Refrigeration control method, refrigeration system and readable storage medium

By obtaining the status parameters and demand of the refrigerator split, controlling the compressor operating frequency and the electric conversion valve output pipeline, the problem of high energy consumption in the multi-temperature zone is solved, and accurate temperature control and power saving of the refrigerator split is achieved. .

CN119063325AActive Publication Date: 2024-12-03MIDEA BIOMEDICAL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310647754.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-01
Publication Date
2024-12-03
Estimated Expiration
2043-06-01

AI Technical Summary

Technical Problem

In the integrated setting of home appliances, the temperature control of multi-temperature refrigerators increases energy consumption, resulting in higher electricity consumption.

Method used

By obtaining the status parameters of each refrigerator split, determining its refrigeration demand, and controlling the operating frequency of the compressor and the output pipeline of the electric conversion valve according to the demand, precise control of the target refrigerator split and saving electricity.

Benefits of technology

Accurate temperature control of refrigerator splits is achieved, energy consumption is reduced, and electricity consumption is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119063325A_ABST
    Figure CN119063325A_ABST
Patent Text Reader

Abstract

The invention discloses a refrigeration control method, a refrigeration system and a readable storage medium. Firstly, state parameters corresponding to all refrigerator split bodies are obtained; then according to the state parameters corresponding to all the refrigerator split bodies, the refrigeration demand quantity corresponding to all the refrigerator split bodies is determined; according to the refrigeration demand quantity corresponding to each refrigerator split body, a target refrigerator split body is determined, and the target refrigerator split body represents the refrigerator split body with the refrigeration demand; a compressor is started, and an electric change-over valve is controlled to communicate with an output pipeline corresponding to the target refrigerator split body; and according to the refrigeration demand quantity corresponding to each target refrigerator split body, the compressor is controlled to operate at a proper frequency, so that electric power is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of refrigerators, and in particular to a refrigeration control method, a refrigeration system, and a readable storage medium. Background Art

[0002] Currently, there are many different types of refrigerators. Multi-temperature zone refrigerators offer more space and allow for categorized storage, making them popular with consumers. However, the large number of temperature zones makes refrigerators larger and occupies a significant amount of space. Consequently, the trend towards integrated home appliances is gaining momentum. This integration integrates the refrigerator with the home, increasing space utilization. However, this hybrid setup increases energy consumption by controlling the temperature of each temperature zone simultaneously, leading to higher electricity usage. Summary of the Invention

[0003] The following is a summary of the subject matter described in detail herein. This summary is not intended to limit the scope of the claims.

[0004] The embodiments of the present application provide a refrigeration control method, a refrigeration system, and a readable storage medium, which can not only save electricity but also achieve accurate temperature control.

[0005] In a first aspect, an embodiment of the present application provides a refrigeration control method, which is applied to a refrigeration system, wherein the refrigeration system includes a refrigeration main unit and multiple refrigerator splits, the refrigeration main unit includes a compressor, and the compressor is connected to multiple output pipes via an electric conversion valve, and each output pipe is connected to each refrigerator split. The refrigeration control method includes:

[0006] Obtaining status parameters corresponding to each of the refrigerator components;

[0007] determining the refrigeration demand corresponding to each of the refrigerator splits according to the state parameters corresponding to each of the refrigerator splits;

[0008] Determining a target refrigerator split according to the refrigeration demand corresponding to each of the refrigerator splits, wherein the target refrigerator split represents the refrigerator split with refrigeration demand;

[0009] Turning on the compressor and controlling the electric switching valve to connect the output pipeline corresponding to the target refrigerator split;

[0010] The operating frequency of the compressor is controlled according to the refrigeration demand corresponding to each target refrigerator unit.

[0011] According to the refrigeration control method of the first aspect of the present application, there are at least the following beneficial effects: first, the state parameters corresponding to each refrigerator split are obtained; then, based on the state parameters corresponding to each refrigerator split, the refrigeration demand corresponding to each refrigerator split is determined; then, based on the refrigeration demand corresponding to each refrigerator split, the target refrigerator split is determined, wherein the target refrigerator split represents a refrigerator split with refrigeration demand; the compressor is turned on, and the electric conversion valve is controlled to connect the output pipeline corresponding to the target refrigerator split, thereby achieving precise control of the target refrigerator split; and based on the refrigeration demand corresponding to each target refrigerator split, the operating frequency of the compressor is controlled so that the compressor is at an appropriate operating frequency, thereby achieving the effect of saving electricity.

[0012] In some embodiments of the present application, controlling the operating frequency of the compressor according to the refrigeration demand corresponding to each target refrigerator unit includes:

[0013] Calculating a total refrigeration demand based on the refrigeration demand corresponding to each target refrigerator segment;

[0014] The operating frequency of the compressor is determined according to the total refrigeration demand and a preset frequency operation mapping table.

[0015] In the above technical solution, the operating frequency of the compressor is determined by the total refrigeration demand, so that the compressor is at an appropriate operating frequency, saving electricity.

