Water heater and control method thereof
By designing a heating device, a water storage tank, and a multi-pipeline system in a gas water heater, and utilizing bypass holes, branch pipe structures, and solenoid valve control, the problems of large water temperature fluctuations and long waiting times have been solved, enabling the rapid acquisition of constant-temperature hot water.
Patent Information
- Application Number
- CN202310605603.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-11-26
AI Technical Summary
Existing gas water heaters suffer from large water temperature fluctuations when restarted or when water pressure fluctuates, which affects user safety and causes long waiting times.
Design a water heater structure including a heating device, a storage tank, and a multi-pipeline system. Hot water is quickly obtained through bypass holes and branch pipes and mixed and heated in the storage tank. Solenoid valves are used to control the water circuit switching to ensure constant temperature performance.
This allows users to quickly obtain hot water while reducing water temperature fluctuations, improving the water heater's temperature control, and shortening waiting time.
Smart Images

Figure CN119022459A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of heating, and in particular to a water heater and a control method thereof. Background Art
[0002] At present, the existing gas water heaters have the problem of large water temperature fluctuations during the second start-up. For example, when the water heater is turned on again within a short period of time after being turned off, the temperature will be high for a short period of time, which may cause the user to be scalded; during the process of the water heater outputting hot water, the hot water temperature may also fluctuate due to water pressure fluctuations and other reasons, affecting user use. In order to achieve better constant temperature performance and avoid large water temperature fluctuations during use and secondary water use, a water storage tank is usually added inside the water heater to reduce the obvious water temperature fluctuations.
[0003] Since the water tank has a certain volume, when the water temperature in the water tank is completely cooled and the user uses hot water, the water heater needs to discharge all the cold water in the water tank before it can output hot water. The larger the volume of the water tank, the longer the water heater takes to heat up, causing the user to wait for hot water for a long time, affecting user use. If the volume of the water tank is reduced, although the heating time can be shortened, it will also affect the constant temperature effect and cause water temperature fluctuations. Summary of the invention
[0004] One of the technical problems solved by the present invention is to provide a water heater which can effectively solve the problem of ensuring that the water heater has a constant temperature function while enabling a user to quickly obtain hot water.
[0005] The second technical problem solved by the present invention is to provide a water heater control method, which enables users to quickly obtain hot water; and the water storage tank can play a role in maintaining a constant temperature and reduce water temperature fluctuations.
[0006] The above technical problems are solved by the following technical solutions:
[0007] A water heater comprises a heating device, wherein a water inlet end of the heating device is connected to a water inlet joint through a first pipeline, and the water heater further comprises a water storage tank, wherein the water storage tank comprises:
[0008] A shell body, wherein the shell body is provided with a water storage cavity, wherein one end of the shell body is provided with a water inlet, and the other end of the shell body is provided with a first water outlet and a second water outlet;
[0009] A main pipe, the main pipe is provided through the water inlet, the water storage chamber and the first water outlet, and the main pipe is sealed and connected to the water inlet and the first water outlet, a bypass hole is provided on the side wall of the main pipe, the bypass hole is connected to the water storage chamber, one end of the main pipe is connected to the water outlet end of the heating device through a second pipe, and the other end is selectively connected to the water outlet joint through a third pipe;
[0010] A branch pipe is sealed and connected to the second water outlet, and one end of the branch pipe extends into the water storage cavity, and the other end is connected to the water outlet joint through a fourth pipeline.
