Automatic Correction Method and Related Device for Predicted Deviations Along Marine Seismic Exploration Shot Points
By calculating the deflection of shot points along the line and adaptively adjusting the ship speed and prediction method, the problem of deflection in the prediction of shot points along the line in marine seismic exploration was solved, improving operational efficiency and data quality.
Patent Information
- Application Number
- CN202411166763.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-08-23
AI Technical Summary
In existing technologies, when conducting 4D seismic exploration firing operations in marine seismic exploration, the method for predicting firing points has deviations along the line, resulting in uneven firing intervals, affecting operational efficiency, and lacking an automatic correction method.
By calculating the distance and angle deviation data of the firing along the line, it is determined whether the deviation criteria are met, the firing prediction mode is switched adaptively, and a speed reduction command is sent when necessary to correct the deviation and restore the operation quality control conditions. Adaptive filtering and navigation system data processing are used to improve accuracy.
It effectively reduced the impact of deviations along the route on the operation, improved the efficiency of four-dimensional detonation operations in marine seismic exploration and the quality of acquired data, and ensured the stability and efficiency of the operation process.
Smart Images

Figure CN119045055B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of marine seismic exploration technology, specifically to a method and apparatus for automatic correction of deviations along the prediction line of marine seismic exploration shot points, as well as a computing device and computer storage medium. Background Technology
[0002] In the field of offshore oil seismic exploration, seafloor node cascade acquisition exploration (4D seismic exploration) has the advantages of high resolution, high precision, and high efficiency, and is an important area of development in offshore oil seismic exploration at present. In order to improve the operational efficiency of 4D seismic exploration, multi-source excitation is generally adopted. Therefore, high-precision shot point prediction is the key to ensuring efficient operation.
[0003] The current main application method for 4D seismic exploration shot point prediction in marine seismic exploration is to independently predict shot points based on the left and right sources of the seismic array. When the source point reaches the theoretical shot point along the survey line, the source is activated to initiate the shot-firing operation. However, this method has significant drawbacks: when the seismic array is affected by ocean currents, causing a large angle between the line connecting the left and right sources and the perpendicular to the survey line, the shot-firing interval becomes uneven. To ensure the minimum shot-firing interval, a large deviation along the line will occur when a source on one side fires, affecting the quality of seismic acquisition. Currently, the only way to reduce the deviation along the line is by manually reducing the ship speed, which significantly reduces operational efficiency, with the maximum impact reaching 10%.
[0004] To date, no existing technology has been found that can automatically correct deviations along the firing line in offshore oil exploration, thus solving the problem of excessive deviations caused by uneven firing intervals, which leads to reduced operational efficiency. Summary of the Invention
[0005] In view of the above problems, the present invention is proposed to provide a method and apparatus, computing device and computer storage medium for automatically correcting deviations along the prediction line of marine seismic exploration shot points, which overcomes the problem of low efficiency of four-dimensional shot operation in marine seismic exploration.
[0006] According to one aspect of the present invention, an automatic correction method for deviation along the prediction line of marine seismic exploration shot points is provided, comprising:
[0007] Step S10: After the seismic source detonates, calculate the detonation distance deviation data and / or detonation angle deviation data along the line, and determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, proceed to step S11.
[0008] Step S11: Switch the cannon firing prediction method;
[0009] Step S12: Calculate the difference between the center point position of the left and right seismic sources and the corresponding projected position of the front-drawn shot point, and determine whether the operation quality control conditions are met. If they are met, proceed to step S14; otherwise, proceed to step S13.
[0010] Step S13: Send a deceleration command to adaptively reduce the ship speed, and execute step S10.
[0011] Step S14: Exit the deviation correction process along the line.
[0012] In an alternative approach, the method further includes: after adaptively reducing the ship speed, if the operation quality control conditions are met for n consecutive firings, then the deviation recovery process along the line is triggered, where n is greater than or equal to 1.
[0013] The deviation recovery process along the line includes the following steps:
[0014] Step S20: Send an acceleration command to adaptively increase the ship speed;
[0015] Step S21: After the seismic source fires again, determine whether the operation quality control conditions are met. If they are met, continue to send the speed-up command until the ship speed is increased to the maximum ship speed that meets the operation quality control conditions.
[0016] In one alternative approach, after increasing the vessel speed to the maximum speed required to meet the operational quality control conditions, the deviation recovery process further includes the following steps:
[0017] Step S22: After the seismic source fires again, calculate the distance deviation data and / or angle deviation data along the firing line, and determine whether the distance deviation criterion and / or angle deviation criterion are met. If they are met, proceed to step S24; if they are not met, proceed to step S23.
[0018] Step S23: Fire the cannon d times consecutively, where d is greater than or equal to 1, then proceed to step S22;
[0019] Step S24: Switch the cannon prediction mode to the independent cannon mode for left and right seismic sources, and exit the deviation recovery process along the line.
[0020] In one alternative approach, calculating the firing distance deviation data and / or firing angle deviation data along the line, and determining whether the distance deviation criterion and / or angle deviation criterion are satisfied, further includes:
[0021] Calculate the shot deviation matrix along the line of continuous x shots from the source, calculate the rate of change matrix of shot deviation along the line of continuous x shots from the source; and / or, calculate the angle between the line connecting the left and right sources and the perpendicular line of the survey line.
[0022] Based on the deflection matrix along the line and the rate of change matrix of the deflection along the line, determine whether the distance deviation criterion is satisfied; and / or, based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line, determine whether the angle deviation criterion is satisfied.
