Method for measuring and calculating value-added tax of construction enterprise

By establishing a VAT calculation model for construction projects and using cloud computing, the complexity of VAT management in the construction industry has been solved, efficient VAT calculation and comparison have been achieved, and the efficiency of fund use and report generation speed has been improved.

CN119048259AInactive Publication Date: 2024-11-29THE 3RD ENG CO LTD OF CHINA RAILWAY 18TH BUREAU GRP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411104176.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing tax management software cannot meet the VAT management needs of the construction industry, resulting in many taxpayers, complex tax-related management matters, unreasonable distribution of input invoice tax points, resulting in reduced efficiency of fund use, lack of professional calculation software, resulting in manual work Low calculating efficiency and low data comparison efficiency.

Method used

A construction enterprise value-added tax calculation method is adopted, and by establishing a construction project value-added tax calculation model, using cloud computing for calculation and comparison, generating comparison reports, realizing automatic data comparison and measure recommendation, and improving calculation and comparison efficiency.

Benefits of technology

It has achieved high efficiency in the calculation and comparison of value-added tax in construction enterprises, quickly process massive data through cloud computing, generate optimization plans, and automatically recommend measures, which has improved the efficiency of fund use and report generation speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048259A_ABST
    Figure CN119048259A_ABST
Patent Text Reader

Abstract

The invention discloses a construction enterprise value-added tax calculation method. The method comprises the following steps: S1, establishing a construction project value-added tax calculation model; s2, the input parameters are substituted into the calculation model; s3, obtaining a result through cloud computing; s4, taking a selection result as a comparison target; s5, docking a PM system comparison target after starting the work; and S6, forming a comparison report. The method is high in calculation and comparison efficiency, and can achieve the fine management of the construction project tax field.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of value-added tax calculation, and in particular to a method for calculating the value-added tax of a construction enterprise. Background Art

[0002] In terms of tax management application software. At present, there are many financial software on the market, but most of them are used for financial accounting management, and the functional modules for tax management are limited to basic functions such as invoice management. There are also some professional tax software on the market, which are general tax software for the entire industry and cannot fully meet the tax management characteristics of the construction industry. In addition, the market competition and technical barriers between software vendors make data integration and data interaction between tax software and financial software difficult, which restricts the application and development of tax software.

[0003] In terms of VAT management, the main characteristics of the problems faced by construction companies are that there are many tax payers, which is reflected in the fact that each branch and project department is a tax payer. At the same time, there are many tax-related management matters. Taking VAT as an example, the main characteristics are the management of input invoices and the deduction of prepaid VAT. For the company headquarters, the balance of prepaid VAT and the retained tax amount are increasing day by day. The reason is that there is only a financial budget in the project bidding budget stage, and there is no reasonable tax planning. After the start of construction, the tax point distribution of input invoices is not reasonable. Either the prepaid VAT is retained or the input is retained, which has caused a certain degree of reduction in the cash utilization efficiency of the company.

[0004] For construction projects, all projects that are not started at the company's location must pay 2% prepaid VAT according to the contract price at the project location. The company headquarters can use it to offset the current tax payable when filing VAT tax returns every month. However, from the perspective of a single project, both input and prepaid can be used to offset output tax. If the offset is not enough, VAT needs to be paid. If there is a balance after the offset, it will cause a contraction in cash flow. Therefore, it is very important to make reasonable planning for VAT before starting construction. The formula "output tax = input tax + prepaid VAT" is obtained. The closer the actual result is to this formula, the higher the capital efficiency is, and the opposite is true if it is far away. The main costs of construction projects are labor costs, material costs and machinery costs, and also include labor subcontracting and professional subcontracting provided by suppliers, dry lease and wet lease of machinery costs, etc., so higher requirements are put forward for the measurement work, more factors are considered, and experienced financial personnel are often required to build models based on experience.

[0005] Due to the tax characteristics of the construction industry, there is currently no professional calculation software available. We can only use Excel spreadsheets to perform manual calculations before construction begins. The spreadsheet formulas can only verify and calculate the calculation results, but cannot capture the best data combination among the massive data combinations through the calculation conditions. It often requires experienced financial personnel to understand the specific business situation of the project, and then to refine the basic data based on experience, and to continuously adjust the results calculated by the formula to finally form an approximately reasonable planning scheme.