[0011] Compared with the background technology, the water heater of the present invention has the following beneficial effects:
[0012] When the water heater is in use, the connection between the main pipe and the water outlet joint is opened, and the cold water enters the heating device through the water inlet joint and the first pipe. The heating device can heat the cold water, and the heated hot water flows into the main pipe through the second pipe. A part of the hot water is discharged through the main pipe, and the other part of the hot water flows out through the bypass hole. The hot water directly discharged from the main pipe passes through the third pipe and the water outlet joint in turn and then flows out for the user to use, so that the user can quickly obtain hot water; and the hot water flowing out through the bypass hole of the main pipe will first flow to the water storage chamber, mix with the cold water in the water storage chamber, heat the cold water in the water storage chamber, and the mixed water in the water storage chamber passes through the branch pipe and the fourth pipe in turn and mixes with the hot water in the third pipe and then flows to the water outlet joint, and then flows out for the user to use. This design has the effect of balancing the water temperature of the water in the third pipe.
[0013] When the water temperature in the water storage tank reaches the preset temperature, the connection between the main pipe and the water outlet joint is cut off, and the hot water from the heating device is sequentially supplied to the user through the second pipe, the main pipe, the bypass hole, the water storage chamber, the branch pipe, the fourth pipe and the water outlet joint. At this time, the hot water heated by the heating device must be mixed with the water in the water storage tank before it can be discharged. The water storage tank can play a role in maintaining a constant temperature and reduce water temperature fluctuations.
[0014] In one of the embodiments, it further includes a solenoid valve for connecting or cutting off the third pipeline, the solenoid valve is arranged on the third pipeline and the solenoid valve and the fourth pipeline are arranged in parallel.
[0015] In one of the embodiments, it further includes a first flow rate temperature sensor and a controller. The first flow rate temperature sensor is arranged on the fourth pipeline, and the controller is electrically connected to the first flow rate temperature sensor and the solenoid valve respectively.
[0016] In one embodiment, the fourth pipeline is connected to the third pipeline, the third pipeline is provided with a spoiler section, the connecting position between the fourth pipeline and the third pipeline and the spoiler section are sequentially arranged on the third pipeline along the water flow direction, and a spoiler device is arranged in the spoiler section.
[0017] In one embodiment, the spoiler device comprises a spoiler spring, and the spoiler spring is arranged in the spoiler section; or
[0018] The spoiler device comprises a spoiler, and the spoiler is arranged in the spoiler section;
[0019] In one embodiment, there are a plurality of the side through holes, the plurality of side through holes are arranged at intervals along the water flow direction in the main pipe, and the aperture of the side through holes increases in sequence along the water flow direction in the main pipe.
[0020] In one embodiment, the diameter of the main pipe is larger than that of the branch pipe.
[0021] In one embodiment, the side through holes are located at one end of the water storage cavity close to the first water outlet;
[0022] The end of the branch pipe extending into the water storage cavity is located at one end of the water storage cavity far from the second water outlet.
[0023] In one embodiment, the housing includes an upper cover, a sleeve and a lower cover which are connected in sequence, the water inlet is arranged on the upper cover, and the first water outlet and the second water outlet are arranged on the lower cover;
[0024] Both the upper cover and the lower cover are provided with flange edges.
[0025] In one embodiment, a second flow and temperature sensor is arranged on the first pipeline.
[0026] The above second technical problem is solved by the following technical solutions:
[0027] A water heater control method is applied to the above water heater, and includes:
[0028] Obtain the total water flow rate Q_total in the first pipeline detected in real time;
[0029] If it is determined that the total water flow rate Q_total is greater than the start flow rate value Q_start, then obtain the outlet water temperature T_branch in the branch pipe detected in real time;
[0030] If it is determined that the outlet water temperature T_branch is greater than the preset temperature threshold T_set, then control the solenoid valve on the third pipeline to close to disconnect the connection between the main pipe and the water outlet joint;
[0031] If it is determined that the outlet water temperature T_branch is not greater than the preset temperature threshold T_set, then control the solenoid valve on the third pipeline to open to communicate the main pipe with the water outlet joint.
[0032] Compared with the background technology, the beneficial effects of the water heater control method of the present invention are as follows:
[0033] By adopting the above water heater control method, it is realized that the user can quickly obtain hot water; moreover, when the water temperature in the water storage tank reaches the preset temperature threshold T_set, the hot water heated by the heating device needs to be fully mixed with the water in the water storage tank before it can be discharged, and the water storage tank can play a role in keeping the temperature constant and reduce the water temperature fluctuation.