[0016] In some embodiments of the present application, the frequency operation mapping table includes a preset demand interval and a preset operating frequency;

[0017] The step of determining the operating frequency of the compressor according to the total cooling demand and a preset frequency operation mapping table includes:

[0018] Determining the demand interval within which the total cooling demand falls;

[0019] The operating frequency corresponding to the demand interval is searched in the frequency operation mapping table, and the operating frequency is used as the operating frequency of the compressor.

[0020] In the above technical solution, according to the demand range of the total refrigeration demand, an appropriate operating frequency is found as the operating frequency of the compressor, thereby reducing energy consumption and saving electricity.

[0021] In some embodiments of the present application, the state parameters include a set temperature, a current temperature, and a volume of a refrigerator compartment;

[0022] The determining, based on the state parameters corresponding to the refrigerator components, the refrigeration demand corresponding to each refrigerator component, includes:

[0023] For each of the refrigerator components, calculating the difference between the current temperature and the set temperature to obtain a temperature difference;

[0024] The temperature difference is multiplied by the volume of the refrigerator compartment to obtain the refrigeration demand.

[0025] In the above technical solution, by calculating the temperature difference between the set temperature and the current temperature, and combining it with the volume of the refrigerator split, the refrigeration demand of the refrigerator split can be accurately obtained, thereby achieving accurate control of the temperature of the refrigerator split.

[0026] In some embodiments of the present application, determining a target refrigerator segment according to the refrigeration demand corresponding to each of the refrigerator segments includes:

[0027] When the refrigeration demand is not zero, the refrigerator split corresponding to the refrigeration demand is determined as the target refrigerator split.

[0028] In the above technical solution, when the refrigeration demand is not zero, it is indicated that the refrigerator split needs to be refrigerated, and the refrigerator split that needs to be refrigerated can be accurately obtained, thereby achieving precise control.

[0029] In some embodiments of the present application, after determining the refrigeration demand corresponding to each of the refrigerator subunits according to the state parameters corresponding to each of the refrigerator subunits, the refrigeration control method further includes:

[0030] When the refrigeration demand corresponding to each of the refrigerator units is zero, the compressor is controlled to be in an off state.

[0031] In the above technical solution, when it is determined that refrigeration is not required, the compressor is controlled to be in an off state and to suspend operation, thereby saving electricity.

[0032] In some embodiments of the present application, the total refrigeration demand is calculated based on the refrigeration demand corresponding to each of the target refrigerator units, including:

[0033] The refrigeration demand corresponding to each target refrigerator unit is weightedly summed to obtain the total refrigeration demand.

[0034] In the above technical solution, in the weighted summation calculation, the weighted summation coefficient affects the total refrigeration demand, which in turn affects the operating frequency of the compressor, thereby determining the appropriate operating frequency to achieve the effect of saving electricity.

[0035] In some embodiments of the present application, starting the compressor and controlling the electric conversion valve to connect to the output pipeline corresponding to the target refrigerator split includes:

[0036] Turn on the compressor, control the electric conversion valve to poll each of the refrigerator splits, and when the currently polled refrigerator split is the target refrigerator split, control the electric conversion valve to connect the output pipeline corresponding to the currently polled refrigerator split.

[0037] In the above technical solution, each refrigerator split is polled and the output pipeline is controlled by the electric conversion valve to connect to the target refrigerator split, thereby achieving accurate control of each refrigerator split.

[0038] In some embodiments of the present application, after starting the compressor and controlling the electric conversion valve to connect the output pipeline corresponding to the target refrigerator split, and before controlling the operating frequency of the compressor according to the refrigeration demand corresponding to each target refrigerator split, the refrigeration control method further includes:

[0039] When the current temperature of the target refrigerator sub-unit reaches a preset shutdown temperature, the electric switching valve is controlled to point to the next refrigerator sub-unit.

[0040] In the above technical solution, when the current temperature is equal to the preset shutdown temperature, the electric switching valve points to the next refrigerator split, the refrigeration ends, the total refrigeration demand is recalculated, and the operating frequency of the compressor is re-determined, so that the compressor always runs at the optimal frequency to achieve the purpose of saving electricity.

[0041] In some embodiments of the present application, the refrigerator is divided into a freezer and a refrigerator, and the number of the freezer and the refrigerator is at least one respectively, and the freezer and the refrigerator are distributed in the storage space of the cabinet.

[0042] In the above technical solution, each freezer and each refrigerator is distributed in the storage space of the cabinet. This design can make full use of the room space, improve space utilization, and increase convenience.

[0043] In a second aspect, an embodiment of the present application further provides a refrigeration system, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the refrigeration control method as described in the first aspect is implemented.

[0044] In a third aspect, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to enable a computer to execute the refrigeration control method as described in the first aspect.

[0045] Other features and advantages of the present application will be described in the following description, and in part will become apparent from the description, or will be understood by practicing the present application. The purposes and other advantages of the present application can be achieved and obtained through the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The accompanying drawings are used to provide a further understanding of the technical solution of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the technical solution of the present application and do not constitute a limitation on the technical solution of the present application.

