Hybrid energy recovery system

By combining turbocharger and isopressurized chamber in the RO system, using salt water hydraulic energy to perform interstage pressure boosting, the problems of limited recovery rate and energy loss in the existing RO system are solved, and more efficient energy recovery and System economy.

CN119053555AActive Publication Date: 2024-11-29FLUID EQUIPMENT DEVELOPMENT COMPANY LLC
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202380032859.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-02-07
Filing Date
2023-02-06
Publication Date
2024-11-29
Estimated Expiration
2043-02-06

AI Technical Summary

Technical Problem

The recovery rate in existing RO systems is limited, resulting in energy loss and high modification costs, especially in the case where the second stage membrane is required, the existing high-pressure pumps and energy recovery devices have high cost and complexity.

Method used

A system using a turbocharger and isopressurized chamber combined with a multi-stage high-pressure pump is used to recover the brine hydraulic energy through the turbocharger, and the isopressurized chamber is used to provide interstage pressure boost without increasing excessive feed pressure. Replaces the traditional motor-driven interstage booster pump, combining intelligent control logic to optimize flow and pressure regulation.

Benefits of technology

Effective recovery of saline hydraulic energy reduces energy loss and system costs, reduces dependence on high-pressure pumps, improves the economic performance and flexibility of the system, and reduces capital and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119053555A_ABST
    Figure CN119053555A_ABST
Patent Text Reader

Abstract

A system is designed to recover energy from a fluid treatment operation that removes impurities from a feed stream using a membrane. Energy recovery devices, such as turbochargers, isobaric chambers, and multi-stage pumps, are used to recover energy.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Cross-references to related applications

[0002] This application is based upon and claims the benefit of U.S. Provisional Patent Application No. 63 / 307,285, filed on February 7, 2022, which is incorporated herein by reference in its entirety. Background Art

[0003] The Reverse Osmosis (RO) process uses an array of membrane elements that allow a solvent (e.g., water) to pass through the membranes but blocks dissolved solids (e.g., salts). RO is used for the desalination of brackish water and seawater, where a feed stream is separated by the membrane into a freshwater stream (called permeate) and the remainder is rejected as a concentrated brine stream (called concentrate or brine or waste), which leaves the membrane at a pressure slightly lower than the feed pressure entering the membrane array. This article will focus on desalination, but it is equally applicable to all separation processes for any type of solvent using membranes.

[0004] Figure 1 shows an RO system comprising a source of brackish water or seawater (brackish water or seawater is referred to as feed) connected to a High-Pressure Pump (HPP) 2 via a pipe 1. The discharge of the HPP 2 enters the membrane 10 via a pipe 4 with flow regulation provided by a control valve 3. The permeate leaves via a pipe 11. The brine leaves the membrane 10 via a pipe 16 to a drain 6. A control valve 8 regulates the brine flow.

[0005] The rate at which permeate is produced in the membrane (called the flux rate) is determined by the Net Driving Pressure (NDP), which is equal to the fluid pressure minus the average osmotic pressure of the feed in the membrane. The osmotic pressure is determined by the concentration of dissolved solids. As the feed passes through the length of the membrane, it becomes more and more concentrated and therefore has a progressively higher osmotic pressure and a lower NDP. Therefore, the production of permeate decreases along the length of the membrane.

[0006] The amount of permeate produced divided by the amount of feed is called the recovery rate. 3 4m is recovered from the feed 3 In a seawater reverse osmosis (SWRO) system, a set of membranes can achieve a recovery rate of up to about 45% while maintaining acceptable energy consumption and permeate quality.

[0007] If higher recoveries are desired, the prior art membrane arrangement depicted in Figure 2 is used. Brine leaves membrane 10 through pipe 5 and enters pump 7, which raises the pressure to restore the NPD, and then enters second membrane 15. Due to the increased NDP supplied by pump 7, additional permeate leaves membrane 15 through pipe 12 and is collected by permeate header 13. Brine leaves membrane 15 through pipe 16 to drain 6. Control valve 8 regulates the brine flow.

[0008] Energy Recovery Devices (ERDs) are often used to recover hydraulic energy in the brine stream leaving the last stage. ERDs relevant to the present disclosure are turbochargers and isobaric chambers.

