A method, device and equipment for analyzing the impact of water diversion and regulation projects on downstream water intake
By obtaining and analyzing the water intake statistical data of the water diversion and diversion project, the saline intrusion statistical model is used to evaluate the impact of the water diversion and diversion project on downstream water intake, solving the problem of how to evaluate the impact of the water diversion and diversion project on downstream water intake, and achieving the stability and reliability of water intake.
Patent Information
- Application Number
- CN202411000165.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2044-07-24
AI Technical Summary
How to evaluate the impact of water diversion and diversion projects on downstream water withdrawal and ensure the stability and reliability of water withdrawal.
By obtaining statistical data of the water intake port of the water diversion project, including salinity of the day, salinity of the previous day, average daily flow, maximum daily tide difference and average daily salinity, the salinity of the brine intrusion statistical model is used to generate saline intrusion values, evaluate the moving distance between the affected area of the salt tide and the junction line of the salt freshwater, calculate the water intake amount and water shortage rate, and finally generate the minimum water shortage rate to describe the impact of the water diversion project on downstream water intake.
A scientific assessment of the impact of water diversion and diversion projects on downstream water intake was achieved, ensuring the stability and reliability of water intake, and helping to ensure the normal operation of downstream water supply systems.
Smart Images

Figure CN119067347B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of Internet technology, and in particular to a method, device and equipment for analyzing the impact of a water diversion project on downstream water intake. Background Art
[0002] Water resources are important natural and economic resources. Water diversion projects are key measures to optimize the allocation of water resources, solve the problem of water shortage in urban life and production, and improve the level of water supply security.
[0003] The construction of water diversion and regulation projects can effectively change the single water supply pattern of urban water intake. While solving the water shortage for economic development in various cities, it can improve the city’s water supply security and emergency backup guarantee capabilities. It can also appropriately improve the ecological environment of downstream rivers during the dry season, and plays an important role in maintaining regional urban water supply security and economic and social sustainable development.
[0004] In order to meet the water intake requirements after the completion of the water diversion and regulation project, it is necessary to conduct research on the impact of the water diversion and regulation project on downstream water supply. Therefore, how to evaluate the impact of the water diversion and regulation project on downstream water intake is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The embodiments of the present application provide a method, device and equipment for analyzing the impact of a water diversion project on downstream water intake, so as to solve the above-mentioned technical problem of how to evaluate the impact of a water diversion project on downstream water intake.
[0006] In a first aspect, an embodiment of the present application provides a method for analyzing the impact of a water diversion project on downstream water intake, which is applied to electronic equipment. The method for analyzing the impact includes:
[0007] Obtain the salinity of the water intake of the water diversion project on the day before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity, where the salinity on the day before water diversion is the salinity of the river water flowing into the water intake on the day before water diversion, and the salinity of the previous day is the salinity of the river water on the previous day;
[0008] Generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, the wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value;
[0009] When the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide;
[0010] Obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0011] When the first distance is less than the preset second distance, obtaining the water intake time of the water intake after the water transfer, the water intake time being the time for taking the river water within the preset time period;
[0012] Acquire the water intake speed of the water intake port, and obtain the water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0013] Obtain the water demand of the water demand area of the downstream water supply system in the time period, and generate a minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model for the water shortage rate.
[0014] Exemplarily, the saltwater intrusion statistical model is:
[0015] S=a*e -bQ +c*H+d*G+r;
[0016] Among them, S is the salinity of the day, Qi is the average daily flow rate; H is the maximum daily tidal range; G is the salinity of the previous day; r is the wind speed correction term, and a, b, c, and d are preset coefficients.
[0017] Exemplarily, the water shortage rate generation model is:
[0018]
[0019] Where, f is the minimum water shortage rate, D kt is the water demand of the kth water demand area in the tth time period, q t is the water intake of the water intake in the tth time period, t∈[1,T], T is the number of the time periods, t is the sequence number of the time periods, k∈[1,M], k is the sequence number of the water demand area, M is the number of the water demand areas, and min is the minimization function.
[0020] In a possible implementation of the first aspect, obtaining statistical data of a water intake of a water diversion and regulation project before water diversion includes:
[0021] Obtaining a preset statistical time, and obtaining the runoff data, tide level data, and salinity data of the water intake before water diversion;
[0022] In the salinity data, the salinity of the current day and the salinity of the previous day are obtained;
[0023] Determine the average daily flow rate according to the runoff data and the statistical time;
[0024] Determining the daily maximum tidal range according to the tidal level data and the statistical time;
[0025] The daily average salinity is determined according to the salinity data and the statistical time.