[0006] In order to effectively implement the pre-construction calculation plan and form the expected goals. After the construction starts, it is necessary to compare the cumulative data from the start of the construction with the pre-construction calculation plan at important time points such as the owner's pricing and the end of the quarter, analyze the reasons for the deviation of each data, and make suggestions for the optimization of subsequent engineering work. At present, financial personnel use Excel spreadsheet data comparison to perform operations, manually fill in tables, compare, analyze and issue reports. However, the manual establishment of Excel spreadsheet management requires high capabilities of financial personnel who establish project model plans, the workload of comparing data after the start of construction is large, and the writing of comparative analysis reports also requires high capabilities of financial personnel. Summary of the invention

[0007] The technical problem to be solved by the present invention is to provide a method for calculating the value-added tax of a construction enterprise, which has not only high calculation efficiency but also high data comparison efficiency.

[0008] In order to solve the above technical problems, the technical solutions adopted by the present invention are as follows.

[0009] A method for calculating value-added tax for a construction enterprise comprises the following steps:

[0010] S1. Establish a VAT calculation model for construction projects;

[0011] S2. Substitute the input parameters into the calculation model;

[0012] S3. Obtain results through cloud computing;

[0013] S4. Select the results as comparison targets;

[0014] S5. After the start of work, connect to the PM system for comparison;

[0015] S6. Form a comparative report.

[0016] Preferably, in step S1, the target model of the construction project value-added tax is first determined as: output tax = input tax + prepaid value-added tax, and then a construction project value-added tax calculation model is established with output tax = input tax + prepaid value-added tax as the target. The construction project value-added tax calculation model is:

[0017] Calculate the project investment amount and output tax based on the total cost and rate of return;

[0018] Prepaid VAT = (project price including tax - subcontract price) / (1 + output tax rate) * prepaid VAT rate;

[0019] Labor costs can be deducted when prepaying VAT in the case of labor subcontracting;

[0020] In the case of wet lease, machinery costs can be deducted when prepaying VAT before tax;

[0021] Labor costs, material costs and machinery costs have input invoices with different tax rates according to the nature of the invoicing enterprise; labor costs, material costs and machinery costs with determined tax rates are only included in the calculation and are not included in the estimated tax rate part;

[0022] Other expenses are only used for calculation and not for estimation of the tax rate.

[0023] Preferably, the input parameters in step S2 include labor costs, material costs, machinery costs, other costs and tax rates, yield rates and calculation accuracy.

[0024] Preferably, the step S3 specifically includes the following steps:

[0025] S31. Set the proportion of labor costs, material costs and machinery costs under different tax rates to corresponding different parameters;

[0026] S32. Through the exhaustive method, the labor cost, material cost, and machinery cost are assigned parameters at a scale of 1%, and the existing multiple parameter combinations are called sample G0.

[0027] S33. Substitute sample G0 into the construction project value-added tax calculation model, with output tax as a fixed number, and input tax + prepaid value-added tax as the calculation result for each group of samples. According to the target model, output tax - input tax - prepaid value-added tax = 0 is the ideal result. Sample G0 may not be 0, but it is close to 0.

[0028] Preferably, the step S4 specifically includes the following steps:

[0029] S41. Perform the first filtration on sample G0 by measuring the accuracy a. After the first filtration of sample G0, abs(output tax – input tax – prepaid value-added tax) < project investment amount * The samples are stored in a new set G1; the measurement accuracy is a ten-thousandth a, which refers to a ten-thousandth a of the project investment amount, and a deviation of a ten-thousandth a is allowed;

[0030] S42. Ratio the cost parameters of labor costs under different tax rates to labor costs, the cost parameters of material costs under different tax rates to material costs, and the cost parameters of machinery costs under different tax rates to machinery costs. If any value of the ratio is less than 20% or greater than 80%, it is considered as an extreme sample and removed from the set G1. The set after removal is G2.