[0034] In one embodiment, after determining that the total water flow rate Qtotal is greater than the start flow rate value Qstart, the method further includes:
[0035] If it is determined that the total water flow rate Qtotal is less than the hot water shut-off flow rate value Qoff, the working state of the water heater is controlled to be a standby state.
[0036] In one embodiment, the water heater control method further includes:
[0037] Obtaining the water temperature T required set by the user, and using the water temperature T required as the temperature threshold T set; or,
[0038] The water temperature T required is linearly calculated with a preset temperature value interval to obtain the temperature threshold T set. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 is a schematic diagram of a water heater provided in a specific embodiment of the present invention;
[0040] Figure 2 It is a schematic diagram of the water flow direction in a water storage tank provided by a specific embodiment of the present invention;
[0041] Figure 3 It is a structural schematic diagram of a water storage tank provided in a specific embodiment of the present invention;
[0042] Figure 4 It is a structural explosion diagram of a water storage tank provided in a specific embodiment of the present invention;
[0043] Figure 5 is a flow chart of a water heater control method provided by a specific embodiment of the present invention;
[0044] Figure 6 It is a flow chart of another water heater control method provided by a specific embodiment of the present invention.
[0045] Description of labels:
[0046] 1. Heating device; 2. First pipeline; 3. Water inlet joint;
[0047] 4. water storage tank; 41. shell; 411. upper cover; 4111. water inlet; 412. sleeve; 413. lower cover; 4131. first water outlet; 4132. second water outlet; 414. water storage chamber; 42. main pipe; 421. bypass hole; 43. branch pipe;
[0048] 5. Second pipeline; 6. Third pipeline; 61. turbulence section; 62. turbulence device; 7. water outlet joint; 8. Fourth pipeline; 9. solenoid valve; 10. First flow temperature sensor; 11. Second flow temperature sensor. DETAILED DESCRIPTION
[0049] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0050] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0052] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operate in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0053] like Figure 1 and Figure 2As shown, this embodiment provides a water heater, which includes a heating device 1 and a water storage tank 4. Specifically, the water inlet end of the heating device 1 is connected to the water inlet joint 3 through the first pipeline 2, and the water storage tank 4 includes a shell 41, a main pipe 42 and a branch pipe 43. The shell 41 is provided with a water storage cavity 414, and one end of the shell 41 is provided with a water inlet 4111, and the other end is provided with a first water outlet 4131 and a second water outlet 4132; the main pipe 42 is arranged through the water inlet 4111, the water storage cavity 414 and the first water outlet 4131, and the main pipe 42 is sealed and connected to the water inlet 414. 111 and the first water outlet 4131, the side wall of the main pipe 42 is provided with a bypass hole 421, the bypass hole 421 is connected to the water storage chamber 414, one end of the main pipe 42 is connected to the water outlet end of the heating device 1 through the second pipe 5, and the other end is connected or cut off with the water outlet joint 7 through the third pipe 6; the branch pipe 43 is sealed and connected to the second water outlet 4132, and one end of the branch pipe 43 extends into the water storage chamber 414, and the other end is connected with the water outlet joint 7 through the fourth pipe 8.