[0026] In a possible implementation of the first aspect, when the saltwater intrusion value is less than a first preset value, obtaining an impact area of saltwater tide upstream includes:
[0027] Determining whether the salt water intrusion value is less than the first preset value;
[0028] When the saltwater intrusion value is less than the first preset value, the average daily flow, the maximum daily tidal range, the average daily salinity, and the saltwater intrusion value are input into a preset ocean numerical model to obtain the impact area of the saltwater tide output by the ocean numerical model.
[0029] In a possible implementation manner of the first aspect, obtaining a first distance moved from a salt-fresh water boundary line to the water intake in the impact area includes:
[0030] Obtaining the water intake area of the water intake, and determining whether there is an overlapping area between the impact area and the water intake area;
[0031] If there is an overlapping area between the impact area and the water area, the first distance of the fresh-salt water boundary moving toward the water intake is obtained in the overlapping area, and the overlapping area is a partial area of the impact area.
[0032] In a possible implementation of the first aspect, acquiring a water intake speed of the water intake, and obtaining a water intake amount of the water intake in the time period according to a product of the water intake speed and the water intake time, includes:
[0033] Acquire a water intake rate of the water intake, where the water intake rate is a ratio of the water intake time to the time period;
[0034] Determining whether the de-blurring rate is greater than a second preset value;
[0035] If the desalination rate is greater than the second preset value, obtaining the water intake speed of the water intake port;
[0036] The water intake volume of the water intake port in the time period is obtained according to the product of the water intake speed and the water intake time.
[0037] In a possible implementation manner of the first aspect, after obtaining the water demand of the water demand area of the downstream water supply system in the time period, and generating the minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas, and a preset water shortage rate generation model, the impact analysis method further includes:
[0038] Obtain the water storage capacity of the reservoir corresponding to the water intake within the time period.
[0039] In a possible implementation manner of the first aspect, after obtaining the water demand of the water demand area of the downstream water supply system in the time period, and generating the minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas, and a preset water shortage rate generation model, the impact analysis method further includes:
[0040] The water replenishment amount of the reservoir corresponding to the water intake within the time period is obtained, where the water replenishment amount is the amount of water supplemented by the reservoir to the downstream water supply system.
[0041] In a possible implementation manner of the first aspect, obtaining the water replenishment amount of the reservoir corresponding to the water intake within the time period includes:
[0042] Determining whether the minimum water shortage rate is greater than a third preset value;
[0043] If the minimum water shortage rate is greater than the third preset value, the water replenishment volume of the reservoir corresponding to the water intake within the time period is obtained.
[0044] In a second aspect, an embodiment of the present application provides a device for analyzing the impact of a water diversion project on downstream water intake, which is applied to electronic equipment, including:
[0045] The first acquisition module is used to obtain the salinity of the water intake of the water diversion project before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity, wherein the salinity of the current day is the salinity of the river water flowing into the water intake on the current day, and the salinity of the previous day is the salinity of the river water on the previous day;
[0046] A first generating module is used to generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, a wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generating model of the saltwater intrusion value;
[0047] A second acquisition module is used to acquire the impact area of the saltwater intrusion when the saltwater intrusion value is less than the first preset value;
[0048] A third acquisition module is used to acquire a first distance of a salt-fresh water boundary line moving from the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0049] A fourth acquisition module, configured to acquire the water intake time of the water intake after the water transfer when the first distance is less than a preset second distance, wherein the water intake time is the time for taking the river water within a preset time period;
[0050] A fifth acquisition module, used to acquire the water intake speed of the water intake port, and obtain the water intake volume of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0051] The second generating module is used to obtain the water demand of the water demand area of the downstream water supply system in the said time period, and generate a minimum water shortage rate according to the said water demand, the said water intake, the number of the said time periods, the number of the said water demand areas and a preset water shortage rate generating model. The said minimum water shortage rate is used to describe the minimum impact of the said water diversion and regulation project on the said water demand area, and the said water shortage rate generating model is a generation model of the said water shortage rate.
[0052] In a third aspect, an embodiment of the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any one of the impact analysis methods of the first aspect when executing the computer program.
[0053] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the impact analysis method of any one of the above-mentioned first aspects is implemented.
[0054] In a fifth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the impact analysis method described in any one of the above-mentioned first aspects.
[0055] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, the water demand of the water demand area of the downstream water supply system in the time period is obtained, and the minimum water shortage rate is generated according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate. Therefore, the electronic device can evaluate the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate. On the other hand, evaluating the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate helps to ensure the stability and reliability of the downstream water intake. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0057] Figure 1 An application scenario diagram of the impact analysis method provided in the embodiment of the present application;
[0058] Figure 2 It is a flowchart of the impact analysis method provided in the embodiment of the present application;
[0059] Figure 3 A flowchart showing the processing results of a list provided in an embodiment of the present application;
[0060] Figure 4 A schematic block diagram of an impact analysis device provided in an embodiment of the present application;
[0061] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0063] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0064] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0065] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0066] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0067] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0068] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0069] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0070] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.
