Power grid fault diagnosis method and device based on new energy side control strategy
By introducing new energy side control strategy information in power grid fault diagnosis, combining protection action and circuit breaker information, using the three-phase current deduction value and KL similarity to judge the fault, the error of traditional methods under the high permeability access of new energy is solved. Diagnosing and misdiagnosing problems improves the accuracy of grid fault diagnosis.
Patent Information
- Application Number
- CN202411039052.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-26
AI Technical Summary
Traditional power grid fault diagnosis methods are prone to misdiagnosis and misdiagnosis under the high permeability access of new energy, and the refusal and misalignment of protective devices and circuit breakers is complex, resulting in insufficient diagnostic accuracy.
The grid fault diagnosis method based on the new energy side control strategy is adopted. By obtaining grid equipment information, including protection action information, circuit breaker action information and inverter control strategy information, preliminary diagnosis results are generated, suspicious lines are screened, and three-phase voltage is passed. The three-phase current deduction value is calculated by combining the KL similarity and threshold value to determine the fault, and correct the preliminary diagnostic results.
It significantly improves the accuracy of grid fault diagnosis with new energy power supplies, and enhances the applicability and accuracy of diagnosis under the influence of new energy.
Smart Images

Figure CN119024095A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transmission network fault diagnosis, and in particular to a power transmission network fault diagnosis method and device based on a new energy side control strategy. Background Art
[0002] Power grid fault diagnosis relies on the massive amount of information received by the power system dispatching and control center's supervisory control and data acquisition system (SCADA) and energy management system (EMS). It is an automated function that accurately identifies the location of the fault and locates the line. It is an important guarantee for the safe and reliable operation of the power grid. It can help staff quickly locate the fault, eliminate it in time, and restore the normal operation of the power grid.
[0003] At present, the most common method for diagnosing power grid faults is to determine whether a line fault has occurred based on the action information of the protection device and the position information of the circuit breaker. However, the protection device and the circuit breaker may fail to operate or malfunction from time to time, which may lead to misdiagnosis of faults. Therefore, the traditional power grid fault diagnosis method needs to be improved to address the above problems. At the same time, with the rapid development of new energy, the converter control strategy on the new energy power supply side has a significant impact on the action behavior of the protection, further exacerbating the risk of failure and malfunction of the protection device, and changing the electrical quantity characteristics during power grid faults, which will inevitably lead to the traditional power grid fault diagnosis method's lack of adaptability to the high penetration rate of new energy access, and more prone to misdiagnosis and missed diagnosis. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a power grid fault diagnosis method and device based on a new energy side control strategy to solve the above technical problems
[0005] The technical solution of the present invention to solve the above technical problems is as follows: a power grid fault diagnosis method based on a new energy side control strategy, comprising:
[0006] Obtaining grid equipment information of the grid to be diagnosed, wherein the grid equipment information is information describing protection action information, circuit breaker action information, and converter control strategy information of a new energy station incorporated into the grid; the protection action information is information describing whether protection devices associated with each line in the grid are in action; the circuit breaker action information is information describing whether circuit breakers associated with each line in the grid are in action;
[0007] According to the power grid equipment information, a preliminary diagnosis result of the power grid fault is generated, and a suspicious line is determined; the preliminary diagnosis result of the power grid fault is information describing the fault status of each line in the power grid; the suspicious line represents a line that is affected by the converter control strategy of the new energy station incorporated into the power grid and has a risk of misjudgment of the fault status;
[0008] Respectively obtaining three-phase voltage sampling values and three-phase current sampling values of each of the suspicious lines;
[0009] According to the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines, the three-phase current deduction values of each of the suspicious lines are calculated respectively, wherein the three-phase current deduction values represent the theoretical values of the opposite-end current after the traveling wave propagates through the entire line;
[0010] For each of the suspicious lines, generating a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line, the suspicious line diagnosis result being a fault or no fault;
[0011] The preliminary power grid fault diagnosis result is corrected by using the diagnosis results of each of the suspicious lines to obtain a power grid fault diagnosis result.
[0012] The beneficial effect of the present invention is that the present invention improves the diagnostic algorithm based on the traditional power grid fault diagnosis model by considering the coupling relationship between the control strategy of the converter on the new energy side and the protection and circuit breaker action. First, the suspicious lines that are affected by the control strategy of the converter on the new energy side and may be misjudged or missed by the traditional model are screened out, and then the actual operating status of the suspicious lines is further determined. The present invention is expected to significantly improve the accuracy of fault diagnosis of power grids containing new energy power sources, and has high applicability and good promotion and utilization value.
[0013] Based on the above technical solution, the present invention can also be improved as follows.
[0014] Further, the protection action information includes the main protection action state, the first backup protection action state, the second backup protection action state corresponding to each line in the power grid and the bus main protection action state at both ends of each line; the circuit breaker action information includes the circuit breaker position state corresponding to each line, and the associated circuit breaker position state of each line and the next level adjacent line of the line; the converter control strategy information includes the control strategy state of each converter of the new energy station incorporated into the power grid;
[0015] The main protection action state, the first backup protection action state, the second backup protection action state, the busbar main protection action state, the circuit breaker position state and the associated circuit breaker position state all include an action state and an unaction state;
[0016] The control strategy state includes a fault control strategy state and a fault control strategy state. The fault control strategy state is to adopt a low voltage ride-through fault control strategy or a negative sequence suppression fault control strategy.
[0017] Further, generating a preliminary diagnosis result of a power grid fault according to the power grid equipment information includes:
[0018] Based on the protection action information and the circuit breaker action information, the objective function of the pre-established analytical fault diagnosis model is optimized by a genetic algorithm to generate a preliminary power grid fault diagnosis result, wherein the objective function of the analytical fault diagnosis model is:
[0019]
[0020] In the formula, E represents the target value, R mi Indicates the main protection action status of the i-th line, R pi Indicates the first backup protection action state of the i-th line, R bi Indicates the second backup protection action state of the i-th line, C i represents the circuit breaker position state of the i-th line, C ig represents the position status of the associated circuit breaker of the ith line, represents the expected value of the main protection action state of the i-th line, represents the expected value of the first backup protection action state of the i-th line, represents the expected value of the second backup protection action state of the i-th line, represents the expected value of the circuit breaker position state of the i-th line, represents the expected value of the position state of the associated circuit breaker of the i-th line; The expression is:
[0021]
[0022] In the formula, S Li represents the fault status of the ith line, S M and S N Respectively represent the fault status of the busbar main protection at both ends of the i-th line, S Lg represents the fault status of the next-level adjacent line of the ith line, C g represents the circuit breaker position status of the next level adjacent line of the i-th line, R mM and R mN They respectively represent the busbar main protection action status at both ends of the i-th line.
