Power generation enterprise cost index tracking control method, system and device and storage medium

By detecting and analyzing the cost indicators of power generation enterprises, real-time tracking and control of cost indicators is achieved, the tracking problems of power enterprises in cost management is solved, and management level and management efficiency are improved.

CN119027147APending Publication Date: 2024-11-26JIANGXI BRANCH OF CHINA HUANENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410902762.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In terms of cost control, it is difficult for power enterprises to effectively track and manage various cost indicators in the production and operation process, especially during the implementation of cost plans, and there are challenges in the supervision and adjustment of various factors affecting costs.

Method used

By detecting whether the cost value of the upper-level indicator of the power generation enterprise reaches the cost alert threshold within the current cycle, determining the secondary indicator, and traversing and unit analysis are carried out to determine whether the cost value exceeds the benchmark value. If it exceeds the alarm indicator, select the alarm indicator to generate abnormal record , perform cost indicator tracking and control, and use system modules and equipment to process and store data to achieve cost control.

Benefits of technology

Real-time tracking and control of enterprise cost indicators is achieved, and the ability to drill down to the bottom granularity is able to find the root cause of the excess of upper cost indicators, provide decision-making support for enterprise operations, and improve management level and management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027147A_ABST
    Figure CN119027147A_ABST
Patent Text Reader

Abstract

The invention discloses a power generation enterprise cost index tracking control method, system and device and a storage medium, and the method comprises the steps: determining all secondary indexes corresponding to an upper-layer index of a power generation enterprise when the cost value of the upper-layer index of the power generation enterprise is detected to reach a cost warning threshold value in a current period; traversing all the secondary indexes, and taking the traversed secondary indexes as the current secondary indexes; if the cost value of the current secondary index does not exceed the benchmark value corresponding to the current secondary index, determining a subordinate index corresponding to the current secondary index, and performing unit analysis on the subordinate index; if the year-on-year deviation value and / or the link-on-year deviation value of the lower-level indexes exceed a preset growth ratio, at least one alarm index is selected from the multiple lower-level indexes to generate an index transaction record; and when the traversal is completed, carrying out cost index tracking control according to the index transaction record. According to the method, various elements influencing the cost are supervised, adjusted and controlled through a digital means, and various cost indexes are effectively tracked.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method, system, equipment and storage medium for tracking and controlling cost indicators of a power generation enterprise. Background Art

[0002] In recent years, power companies have caused traditional power generation companies, especially thermal power companies, to face a huge change in their development mode. On the one hand, after years of energy-saving and emission-reduction technology transformation, the overall coal consumption and emissions of my country's thermal power units have reached the international leading level, and energy-saving and emission-reduction work has entered a deep water zone; on the other hand, the reform of the power system has been accelerated, market competition has become increasingly fierce, the proportion of new energy grid access has continued to increase, and deep peak regulation has posed new challenges to the flexibility of thermal power. The cost control pressure has forced thermal power companies to continuously improve their management level and control efficiency.

[0003] Cost control is the core content of cost management. In the process of cost plan implementation, digital means are used to take certain measures to supervise, adjust and control various factors that affect costs. Therefore, how to effectively track various cost indicators in the production and operation process of an enterprise has become a problem that needs to be solved urgently.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of the present invention is to provide a method, system, device and storage medium for tracking and controlling cost indicators of a power generation enterprise, aiming to solve the technical problem of how to effectively track various cost indicators in the production and operation process of the enterprise.

[0006] To achieve the above object, the present invention provides a method for tracking and controlling cost indicators of a power generation enterprise, the method comprising:

[0007] When it is detected in the current cycle that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined;

[0008] Traverse all secondary indicators and use the traversed secondary indicators as the current secondary indicators;

[0009] Determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator;

[0010] If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, then determining multiple subordinate indicators corresponding to the current secondary indicator, and performing unit analysis on the multiple subordinate indicators respectively;

[0011] According to the unit analysis results of each subordinate indicator, determine whether the year-on-year deviation value and / or month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio;

[0012] If so, selecting at least one alarm indicator from the multiple subordinate indicators, generating an indicator change record according to the at least one alarm indicator, and returning to the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator;

[0013] When the traversal is completed, the cost indicator tracking and control is performed according to the indicator change record.