[0071] The impact analysis method provided in the embodiments of the present application can be applied to electronic devices such as mobile phones, tablet computers, wearable devices, vehicle-mounted devices, augmented reality (AR) / virtual reality (VR) devices, laptop computers, ultra-mobile personal computers (UMPCs), netbooks, personal digital assistants (PDAs), etc. The embodiments of the present application do not impose any restrictions on the specific types of electronic devices.
[0072] For example, the electronic device may be a station (STAION, ST) in a WLAN, a cellular phone, a cordless phone, a Session Initiation Protocol (SIP) phone, a Wireless Local Loop (WLL) station, a Personal Digital Assistant (PDA) device, a handheld device with wireless communication function, a computing device or other processing device connected to a wireless modem, a vehicle-mounted device, a vehicle networking terminal, a computer, a laptop computer, a handheld communication device, a handheld computing device, a satellite wireless device, a wireless modem card, a TV set top box (STB), a customer premises equipment (CPE) and / or other devices for communicating on a wireless system and a next generation communication system, for example, a mobile terminal in a 5G network or a mobile terminal in a future evolved Public Land Mobile Network (PLMN) network, etc.
[0073] See also Figure 1 , Figure 1 The generalized diagram of the water supply system provided in the embodiment of the present application is described as follows:
[0074] Among them, the generalized map of the water supply system includes waterways, water intakes, reservoirs, water plants and water demand areas.
[0075] The water intake draws river water from the waterway, the water intake transports river water to the reservoir, the reservoir transports river water to the water plant, and the water plant transports purified river water to the water-demanding area.
[0076] When the water diversion and regulation project involves this waterway, the electronic device obtains the salinity of the water intake of the water diversion and regulation project on the day before water diversion, the salinity of the previous day, the average daily flow, the daily maximum tidal range and the average daily salinity. The salinity on the day is the salinity of the river water flowing into the water intake on the day, and the salinity on the previous day is the salinity of the river water on the previous day.
[0077] Among them, the salinity of the day, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity can come from one database or from multiple databases.
[0078] For ease of explanation, two databases are used as examples, as detailed below:
[0079] The two databases include database A and database B. The electronic device is connected to database A and database B respectively, and obtains the salinity of the day, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity from database A and database B.
[0080] In an embodiment of the present application, the electronic device can be connected to different databases at the same time to obtain the salinity of the day, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity from the different databases.
[0081] See also Figure 2 , Figure 2 It is a flow chart of the impact analysis method provided in an embodiment of the present application, which can be applied to electronic devices.
[0082] like Figure 2 As shown, the impact analysis method provided in the embodiment of the present application includes the following steps, which are described in detail as follows:
[0083] S201, obtaining the salinity of the water intake of the water diversion project on the current day, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity before water diversion, wherein the salinity on the current day is the salinity of the river water flowing into the water intake on the current day, and the salinity of the previous day is the salinity of the river water on the previous day;
[0084] The dispatching and operation of the water diversion project is based on the water inflow of the upstream water conservancy hub station S. Project 1 is an unbuilt water diversion project and does not take water; Project 2 is a built water diversion project, with the water intake location at intake 1 and the water intake flow rate of Am3 / s.
[0085] For ease of explanation, refer to Table 1, which is a design engineering table, as detailed below:
[0086]
[0087] The obtaining of statistical data of the water intake of the water diversion project before water diversion includes:
[0088] Obtaining a preset statistical time, and obtaining the runoff data, tide level data, and salinity data of the water intake before water diversion;
[0089] In the salinity data, the salinity of the current day and the salinity of the previous day are obtained;
[0090] Determine the average daily flow rate according to the runoff data and the statistical time;
[0091] Determining the daily maximum tidal range according to the tidal level data and the statistical time;
[0092] The daily average salinity is determined according to the salinity data and the statistical time.
[0093] S202, generating a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, a wind speed correction term, and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value;
[0094] The larger the saltwater intrusion value is, the more serious the degree of the saltwater intrusion into the river water is; and the smaller the saltwater intrusion value is, the less serious the degree of the saltwater intrusion into the river water is.
[0095] Exemplarily, the saltwater intrusion statistical model is:
[0096] S=a*e -bQ +c*H+d*G+r;
[0097] Among them, S is the salinity of the day, Qi is the average daily flow rate; H is the maximum daily tidal range; G is the salinity of the previous day; r is the wind speed correction term, and a, b, c, and d are preset coefficients.
