Management method, device and system for network management service intention

During the execution of network management intentions, the consumer entity decides whether to replace the management action group based on the execution of multiple subnetwork management intentions, which solves the problem of resource waste in the prior art and improves the execution efficiency and goal achievement of network management intentions rationality.

CN119071349APending Publication Date: 2024-12-03HUAWEI TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202310627382.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The execution of existing network management intentions may lead to waste of resources because the goals of subnet management intentions are not accurately achieved, resulting in unnecessary management action groups being replaced.

Method used

By sending the sub-network management intentions one-to-one to the network management service production entity, receiving and analyzing the execution results, the consumer entity decides whether to replace the management action group, rather than being decided by the production entity, the implementation of multiple sub-network management intentions is reasonable based on the implementation of multiple sub-network management intentions Determine the goal of network management intent to achieve.

Benefits of technology

It avoids unnecessary replacement of management action groups, improves the execution efficiency and resource utilization of network management intentions, and ensures that the goals are achieved reasonably.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119071349A_ABST
    Figure CN119071349A_ABST
Patent Text Reader

Abstract

The invention provides a network management intention management method. The method comprises the following steps: sending N sub-network management intentions obtained by decomposing a network management intention to N network management service production entities in a one-to-one manner; n execution results of the N sub-network management intentions are received respectively, the execution result of the network management intention is obtained based on the N execution results, and the N execution results comprise execution results indicating that the execution results are not achieved; and sending management indication information to the substandard network management service production entity based on the execution result of the network management intention, wherein the management indication information indicates whether to replace the network management action group for achieving the target of the corresponding sub-network management intention. Therefore, whether the substandard production entity replaces the management action group is determined based on the execution result of the network management intention instead of automatically replacing the management action group based on the target which does not reach the sub-network management intention, and the management mode of the network management intention is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and more specifically, to a management method, device and system for network management service intent. Background Art

[0002] Network management service consumption entities can express their demand for network management services through network management intents. With the development of network resource management, network management service consumption entities can decompose network management intents into multiple sub-network management intents, triggering multiple network management service production entities to execute the sub-network management intents respectively. As long as the goal of a sub-network management intent is not achieved, the corresponding network management service production entity must replace the management action group used to achieve the goal of the sub-network management intent so that the execution result of the network management intent is achieved. However, this execution result may be higher than the goal of achieving the network management intent, which may cause unnecessary waste of resources.

[0003] Therefore, how to improve the management method of network management intentions is a technical problem that needs to be solved urgently. Summary of the invention

[0004] The present application provides a method, device and system for managing network management intent, which can improve the management mode of network management intent.

[0005] In a first aspect, a method for executing a network management intent is provided. The method can be executed by a network management service consumer entity or a chip in the network management service consumer entity. The method comprises: decomposing N sub-network management intents obtained from the network management intent Figure 1 Send to N network management service production entities in one place; receive N execution results corresponding to N sub-network management intentions, the N execution results correspond to the N network management entities, and obtain the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; send management instruction information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity that has not achieved the target of the corresponding sub-network management intention among the N network management service production entities, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

[0006] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group through the execution of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid the execution of unnecessary changes in the management action group and improve the management method of network management intentions.

[0007] In combination with the first aspect, in certain implementation methods of the first aspect, the N execution results respectively include the performance indicator values ​​of the managed entities of the corresponding sub-network management intentions, and the execution results of the network management intentions are obtained based on the N execution results, including: determining whether the execution results of the network management intentions are achieved or not achieved based on the performance indicator values ​​of the managed entities of the N sub-network management intentions.

[0008] Based on this technical solution, the consumer entity can determine whether the goal of the network management intention has been achieved through the performance indicator values ​​returned by multiple production entities, rather than determining whether the goal of the network management intention has been achieved based on whether the goal of each sub-network management intention has been achieved. This improves the rationality of judging whether the network management intention has achieved its goal and further improves the management method of the network management intention.

[0009] In combination with the first aspect, in certain implementations of the first aspect, the execution result of the sub-network management intention sent by the non-compliant network management production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.

[0010] Based on the present technical solution, the non-compliant management service production entity can also return action group exhaustion indication information, so that the consumer entity can know whether the non-compliant management service production entity has the ability to replace the management action group, thereby avoiding the consumer entity instructing the production entity to replace the management action group when there is no replaceable management action group, causing unnecessary signaling interaction.