[0054] When the water heater is in use, the connection between the main pipe 42 and the water outlet joint 7 is opened, and cold water enters the heating device 1 through the water inlet joint 3 and the first pipe 2. The heating device 1 can heat the cold water. The heated hot water flows into the main pipe 42 through the second pipe 5, and a part of the hot water is discharged through the main pipe 42, and the other part of the hot water flows out through the bypass hole 421. The hot water directly discharged from the main pipe 42 passes through the third pipe 6 and the water outlet joint 7 in turn and then flows out for the user to use, so that the user can quickly obtain hot water; and the hot water flowing out through the bypass hole 421 of the main pipe 42 will first flow to the water storage chamber 414, mix with the cold water in the water storage chamber 414, heat the cold water in the water storage chamber 414, and the mixed water in the water storage chamber 414 passes through the branch pipe 43 and the fourth pipe 8 in turn and mixes with the hot water in the third pipe 6 and flows to the water outlet joint 7, and then flows out for the user to use. This design has the effect of balancing the water temperature of the water in the third pipe 6. When the water temperature in the water storage tank 4 reaches the preset temperature, the connection between the main pipe 42 and the water outlet joint 7 is cut off, and the hot water of the heating device 1 is sequentially supplied to the user through the second pipe 5, the main pipe 42, the bypass hole 421, the water storage chamber 414, the branch pipe 43, the fourth pipe 8 and the water outlet joint 7. At this time, the hot water heated by the heating device 1 must be mixed with the water in the water storage tank 4 before it can be discharged. The water storage tank 4 can play a role in maintaining a constant temperature and reduce water temperature fluctuations.
[0055] In some embodiments, Figure 1As shown, the water heater further includes a solenoid valve 9 for connecting or cutting off the third pipeline 6. The solenoid valve 9 is arranged on the third pipeline 6 and the solenoid valve 9 and the fourth pipeline 8 are arranged in parallel. When the solenoid valve 9 is opened, the connection between the main pipe 42 and the water outlet joint 7 is realized, and the hot water can flow out through the main pipe 42, the third pipeline 6 and the water outlet joint 7. When the solenoid valve 9 is closed, the connection between the main pipe 42 and the water outlet joint 7 is cut off. At this time, the hot water in the main pipe 42 flows into the water storage chamber 414 from the bypass hole 421, and is sequentially provided to the user through the branch pipe 43, the fourth pipeline 8 and the water outlet joint 7, so that the water heater can discharge constant temperature hot water and reduce water temperature fluctuations.
[0056] In some embodiments, the water heater further includes a first flow rate and temperature sensor 10 and a controller. The first flow rate and temperature sensor 10 is disposed on the fourth pipeline 8. The controller is electrically connected to the first flow rate and temperature sensor 10 and the solenoid valve 9, respectively. The first flow rate and temperature sensor 10 can detect the flow rate and temperature of the water in the fourth pipeline 8. When the temperature of the water in the fourth pipeline 8 is lower than the preset temperature, it indicates that there is still cold water mixed in the water storage tank 4. The controller controls the solenoid valve 9 to be in an open state according to the detection information of the first flow rate and temperature sensor 10. The hot water produced by the water heater can flow out of the main pipe 42 quickly without waiting for the cold and hot water in the water storage tank 4 to be completely mixed or filled, thereby reducing the time for the user to wait for hot water. When the temperature of the water in the fourth pipeline 8 reaches the preset temperature, it indicates that the water storage tank 4 is full of hot water. The controller controls the solenoid valve 9 to be in a closed state according to the detection information of the first flow rate and temperature sensor 10. The tap water that subsequently flows into the water heater needs to be mixed with the hot water in the water storage tank 4 before being discharged, so as to ensure the constant temperature performance of the water heater and reduce water temperature fluctuations.
[0057] In some embodiments, a second flow rate and temperature sensor 11 is provided on the first pipeline 2, and the second flow rate and temperature sensor 11 can detect the flow rate and temperature of water in the first pipeline 2. The second flow rate and temperature sensor 11 and the heating device 1 are both electrically connected to a controller, and the controller adjusts the heating power of the heating device 1 according to the water flow rate information and temperature information in the first pipeline 2 detected by the second flow rate and temperature sensor 11.