[0031] S43. Deduplication of high similarity samples in set G2 is performed to reduce the number of G2 samples to <= 10; the deduplication method specifically comprises the following steps:

[0032] S431. Let the number of deduplication rounds be n, n>=1, and the duplication index in the first round (n=1) be (n+1)%, that is, if the parameter difference between any samples is less than or equal to 2%, they will be removed, and the result set after each round of deduplication is G3(n);

[0033] S432. If |G3(n)|<=10, the result is returned to the measurement page; if |G3(n)|>10, the next round of deduplication is entered, and the next round is n+1, and the duplication index also changes accordingly, and the deduplication step operation is continued until |G3(n)|<=10 after n rounds;

[0034] S433. The calculation interface finally generates a calculation result with recommended value. The calculation result is N (N<=10) groups of plans. For satisfactory calculation plans, click "Save Plan" to permanently save the plan as a comparison target for use by calculation personnel. The calculation plan can be viewed in three ways: text reports, financial data and chart data.

[0035] Preferably, when the number of measurement result groups N in step S433 is 0, the measurement accuracy in the input parameters is reduced in step S2 and recalculated.

[0036] Preferably, step S5 is specifically as follows: after the project starts, by connecting to the input tax details of the PM system, the data of labor costs, material costs, and machinery costs at different tax rates are summarized and compared with the plan calculated before the start of the project. The tax rate of each account is a comparison item. Through the comparison results, the measures and regulations database established by this system is automatically called to filter the scenarios that may cause excess differences. At the same time, secondary filtering is performed according to the combination relationship between project conditions, and finally each comparison item is presented with recommended measures for subsequent solutions; the set of measures composed of the comparison items integrates the natural language algorithm and the report template, and finally generates a plain text report.

[0037] Preferably, the step S6 specifically includes: generating a plain text report and simultaneously generating a table data comparison result and a chart data comparison result for use by comparison personnel.

[0038] Due to the adoption of the above technical scheme, the technical progress achieved by the present invention is as follows.

[0039] The present invention is based on the principle of calculating the value-added tax of construction enterprises, draws on the tax planning experience of construction enterprises, integrates policies and regulations, and conducts in-depth research on the optimization algorithm of the input tax ratio structure of the main cost "people, materials and machines". With "output tax = input tax + prepaid value-added tax" as the planning goal, a calculation model is established in the software system, and the advantages of software systems and cloud computing are used to substitute massive data into the model for calculation and analysis, output the optimal solution library, and present it in the form of tabular data, graphic data, and text reports; by docking with the company's PM system interface, the functions of automatic comparison of cumulative data after construction, automatic recommendation of measures, and automatic issuance of analysis reports are realized, thus realizing refined management in the tax field of construction projects.

[0040] The present invention has high calculation efficiency. By building a software system on a cloud server, it can realize the construction of complex models, comparison of results of massive test cases, and filtering of low-matching samples. It is also extremely fast. One hundred million samples are selected under 8 parameters, and the calculation results are within 20 seconds.

[0041] The present invention has high comparison efficiency. By building a measures and regulations library in the software system and realizing data comparison, the database situation is automatically matched and an analysis report is automatically issued. Reports in different forms such as text, charts, and tables can be issued, which greatly improves work efficiency and report presentation. The issuance speed of the project report is basically controlled within 2 seconds. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 is a flow chart of the present invention;

[0043] Figure 2 It is the architectural design diagram of the present invention;

[0044] Figure 3 This is a screenshot of the interface for condition input of an embodiment of the present invention;

[0045] Figure 4 It is a measurement analysis diagram of an embodiment of the present invention;

[0046] Figure 5 This is a screenshot of the interface of the calculation results of the embodiment of the present invention;

[0047] Figure 6 This is a screenshot of the comparison result of an embodiment of the present invention;

[0048] Figure 7 This is a screenshot of the text report interface of the comparison record after the start of work in an embodiment of the present invention;

[0049] Figure 8This is a screenshot of the comparison data interface of the comparison record after the start of work in an embodiment of the present invention;

[0050] Fig. 9 This is a screenshot of the chart data interface of the comparison record after the start of work in an embodiment of the present invention. DETAILED DESCRIPTION

[0051] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0052] A method for calculating value-added tax for construction enterprises, combined with Figure 1 As shown, it includes the pre-construction measurement stage and the post-construction comparison stage. The technical routes of the two stages are as follows:

[0053] (1) Pre-construction calculation algorithm: Using the VAT calculation principle, input the labor, material, and machinery costs. The system automatically and quickly splits the combined results under different tax rates and substitutes them into the set target model. Based on historical project experience data, it filters out the calculation samples with low fit, and finally generates N (N<=10) groups of solutions with recommended value for use by the calculation personnel.