[0011] In combination with the first aspect, in certain implementations of the first aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending action group freeze indication information to N network management service production entities respectively, and the action group freeze indication information instructs the N network management service production entities not to change the network management action group based on the execution result of the corresponding sub-network management intention.

[0012] Based on this technical solution, the production entity can freeze and replace the management action group before receiving the management instruction information from the consumption entity, thereby reducing unnecessary replacement actions and improving the management method of network management intentions.

[0013] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: adjusting the target of the sub-network management intention corresponding to the non-compliant network management service production entity based on N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the non-compliant network management service production entity.

[0014] Based on this technical solution, the consumer entity can also adjust the target of the sub-network management intention based on the execution results of different sub-network management intentions, so that the execution method of the network management intention is more reasonable.

[0015] In combination with the first aspect, in certain implementations of the first aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending trigger conditions for returning the execution result of the sub-network management intention to N network management service production entities respectively, and the trigger condition is that the goal of the corresponding sub-network management intention is not achieved within the detection time.

[0016] Based on this technical solution, the consumer entity can instruct the production entity to return the execution result when the target of the sub-network management intention is not achieved within the detection time, so that the consumer entity can promptly know the achievement status of the sub-network management intention and make timely judgments, which can improve the management performance of the network management intention.

[0017] In combination with the first aspect, in certain implementations of the first aspect, execution results of corresponding sub-network management intentions are received from N network management service production entities respectively, including: receiving the execution results of corresponding sub-network management intentions from non-compliant network management service production entities; sending achievement query information to other network management service production entities among the N network management service production entities except the non-compliant network management service production entities, the achievement query information requesting return of the execution results of corresponding sub-network management intentions; receiving the execution results of corresponding sub-network management intentions from other network management service production entities.

[0018] Based on the present technical solution, the consumer entity can send execution result query information to other production entities that have not returned execution results based on the return results of the production entity that did not meet the standards, or the goals of the sub-network management intention were not achieved, so that other production entities can return the execution results of the corresponding sub-network management intentions to the consumer entity in a timely manner.

[0019] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: when the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not replace the network management action group, and the management instruction information indicates that the non-compliant network management service production entity does not replace the network management action group; when the execution result of the network management intention is not achieved, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information indicates that the non-compliant network management service production entity replaces the network management action group; or, when the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information indicates that the non-compliant network management service production entity replaces the network management action group.

[0020] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should change the management action group based on the achievement of different sub-network management intentions, rather than determining whether the goal of the network management intention has been achieved based on whether the goal of each sub-network management intention has been achieved. This improves the rationality of judging whether the network management intention has achieved its goal and can improve the management performance of the network management intention.

[0021] In combination with the first aspect, in some implementations of the first aspect, the N network management service production entities are respectively N different device management systems, or the N network management production entities are respectively N different network elements.

[0022] In combination with the first aspect, in certain implementations of the first aspect, the network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.

[0023] In a second aspect, a method for managing network management intent is provided, which can be executed by a network management service production entity or a chip in the network management service production entity, and the method includes: receiving a sub-network management intent decomposed from the network management intent; sending an execution result of the sub-network management intent, the execution result of the sub-network management intent indicating that the goal of the sub-network management intent has not been achieved; receiving management indication information, the management indication information indicating whether to replace the network management action group used to achieve the goal of the sub-network management intent, and the management indication information is determined based on the execution result of the network management intent.

[0024] Regarding the beneficial technical effects of various implementation methods of the second aspect, reference may be made to the description of the relevant implementation methods of the first aspect and will not be elaborated herein.

[0025] In combination with the second aspect, in certain implementations of the second aspect, the execution result of the sub-network management intention includes a performance indicator value of the managed entity of the sub-network management intention, and the performance indicator value is used to determine whether the execution result of the network management intention is achieved or not achieved.

[0026] In combination with the second aspect, in some implementations of the second aspect, the execution result of the sub-network management intention further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether there is a network management action group that can be used for replacement.

[0027] In combination with the second aspect, in certain implementations of the second aspect, before sending the execution result of the sub-network management intention, the method also includes: receiving action group freeze indication information, the action group freeze indication information indicating not to change the network management action group based on the execution result of the sub-network management intention.

[0028] In combination with the second aspect, in certain implementations of the second aspect, the management indication information further indicates a target of the adjusted sub-network management intention.

[0029] In combination with the second aspect, in certain implementations of the second aspect, before sending the execution result of the sub-network management intention, the method also includes: receiving a trigger condition for returning the execution result of the sub-network management intention, the trigger condition being that the goal of the sub-network management intention is not achieved within the detection time; sending the execution result of the sub-network management intention, including: sending the execution result of the sub-network management intention in response to the trigger condition being met.

