Method for dynamically updating backlog for network platform

By classifying and splitting the real-time project requirements of the network platform, combining real-time event promotion results and dynamic reminder results, dynamic updates of to-do items are achieved, solving the problems of low update efficiency and insufficient accuracy in the existing technology, and improving the Update efficiency and accuracy of to-do items.

CN119027065AInactive Publication Date: 2024-11-26HUANENG INFORMATION TECH CO LTD +1
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411496817.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The to-do update method of existing online platforms is inefficient, the update is not accurate enough, and it cannot effectively handle the rapid growth of the number of users and to-do items on the Internet platform.

Method used

By obtaining the real-time project requirements of the target network platform, classifying and splitting, determining the requirements level, and combining real-time event promotion results and dynamic reminder results, dynamic updates of to-do items can be achieved to ensure the accuracy and timeliness of updates.

Benefits of technology

It improves the efficiency and accuracy of dynamic updates of to-do items, can update related matters in a timely manner, and ensures accurate handling and update of to-do items.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027065A_ABST
    Figure CN119027065A_ABST
Patent Text Reader

Abstract

The invention provides a to-do list dynamic updating method for a network platform, and relates to the technical field of dynamic updating, and the method comprises the steps: obtaining a real-time project demand of a target network platform, carrying out the classification of the real-time project demand to obtain a first classification demand, and determining a first demand level; performing demand splitting on the first classification demand to obtain a first to-do list set; determining a second demand level based on the item type of each first to-do item to obtain a second demand level set; comprehensively determining a comprehensive item demand of each first to-do item based on the first demand level and the second demand level set, and displaying and dynamically reminding the first to-do items; and dynamically updating the first to-do items based on the real-time item propelling result of each first to-do item in combination with the corresponding dynamic reminding result. By comparing and updating the real-time item propelling result, the item display result and the dynamic reminding result of each to-do item, the dynamic updating of the to-do item can be more accurate and timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of dynamic update technology, and in particular to a to-do list dynamic update method for a network platform. Background Art

[0002] At present, the amount of data on the online platform is growing exponentially with the increase in the number of platform users, and the speed at which the to-do items on the online platform are increasing is also very significant.

[0003] However, the existing to-do item update method generally needs to obtain the entire to-do item before updating the corresponding sub-item, which results in slow update efficiency.

[0004] Therefore, the present invention provides a to-do list dynamic update method for a network platform. Summary of the invention

[0005] The present invention provides a to-do list dynamic update method for a network platform, which is used to solve the problems of low updating efficiency and inaccurate updating in the prior art.

[0006] The present invention provides a method for dynamically updating a to-do list on a network platform, comprising: Step 1: Acquire the real-time project requirements of the target network platform, classify them to obtain first classified requirements, and determine the corresponding first requirement level based on the requirement type of the first classified requirements; Step 2: Split the first category of requirements into requirements, thereby obtaining a first to-do item set; Step 3: Determine the corresponding second demand level based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second demand level set of the first classification requirements; Step 4: comprehensively determining the comprehensive item requirement of each first to-do item based on the first requirement level and the second requirement level set, and displaying and dynamically reminding the first to-do item based on the comprehensive item requirement; Step 5: Based on the real-time progress result of each first to-do item and the corresponding dynamic reminder result, the first to-do item is dynamically updated.

[0007] According to the present invention, the real-time project requirements of the target network platform are obtained, and first classified requirements are obtained by classification, and the corresponding first requirement level is determined based on the requirement type of the first classified requirements, including: Step 11: obtaining the real-time project requirements of the target network platform, and first classifying the real-time project requirements based on the different projects corresponding to the real-time project requirements to obtain a first classified requirement set; Step 12: Based on the requirement type of each first classification requirement in the first classification requirement set, the corresponding requirement level is acquired from the type-requirement database, thereby obtaining the first requirement level of each first classification requirement.