[0014] Optionally, if the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, then determining multiple subordinate indicators corresponding to the current secondary indicator and performing unit analysis on the multiple subordinate indicators respectively, further comprising:

[0015] Determine indicator abnormality data according to the unit analysis results of each subordinate indicator, and select at least one corresponding alarm indicator from multiple subordinate indicators according to the indicator abnormality data;

[0016] The warning value of the indicator change data is checked according to the at least one alarm indicator, and an indicator change record is generated according to the at least one alarm indicator.

[0017] Optionally, after the step of determining whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator, the step further includes:

[0018] If the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator, then a unit analysis is performed on the current secondary indicator;

[0019] Determine a plurality of lower-level indicators according to the unit analysis results of the current secondary indicator;

[0020] Selecting at least one alarm indicator corresponding to a percentage of a warning threshold value exceeding the benchmark value of each lower-level indicator from the cost values ​​of the multiple lower-level indicators;

[0021] Generate an indicator change record according to the at least one alarm indicator.

[0022] Optionally, after the step of tracking and controlling the cost indicator according to the indicator change record, the method further includes:

[0023] Determine at least one abnormal indicator according to the indicator change record, and analyze the cause of the indicator change record;

[0024] The at least one abnormal indicator is rectified and recorded according to the cause analysis result.

[0025] Optionally, after the step of rectifying and recording the at least one abnormal indicator according to the cause analysis result, the method further includes:

[0026] Determine whether at least one abnormal indicator is effectively rectified in the next cycle;

[0027] If not, determine the person-in-charge information corresponding to the at least one abnormal indicator, issue an alarm to the person-in-charge information according to the indicator change record, and return to the step of analyzing the cause of the indicator change record.

[0028] In addition, to achieve the above-mentioned purpose, the present invention also proposes a power generation enterprise cost index tracking and control system, the power generation enterprise cost index tracking and control system comprising:

[0029] A determination module, configured to determine all secondary indicators corresponding to the upper-level indicator of the power generation enterprise when it is detected in the current cycle that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold;

[0030] The traversal module is used to traverse all secondary indicators and use the traversed secondary indicators as the current secondary indicators;

[0031] A judgment module, used to judge whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator;

[0032] A determination module, configured to determine a subordinate indicator corresponding to the current subordinate indicator if the cost value of the current subordinate indicator does not exceed the benchmark value corresponding to the current subordinate indicator, and perform unit analysis on the subordinate indicator;

[0033] The judgment module is further used to judge whether the year-on-year deviation value and / or the month-on-month deviation value of the subordinate indicator exceeds a preset growth ratio according to the unit analysis result of the subordinate indicator;

[0034] The determination module is further configured to, if yes, select at least one alarm indicator from a plurality of subordinate indicators, generate an indicator change record according to the at least one alarm indicator, and return to the step of traversing all subordinate indicators and taking the traversed subordinate indicator as the current subordinate indicator;

[0035] The tracking module is used to track and control the cost indicators according to the indicator change records when the traversal is completed.

[0036] In addition, to achieve the above-mentioned objectives, the present invention also proposes a power generation enterprise cost indicator tracking and control device, the device comprising: a memory, a processor, and a power generation enterprise cost indicator tracking and control program stored in the memory and executable on the processor, the power generation enterprise cost indicator tracking and control program being configured to implement the steps of the power generation enterprise cost indicator tracking and control method as described above.

[0037] In addition, to achieve the above-mentioned purpose, the present invention also proposes a storage medium, on which a power generation enterprise cost indicator tracking and control program is stored. When the power generation enterprise cost indicator tracking and control program is executed by a processor, the steps of the power generation enterprise cost indicator tracking and control method described above are implemented.

[0038] When the present invention detects that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold value within the current cycle, firstly, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined, then all the secondary indicators are traversed, and the traversed secondary indicators are used as the current secondary indicators to determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator. If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, multiple subordinate indicators corresponding to the current subordinate indicator are determined, and unit analysis is performed on the multiple subordinate indicators respectively. According to the unit analysis results of each subordinate indicator, it is determined whether the year-on-year deviation value and / or the month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio. If so, at least one alarm indicator is selected from the multiple subordinate indicators, an indicator change record is generated according to the at least one alarm indicator, and the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator is returned. Finally, when the traversal is completed, the cost indicator tracking control is performed according to the indicator change record. During the implementation of the cost plan, the present invention adopts digital means to take certain measures to supervise, adjust and control various factors that affect the cost, which can effectively track various cost indicators in the production and operation process of the enterprise, and use cost analysis and control means to drill down the cost indicators to the bottom granularity to find the most fundamental reasons for the excess of upper-level cost indicators, providing decision-making support opinions for enterprise operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a structural diagram of a power generation enterprise cost indicator tracking and control device in a hardware operating environment involved in an embodiment of the present invention;