[0030] In combination with the second aspect, in certain implementations of the second aspect, the network management intent is an end-to-end intent, and the sub-network management intent is a management domain intent decomposed from the end-to-end intent.

[0031] In combination with the second aspect, in certain implementations of the second aspect, the method further includes: determining whether to replace a network management action group used to achieve a goal of the sub-network management intention based on the management indication information.

[0032] In a third aspect, a method for executing a network management intention is provided, the method comprising: decomposing N sub-network management intentions obtained from the network management intention Figure 1A message is sent to N network management service production entities in one place, and the N network management service production entities respectively receive the corresponding sub-network management intentions; the N network management service production entities respectively send the execution results of the corresponding sub-network management intentions, and receive N execution results corresponding to the N sub-network management intentions, the N execution results correspond to those from the N network management entities, and the execution results of the network management intentions are obtained based on the N execution results, wherein the N execution results include execution results indicating that they have not been achieved; based on the execution results of the network management intentions, management indication information is sent to the non-compliant network management service production entity, and the non-compliant network management service production entity receives the management indication information, wherein the non-compliant network management service production entity is the network management service production entity that has not achieved the target of the corresponding sub-network management intention among the N network management service production entities, and the management indication information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

[0033] Regarding the beneficial technical effects of various implementation methods of the third aspect, reference may be made to the description of the relevant implementation methods of the first aspect and will not be elaborated herein.

[0034] In combination with the third aspect, in certain implementation methods of the third aspect, the N execution results respectively include performance indicator values ​​of the managed entities of the corresponding sub-network management intentions, and obtaining the execution result of the network management intention based on the N execution results includes: determining whether the execution result of the network management intention is achieved or not achieved based on the performance indicator values ​​of the managed entities of the N sub-network management intentions.

[0035] In combination with the third aspect, in certain implementations of the third aspect, the execution result of the sub-network management intention sent by the non-compliant network management production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.

[0036] In combination with the third aspect, in certain implementations of the third aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending action group freeze indication information to the N network management service production entities respectively, and the N network management service production entities respectively receive the action group freeze indication information, and the action group freeze indication information instructs the N network management service production entities not to change the network management action group based on the execution result of the corresponding sub-network management intention.

[0037] In combination with the third aspect, in certain implementations of the third aspect, the method also includes: adjusting the target of the sub-network management intention corresponding to the non-compliant network management service production entity based on the N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the non-compliant network management service production entity.

[0038] In combination with the third aspect, in certain implementations of the third aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending trigger conditions for returning the execution result of the sub-network management intention to the N network management service production entities respectively, and the N network management service production entities respectively receive the trigger conditions for returning the execution result of the sub-network management intention, and the trigger condition is that the goal of the corresponding sub-network management intention is not achieved within the detection time.

[0039] In combination with the third aspect, in certain implementations of the third aspect, the execution results of the corresponding sub-network management intentions are respectively received from the N network management service production entities, including: receiving the execution results of the corresponding sub-network management intentions from the non-compliant network management service production entity, and the execution results of the corresponding sub-network management intentions of the non-compliant network management service production entity; sending achievement query information to other network management service production entities among the N network management service production entities except the non-compliant network management service production entity, and the other network management service production entities receiving the achievement query information, and the achievement query information requesting the return of the execution results of the corresponding sub-network management intentions; the other network management service production entities sending the execution results of the corresponding sub-network management intentions and receiving the execution results of the corresponding sub-network management intentions from the other network management service production entities.

[0040] In combination with the third aspect, in certain implementations of the third aspect, the method also includes: when the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity not to replace the network management action group; when the execution result of the network management intention is not achieved, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group; or, when the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group.

[0041] In combination with the third aspect, in certain implementations of the third aspect, the N network management service production entities are respectively N different device management systems, or the N network management production entities are respectively N different network elements.

[0042] In combination with the third aspect, in certain implementations of the third aspect, the network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.

[0043] In combination with the third aspect, in certain implementations of the third aspect, the method further includes: the non-compliant network management production entity determines whether to replace the network management action group used to achieve the goal of achieving the sub-network management intention based on the management indication information.