[0023] Further, determining suspicious lines according to the power grid equipment information includes: determining, according to the converter control strategy information, lines associated with converters whose control strategy state is to adopt a fault control strategy state as suspicious lines.
[0024] Further, for each of the suspicious lines, the three-phase voltage sampling values include a first three-phase voltage sampling value and a second three-phase voltage sampling value, and the three-phase current sampling values include a first three-phase current sampling value and a second three-phase current sampling value; respectively obtaining the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines includes:
[0025] For each of the suspicious lines, obtain a first three-phase voltage amplitude and a first three-phase current amplitude at one end of the suspicious line, and obtain a second three-phase voltage amplitude and a second three-phase current amplitude at the other end of the suspicious line;
[0026] For each of the suspicious lines, outliers in the first three-phase voltage amplitude, the first three-phase current amplitude, the second three-phase voltage amplitude, and the second three-phase current amplitude are respectively detected by an outlier detection algorithm;
[0027] For each of the suspicious lines, the outliers corresponding to the suspicious lines are deleted, and the data positions corresponding to the outliers are filled in by linear interpolation to obtain the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value, and the second three-phase current sampling value.
[0028] Further, for each of the suspicious lines, the three-phase current derivation value includes a first three-phase current derivation value and a second three-phase current derivation value; the three-phase current derivation value of each of the suspicious lines is calculated according to the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines, including:
[0029] For each of the suspicious lines, according to the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value and the second three-phase current sampling value corresponding to the suspicious line, a first three-phase current deduced value and a second three-phase current deduced value are respectively calculated by a first formula;
[0030] The first formula is:
[0031] In the formula, I' N Indicates the first three-phase current deduced value, U N Indicates the first three-phase voltage sampling value, I N Represents the first three-phase current sampling value, I' M Indicates the second three-phase current deduced value, U M Indicates the second three-phase voltage sampling value, I M Indicates the second three-phase current sampling value;
[0032] in,
[0033]
[0034] Where D e (τ) represents the delay factor; R represents the line resistance; Z c represents the line wave impedance; τ represents the time it takes for a wave to be transmitted from one end of the line to the other end, τ = l / v, l represents the line length, and v represents the speed of light.
[0035] Further, for each of the suspicious lines, the three phases of the suspicious line include phase A, phase B and phase C, the first three-phase current sampling value includes a first phase A current sampling value, a first phase B current sampling value and a first phase C current sampling value, the first three-phase current deduction value includes a first phase A current deduction value, a first phase B current deduction value and a first phase C current deduction value, the second three-phase current sampling value includes a second phase A current sampling value, a second phase B current sampling value and a second phase C current sampling value, and the second three-phase current deduction value includes a second phase A current deduction value, a second phase B current deduction value and a second phase C current deduction value;
[0036] The generating a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line includes:
[0037] For each of the suspicious lines, a threshold value is calculated according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line;
[0038] For each of the suspicious lines, based on the first three-phase current sampling values and the first three-phase current deduced values corresponding to the suspicious line, the first A-phase similarity, the first B-phase similarity and the first C-phase similarity between the corresponding phases in the first three-phase current sampling values and the first three-phase current deduced values are respectively calculated by KL similarity;
[0039] For each of the suspicious lines, based on the second three-phase current sampling values and the second three-phase current deduced values corresponding to the suspicious line, the second A-phase similarity, the second B-phase similarity and the second C-phase similarity between the phases corresponding to the second three-phase current sampling values and the second three-phase current deduced values are respectively calculated by KL similarity;
[0040] For each of the suspicious lines, judging whether three phases of the suspicious line are faulty according to the first A-phase similarity, the first B-phase similarity, the first C-phase similarity, the second A-phase similarity, the second B-phase similarity, the second C-phase similarity and the threshold value corresponding to the suspicious line;
[0041] For each of the suspicious lines, if at least one of the three phases of the suspicious line fails, the suspicious line diagnosis result of the suspicious line is determined to be a failure; otherwise, the suspicious line diagnosis result of the suspicious line is determined to be no failure.
[0042] Further, for each of the suspicious lines, calculating a threshold value according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line includes:
[0043] For each of the suspicious lines, respectively calculating a first current effective value at one end of the suspicious line and a second current effective value at the other end of the suspicious line according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line;
[0044] For each of the suspicious lines, a threshold value is calculated by a second formula based on the first current effective value and the second current effective value corresponding to the suspicious line;
[0045] The second formula is: D set =min(I Mrms , I Nrms )·(K trans +K error )·K rel ;
[0046] Where D set represents the threshold value, K trans Indicates the transformer transmission error coefficient, K error Represents the model error coefficient, K rel Represents the reliability coefficient; I Nrms Represents the effective value of the first current, I Mrms Indicates the effective value of the second current.
[0047] Further, for each of the suspicious lines, judging whether three phases of the suspicious line are faulty according to the first A-phase similarity, the first B-phase similarity, the first C-phase similarity, the second A-phase similarity, the second B-phase similarity, the second C-phase similarity and the threshold value corresponding to the suspicious line includes:
[0048] For each of the suspicious lines, if the first phase A similarity and the second phase A similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the phase A of the suspicious line is faulty; otherwise, it is determined that the phase A of the suspicious line is not faulty;
[0049] For each of the suspicious lines, if the first B-phase similarity and the second B-phase similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the B-phase of the suspicious line is faulty; otherwise, it is determined that the B-phase of the suspicious line is not faulty;
[0050] For each of the suspicious lines, if the first C-phase similarity and the second C-phase similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the C-phase of the suspicious line is faulty; otherwise, it is determined that the C-phase of the suspicious line is not faulty.