[0058] In some embodiments, the fourth pipeline 8 is connected to the third pipeline 6, and the third pipeline 6 is provided with a flow disturbance section 61. The connection position between the fourth pipeline 8 and the third pipeline 6 and the flow disturbance section 61 are sequentially arranged on the third pipeline 6 along the water flow direction, and a flow disturbance device 62 is arranged in the flow disturbance section 61. When the controller controls the solenoid valve 9 to open, the connection between the main pipe 42 and the water outlet joint 7 is opened to be in a connected state, and the main pipe 42 transports the hot water with a higher temperature to the flow disturbance section 61, and at the same time, the branch pipe 43 also transports the hot water with a lower temperature to the flow disturbance section 61 through the fourth pipeline 8. The flow disturbance device 62 in the flow disturbance section 61 can fully mix the two parts of hot water so that the temperature of the hot water flowing out of the water outlet joint 7 is constant.
[0059] In this embodiment, the third pipeline 6 is a one-section pipeline, and the fourth pipeline 8 is connected to the side wall of the third pipeline 6. In other embodiments, the third pipeline 6 can also be two sections of pipelines, one section of the pipeline is provided with a solenoid valve 9, and the other section of the pipeline is a flow-disturbing section 61, and the two sections of the pipeline and the fourth pipeline 8 are connected through a three-way valve.
[0060] In some embodiments, the spoiler device 62 includes a spoiler spring, which is arranged in the spoiler section 61, and / or the spoiler device 62 includes a spoiler plate, which is arranged in the spoiler section 61. The spoiler spring or the spoiler plate can fully disrupt the hot water in the spoiler section 61.
[0061] In some embodiments, Figure 2-Figure 4 As shown, the bypass hole 421 is located at one end of the water storage chamber 414 close to the first water outlet 4131; the end of the branch pipe 43 extending into the water storage chamber 414 is located at one end of the water storage chamber 414 away from the second water outlet 4132. After the hot water in the main pipe 42 of this embodiment flows out through the bypass hole 421, the flow distance of the hot water in the water storage chamber 414 is increased, ensuring that the hot water flowing out of the bypass hole 421 is fully mixed with the cold water in the water storage tank 4 before being discharged through the branch pipe 43, thereby improving the heating efficiency of the cold water in the water storage tank 4.
[0062] In some embodiments, there are multiple bypass holes 421, and the multiple bypass holes 421 are arranged at intervals along the water flow direction in the main pipe 42, and the apertures of the bypass holes 421 increase successively along the water flow direction in the main pipe 42. Among them, by providing multiple bypass holes 421, the amount of hot water discharged from the bypass holes 421 is increased, and the heating efficiency of the cold water in the water storage tank 4 is improved. The closer to the first water outlet 4131, the greater the amount of hot water flowing out of the bypass hole 421, and the hot water is neutralized with the cold water stored in the water storage chamber 414, so that the cold water and hot water in the water storage chamber 414 are fully mixed during the flow process, which also heats the cold water in the water storage tank 4.
[0063] In some embodiments, the diameter of the main pipe 42 is larger than the diameter of the branch pipe 43, so that the water resistance of the main pipe 42 is small. When the solenoid valve 9 is opened, the hot water flows out through the main pipe 42 and the water outlet joint 7 first, and the water temperature of the hot water discharged from the water outlet joint 7 rises rapidly, and the heating time is short. In this embodiment, the diameter of the main pipe 42 is larger than the diameter of the bypass hole 421, and the flow resistance of the water flow in the main pipe 42 is smaller than the flow resistance of the water flow in the bypass hole 421. Most of the hot water is discharged through the main pipe 42, and a small amount of hot water flows out through the bypass hole 421. The temperature of the hot water discharged through the main pipe 42 is relatively high, which is convenient for users to quickly obtain hot water of a preset temperature.
[0064] In this embodiment, the water heater is a gas water heater, and the heating device 1 adopts a gas heating method. The specific heating structure and principle are the existing technology. The heating device 1 includes a heat exchange tube, one end of the heat exchange tube is connected to the first pipeline 2, and the other end is connected to the second pipeline 5. When the user needs to use hot water, the water heater is started, and cold water flows into the heat exchanger from the water inlet connector 3 for heating. In other embodiments, the water heater can also be an electric water heater, and the heating device 1 adopts an electric heating method.