[0023] In an optional approach, determining whether the distance deviation criterion is satisfied based on the firing deviation matrix along the line and the rate of change matrix of the firing deviation along the line further includes:
[0024] Determine whether one or more values of the firing deviation matrix along the line are greater than or equal to the first distance threshold. If so, it is determined that the distance deviation criterion is not met.
[0025] If one or more values of the detonation deviation matrix along the line are less than the first distance threshold, then it is determined whether one or more values of the rate of change matrix of the detonation deviation along the line are greater than or equal to the rate of change threshold. If so, it is determined that the distance deviation criterion is not met.
[0026] The step of determining whether the angle deviation criterion is satisfied based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line further includes:
[0027] Determine whether the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line is greater than or equal to the angle threshold. If yes, it is determined that the angle deviation criterion is not met; otherwise, it is determined that the angle deviation criterion is met.
[0028] In an alternative approach, determining whether the work quality control conditions are met further includes:
[0029] Determine whether the difference between the position of the firing center point of the left and right seismic sources and the corresponding projected position of the firing point is less than or equal to the second distance threshold. If so, it is determined that the operation quality control conditions are met; otherwise, it is determined that the operation quality control conditions are not met.
[0030] In an alternative approach, the method further includes: calculating the firing positions of the left and right seismic source reference points and the firing center positions of the left and right seismic sources based on data provided by the navigation system; and detecting gross errors and performing robust filtering during the calculation process.
[0031] According to another aspect of the present invention, an automatic correction device for deviation along the prediction line of marine seismic exploration shot points is provided, comprising:
[0032] The first judgment module is used to calculate the distance deviation data and / or angle deviation data of the detonation along the seismic source after the detonation, and to determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, the switching module is triggered to run.
[0033] The switching module is used to switch the cannon firing prediction method;
[0034] The second judgment module is used to calculate the difference between the firing center point position of the left and right seismic sources and the corresponding projected firing point position, and to determine whether the operation quality control conditions are met. If they are met, the deviation correction process along the line is exited; if they are not met, the control module is triggered to run.
[0035] The control module is used to send deceleration commands to adaptively reduce the ship's speed.
[0036] According to another aspect of the present invention, a computing device is provided, comprising: a processor, a memory, a communication interface, and a communication bus, wherein the processor, the memory, and the communication interface communicate with each other via the communication bus;
[0037] The memory is used to store at least one executable instruction, which causes the processor to perform the operation corresponding to the above-described automatic correction method for deviation along the prediction line of marine seismic exploration shot points.
[0038] According to another aspect of the present invention, a computer storage medium is provided, the storage medium storing at least one executable instruction, the executable instruction causing a processor to perform an operation corresponding to the above-described automatic correction method for deviation along the prediction of marine seismic exploration shot points.
[0039] According to the solution provided by this invention, after the seismic source fires, the distance deviation data and / or angle deviation data along the firing line are calculated to determine whether the distance deviation criteria and / or angle deviation criteria are met. If not, the firing prediction mode is switched. Then, the difference between the firing center point position of the left and right seismic sources and the corresponding projected firing point position is calculated to determine whether the operation quality control conditions are met. If met, the deviation correction process along the line is exited; if not, a deceleration command is sent to adaptively reduce the ship speed. This invention improves the efficiency and data quality of four-dimensional firing operations in marine seismic exploration by automatically correcting the deviation along the firing point prediction line.
[0040] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, and in order to make the above and other objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description
[0041] Various other advantages and benefits will become apparent to those skilled in the art upon reading the following detailed description of preferred embodiments. The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Furthermore, the same reference numerals denote the same parts throughout the drawings. In the drawings:
[0042] Figure 1A flowchart illustrating an automatic correction method for deviation along the prediction line of marine seismic exploration shot points provided in an embodiment of the present invention is shown.
[0043] Figure 2 The diagram shows the overall design architecture of an automatic correction method for prediction of marine seismic exploration shot points along the line, provided by another embodiment of the present invention.
[0044] Figure 3 A flowchart of the process for judging and correcting deviations along the line, provided in another embodiment of the present invention;
[0045] Figure 4 A flowchart of the deviation recovery process along the line is provided as another embodiment of the present invention;
[0046] Figure 5 This is a schematic diagram illustrating the deviation correction effect along the line according to an embodiment of the present invention;
[0047] Figure 6 This invention provides a functional block diagram of an automatic correction device for deviation along the prediction line of marine seismic exploration shot points.
[0048] Figure 7 A schematic diagram of the structure of a computing device according to an embodiment of the present invention is shown. Detailed Implementation
[0049] Exemplary embodiments of the invention will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the invention are shown in the drawings, it should be understood that the invention may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this invention will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
[0050] Figure 1 This diagram illustrates a flowchart of an automatic correction method for deviations along the prediction path of marine seismic exploration shot points, provided by an embodiment of the present invention. Specifically, as shown... Figure 1 As shown, it includes the following steps:
[0051] Step S10: After the seismic source detonates, calculate the distance deviation data and / or angle deviation data along the detonation line, and determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, proceed to step S11.
[0052] During seismic exploration operations, a series of deviation judgment criteria are established to ensure that the location deviation of the seismic source is within an acceptable range. These criteria include the along-line shot distance deviation criterion and the along-line shot angle deviation criterion. The along-line shot distance deviation criterion refers to the actual offset of the seismic source relative to its designed position. For example, after any seismic source fires, the along-line shot deviation for its consecutive x shots (x can be pre-configured according to actual conditions) is calculated. The along-line shot angle deviation criterion refers to the deviation of the seismic source excitation direction relative to a predetermined direction. For example, the angle between the line connecting the left and right seismic sources and the current survey line is greater than c° (c can be pre-configured according to actual conditions).