[0040] Figure 2 It is a flow chart of the first embodiment of the cost index tracking and control method for power generation enterprises of the present invention;

[0041] Figure 3 It is a schematic diagram of unit analysis results of the first embodiment of the cost index tracking and control method for power generation enterprises of the present invention;

[0042] Figure 4 This is a schematic diagram of recording indicator changes in the first embodiment of the cost indicator tracking and control method for power generation enterprises of the present invention;

[0043] Figure 5 It is a structural block diagram of the first embodiment of the cost indicator tracking and control system for power generation enterprises of the present invention.

[0044] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0045] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0046] Reference Figure 1 , Figure 1 A schematic diagram of the structure of a cost indicator tracking and control device for a power generation enterprise in a hardware operating environment involved in an embodiment of the present invention.

[0047] like Figure 1 As shown, the power generation enterprise cost indicator tracking and control device may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (Wireless-Fidelity, Wi-Fi) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM), or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk storage. The memory 1005 may also be a storage system independent of the aforementioned processor 1001.

[0048] Those skilled in the art will understand that Figure 1 The structure shown in does not constitute a limitation on the cost indicator tracking and control device for power generation enterprises, and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.

[0049] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a power generation enterprise cost indicator tracking control program.

[0050] exist Figure 1In the power generation enterprise cost indicator tracking and control device shown, the network interface 1004 is mainly used for data communication with the network server; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the power generation enterprise cost indicator tracking and control device of the present invention can be set in the power generation enterprise cost indicator tracking and control device, and the power generation enterprise cost indicator tracking and control device calls the power generation enterprise cost indicator tracking and control program stored in the memory 1005 through the processor 1001, and executes the power generation enterprise cost indicator tracking and control method provided by the embodiment of the present invention.

[0051] The embodiment of the present invention provides a method for tracking and controlling cost indicators of a power generation enterprise, referring to Figure 2 , Figure 2 It is a flow chart of the first embodiment of the cost indicator tracking and control method for power generation enterprises of the present invention.

[0052] In this embodiment, the power generation enterprise cost indicator tracking and control method includes the following steps:

[0053] Step S10: when it is detected in the current cycle that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined.

[0054] It is easy to understand that the executor of this embodiment can be a power generation enterprise cost indicator tracking and control system with functions such as data processing, network communication and program running, or other computer equipment with similar functions, etc., and this embodiment is not limited.

[0055] It should be noted that the current cycle is the cycle corresponding to all the secondary indicators corresponding to the upper indicators of the power generation enterprise and all the lower indicators corresponding to the secondary indicators.

[0056] The cost warning threshold can be customized by the user, and this embodiment does not limit this.

[0057] It should be understood that there are multiple upper-level indicators in a power generation enterprise. When it is detected that the cost value of a certain upper-level indicator reaches the cost warning threshold, it is necessary to determine all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise.

[0058] Assuming that the upper-level indicator is the thermal power industry, the corresponding total cost, fuel cost, production cost and fixed cost are secondary indicators.

[0059] Step S20: traverse all secondary indicators, and use the traversed secondary indicators as the current secondary indicators.

[0060] Step S30: Determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator.

[0061] It should be understood that each secondary indicator corresponds to a pre-set benchmark value (i.e., a quota benchmark value), which can be modified by the person in charge of the secondary indicator.

[0062] Furthermore, if the cost value of the current sub-indicator exceeds the benchmark value corresponding to the current sub-indicator, a unit analysis is performed on the current sub-indicator; multiple lower-level indicators are determined based on the unit analysis results of the current lower-level indicator; at least one alarm indicator corresponding to the warning threshold percentage that exceeds the benchmark value of each lower-level indicator is selected from the cost values ​​of the multiple lower-level indicators; and an indicator change record is generated based on at least one alarm indicator.

[0063] It should be understood that at least one alarm indicator corresponding to the percentage of the warning threshold that exceeds the benchmark value of each lower-level indicator is selected from the cost values ​​of multiple lower-level indicators, and the enterprise, department and unit cost responsible person of at least one alarm indicator are determined to issue an "abnormal" warning. Warning methods may include: system reminders, SMS reminders, OA email reminders, etc. This platform implements at least one of the above warning methods. At the same time, when the warning mechanism is triggered, the system automatically creates a workflow, requiring the corresponding unit cost responsible person to submit disposal opinions, and conducts closed-loop tracking of the actual completion of the indicator for the month and the next month.