[0065] In some embodiments, the shell 41 includes an upper cover 411, a sleeve 412 and a lower cover 413 connected in sequence, the water inlet 4111 is arranged on the upper cover 411, and the first water outlet 4131 and the second water outlet 4132 are arranged on the lower cover 413; the upper cover 411 and the lower cover 413 are both provided with flange edges to facilitate the fixation of the water storage tank 4.
[0066] like Figure 1 and Figure 5 As shown, this embodiment also provides a water heater control method, which is applied to the above water heater, including:
[0067] S11, obtaining the total water flow Qtotal in the first pipeline 2 detected in real time.
[0068] S12. If it is determined that the total water flow rate Qtotal is greater than the start flow rate value Qstart, the outlet water temperature Tbranch in the branch pipe 43 detected in real time is obtained.
[0069] If the total water flow Qtotal is greater than the start flow value Qstart, it indicates that the user needs to use hot water. The start flow value Qstart can be set according to actual needs. In this embodiment, the range of the start flow value Qstart is 2.5L / min-3L / min.
[0070] S13, determine whether the water temperature T is greater than the preset temperature threshold T, if so, it means that the water in the water tank 4 is still at the temperature required by the user, and execute S14; if not, it means that the water in the water tank 4 is lower than the temperature required by the user, and execute S15.
[0071] S14 , controlling the solenoid valve 9 on the third pipeline 6 to close, so as to disconnect the main pipe 42 and the water outlet connector 7 .
[0072] S15, controlling the solenoid valve 9 on the third pipeline 6 to open, so that the main pipe 42 is connected to the water outlet connector 7, so that the user can quickly obtain hot water.
[0073] This embodiment obtains the total water flow Qtotal in the first pipeline 2 detected in real time. If it is determined that the total water flow Qtotal is greater than the starting flow value Qstart, the outlet water temperature Tbranch in the branch pipe 43 detected in real time is obtained, and it is determined whether the outlet water temperature Tbranch is greater than the preset temperature threshold Tset. If so, the solenoid valve 9 on the third pipeline 6 is controlled to be closed to disconnect the connection between the main pipe 42 and the water outlet connector 7. If not, the solenoid valve 9 on the third pipeline 6 is controlled to be opened to connect the main pipe 42 with the water outlet connector 7. This technical means can enable users to quickly obtain hot water, and the water storage tank 4 can play a role in maintaining a constant temperature and reduce water temperature fluctuations.
[0074] Based on the above embodiments, Figure 6 Another water heater control method provided in this embodiment is applied to the above water heater, including:
[0075] S21, obtaining the total water flow Qtotal in the first pipeline 2 detected in real time.
[0076] S22. Determine whether the total water flow Qtotal is greater than the start flow value Qstart. If so, it means that the user needs to use hot water, and execute S23; if not, it means that the user does not need to use hot water, and execute S24.
[0077] S23, obtaining the outlet water temperature Tbranch in the branch pipe 43 detected in real time, and determining whether the outlet water temperature Tbranch is greater than a preset temperature threshold Tset, if so, executing S25; if not, executing S27.
[0078] Among them, the water temperature T required set by the user is obtained, and the water temperature T required is used as the temperature threshold T set. Alternatively, the water temperature T required is linearly calculated with the preset temperature value interval to obtain the temperature threshold T set. In this embodiment, the preset temperature value interval can be 2°C-5°C. By subtracting the water temperature T required from any value in the preset temperature value interval, the temperature threshold T set can be obtained to prevent the mixed water temperature in the water storage tank 4 from being higher than the water temperature T required, thereby preventing the outlet water temperature T out of the water outlet joint 7 from exceeding the water temperature T required, thereby achieving the purpose of constant temperature and rapid heating.