[0053] In this embodiment, the distance deviation data and / or angle deviation data of the firing along the line are calculated, and it is determined whether the distance deviation criterion and / or angle deviation criterion for firing along the line are met. That is, based on the distance deviation and angle deviation criteria for firing along the line, it is determined whether to automatically enter the deviation correction process along the line, i.e., to enter the processing flow of steps S11, S12, and S13. If the distance deviation criterion and / or angle deviation criterion for firing along the line are met, the firing operation is carried out normally.
[0054] Step S11: Switch the cannon firing prediction method.
[0055] In this embodiment, if the next shot needs to enter the deviation correction process along the line, the shot prediction mode is adaptively switched. That is, the quality control conditions for the next operation are changed to: the difference between the position of the center point of the left and right seismic sources of the current shot and the projection position of the corresponding previously drawn shot point satisfies the condition that it is less than or equal to a preset value (referred to as the second distance threshold in this article).
[0056] Step S12: Calculate the difference between the center point position of the left and right seismic sources and the corresponding projected position of the front-drawn shot point, and determine whether the operation quality control conditions are met. If they are met, proceed to step S14; otherwise, proceed to step S13.
[0057] Specifically, the difference between the firing center point position of the left and right seismic sources and the corresponding projected firing point position is calculated, and it is determined whether the difference between the firing center point position of the left and right seismic sources and the corresponding projected firing point position is less than or equal to the second distance threshold. If so, the operation quality control conditions are met, and step S14 is executed; otherwise, the operation quality control conditions are not met, and step S13 is executed.
[0058] Step S13: Send a speed reduction command to adaptively reduce the ship speed, and execute step S10.
[0059] Step S14: Exit the deviation correction process along the line.
[0060] The solution provided in the above embodiments of the present invention calculates the distance deviation data and / or angle deviation data along the firing line after the seismic source fires, and determines whether the distance deviation criteria and / or angle deviation criteria are met. If not, the firing prediction mode is switched. Then, the difference between the firing center point position of the left and right seismic sources and the corresponding projected firing point position is calculated to determine whether the operation quality control conditions are met. If met, the deviation correction process along the line is exited; if not, a speed reduction command is sent to adaptively reduce the ship speed. Based on the judgment results of distance / angle deviation and position deviation, the present invention adaptively reduces the ship speed, realizing automatic correction of the deviation along the firing point prediction line, improving the efficiency of four-dimensional firing operations in marine seismic exploration and the quality of acquired data.
[0061] Figure 2 This diagram illustrates the overall design architecture of an automatic correction method for shot point prediction along the predicted trajectory provided by another embodiment of the present invention. It mainly involves steps such as calculating the source location and velocity of the exploration vessel, calculating the prediction trajectory deviation of independent shot points from left and right sources, and automatically correcting the trajectory deviation. Furthermore, after the deviation is corrected, a step of trajectory deviation recovery is also included. In executing the above main steps, adaptive filtering, trajectory deviation judgment, automatic switching of shot point prediction, and re-judgment of trajectory deviation are employed to achieve automatic correction of the prediction trajectory deviation.
[0062] The method provided in this embodiment specifically includes:
[0063] (1) Obtain the current survey line information.
[0064] The method provided in this embodiment is mainly applied to the process of marine 4D seismic exploration. The geophysical exploration vessel needs to tow the seismic source along the pre-drawn survey line. The theoretical firing point is predefined in the pre-drawn survey line, i.e. the pre-drawn firing point. Before the operation starts, the pre-drawn survey line file needs to be imported into the integrated navigation system, and external equipment such as gyrocompass, DGPS, and depth sounder need to be connected to the integrated navigation system.
[0065] During the operation, the location of all pre-drawn firing points, the beginning and end points of the route, and the direction of the route are obtained from the integrated navigation system software. The survey line calculation method, reference ellipsoid information, and plane projection information are also obtained. Real-time parameters from DGPS, Gyro, RGPS, and other devices are used for the calculation of the source location and velocity.
[0066] (2) Calculate the location and velocity of the earthquake source.
[0067] Before calculating the source velocity, the navigation data needs to be preprocessed, its location estimated, and filtered. The navigation data includes DGPS, Gyro, and RGPS observations. In this embodiment, a fixed-length sliding time window is used to store the historical data of each observation, and gross error detection and epoch synchronization are performed on this basis. The formula for calculating the rate of change of the observation over time is:
[0068]
[0069] Where, r i,j For the observed value t i Time to t j The average rate of change at time x i For historical data, x j This is newly added data. If the rate of change of the observed values is r... i,j If the value exceeds the set threshold, the observed value x is considered to be... j There are gross errors. Because the sampling rates and observation epochs of various positioning devices differ, in order to normalize their observations to the calculation time t... c This requires epochal synchronization. A polynomial fitting method is used to fit the cached historical data:
[0070] x(t) = a0 + a1t + a2t 2 +…+a n t n
[0071] Among them, a0…a n Let be the polynomial coefficients, and n be the polynomial order. After determining the polynomial coefficients using least squares estimation, t = t c Substituting into the above formula, we can obtain t. c The observation value corresponding to the time.
[0072] For position estimation, the absolute position of the geophysical survey vessel is provided by DGPS, whose observation values are in geodetic coordinates. To perform subsequent coordinate estimation, these values need to be converted to planar projected coordinates. The conversion is performed using the UTM projection forward calculation formula:
[0073]
[0074] Where (X,Y) are the plane projection coordinates of the point; (B,L) are the geodetic coordinates of the point; l(B) is the meridian arc length from the equator to the projection point; N is the radius of the zonal circle; t = tan(B); η = e′cos(B), where e′ is the second eccentricity of the reference ellipsoid; l = L - L0 is the longitude difference, where L0 is the longitude of the central meridian of the projection zone. After obtaining the plane coordinates of the DGPS point on the tugboat, the coordinates of the RGPS reference station on the exploration vessel are calculated using the design offset of each node in the ship's coordinate system.