[0044] In a fourth aspect, a communication device is provided, the communication device comprising a transceiver unit and a processing unit, wherein the transceiver unit is used to decompose N sub-network management intents obtained from the network management intent. Figure 1 A method for sending a message to N network management service production entities in one place; a transceiver unit for receiving N execution results corresponding to N sub-network management intentions, wherein the N execution results correspond to the N network management entities, and the execution result of the network management intention is obtained based on the N execution results, wherein the N execution results include an execution result indicating that the intention has not been achieved; a processing unit for sending management instruction information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity that has not achieved the target of the corresponding sub-network management intention among the N network management service production entities, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

[0045] Regarding various implementation methods of the fourth aspect and the beneficial technical effects of various implementation methods, reference may be made to the description of the relevant implementation methods of the first aspect and no further elaboration will be given.

[0046] In a fifth aspect, a communication device is provided, which includes a transceiver unit and a processing unit, the transceiver unit being used to receive a sub-network management intent decomposed from a network management intent; the transceiver unit being used to send an execution result of the sub-network management intent, the execution result of the sub-network management intent indicating that a goal of the sub-network management intent has not been achieved; the transceiver unit being used to receive management indication information, the management indication information indicating whether to replace a network management action group used to achieve the goal of the sub-network management intent, the management indication information being determined based on the execution result of the network management intent.

[0047] Regarding various implementation methods of the fifth aspect and the beneficial technical effects of various implementation methods, reference may be made to the description of the relevant implementation methods of the first and second aspects, and no further elaboration will be given.

[0048] In a sixth aspect, a communication device is provided, wherein the communication device has the function of implementing the first aspect or any possible implementation of the first aspect, the second aspect or any possible implementation of the second aspect, or the third aspect or any possible implementation of the third aspect. The function can be implemented by hardware, or the corresponding software can be implemented by hardware. The hardware or software includes one or more units corresponding to the above functions.

[0049] In a seventh aspect, a communication device is provided, comprising a processor and a memory. Optionally, a transceiver may also be included. The memory is used to store a computer program, and the processor is used to call and run the computer program stored in the memory, and control the transceiver to send and receive signals, so that the communication device executes the method in any possible implementation of the first aspect or any aspect of the first aspect.

[0050] Exemplarily, the communication device is a network management service production entity.

[0051] In an eighth aspect, a communication device is provided, comprising a processor and a memory. Optionally, a transceiver may also be included. The memory is used to store a computer program, and the processor is used to call and run the computer program stored in the memory, and control the transceiver to send and receive signals, so that the communication device executes the method in any possible implementation of the second aspect or any aspect of the second aspect.

[0052] Exemplarily, the communication device is a network management service consumption entity.

[0053] In a ninth aspect, a communication device is provided, comprising a processor and a communication interface, wherein the communication interface is used to receive data and / or information, and transmit the received data and / or information to the processor, and the processor processes the data and / or information, and the communication interface is also used to output the data and / or information processed by the processor, so that the method in any possible implementation of the first aspect or any aspect of the first aspect is executed. The communication device may be a chip used for network management service production network elements.

[0054] In a tenth aspect, a communication device is provided, comprising a processor and a communication interface, wherein the communication interface is used to receive data and / or information, and transmit the received data and / or information to the processor, and the processor processes the data and / or information, and the communication interface is also used to output the data and / or information processed by the processor, so that the method in any possible implementation of the second aspect or any aspect of the second aspect is executed. The communication device can be a chip applied to a network management service consumption network element.

[0055] In an eleventh aspect, a computer-readable storage medium is provided, wherein computer instructions are stored in the computer-readable storage medium. When the computer instructions are executed on a computer, the method in any possible implementation of the first aspect or any aspect in the first aspect is executed.

[0056] In a twelfth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions. When the computer instructions are executed on a computer, the method in the second aspect, or any possible implementation of any aspect in the second aspect, is executed.

[0057] In a thirteenth aspect, a computer program product is provided, the computer program product comprising a computer program code, and when the computer program code is run on a computer, the method in the first aspect, or any possible implementation of any aspect in the first aspect, is executed.

[0058] In a fourteenth aspect, a computer program product is provided, the computer program product comprising a computer program code, and when the computer program code is run on a computer, the method in the second aspect, or any possible implementation of any aspect in the second aspect, is executed.

[0059] In a fifteenth aspect, a wireless communication system is provided, comprising the communication device as described in the fourth aspect, and / or the communication device as described in the fifth aspect.