[0008] According to the present invention, the first classification requirement is split into requirements to obtain a first to-do item set, including: Step 21: extracting historical project requirements of the same requirement type from the historical requirement database of the target network platform based on the requirement type of the first classification requirement, and obtaining a historical project requirement set; Step 22: Obtain the demand splitting scheme for each historical project demand in the historical project demand set, and compare the demand completion efficiency of each demand splitting scheme corresponding to the historical project demand, so as to extract the demand splitting scheme corresponding to the historical project demand with the highest demand completion efficiency as the first demand splitting scheme; Step 23: Determine the degree of similarity between each historical project requirement in the historical project set and the first classification requirement, and extract the requirement splitting scheme corresponding to the historical project requirement with the highest degree of similarity as the second requirement splitting scheme; Step 24: Compare the first demand splitting plan and the second demand splitting plan, and optimize the splitting plan, so as to split the first classification demand based on the optimized plan, thereby obtaining a first to-do item set.

[0009] According to the present invention, the method of determining the corresponding second requirement level based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second requirement level set of the first classification requirements, includes: Step 31: Obtain the item type of each first to-do item in the first to-do item set, and extract the second requirement level of the corresponding item type from the item-requirement database; Step 32: Obtain each second requirement level of the same first category requirement, thereby constructing a second requirement level set of the first category requirements.

[0010] According to the present invention, the comprehensive item requirement of each first to-do item is comprehensively determined based on the first requirement level and the second requirement level set, and the first to-do item is displayed and dynamically reminded based on the comprehensive item requirement, including: Step 41: extracting the first requirement level corresponding to the first classification requirement of each first to-do item as the first basis of the current first to-do item; Step 42: extracting the second requirement level in the second requirement level set corresponding to each first to-do item as the second basis for the current first to-do item; Step 43: Combine the first basis with the second basis to obtain the comprehensive task requirements of the first to-do items, and display items in an orderly manner based on the comprehensive task requirements of each first to-do item of the target network platform, and provide periodic dynamic task reminders based on the comprehensive task requirements of each first to-do item.

[0011] According to the present invention, the real-time task advancement result of each first to-do task is combined with the corresponding dynamic reminder result to realize the dynamic update of the first to-do task, thereby realizing the dynamic update of the real-time project requirements, including: Step 51: obtaining the real-time item advancement result of each first to-do item, and comparing whether there is a difference between the real-time item advancement result and the item display result of the first to-do item; If it does not exist, there is no need to dynamically update the corresponding first to-do item; If it exists, the real-time event advancement result and the event display result are converted into the to-do progress in the corresponding first to-do event to obtain the first progress value corresponding to the real-time event advancement result and the second progress value corresponding to the event display result; Step 52: Compare the first progress value with the second progress value; Step 53: Perform a first inspection on the standardization of the real-time event advancement result based on the progress value comparison result. If the first inspection is qualified, the qualified real-time event advancement result is used as the initial update result; Step 54: Based on the item type of the first to-do item corresponding to the initial update result, determine whether the current initial update result adjustment will cause update adjustment to the first to-do item and the first classification requirement corresponding to the first to-do item; Step 55: obtaining the type of to-do item that needs to be updated and adjusted, and extracting the corresponding first to-do item based on the to-do item type, thereby determining the corresponding second initial update result; Step 56: Obtain the dynamic reminder result of the first to-do item corresponding to the initial update result and the second initial update result, and compare the dynamic reminder result with the corresponding initial update result and the second initial update result, so as to determine the consistency between the dynamic reminder result and the corresponding initial update result and the second initial update result; If they are consistent, there is no need for dynamic reminder, and the corresponding first to-do item is dynamically updated based on the initial update result and the second initial update result; Step 57: Based on the dynamic update result of the first to-do item of each first classification requirement, the corresponding classification requirement is dynamically updated, thereby dynamically updating the real-time project requirement of the target network platform.

[0012] According to the present invention, comparing the first progress value with the second progress value includes: If the first progress value is less than the second progress value, it is determined that the item display result of the first to-do item is wrong, and the first to-do item needs to be dynamically updated based on the real-time item advancement result corresponding to the first progress value; If the first progress value is greater than the second progress value, it is determined that the display result of the first to-do item is delayed, and the real-time item advancement result needs to be checked.