[0051] In order to solve the above technical problems, the present invention also proposes a power grid fault diagnosis device based on a new energy side control strategy, comprising:
[0052] An information acquisition module, used to acquire grid equipment information of the grid to be diagnosed, wherein the grid equipment information is information describing protection action information of the grid, circuit breaker action information, and converter control strategy information of a new energy station incorporated into the grid; the protection action information is information describing whether the protection device associated with each line in the grid is in action; the circuit breaker action information is information describing whether the circuit breaker associated with each line in the grid is in action;
[0053] A preliminary diagnosis module is used to generate preliminary diagnosis results of power grid faults according to the power grid equipment information, and determine suspicious lines; the preliminary diagnosis results of power grid faults are information describing the fault status of each line in the power grid; the suspicious lines represent lines that are affected by the converter control strategy of the new energy station incorporated into the power grid and have the risk of misjudging the fault status;
[0054] A data acquisition module, used to respectively acquire the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines;
[0055] A deduction module, used to calculate the three-phase current deduction value of each of the suspicious lines according to the three-phase voltage sampling value and the three-phase current sampling value of each of the suspicious lines, wherein the three-phase current deduction value represents the theoretical value of the opposite end current after the traveling wave propagates through the entire line;
[0056] A suspicious line diagnosis module, for generating, for each of the suspicious lines, a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line, wherein the suspicious line diagnosis result is a failure or no failure;
[0057] The correction module is used to correct the preliminary diagnosis result of the power grid fault by using the diagnosis results of each of the suspicious lines to obtain the power grid fault diagnosis result. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 A flowchart of a power grid fault diagnosis method based on a new energy side control strategy provided by an embodiment of the present invention;
[0059] Figure 2 A structural diagram of an AC power transmission line provided by an embodiment of the present invention;
[0060] Figure 3 A KL similarity graph of phase A of the L1 line provided by an embodiment of the present invention;
[0061] Figure 4 A KL similarity graph of phase A of the L2 line provided by an embodiment of the present invention;
[0062] Figure 5 A KL similarity graph of phase C of the L1 line provided by an embodiment of the present invention;
[0063] Figure 6 A KL similarity graph of phase C of the L2 line provided by an embodiment of the present invention;
[0064] Figure 7 A schematic diagram of a power grid fault diagnosis device based on a new energy side control strategy provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0065] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0066] Embodiment 1
[0067] like Figure 1As shown, this embodiment provides a power grid fault diagnosis method based on the new energy side control strategy, including: obtaining power grid equipment information of the power grid to be diagnosed, the power grid equipment information is protection action information, circuit breaker action information and converter control strategy information of the new energy field station incorporated into the power grid describing the power grid; the protection action information is information describing whether the protection device associated with each line in the power grid is in action; the circuit breaker action information is information describing whether the circuit breaker associated with each line in the power grid is in action; based on the power grid equipment information, generating a preliminary power grid fault diagnosis result and determining a suspicious line; the preliminary power grid fault diagnosis result is information describing the fault status of each line in the power grid; the suspicious line represents the power grid affected by the new energy field station incorporated into the power grid The influence of the converter control strategy of the source station on the lines with the risk of misjudgment of the fault state; respectively obtain the three-phase voltage sampling value and the three-phase current sampling value of each of the suspicious lines; respectively calculate the three-phase current deduction value of each of the suspicious lines according to the three-phase voltage sampling value and the three-phase current sampling value of each of the suspicious lines, and the three-phase current deduction value represents the theoretical value of the opposite end current after the traveling wave propagates through the entire line; for each of the suspicious lines, generate the suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduction value and the three-phase current sampling value of the suspicious line, and the suspicious line diagnosis result is whether a fault has occurred or not; correct the preliminary diagnosis result of the power grid fault through the diagnosis results of each of the suspicious lines to obtain the power grid fault diagnosis result.
[0068] This embodiment improves the diagnostic algorithm based on the traditional power grid fault diagnosis model by considering the coupling relationship between the control strategy of the converter on the new energy side and the protection and circuit breaker action. First, the suspicious lines that may be misjudged or missed by the traditional model due to the control strategy of the converter on the new energy side are screened out, and then the actual operating status of the suspicious lines is further determined. This embodiment is expected to significantly improve the accuracy of fault diagnosis of power grids containing new energy power sources, and has high applicability and good promotion and utilization value.
[0069] Optionally, in an embodiment, the protection action information includes the main protection action status, the first backup protection action status, the second backup protection action status and the bus main protection action status at both ends of each line corresponding to each line in the power grid; the circuit breaker action information includes the circuit breaker position status corresponding to each line, and the associated circuit breaker position status of each line and the next-level adjacent line of the line; the converter control strategy information includes the control strategy status of each converter of the new energy station incorporated into the power grid; the main protection action status, the first backup protection action status, the second backup protection action status, the bus main protection action status, the circuit breaker position status and the associated circuit breaker position status all include an action status and an unaction status; the control strategy status includes a fault control strategy adoption status and a fault control strategy non-adopted status, and the fault control strategy adoption status is to adopt a low voltage ride-through fault control strategy or a negative sequence suppression fault control strategy.
[0070] In the power grid, the two ends of a line are connected to the busbars respectively, and each busbar is provided with busbar main protection. The line is provided with main protection, first backup protection and second backup protection respectively, and the first backup protection and the second backup protection are also called near backup protection and far backup protection respectively. Main protection refers to the protection that meets the requirements of system stability and equipment safety and can selectively cut off the protected equipment and lines at the fastest speed. Near backup protection refers to the backup protection implemented by another set of protection of the power equipment or line when the main protection fails to operate: when the circuit breaker fails to operate, the backup protection is implemented by the circuit breaker failure protection. Far backup protection is the backup protection implemented by the protection of adjacent power equipment or lines when the main protection or circuit breaker fails to operate. For example, the backup protection of the transformer is the far backup of the line.
[0071] The protection action information, circuit breaker action information and converter control strategy information can all be collected through the power system dispatching and control center. The protection action information is recorded as R, the circuit breaker action information is recorded as C, and the converter control strategy information is recorded as Q. For the main protection action state, the first backup protection action state, the second backup protection action state, the busbar main protection action state, the circuit breaker position state and the associated circuit breaker position state, if it is in the action state, it is recorded as 1, if it is in the non-action state, it is recorded as 0. For the control strategy state of the converter, if it is in the state of adopting the fault control strategy, it is recorded as 1, if it is in the state of not adopting the fault control strategy, it is recorded as 0. The protection action information, the circuit breaker action information and the converter control strategy information form three sets of data sequences.