[0009] A turbocharger uses the hydraulic energy of brine to boost the pressure of another stream, typically the feed entering the membrane stage. For a turbocharger designed for high pressure desalination, refer to Figure 2.1. The turbocharger 26 includes a pump section 47 and a turbine section 48, the pump section 47 having a feed inlet 32, a feed outlet 33, and the turbine section 48 having a brine inlet 34 and a brine outlet 35. The pump section includes a diffuser 37 that surrounds the pump impeller 36 with a wear ring 42 and is in fluid communication with the feed inlet 32 ​​and the feed outlet 33. The turbine section 48 includes a nozzle ring or volute 39 that surrounds the impeller 38 with a wear ring 43 and is in fluid communication with the brine inlet 34 and the brine outlet 35. The pump and turbine impellers are attached to a shaft 40, which is supported by bearings 41. In operation, high pressure brine enters brine inlet 34, passes through nozzle ring 39 where a high tangential velocity is imparted to the fluid, then enters impeller 38 and imparts torque to shaft 40. Brine exits through brine outlet 35. Feed enters inlet 32, passes through impeller 36 which rotates in response to shaft torque generated by turbine impeller 38. The feed, now having a high tangential velocity, enters diffuser 37 which converts the velocity to static pressure. The feed exits through outlet 33.

[0010] Valve 44 may be opened to allow additional brine to flow to the nozzle ring or volute 45, thereby increasing brine flow or reducing brine flow resistance through turbine section 48. Figure 2.2 shows typical process symbols for a turbocharger equipped with a brine assist nozzle as described hereinbefore.

[0011] Please refer to Figure 3. The system depicted is similar to Figure 2, with the addition of turbochargers 21 and 26. The feed from the HPP 2 enters the pump section 18 of the turbocharger 21, which boosts the pressure of the feed, which then passes through pipe 9 to the first membrane 10. The high-pressure brine leaves the membrane 10 through pipe 5 and enters the pump section 27 of the turbocharger 26, which increases the pressure of the stream, and the pressure-enhanced stream then enters the second membrane 15. The permeate leaves the membrane 15 through pipe 12 and is collected by the permeate header 13. The brine leaves the membrane 15 through pipe 16 to the turbine section 28 of the turbocharger 26. The hydraulic energy is recovered and used to power the pump section 27. The partially depressurized brine passes through pipe 29 to the turbine section 20 of the turbocharger 21 to power the pump section 18. The brine leaves the turbine section 20 through pipe 17 to the drain pipe 6.

[0012] The prior art depicted in FIG3 is the preferred method for obtaining increased recovery when designing a new facility. Increasing the recovery of an RO system can improve the economic performance of the system. However, there are hundreds of RO systems that are single-stage systems with limited recovery. If the cost of replacing the existing HPP and ERD is considered too expensive, it means that a second stage needs to be added for higher recovery while retaining as many existing system components as possible to reduce the overall cost of the renovation.

[0013] The isobaric chamber pressurizes the feed stream to equal the brine stream and discharges the feed at a pressure slightly lower than the incoming brine stream. The isobaric chamber thus acts as a high pressure pump, which pressurizes the feed stream to equal the brine stream. A separate high pressure pump pressurizes the feed stream to equal the permeate stream. An additional pump is required to raise the feed discharge of the isobaric chamber to compensate for the 2 to 4 bar pressure loss to match the membrane pressure.

[0014] Figure 4 shows an isobaric chamber 112 for recovering hydraulic energy from the high pressure brine to pressurize the feed stream. Isobaric chambers and how they function are well known in the art and will not be disclosed in detail here.

[0015] The inherent hydraulic properties of the isobaric chamber include that the HP feed pressure leaving the unit is slightly lower than the HP brine pressure. In addition, the volume of HP brine entering the isobaric chamber is equal to the amount of HP feed leaving the isobaric chamber, excluding leakage. It is critical that the HP brine pressure is always higher than the HP feed pressure. Likewise, the feed charge to purge brine from the pump cylinder requires that the feed pressure is greater than the brine pressure to the drain pipe. FIG. 4 shows the prior art using an isobaric chamber 112 energy recovery device and a booster pump 110 in an RO system. The isobaric chamber 112 receives high pressure brine from the membrane 10 through pipe 16 and discharges brine at low pressure to the drain pipe 6 through pipe 17. The control valve 8 regulates the brine flow. The rate at which the feed enters the isobaric chamber 112 through pipe 150 is the same as the rate at which the brine flows through pipe 16 into the isobaric chamber 112. The feed leaves the isobaric chamber 112 through pipe 148, through pump 110 to pipe 4. The combined flow of the HPP 2 and the isobaric chamber 112 enters the membrane 10. The pump 110 typically provides a pressure boost of 2 to 4 bar.