[0013] After the dynamic update of the first to-do item is realized according to the present invention, the accuracy of the dynamic update result is checked, specifically including: Compare the dynamic update result of the first to-do item with the standard dynamic update result, thereby obtaining an accuracy coefficient S of the real-time dynamic update result; ; Where S is the accuracy coefficient of the real-time dynamic update result of the target network platform, m is the number of the first category requirements, is the number of first to-do items in the i-th first category requirement, is the progress value of the jth ordered first to-do item in the i-th first category requirement, is the progress value of the j+1th ordered first to-do item in the i-th first category requirement, Adjust parameters for schedule deviations; If the accuracy coefficient S is greater than the preset minimum accuracy coefficient, the dynamic update results of the real-time project requirements of the target network platform do not need to be adjusted; Otherwise, it is necessary to adjust the dynamically updated results of real-time project requirements.

[0014] The present invention provides a method for dynamically updating to-do items for a network platform. By splitting the real-time project requirements of the target network platform, the real-time item advancement results, item display results and dynamic reminder results of each to-do item are compared and updated, and the to-do items related to the current to-do items are updated accordingly. This can make the dynamic update of to-do items more accurate and timely, and can also accurately update related items in a timely manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a flow chart of a method for dynamically updating a to-do list on a network platform provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Embodiment 1: The embodiment of the present invention provides a method for dynamically updating to-do items on a network platform, such as Figure 1 As shown, including: Step 1: Acquire the real-time project requirements of the target network platform, classify them to obtain first classified requirements, and determine the corresponding first requirement level based on the requirement type of the first classified requirements; Step 2: Split the first category of requirements into requirements, thereby obtaining a first to-do item set; Step 3: Determine the corresponding second demand level based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second demand level set of the first classification requirements; Step 4: comprehensively determining the comprehensive item requirement of each first to-do item based on the first requirement level and the second requirement level set, and displaying and dynamically reminding the first to-do item based on the comprehensive item requirement; Step 5: Based on the real-time progress result of each first to-do item and the corresponding dynamic reminder result, the first to-do item is dynamically updated.

[0019] In this embodiment, the real-time project requirement refers to the project advancement requirement of the real-time project of the target network platform.

[0020] In this embodiment, for example, the network platform is an online education platform, and the corresponding project requirements include enrollment requirements, teaching requirements, teacher requirements, etc.

[0021] In this embodiment, the first requirement level is obtained from a type-requirement database based on the requirement type of each first classification requirement, and the type-requirement database contains the requirement level of each requirement type on different types of network platforms.

[0022] In this embodiment, for example, the types of matters include contract signing, partner invitation, company entity change, daily tasks and project management, reminders and notifications, task progress tracking, and personalized settings, among other aspects.

[0023] In this embodiment, the second requirement level is the requirement level of the corresponding item type extracted from the item-requirement database according to the item type of each first to-do item.

[0024] In this embodiment, the second requirement level set is determined by grouping together the second requirement levels of all first to-do items of the same first classification requirement.

[0025] In this embodiment, the comprehensive matter requirements are comprehensively determined based on the second requirement level of each first to-do item and the first requirement level of the first classification requirement corresponding to the first to-do item. In order to ensure the accuracy of the comprehensive matter requirements, the first requirement level and the second requirement level need to be standardized and normalized.

[0026] In this embodiment, dynamic reminders refer to periodic dynamic reminders based on the progress changes of the to-do items. For example, dynamic reminders are required when a to-do item changes from a to-do state to a processing state, or when the progress of a to-do item changes from stage 1 to stage 2.

[0027] In this embodiment, dynamic update refers to updating the real-time event display results of the first to-do item based on the real-time event advancement results of the first to-do item in combination with the corresponding dynamic reminder results, thereby realizing dynamic update of real-time project requirements based on the dynamic update of each first to-do item of the target network platform.