[0075]
[0076] Among them, (X) ref ,Y ref ) represents the coordinates of the RGPS reference station; α v The azimuth angle of the bow, obtained by Gyro; dx offset dy offset The design offset of the RGPS reference station relative to the DGPS node in ship coordinates is given by the configuration; (X DGPS ,Y DGPS The coordinates of the DGPS node are shown below. After obtaining the coordinates of the RGPS reference station, the coordinates of the RGPS rover located on the gun array are shown below (X). mob ,Y mob )Calculated based on the RGPS baseline observations between it and the reference station:
[0077]
[0078] Among them, S b α is the baseline length. b This is the baseline azimuth. After obtaining the RGPS coordinates of each gun array, the coordinates of its source reference point can also be calculated based on the design offset. Taking the left source as an example, the calculation method is as follows:
[0079]
[0080] Among them, (X) l ,Y l ) represents the coordinates of the left source reference point, dx offset dy offset This represents the design offset of the left source reference point relative to the RGPS node in ship coordinates. After obtaining the left source coordinates (X... l ,Y l ) and right source coordinates (X r ,Y r After that, the coordinates of the epicenter (X) m ,Y m It can be calculated using the following formula:
[0081]
[0082] In this embodiment, gross errors are detected and robustly filtered during the location estimation process. Specifically, a fixed-length sliding window is used to cache the coordinates of the source reference point and the source center point for the past N epochs. Using t i-N t i-1 The node coordinates of an epoch relative to the current epoch t i To make predictions, since the exploration vessel's trajectory during the firing process is approximately a straight line, a linear fitting method can be used to calculate the predicted values:
[0083]
[0084] in, Let a be the node position vector at time t, and a0 and a1 be the polynomial coefficient vectors. After determining the polynomial coefficients using least squares estimation, let t = t i Substituting into the above formula yields the predicted value. The actual calculated position of this node in the current epoch can be obtained from the above position deduction process. Compare it with the predicted value Compare them, if their distance If the value is less than the set threshold, the calculated value will be... Added to a fixed-length sliding window, the data epoch in the sliding window now becomes t. i-N+1 t i Using the updated sliding window data, a linear fit is performed again based on the above formula. After determining the polynomial coefficients, the filter value for the node's position in the current epoch is: If its distance If the value is greater than the set threshold, then the calculated value is considered to be greater than the set threshold. It contains gross errors. This node will not be added to the sliding window; its position is determined by the filter value in the current epoch.
[0085] Then, the source velocity is calculated. When using filtering to calculate the location of each node, the coefficient a1 of the first-order term in the fitted polynomial represents the velocity of that node. Its direction is the same as the exploration vessel's direction of travel. What's needed for predicting the detonation is the velocity component v along its path. a The calculation method is as follows:
[0086]
[0087] in, Let X be the azimuth of the survey line. start ,Y start ), (X end ,Y end () represent the starting point and the ending point of the route, respectively.
[0088] Next, the detonation prediction is performed. First, the distance d along the line from the current epicenter node to the next previously plotted detonation point is calculated. DA The distance d along the line from the current epicenter node to the starting point of the survey line. s for:
[0089]
[0090] in, This indicates the current location of the epicenter. This represents the starting point of the survey line. The distance d along the line from the previously drawn shot point to the starting point of the survey line is... p for:
[0091]
[0092] Based on the current distance d along the epicenter node s By combining the previous drawing information, we can determine the previous drawing shot point and its distance d along the line. p The distance d along the line from the current epicenter node to the next previously drawn shot point is then... DA for:
[0093] d DA =d p -d s
[0094] The time interval Δt between the current moment and the next firing time is:
[0095]
[0096] (3) Determination of deviation along the firing point
[0097] Step 1: Calculate the deviation of the shot from the center point of the left and right seismic sources along the survey line.
[0098] The calculation process of the detonation deviation (DA) at the center point of the left and right seismic sources, taking the left seismic source as an example:
[0099] Calculate the left-side forward drawing point p i (x i ,y i ) to the starting point p of the survey line o (x o ,y o ) DA distance d p The calculation formula is:
[0100]
[0101] in, For p o With p i The azimuth angle between them, α l This is the azimuth angle of the survey line.
[0102] Calculate the left-side epicenter point p at the moment of the cannon's detonation. MGP (x MGP ,y MGP ) to the starting point p of the survey line o (x o ,y o ) DA distance d MGP The calculation formula is:
[0103]
[0104] in, For p o With p MGP The azimuth angle between them.
[0105] Calculate the deflection d of the shot at the center point of the left seismic source. DAL :
[0106] d DAL =d MGP -d p
[0107] Step 2: Calculate the angle between the line connecting the centers of the left and right seismic sources and the perpendicular line of the current survey line. The calculation process for the angle between the line connecting the centers of the left and right seismic sources and the perpendicular line of the current survey line is as follows:
[0108] Calculate the left hypocenter point p l (x l ,y l (to the right hypocenter p) r (x r ,y r azimuth angle α G The calculation formula is:
[0109]
[0110] Calculate the azimuth angle α of the perpendicular line of the survey line. V Given α l The azimuth angle of the survey line is calculated using the following formula:
[0111] α V =α l +90°
[0112] The angle between the line connecting the centers of the left and right seismic sources and the perpendicular line of the current survey line is calculated using the following formula:
[0113] α LGP =α G -α V
[0114] Step 3: Determine the deviation, including distance deviation and angle deviation.