[0098] Among them, when the wind direction is in the positive direction, the wind speed correction term is a positive value, and when the wind direction is in the negative direction, the wind speed correction term is a negative value.
[0099] The positive direction is set by the user or by the system by default and is not restricted here.
[0100] Among them, a, b, c, and d are set by the user or by the system by default and are not limited here.
[0101] For the sake of illustration, an example is given below:
[0102] For example, a = 2.5, b = 0.00015, c = -0.65, d = 0.63, r = -0.63, then the obtained saltwater intrusion statistical model is:
[0103] S=2.5*e- 0.00015Q -0.65*H+0.63*G-0.63;
[0104] For the sake of illustration, an example is given below:
[0105] For example, a = 2.5, b = 0.00016, c = -0.65, d = 0.63, r = 0.7, then the obtained saltwater intrusion statistical model is:
[0106] S=2.5*e- 0.00016Q -0.65*H+0.63*G+0.7;
[0107] Among them, the salt water intrusion value of the water intake is stored in a preset file for subsequent retrieval.
[0108] S203, when the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide;
[0109] S204, obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0110] Wherein, obtaining the first distance of the salt-fresh water boundary line moving toward the water intake in the affected area includes:
[0111] Obtaining the water intake area of the water intake, and determining whether there is an overlapping area between the impact area and the water intake area;
[0112] If there is an overlapping area between the impact area and the water area, the first distance of the fresh-salt water boundary moving toward the water intake is obtained in the overlapping area, and the overlapping area is a partial area of the impact area.
[0113] S205, when the first distance is less than a preset second distance, obtaining the water intake time of the water intake after the water transfer, the water intake time being the time for taking the river water within a preset time period;
[0114] S206, obtaining the water intake speed of the water intake port, and obtaining the water intake volume of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0115] Wherein, obtaining the water intake speed of the water intake port, and obtaining the water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time, comprises:
[0116] Acquire a water intake rate of the water intake, where the water intake rate is a ratio of the water intake time to the time period;
[0117] Determining whether the de-blurring rate is greater than a second preset value;
[0118] If the desalination rate is greater than the second preset value, obtaining the water intake speed of the water intake port;
[0119] The water intake volume of the water intake port in the time period is obtained according to the product of the water intake speed and the water intake time.
[0120] For the sake of explanation, the waterway is taken as SD waterway and the water diversion project is taken as Project 2 as an example. The following are some examples:
[0121] The desalination rate before water diversion in the water diversion project is referred to as the pre-project desalination rate.
[0122] The desalination rate after water diversion in the water diversion project is referred to as the post-project desalination rate.
[0123] The SD waterway has multiple water intakes, and the multiple water intakes are respectively water intake 1, water intake 2, and water intake 3.
[0124] The desalination rates before the project at water intake 1, water intake 2, and water intake 3 are reduced by 0.93%, 0.32%, and 1.68% respectively compared with the desalination rates after the project at water intake 1, water intake 2, and water intake 3.
[0125] Therefore, Project 2 has little impact on the desalination rates of Intake 1, Intake 2, and Intake 3.
[0126] When the designed inflow of Project 2 at Station S is X1 m3 / s, the fresh and salt water boundary line of the SD waterway moves up by about 0.42 km, that is, the first distance is 0.42 km.
[0127] Among them, water intake 1, water intake 2, and water intake 3 are different water intakes.
[0128] For the sake of explanation, refer to Table 2, which is a table showing the variation of the dilution rate, as detailed below:
[0129]
[0130] S207, obtaining the water demand of the water demand area of the downstream water supply system in the time period, and generating a minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate.
[0131] Among them, the larger the minimum water shortage rate is, the greater the minimum impact of the water diversion and regulation project on the water demand area is, and the smaller the minimum water shortage rate is, the smaller the minimum impact of the water diversion and regulation project on the water demand area is.
[0132] Exemplarily, the water shortage rate generation model is:
[0133]
[0134] Where, f is the minimum water shortage rate, D kt is the water demand of the kth water demand area in the tth time period, q t is the water intake of the water intake in the tth time period, t∈[1,T], T is the number of the time periods, t is the sequence number of the time periods, k∈[1,M], k is the sequence number of the water demand area, M is the number of the water demand areas, and min is the minimization function.
[0135] The time period is set by the user or by system default and is not restricted here.
[0136] For ease of explanation, the time period is month, as follows:
[0137] For example, when the number of time periods is set to 3, the first time period is January of this year, the second time period is February of this year, and the third time period is March of this year.
[0138] For example, when the number of time periods is set to 5, the first time period is November of this year, the second time period is December of this year, the third time period is January of next year, the fourth time period is February of next year, and the third time period is March of next year.