[0047] Figure 1 This is a flow chart of a refrigeration control method provided by one embodiment of the present application;

[0048] Figure 2 yes Figure 1 Flowchart of the specific method of step S500;

[0049] Figure 3 yes Figure 2 Flowchart of the specific method of step S520;

[0050] Figure 4 yes Figure 1 Flowchart of the specific method of step S200;

[0051] Figure 5 This is an overall flow chart of a refrigeration control method provided by an embodiment of the present application;

[0052] Figure 6 This is a schematic diagram of the split distribution of refrigerators provided in an embodiment of the present application;

[0053] Figure 7 is a schematic diagram of a refrigeration system provided in an embodiment of the present application;

[0054] Figure 8 It is a schematic diagram of the system architecture platform of the refrigeration control method provided in one embodiment of the present application. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementation methods. At the same time, the steps or actions in the method description can also be swapped or adjusted in order in a manner that is obvious to those skilled in the art. Therefore, the various orders in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a necessary order, unless otherwise specified that a certain order must be followed.

[0056] In the description of this application, "several" means one or more, "many" means more than two, "greater than," "less than," and "exceed" are understood to exclude the number itself, while "above," "below," and "within" are understood to include the number itself. The terms "first" and "second" are used solely to distinguish technical features and are not to be construed as indicating or implying relative importance, or as implicitly specifying the number or order of the technical features indicated.

[0057] The serial numbers assigned to components herein, such as "first," "second," etc., are used solely to distinguish the objects being described and do not convey any sequential or technical meaning. References to "connection" and "coupling" herein, unless otherwise specified, include both direct and indirect connections (couplings).

[0058] In the description of this application, unless otherwise clearly defined, terms such as setting, installing, and connecting should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in this application based on the specific content of the technical solution.

[0059] In the prior art, integrated multi-temperature-zone refrigerators typically use multiple solenoid valves to control each temperature zone. Specifically, each valve controls one temperature zone, enabling precise temperature control through a specific solenoid valve. However, in some split-unit refrigerators, when cooling demand is low or no cooling is required, multiple zones use a fixed compressor operating frequency, resulting in wasted electricity.

[0060] Based on the above situation, the embodiments of the present application provide a refrigeration control method, refrigeration system, and readable storage medium. By obtaining the status parameters of each refrigerator split and determining the refrigeration demand of each refrigerator split based on the status parameters, the target refrigerator split is determined based on the refrigeration demand corresponding to each refrigerator split, the compressor is turned on, and the electric conversion valve is controlled to connect the output pipeline corresponding to the target refrigerator split. The target refrigerator split can be precisely controlled to achieve centralized refrigeration and distributed cooling. The operating frequency of the compressor is controlled based on the refrigeration demand corresponding to each target refrigerator split, so that the compressor is at an appropriate operating frequency, thereby saving electricity. This refrigeration control method can be applied to the refrigeration of cabinet refrigerators to achieve integrated control of cabinet refrigerators; it can also be applied to the refrigeration of storage cabinet refrigerators in halls or rooms to achieve integrated control of cabinet furniture and refrigerators. It can also be applied to the temperature control of other refrigerator split distributed installation design models, and is widely used.

[0061] The following further describes the embodiments of the refrigeration control method provided in the present application in conjunction with the accompanying drawings.

[0062] like Figure 1 As shown, Figure 1 The flowchart of the refrigeration control method provided in one embodiment of the present application is shown. The refrigeration control method of the embodiment of the present application is applied to a refrigeration system, which includes a main refrigeration unit and multiple refrigerator units. The main refrigeration unit includes a compressor, which is connected to multiple output pipelines via an electric switching valve, with each output pipeline corresponding to a refrigerator unit. The refrigeration control method includes but is not limited to steps S100, S200, S300, S400, and S500.

[0063] Step S100: Obtain status parameters corresponding to each refrigerator unit.

[0064] In one embodiment, the refrigerator compartments can be either freezers or refrigerators. Each refrigerator compartment is equipped with a sensor that can obtain corresponding status parameters for the freezer and refrigerator compartments, enabling communication between the sensor and the refrigeration unit. The sensors include a temperature sensor and a diameter sensor. The temperature sensor measures the temperature of the refrigerator compartment, including its current temperature, a preset shutdown temperature, or a set temperature. The diameter sensor measures the volume of the refrigerator compartments and can also count the number of refrigerator compartments. Therefore, the status parameters include the set temperature, current temperature, refrigerator compartment volume, and the number of refrigerator compartments. Obtaining the corresponding status parameters for each refrigerator compartment facilitates subsequent use of the status parameters to determine whether each refrigerator compartment has a cooling demand.

[0065] Step S200: determining the refrigeration demand corresponding to each refrigerator split unit according to the state parameters corresponding to each refrigerator split unit.

[0066] In one embodiment, state parameters are obtained through communication, and these state parameters are substituted into preset arithmetic rules for calculation to obtain the refrigeration demand corresponding to the refrigerator split. The refrigeration demand can be used to determine which refrigerator splits need refrigeration and which refrigerator splits do not need refrigeration. The refrigeration demand of each refrigerator split is determined, which is conducive to adjusting the operating frequency of the compressor according to the operating conditions of each refrigerator split, thereby saving electricity.