[0115] The distance deviation determination further includes: after any seismic source fires, calculating the along-line firing deviation matrix for x consecutive shots from the seismic source, and calculating the rate of change matrix of the along-line firing deviation for x consecutive shots from the seismic source; based on the along-line firing deviation matrix and the rate of change matrix of the along-line firing deviation, determining whether the distance deviation criterion is met. Optionally, determining whether one or more values of the along-line firing deviation matrix are greater than or equal to a first distance threshold; if so, determining that the distance deviation criterion is not met; if one or more values of the along-line firing deviation matrix are less than the first distance threshold, determining whether one or more values of the along-line firing deviation rate matrix are greater than or equal to the rate of change threshold; if so, determining that the distance deviation criterion is not met.
[0116] In one specific implementation, after any seismic source fires, the firing deviation along the line of consecutive firings x is calculated (x can be pre-configured according to actual conditions). Here, x refers to a cached data window, which stores historical firing deviations and uses these historical firing deviations for auxiliary judgment.
[0117] The deflection matrix D along the firing line of continuous shots from this seismic source was calculated. DAL =[d DAL1 ,d DAL2 …d DALx The rate of change matrix D of the firing deviation along the line of continuous x shots from the seismic source was calculated. ROC =[d ROC1 ,d ROC2 …d ROCx-1 The calculation formula is:
[0118] d ROCx =(d DALx -d DALx-1 ) / d DALx-1
[0119] If d DALn If d is greater than or equal to a1, it is determined that the distance deviation criterion is not met, and the process automatically switches to the deviation correction process along the line; if d DALn Less than a1, but d ROCn-1 If the distance deviation criterion is not met, the deviation will automatically be entered into the deviation correction process (a1 and b can be pre-configured according to the actual situation).
[0120] Where, d DALn d represents a single value in the detonation deviation matrix along the line, or the average of multiple values in the detonation deviation matrix along the line. ROCn-1 This can be a single value of the rate of change matrix of the deflection deviation along the line, or the average of multiple values of the rate of change matrix of the deflection deviation along the line. The present invention can select the appropriate value based on the actual situation.
[0121] The angle deviation judgment further includes: calculating the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line; and determining whether the angle deviation criterion is met based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line. Optionally, it is determined whether the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line is greater than or equal to an angle threshold. If it is, the angle deviation criterion is not met; if it is not, the angle deviation criterion is met.
[0122] In one specific implementation, it is determined whether the angle between the line connecting the left and right seismic sources and the current survey line is greater than c°. If so, the process of correcting deviations along the line is automatically initiated (c can be pre-configured according to the actual situation).
[0123] (4) Correction process for deviation along the line.
[0124] When it is determined that the next shot needs to enter the deviation correction process along the line based on the distance / angle deviation criterion, the shot prediction method is switched. That is, the quality control conditions for the next operation are changed to: the difference between the position of the left and right seismic source center point of the current shot and the corresponding projected position of the shot point is less than or equal to the second distance threshold.
[0125] Calculate the difference between the firing center positions of the left and right seismic sources and the corresponding projected firing points. Determine whether the operational quality control conditions are met based on the positional deviation. If not, automatically switch to the adaptive speed reduction process. If the conditions are met, exit the deviation correction process.
[0126] Figure 3 A flowchart of the process for judging and correcting deviations along the line, as provided in another embodiment of the present invention, is shown below. Figure 3 As shown, firstly, distance / angle deviation is calculated to determine whether the distance / angle deviation criterion is met; the specific calculation and judgment process is described in the above embodiment. If not, the artillery prediction mode is adaptively switched, and the subsequent operation quality control condition is changed to compare the current artillery source center point p. MGP (x MGP ,y MGP ) and the corresponding projected gun point p r (x r ,y r The difference between the values is less than the preset value a2. Next, it is determined whether the operation quality control conditions are met. If not, the speed is adaptively reduced to 90% of the current ship speed.
[0127] If the detonation deviation along the line still does not meet the conditions after switching the detonation prediction mode, the system will automatically switch to an adaptive speed reduction process. First, a speed reduction command is sent to the automatic steering module of the integrated navigation system, the current speed is recorded, and the target speed is set to 90% of the current speed. When reducing the target speed with the actual speed, the system will again judge according to the distance deviation judgment criteria and the angle deviation judgment criteria to determine whether the operation quality control conditions are met, and then determine whether to reduce the speed again.
[0128] (5) Deviation recovery process along the line.
[0129] After adaptively reducing the ship speed, once the operation quality control conditions and distance / angle deviation criteria are met for n consecutive shots, the deviation recovery process along the line is initiated (n is greater than or equal to 1, and n can be pre-configured according to the actual situation), including adaptively increasing the ship speed and adaptively switching the shot prediction mode.
[0130] Optionally, the deviation recovery process along the line includes the following steps:
[0131] Step S20: Send an acceleration command to adaptively increase the ship speed;
[0132] Step S21: After the seismic source fires again, determine whether the operation quality control conditions are met. If they are met, continue to send the speed-up command until the ship speed is increased to the maximum ship speed that meets the operation quality control conditions.
[0133] After increasing the vessel speed to the maximum speed that meets the operational quality control conditions, the deviation recovery process along the route also includes the following steps:
[0134] Step S22: After the seismic source fires again, calculate the distance deviation data and / or angle deviation data along the firing line, and determine whether the distance deviation criterion and / or angle deviation criterion are met. If they are met, proceed to step S24; if they are not met, proceed to step S23.
[0135] Step S23: Fire the cannon d times consecutively, where d is greater than or equal to 1, then proceed to step S22;
[0136] Step S24: Switch the cannon prediction mode to the independent cannon mode for left and right seismic sources, and exit the deviation recovery process along the line.