[0060] In the sixteenth aspect, a wireless communication system is provided, comprising a communication device as described in any one or more of the fourth to fifteenth aspects, or a communication device in any possible implementation of any of these aspects. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A schematic structural diagram of an intended IOC is shown;

[0062] Figure 2 is a schematic structural diagram of a communication system applicable to an embodiment of the present application;

[0063] Figure 3 It is a schematic flow chart of a method for managing network management intent provided in an embodiment of the present application;

[0064] Figure 4 is another schematic flow chart of a method for managing network management intent provided in an embodiment of the present application;

[0065] Figures 5 to 7 It is a schematic diagram of a possible communication device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0066] The technical solution in this application will be described below in conjunction with the accompanying drawings.

[0067] The technical solution of the present application can be applied to various network function virtualization (NFV) systems, which can use standard formal language to describe the current operator's business technology solutions, network construction solutions and network operation and maintenance methods as patterns and strategies, and implement the technical solutions and construction solutions based on these patterns and strategies. For example, the technical solution of the present application can be applied to one or more of the following systems: wireless intent driven network (wIDN) system, experiential networked intelligence (ENI) system, intent driven management service (IDMS) system or open network automation platform (ONAP) system, etc.

[0068] For the sake of clarity, some terms in the embodiments of the present application are explained below.

[0069] For the sake of clarity, some terms in the embodiments of the present application are explained below.

[0070] 1. Network management, network management services, network management service production entities and network management service consumption entities

[0071] 1.1 Network Management

[0072] Network management refers to the management of network resources, including but not limited to monitoring, controlling and recording the performance and usage of network resources, and issuing management action groups to network resources (such as devices in the network) based on the detected network conditions to enable the network to operate effectively. Exemplarily, network management can be monitoring, testing, configuring, analyzing, evaluating and controlling network resources. Network management can also be timely reporting and processing when a network failure occurs, and coordinating and maintaining the efficient operation of the network system. Among them, network resources are the objects of network management, which can also be called network objects or managed entities. Exemplarily, network resources can be base station equipment, routers, switches, core network equipment, etc. In this regard, the embodiments of the present application are not particularly limited. For the convenience of description, the embodiments of the present application are described by taking the managed entity as an example, but they can all be replaced by other objects of network management.

[0073] 1.2 Network Management Services

[0074] A network management service refers to a service that provides network management functions. The service production entity usually provides the network management functions to the service consumption entity through a network interface (eg, a service-based interface).

[0075] 1.3 Network management service production entity

[0076] The entity providing the network management service is called the network management service production entity. Exemplarily, the capabilities or functions of the network management service production entity can be deployed on a certain network element, which is called the network management service production network element; the capabilities or functions of the network management service production entity can also be deployed on other devices, which is not limited in the embodiments of the present application; for the convenience of description, the embodiments of the present application take the network management service production entity as an example for explanation, but they can all be replaced by other devices that deploy the capabilities or functions of the network management service production entity.

[0077] 1.4 Network Management Service Consumption Entity

[0078] The calling entity of network management is called a network management service consumption entity. Exemplarily, the capability or function of the network management service consumption entity can be deployed on a certain network element, which is called a network management service consumption network element; the capability or function of the network management service consumption entity can also be deployed on other devices, which is not limited in the embodiments of the present application; for the convenience of description, the embodiments of the present application take the network management service consumption entity as an example for explanation, but they can all be replaced by other devices that deploy the capability or function of the network management service consumption entity.

[0079] 2. Network Management Intent (abbreviated as Intent)

[0080] The network management intent refers to the demand of the network management service consumer entity for the network management service, which may also be referred to as the network management service demand. The embodiment of the present application does not limit this name. For example, the network management intent may be an optical dedicated line service intent or an energy-saving intent, such as the intent defined in the third generation partnership project (3GPP) standard specification 28.312.

[0081] In the intentional interaction scenario of this application, there are mainly two roles, namely the network management provider entity and the network management service consumer entity. Among them, the network management provider entity can also be called a network management provider, or an intent provider (intent provider), or an intent handler (intent handler), etc. The network management service consumer entity can also be called a network management service consumer, or an intent consumer (intent consumer), or an intent owner (intent owner), etc.

[0082] Among them, the network management service consumer entity can be the caller of the network management service, can perform operations such as creating, modifying, deleting, and querying network management intent expressions, can be configured in a network management system (network management system, NMS), or an element management system (element management system, EMS), or network equipment (network equipment, NE), can be a management function, or a management function entity, or a management entity, or a network device, or a network element, etc., and this application does not limit this.

