mining has been solved, the protection of groundwater resources and the improvement of mining efficiency has been achieved, and the waste of coal resources has been reduced.

CN119021693AActive Publication Date: 2024-11-26CHINA COAL TECH & ENG GRP +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410985513.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-26
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

Coal seam mining leads to the loss of groundwater resources and the degradation of the ecological environment. The existing technology has problems of waste of coal resources and low mining efficiency.

Method used

Adopting the advanced transformation method of high-porosity aquifer based on groundwater resource protection, by collecting the actual measurement data of the water conduction crack zone, constructing a groundwater loss model for coal seam mining, determining the optimal water barrier thickness, and using grouting materials to transform the high-porosity aquifer , reduce groundwater losses.

Benefits of technology

Effectively reduce the disturbance of coal seam mining on groundwater, protect the groundwater resources of aquifers, improve mining efficiency, and avoid mine water influx and groundwater levels drop.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021693A_ABST
    Figure CN119021693A_ABST
Patent Text Reader

Abstract

The invention provides a high-porosity aquifer advanced transformation method based on underground water resource protection, which comprises the following steps of: giving a water-conducting fissure zone calculation formula and calculating the development height of the water-conducting fissure zone, and if the water-conducting fissure zone does not enter a water-resisting layer and the original thickness of the water-resisting layer is smaller than the optimal thickness x of the water-resisting layer, judging that the water-resisting layer is a water-resisting layer; and the area needs to be subjected to advanced transformation aiming at the high-porosity aquifer. During transformation, horizontal directional drilling is constructed downwards from the ground, and grout is conveyed to a high-porosity aquifer between the top boundary of a water flowing fractured zone and the bottom boundary of a water-resisting layer; and after the grouting procedure is completed, a vertical inspection hole is constructed in the ground, and sampling testing is conducted on the rock core at the grouting layer. The upper section of the high-porosity aquifer is transformed into the water-resisting layer through the grouting technology, so that the thickness of the water-resisting layer on the lower portion of the target protection aquifer is increased, the groundwater loss amount of the target protection aquifer covering the water-resisting layer is reduced, and protection of groundwater resources of the target protection aquifer is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground water protection of coal seam roof aquifers, and in particular to an advanced transformation method of high-porosity aquifers based on underground water resource protection. Background Art

[0002] In Northwest my country, surface water resources are in short supply. Groundwater resources, as an important component of water resources, have even become the only source of water supply in many areas, playing an important role in maintaining industrial and agricultural production, drinking water for humans and livestock, and controlling the ecological environment. Large-scale and high-intensity mining of coal resources has changed the internal structure of the aquiclude and the original water storage structure, forming a series of water-conducting fractures in the strata, accelerating the hydraulic connection between the aquifers overlying the coal seams, and causing the groundwater in the aquifers to flow into the mining space and transform into mine water. A large amount of mine water inrush induces the decline of groundwater levels in mining areas and the loss of groundwater resources, leading to the depletion of regional groundwater resources and the degradation of the ecological environment. At present, mining methods such as limited height mining and backfill mining are often used to reduce the disturbance of mining to groundwater, which has problems such as large waste of coal resources and low mining efficiency. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, an embodiment of the present invention provides a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection, which can reduce the loss of groundwater in the aquifer overlying the impermeable layer disturbed by coal seam mining, and realize the protection of groundwater resources in the aquifer.

[0004] The embodiment of the present invention provides a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection, comprising the following steps:

[0005] Step S1, collect measured data of regional water-conducting fracture zones, and respectively count the height H of the water-conducting fracture zone, the thickness M of the coal seam mining, the depth D of the coal seam mining, and the width B of the coal mining face, and use the multivariate regression analysis method to obtain the empirical formula for the height of the water-conducting fracture zone:

[0006] Formula 1: H = α × M + β × B + γ × ln (D) + C

[0007] Among them: α, β, γ are fitting parameters, C is a constant, D = M1 + M2 + M3 + M4, M1 is the thickness of the target protection aquifer, M2 is the thickness of the aquiclude, M3 is the thickness of the high porosity aquifer, M4 is the thickness of the bedrock aquifer, M1, M2, M3, M4 are all obtained by searching the regional geological exploration drilling data;

[0008] At the same time, the bulk density, elastic modulus, cohesion, internal friction angle, Poisson's ratio, porosity and permeability coefficient of the target protection aquifer, impermeable layer, high porosity aquifer and coal seam were obtained by testing. On this basis, the groundwater loss model of coal seam mining was constructed using COMSOL multi-physics field coupling analysis software as a simulation platform. The relationship between the thickness of different impermeable layers and the groundwater loss of the target protection aquifer under the conditions of average coal seam thickness and average coal seam burial depth in the analysis area was obtained as follows:

[0009] Formula 2: y = a + b × c x

[0010] Among them: y is the groundwater loss, x is the thickness of the impermeable layer, b and c are fitting parameters, and a is a constant;

[0011] When d(y) / d(x)=-0.75, the thickness of the waterproof layer x is the optimal waterproof layer thickness. The optimal waterproof layer thickness x is obtained by taking the derivative of formula 2:

[0012]

[0013] Step S2, based on the aquiclude thickness M2 data of each exploration borehole, draw a linear distribution map of the regional aquiclude thickness, delineate the area where the water-conducting fracture zone has not entered the aquiclude and the original aquiclude thickness is less than the optimal aquiclude thickness x, and consider that the area needs to be advancedly transformed for the high-porosity aquifer;

[0014] Step S3, sampling the aquiclude, testing and obtaining the mineral composition and mechanical parameters of the aquiclude, and obtaining a grouting material with properties similar to those of the aquiclude through a proportioning test;

[0015] Step S4, based on the regional exploration drilling data, using formula 1 to calculate the development height H of the water-conducting fracture zone in the area, draw a contour map of the top interface of the water-conducting fracture zone, construct horizontal directional drilling from the ground downward, and keep the final hole layer of the horizontal directional drilling at 15-20m below the bottom boundary of the aquiclude;

[0016] Step S5, using a grouting pump to transport the slurry through the horizontal directional drilling hole to the high-porosity aquifer between the top boundary of the water-conducting fracture zone and the bottom boundary of the impermeable layer;

[0017] Step S6, after completing the grouting process, construct a vertical inspection hole on the ground, sample the core of the grouting layer, observe and measure the slurry diffusion distance L, and carry out a water pressure test to test the permeability coefficient of the grouting layer. When the sum of the slurry diffusion distance L and the thickness of the impermeable layer M2 is greater than the optimal thickness of the impermeable layer x, and the ratio of the permeability coefficient of the grouting layer tested by the water pressure test to the permeability coefficient of the impermeable layer is less than 0.8, it is considered that the transformation requirements are met; if the requirements are not met, grouting is required again until the requirements are met.

[0018] In some embodiments, in step S3, the grouting material includes clay, cement and water, the mass ratio of clay to cement is 8:2, and the water-to-solid ratio is 1:1.

[0019] In some embodiments, in step S5, the grouting end pressure is 2.5 times the hydrostatic pressure of the high porosity aquifer, and the grouting pressure stabilization time is 30 minutes. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings.

[0021] in:

[0022] Figure 1 It is a flow chart of a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection in an embodiment of the present invention;

[0023] Figure 2 It is a schematic diagram of a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection in an embodiment of the present invention;

[0024] Figure 3 A relationship diagram between different aquiclude thicknesses and groundwater loss of a target protected aquifer in an embodiment of the present invention;

[0025] Figure 4 It is the advanced transformation area of ​​the high-porosity aquifer in the embodiment of the present invention;

[0026] Reference numerals:

[0027] 1-target protection aquifer; 2-aquiclude; 3-high porosity aquifer; 4-bedrock aquifer; 5-coal seam; 6-water-conducting fracture zone boundary; 7-horizontal directional drilling; 8. Grouting stone body; 9. Vertical inspection hole. DETAILED DESCRIPTION

[0028] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0029] The following describes a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection according to an embodiment of the present invention with reference to the accompanying drawings.

[0030] like Figure 1 , 2 As shown, the embodiment of the present invention proposes a method for advanced transformation of a high-porosity aquifer based on groundwater resource protection, comprising the following steps:

[0031] Step S1, collect measured data of regional water-conducting fracture zones, and respectively count the height H of the water-conducting fracture zone, the thickness M of the coal seam mining, the depth D of the coal seam mining, and the width B of the coal mining face, and use the multivariate regression analysis method to obtain the empirical formula for the height of the water-conducting fracture zone:

[0032] Formula 1: H = α × M + β × B + γ × ln (D) + C

[0033] Among them: α, β, γ are fitting parameters, C is a constant, D = M1 + M2 + M3 + M4, M1 is the thickness of the target protection aquifer, M2 is the thickness of the aquiclude, M3 is the thickness of the high porosity aquifer, M4 is the thickness of the bedrock aquifer, M1, M2, M3, M4 are all obtained by searching the regional geological exploration drilling data;