[0054] (2) Comparison logic after the project starts: After the project starts, the input tax details of the PM system are connected, and the data of labor costs, material costs, and machinery costs under different tax rates are summarized and compared with the plan calculated before the project starts. The tax rate of each item is a comparison item. Through the comparison results, the measures and regulations database established by this system is automatically called to filter the scenarios that may produce excess differences. At the same time, secondary filtering is performed based on the combination relationship between project conditions, and finally the recommended measures for subsequent solutions for each comparison item are presented. The set of measures composed of each comparison item is integrated with the natural language algorithm and the report template, and finally a plain text report is generated, and a table data comparison result and a chart data comparison result are generated simultaneously for the comparison personnel to use.

[0055] Referring to the two-stage technical route, this method includes the following steps:

[0056] S1. Establish a VAT calculation model for construction projects.

[0057] In this step, the target model of VAT for construction projects is first determined as: output tax = input tax + prepaid VAT, and then the VAT calculation model for construction projects is established with output tax = input tax + prepaid VAT as the target. The VAT calculation model for construction projects is:

[0058] Calculate the project investment amount and output tax based on the total cost and rate of return;

[0059] Prepaid VAT = (project price including tax - subcontract price) / (1 + output tax rate) * prepaid VAT rate;

[0060] When the output tax rate is 9% and the prepaid VAT rate is 2%:

[0061] Prepaid VAT = (project price including tax - subcontract price) / (1 + 9%) * 2%.

[0062] In the case of labor subcontracting, labor costs can be deducted when prepaying value-added tax; referring to the current tax rate, that is, labor costs can be deducted when prepaying value-added tax in the case of 9% and 3% (labor subcontracting).

[0063] In the case of wet lease, machinery fees can be deducted when the value-added tax is prepaid before tax; referring to the current tax rate, that is, machinery fees can be deducted when the value-added tax is prepaid before tax in the case of 9% (wet lease).

[0064] Labor costs, material costs and machinery costs have input invoices with different tax rates according to the nature of the invoicing enterprise; labor costs, material costs and machinery costs with determined tax rates are only included in the calculation and are not included in the estimated tax rate; refer to the current tax rate, that is:

[0065] Labor costs are subject to 9% or 3% input invoices depending on the nature of the invoicing enterprise;

[0066] Material costs are subject to 13% or 3% input invoices depending on the nature of the invoicing company;

[0067] Depending on the nature of the invoicing company, machinery fees may have input invoices of 13%, 9%, or 3%.

[0068] Other expenses are only used for calculation and not for estimation of the tax rate.

[0069] S2. Substitute the input parameters into the calculation model.

[0070] Input parameters include labor costs, material costs, machinery costs, other costs and tax rates, yield rates and calculation accuracy.

[0071] S3. Obtain the result through cloud computing. Specifically, it includes the following steps:

[0072] S31. Set the proportion of labor costs, material costs and machinery costs under different tax rates to corresponding different parameters. For example:

[0073] Set the proportion of labor costs under 9% and 3% tax rates as x1 and x2 parameters;

[0074] Set the proportion of material costs under the tax rates of 13% and 3% as parameters y1 and y2;

[0075] Set the proportion of machinery costs under tax rates of 13%, 9%, and 3% as parameters z1, z2, and z3.

[0076] S32. Through the exhaustive method, the labor cost, material cost, and machinery cost are assigned parameters at a scale of 1%, and the existing multiple parameter combinations are called sample G0.

[0077] Specifically, the labor cost, material cost, and machinery cost are allocated parameters at a scale of 1% through an exhaustive method, that is, there are x1(1%~100%)*y1(1%~100%)*z1(1%~100%)*z2(1%~100%)=100^4=100,000,000 parameter combinations, called sample G0.

[0078] S33. Substitute sample G0 into the construction project value-added tax calculation model, with output tax as a fixed number, and input tax + prepaid value-added tax as the calculation result for each group of samples. According to the target model, output tax - input tax - prepaid value-added tax = 0 is the ideal result. Sample G0 may not be 0, but it is close to 0.