[0137] Figure 4 A flowchart of the deviation recovery process along the line provided in another embodiment of the present invention is shown below. Figure 4 As shown, the deviation recovery process along the line includes:
[0138] After n consecutive cannon shots, determine whether the operational quality control conditions are met. If they are met, increase the speed to 110% of the current speed; if not, continue monitoring.
[0139] The cannon fires again to determine if the operational quality control conditions are still met. If they are, the speed is increased until the ship reaches the maximum speed required to meet the operational quality control conditions.
[0140] The firing is repeated, and the distance / angle deviation is calculated to determine if it meets the distance / angle deviation criteria. The specific calculation and judgment process is described in the example above. If it meets the criteria, the firing prediction mode is switched to independent firing mode for left and right seismic sources, and the deviation recovery process along the line is exited. If it does not meet the criteria, firing is repeated d times, and the distance / angle deviation calculation and judgment are performed again.
[0141] Figure 5 This is a schematic diagram illustrating the deviation correction effect along the line according to an embodiment of the present invention. Figure 5 The theoretical firing method is shown, along with the effects without and with deviation correction. From... Figure 5 As can be seen, the embodiments of the present invention dynamically adjust the method of predicting detonation during the operation, which helps to reduce the impact of deviations along the line on the operation and improve the efficiency of the operation.
[0142] Compared with existing technologies, the solution provided by the above embodiments of the present invention eliminates the impact of significant line-of-sight deviations on the quality of seismic data acquisition. In marine seismic exploration, the epicenter is located in the sea, the observation environment is complex, and the epicenter position changes drastically due to sea conditions. This makes the traditional empirical method of deceleration ineffective, significantly impacting the efficiency of acquisition operations. The present invention uses an automatic correction method for line-of-sight deviations based on shot point prediction, effectively eliminating the impact of traditional methods. The present invention uses data processing methods such as rate of change gross error detection and robust filtering, utilizing raw data from the integrated navigation system to calculate the epicenter position and ship speed. It is highly operable, computationally efficient, and stable, effectively resisting the influence of gross errors in practical applications, ensuring continuous and stable prediction of shot detonation time, and laying a good foundation for the subsequent automatic line-of-sight deviation correction process. Furthermore, the present invention, by adopting an adaptive switching method for shot detonation prediction and adaptive reduction of ship speed, abandons the shortcomings of traditional methods based on human experience. After line-of-sight deviation correction, an adaptive line-of-sight deviation re-judgment and recovery process is introduced to dynamically adjust the shot detonation prediction method during operations, helping to reduce the impact of line-of-sight deviations on operations and improving operational efficiency.
[0143] Figure 6 This diagram illustrates a functional block diagram of an automatic correction device for deviation along the prediction path of marine seismic exploration shot points provided in an embodiment of the present invention. The automatic correction device 600 for deviation along the prediction path of marine seismic exploration shot points includes: a first judgment module 610, a switching module 620, a second judgment module 630, and a control module 640.
[0144] The first judgment module 610 is used to calculate the distance deviation data and / or angle deviation data along the seismic source after the seismic source fires, and to determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, the switching module is triggered to run.
[0145] Switching module 620 is used to switch the cannon firing prediction mode;
[0146] The second judgment module 630 is used to calculate the difference between the position of the firing center point of the left and right seismic sources and the corresponding projected position of the front-drawn firing point, and to determine whether the operation quality control conditions are met. If they are met, the deviation correction process along the line is exited; if they are not met, the control module is triggered to run.
[0147] The control module 640 is used to send deceleration commands to adaptively reduce the ship's speed.
[0148] In an alternative embodiment, the second determining module is further configured to:
[0149] After adaptively reducing the ship speed, if the operation quality control conditions are met for n consecutive shots, the deviation recovery process along the line is triggered, where n is greater than or equal to 1.
[0150] The control module is further used to: send acceleration commands to adaptively increase the ship's speed;
[0151] The second judgment module is further used to: determine whether the operation quality control conditions are met after the seismic source fires again; if so, continue to trigger the control module to send an acceleration command until the ship speed is increased to the maximum ship speed that meets the operation quality control conditions.
[0152] In an alternative embodiment, the first determining module is further configured to:
[0153] After the seismic source fires again, calculate the distance deviation data and / or angle deviation data along the line, and determine whether the distance deviation criterion and / or angle deviation criterion are met. If they are met, trigger the switching module to switch the fire prediction mode to the independent fire mode of the left and right seismic sources, and exit the deviation recovery process along the line. If they are not met, continue to calculate and judge the distance / angle deviation after d consecutive fires, where d is greater than or equal to 1.
[0154] In an alternative embodiment, the first determining module is further configured to:
[0155] Calculate the shot deviation matrix along the line of continuous x shots from the source, calculate the rate of change matrix of shot deviation along the line of continuous x shots from the source; and / or, calculate the angle between the line connecting the left and right sources and the perpendicular line of the survey line.
[0156] Based on the deflection matrix along the line and the rate of change matrix of the deflection along the line, determine whether the distance deviation criterion is satisfied; and / or, based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line, determine whether the angle deviation criterion is satisfied.
[0157] In an alternative embodiment, the first determining module is further configured to:
[0158] Determine whether one or more values of the firing deviation matrix along the line are greater than or equal to the first distance threshold. If so, it is determined that the distance deviation criterion is not met.
[0159] If one or more values of the detonation deviation matrix along the line are less than the first distance threshold, then it is determined whether one or more values of the rate of change matrix of the detonation deviation along the line are greater than or equal to the rate of change threshold. If so, it is determined that the distance deviation criterion is not met.