[0034] At the same time, the bulk density, elastic modulus, cohesion, internal friction angle, Poisson's ratio, porosity and permeability coefficient of the target protection aquifer, impermeable layer, high porosity aquifer and coal seam were obtained by testing. On this basis, the groundwater loss model of coal seam mining was constructed using COMSOL multi-physics field coupling analysis software as a simulation platform. The relationship between the thickness of different impermeable layers and the groundwater loss of the target protection aquifer under the conditions of average coal seam thickness and average coal seam burial depth in the analysis area was obtained as follows:

[0035] Formula 2: y = a + b × c x

[0036] Among them: y is the groundwater loss, x is the thickness of the impermeable layer, b and c are fitting parameters, and a is a constant;

[0037] Taking the derivative of both sides of the equal sign of formula 2, we get d(y) / d(x)=bc x lnc.

[0038] When d(y) / d(x)=-0.75, the thickness of the waterproof layer x is the optimal waterproof layer thickness. The optimal waterproof layer thickness x is obtained by taking the derivative of formula 2:

[0039]

[0040] Step S2, based on the aquiclude thickness M2 data of each exploration borehole, draw a linear distribution map of the regional aquiclude thickness, delineate the area where the water-conducting fracture zone has not entered the aquiclude and the original aquiclude thickness is less than the optimal aquiclude thickness x, and consider that the area needs to be advancedly transformed for the high-porosity aquifer;

[0041] Step S3, sampling the aquiclude, testing and obtaining the mineral composition and mechanical parameters of the aquiclude, and obtaining a grouting material with properties similar to those of the aquiclude through a proportioning test;

[0042] Step S4, based on the regional exploration drilling data, using formula 1 to calculate the development height H of the water-conducting fracture zone in the area, draw a contour map of the top interface of the water-conducting fracture zone, construct horizontal directional drilling from the ground downward, and keep the final hole layer of the horizontal directional drilling at 15-20m below the bottom boundary of the aquiclude;

[0043] Step S5, using a grouting pump to transport the slurry through the horizontal directional drilling to the high-porosity aquifer between the top boundary of the water-conducting fracture zone and the bottom boundary of the aquiclude to form a grouting stone body;

[0044] Step S6, after completing the grouting process, construct a vertical inspection hole on the ground, sample the core of the grouting layer, observe and measure the slurry diffusion distance L, and carry out a water pressure test to test the permeability coefficient of the grouting layer. When the sum of the slurry diffusion distance L and the thickness of the impermeable layer M2 is greater than the optimal thickness of the impermeable layer x, and the ratio of the permeability coefficient of the grouting layer tested by the water pressure test to the permeability coefficient of the impermeable layer is less than 0.8, it is considered that the transformation requirements are met; if the requirements are not met, grouting is required again until the requirements are met.

[0045] It should be noted that in some mines in the northwest region, such as Figure 2 As shown in the figure, the lower part of the target protection aquifer is an impermeable layer, and there is a high-porosity aquifer under the impermeable layer. The lower part of the high-porosity aquifer is the bedrock aquifer, and the lower part of the bedrock aquifer is the coal seam. The circle formed by the high-porosity aquifer and the bedrock aquifer is the boundary of the water-conducting fracture zone, and the upper part of the boundary of the water-conducting fracture zone is the top boundary of the water-conducting fracture zone.

[0046] The embodiment of the present invention seeks for transformation space in the impermeable layer below the target protection aquifer before coal seam mining, and uses a grouting process to transform the upper section of the high-porosity aquifer into an impermeable layer, thereby increasing the thickness of the impermeable layer below the target protection aquifer, reducing the amount of groundwater in the target protection aquifer caused by coal seam mining disturbance that enters the mining space, reducing the amount of groundwater loss in the target protection aquifer overlying the impermeable layer, and achieving protection of groundwater resources in the target protection aquifer.

[0047] like Figure 3 As shown in the figure, the relationship between different aquifer thicknesses and groundwater loss in the target protected aquifer is shown. It can be seen that the thicker the aquifer, the smaller the groundwater loss in the target protected aquifer. Figure 4 As shown, the high-porosity aquifer advanced transformation area is shown, which is 15-20m below the bottom boundary of the aquiclude.

[0048] Further, in step S2, if Figure 1As shown in the figure, if the water-conducting fracture zone enters the aquiclude, and the distance between the top boundary of the water-conducting fracture zone and the top boundary of the aquiclude is greater than the optimal aquiclude thickness x, then normal mining is performed; if the distance between the top boundary of the water-conducting fracture zone and the top boundary of the aquiclude is less than the optimal aquiclude thickness x, then backfill mining and height-limited mining are performed. If the water-conducting fracture zone does not enter the aquiclude, and the original aquiclude thickness is greater than the optimal aquiclude thickness x, then normal mining is performed.