[0067] like Figure 4 As shown, according to the state parameters corresponding to each refrigerator split, determining the refrigeration demand corresponding to each refrigerator split includes but is not limited to the following steps:

[0068] Step S210: Calculate the difference between the current temperature and the set temperature of each refrigerator unit to obtain the temperature difference;

[0069] In a specific embodiment, the current temperature and the set temperature parameters are substituted into the arithmetic rule formula, and the difference between the current temperature and the set temperature is first calculated to obtain the temperature difference, which is convenient for the subsequent calculation of the refrigeration demand. Under normal circumstances, the current temperature is higher than the set temperature. Therefore, when calculating, the current temperature is subtracted from the set temperature, and the temperature difference obtained is a value not less than zero. It is also possible to use the set temperature minus the current temperature, and the temperature difference obtained is less than zero. A value less than zero indicates that the temperature is below zero. When calculating the subsequent refrigeration demand, the sign is not taken, and the numerical value is directly used for calculation. In this way, the subsequent calculated refrigeration capacity is a value not less than zero, which is convenient for judging whether there is a refrigeration demand. For each refrigerator split, in order to make the calculation result a value not less than zero, the calculation of the above temperature difference can be expressed by the formula:

[0070] ΔT=|T xi -T yi |

[0071] Where ΔT is the temperature difference, T xi The i-th refrigerator split represents the current temperature, T yi Indicates the set temperature of the i-th refrigerator unit.

[0072] Step S220: multiplying the temperature difference by the volume of the refrigerator compartment to obtain the refrigeration demand.

[0073] In a specific embodiment, according to the temperature difference calculated in step S210, the temperature difference and the volume of the refrigerator are substituted into the arithmetic rule to calculate the refrigeration demand of each refrigerator, which is expressed as S i =V i *ΔT, where S i represents the cooling demand of the ith refrigerator, V irepresents the volume of the i-th refrigerator, and ΔT represents the temperature difference.

[0074] For example, the refrigeration demand calculated based on the parameter set temperature, current temperature and refrigerator split volume is shown in the following table:

[0075]

[0076] Step S300: determining a target split refrigerator unit according to the refrigeration demand corresponding to each split refrigerator unit, wherein the target split refrigerator unit represents a split refrigerator unit having a refrigeration demand.

[0077] In one embodiment, step S200 calculates the refrigeration demand of each refrigerator split. Since the values ​​of the above refrigeration demand are all not less than zero, when the refrigeration demand is not zero or is greater than zero, it means that the current temperature in the refrigerator split is greater than the set temperature. At this time, the refrigerator split is determined to require refrigeration, and the refrigerator split is determined as the target refrigerator split. The refrigeration demand is saved, which is conducive to the subsequent use of the refrigeration demand to calculate and determine the appropriate compressor operating frequency, thereby achieving the effect of saving electricity.

[0078] In another embodiment, after determining the refrigeration demand corresponding to each refrigerator split according to the state parameters corresponding to each refrigerator split, the refrigeration control method further includes: calculating the refrigeration demand of each refrigerator split according to step S200. Since the values ​​of the above refrigeration demand are all values ​​not less than zero, when the refrigeration demand corresponding to each of the refrigerator splits is zero, it means that the current temperature in the corresponding refrigerator split is equal to the set temperature, or the current temperature in the corresponding refrigerator split is equal to the preset shutdown temperature. At this time, the refrigerator split is determined to not require refrigeration, and the compressor is shut down to save electricity.

[0079] Step S400: Turn on the compressor and control the electric switching valve to connect the output pipeline corresponding to the target refrigerator split.

[0080] In one embodiment, a cooling demand is determined based on the obtained state parameters to determine which refrigerator compartments require cooling and which do not. The compressor and the electric switching valve are then activated. Since the output pipeline of the electric switching valve corresponds to the refrigerator compartment, the target refrigerator compartment is determined in step S300. The electric switching valve is adjusted so that the output pipeline of the electric switching valve communicates with the corresponding target refrigerator compartment, thereby achieving precise temperature control for each refrigerator compartment. This also facilitates subsequent calculation of the total cooling demand based on the cooling demand of the target refrigerator compartment, thereby enabling appropriate compressor operating efficiency settings.

[0081] In one specific embodiment, the compressor is turned on, and the electric switching valve is controlled to poll each refrigerator unit. If the current refrigerator unit does not require refrigeration, or if the cooling demand is zero, the output pipeline of the electric switching valve is disconnected from the refrigerator unit. If the currently polled refrigerator unit is the target refrigerator unit, the electric switching valve is controlled to connect the output pipeline corresponding to the target refrigerator unit, and cooling control is performed on the target refrigerator unit. By polling each refrigerator unit, accurate control of each refrigerator unit is achieved, and the polling time is short, completing the query within a few seconds.