[0064] It should also be noted that the lower-level indicators can be understood as lower-level indicators, lower-level indicators corresponding to the lower-level indicators, etc., until the last-level indicators of the lower-level indicators. The warning threshold percentage is a user-defined setting.

[0065] The unit analysis results of the current secondary indicator include multiple lower-level indicators, the cost values ​​of each stage or time corresponding to the multiple lower-level indicators, and the actual percentage results of the multiple lower-level indicators exceeding the benchmark values ​​of the lower-level indicators. Figure 3 , Figure 3 This is a schematic diagram of unit analysis results of the first embodiment of the cost indicator tracking and control method for power generation enterprises of the present invention.

[0066] It should also be noted that reference Figure 3 , at least one alarm indicator includes factory expenses and losses, calorific value difference between entering the factory and the furnace, material inventory per unit capacity, fixed cost per unit electricity, etc.

[0067] Step S40: If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, multiple subordinate indicators corresponding to the current secondary indicator are determined, and unit analysis is performed on the multiple subordinate indicators respectively.

[0068] Furthermore, indicator change data is determined based on the unit analysis results of each subordinate indicator, and at least one corresponding alarm indicator is selected from multiple subordinate indicators based on the indicator change data; the warning value of the indicator change data is checked based on at least one alarm indicator, and an indicator change record is generated based on at least one alarm indicator.

[0069] It should also be noted that indicator abnormal data refers to indicator data that fluctuates at the same time or has a larger fluctuation in the previous and next time periods.

[0070] In the specific implementation, the indicator person in charge corresponding to the indicator change data is determined, and the warning value is changed through the indicator person in charge. After that, the indicator change data is checked against the warning value, and a record of the indicator change is formed.

[0071] Step S50: judging whether the year-on-year deviation value and / or month-on-month deviation value of each subordinate indicator exceeds a preset growth ratio according to the unit analysis results of each subordinate indicator.

[0072] It should be understood that the preset growth ratio is a user-defined setting.

[0073] Step S60: If yes, then select at least one alarm indicator from multiple subordinate indicators, generate an indicator change record according to the at least one alarm indicator, and return to the step of traversing all secondary indicators and taking the traversed secondary indicator as the current secondary indicator.

[0074] It should also be understood that if the year-on-year deviation value and / or the month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio, it is necessary to select the indicator corresponding to the year-on-year deviation value and / or the month-on-month deviation value of the subordinate indicator that exceeds the preset growth ratio from multiple subordinate indicators, and use the selected indicator as the alarm indicator.

[0075] In this embodiment, reference Figure 4 , Figure 4 This is a schematic diagram of an indicator change record of the first embodiment of the cost indicator tracking and control method for power generation enterprises of the present invention. It is necessary to sequentially add at least one alarm indicator to the indicator change record (ie, the cost change record).

[0076] Step S70: When the traversal is completed, cost indicator tracking and control is performed according to the indicator change record.

[0077] It should also be noted that this platform tracks various cost indicators in real time. For indicators that exceed the warning threshold range, records are tracked, including at least: indicator name, related indicator status (if any), change time (the time when the indicator exceeds the benchmark value or the warning), indicator responsible department, responsible person, processing status, etc.

[0078] For cost indicators that have undergone "changes", processing and tracking are carried out, including processing time, processing method, and uploading and downloading of related files.

[0079] For the indicators that have been processed, the relevant responsible personnel will follow up and further confirm the improvement of the indicators, forming a closed loop of cost tracking and control.

[0080] Further, at least one abnormal indicator is determined based on the indicator change record, and the cause of the abnormal indicator in the indicator change record is analyzed by the person responsible for the abnormal indicator; at least one abnormal indicator is rectified and recorded based on the cause analysis result; it is determined whether at least one abnormal indicator in the next cycle is effectively rectified; if not, the person responsible for the at least one abnormal indicator is determined, and an alarm is issued for the person responsible according to the indicator change record, and a copy is sent to the superior person in charge, and the step of performing cause analysis on the indicator change record is returned.

[0081] It should be understood that the alarm methods may include: system reminders, SMS reminders, OA mailbox reminders, etc.

[0082] In the specific implementation, refer to Figure 4 , providing functions such as detailed review and file attachment upload and download. The detailed review includes the historical trends of various indicators, benchmarking results, and the number of over-limit warnings; the attachment transmission function provides detailed report uploads of the cost indicator parameters, as well as the branch side's correction report, etc., to form a file trace management.