[0049] In some embodiments, in step S3, the grouting material includes clay, cement and water, the mass ratio of clay to cement is 8:2, and the water-to-solid ratio is 1:1.

[0050] It should be noted that since the composition of the aquiclude is generally clay and sub-clay, the grouting material for transforming the high-porosity aquifer is mainly clay. In order to improve the mechanical parameters of the grouting stone body, an appropriate amount of cement is added to the clay slurry.

[0051] In some embodiments, in step S5, the grouting end pressure is 2.5 times the hydrostatic pressure of the high porosity aquifer, and the grouting pressure stabilization time is 30 minutes.

[0052] The present invention is further described below through specific examples.

[0053] Example 1

[0054] Taking a typical working face in the Ordos Basin as an example, the high-porosity aquifer advanced transformation method based on groundwater resource protection includes the following steps:

[0055] Step 1: Collect the measured data of regional water-conducting fracture zones (Table 1), and respectively count the height of water-conducting fracture zones (H), coal seam mining thickness (M), coal seam mining depth (D), and coal mining face width (B). Use the multivariate regression analysis method to obtain the empirical formula for the height of water-conducting fracture zones:

[0056] H=20.266×M+0.094×B+13.817×lnS-88.443(R 2 =0.788)

[0057] Table 1 Measured data of regional water-conducting fracture zones

[0058]

[0059]

[0060] Step 2: Construct a groundwater loss model for coal seam mining to obtain the relationship between different aquiclude thicknesses and groundwater loss in the target protected aquifer. The groundwater loss in the target protected aquifer and the aquiclude thickness show a power exponential relationship, as shown in the following formula.

[0061] y=215.34+114.28×0.95 x (R 2 =0.9945)

[0062] Where: y is the groundwater loss (m 3 / h), x is the thickness of the waterproof layer (m).

[0063] When d(y) / d(x)=-0.75, the thickness of the waterproof layer x is the optimal waterproof layer thickness. At this time, the optimal waterproof layer thickness x is obtained by the following formula:

[0064]

[0065] Step 3: Based on the empirical formula for the development height of the water-conducting fracture zone given above, it is judged that the water-conducting fracture zone of the working face has not entered the aquiclude (15 to 20 meters away from the bottom of the aquiclude), and the thickness of the original aquiclude in most areas is less than 40 meters. It is believed that areas with original aquiclude thickness less than 40 meters need to carry out advanced transformation of high-porosity aquifers.

[0066] Step 4: Take samples of the aquiclude, test and obtain the mineral composition and mechanical parameters of the aquiclude. On this basis, obtain grouting materials with properties similar to those of the aquiclude through a ratio test. Since the aquiclude is generally composed of clay and sub-clay, the grouting material for transforming the high-porosity aquifer is mainly clay. In order to improve the mechanical parameters of the grouting stone body, an appropriate amount of cement can be added to the clay slurry. Since there is a large amount of loess (a type of clay) around the coal mine, in the specific implementation, the grouting material is a mixture of loess and cement in a ratio of 8:2, and the water-solid ratio of the slurry is 1:1.

[0067] Step 5: Based on the exploration drilling data of the working face, use the empirical formula of the height of the water-conducting fracture zone to calculate the height of the water-conducting fracture zone and draw the contour map of the top interface of the water-conducting fracture zone. Horizontal directional drilling is carried out on the construction ground, and the final hole layer of the horizontal directional drilling is kept 15-20m below the bottom boundary of the aquiclude.

[0068] Step 6: Use a grouting pump to transport the slurry through the horizontal directional drilling to the high-porosity aquifer between the top boundary of the water-conducting fracture zone and the bottom boundary of the aquifer. The hydrostatic pressure of the high-porosity aquifer in the working face is 1MPa, and the grouting end pressure is 2.5 times the hydrostatic pressure of the high-porosity aquifer, so the grouting end pressure is set to 2.5MPa; the grouting stabilization time is 30min.

[0069] Step 7: After the grouting process is completed, a vertical inspection hole is constructed downward on the ground to sample the core of the grouting layer and conduct a water pressure test. The results show that the slurry diffusion distance L exceeds 30m, the original aquiclude thickness M2 is generally greater than 10m, and the sum of the slurry diffusion distance and the aquiclude thickness is greater than the optimal aquiclude thickness of 40m, which meets the transformation thickness requirements. The permeability coefficient of the grouting layer is 0.04m / d, and the permeability coefficient of the aquiclude is 0.034m / d. The ratio of the two is less than 0.8, which is considered to meet the transformation permeability coefficient requirements.