[0160] Determine whether the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line is greater than or equal to the angle threshold. If yes, it is determined that the angle deviation criterion is not met; otherwise, it is determined that the angle deviation criterion is met.
[0161] In an alternative embodiment, the second determining module is further configured to:
[0162] Determine whether the difference between the position of the firing center point of the left and right seismic sources and the corresponding projected position of the firing point is less than or equal to the second distance threshold. If so, it is determined that the operation quality control conditions are met; otherwise, it is determined that the operation quality control conditions are not met.
[0163] In an alternative embodiment, the device is further configured to:
[0164] Based on the data provided by the navigation system, the firing positions of the left and right seismic source reference points and the firing center positions of the left and right seismic sources are calculated; during the calculation process, gross errors are detected and robust filtering is performed.
[0165] The apparatus provided in the above embodiments of the present invention improves the efficiency of four-dimensional detonation operations and the quality of acquired data in marine seismic exploration by automatically correcting deviations along the predicted shot point.
[0166] Figure 7 The diagram shows a structural schematic of an embodiment of the computing device of the present invention. The specific embodiments of the present invention do not limit the specific implementation of the computing device.
[0167] like Figure 7 As shown, the computing device may include: a processor 702, a communications interface 704, a memory 706, and a communications bus 708.
[0168] The processor 702, communication interface 704, and memory 706 communicate with each other via communication bus 708. Communication interface 704 is used to communicate with other network elements, such as clients or other servers. Processor 702 executes program 710, specifically performing the relevant steps in the above-described embodiment of the automatic correction method for deviations along the prediction path of marine seismic exploration shot points.
[0169] Specifically, program 710 may include program code that includes computer operation instructions.
[0170] The processor 702 may be a central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement embodiments of the present invention. The computing device includes one or more processors, which may be processors of the same type, such as one or more CPUs; or processors of different types, such as one or more CPUs and one or more ASICs.
[0171] Memory 706 is used to store program 710. Memory 706 may include high-speed RAM memory, and may also include non-volatile memory, such as at least one disk storage device.
[0172] This invention provides a non-volatile computer storage medium storing at least one executable instruction that can execute the automatic correction method for deviation along the prediction line of marine seismic exploration shot points in any of the above method embodiments.
[0173] The algorithms or displays provided herein are not inherently related to any particular computer, virtual system, or other device. Various general-purpose systems can also be used in conjunction with the teachings herein. The required structure for constructing such systems is apparent from the above description. Furthermore, the embodiments of the present invention are not directed to any particular programming language. It should be understood that the content of the invention described herein can be implemented using various programming languages, and the above description of specific languages is for the purpose of disclosing the best mode of implementation of the invention.
[0174] Numerous specific details are set forth in the specification provided herein. However, it will be understood that embodiments of the invention may be practiced without these specific details. In some instances, well-known methods, structures, and techniques have not been shown in detail so as not to obscure the understanding of this specification.
[0175] Similarly, it should be understood that, in order to simplify the invention and aid in understanding one or more of the various inventive aspects, features of the embodiments of the invention are sometimes grouped together in a single embodiment, figure, or description thereof in the above description of exemplary embodiments of the invention. However, this disclosure should not be construed as reflecting an intention that the claimed invention requires more features than are expressly recited in each claim. Rather, as reflected in the following claims, inventive aspects lie in fewer than all features of a single foregoing disclosed embodiment. Therefore, the claims following the detailed description are hereby expressly incorporated into this detailed description, wherein each claim itself is a separate embodiment of the invention.
[0176] Those skilled in the art will understand that modules in the device of the embodiments can be adaptively changed and placed in one or more devices different from that embodiment. Modules, units, or components in the embodiments can be combined into a single module, unit, or component, and further, they can be divided into multiple sub-modules, sub-units, or sub-components. Except where at least some of such features and / or processes or units are mutually exclusive, any combination can be used to combine all features disclosed in this specification (including the accompanying claims, abstract, and drawings) and all processes or units of any method or device so disclosed. Unless expressly stated otherwise, each feature disclosed in this specification (including the accompanying claims, abstract, and drawings) may be replaced by an alternative feature that serves the same, equivalent, or similar purpose.
[0177] Furthermore, those skilled in the art will understand that although some embodiments herein include certain features included in other embodiments but not others, combinations of features from different embodiments are intended to be within the scope of the invention and form different embodiments. For example, in the following claims, any of the claimed embodiments can be used in any combination.
[0178] The various component embodiments of the present invention can be implemented in hardware, or as software modules running on one or more processors, or a combination thereof. Those skilled in the art will understand that microprocessors or digital signal processors (DSPs) can be used in practice to implement some or all of the functions of some or all of the components according to the embodiments of the present invention. The present invention can also be implemented as a device or apparatus program (e.g., a computer program and computer program product) for performing part or all of the methods described herein. Such programs implementing the present invention can be stored on a computer-readable medium, or can be in the form of one or more signals. Such signals can be downloaded from an Internet website, provided on a carrier signal, or provided in any other form.
[0179] It should be noted that the above embodiments are illustrative of the invention and not restrictive, and that those skilled in the art can devise alternative embodiments without departing from the scope of the appended claims. In the claims, any reference signs placed between parentheses should not be construed as limiting the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The invention can be implemented by means of hardware comprising several different elements and by means of a suitably programmed computer. In the unit claims enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third, etc., does not indicate any order. These words can be interpreted as names. The steps in the above embodiments, unless otherwise specified, should not be construed as limiting the order of execution.