[0028] The beneficial effect of the above technical solution is: by splitting the real-time project requirements of the target network platform, the real-time item advancement results, item display results and dynamic reminder results of each to-do item are compared and updated, and the to-do items related to the current to-do items are updated accordingly, which can make the dynamic update of the to-do items more accurate and timely, and can also accurately update the related items in time.

[0029] Embodiment 2: Based on Example 1, the real-time project requirements of the target network platform are obtained, and the first classified requirements are obtained by classification, and the corresponding first requirement level is determined based on the requirement type of the first classified requirements, including: Step 11: obtaining the real-time project requirements of the target network platform, and first classifying the real-time project requirements based on the different projects corresponding to the real-time project requirements to obtain a first classified requirement set; Step 12: Based on the requirement type of each first classification requirement in the first classification requirement set, the corresponding requirement level is acquired from the type-requirement database, thereby obtaining the first requirement level of each first classification requirement.

[0030] In this embodiment, the real-time project requirement refers to the project advancement requirement of the real-time project of the target network platform.

[0031] In this embodiment, each first classification requirement in the first classification requirement set corresponds to a different project, that is, the same network platform and the same processing time may include multiple project requirements.

[0032] In this embodiment, the first requirement level is obtained from a type-requirement database based on the requirement type of each first classification requirement, and the type-requirement database contains the requirement level of each requirement type on different types of network platforms.

[0033] The beneficial effect of the above technical solution is: by judging the demand level of real-time project needs, it is possible to make an initial judgment on the urgency of the to-do items, and then make a comprehensive judgment based on the demand level of each to-do item, so as to update the to-do items in an orderly and accurate manner based on the urgency.

[0034] Embodiment 3: Based on Example 2, the first category of requirements is split into requirements, so as to obtain a first to-do item set, including: Step 21: extracting historical project requirements of the same requirement type from the historical requirement database of the target network platform based on the requirement type of the first classification requirement, and obtaining a historical project requirement set; Step 22: Obtain the demand splitting scheme for each historical project demand in the historical project demand set, and compare the demand completion efficiency of each demand splitting scheme corresponding to the historical project demand, so as to extract the demand splitting scheme corresponding to the historical project demand with the highest demand completion efficiency as the first demand splitting scheme; Step 23: Determine the degree of similarity between each historical project requirement in the historical project set and the first classification requirement, and extract the requirement splitting scheme corresponding to the historical project requirement with the highest degree of similarity as the second requirement splitting scheme; Step 24: Compare the first demand splitting plan and the second demand splitting plan, and optimize the splitting plan, so as to split the first classification demand based on the optimized plan, thereby obtaining a first to-do item set.

[0035] In this embodiment, the historical project demand refers to a project demand of the same demand type as the first classification demand extracted from a historical demand database of the target network platform.

[0036] In this embodiment, the demand splitting plan refers to a splitting plan for splitting the historical project demand into a number of corresponding to-do items.

[0037] In this embodiment, the demand completion efficiency is determined by comprehensively determining the item advancement efficiency and item completion efficiency of each to-do item in each historical project demand in the historical project demand set.

[0038] In this embodiment, the first demand splitting scheme is determined based on the demand splitting scheme corresponding to the historical project demand with the highest demand completion efficiency in the historical project demand set.

[0039] In this embodiment, the demand similarity includes the similarity of the project demand data volume and the project demand data value.

[0040] In this embodiment, the second demand splitting scheme is determined based on the demand splitting scheme corresponding to the historical project demand that has the highest degree of similarity with the first classification demand in the historical project demand set.

[0041] In this embodiment, the splitting plan optimization refers to comparing the first demand splitting plan and the second demand splitting plan, retaining the sub-splitting plans with consistent splitting, and judging the item advancement efficiency of the to-do items corresponding to the sub-splitting plans with inconsistent splitting, thereby retaining the sub-splitting plan with high item advancement efficiency as the splitting plan for the first to-do item, thereby achieving plan optimization.

[0042] In this embodiment, the first to-do item set is a set of to-do items obtained after splitting the first classification requirements according to the optimization plan, wherein one first classification requirement includes multiple first to-do items, and the first to-do items are interrelated.