[0016] FIG5 shows the prior art using an isobaric chamber 112 which receives brine from the second membrane 15. This configuration uses an interstage pump 7 to raise the pressure between the first membrane 10 and the second membrane 15. As noted above, the isobaric chamber 112 discharges the feed through a pipe 148 at a pressure 2 to 4 bar below the brine pressure in the pipe 16. Typically, the brine pressure in the second membrane 15 is about 25 bar higher than the feed to the first membrane 10. Subtracting the maximum of 4 bar lost in the piping and the second membrane 15, the feed pressure in the pipe 148 is 21 bar higher than required by the membrane 10. The excess pressure must be directed by a control valve 149 or be wasted. This represents a large amount of energy loss that could otherwise be recovered for useful purposes. Summary of the invention

[0017] A system is designed to recover energy from a fluid processing operation that uses membranes to remove impurities from a feed stream. Energy recovery devices such as turbochargers, isobaric chambers, and multistage pumps are used to recover energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] FIG. 1 is a side elevation view.

[0019] FIG. 2 is a side elevation view.

[0020] Figure 2.1 is a side elevation view.

[0021] Figure 2.2 is a side elevation view.

[0022] FIG. 3 is a side elevation view.

[0023] FIG. 4 is a side elevation view.

[0024] Figure 4.1 is a side elevation view

[0025] FIG. 5 is a side elevation view.

[0026] Figure 6 It is a side elevation view.

[0027] FIG. 7 is a side elevation view.

[0028] FIG. 7A is a partial side elevation view.

[0029] Figure 8 It is a side elevation view.

[0030] Fig. 9 It is a side elevation view.

[0031] Fig.10 It is a side elevation view.

[0032] FIG. 11 is a side elevation view.

[0033] Fig.12 It is a side elevation view.

[0034] Fig.13 It is a side elevation view.

[0035] Fig.14 It is a flow chart of the operating parameters.

[0036] Fig.15 It is a flow chart of the operating parameters.

[0037] Fig.16 It is a flow chart of the operating parameters. DETAILED DESCRIPTION

[0038] The present invention relates to an energy recovery system, in particular, the system utilizes a turbocharger, an isobaric chamber and a multi-stage high-pressure pump to achieve a desired energy recovery result.

[0039] Figure 6 A first embodiment of the invention is shown. The essence of the invention is to reduce the brine pressure leaving the membrane 15 to a value below the feed pressure for the membrane 10 without wasting the available brine hydraulic energy. Thus, the inherent hydraulic properties of the isobaric chamber will not result in excessive feed pressure that must be wasted or removed from the system via the control valve described with respect to FIG. 5 .

[0040] For a better understanding of the operation, assume that the feed pressure in pipe 9 is 50 bar, the brine pressure in pipe 16 is 70 bar, and the brine pressure in pipe 29 is 35 bar. The pressure in pipe 29 is the result of the pressure reduction produced by the use of the fluid pressure in the turbine section 28 of the turbocharger 26 relative to the input pressure in pipe 16. For clarity, Figure 6 Pressure is included by way of illustration.

[0041] The turbocharger 26 provides a pressure boost from 49 bar to 71 bar between the first membrane 10 and the second membrane 15. The partially decompressed brine leaves the turbine section 28 of the turbocharger 26 at 35 bar and passes through the pipe 29 to the isobaric chamber 112 at 35 bar. The isobaric chamber 112 will discharge the feed at a pressure 4 bar lower. The pump 110 needs to increase the feed pressure supplied to the pipe 9 by 19 bar to match the 50 bar requirement of the membrane 10. The main advantage of this embodiment is the elimination of the energy from feed throttling wasted by the valve 149 in Figure 5, and the elimination of the cost, complexity and energy consumption of the motor driven interstage booster pump 7.