[0070] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0071] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0072] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0073] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0074] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0075] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for advanced transformation of high-porosity aquifers based on groundwater resource protection, characterized in that: The steps include: Step S1, collect measured data of regional water-conducting fracture zones, and respectively count the height H of the water-conducting fracture zone, the thickness M of the coal seam mining, the depth D of the coal seam mining, and the width B of the coal mining face, and use the multivariate regression analysis method to obtain the empirical formula for the height of the water-conducting fracture zone: Formula 1: H = α × M + β × B + γ × ln (D) + C Among them: α, β, γ are fitting parameters, C is a constant, D = M1 + M2 + M3 + M4, M1 is the thickness of the target protection aquifer, M2 is the thickness of the aquiclude, M3 is the thickness of the high porosity aquifer, M4 is the thickness of the bedrock aquifer, M1, M2, M3, M4 are all obtained by searching the regional geological exploration drilling data; At the same time, the bulk density, elastic modulus, cohesion, internal friction angle, Poisson's ratio, porosity and permeability coefficient of the target protection aquifer, impermeable layer, high porosity aquifer and coal seam were obtained by testing. On this basis, the groundwater loss model of coal seam mining was constructed using COMSOL multi-physics field coupling analysis software as a simulation platform. The relationship between the thickness of different impermeable layers and the groundwater loss of the target protection aquifer under the conditions of average coal seam thickness and average coal seam burial depth in the analysis area was obtained as follows: Formula 2: y = a + b × c x Among them: y is the groundwater loss, x is the thickness of the impermeable layer, b and c are fitting parameters, and a is a constant; When d(y) / d(x)=-0.75, the thickness of the waterproof layer x is the optimal waterproof layer thickness. The optimal waterproof layer thickness x is obtained by taking the derivative of formula 2: Formula 3: Step S2, based on the aquiclude thickness M2 data of each exploration borehole, draw a linear distribution map of the regional aquiclude thickness, delineate the area where the water-conducting fracture zone has not entered the aquiclude and the original aquiclude thickness is less than the optimal aquiclude thickness x, and consider that the area needs to be advancedly transformed for the high-porosity aquifer; Step S3, sampling the aquiclude, testing and obtaining the mineral composition and mechanical parameters of the aquiclude, and obtaining a grouting material with properties similar to those of the aquiclude through a proportioning test; Step S4, based on the regional exploration drilling data, using formula 1 to calculate the development height H of the water-conducting fracture zone in the area, draw a contour map of the top interface of the water-conducting fracture zone, construct horizontal directional drilling from the ground downward, and keep the final hole layer of the horizontal directional drilling at 15-20m below the bottom boundary of the aquiclude; Step S5, using a grouting pump to transport the slurry through the horizontal directional drilling hole to the high-porosity aquifer between the top boundary of the water-conducting fracture zone and the bottom boundary of the aquiclude; Step S6, after completing the grouting process, construct a vertical inspection hole on the ground, sample the core of the grouting layer, observe and measure the slurry diffusion distance L, and carry out a water pressure test to test the permeability coefficient of the grouting layer. When the sum of the slurry diffusion distance L and the thickness of the impermeable layer M2 is greater than the optimal thickness of the impermeable layer x, and the ratio of the permeability coefficient of the grouting layer tested by the water pressure test to the permeability coefficient of the impermeable layer is less than 0.8, it is considered that the transformation requirements are met; if the requirements are not met, grouting is required again until the requirements are met.

2. The method for advanced transformation of high-porosity aquifers based on groundwater resource protection according to claim 1 is characterized in that: In step S3, the grouting material includes clay, cement and water, the mass ratio of clay to cement is 8:2, and the water-to-solid ratio is 1:

1.

3. The method for advanced transformation of high-porosity aquifers based on groundwater resource protection according to claim 1 is characterized in that: In step S5, the grouting end pressure is 2.5 times the hydrostatic pressure of the high-porosity aquifer, and the grouting pressure stabilization time is 30 minutes.

Citation Information

Patent Citations

  • Water conservation method used in coal mining process

    CA2945852A1

  • Method for implementing water-preserved coal mining of coal mining area

    CN104564074A

  • Roof water control method based on presplitting and grouting modification

    CN110761814A

  • Method for reconstructing mining overlying strata water-resisting layer through multi-section graded grouting

    CN114837608A

  • Coal mine prevention and control method for thick-layer sandstone water disasters

    CN116044402A