[0079] S24, controlling the working state of the water heater to be a standby state.
[0080] S25 , controlling the solenoid valve 9 on the third pipeline 6 to close, so as to disconnect the third pipeline 6 from the water outlet connector 7 .
[0081] S26, controlling the heating power of the heating device 1 so that the water temperature Theat of the second pipeline 5 is equal to the water temperature Trequired set by the user, and thus the outlet water temperature Tout is equal to the water temperature Trequired;
[0082] S27 , controlling the solenoid valve 9 on the third pipeline 6 to open, so that the third pipeline 6 is connected to the water outlet connector 7 .
[0083] S28. Obtain the water flow Q branch and the water temperature T branch in the branch pipe 43 in real time, and control the heating power of the heating device 1 so that T heat = (T required * Q total - T branch * Q branch) / (Q total - Q branch).
[0084] Among them, the hot water device controls the combustion load so that the temperature of the hot water outputted from the hot water device to the second pipeline 5 is Thot, Thot=(Tdemand*Qtotal-Tbranch*Qbranch) / (Qtotal-Qbranch), the water flows of the main pipe 42 and the branch pipe 43 are mixed through the turbulence section 61, so that the outlet water temperature Tout is equal to the water temperature Tdemand, and the water temperature of the main pipe 42 is Tmain, because it is directly connected to the hot water device, Tmain=Thot, according to the law of conservation of energy, Tdemand*Qtotal=Tmain*Qmain+Tbranch*Qbranch, Qmain=Qtotal-Qbranch, so it is concluded that Thot=(Tdemand*Qtotal-Tbranch*Qbranch) / (Qtotal-Qbranch).
[0085] S29. Determine whether the water temperature T is equal to the water temperature T set by the user; if so, it means that the water temperature in the water storage tank 4 meets the requirement of the water temperature T, and execute S25. The tap water that subsequently flows into the water heater needs to be mixed with the hot water in the water storage tank 4 before being discharged to ensure the constant temperature performance of the water heater and reduce water temperature fluctuations; if not, execute S30.
[0086] S30, determining whether the total water flow Qtotal is less than the hot water shut-off flow value Qoff, if so, it means that the user does not need to use hot water, and executing S24; if not, executing S23.
[0087] The closing flow value QOFF can be set according to actual needs. In this embodiment, the closing flow value QOFF ranges from 2L / min to 2.5L / min.
[0088] The water heater control method enables users to quickly obtain hot water; moreover, when the water temperature in the water tank 4 reaches the water temperature T required, the hot water heated by the heating device 1 must be mixed with the water in the water tank 4 before it can be discharged. The water tank 4 can play a role in maintaining a constant temperature and reduce water temperature fluctuations.
[0089] It should be noted that the first flow temperature sensor 10 on the fourth pipeline 8 can obtain the outlet water temperature T branch and the water flow rate Q branch; the second flow temperature sensor 11 on the first pipeline 2 can obtain the water temperature T heat and the total water flow rate Q total; a temperature sensor can be set at the water outlet joint 7 to detect the outlet water temperature T out of the water outlet joint 7; the solenoid valve 9 can control the connectivity between the main pipe 42 and the water outlet joint 7.
[0090] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A water heater, comprising a heating device (1), wherein a water inlet end of the heating device (1) is connected to a water inlet joint (3) via a first pipe (2), characterized in that: The water heater further comprises a water storage tank (4), wherein the water storage tank (4) comprises: A shell (41), wherein the shell (41) is provided with a water storage chamber (414), one end of the shell (41) is provided with a water inlet (4111), and the other end of the shell (41) is provided with a first water outlet (4131) and a second water outlet (4132); a main pipe (42), the main pipe (42) being arranged through the water inlet (4111), the water storage chamber (414) and the first water outlet (4131), and the main pipe (42) being sealedly connected to the water inlet (4111) and the first water outlet (4131), a bypass hole (421) being arranged on a side wall of the main pipe (42), the bypass hole (421) being connected to the water storage chamber (414), one end of the main pipe (42) being connected to the water outlet end of the heating device (1) through a second pipe (5), and the other end of the main pipe (42) being connected to or cut off from a water outlet joint (7) through a third pipe (6); A branch pipe (43), wherein the branch pipe (43) is sealedly connected to the second water outlet (4132), and one end of the branch pipe (43) extends into the water storage chamber (414), and the other end is connected to the water outlet joint (7) through a fourth pipeline (8).