[0042] An advantage of this embodiment is that brine energy is utilized to provide both interstage pressure boost and brine pressure reduction to allow the isobaric chamber to operate without generating excessive feed pressure.

[0043] Note that pump 110 has a high pressure differential, which requires a large motor, variable frequency drive (VFD), high pressure mechanical seals and heavy bearings to accommodate operation at high inlet pressures. Such pumps have high capital costs, high maintenance costs and limited efficiency. The next feature of the present invention eliminates the need for such pumps.

[0044] FIG. 7 shows the prior art of a multistage high pressure pump 120 typically used in an RO system. The pump housing 125 of the pump 120 contains stages 126 stacked in a series arrangement. Low pressure feed enters through an inlet port 122 in an inlet housing 131 and is then passed to the stage array. As the fluid advances from one stage to another, each stage adds pressure to the fluid. The feed leaves the pump 120 through an outlet port 132. A motor 121 rotates a pump shaft 124. A shaft seal 123 prevents leakage.

[0045] As illustrated in Figure 7-A, shaft 124 drives impeller 127 in each stage 126. Diffuser 128 converts dynamic pressure to static pressure, and return passage 129 directs the flow to the next stage. Arrows 130 illustrate the flow path through the stage.

[0046] Figure 8An embodiment of the multi-stage pump of the present invention is illustrated, which overcomes the limitation of the previous embodiment of wasting energy (energy cannot be recovered and used to provide feed pressure for the first membrane and the second membrane). Motor 121 is connected to pump shaft 124. Shaft seal 123 prevents leakage. Feed enters pump 140 through inlet port 122 in first inlet housing 131. Stage stack 126-A generates a specified feed pressure. Second inlet port 135 in second inlet housing 136 accepts additional feed from another source, which is mixed with the feed leaving stage stack 126-A. The combined flow is passed to second stage stack 138-A, which raises the pressure to a specified value and leaves through exhaust port 139. Note that the stages in stage stack 138-A can be larger than the stages in stage stack 126-A to accommodate higher flow rates.

[0047] Fig. 9 The functionality of the improved pump 140 within the present invention is shown. Feed from pipeline 1 enters pump 140 through inlet port 122. Feed pressure is increased by stage stack 126-A to a specified value at inlet housing 136. Feed from pump 110 enters through inlet port 135 and mixes with feed from stage stack 126-A. The combined flow passes through stage stack 138-A through pipeline 4 to membrane 10.

[0048] The pump 140 receives flow from the isobaric chamber 112 through the second inlet port 135, which supplies the pump 110. The combined flow entering the pump 140 through the first inlet port 122 and through the second inlet port 135 exits through the outlet port 139 and is delivered to the first membrane 10 through the conduit 4. The motor 145 includes a VFD 144 to allow the pump speed to be adjusted to obtain the desired pressure for the first membrane 10.

[0049] A booster pump 110 with a motor 146 and a VFD 147 may be required to provide precise control of the pressure of the feed outlet pipe 148 from the isobaric chamber 112. Note that the pump 110 must be rated to operate at high inlet pressures, which necessitates expensive and failure-prone high pressure shaft seals and high capacity bearings. If precise pressure control at the inlet port 135 is not required, the booster pump 110 and associated equipment may not be required.

[0050] Integrating the turbocharger and the isobaric chamber in the same system requires novel control logic. Control data is provided by flow meter 190, which measures the feed flow in pipe 148 supplying feed from the isobaric chamber 112 to the pump 140, flow meter 191, which measures the brine discharge through pipe 17, and flow meter 192, which measures the total permeate flow in the permeate header 13. The flow data is processed by PLC 160. PLC 160 controls flow control valve 8 through control line 168, controls VFD 147 through control line 164, and controls VFD 144 through control line 165.

[0051] Fig.10 Another embodiment is shown in which the pump 110 and associated equipment are replaced with a pressure reducing valve 151. The pressure in the second inlet port 135 will be designed to be a few bars lower than the lowest expected pressure of the feed discharge pipe 148 of the isobaric chamber 112. Adjustment of the valve 151 provides regulation of the flow rate. The stage stack 138-A will be designed to provide the pressure required by the membrane 10. The VFD 144 can be used to adjust the motor speed 145, thereby controlling the pump discharge pressure at the outlet port 139.