[0043] The beneficial effect of the above technical solution is: by splitting the first category of needs, a more efficient demand splitting result is obtained, thereby achieving efficient processing and efficient updating of to-do items.

[0044] Embodiment 4: Based on Example 3, the corresponding second requirement level is determined based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second requirement level set of the first classification requirements, including: Step 31: Obtain the item type of each first to-do item in the first to-do item set, and extract the second requirement level of the corresponding item type from the item-requirement database; Step 32: Obtain each second requirement level of the same first category requirement, thereby constructing a second requirement level set of the first category requirements.

[0045] In this embodiment, the second requirement level is the requirement level of the corresponding item type extracted from the item-requirement database according to the item type of each first to-do item.

[0046] The beneficial effect of the above technical solution is: by obtaining the demand level of the first to-do item and combining it with the demand level corresponding to the first category demand to comprehensively determine the item demand of the to-do item, the item dynamics of the first to-do item can be determined more accurately, so as to provide dynamic reminders and dynamic updates in a timely manner.

[0047] Embodiment 5: Based on Example 4, the comprehensive item requirement of each first to-do item is comprehensively determined based on the first requirement level and the second requirement level set, and the first to-do item is displayed and dynamically reminded based on the comprehensive item requirement, including: Step 41: extracting the first requirement level corresponding to the first classification requirement of each first to-do item as the first basis of the current first to-do item; Step 42: extracting the second requirement level in the second requirement level set corresponding to each first to-do item as the second basis for the current first to-do item; Step 43: Combine the first basis with the second basis to obtain the comprehensive task requirements of the first to-do items, and display items in an orderly manner based on the comprehensive task requirements of each first to-do item of the target network platform, and provide periodic dynamic task reminders based on the comprehensive task requirements of each first to-do item.

[0048] In this embodiment, the comprehensive item demand is comprehensively determined based on the second demand level of each first to-do item and the first demand level of the first classification demand corresponding to the first to-do item. In order to ensure the accuracy of the comprehensive item demand, the first demand level and the second demand level need to be standardized and normalized. For example, the first demand level is 7, the second demand level is 3, and the current demand level is the standardized demand level, then 7, 3 are normalized to obtain 0.7, 0.3, and the comprehensive item demand is 0.7*0.3=0.21. If each first to-do item and the corresponding comprehensive item demand are (A) 0.21, (B) 0.23, (C) 0.54, (D) 0.13, then the orderly display results are the first to-do items D, A, B, C corresponding to the comprehensive item demands of 0.13, 0.21, 0.23, 0.54, and dynamic item reminders are made in the order of D, A, B, C.

[0049] In this embodiment, periodic dynamic event reminders refer to periodic dynamic event reminders based on the progress changes of the to-do items. For example, dynamic event reminders are required when a to-do item changes from to-do status to processing status, or when the progress of a to-do item changes from stage 1 to stage 2.

[0050] The beneficial effect of the above technical solution is: by displaying and dynamically reminding the first to-do item based on comprehensive item needs, the first to-do item can be advanced in a timely manner, thereby ensuring the timely update of the first to-do item.

[0051] Embodiment 6: Based on Example 5, the first to-do items are dynamically updated based on the real-time item advancement result of each first to-do item in combination with the corresponding dynamic reminder result, including: Step 51: obtaining the real-time item advancement result of each first to-do item, and comparing whether there is a difference between the real-time item advancement result and the item display result of the first to-do item; If it does not exist, there is no need to dynamically update the corresponding first to-do item; If it exists, the real-time event advancement result and the event display result are converted into the to-do progress in the corresponding first to-do event to obtain the first progress value corresponding to the real-time event advancement result and the second progress value corresponding to the event display result; Step 52: Compare the first progress value with the second progress value; Step 53: Perform a first check on the standardization of the real-time event advancement result based on the progress value comparison result. If the first check is qualified, the qualified real-time event advancement result is used as the initial update result; Step 54: Based on the item type of the first to-do item corresponding to the initial update result, determine whether the current initial update result adjustment will cause update adjustment to the first to-do item and the first classification requirement corresponding to the first to-do item; Step 55: obtaining the type of to-do item that needs to be updated and adjusted, and extracting the corresponding first to-do item based on the to-do item type, thereby determining the corresponding second initial update result; Step 56: Obtain the dynamic reminder result of the first to-do item corresponding to the initial update result and the second initial update result, and compare the dynamic reminder result with the corresponding initial update result and the second initial update result, so as to determine the consistency between the dynamic reminder result and the corresponding initial update result and the second initial update result; If they are consistent, there is no need for dynamic reminder, and the corresponding first to-do item is dynamically updated based on the initial update result and the second initial update result; Step 57: Based on the dynamic update result of the first to-do item of each first classification requirement, the corresponding classification requirement is dynamically updated, thereby dynamically updating the real-time project requirement of the target network platform.