[0079] The result close to 0 also meets the requirements of the measurer, so the parameter of measurement accuracy needs to be calculated.

[0080] S4. Select the results as the comparison target. Specifically, it includes the following steps:

[0081] S41. Perform the first filtration on sample G0 by measuring the accuracy a. After the first filtration of sample G0, abs(output tax – input tax – prepaid value-added tax) < project investment amount * The samples are stored in a new set G1.

[0082] The measurement accuracy is one ten-thousandth a, which refers to one ten-thousandth of the project investment amount. A deviation of one ten-thousandth of a is allowed.

[0083] S42. Ratio the cost parameters of labor costs under different tax rates to labor costs, the cost parameters of material costs under different tax rates to material costs, and the cost parameters of machinery costs under different tax rates to machinery costs. If any value in the ratio is less than 20% or greater than 80%, it is considered as an extreme sample and removed from the set G1. The set after removal is G2. The details are as follows:

[0084] According to the actual business situation, any value of x1 / labor cost, x2 / labor cost, y1 / material cost, y2 / material cost, z1 / machinery cost, z2 / machinery cost, z3 / machinery cost that is less than 20% or greater than 80% is considered an extreme sample. There is no need to adopt it in the actual situation and it needs to be eliminated from the set G1. The set after elimination is G2.

[0085] S43. Remove duplicate samples with high similarity in set G2 to reduce the number of G2 samples to <= 10.

[0086] The set G2 is relatively consistent with the required results, but there are samples with high similarity, which increases the time cost of selecting solutions, so it needs to be deduplicated. The deduplication goal is to reduce the number of G2 samples to <= 10. The deduplication method specifically includes the following steps:

[0087] S431. Let the number of deduplication rounds be n, n>=1, and the duplication index in the first round (n=1) be (n+1)% (the sample split is 1%, so +1%), that is, if the parameter difference between any samples is less than or equal to 2%, for example, abs(G2(0)x1-G2(1)x1)<=labor cost*2%, then they will be eliminated, and the result set after each round of deduplication is G3(n).

[0088] S432. If |G3(n)|<=10, the result is returned to the measurement page; if |G3(n)|>10, the next round of deduplication is entered, and the next round is n+1. The duplication index also changes accordingly, and the deduplication steps are continued until |G3(n)|<=10 after n rounds.

[0089] S433. The calculation interface finally generates a calculation result with recommended value. The calculation result is N (N<=10) groups of plans. For satisfactory calculation plans, click "Save Plan" to save the plan permanently as a comparison target for use by calculation personnel. The calculation plan can be viewed in three ways: text report, financial data and chart data.

[0090] When the number of calculation result groups N=0, the calculation accuracy in the input parameters is reduced in step S2 and the calculation is repeated.

[0091] S5. After the start of work, connect to the PM system for comparison. The details are as follows:

[0092] After the project starts, the input tax details of the PM system are connected, and the data of labor costs, material costs, and machinery costs at different tax rates are summarized and compared with the plan calculated before the start of construction. The tax rate of each item is a comparison item. Through the comparison results, the measures and regulations database established by this system is automatically called to filter out the scenarios that may cause excess differences. At the same time, secondary filtering is performed based on the combination relationship between project conditions, and finally the recommended measures for subsequent solutions to each comparison item are presented; the set of measures composed of each comparison item integrates natural language algorithms and report templates, and finally generates a plain text report.

[0093] S6. Form a comparative report.

[0094] When a plain text report is generated, a table data comparison result and a chart data comparison result are also generated simultaneously for use by comparison personnel.

[0095] like Figure 2As shown, the present invention is further described in detail below with reference to specific embodiments.

[0096] The system on which this method is based mainly includes functional modules such as tax burden estimation before construction, company plan management, tax burden comparison after construction, comparison records after construction, policy library, and legal library.