[0052] Integrating a turbocharger and an isobaric chamber in the same system requires novel control logic. Fig.10 , control data is provided by flow meter 190, flow meter 191, and flow meter 192, flow meter 190 measures the feed flow in pipe 148 supplying feed from isobaric chamber 112 to pump 140, flow meter 191 measures the brine discharge through pipe 17, and flow meter 192 measures the total permeate flow in permeate header 13. The flow data is processed by PLC 160. PLC 160 controls flow control valve 8 through control line 168, controls control valve 151 through control line 164, and controls VFD 144 through control line 165.

[0053] Isobaric chamber 112 requires that the feed flow rate through line 148 must be equal to the brine flow rate through line 17. This control functionality also allows the brine and feed flow rates to be adjusted as required for process control.

[0054] The turbocharger 26 is equipped with an auxiliary brine nozzle 25. Opening the nozzle 25 increases the brine flow rate and / or reduces the pressure differential, while closing the nozzle reduces the brine flow rate and / or increases the pressure differential. Since the brine flow rate can be kept constant by adjusting the control valve 8 of the isobaric chamber 112, the pressure differential across the turbine section 28 is controlled by adjusting the brine nozzle 25. When opened, the pressure differential is reduced, which reduces the pressure boost from the pump section 27. Conversely, when closed, the pressure differential is increased, resulting in a greater pressure boost. If the pressure boost is higher, the permeate production from the second membrane 15 is increased, while if the pressure boost is lower, the permeate production is reduced. The position of the brine nozzle 25 can be set to any value between fully open and fully closed to achieve the desired intermediate pressure boost values.

[0055] Fig.14 The control logic used in the present invention is described.

[0056] FIG. 11 shows the prior art of functionally replacing an isobaric chamber using a turbocharger 21. A turbocharger has many advantages, such as having higher reliability compared to an isobaric chamber due to a much less complex design and lower capital cost. A turbine exchanger (TurboExchanger, TX) 21 replaces an isobaric chamber as described in the prior art. The notable difference is that a boost pump 110 raises the pressure upstream of the turbocharger feed inlet compared to a pump 110 for raising the pressure downstream of the isobaric chamber feed outlet. The feed enters through pipeline 1. A portion of the feed passes through pipeline 19, passes through HPP2, passes through control valve 3 to membrane 10. The remaining feed flows through pipeline 150 through boost pump 110 to the pump section 18 of the turbocharger 21. The pump section 18 raises the feed pressure to a pressure sufficient to match the control valve 3 downstream. As previously disclosed, partially depressurized brine from turbocharger 26 passes through conduit 29 to turbine section 20 of turbocharger 21 , drives pump section 18 , and then exits through conduit 17 to drain 6 at low pressure.

[0057] A significant difference relative to an isobaric chamber is that the feed flow rate through line 150 can be greater than, equal to, or less than the brine flow rate through line 29. This expands the operational flexibility of the system.

[0058] The pump 110 requires its own motor, VFD, power supply, base plate, etc., resulting in significant added capital and maintenance costs.

[0059] Fig.12An embodiment of the present invention based on the use of TX 21 is shown. Pump 140 is similar to the previous embodiment, but with several key differences. The total feed flow enters the inlet port 122 through pipe 1. The stage stack 126-A raises the pressure to slightly above the required pressure at the feed inlet of the pump section 18 of the turbocharger 21 (the pressure increase ranges from 4 bar to 8 bar as required) to suppress cavitation in the pump section 18 of the turbocharger 21. A portion of the feed leaves the pump 140 through the outlet 135, passes through the control valve 151 to the pump section 18 of the turbocharger 21. The feed leaves the pump section 18 at a pressure that matches the pressure required by the membrane 10. With reference to the pump 140, the feed that does not leave at the outlet 135 continues through the stage stack 138-A, where the pressure is increased to match the pressure required by the membrane 10. The flows from the pump 140 and the pump section 18 are combined in the pipe 4 and enter the membrane 10.

[0060] The control valve 151 is adjusted to maintain the feed flow rate at the desired value. The PLC 160 is used to control the fluid flow rate, as previously described with respect to Fig.10 described.