[0052] In this embodiment, the real-time item advancement result refers to the real-time advancement progress of the first to-do item. For example, if the first to-do item belongs to the enrollment item of Class 1 in the enrollment requirements, the real-time item advancement result may be the enrollment of 12 people.

[0053] In this embodiment, the item display result refers to the real-time item display result of the first to-do item on the target network platform. For example, the item display result corresponding to the first to-do item is to enroll 10 students.

[0054] In this embodiment, the first progress value and the second progress value refer to converting the progress of the item advancement corresponding to the first to-do item into a visual progress value, thereby obtaining the progress value corresponding to the real-time item advancement result of the first to-do item as the first progress value, and obtaining the progress value corresponding to the item display result of the first to-do item as the second progress value, wherein the visual progress value can be divided into 1-10.

[0055] In this embodiment, the standardization of results refers to the standardization of the result attributes of the real-time event advancement results. For example, in the enrollment event, 12 people is a text attribute, and 12 is a numeric attribute. Differences in attributes may also lead to deviations in the results.

[0056] In this embodiment, the initial update result refers to the initial update result that needs to be dynamically updated when the result standardization of the real-time event advancement result is qualified.

[0057] In this embodiment, the types of matters include contract signing, partner invitation, company entity change, daily tasks and project management, reminders and notifications, task progress tracking, and personalized settings. For example, online education platform enrollment includes contract signing, deposit payment, balance payment, course experience, and other matters.

[0058] In this embodiment, for example, if the contract signing is the last to-do item for enrollment, then after the contract signing is completed, the current to-do item changes from in progress to completed, and the progress of the corresponding enrollment project changes from 11 people to 12 people.

[0059] The beneficial effect of the above technical solution is: by comparing the real-time event advancement results with the event display results, and dynamically updating them in combination with the dynamic reminder results, the dynamic update efficiency can be improved, unnecessary dynamic reminders can be reduced, and project requirements can be completed more efficiently.

[0060] Embodiment 7: Based on Embodiment 6, comparing the first progress value with the second progress value includes: If the first progress value is less than the second progress value, it is determined that the item display result of the first to-do item is wrong, and the first to-do item needs to be dynamically updated based on the real-time item advancement result corresponding to the first progress value; If the first progress value is greater than the second progress value, it is determined that the display result of the first to-do item is delayed, and the real-time item advancement result needs to be checked.

[0061] The beneficial effect of the above technical solution is that by comparing the progress values, the real-time progress results of the matters and the display results of the matters can be judged more intuitively and accurately, thereby making the update of the pending matters more accurate and effective.

[0062] Embodiment 8: Based on Example 6, after the dynamic update of the first to-do item is realized, the following steps are included: checking the accuracy of the dynamic update result, specifically including: Compare the dynamic update result of the first to-do item with the standard dynamic update result, thereby obtaining an accuracy coefficient S of the real-time dynamic update result; ; Where S is the accuracy coefficient of the real-time dynamic update result of the target network platform, m is the number of the first category requirements, is the number of first to-do items in the i-th first category requirement, is the progress value of the jth ordered first to-do item in the i-th first category requirement, is the progress value of the j+1th ordered first to-do item in the i-th first category requirement, Adjust parameters for schedule deviations; If the accuracy coefficient S is greater than the preset minimum accuracy coefficient, the dynamic update results of the real-time project requirements of the target network platform do not need to be adjusted; Otherwise, it is necessary to adjust the dynamically updated results of real-time project requirements.