[0082] In one embodiment, after the compressor is turned on and the electric switching valve is controlled to connect the output pipeline corresponding to the target refrigerator split, and before the operating frequency of the compressor is controlled according to the refrigeration demand corresponding to each target refrigerator split, each refrigerator split is polled by the electric switching valve. When the target refrigerator split is polled, the target refrigerator split is refrigerated. When the current temperature reaches the preset shutdown temperature, refrigeration is completed, and the electric switching valve is controlled to point to the next refrigerator split to refrigerate the next refrigerator split. The shutdown temperature can be a set temperature or a set appropriate operating temperature. It should be noted that when refrigeration is completed for the target refrigerator split and the electric switching valve points to the next refrigerator split, the total refrigeration demand will decrease, and the operating frequency of the compressor determined based on the total refrigeration demand will become smaller, thereby achieving the purpose of saving electricity.

[0083] In another embodiment, the electric switching valve is controlled to poll each refrigerator sub-unit, first determining the refrigerator sub-unit for initial query. This can be done by selecting a refrigerator sub-unit for initial query using a random algorithm, or by determining the initial query point based on the refrigeration demand of each target refrigerator sub-unit. Specifically, determining the initial query point based on the refrigeration demand of each target refrigerator sub-unit involves sorting the refrigeration demand values ​​stored in the communication, and selecting the target refrigerator sub-unit corresponding to the largest or smallest refrigeration demand value as the refrigerator sub-unit for initial query. When the target refrigerator sub-unit corresponding to the largest refrigeration demand value is selected for refrigeration, the total refrigeration demand value will be significantly reduced after refrigeration is completed, and the operating frequency of the compressor will be reduced to save power. When the target refrigerator sub-unit corresponding to the smallest refrigeration demand value is selected for refrigeration, the total refrigeration demand value will also be reduced after refrigeration is completed, and the operating frequency of the compressor will be maintained or reduced based on the total refrigeration demand value to save power.

[0084] Step S500: Control the operating frequency of the compressor according to the refrigeration demand corresponding to each target refrigerator unit.

[0085] In another embodiment, the refrigeration demand for each refrigerator unit is obtained according to steps S100 to S400. It should be noted that the refrigeration demand for refrigerator units without refrigeration demand is zero, which has little impact on the compressor's operating frequency. Based on the refrigeration demand of each target refrigerator unit, when refrigeration control for a target refrigerator unit is completed, the refrigeration demand of that target refrigerator unit is reduced, and the total refrigeration demand is reduced, so the compressor's operating frequency is adjusted down or maintained. When a refrigerator unit that does not require refrigeration is converted to a target refrigerator unit, the total refrigeration demand increases, so the compressor's operating frequency is adjusted up or maintained. This adjustment maintains the compressor at an appropriate operating frequency, thereby saving electricity. Adjusting the compressor's operating frequency involves adjusting its speed, and the speed can intuitively reflect the compressor's operating status.

[0086] like Figure 2 As shown, according to the refrigeration demand corresponding to each target refrigerator split, the operating frequency of the compressor is controlled, including but not limited to the following steps:

[0087] Step S510: calculating the total refrigeration demand according to the refrigeration demand corresponding to each target refrigerator unit.

[0088] In one embodiment, the cooling demands corresponding to each target refrigerator are added together to obtain a total cooling demand, which is advantageous for adjusting the operating frequency of the compressor using the total cooling demand to save electricity. The formula for calculating the total cooling demand based on the individual cooling demands is expressed as: Among them, S i represents the cooling demand of the i-th refrigerator unit, S represents the total cooling demand, and n represents the number of target refrigerator units. In another embodiment, a weighted summation is performed on the cooling demand corresponding to each target refrigerator unit, i.e., a correlation coefficient is set for each target refrigerator unit to obtain the total cooling demand. This allows the total cooling demand to be controlled within a certain range while still ensuring effective cooling of each target refrigerator unit.

[0089] Step S520 : determining the operating frequency of the compressor according to the total cooling demand and a preset frequency operation mapping table.

[0090] In one embodiment, the preset frequency operation mapping table is an operation frequency that can save electricity, which is set by experts based on experience. The frequency operation mapping table includes a preset demand interval and a preset operation frequency, such as Figure 3 As shown, according to the total cooling demand and the preset frequency operation mapping table, the operating frequency of the compressor is determined, including but not limited to the following steps:

[0091] Step S521: determine the demand range of the total cooling demand.

[0092] Step S522: Look up the operating frequency corresponding to the demand interval in the frequency operation mapping table, and use the operating frequency as the operating frequency of the compressor.

[0093] In a specific embodiment, the preset frequency operation mapping table is shown in the following table:

[0094]

[0095] In one embodiment, based on the total cooling demand obtained in step S510, the demand interval in which the total cooling demand falls is determined based on the demand intervals in the frequency operation mapping table. For example, if the total cooling demand is 2550, and referring to the frequency operation mapping table, this value is less than 3000 and greater than 2000, the compressor operating frequency corresponding to a value less than 3000 is determined, and the compressor frequency is adjusted to 900. Based on the cooling demand of each target refrigerator, the total cooling demand is obtained, and the corresponding compressor operating frequency is searched in the preset frequency operation mapping table, thereby saving electricity.