[0097] 1. Calculation of tax burden before construction starts

[0098] This function mainly uses the input of conditions to automatically calculate the cost matching target under the most reasonable tax rate structure for the main costs "people, materials and machines", so that the calculation result is infinitely close to "output tax = input tax + prepaid value-added tax", ensuring the lowest cash flow and tax fees. Figure 3 As shown, conditional input is divided into five parts: "Basic Project Information", "Main Cost Budget Structure", "Other Cost Budget Structure", "Other Indicators", and "Cost Allocation before Calculation". The details of each part are as follows:

[0099] 1) Basic information of the project: Enter basic information such as project number, name, type, etc., which does not participate in data calculation.

[0100] 2) Main cost budget structure: It is the core content of the calculation. Labor cost, material cost and machinery cost are required items and participate in the data calculation. The fixed part (tax rate X) is the unplanned part of the major categories of expenses, that is, the tax rate part that does not participate in the calculation, such as Figure 4 It can also be considered as the part with a determined contract tax rate, which does not need to be calculated. Such expenses need to be filled in at the corresponding tax rate of the fixed part.

[0101] 3) Other cost budget structure: other expenses used for estimation, which are only involved in calculation but not estimation.

[0102] 4) Other indicators: "Rate of return" is a required item. "Tax burden rate" is an optional item, which will narrow the result range. "Calculation accuracy" defaults to 0.1 per ten thousand, which means that the "actual tax payable" in the test result must be less than the "project investment amount". The smaller the number filled in for the calculation accuracy, the higher the accuracy, the smaller the range of the calculation results, and the fewer hits; the larger the number, the lower the accuracy, the larger the range, and the larger the hits. In general, the ratio between the main costs determines the range of the calculation results. It is not recommended for beginners to adjust this function.

[0103] 5) Cost allocation before calculation is mainly used to compare the tax rate ratio of the main cost defined by the user with the result calculated by the system. It can be left blank and will not affect the calculation. It is only used for comparison.

[0104] like Figure 5The following table shows the calculation results. The calculation results are usually N (N<=10). If there are no calculation results, return to the input condition page, reduce the "calculation accuracy", and recalculate.

[0105] The system takes "output tax = input tax + prepaid value-added tax" as the target. Affected by the calculation conditions, the final result is "output tax - input tax - prepaid value-added tax" which is closest to 0.

[0106] The calculation results are listed by item. Click "Policy Basis", "Text Report" and "Financial Data" on the right to view the calculation results respectively. For a satisfactory calculation plan, click the multiple-selection box on the left and click "Save Plan" below to save the plan permanently, in preparation for selecting it as a "comparison target after construction starts" in the future.

[0107] (II) Company plan management

[0108] 1) All saved plans are listed in "Company Plan Management".

[0109] 2) You can change the status of the plan by "cancelling the target". The plan that is not the target will no longer appear in the drop-down box of "Tax burden comparison after construction starts".

[0110] 3) “Policy Basis”, “Text Report” and “Financial Data” can be viewed by clicking respectively.

[0111] 4) The plan that has been “invalidated” will be permanently deleted and cannot be restored.

[0112] 5) Click "Text Report", "Financial Data" or "Chart Data" to view the generated results.

[0113] (III) Comparison of tax burden after construction starts

[0114] This function mainly selects the "before construction" plan as the target, inputs the "after construction" data, compares a series of indicators such as cost occurrence and tax burden, and obtains subsequent adjustment optimization, suggestions, feedback and other information.

[0115] 1. Comparison condition input

[0116] 1) Compare the target, select the saved pre-construction estimation plan, and fill in the cumulative start date of this estimation.

[0117] 2) For cumulative price, fill in “cumulative price after deducting tax” and “price after deducting tax by the owner”.

[0118] 3) Cumulative cost (main) is the cumulative cost of labor, materials, and machinery at each tax rate at the start of the project. Fill in this field.

[0119] 4) Cumulative cost (times) is the cumulative cost incurred when starting the project. Please fill in the other cumulative costs incurred when starting the project.

[0120] 5) Open a cumulative contract (primary) (secondary), which is to accumulate various expenses of the signed contract and fill in them.

[0121] After filling in the conditions, click "Start Comparison" to display the comparison results.

[0122] 2. Comparison results

[0123] like Figure 6 As shown, the comparison results show that according to the data information, it is divided into 8 columns: "Project", "Total Target Value Tax", "Cumulative Contract Tax", "Cumulative Cost Tax", "Cumulative Target Value", "Tax Deviation", "Summary Analysis", and "Reason Fill". Click "View Tax Analysis Report" to view the report content.