[0083] In this embodiment, when it is detected that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold in the current cycle, firstly, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined, then all the secondary indicators are traversed, and the traversed secondary indicators are used as the current secondary indicators to determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator. If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, then multiple subordinate indicators corresponding to the current secondary indicator are determined, and unit analysis is performed on the multiple subordinate indicators respectively. According to the unit analysis results of each subordinate indicator, it is determined whether the year-on-year deviation value and / or the month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio. If so, at least one alarm indicator is selected from the multiple subordinate indicators, an indicator change record is generated according to the at least one alarm indicator, and the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator is returned. Finally, when the traversal is completed, the cost indicator tracking control is performed according to the indicator change record. In this embodiment, the system is directly connected to the financial system, such as SAP, financial budget system, etc., and uses the results of one-day operating accounting to track the cost indicator data of power generation groups, regional companies and grassroots enterprises in real time. The source of cost data is authentic and reliable; the cost indicators can penetrate to the bottom indicators step by step. For the "changes" of the upper indicators, the biggest influencing factors in the bottom indicators can be quickly checked, and the most critical "dependent variables" can be locked to provide support for enterprise cost control; after the cost indicators "change", a "change" closed-loop tracking mechanism is established, and the system is used to form online control traces, which can provide a closed-loop control mechanism for cost control.

[0084] Reference Figure 5 , Figure 5 It is a structural block diagram of the first embodiment of the cost indicator tracking and control system for power generation enterprises of the present invention.

[0085] like Figure 5 As shown, the power generation enterprise cost index tracking and control system proposed in the embodiment of the present invention includes:

[0086] The determination module 5001 is used to determine all the secondary indicators corresponding to the upper-level indicators of the power generation enterprise when it is detected within a preset period that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold;

[0087] A traversal module 5002 is used to traverse all secondary indicators and use the traversed secondary indicators as the current secondary indicators;

[0088] The judgment module 5003 is used to judge whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator;

[0089] The determination module 5004 is used to determine the subordinate indicator corresponding to the current subordinate indicator if the cost value of the current subordinate indicator does not exceed the benchmark value corresponding to the current subordinate indicator, and perform unit analysis on the subordinate indicator;

[0090] The judgment module 5003 is further used to judge whether the year-on-year deviation value and / or the month-on-month deviation value of the subordinate indicator exceeds a preset growth ratio according to the unit analysis result of the subordinate indicator;

[0091] The determination module 5004 is further configured to, if yes, select at least one alarm indicator from the multiple subordinate indicators, generate an indicator change record according to the at least one alarm indicator, and return to the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator;

[0092] The tracking module 5005 is used to track and control the cost index according to the index change record when the traversal is completed.

[0093] In this embodiment, when it is detected that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold in the current cycle, firstly, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined, then all the secondary indicators are traversed, and the traversed secondary indicators are used as the current secondary indicators to determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator. If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, then multiple subordinate indicators corresponding to the current secondary indicator are determined, and unit analysis is performed on the multiple subordinate indicators respectively. According to the unit analysis results of each subordinate indicator, it is determined whether the year-on-year deviation value and / or the month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio. If so, at least one alarm indicator is selected from the multiple subordinate indicators, an indicator change record is generated according to the at least one alarm indicator, and the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator is returned. Finally, when the traversal is completed, the cost indicator tracking control is performed according to the indicator change record. In this embodiment, the system is directly connected to the financial system, such as SAP, financial budget system, etc., and uses the results of one-day operating accounting to track the cost indicator data of power generation groups, regional companies and grassroots enterprises in real time. The source of cost data is authentic and reliable; the cost indicators can penetrate to the bottom indicators step by step. For the "changes" of the upper indicators, the biggest influencing factors in the bottom indicators can be quickly checked, and the most critical "dependent variables" can be locked to provide support for enterprise cost control; after the cost indicators "change", a "change" closed-loop tracking mechanism is established, and the system is used to form online control traces, which can provide a closed-loop control mechanism for cost control.

[0094] Other embodiments or specific implementations of the power generation enterprise cost index tracking and control system of the present invention can refer to the above-mentioned method embodiments and will not be described in detail here.