[0096] like Figure 5 As shown, the overall flow diagram of the refrigeration control method provided by an embodiment of the present application is as follows: First, the host communicates with each refrigerator split to obtain status parameters, including the refrigerator split volume, current temperature, and set temperature. The refrigeration demand of each refrigerator split is calculated based on the refrigerator split volume, current temperature, and set temperature. When the refrigeration demand of each refrigerator split is zero, it is determined that the refrigerator split does not require refrigeration, and the compressor is turned off. When the refrigeration demand of at least one refrigerator split is not zero, the refrigerator split that requires refrigeration is designated as the target refrigerator split, the compressor and the electric switching valve are turned on, and each refrigerator split is polled through the electric switching valve. When the target refrigerator split is found, the electric switching valve connects the output pipeline corresponding to the target refrigerator split, and the total refrigeration demand is calculated based on the refrigeration demand of each target refrigerator split. The optimal operating frequency is determined based on the total refrigeration demand using a frequency operation mapping table. The query time is short, and the total refrigeration demand is recalculated once with each query, thereby adjusting the optimal operating frequency of the compressor, thereby saving electricity.

[0097] Example 1: Take a cabinet refrigerator refrigeration system as an example and describe it with reference to the accompanying drawings.

[0098] Cabinet refrigerator structure Figure 6As shown, the refrigerated area 11, rice storage 12, frozen area 16, rare dry goods area 14, seasoning area 15, and wine and beverage area 13 are all distributed within the cabinet's storage space. The refrigerator is divided into a freezer and a refrigerator. The freezer is located in the refrigerated area 11, and the freezer is located in the freezer area 16. The refrigerator and freezer are connected, and the freezer is connected to the compressor. Through a series-parallel connection, this greatly improves the refrigerator's space utilization and achieves precise temperature control. There is at least one freezer and at least one refrigerator.

[0099] like Figure 7 As shown, Figure 7 Schematic diagram of a refrigeration system provided by an embodiment of the present application. The refrigeration system includes a compressor 110, a condenser 120, an anti-condensation pipe 130, a drying filter 140, an electric switching valve 150, and multiple refrigerator splits. The multiple refrigerator splits are distributed within the storage space of the cabinet. Each refrigerator split is equipped with a sensor, including a temperature sensor and a diameter sensor. The temperature sensor is used to detect the temperature of the refrigerator split, and the diameter sensor is used to measure the volume of the refrigerator split. The refrigerator split includes a freezer 1, a refrigerator 2, a refrigerator 3, and a refrigerator 4. Freezer 1, refrigerator 2, refrigerator 3, and refrigerator 4 are each connected to compressor 110. Compressor 110 is connected to electric switching valve 150 via condenser 120, anti-condensation pipe 130, and drying filter 140. Electric switching valve 150 is connected to multiple output pipelines, with each output pipeline corresponding to a refrigerator split. The refrigeration host controls the compressor 110 and the electric conversion valve 150 according to the information detected by the sensor, thereby controlling the temperature of each refrigerator split, realizing centralized refrigeration and distributed cooling; and polling each refrigerator split through the electric conversion valve 150, calculating the total refrigeration demand of each refrigerator split, adjusting the compressor 110 to operate at the optimal frequency, and reducing power consumption.

[0100] In one embodiment, the refrigeration system further includes an evaporator, a capillary tube, a condensing fan, a fan, and other components to achieve refrigeration. The compressor 110 and the condenser 120 and other components may also be placed outdoors to reduce noise generated by vibration of the compressor 110 during the refrigeration process.

[0101] Embodiment 2: The specific process of the refrigeration control method is described below using a freezer 1, a refrigerator 2, a refrigerator 3 and a refrigerator 4.