[0139] Wherein, after obtaining the water demand of the water demand area of the downstream water supply system in the time period, generating the minimum water shortage rate according to the water demand, the water intake, the number of the time period, the number of the water demand areas and a preset water shortage rate generation model, the impact analysis method further includes:
[0140] Step A, obtaining the water storage capacity of the reservoir corresponding to the water intake within the time period.
[0141] Wherein, after obtaining the water demand of the water demand area of the downstream water supply system in the time period, generating the minimum water shortage rate according to the water demand, the water intake, the number of the time period, the number of the water demand areas and a preset water shortage rate generation model, the impact analysis method further includes:
[0142] Step B, obtaining the water replenishment amount of the reservoir corresponding to the water intake within the time period, wherein the water replenishment amount is the amount of water supplemented by the reservoir to the downstream water supply system.
[0143] Wherein, obtaining the water replenishment amount of the reservoir corresponding to the water intake within the time period includes:
[0144] Determining whether the minimum water shortage rate is greater than a third preset value;
[0145] If the minimum water shortage rate is greater than the third preset value, the water replenishment volume of the reservoir corresponding to the water intake within the time period is obtained.
[0146] Step B may be executed before or after step A, or simultaneously with step A. The specific execution order is not limited here.
[0147] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, the water demand of the water demand area of the downstream water supply system in the time period is obtained, and the minimum water shortage rate is generated according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate. Therefore, the electronic device can evaluate the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate. On the other hand, evaluating the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate helps to ensure the stability and reliability of the downstream water intake.
[0148] See also Figure 3 , Figure 3 The flowchart of the display list processing result provided in the embodiment of the present application is described in detail as follows:
[0149] S301, determining whether the salt water intrusion value is less than the first preset value;
[0150] S302, when the saltwater intrusion value is less than the first preset value, the average daily flow, the daily maximum tidal range, the average daily salinity, and the saltwater intrusion value are input into a preset ocean numerical model to obtain the impact area of the saltwater tide output by the ocean numerical model.
[0151] The ocean numerical model includes any one of FVCOM, ROMS and ECOM.
[0152] Among them, FVCOM (Finite Volume Coastal Ocean Model) is a complex numerical model used to simulate ocean and coastal areas.
[0153] Among them, ROMS (Regional Ocean Modeling System) is a numerical model widely used to simulate ocean and offshore environments.
[0154] Among them, ECOM (Estuarine and Coastal Ocean Model) is a numerical model specially used for simulating estuaries and nearshore waters.
[0155] In the embodiment of the present application, determining the impact area of the saltwater tide upstream output by the ocean numerical model can formulate more effective water resource protection and rational utilization policies and promote the sustainable use of water resources.
[0156] For the impact analysis method described in the above embodiment, please refer to Figure 4 , Figure 4 A schematic block diagram of an impact analysis device provided in an embodiment of the present application, Figure 4 The impact analysis device 400 shown can be applied to Figure 1 The electronic device in the application scenario diagram shown below takes the electronic device as an example. Figure 4 The impact analysis device 400 shown is described in detail. The impact analysis device 400 may include a first acquisition module 401, a first generation module 402, a second acquisition module 403, a third acquisition module 404, a fourth acquisition module 405, a fifth acquisition module 406, and a second generation module 407.
[0157] The first acquisition module 401 is used to obtain the salinity of the water intake of the water diversion project before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity, wherein the salinity of the current day is the salinity of the river water flowing into the water intake on the current day, and the salinity of the previous day is the salinity of the river water on the previous day;
[0158] A first generating module 402 is used to generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, a wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generating model of the saltwater intrusion value;
[0159] The second acquisition module 403 is used to acquire the impact area of the saltwater intrusion when the saltwater intrusion value is less than the first preset value;
[0160] A third acquisition module 404 is used to acquire, in the affected area, a first distance of a salt-fresh water boundary line moving toward the water intake, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0161] The fourth acquisition module 405 is used to acquire the water intake time of the water intake after the water transfer when the first distance is less than the preset second distance, and the water intake time is the time for taking the river water within the preset time period;
[0162] A fifth acquisition module 406 is used to acquire a water intake speed of the water intake port, and obtain a water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0163] The second generation module 407 is used to obtain the water demand of the water demand area of the downstream water supply system in the time period, and generate a minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate.
[0164] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0165] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, the water demand of the water demand area of the downstream water supply system in the time period is obtained, and the minimum water shortage rate is generated according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate. Therefore, the electronic device can evaluate the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate. On the other hand, evaluating the impact of the water diversion and regulation project on the downstream water intake based on the minimum water shortage rate helps to ensure the stability and reliability of the downstream water intake.