2. The water heater according to claim 1, characterized in that: It also comprises a solenoid valve (9) for connecting or cutting off the third pipeline (6); the solenoid valve (9) is arranged on the third pipeline (6) and the solenoid valve (9) and the fourth pipeline (8) are arranged in parallel.
3. The water heater according to claim 2, characterized in that: It also includes a first flow rate temperature sensor (10) and a controller, wherein the first flow rate temperature sensor (10) is arranged on the fourth pipeline (8), and the controller is electrically connected to the first flow rate temperature sensor (10) and the solenoid valve (9), respectively.
4. The water heater according to claim 1, characterized in that: The fourth pipeline (8) is connected to the third pipeline (6), the third pipeline (6) is provided with a flow-disturbing section (61), the connecting position between the fourth pipeline (8) and the third pipeline (6) and the flow-disturbing section (61) are arranged on the third pipeline (6) in sequence along the direction of water flow, and a flow-disturbing device (62) is arranged in the flow-disturbing section (61).
5. The water heater according to claim 4, characterized in that: The spoiler device (62) comprises a spoiler spring, wherein the spoiler spring is arranged in the spoiler section (61); and / or The spoiler device (62) comprises a spoiler plate, and the spoiler plate is arranged in the spoiler section (61).
6. The water heater according to claim 1, characterized in that: The bypass hole (421) is located at one end of the water storage chamber (414) close to the first water outlet (4131); The end of the branch pipe (43) extending into the water storage chamber (414) is located at an end of the water storage chamber (414) away from the second water outlet (4132).
7. The water heater according to claim 6, characterized in that: There are a plurality of bypass holes (421), and the plurality of bypass holes (421) are arranged at intervals along the water flow direction in the main pipe (42), and the apertures of the bypass holes (421) increase sequentially along the water flow direction in the main pipe (42).
8. The water heater according to claim 1, characterized in that: The diameter of the main pipe (42) is greater than the diameter of the branch pipe (43).
9. A water heater control method, characterized in that: The water heater according to claim 2 comprises: Obtaining the total water flow Qtotal in the first pipeline (2) detected in real time; If it is determined that the total water flow rate Q_total is greater than the start-up flow rate value Q_start, then obtain the outlet water temperature T_branch in the branch pipe (43) detected in real time; If it is determined that the outlet water temperature T_branch is greater than the preset temperature threshold T_set, then control the solenoid valve (9) on the third pipeline (6) to close, so as to disconnect the connection between the main pipe (42) and the water outlet joint (7); If it is determined that the outlet water temperature T_branch is not greater than the preset temperature threshold T_set, then control the solenoid valve (9) on the third pipeline (6) to open, so that the main pipe (42) is communicated with the water outlet joint (7).
10. The water heater control method according to claim 9, characterized in that: After it is determined that the total water flow rate Q_total is greater than the start-up flow rate value Q_start, it further includes: If it is determined that the total water flow rate Q_total is less than the hot water shut-off flow rate value Q_off, then control the working state of the water heater to the standby state.
11. The water heater control method according to claim 9, characterized in that: The water heater control method further includes: Obtain the required water temperature T_required set by the user, and use the required water temperature T_required as the temperature threshold T_set; or, Perform a linear operation on the required water temperature T_required and a preset temperature value range to obtain the temperature threshold T_set.