[0102] First, the refrigeration host communicates with freezer 1, refrigerator 2, refrigerator 3, and refrigerator 4, respectively, obtaining the status parameters of each refrigerator, including the refrigerator unit volume, current temperature, and set temperature (the preset shutdown temperature is the set temperature). The refrigeration demand for each refrigerator unit is calculated based on the refrigerator unit volume, current temperature, and set temperature of each refrigerator unit. For example, the refrigeration demand for freezer 1 is 3500, the refrigeration demand for refrigerator 2 is 0, the refrigeration demand for refrigerator 3 is 0, and the refrigeration demand for refrigerator 4 is 1500. If the refrigeration demand for freezer 1 and refrigerator 4 is not zero, it is determined that freezer 1 and refrigerator 4 require refrigeration. If the refrigeration demand for refrigerator 2 and refrigerator 3 is zero, it is determined that refrigerator 2 and refrigerator 3 do not require refrigeration. At this point, two refrigerator units require refrigeration, and the compressor and electric switching valve are turned on. The total refrigeration demand is the sum of the refrigeration demand of freezer 1 and the refrigeration demand of refrigerator 4. The calculated total refrigeration demand is 5000. According to the preset frequency operation mapping table, the operating frequency of the compressor is adjusted to 2300. Then, each refrigerator split is polled through the electric switching valve. According to the above calculation of the refrigeration demand, the refrigeration demand of freezer 1 is the largest. The polling starts from freezer 1 first, and the electric switching valve is controlled to connect to the output pipeline corresponding to freezer 1 to cool freezer 1. When the current temperature of freezer 1 reaches the set temperature, the electric switching valve is controlled to point to the next refrigerator split. Figure 7 As shown, the next refrigerator unit is refrigerator 2. At this time, the cooling demand of freezer 1 is 0, the cooling demand of refrigerator 2 is 0, the cooling demand of refrigerator 3 is 0, and the cooling demand of refrigerator 4 is 1500. The total cooling demand is recalculated to 1500, and the operating frequency of the compressor is adjusted to 600 according to the preset frequency operation mapping table. The cooling demand of refrigerator 2 is 0, and no cooling is required. At this time, the total cooling demand does not change, and the operating frequency of the compressor is maintained. The electric switching valve is controlled to point to the next refrigerator compartment, refrigerator compartment 3. In the next round of polling, the cooling demand of freezer compartment 1 and refrigerator compartment 2 is zero, the cooling demand of refrigerator compartment 3 is 2200, and the cooling demand of refrigerator compartment 4 is 1000. The total cooling demand is calculated to be 3200. The operating frequency of the compressor is adjusted to 1200 according to the frequency operation mapping table, and refrigerator compartment 3 is cooled. After cooling is completed, the electric switching valve is controlled to point to the next refrigerator compartment, refrigerator compartment 4, and the calculation is repeated. This operation not only accurately controls the temperature of each refrigerator compartment, but also ensures that the compressor runs at the optimal operating frequency after each polling, thereby reducing energy consumption and saving electricity. The above query time for the cooling demand of each refrigerator compartment is short, completing within a few seconds. Through uninterrupted communication and querying, the compressor can be adjusted to the optimal operating frequency.

[0103] like Figure 8 As shown, Figure 8 It is a schematic diagram of the system architecture platform of the refrigeration control method provided in one embodiment of the present application.

[0104] The system architecture platform 1000 of the embodiment of the present application includes one or more processors 1001 and a memory 1002. Figure 8 In the figure, a processor 1001 and a memory 1002 are taken as an example.

[0105] The processor 1001 and the memory 1002 may be connected via a bus or other means. Figure 8 The bus connection is taken as an example.

[0106] The memory 1002 is a non-transitory computer-readable storage medium that can be used to store non-transitory software programs and non-transitory computer executable programs. In addition, the memory 1002 may include a high-speed random access memory, and may also include a non-transitory memory, such as at least one disk storage device, a flash memory device, or other non-transitory solid-state storage device. In some embodiments, the memory 1002 may optionally include a memory 1002 remotely located relative to the processor 1001, and these remote memories may be connected to the system architecture platform 1000 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0107] Those skilled in the art will understand that Figure 8 The device structure shown in the figure does not constitute a limitation on the system architecture platform 1000, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.

[0108] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, i.e., they may be located in one place or distributed across multiple network nodes. Some or all of the modules may be selected based on actual needs to achieve the objectives of this embodiment.

[0109] In addition, an embodiment of the present application further provides a refrigeration system, including: a memory, a processor, and a computer program stored in the memory and executable on the processor. The processor and the memory may be connected via a bus or other means.

[0110] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely arranged relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0111] The non-transient software program and instructions required to implement the refrigeration control method of the above embodiment are stored in the memory. When executed by the processor, the refrigeration control method of the above embodiment is executed, for example, the above-described Figure 1 Method steps S100 to S500, Figure 2 Method steps S510 and S520, Figure 3 Method steps S521 and S522, Figure 4 Method steps S210 and S220 in .

[0112] It is worth noting that since the refrigeration system of the embodiment of the present application can execute the refrigeration control method of the above embodiment, the specific implementation methods and technical effects of the refrigeration system of the embodiment of the present application can refer to the specific implementation methods and technical effects of the refrigeration control method of any of the above embodiments.

[0113] The device embodiments or system embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, i.e., they may be located in one place or distributed across multiple network units. Some or all of the modules may be selected based on actual needs to achieve the objectives of the present embodiments.

[0114] In addition, an embodiment of the present application further provides a computer-readable storage medium, which stores computer-executable instructions. The computer-executable instructions are executed by a processor or controller, for example, to execute the above-described Figure 1 Method steps S100 to S500, Figure 2 Method steps S510 and S520, Figure 3 Method steps S521 and S522, Figure 4 Method steps S210 and S220 in .

[0115] Those skilled in the art will appreciate that all or some of the steps and systems in the method disclosed above can be implemented as software, firmware, hardware, and appropriate combinations thereof. Some physical components or all physical components can be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software can be distributed on a computer-readable medium, and the computer-readable medium can include a computer-readable storage medium (or non-transitory medium) and a communication medium (or temporary medium). As known to those skilled in the art, the term computer-readable storage medium is included in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data) and is volatile and non-volatile, removable, and non-removable. Computer-readable storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory, or other memory technology, CD-ROM, digital versatile disks (DVD), or other optical disk storage, magnetic cassettes, magnetic tapes, magnetic disk storage, or other magnetic storage devices, or any other medium that can be used to store desired information and can be accessed by a computer. Furthermore, as is well known to those skilled in the art, communication media typically embodies computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0116] The above is a specific description of the preferred implementation of the present application, but the present application is not limited to the above implementation mode. Technical personnel familiar with the field can also make various equivalent modifications or substitutions without violating the spirit of the present application. These equivalent modifications or substitutions are all included in the scope defined by the claims of the present application.