[0124] 1) Projects, namely, comparison subjects, indicators, etc.

[0125] 2) The total target tax amount is the output and input tax amount of the selected target.

[0126] 3) The cumulative contract tax amount is to enter the cumulative contract information and calculate the output and input tax amounts.

[0127] 4) The tax amount incurred by cumulative cost is the tax amount of each output item and input item calculated by entering the cumulative cost information and the cumulative tax-deducted valuation.

[0128] 5) The construction progress (not displayed) is calculated based on the cumulative target value minus tax / total target project investment amount, and each item is displayed based on the total target tax amount*construction progress.

[0129] 6) Tax amount deviation: when the tax burden rate of the tax amount incurred by the cumulative cost deviates from the tax burden rate of the cumulative target value by more than 0.5%, this column is displayed, and the result of this column is the cumulative target value minus the tax amount incurred by the cumulative cost.

[0130] 7) Summary and analysis: when the tax burden rate of the accumulated cost tax amount deviates from the tax burden rate of the accumulated target value by more than 0.5%, this column will be displayed. Click to view the reasons, measures and policy basis.

[0131] 8) Reason filling: When the tax rate of the accumulated cost tax amount deviates from the tax rate of the accumulated target value by more than 0.5%, this column will be displayed, and the estimator can select and fill in the reason for the deviation. After filling in, click Save to save the comparison data and feedback reasons for the superior manager to view.

[0132] (IV) Comparison records after commencement of work

[0133] 1) You can view the comparison records of all units and subordinate units. Click on the text report or comparison data to view the data.

[0134] 2) Click Cancel to permanently delete the data.

[0135] 3) Click "Text Report", "Comparison Data", "Chart Data" to view the results of the comparison, such as Figures 7 to 9 shown.

[0136] When the present invention is used, it draws on the tax planning experience of construction enterprises over the years of business tax to value-added tax reform, integrates policies and regulations, conducts in-depth research on the latest policies and regulations, conducts in-depth research on the optimization algorithm of the input proportion structure of the main cost "people, materials and machines", takes "output tax = input tax + prepaid value-added tax" as the planning goal, establishes a construction project measurement model in the software system, utilizes the advantages of software systems and cloud computing, substitutes massive data into the model for calculation and analysis, outputs the optimal solution library, and presents it in the form of tabular data, graphic data, and text reports to meet the reading habits of personnel in the project department and various positions of the company, and finally forms a target plan before starting construction.

[0137] This software system is connected to the company's PM system interface, which can automatically obtain data after the project starts. With time nodes and engineering projects as parameters, it can retrieve the invoicing data in the PM system, and automatically summarize the input tax data under different subjects and different tax rates. By anchoring the pre-start target plan, the project progress is based on the cumulative tax deduction pricing and the proportion of project investment, and a comparison table of the actual input tax of each subject after the start of construction and a comparison table of tax burden rates are formed. According to the comparison situation, the measures library and regulations library established by the system, the response measures and corresponding laws and regulations are automatically screened and presented. At the same time, comparison reports, comparison charts, and comparison tables are automatically formed to meet the work needs of personnel in various positions in the project department.

Claims

1. A method for calculating value-added tax for construction enterprises. Features: The following steps are involved: S1. Establish a VAT calculation model for construction projects; S2. Substitute the input parameters into the calculation model; S3. Obtain results through cloud computing; S4. Select the results as comparison targets; S5. After the start of work, connect to the PM system for comparison; S6. Form a comparative report.

2. A method for calculating value-added tax for construction enterprises according to claim 1, Features: In step S1, the target model of the construction project value-added tax is first determined as: output tax = input tax + prepaid value-added tax, and then the construction project value-added tax calculation model is established with the output tax = input tax + prepaid value-added tax as the target. The construction project value-added tax calculation model is: Calculate the project investment amount and output tax based on the total cost and rate of return; Prepaid VAT = (project price including tax - subcontract price) / (1 + output tax rate) * prepaid VAT rate; Labor costs can be deducted when prepaying VAT in the case of labor subcontracting; In the case of wet lease, machinery costs can be deducted when prepaying VAT before tax; Labor costs, material costs and machinery costs have input invoices with different tax rates according to the nature of the invoicing enterprise; labor costs, material costs and machinery costs with determined tax rates are only included in the calculation and are not included in the estimated tax rate part; Other expenses are only used for calculation and not for estimation of the tax rate.