[0072] Optionally, in an embodiment, generating a preliminary diagnosis result of a power grid fault according to the power grid equipment information includes:
[0073] Based on the protection action information and the circuit breaker action information, the objective function of the pre-established analytical fault diagnosis model is optimized by a genetic algorithm to generate a preliminary power grid fault diagnosis result, wherein the objective function of the analytical fault diagnosis model is:
[0074]
[0075] In the formula, E represents the target value, R mi Indicates the main protection action status of the ith line, R pi Indicates the first backup protection action state of the i-th line, R bi Indicates the second backup protection action state of the i-th line, C i represents the circuit breaker position state of the i-th line, C ig represents the position status of the associated circuit breaker of the ith line, represents the expected value of the main protection action state of the i-th line, represents the expected value of the first backup protection action state of the i-th line, represents the expected value of the second backup protection action state of the i-th line, represents the expected value of the circuit breaker position state of the i-th line, represents the expected value of the position state of the associated circuit breaker of the i-th line; The expression is:
[0076]
[0077] In the formula, S Li represents the fault status of the ith line, S M and S N Respectively represent the fault status of the busbar main protection at both ends of the i-th line, S Lg represents the fault status of the next-level adjacent line of the ith line, C g represents the circuit breaker position status of the next level adjacent line of the i-th line, R mM and R mN They respectively represent the busbar main protection action status at both ends of the i-th line.
[0078] By optimizing the objective function of the analytical fault diagnosis model through genetic algorithm, the fault status of all lines can be obtained, the fault status of all lines can be saved in a set, and the preliminary diagnosis result of the power grid fault can be generated. The preliminary diagnosis result of the power grid fault uses 0 and 1 to represent the fault status of the line, 0 means that the line has no fault, and 1 means that the circuit has a fault.
[0079] Optionally, in an embodiment, determining a suspicious line according to the power grid equipment information includes: determining a line associated with a converter whose control strategy state is to adopt a fault control strategy state as a suspicious line according to the converter control strategy information.
[0080] If a line is associated with at least two converters at the same time, as long as the control strategy state of one of the converters is to adopt the fault control strategy state, the line is determined as a suspicious line.
[0081] Optionally, in an embodiment, for each of the suspicious lines, the three-phase voltage sampling values include a first three-phase voltage sampling value and a second three-phase voltage sampling value, and the three-phase current sampling values include a first three-phase current sampling value and a second three-phase current sampling value; the three-phase voltage sampling values and three-phase current sampling values of each of the suspicious lines are obtained separately, including: for each of the suspicious lines, obtaining the first three-phase voltage amplitude and the first three-phase current amplitude at one end of the suspicious line, and obtaining the second three-phase voltage amplitude and the second three-phase current amplitude at the other end of the suspicious line; for each of the suspicious lines, outliers in the first three-phase voltage amplitude, the first three-phase current amplitude, the second three-phase voltage amplitude and the second three-phase current amplitude are detected separately by an outlier detection algorithm; for each of the suspicious lines, the outliers corresponding to the suspicious lines are deleted, and the data positions corresponding to the outliers are filled by linear interpolation to obtain the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value and the second three-phase current sampling value.
[0082] The first three-phase voltage amplitude is recorded as The first three-phase current amplitude is recorded as The second three-phase voltage amplitude is recorded as The second three-phase current amplitude is recorded as The length of the collected data n is set to 1200.
[0083] The first three-phase voltage amplitude Take the example to explain the outlier detection algorithm:
[0084] Define the Z-score:
[0085] Among them, v k express The kth data value in , express The average value, s represents The standard deviation of .
[0086] If Z satisfies the following relationship, then the current v k is an outlier, that is, an abnormal value:
[0087]
[0088] In the formula, It represents the value of t probability distribution under the significance level α / (2n), where α is generally taken as 0.05 and n represents the length of collected data.
[0089] in, The method to obtain is:
[0090]
[0091] In the formula, t α (n) can be found from the upper quantile table of t distribution. When α is 0.05, t α (n) = 1.645. Γ is the gamma function, and the specific calculation formula of the gamma function is:
[0092] The first three-phase voltage amplitude Taking as an example, the following describes how to fill in the gaps in the data positions corresponding to the outliers by using the linear interpolation method:
[0093] The following formula is used to fill the gaps in the data positions corresponding to the outliers:
[0094]
[0095] In the formula, v pe express The outliers deleted in v are the missing values; pe+1 Indicates v pe The next normal data, v pe+w With v pe The interval is w data. If v pe exist The first end of the pe+1 Interpolation is performed. If v pe exist The end of the pe-1 Interpolation, v pe-1 Indicates v pe The previous normal data.
[0096] According to the above method, the first three-phase voltage amplitude, the first three-phase current amplitude, the second three-phase voltage amplitude and the second three-phase current amplitude are respectively subjected to discrete point detection and gap filling processing to obtain the first three-phase voltage sampling value. The first three-phase current sampling value The second three-phase voltage sampling value And the second three-phase current sampling value
[0097] Optionally, in an embodiment, for each of the suspicious lines, the three-phase current derivation value includes a first three-phase current derivation value and a second three-phase current derivation value; the three-phase current derivation value of each of the suspicious lines is calculated according to the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines, including:
[0098] For each of the suspicious lines, according to the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value and the second three-phase current sampling value corresponding to the suspicious line, a first three-phase current deduced value and a second three-phase current deduced value are respectively calculated by a first formula;
[0099] The first formula is:
[0100] In the formula, I' N Indicates the first three-phase current deduced value, U N Indicates the first three-phase voltage sampling value, I N Represents the first three-phase current sampling value, I' M Indicates the second three-phase current deduced value, U M Indicates the second three-phase voltage sampling value, I M Indicates the second three-phase current sampling value;
[0101] in,
[0102]
[0103] Where D e (τ) represents the delay factor, which is used to delay the data sequence by τ seconds; R represents the line resistance; Z c represents the line wave impedance; τ represents the time it takes for a wave to be transmitted from one end of the line to the other end, τ = l / v, l represents the line length, and v represents the speed of light.