[0166] See also Figure 5 , Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0167] like Figure 5 As shown, Figure 5 The electronic device 2 includes: at least one processor 20, a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20, and when the processor 20 executes the computer program 22, the steps in any of the above-mentioned method embodiments are implemented.
[0168] The electronic device 2 may include, but is not limited to, a processor 20 and a memory 21. Those skilled in the art will appreciate that Figure 5 It is only an example of the electronic device 2 and does not constitute a limitation on the electronic device 2. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.
[0169] The processor 20 is used to run the computer program 22 stored in the memory 21, and implement the following steps when executing the computer program 22:
[0170] Obtain the salinity of the water intake of the water diversion project on the day before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity, where the salinity on the day before water diversion is the salinity of the river water flowing into the water intake on the day before water diversion, and the salinity of the previous day is the salinity of the river water on the previous day;
[0171] Generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, the wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value;
[0172] When the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide;
[0173] Obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0174] When the first distance is less than the preset second distance, the water intake time of the water intake after water diversion is obtained, and the water intake time is the time for taking the river water within a preset time period; the water intake speed of the water intake is obtained, and the water intake of the water intake in the time period is obtained according to the product of the water intake speed and the water intake time; the water demand of the water demanding area of the downstream water supply system in the time period is obtained, and a minimum water shortage rate is generated according to the water demand, the water intake, the number of the time periods, the number of the water demanding areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion project on the water demanding area, and the water shortage rate generation model is a water shortage rate generation model.
[0175] In some embodiments, the processor 20 is configured to implement:
[0176] Obtaining a preset statistical time, and obtaining the runoff data, tide level data, and salinity data of the water intake before water diversion;
[0177] In the salinity data, the salinity of the current day and the salinity of the previous day are obtained;
[0178] Determine the average daily flow rate according to the runoff data and the statistical time;
[0179] Determining the daily maximum tidal range according to the tidal level data and the statistical time;
[0180] The daily average salinity is determined according to the salinity data and the statistical time.
[0181] In some embodiments, the processor 20 is used to implement: determining whether the salt water intrusion value is less than the first preset value;
[0182] When the saltwater intrusion value is less than the first preset value, the average daily flow, the maximum daily tidal range, the average daily salinity, and the saltwater intrusion value are input into a preset ocean numerical model to obtain the impact area of the saltwater tide output by the ocean numerical model.
[0183] In some embodiments, the processor 20 is used to implement: obtaining the water intake area of the water intake, and determining whether there is an overlapping area between the affected area and the water intake area;
[0184] If there is an overlapping area between the impact area and the water area, the first distance of the fresh-salt water boundary moving toward the water intake is obtained in the overlapping area, and the overlapping area is a partial area of the impact area.
[0185] In some embodiments, the processor 20 is used to implement: obtaining a water intake rate of the water intake, wherein the water intake rate is a ratio of the water intake time to the time period;
[0186] Determining whether the de-blurring rate is greater than a second preset value;
[0187] If the desalination rate is greater than the second preset value, obtaining the water intake speed of the water intake port;
[0188] The water intake volume of the water intake port in the time period is obtained according to the product of the water intake speed and the water intake time.
[0189] In some embodiments, the processor 20 is used to implement: obtaining the water storage capacity of the reservoir corresponding to the water intake within the time period.
[0190] In some embodiments, the processor 20 is configured to implement:
[0191] The water replenishment amount of the reservoir corresponding to the water intake within the time period is obtained, where the water replenishment amount is the amount of water supplemented by the reservoir to the downstream water supply system.
[0192] In some embodiments, the processor 20 is used to implement: determining whether the minimum water shortage rate is greater than a third preset value;
[0193] If the minimum water shortage rate is greater than the third preset value, the water replenishment volume of the reservoir corresponding to the water intake within the time period is obtained.
[0194] The processor 20 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0195] In some embodiments, the memory 21 may be an internal storage unit of the electronic device 2, such as a hard disk or memory of the electronic device 2. In other embodiments, the memory 21 may also be an external storage device of the electronic device 2, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 2. Further, the memory 21 may also include both an internal storage unit of the electronic device 2 and an external storage device. The memory 21 is used to store an operating system, an application program, a boot loader (Boot Loader), data, and other programs, such as the program code of the computer program, etc. The memory 21 may also be used to temporarily store data that has been output or is to be output.
[0196] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0197] An embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.
[0198] The computer-readable storage medium stores program codes, which can be called by a processor to execute the impact analysis method described in the above method embodiment.
[0199] The computer-readable storage medium has a storage space for program codes.
[0200] The program code includes the code of any step in the impact analysis method described in the above method embodiment.