[0063] In this embodiment, the preset minimum accuracy coefficient has a value range of (0.9, 1).

[0064] In this embodiment, the standard dynamic update result is determined based on the standard progress and standard dynamic attributes of the to-do items of the target network platform. The accuracy of the real-time dynamic update result includes not only data accuracy but also attribute accuracy. However, attribute accuracy is generally judged before the dynamic update, so attribute accuracy is not included in the accuracy coefficient.

[0065] The beneficial effect of the above technical solution is that by checking the dynamic update results, the accuracy of the dynamic update results can be determined in time, so that adjustments can be made in time to improve the dynamic update efficiency.

[0066] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for dynamically updating to-do items on a network platform, characterized in that: include: Step 1: Acquire the real-time project requirements of the target network platform, classify them to obtain first classified requirements, and determine the corresponding first requirement level based on the requirement type of the first classified requirements; Step 2: Split the first category of requirements into requirements, thereby obtaining a first to-do item set; Step 3: Determine the corresponding second demand level based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second demand level set of the first classification requirements; Step 4: comprehensively determining the comprehensive item requirement of each first to-do item based on the first requirement level and the second requirement level set, and displaying and dynamically reminding the first to-do item based on the comprehensive item requirement; Step 5: Based on the real-time progress result of each first to-do item and the corresponding dynamic reminder result, the first to-do item is dynamically updated.

2. A method for dynamically updating to-do items on a network platform according to claim 1, characterized in that: Acquire the real-time project requirements of the target network platform, classify them to obtain first-classified requirements, and determine the corresponding first-classified requirements level based on the requirement type of the first-classified requirements, including: Step 11: obtaining the real-time project requirements of the target network platform, and first classifying the real-time project requirements based on the different projects corresponding to the real-time project requirements to obtain a first classified requirement set; Step 12: Based on the requirement type of each first classification requirement in the first classification requirement set, the corresponding requirement level is acquired from the type-requirement database, thereby obtaining the first requirement level of each first classification requirement.

3. A method for dynamically updating to-do items on a network platform according to claim 2, characterized in that: The first category of requirements is split into requirements to obtain the first to-do set, including: Step 21: extracting historical project requirements of the same requirement type from the historical requirement database of the target network platform based on the requirement type of the first classification requirement, and obtaining a historical project requirement set; Step 22: Obtain the demand splitting scheme for each historical project demand in the historical project demand set, and compare the demand completion efficiency of each demand splitting scheme corresponding to the historical project demand, so as to extract the demand splitting scheme corresponding to the historical project demand with the highest demand completion efficiency as the first demand splitting scheme; Step 23: Determine the degree of similarity between each historical project requirement in the historical project set and the first classification requirement, and extract the requirement splitting scheme corresponding to the historical project requirement with the highest degree of similarity as the second requirement splitting scheme; Step 24: Compare the first demand splitting plan and the second demand splitting plan, and optimize the splitting plan, so as to split the first classification demand based on the optimized plan, thereby obtaining a first to-do item set.

4. A method for dynamically updating to-do items on a network platform according to claim 3, characterized in that: Determining the corresponding second requirement level based on the item type of each first to-do item in the first to-do item set, thereby obtaining a second requirement level set of the first classification requirements, including: Step 31: Obtain the item type of each first to-do item in the first to-do item set, and extract the second requirement level of the corresponding item type from the item-requirement database; Step 32: Obtain each second requirement level of the same first category requirement, thereby constructing a second requirement level set of the first category requirements.