[0104] Through the Berelon model, the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value and the second three-phase current sampling value are deduced to the opposite side of the line to obtain the first three-phase current deduction value. and the second three-phase current deduced value
[0105] Optionally, in an embodiment, for each of the suspicious lines, the three phases of the suspicious line include phase A, phase B and phase C, the first three-phase current sampling value includes a first phase A current sampling value, a first phase B current sampling value and a first phase C current sampling value, the first three-phase current deduction value includes a first phase A current sampling value, a first phase B current sampling value and a first phase C current deduction value, the second three-phase current sampling value includes a second phase A current sampling value, a second phase B current sampling value and a second phase C current sampling value, and the second three-phase current deduction value includes a second phase A current deduction value, a second phase B current deduction value and a second phase C current deduction value; the generating of the suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduction value and the three-phase current sampling value of the suspicious line includes: for each of the suspicious lines, according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line, calculating the threshold value; for each of the suspicious lines, based on the first three-phase current sampling value and the first three-phase current deduction value corresponding to the suspicious line, through the KL phase The similarity is used to respectively calculate the first A phase similarity, the first B phase similarity and the first C phase similarity between the corresponding phases in the first three-phase current sampling value and the first three-phase current deduced value; for each of the suspicious lines, based on the second three-phase current sampling value and the second three-phase current deduced value corresponding to the suspicious line, the second A phase similarity, the second B phase similarity and the second C phase similarity between the phases corresponding to the second three-phase current sampling value and the second three-phase current deduced value are respectively calculated by KL similarity; for each of the suspicious lines, according to the first A phase similarity, the first B phase similarity, the first C phase similarity, the second A phase similarity, the second B phase similarity, the second C phase similarity and the threshold value corresponding to the suspicious line, it is judged whether the three phases of the suspicious line are faulty; for each of the suspicious lines, if at least one of the three phases of the suspicious line is faulty, the suspicious line diagnosis result of the suspicious line is determined to be faulty; otherwise, the suspicious line diagnosis result of the suspicious line is determined to be no faulty.
[0106] Taking the calculation of the first phase A similarity as an example, the similarity calculation is explained:
[0107] According to the first three-phase current sampling value and the first three-phase current deduced value Calculate separately The probability distribution function of each data value in and The probability distribution function for each data value in .
[0108] by The first data value in Taking the first data value in as an example, the calculation of the probability distribution function is explained:
[0109]
[0110] Among them, x represents The first data value in x k express The kth data value in; p(x) represents The probability distribution function of the first data value in ; y represents The first data value in y k express The kth data value in ; q(y) represents The probability distribution function of the first data value in ; h represents the smoothing parameter, which is generally 0.8 to 2; K[·] is the kernel function, and the kernel function generally uses the Gaussian kernel function, that is:
[0111]
[0112] According to the above calculation method, calculate The probability distribution function of each data value in and The probability distribution function for each data value in .
[0113] according to The probability distribution function of each data value in and The probability distribution function of each data value in is used to calculate the similarity of the first phase A. The specific formula is:
[0114]
[0115] Where D KL (p(x)||q(y)) represents the first A-phase similarity, p(x k )express The probability distribution function of the kth data value in , q(y k )express The probability distribution function of the kth data value in .
[0116] The first B phase similarity, the first C phase similarity, the second A phase similarity, the second B phase similarity, and the second C phase similarity are all calculated according to the above method. The first A phase similarity is recorded as The first B phase similarity is denoted as The first C phase similarity is denoted as The similarity of the second phase A is recorded as The second B phase similarity is recorded as The second C phase similarity is recorded as
[0117] Optionally, in an embodiment, for each of the suspicious lines, calculating a threshold value according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line includes:
[0118] For each of the suspicious lines, respectively calculating a first current effective value at one end of the suspicious line and a second current effective value at the other end of the suspicious line according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line;
[0119] For each of the suspicious lines, a threshold value is calculated by a second formula based on the first current effective value and the second current effective value corresponding to the suspicious line;
[0120] The second formula is: D set =min(I Mrms , I Nrms )·(K trans +K error )·K rel ;
[0121] Where D set represents the threshold value, K trans Indicates the transformer transmission error coefficient, K error Represents the model error coefficient, K rel Represents the reliability coefficient; I Nrms Represents the effective value of the first current, I Mrms Indicates the effective value of the second current.
[0122] K trans Represents the maximum transmission error, which can be set to 0.1; K error Can be set from 0.01 to 0.03; K rel Can be set from 1.2 to 1.5.
[0123] For the second current effective value and the first current effective value, the specific calculation formula is:
[0124]
[0125] in
[0126] In the formula, for The kth data value in , for The kth data value in , for The kth data value in , for The kth data value in , for The kth data value in , for The kth data value in .
[0127] Optionally, in an embodiment, for each of the suspicious lines, judging whether the three phases of the suspicious line are faulty is performed based on the first A-phase similarity, the first B-phase similarity, the first C-phase similarity, the second A-phase similarity, the second B-phase similarity, the second C-phase similarity and the threshold value corresponding to the suspicious line, including: for each of the suspicious lines, if the first A-phase similarity and the second A-phase similarity corresponding to the suspicious line are both greater than the threshold value, determining that the A-phase of the suspicious line is faulty; otherwise, determining that the A-phase of the suspicious line is not faulty; for each of the suspicious lines, if the first B-phase similarity and the second B-phase similarity corresponding to the suspicious line are both greater than the threshold value, determining that the B-phase of the suspicious line is faulty; otherwise, determining that the B-phase of the suspicious line is not faulty; for each of the suspicious lines, if the first C-phase similarity and the second C-phase similarity corresponding to the suspicious line are both greater than the threshold value, determining that the C-phase of the suspicious line is faulty; otherwise, determining that the C-phase of the suspicious line is not faulty.
[0128] In summary, the access of new energy and direct current provides more interference factors for the protection action. The present invention innovatively introduces the control strategy information of the converter on the new energy side, and establishes the coupling relationship between the control strategy information, the protection action information and the preliminary diagnosis result. The power grid fault diagnosis method considering the control strategy information on the new energy side proposed by the present invention introduces a control strategy to the analytical model based on the protection and circuit breaker action information for diagnosis, and selects the line that may be misdiagnosed; then adjusts the voltage and current at both ends of the suspicious line, and then uses the Berelon model to deduce the current values on both sides to obtain the countermeasure deduction value. Since the Berelon model is only related to the line parameters, when there is no fault in the line, the KL similarity between the derived value and the collected value is small; and when the line fails, its parameter structure changes, resulting in a large KL similarity between the derived value and the collected value, thereby further improving the accuracy of fault diagnosis. This method solves the problem that only using protection and circuit breaker information for fault diagnosis has poor adaptability to the situation where there is protection misoperation, and further makes an accurate judgment on the fault condition of the suspicious line. The present invention can significantly improve the accuracy of power grid fault diagnosis, and therefore has high applicability and significant superiority.