[0201] For example, the program code is called by the processor and can execute the following steps:
[0202] Obtain the salinity of the water intake of the water diversion project on the day before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity, where the salinity on the day before water diversion is the salinity of the river water flowing into the water intake on the day before water diversion, and the salinity of the previous day is the salinity of the river water on the previous day;
[0203] Generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, the wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value;
[0204] When the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide;
[0205] Obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0206] When the first distance is less than the preset second distance, obtaining the water intake time of the water intake after the water transfer, the water intake time being the time for taking the river water within the preset time period;
[0207] Acquire the water intake speed of the water intake port, and obtain the water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0208] Obtain the water demand of the water demand area of the downstream water supply system in the time period, and generate a minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model for the water shortage rate.
[0209] The specific implementation of the above operations can be found in the previous embodiments, which will not be described in detail here.
[0210] The computer-readable storage medium may also be an external storage device that affects the analysis device or the electronic device, for example, a plug-in hard disk equipped on the analysis device or the electronic device, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), a non-transitory computer-readable storage medium (non-transitory computer-readable storage medium), etc.
[0211] Since the computer program stored in the computer-readable storage medium can execute any one of the methods for analyzing the impact of water diversion and regulation projects on downstream water intake provided in the embodiments of the present application, the computer-readable storage medium can achieve the beneficial effects that can be achieved by any one of the methods for analyzing the impact of water diversion and regulation projects on downstream water intake provided in the embodiments of the present application. Please see the previous embodiments for details and will not be repeated here.
[0212] An embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the above-mentioned impact analysis method.
[0213] The computer program product is loaded into the electronic device and can execute the following steps:
[0214] Obtain the salinity of the water intake of the water diversion project on the day before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity, where the salinity on the day before water diversion is the salinity of the river water flowing into the water intake on the day before water diversion, and the salinity of the previous day is the salinity of the river water on the previous day;
[0215] Generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, the wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value;
[0216] When the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide;
[0217] Obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water;
[0218] When the first distance is less than the preset second distance, obtaining the water intake time of the water intake after the water transfer, the water intake time being the time for taking the river water within the preset time period;
[0219] Acquire the water intake speed of the water intake port, and obtain the water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time;
[0220] Obtain the water demand of the water demand area of the downstream water supply system in the time period, and generate a minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion and regulation project on the water demand area. The water shortage rate generation model is a generation model for the water shortage rate.
[0221] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.
[0222] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0223] Based on such understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device capable of carrying the computer program code to an electronic device, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0224] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0225] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for analyzing the impact of a water diversion project on downstream water intake, characterized in that: Applied to electronic equipment, the impact analysis method includes: Obtain the salinity of the water intake of the water diversion project on the day before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range, and the average daily salinity, where the salinity on the day before water diversion is the salinity of the river water flowing into the water intake on the day before water diversion, and the salinity of the previous day is the salinity of the river water on the previous day; Generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, the wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generation model of the saltwater intrusion value; When the saltwater intrusion value is less than a first preset value, obtaining an impact area of the saltwater tide; Obtaining a first distance of a salt-fresh water boundary line moving toward the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water; When the first distance is less than the preset second distance, obtaining the water intake time of the water intake after the water transfer, the water intake time being the time for taking the river water within the preset time period; Acquire the water intake speed of the water intake port, and obtain the water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time; Obtain the water demand of the water demand area of the downstream water supply system in the time period, and generate a minimum water shortage rate according to the water demand, the water intake, the number of the time period, the number of the water demand areas, and a preset water shortage rate generation model. The minimum water shortage rate is used to describe the minimum impact of the water diversion project on the water demand area. The water shortage rate generation model is a generation model of the water shortage rate; The statistical data of the water intake of the water diversion project before water diversion is obtained includes: Obtaining a preset statistical time, and obtaining the runoff data, tide level data, and salinity data of the water intake before water diversion; In the salinity data, the salinity of the current day and the salinity of the previous day are obtained; Determine the average daily flow rate according to the runoff data and the statistical time; Determining the daily maximum tidal range according to the tidal level data and the statistical time; Determining the daily average salinity according to the salinity data and the statistical time; When the saltwater intrusion value is less than a first preset value, obtaining the affected area of the saltwater tide upward movement includes: Determining whether the salt water intrusion value is less than the first preset value; When the saltwater intrusion value is less than the first preset value, the average daily flow, the maximum daily tidal range, the average daily salinity, and the saltwater intrusion value are input into a preset ocean numerical model to obtain the impact area of the saltwater tide output by the ocean numerical model.