Claims
1. A method for automatically correcting deviations along the prediction path of shot points in marine seismic exploration, characterized in that, include: Step S10: After the seismic source detonates, calculate the detonation distance deviation data and / or detonation angle deviation data along the line, and determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, proceed to step S11. Step S11: Switch the cannon firing prediction method; Step S12: Calculate the difference between the center point position of the left and right seismic sources and the corresponding projected position of the front-drawn shot point, and determine whether the operation quality control conditions are met. If they are met, proceed to step S14; otherwise, proceed to step S13. Step S13: Send a deceleration command to adaptively reduce the ship speed, and execute step S10. Step S14: Exit the deviation correction process along the line; After adaptively reducing the ship speed, if the operation quality control conditions are met for n consecutive shots, the deviation recovery process along the line is triggered, where n is greater than or equal to 1. The deviation recovery process along the line includes the following steps: Step S20: Send an acceleration command to adaptively increase the ship speed; Step S21: After the seismic source fires again, determine whether the operation quality control conditions are met. If they are met, continue to send the speed-up command until the ship speed is increased to the maximum ship speed that meets the operation quality control conditions.
2. The method according to claim 1, characterized in that, After the ship speed is increased to the maximum speed that meets the operational quality control conditions, the deviation recovery process along the route further includes the following steps: Step S22: After the seismic source fires again, calculate the distance deviation data and / or angle deviation data along the firing line, and determine whether the distance deviation criterion and / or angle deviation criterion are met. If they are met, proceed to step S24; if they are not met, proceed to step S23. Step S23: Fire the cannon d times consecutively, where d is greater than or equal to 1, then proceed to step S22; Step S24: Switch the cannon prediction mode to the independent cannon mode for left and right seismic sources, and exit the deviation recovery process along the line.
3. The method according to any one of claims 1-2, characterized in that, The step of calculating the distance deviation data and / or angle deviation data of the firing line along the firing line, and determining whether the distance deviation criterion and / or angle deviation criterion are satisfied, further includes: Calculate the shot deviation matrix along the line of continuous x shots from the source, calculate the rate of change matrix of shot deviation along the line of continuous x shots from the source; and / or, calculate the angle between the line connecting the left and right sources and the perpendicular line of the survey line. Based on the deflection matrix along the line and the rate of change matrix of the deflection along the line, determine whether the distance deviation criterion is satisfied; and / or, based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line, determine whether the angle deviation criterion is satisfied.
4. The method according to claim 3, characterized in that, The step of determining whether the distance deviation criterion is satisfied based on the firing deviation matrix along the line and the rate of change matrix of the firing deviation along the line further includes: Determine whether one or more values of the firing deviation matrix along the line are greater than or equal to the first distance threshold. If so, it is determined that the distance deviation criterion is not met. If one or more values of the detonation deviation matrix along the line are less than the first distance threshold, then it is determined whether one or more values of the rate of change matrix of the detonation deviation along the line are greater than or equal to the rate of change threshold. If so, it is determined that the distance deviation criterion is not met. The step of determining whether the angle deviation criterion is satisfied based on the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line further includes: Determine whether the angle between the line connecting the left and right seismic sources and the perpendicular line of the survey line is greater than or equal to the angle threshold. If yes, it is determined that the angle deviation criterion is not met; otherwise, it is determined that the angle deviation criterion is met.
5. The method according to any one of claims 1-2, characterized in that, The determination of whether the work quality control conditions are met further includes: Determine whether the difference between the position of the firing center point of the left and right seismic sources and the corresponding projected position of the firing point is less than or equal to the second distance threshold. If so, it is determined that the operation quality control conditions are met; otherwise, it is determined that the operation quality control conditions are not met.
6. The method according to claim 1, characterized in that, The method further includes: calculating the firing positions of the left and right seismic source reference points and the firing center positions of the left and right seismic sources based on the data provided by the navigation system; during the calculation process, gross errors are detected and robust filtering is performed.
7. An automatic correction device for deviation along the prediction line of marine seismic exploration shot points, characterized in that, include: The first judgment module is used to calculate the distance deviation data and / or angle deviation data of the detonation along the seismic source after the detonation, and to determine whether the distance deviation criterion and / or angle deviation criterion are met; if not, the switching module is triggered to run. The switching module is used to switch the cannon firing prediction method; The second judgment module is used to calculate the difference between the position of the firing center point of the left and right seismic sources and the corresponding projected position of the firing point, and to determine whether the operation quality control conditions are met. If they are met, the deviation correction process along the line is exited. If the conditions are not met, the control module will be triggered to run. The control module is used to send a deceleration command to adaptively reduce the ship's speed. After the ship's speed is adaptively reduced, if the operation quality control conditions are met for n consecutive firings, the deviation recovery process along the line is triggered, where n is greater than or equal to 1. The deviation recovery process along the line includes: sending an acceleration command to adaptively increase the ship's speed; when the seismic source fires again, it is determined whether the operation quality control conditions are met. If they are met, the acceleration command is sent again until the ship's speed is increased to the maximum speed that meets the operation quality control conditions.
8. A computing device, comprising: The processor, memory, communication interface, and communication bus are provided, wherein the processor, memory, and communication interface communicate with each other via the communication bus. The memory is used to store at least one executable instruction that causes the processor to perform the operation corresponding to the automatic correction method for deviation along the prediction line of marine seismic exploration shot points as described in any one of claims 1-6.
9. A computer storage medium storing at least one executable instruction that causes a processor to perform an operation corresponding to the automatic correction method for deviation along the prediction line of marine seismic exploration shot points as described in any one of claims 1-6.
Citation Information
Patent Citations
Method for acquiring pre-drawn shot point of towline exploration navigation
CN103792580A
Ocean node exploration multi-ship multi-source seismic source array synchronous control method and device