3. A method for calculating value-added tax for construction enterprises according to claim 2, Features: The input parameters in step S2 include labor costs, material costs, machinery costs, other costs and tax rates, yield rates and calculation accuracy.

4. A method for calculating value-added tax for construction enterprises according to claim 3, Features: The step S3 specifically comprises the following steps: S31. Set the proportion of labor costs, material costs and machinery costs under different tax rates to corresponding different parameters; S32. Through the exhaustive method, the labor cost, material cost, and machinery cost are assigned parameters at a scale of 1%, and the existing multiple parameter combinations are called sample G0. S33. Substitute sample G0 into the construction project value-added tax calculation model, with output tax as a fixed number, and input tax + prepaid value-added tax as the calculation result for each group of samples. According to the target model, output tax - input tax - prepaid value-added tax = 0 is the ideal result. Sample G0 may not be 0, but it is close to 0.

5. A method for calculating value-added tax for construction enterprises according to claim 4, Features: The step S4 specifically comprises the following steps: S41. Perform the first filtering on sample G0 by measuring the accuracy a. After the first filtering of sample G0, The samples are stored in a new set G1; the measurement accuracy is a ten-thousandth a, which refers to a ten-thousandth a of the project investment amount, and a deviation of a ten-thousandth a is allowed; S42. Ratio the cost parameters of labor costs under different tax rates to labor costs, the cost parameters of material costs under different tax rates to material costs, and the cost parameters of machinery costs under different tax rates to machinery costs. If any value of the ratio is less than 20% or greater than 80%, it is considered as an extreme sample and removed from the set G1. The set after removal is G2. S43. Deduplication of high similarity samples in set G2 is performed to reduce the number of G2 samples to <= 10; the deduplication method specifically comprises the following steps: S431. Let the number of deduplication rounds be n, n>=1, and the duplication index in the first round (n=1) be (n+1)%, that is, if the parameter difference between any samples is less than or equal to 2%, they will be removed, and the result set after each round of deduplication is G3(n); S432. If |G3(n)|<=10, the result is returned to the measurement page; if |G3(n)|>10, the next round of deduplication is entered, and the next round is n+1, and the duplication index also changes accordingly, and the deduplication step operation is continued until |G3(n)|<=10 after n rounds; S433. The calculation interface finally generates a calculation result with recommended value. The calculation result is N (N<=10) groups of plans. For satisfactory calculation plans, click "Save Plan" to permanently save the plan as a comparison target for use by calculation personnel. The calculation plan can be viewed in three ways: text report, financial data and chart data.

6. A method for calculating value-added tax for construction enterprises according to claim 5, Features: When the number of calculation result groups N in step S433 is 0, the calculation accuracy in the input parameters is reduced in step S2 and recalculated.

7. A method for calculating value-added tax for construction enterprises according to claim 5, Features: The step S5 is specifically as follows: after the project starts, the input tax details of the PM system are connected, and the data of labor costs, material costs, and machinery costs at different tax rates are summarized and compared with the plan calculated before the start of the project. The tax rate of each subject is a comparison item. Through the comparison results, the measures and regulations database established by this system is automatically called to filter the scenarios that may generate excess differences. At the same time, secondary filtering is performed according to the combination relationship between project conditions, and finally the recommended measures for subsequent solutions to each comparison item are presented; The set of measures consisting of various comparison items is integrated with natural language algorithms and report templates to ultimately generate a plain text report.

8. A method for calculating value-added tax for construction enterprises according to claim 7, Features: The step S6 specifically includes: generating a plain text report and simultaneously generating a table data comparison result and a chart data comparison result for comparison personnel to use.

Citation Information

Patent Citations

  • Taxation calculation platform based on real estate project

    CN103106612A

  • Financial index automatic monitoring method and device, computer device and storage medium

    CN109558441A

  • Tax service system based on cloud service

    CN111061534A

  • EPC total package enterprise project digital financial management method

    CN115081999A