[0095] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0096] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0097] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory / random access memory, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0098] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A cost index tracking and control method for a power generation enterprise, characterized in that: The power generation enterprise cost index tracking and control method comprises the following steps: When it is detected in the current cycle that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold, all the secondary indicators corresponding to the upper-level indicator of the power generation enterprise are determined; Traverse all secondary indicators and use the traversed secondary indicators as the current secondary indicators; Determine whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator; If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, then determining multiple subordinate indicators corresponding to the current secondary indicator, and performing unit analysis on the multiple subordinate indicators respectively; According to the unit analysis results of each subordinate indicator, determine whether the year-on-year deviation value and / or month-on-month deviation value of each subordinate indicator exceeds the preset growth ratio; If so, selecting at least one alarm indicator from the multiple subordinate indicators, generating an indicator change record according to the at least one alarm indicator, and returning to the step of traversing all the secondary indicators and taking the traversed secondary indicator as the current secondary indicator; When the traversal is completed, the cost indicator tracking and control is performed according to the indicator change record.

2. The method according to claim 1, characterized in that If the cost value of the current secondary indicator does not exceed the benchmark value corresponding to the current secondary indicator, the step of determining multiple subordinate indicators corresponding to the current secondary indicator and performing unit analysis on the multiple subordinate indicators respectively includes: Determine indicator abnormality data according to the unit analysis results of each subordinate indicator, and select at least one corresponding alarm indicator from multiple subordinate indicators according to the indicator abnormality data; The warning value of the indicator change data is checked according to the at least one alarm indicator, and an indicator change record is generated according to the at least one alarm indicator.

3. The method according to claim 1, characterized in that After the step of determining whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator, the method further includes: If the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator, then a unit analysis is performed on the current secondary indicator; Determine a plurality of lower-level indicators according to the unit analysis results of the current secondary indicator; Selecting at least one alarm indicator corresponding to a percentage of a warning threshold value exceeding the benchmark value of each lower-level indicator from the cost values ​​of the multiple lower-level indicators; Generate an indicator change record according to the at least one alarm indicator.

4. The method according to any one of claims 1 to 3, characterized in that: After the step of tracking and controlling the cost index according to the index change record, the method further includes: Determine at least one abnormal indicator according to the indicator change record, and analyze the cause of the indicator change record; The at least one abnormal indicator is rectified and recorded according to the cause analysis result.

5. The method according to claim 4, characterized in that After the step of rectifying and recording the at least one abnormal indicator according to the cause analysis result, the method further includes: Determine whether at least one abnormal indicator is effectively rectified in the next cycle; If not, determine the person-in-charge information corresponding to the at least one abnormal indicator, issue an alarm to the person-in-charge information according to the indicator change record, and return to the step of analyzing the cause of the indicator change record.

6. A cost index tracking and control system for power generation enterprises, characterized in that: The power generation enterprise cost index tracking and control system comprises: A determination module, configured to determine all secondary indicators corresponding to the upper-level indicator of the power generation enterprise when it is detected in the current cycle that the cost value of the upper-level indicator of the power generation enterprise reaches the cost warning threshold; The traversal module is used to traverse all secondary indicators and use the traversed secondary indicators as the current secondary indicators; A judgment module, used to judge whether the cost value of the current secondary indicator exceeds the benchmark value corresponding to the current secondary indicator; A determination module, configured to determine a subordinate indicator corresponding to the current subordinate indicator if the cost value of the current subordinate indicator does not exceed the benchmark value corresponding to the current subordinate indicator, and perform unit analysis on the subordinate indicator; The judgment module is further used to judge whether the year-on-year deviation value and / or the month-on-month deviation value of the subordinate indicator exceeds a preset growth ratio according to the unit analysis result of the subordinate indicator; The determination module is further configured to, if yes, select at least one alarm indicator from a plurality of subordinate indicators, generate an indicator change record according to the at least one alarm indicator, and return to the step of traversing all subordinate indicators and taking the traversed subordinate indicator as the current subordinate indicator; The tracking module is used to track and control the cost indicators according to the indicator change records when the traversal is completed.

7. A cost index tracking and control device for a power generation enterprise, characterized in that: The device includes: a memory, a processor, and a power generation enterprise cost indicator tracking and control program stored in the memory and executable on the processor, wherein the power generation enterprise cost indicator tracking and control program is configured to implement the steps of the power generation enterprise cost indicator tracking and control method as described in any one of claims 1 to 5.

8. A storage medium, characterized in that: The storage medium stores a power generation enterprise cost indicator tracking control program, and when the power generation enterprise cost indicator tracking control program is executed by the processor, the steps of the power generation enterprise cost indicator tracking control method according to any one of claims 1 to 5 are implemented.