5. A method for dynamically updating to-do items on a network platform according to claim 4, characterized in that: Comprehensively determining the comprehensive item requirements of each first to-do item based on the first requirement level and the second requirement level set, and displaying and dynamically reminding the first to-do item based on the comprehensive item requirements, including: Step 41: extracting the first requirement level corresponding to the first classification requirement of each first to-do item as the first basis of the current first to-do item; Step 42: extracting the second requirement level in the second requirement level set corresponding to each first to-do item as the second basis for the current first to-do item; Step 43: Combine the first basis with the second basis to obtain the comprehensive task requirements of the first to-do items, and display items in an orderly manner based on the comprehensive task requirements of each first to-do item of the target network platform, and provide periodic dynamic task reminders based on the comprehensive task requirements of each first to-do item.

6. A method for dynamically updating to-do items on a network platform according to claim 5, characterized in that: Based on the real-time progress results of each first to-do item and the corresponding dynamic reminder results, the first to-do items are dynamically updated, thereby realizing the dynamic update of real-time project requirements, including: Step 51: obtaining the real-time item advancement result of each first to-do item, and comparing whether there is a difference between the real-time item advancement result and the item display result of the first to-do item; If it does not exist, there is no need to dynamically update the corresponding first to-do item; If it exists, the real-time event advancement result and the event display result are converted into the to-do progress in the corresponding first to-do event to obtain the first progress value corresponding to the real-time event advancement result and the second progress value corresponding to the event display result; Step 52: Compare the first progress value with the second progress value; Step 53: Perform a first check on the standardization of the real-time event advancement result based on the progress value comparison result. If the first check is qualified, the qualified real-time event advancement result is used as the initial update result; Step 54: Based on the item type of the first to-do item corresponding to the initial update result, determine whether the current initial update result adjustment will cause update adjustment to the first to-do item and the first classification requirement corresponding to the first to-do item; Step 55: obtaining the type of to-do item that needs to be updated and adjusted, and extracting the corresponding first to-do item based on the to-do item type, thereby determining the corresponding second initial update result; Step 56: Obtain the dynamic reminder result of the first to-do item corresponding to the initial update result and the second initial update result, and compare the dynamic reminder result with the corresponding initial update result and the second initial update result, so as to determine the consistency between the dynamic reminder result and the corresponding initial update result and the second initial update result; If they are consistent, there is no need for dynamic reminder, and the corresponding first to-do item is dynamically updated based on the initial update result and the second initial update result; Step 57: Based on the dynamic update result of the first to-do item of each first classification requirement, the corresponding classification requirement is dynamically updated, thereby dynamically updating the real-time project requirement of the target network platform.

7. A method for dynamically updating to-do items on a network platform according to claim 6, characterized in that: Comparing the first progress value with the second progress value includes: If the first progress value is less than the second progress value, it is determined that the item display result of the first to-do item is wrong, and the first to-do item needs to be dynamically updated based on the real-time item advancement result corresponding to the first progress value; If the first progress value is greater than the second progress value, it is determined that the display result of the first to-do item is delayed, and the real-time item advancement result needs to be checked.

8. A method for dynamically updating to-do items on a network platform according to claim 6, characterized in that: After the dynamic update of the first to-do item is realized, the accuracy of the dynamic update result is checked, including: Compare the dynamic update result of the first to-do item with the standard dynamic update result, thereby obtaining an accuracy coefficient S of the real-time dynamic update result; ; Where S is the accuracy coefficient of the real-time dynamic update result of the target network platform, m is the number of the first category requirements, is the number of first to-do items in the i-th first category requirement, is the progress value of the jth ordered first to-do item in the i-th first category requirement, is the progress value of the j+1th ordered first to-do item in the i-th first category requirement, Adjust parameters for schedule deviations; If the accuracy coefficient S is greater than the preset minimum accuracy coefficient, the dynamic update results of the real-time project requirements of the target network platform do not need to be adjusted; Otherwise, it is necessary to adjust the dynamically updated results of real-time project requirements.

Citation Information

Patent Citations

  • One-time hastening method and one-time hastening system

    CN104700199A

  • Client dynamic refresh method and system in transaction of bill

    CN107800761A

  • Digitalized construction management system based on BIM model

    CN110084527A

  • Database table processing method and device, equipment and storage medium

    CN113032834A

  • Cloud office big data processing method combined with artificial intelligence and cloud office server

    CN113313464A