[0129] Now Figure 2 The power transmission system shown is used as an example to illustrate the implementation of an embodiment of the present invention.
[0130] The transmission system includes a DC source S1, a wind farm S2, a traditional power source S3, circuit breakers C1, C2, C3, C4, transformers T1, T2, T3, T4, busbars M, N, and lines L1, L2.
[0131] Example 1: A phase A ground fault occurs in line L1, the main protection of L1 line is actuated to trip the circuit breakers on both sides, the DC side commutation failure causes DC blocking, and the main protection of L2 line malfunctions to trip the circuit breakers on both sides.
[0132] S1. After a fault occurs, the system collects protection action information R, circuit breaker action information C, and converter control strategy information Q on the new energy side and DC side. The initial diagnosis result of the power grid fault is generated through the obtained R and C sequences.
[0133] Among them, the R sequence is specifically [R m1 , R p1 , R b1 , R m2 , R p2 , R b2 , R Am , R Bm ], the C sequence is specifically [C1, C2, C3, C4], and the Q sequence is specifically [Q1, Q2]. m1 Indicates the main protection of L1 line, R p1 Indicates the first backup protection of L1 line, R b1 Indicates the second backup protection of L1 line. The protection naming on line L2 is the same as above. mM , R BN They represent the main protection of busbars M and N respectively; C1, C2, C3, and C4 represent circuit breakers. Q1 and Q2 represent the control strategies of the power electronic converters on the DC side and the new energy side respectively.
[0134] Furthermore, the R sequence collected by the system is [1, 0, 0, 1, 0, 0, 0]; the C sequence is [1, 1, 1, 1], and the Q sequence is [1, 1]. According to the analytical fault diagnosis model, the preliminary diagnosis of the line status is L1, L2 fault. N is [1, 1], so lines L1 and L2 are both suspicious lines. That is, the preliminary diagnosis result of the power grid fault S error ={S L1 , S L2}={1, 1}, the set of suspicious lines S susp ={S L1 , S L2}={1, 1}.
[0135] S2, respectively collect the current and voltage at the M and N ends of lines L1 and L2, with a sampling frequency of 50kHz and a sampling volume of 12000. Directly remove the abnormal values and noise to obtain the first three-phase voltage collection value, the first three-phase current collection value, the second three-phase voltage collection value, and the second three-phase current collection value.
[0136] S3. Use the Berelon model to calculate and obtain the peer deduction value
[0137] The specific calculation is as follows:
[0138] Among them, the line wave impedance is 263.0885Ω, the line resistance is 3.12Ω, the line length is 155.13km, and τ is 0.000517s.
[0139] S4. Calculate the KL similarity between the deduced value and the sampled value at each end. For the L1 line: the threshold value of the KL similarity is calculated to be 1.6. Similarly, for the L2 line: the threshold value of the KL similarity is calculated to be 0.4.
[0140] S5, Figure 3 is the KL similarity of phase A of L1 line, which is greater than the threshold value. Figure 4 is the KL similarity of phase A of L2 line, which can be seen to be less than the threshold value. Therefore, it can be judged that phase A of L1 line is faulty and L2 line is normal.
[0141] Then the preliminary diagnosis result of the power grid fault is corrected to obtain the final power grid fault diagnosis result S′ error ={S′ L1 , S′ L2}={1, 0}. That is, line L1 has a fault, and line L2 is a normal line without any fault.
[0142] Example 2: A phase C grounding fault occurs in line L1, the main protection of line L1 is actuated to trip the circuit breakers on both sides, the commutation failure on the DC side causes DC blocking, and the main protection of line L2 is malfunctioned to trip the circuit breakers on both sides.
[0143] S1. After a fault occurs, the system collects protection action information R, circuit breaker action information C, and converter control strategy information Q on the new energy side and DC side. The initial diagnosis result of the power grid fault is generated through the obtained R and C sequences.
[0144] Specifically, the R sequence collected by the system is [1, 0, 0, 1, 0, 0, 0]; the C sequence is [1, 1, 1, 1], and the Q sequence is [1, 1].
[0145] According to the analytical fault diagnosis model, the initial diagnosis of the line status is L1, L2 fault. N is [1, 1], so lines L1 and L2 are both suspicious lines. That is, the initial diagnosis result of the power grid fault S error ={S L1 , S L2}={1, 1}, the set of suspicious lines S susp ={S L1 , S L2}={1, 1}.
[0146] S2, respectively collect the current and voltage of the M and N terminals of lines L1 and L2, with a sampling frequency of 50kHz and a sampling volume of 12000. Directly remove the abnormal values and noise to obtain the first three-phase voltage acquisition value, the first three-phase current acquisition value, the second three-phase voltage acquisition value and the second three-phase current acquisition value
[0147] S3. Use the Berelon model to calculate and obtain the peer deduction value
[0148] The specific calculation is as follows:
[0149] Among them, the line wave impedance is 263.0885Ω, the line resistance is 3.12Ω, the line length is 155.13km, and τ is 0.000517s.
[0150] S4. Calculate the KL similarity between the deduced value and the sampling value at each end to obtain the similarity between the current collection data and the current deduced value data.
[0151] For L1 route: the threshold value of its KL similarity is calculated to be 6.4. Similarly, for L2 route: the threshold value of its KL similarity is calculated to be 0.57.
[0152] S5, Figure 5 is the KL similarity of phase C of L1 line, which is greater than the threshold value. Figure 6 is the KL similarity of phase C of L2 line, which can be seen to be less than the threshold value. Therefore, it can be judged that phase C of L1 line is faulty and L2 line is normal.
[0153] Then the preliminary diagnosis result of the power grid fault is corrected to obtain the final power grid fault diagnosis result S′ error ={S′ L1 , S′ L2}={1, 0}. That is, line L1 has a fault, and line L2 is a normal line without any fault.