Claims

1. A refrigeration control method, characterized in that: Applied to a refrigeration system, the refrigeration system includes a refrigeration main unit and a plurality of refrigerator splits, the refrigeration main unit includes a compressor, the compressor is connected to a plurality of output pipelines through an electric conversion valve, one of the output pipelines is correspondingly connected to one of the refrigerator splits, the refrigeration control method includes: Obtaining status parameters corresponding to each of the refrigerator components; Determining the refrigeration demand corresponding to each of the refrigerator splits according to the state parameters corresponding to each of the refrigerator splits; Determining a target refrigerator split according to the refrigeration demand corresponding to each of the refrigerator splits, wherein the target refrigerator split represents the refrigerator split with refrigeration demand; Turning on the compressor and controlling the electric conversion valve to connect to the output pipeline corresponding to the target refrigerator split; The operating frequency of the compressor is controlled according to the refrigeration demand corresponding to each of the target refrigerator parts.

2. The refrigeration control method according to claim 1, characterized in that: The controlling the operating frequency of the compressor according to the refrigeration demand corresponding to each of the target refrigerator units includes: Calculate the total refrigeration demand according to the refrigeration demand corresponding to each of the target refrigerator parts; The operating frequency of the compressor is determined according to the total refrigeration demand and a preset frequency operation mapping table.

3. The refrigeration control method according to claim 2, characterized in that: The frequency operation mapping table includes a preset demand interval and a preset operation frequency; Determining the operating frequency of the compressor according to the total refrigeration demand and a preset frequency operation mapping table includes: Determine the demand interval in which the total refrigeration demand falls; The operating frequency corresponding to the demand interval is searched in the frequency operation mapping table, and the operating frequency is used as the operating frequency of the compressor.

4. The refrigeration control method according to claim 1, characterized in that: The state parameters include set temperature, current temperature and refrigerator volume; The determining, according to the state parameters corresponding to the refrigerator sub-units, the refrigeration demand corresponding to the refrigerator sub-units comprises: For each of the refrigerator components, calculating the difference between the current temperature and the set temperature to obtain a temperature difference; The temperature difference and the volume of the refrigerator are multiplied to obtain the refrigeration demand.

5. The refrigeration control method according to claim 1, characterized in that: The step of determining a target refrigerator sub-unit according to the refrigeration demand corresponding to each refrigerator sub-unit comprises: When the refrigeration demand is not zero, the refrigerator subunit corresponding to the refrigeration demand is determined as the target refrigerator subunit.

6. The refrigeration control method according to claim 1, characterized in that: After determining the refrigeration demand corresponding to each of the refrigerator split units according to the state parameters corresponding to each of the refrigerator split units, the refrigeration control method further includes: When the refrigeration demand corresponding to each of the refrigerator splits is zero, the compressor is controlled to be in an off state.

7. The refrigeration control method according to claim 2, characterized in that: The calculating the total refrigeration demand according to the refrigeration demand corresponding to each of the target refrigerator parts includes: The refrigeration demand corresponding to each of the target refrigerator parts is weightedly summed to obtain the total refrigeration demand.

8. The refrigeration control method according to claim 1, characterized in that: The step of starting the compressor and controlling the electric conversion valve to connect to the output pipeline corresponding to the target refrigerator split includes: The compressor is turned on, and the electric conversion valve is controlled to poll each of the refrigerator splits. When the currently polled refrigerator split is the target refrigerator split, the electric conversion valve is controlled to connect to the output pipeline corresponding to the currently polled refrigerator split.

9. The refrigeration control method according to claim 8, characterized in that: After turning on the compressor and controlling the electric conversion valve to connect the output pipeline corresponding to the target refrigerator split, and before controlling the operating frequency of the compressor according to the refrigeration demand corresponding to each of the target refrigerator splits, the refrigeration control method further includes: When the current temperature of the target refrigerator subunit reaches a preset shutdown temperature, the electric switching valve is controlled to point to the next refrigerator subunit.

10. The refrigeration control method according to any one of claims 1 to 9, characterized in that: The refrigerator body comprises a freezer and a refrigerator, the number of the freezer and the refrigerator are at least one respectively, and the freezer and the refrigerator are distributed in the storage space of the cabinet.

11. A refrigeration system comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the refrigeration control method according to any one of claims 1 to 10 when executing the computer program.

12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to enable a computer to execute the refrigeration control method according to any one of claims 1 to 10.

Citation Information

Patent Citations

  • Refrigerator control method and refrigerator control system

    CN107726700A

  • Refrigeration control method and device of refrigerator, controller and refrigerator

    CN112665299A

  • Refrigeration control method of refrigerator, refrigerator, computer device and computer readable storage medium

    CN113340048A

  • Refrigeration equipment and control method thereof, storage medium and processor

    CN114234549A

  • Refrigerating system

    JP2013231533A