[0061] Fig.15 The control functions of the above-mentioned embodiments are defined.

[0062] Fig.13 An embodiment of the invention based on the use of a TX 21 with an attached motor 172 and VFD 173 is shown. Shaft 171 couples the motor 172 directly to the shaft 40 depicted in FIG2.1. The rotation rate of shaft 171 is adjusted by adjusting the VFD 173 driving the motor 172, thereby adjusting the pressure and flow in the pipe 148 to match the flow and pressure requirements of the membrane 10. This control method eliminates the need for Fig.12 In addition, the pump 140 no longer requires a VFD for speed control, such as Fig.12 , because feed flow and pressure regulation is provided by the TX 21 with attached motor 172 and VFD 173. Eliminating this large VFD reduces capital costs, maintenance costs, and reduces energy consumption by eliminating energy losses that would otherwise occur in the VFD. Note that the VFD 173 has Fig.12 The motor 145 used in conjunction with the VFD 144 is approximately 10% to 15% of the rating of the VFD 144.

[0063] Fig.16 A control scheme for regulating the motor is defined.

[0064] The above description is given for the purpose of illustrating the present invention. Various modifications and substitutions may be made without departing from the scope of the following claims.

Claims

1. A fluid processing system, include: a first membrane for treating a fluid, the first membrane having an inlet for the fluid to be treated, an outlet for the treated fluid and a discharge opening for the untreated fluid; a source of fluid under pressure to be treated, the source of fluid under pressure to be treated operatively connected to the inlet of the first membrane; a second membrane for treating a fluid, the second membrane having an inlet for the fluid to be treated, an outlet for the treated fluid and a discharge opening for the untreated fluid; an energy recovery turbocharger having a pump section having a feed inlet and a feed outlet, and a turbine section having a brine inlet and a brine outlet, the discharge opening of the first membrane being operatively connected to the feed inlet of the pump section, the feed outlet of the pump section being operatively connected to the inlet of the second membrane, the discharge opening of the second membrane being operatively connected to the brine inlet on the turbine section; an isobaric chamber having an inlet opening operatively connected to a brine outlet of the turbocharger, a discharge opening, a feed inlet opening operatively connected to a source of fluid under pressure, and a feed outlet opening operatively connected to an inlet of the first membrane.

2. The system according to claim 1, in, A pump is connected to the feed outlet, the pump being used to increase the pressure of the fluid from the feed outlet to a pressure required for the operation of the first membrane.

3. The system according to claim 2, in, A feed pump is operatively connected to the source of fluid under pressure, the feed pump providing at least a portion of the pressure required for operation of the first membrane.

4. The system according to claim 3, in, The feed pump is a multi-stage pump having a first stage stack and a second stage stack, wherein the first stage stack has an inlet port and an outlet port, wherein the inlet port is operatively connected to a source of fluid under the pressure, and the outlet port is operatively connected to a first inlet opening for the second stage stack, and the second inlet opening for the second stage stack is operatively connected to a feed outlet opening of the isobaric chamber.

5. The system according to claim 4, in, A motor is used to drive the feed pump, and a variable frequency drive is connected to the motor for driving the feed pump to provide control of the pressure of the fluid supplied to the inlet of the first membrane.

6. The system according to claim 5, in, A motor for operating a pump connected to the feed outlet of the isobaric chamber is coupled to a variable frequency drive to provide control of the pressure of fluid supplied to the second inlet opening of the multistage pump.

7. The system according to claim 6, in, A first flow meter is operatively connected to the outlet of the first membrane, a second flow meter is operatively connected to the outlet of the second membrane, a third flow meter is operatively connected to the discharge opening of the isobaric chamber, and a fourth flow meter is operatively connected to the feed outlet of the isobaric chamber.

8. The system according to claim 7, in, A controller is operatively connected to the first, second, third and fourth flow meters, to a variable frequency drive for the feed pump and to a variable frequency drive for a pump connected to the feed outlet of the isobaric chamber, the controller regulating the flow rate and pressure in the system to achieve a desired pressure of the fluid feed supplied to the inlet for the first membrane and the second membrane.

9. The system according to claim 1, in, A pressure reducing valve is operatively connected to the feed outlet of the isobaric chamber, the pressure reducing valve regulating a flow rate of the fluid from the feed outlet of the isobaric chamber.