[0154] Embodiment 2
[0155] like Figure 7As shown, this embodiment provides a power grid fault diagnosis device based on a new energy side control strategy, including:
[0156] An information acquisition module, used to acquire grid equipment information of the grid to be diagnosed, wherein the grid equipment information is information describing protection action information of the grid, circuit breaker action information, and converter control strategy information of a new energy station incorporated into the grid; the protection action information is information describing whether the protection device associated with each line in the grid is in action; the circuit breaker action information is information describing whether the circuit breaker associated with each line in the grid is in action;
[0157] A preliminary diagnosis module is used to generate preliminary diagnosis results of power grid faults according to the power grid equipment information, and determine suspicious lines; the preliminary diagnosis results of power grid faults are information describing the fault status of each line in the power grid; the suspicious lines represent lines that are affected by the converter control strategy of the new energy station incorporated into the power grid and have the risk of misjudging the fault status;
[0158] A data acquisition module, used to respectively acquire the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines;
[0159] A deduction module, used to calculate the three-phase current deduction value of each of the suspicious lines according to the three-phase voltage sampling value and the three-phase current sampling value of each of the suspicious lines, wherein the three-phase current deduction value represents the theoretical value of the opposite end current after the traveling wave propagates through the entire line;
[0160] A suspicious line diagnosis module, for generating, for each of the suspicious lines, a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line, wherein the suspicious line diagnosis result is a failure or no failure;
[0161] The correction module is used to correct the preliminary diagnosis result of the power grid fault by using the diagnosis results of each of the suspicious lines to obtain the power grid fault diagnosis result.
[0162] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0163] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0164] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0165] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0166] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0167] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A power grid fault diagnosis method based on a new energy side control strategy, characterized in that: include: Obtaining grid equipment information of the grid to be diagnosed, wherein the grid equipment information is information describing protection action information, circuit breaker action information, and converter control strategy information of a new energy station incorporated into the grid; the protection action information is information describing whether protection devices associated with each line in the grid are in action; the circuit breaker action information is information describing whether circuit breakers associated with each line in the grid are in action; According to the power grid equipment information, a preliminary diagnosis result of the power grid fault is generated, and a suspicious line is determined; the preliminary diagnosis result of the power grid fault is information describing the fault status of each line in the power grid; the suspicious line represents a line that is affected by the converter control strategy of the new energy station incorporated into the power grid and has a risk of misjudgment of the fault status; Respectively obtaining three-phase voltage sampling values and three-phase current sampling values of each of the suspicious lines; According to the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines, the three-phase current deduction values of each of the suspicious lines are calculated respectively, wherein the three-phase current deduction values represent the theoretical values of the opposite-end current after the traveling wave propagates through the entire line; For each of the suspicious lines, generating a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line, the suspicious line diagnosis result being a fault or no fault; The preliminary power grid fault diagnosis result is corrected by using the diagnosis results of each of the suspicious lines to obtain a power grid fault diagnosis result.
2. A power grid fault diagnosis method based on a new energy side control strategy according to claim 1, characterized in that: The protection action information includes the main protection action status, the first backup protection action status, the second backup protection action status corresponding to each line in the power grid, and the bus main protection action status at both ends of each line; the circuit breaker action information includes the circuit breaker position status corresponding to each line, and the associated circuit breaker position status of each line and the next-level adjacent line of the line; the converter control strategy information includes the control strategy status of each converter of the new energy station incorporated into the power grid; The main protection action state, the first backup protection action state, the second backup protection action state, the busbar main protection action state, the circuit breaker position state and the associated circuit breaker position state all include an action state and an unaction state; The control strategy state includes a fault control strategy state and a fault control strategy state. The fault control strategy state is to adopt a low voltage ride-through fault control strategy or a negative sequence suppression fault control strategy.
3. A power grid fault diagnosis method based on a new energy side control strategy according to claim 2, characterized in that: Generating a preliminary diagnosis result of a power grid fault according to the power grid equipment information includes: Based on the protection action information and the circuit breaker action information, the objective function of the pre-established analytical fault diagnosis model is optimized by a genetic algorithm to generate a preliminary power grid fault diagnosis result, wherein the objective function of the analytical fault diagnosis model is: In the formula, E represents the target value, R mi Indicates the main protection action status of the i-th line, R pi Indicates the first backup protection action state of the i-th line, R bi Indicates the second backup protection action state of the i-th line, C i represents the circuit breaker position state of the i-th line, C ig represents the position status of the associated circuit breaker of the ith line, represents the expected value of the main protection action state of the i-th line, represents the expected value of the first backup protection action state of the i-th line, represents the expected value of the second backup protection action state of the i-th line, represents the expected value of the circuit breaker position state of the i-th line, represents the expected value of the position state of the associated circuit breaker of the i-th line; The expression is: In the formula, S Li represents the fault status of the ith line, S M and S N Respectively represent the fault status of the busbar main protection at both ends of the i-th line, S Lg represents the fault status of the next-level adjacent line of the ith line, C g represents the circuit breaker position status of the next level adjacent line of the i-th line, R mM and R mN They respectively represent the busbar main protection action status at both ends of the i-th line.
4. A power grid fault diagnosis method based on a new energy side control strategy according to claim 2, characterized in that: Determining suspicious lines according to the power grid equipment information includes: determining, according to the converter control strategy information, a line associated with a converter whose control strategy state is a fault control strategy state as a suspicious line.
5. The power grid fault diagnosis method based on the new energy side control strategy according to claim 1 is characterized in that: For each of the suspicious lines, the three-phase voltage sampling values include a first three-phase voltage sampling value and a second three-phase voltage sampling value, and the three-phase current sampling values include a first three-phase current sampling value and a second three-phase current sampling value; respectively obtaining the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines includes: For each of the suspicious lines, obtain a first three-phase voltage amplitude and a first three-phase current amplitude at one end of the suspicious line, and obtain a second three-phase voltage amplitude and a second three-phase current amplitude at the other end of the suspicious line; For each of the suspicious lines, outliers in the first three-phase voltage amplitude, the first three-phase current amplitude, the second three-phase voltage amplitude, and the second three-phase current amplitude are respectively detected by an outlier detection algorithm; For each of the suspicious lines, the outliers corresponding to the suspicious lines are deleted, and the data positions corresponding to the outliers are filled in by linear interpolation to obtain the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value, and the second three-phase current sampling value.