2. The impact analysis method according to claim 1, characterized in that: The step of obtaining a first distance of movement of the salt-fresh water boundary line toward the water intake in the affected area includes: Obtaining the water intake area of the water intake, and determining whether there is an overlapping area between the impact area and the water intake area; If there is an overlapping area between the impact area and the water intake area, the first distance of the fresh-salt water boundary moving toward the water intake is obtained in the overlapping area, and the overlapping area is a partial area of the impact area.
3. The impact analysis method according to claim 1, characterized in that: Acquiring a water intake speed of the water intake port, and obtaining a water intake amount of the water intake port in the time period according to the product of the water intake speed and the water intake time, including: Acquire a water intake rate of the water intake, where the water intake rate is a ratio of the water intake time to the time period; Determining whether the fade rate is greater than a second preset value; If the desalination rate is greater than the second preset value, obtaining the water intake speed of the water intake port; The water intake volume of the water intake port in the time period is obtained according to the product of the water intake speed and the water intake time.
4. The impact analysis method according to any one of claims 1 to 3, characterized in that: After obtaining the water demand of the water demand area of the downstream water supply system in the time period, and generating the minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model, the impact analysis method further includes: Obtain the water storage capacity of the reservoir corresponding to the water intake within the time period.
5. The impact analysis method according to any one of claims 1 to 3, characterized in that: After obtaining the water demand of the water demand area of the downstream water supply system in the time period, and generating the minimum water shortage rate according to the water demand, the water intake, the number of the time periods, the number of the water demand areas and a preset water shortage rate generation model, the impact analysis method further includes: The water replenishment amount of the reservoir corresponding to the water intake within the time period is obtained, where the water replenishment amount is the amount of water supplemented by the reservoir to the downstream water supply system.
6. The impact analysis method according to claim 5, characterized in that: The obtaining of the water replenishment amount of the reservoir corresponding to the water intake within the time period includes: Determining whether the minimum water shortage rate is greater than a third preset value; If the minimum water shortage rate is greater than the third preset value, the water replenishment volume of the reservoir corresponding to the water intake within the time period is obtained.
7. A device for analyzing the impact of a water diversion project on downstream water intake, characterized in that: Used in electronic equipment, including: The first acquisition module is used to obtain the salinity of the water intake of the water diversion project before water diversion, the salinity of the previous day, the average daily flow, the maximum daily tidal range and the average daily salinity, wherein the salinity of the current day is the salinity of the river water flowing into the water intake on the current day, and the salinity of the previous day is the salinity of the river water on the previous day; These include: Obtaining a preset statistical time, and obtaining the runoff data, tide level data, and salinity data of the water intake before water diversion; In the salinity data, the salinity of the current day and the salinity of the previous day are obtained; Determine the average daily flow rate according to the runoff data and the statistical time; Determining the daily maximum tidal range according to the tidal level data and the statistical time; Determining the daily average salinity according to the salinity data and the statistical time; A first generating module is used to generate a saltwater intrusion value of the water intake according to the salinity of the day, the average daily flow, the maximum daily tidal range, the salinity of the previous day, a wind speed correction term and a preset saltwater intrusion statistical model, wherein the saltwater intrusion value is used to describe the degree of saltwater intrusion into the river water, and the saltwater intrusion statistical model is a generating model of the saltwater intrusion value; A second acquisition module is used to acquire the impact area of the saltwater intrusion when the saltwater intrusion value is less than the first preset value; These include: Determining whether the salt water intrusion value is less than the first preset value; When the saltwater intrusion value is less than the first preset value, the daily average flow, the daily maximum tidal range, the daily average salinity, and the saltwater intrusion value are input into a preset ocean numerical model to obtain the impact area of the saltwater tide output by the ocean numerical model; A third acquisition module is used to acquire a first distance of a salt-fresh water boundary line moving from the water intake in the affected area, wherein the salt-fresh water boundary line is a boundary line between the salt water upstream of the salt tide and the river water; A fourth acquisition module, configured to acquire the water intake time of the water intake after the water transfer when the first distance is less than a preset second distance, wherein the water intake time is the time for taking the river water within a preset time period; A fifth acquisition module, used to acquire the water intake speed of the water intake port, and obtain the water intake volume of the water intake port in the time period according to the product of the water intake speed and the water intake time; The second generating module is used to obtain the water demand of the water demand area of the downstream water supply system in the said time period, and generate a minimum water shortage rate according to the said water demand, the said water intake, the number of the said time periods, the number of the said water demand areas and a preset water shortage rate generating model. The said minimum water shortage rate is used to describe the minimum impact of the said water diversion and regulation project on the said water demand area, and the said water shortage rate generating model is a generation model of the said water shortage rate.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the impact analysis method according to any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Ecological compensation standard measuring and calculating method for networked water transfer
CN112241850A
Quantitative analysis method for water supply benefit of cross-basin water diversion project
CN116307605A