10. A high pressure pump, include: A rotatable shaft; a first inlet housing, an inlet port in the first inlet housing, and a discharge port from the first inlet housing; at least one pump stage operatively connected to the rotatable shaft, the at least one pump stage operatively connected to a discharge port from the first inlet housing, the at least one pump stage having a discharge opening; a second inlet housing operatively connected to a discharge opening from the at least one pumping stage, the second inlet housing having an inlet opening; A second at least one pump stage stack is operatively connected to the second inlet housing, the at least one pump stage being operatively connected to the rotatable shaft, the second stage stack having a discharge opening.

11. The pump according to claim 10, in, A motor is connected to the rotatable shaft.

12. The pump according to claim 11, in, A variable frequency drive is operatively connected to the motor.

13. The pump according to claim 10, in, An inlet port in the first inlet housing is connected to a source of fluid under pressure.

14. The pump according to claim 13, in, The inlet port of the second inlet housing is connected to a source of fluid under pressure.

15. A fluid processing system, include: a first membrane for treating a fluid, the first membrane having an inlet for the fluid to be treated, an outlet for the treated fluid and a discharge opening for the untreated fluid; a source of fluid under pressure to be treated, the source of fluid under pressure to be treated operatively connected to the inlet of the first membrane; a multi-stage feed pump having a first stage stack and a second stage stack, the first stage stack having an inlet port operatively connected to a source of fluid under pressure and an outlet port operatively connected to a first inlet opening for the second stage stack and a second inlet opening in the second stage stack; a second membrane for treating a fluid, the second membrane having an inlet for the fluid to be treated, an outlet for the treated fluid and a discharge opening for the untreated fluid; a first energy recovery turbocharger having a pump section and a turbine section, the pump section having a feed inlet and a feed outlet, the turbine section having a brine inlet and a brine outlet, the discharge opening of the first membrane being operatively connected to the feed inlet of the pump section, the feed outlet of the pump section being operatively connected to the inlet of the second membrane, the discharge opening of the second membrane being operatively connected to the brine inlet on the turbine section; a second energy recovery turbocharger, the second energy recovery turbocharger having a pump section and a turbine section, the pump section of the second energy recovery turbocharger having a feed inlet and a feed outlet, the turbine section of the second energy recovery turbocharger having a brine inlet and a brine outlet, the brine outlet of the first turbocharger being operatively connected to the brine inlet on the turbine section of the second turbocharger, the feed inlet on the pump section of the second turbocharger being operatively connected to a second inlet opening in the second stage stack.

16. The system according to claim 15, in, A motor is used to drive the multi-stage feed pump, and a variable frequency drive is connected to the motor for driving the multi-stage feed pump to provide control over the pressure of the fluid supplied to the inlet of the first membrane.

17. The system according to claim 16, in, A motor is connected to the turbine section of the second energy recovery turbocharger and a variable frequency drive is connected to the motor connected to the turbine section of the second energy recovery turbocharger to provide control of the pressure of the fluid supplied to the second inlet opening of the multi-stage pump.

18. The system according to claim 17, in, A first flow meter is operatively connected to an outlet of the first membrane, a second flow meter is operatively connected to an outlet of the second membrane, and a third flow meter is operatively connected to an exhaust outlet of a turbine section of the second energy recovery turbocharger.

19. The system according to claim 18, in, A controller is operatively connected to the first, second and third flow meters and to a variable frequency drive for the motor connected to the turbine section of the second energy recovery turbocharger, the controller regulating the flow rate and pressure in the system to achieve a desired pressure for the fluid feed supplied to the inlet for the first and second membranes.

20. The system according to claim 15, in, A pressure reducing valve is operatively connected to a feed outlet of a pump section of the second turbocharger, the pressure reducing valve regulating a flow of fluid from the feed outlet.

Citation Information

Patent Citations

  • Concentrated water energy gradient utilization reverse osmosis seawater desalination method

    CN104163470A

  • Reverse osmosis seawater desalination method and system and system control method

    CN109553202A

  • Method and system for operating a high recovery separation process

    CN111194235A

  • System and procedure for energy use of natural osmosis between brine and seawater.

    ES2402628A2

  • Combined pump and energy recovery turbine

    US20140202144A1