6. A power grid fault diagnosis method based on a new energy side control strategy according to claim 5, characterized in that: For each of the suspicious lines, the three-phase current derivation value includes a first three-phase current derivation value and a second three-phase current derivation value; the three-phase current derivation value of each of the suspicious lines is calculated according to the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines, including: For each of the suspicious lines, according to the first three-phase voltage sampling value, the first three-phase current sampling value, the second three-phase voltage sampling value and the second three-phase current sampling value corresponding to the suspicious line, a first three-phase current deduced value and a second three-phase current deduced value are respectively calculated by a first formula; The first formula is: In the formula, I' N Indicates the first three-phase current deduced value, U N Indicates the first three-phase voltage sampling value, I N Represents the first three-phase current sampling value, I' M Indicates the second three-phase current deduced value, U M Indicates the second three-phase voltage sampling value, I M Indicates the second three-phase current sampling value; in, Where D e (τ) represents the delay factor; R represents the line resistance; Z c represents the line wave impedance; τ represents the time it takes for a wave to be transmitted from one end of the line to the other end, τ = l / v, l represents the line length, and v represents the speed of light.
7. A power grid fault diagnosis method based on a new energy side control strategy according to claim 6, characterized in that: For each of the suspicious lines, the three phases of the suspicious line include phase A, phase B and phase C, the first three-phase current sampling value includes a first phase A current sampling value, a first phase B current sampling value and a first phase C current sampling value, the first three-phase current deduction value includes a first phase A current deduction value, a first phase B current deduction value and a first phase C current deduction value, the second three-phase current sampling value includes a second phase A current sampling value, a second phase B current sampling value and a second phase C current sampling value, and the second three-phase current deduction value includes a second phase A current deduction value, a second phase B current deduction value and a second phase C current deduction value; The generating a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line includes: For each of the suspicious lines, a threshold value is calculated according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line; For each of the suspicious lines, based on the first three-phase current sampling values and the first three-phase current deduced values corresponding to the suspicious line, the first A-phase similarity, the first B-phase similarity and the first C-phase similarity between the corresponding phases in the first three-phase current sampling values and the first three-phase current deduced values are respectively calculated by KL similarity; For each of the suspicious lines, based on the second three-phase current sampling values and the second three-phase current deduced values corresponding to the suspicious line, the second A-phase similarity, the second B-phase similarity and the second C-phase similarity between the phases corresponding to the second three-phase current sampling values and the second three-phase current deduced values are respectively calculated by KL similarity; For each of the suspicious lines, judging whether three phases of the suspicious line are faulty according to the first A-phase similarity, the first B-phase similarity, the first C-phase similarity, the second A-phase similarity, the second B-phase similarity, the second C-phase similarity and the threshold value corresponding to the suspicious line; For each of the suspicious lines, if at least one of the three phases of the suspicious line fails, the suspicious line diagnosis result of the suspicious line is determined to be a failure; otherwise, the suspicious line diagnosis result of the suspicious line is determined to be no failure.
8. A power grid fault diagnosis method based on a new energy side control strategy according to claim 7, characterized in that: For each of the suspicious lines, calculating a threshold value according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line includes: For each of the suspicious lines, respectively calculating a first current effective value at one end of the suspicious line and a second current effective value at the other end of the suspicious line according to the first three-phase current sampling value and the second three-phase current sampling value corresponding to the suspicious line; For each of the suspicious lines, a threshold value is calculated by a second formula based on the first current effective value and the second current effective value corresponding to the suspicious line; The second formula is: D set =min(I Mrms , I Nrms )·(K trans +K error )·K rel ; Where D set represents the threshold value, K trans Indicates the transformer transmission error coefficient, K error Represents the model error coefficient, K rel Represents the reliability coefficient; I Nrms Represents the effective value of the first current, I Mrms Indicates the effective value of the second current.
9. A power grid fault diagnosis method based on a new energy side control strategy according to claim 7, characterized in that: For each of the suspicious lines, judging whether three phases of the suspicious line are faulty according to the first A-phase similarity, the first B-phase similarity, the first C-phase similarity, the second A-phase similarity, the second B-phase similarity, the second C-phase similarity and the threshold value corresponding to the suspicious line, includes: For each of the suspicious lines, if the first phase A similarity and the second phase A similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the phase A of the suspicious line is faulty; otherwise, it is determined that the phase A of the suspicious line is not faulty; For each of the suspicious lines, if the first B-phase similarity and the second B-phase similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the B-phase of the suspicious line is faulty; otherwise, it is determined that the B-phase of the suspicious line is not faulty; For each of the suspicious lines, if the first C-phase similarity and the second C-phase similarity corresponding to the suspicious line are both greater than the threshold value, it is determined that the C-phase of the suspicious line is faulty; otherwise, it is determined that the C-phase of the suspicious line is not faulty.
10. A power grid fault diagnosis device based on a new energy side control strategy, characterized in that: include: An information acquisition module, used to acquire grid equipment information of the grid to be diagnosed, wherein the grid equipment information is information describing protection action information of the grid, circuit breaker action information, and converter control strategy information of a new energy station incorporated into the grid; the protection action information is information describing whether the protection device associated with each line in the grid is in action; the circuit breaker action information is information describing whether the circuit breaker associated with each line in the grid is in action; A preliminary diagnosis module is used to generate preliminary diagnosis results of power grid faults according to the power grid equipment information, and determine suspicious lines; the preliminary diagnosis results of power grid faults are information describing the fault status of each line in the power grid; the suspicious lines represent lines that are affected by the converter control strategy of the new energy station incorporated into the power grid and have the risk of misjudging the fault status; A data acquisition module, used to respectively acquire the three-phase voltage sampling values and the three-phase current sampling values of each of the suspicious lines; A deduction module, used to calculate the three-phase current deduction value of each of the suspicious lines according to the three-phase voltage sampling value and the three-phase current sampling value of each of the suspicious lines, wherein the three-phase current deduction value represents the theoretical value of the opposite end current after the traveling wave propagates through the entire line; A suspicious line diagnosis module, for generating, for each of the suspicious lines, a suspicious line diagnosis result corresponding to the suspicious line according to the three-phase current deduced value and the three-phase current sampling value of the suspicious line, wherein the suspicious line diagnosis result is a failure or no failure; The correction module is used to correct the preliminary diagnosis result of the power grid fault by using the diagnosis results of each of the suspicious lines to obtain the power grid fault diagnosis result.