[0083] Intent can be applied to network systems to achieve the expected goals for the specified performance indicators of network devices within a specific range. Intent can express expectations for network systems through formal specifications and description information. Among them, formal specifications can refer to the specific syntax or semantics of intent, and description information can be used to describe the requirements, goals, and constraints of intent.

[0084] An intent may include at least one intent expectation. Each intent expectation may represent the performance requirement of a network management service consuming entity for a specific network object. An intent expectation may consist of at least one expected target and an expected object, and each expected target may represent the performance requirement of a network management service consuming entity for a specific attribute of an expected object. Exemplarily, an intent expectation may include two expected targets, one of which is an average downlink throughput greater than 5 Mbps, and the other is an end-to-end delay less than 10 milliseconds. If the average downlink throughput of the expected object is greater than 5 Mbps, then the expected target for downlink throughput is met. If the end-to-end delay of the expected object is less than 10 milliseconds, then the expected target for delay is met. If both expected targets of an intent expectation are met, then the intent expectation is achieved.

[0085] The intent may also include an intent context. The intent context may represent the constraints or conditions imposed by the network management service consumer on the intent. For example, the network management service consumer may constrain the duration of the intent through the intent context.

[0086] The intent may also include an expected context. The expected context may represent the constraints or conditions that the network management service consuming entity expects for an intent. For example, the network management service consuming entity may constrain the expected duration of the intent through the expected context.

[0087] The intent may also include a target context, which may represent a constraint or condition of a network management service consuming entity on a desired target. For example, the network management service consuming entity may constrain the duration of the desired target through the target context.

[0088] The intent may also include an object context, which may indicate constraints or conditions of the network management service consuming entity on the network object to be acted upon. Exemplarily, the network management service consuming entity may indicate the region where the network object to be acted upon is located through the object context.

[0089] The intent expectation, expected target and intent context introduced above can be used as information elements in the information object class (IOC) in the intent creation request. The network management service consumer entity can express its demand for network management services by sending the above information elements to the network management service producer entity.

[0090] The information element in the IOC may adopt a specific structure to express the demand for network management services. For example, Figure 1 A schematic structural diagram of an intended IOC is shown.

[0091] See also Figure 1, the intent IOC includes the intent expectation and the intent context. The intent expectation includes the expected object, the expected target, and the expected context. The expected object includes the expected object context, and the expected target includes the target context. It can be understood that non-context type information elements (such as intent IOC, intent expectation, expected object or expected target) can include context type information elements (such as intent context, expected object context, target context, expected context, etc.), and context type information elements can be used to constrain non-context type information elements.

[0092] Understandably, Figure 1 This is a schematic illustration of the relationship between the attributes in the intent IOC. Based on the network management service requirements, the intent IOC may also contain other attributes, which are not specifically limited in this application. It can also be understood that this application does not specifically limit the number of attributes of the same type. For example, an intent IOC may contain one or more parallel intent expectation attributes, and an intent expectation may also contain one or more parallel expected target attributes.

[0093] 3. Network Management Intent Template

[0094] The network management intent template refers to the template description information of the network management intent, which can also be called the network management service requirement template. The embodiment of the present application does not limit this name. The intent template can be used to specify the syntax and semantics of the various attribute expressions introduced above. For example, the intent template can specify the field type, value type, etc. that can be used for each attribute in the IOC. Exemplarily, the intent template can include intent expectation description information for specifying how the intent expectation is expressed. The intent expectation description information can specify the type of expected target attributes that the intent expectation can contain, such as latency, bandwidth, maximum number of users, etc. The intent expectation description information can also specify the field type of each expected target, such as the field type of the expected target for latency is a string, the field type of the expected target for bandwidth is a string, and the field type of the expected target for the maximum number of users is an integer. Again exemplarily, the intent template can also include intent context description information that specifies how the intent context and the expected context are expressed. The intent context description information can be used to specify the field type of the intent context, etc., and the present application does not specifically limit this.

[0095] 4. Intent Expression

[0096] In the embodiment of the present application, the intent expression is an information formula that expresses the network management service intent, and can be the instantiation result of the network management intent template. Consumers of network management intent can instantiate the intent IOC according to the intent template to generate an intent expression, and then the intent expression generated after instantiation can be used for specific network services. For example, the intent expression can be represented by a list of a set of attribute and value key-value pairs (for example, a set of [attribute, value]) of the network management service intent.

[0097] Exemplarily, the intent expression includes a performance indicator information instance, a network object information instance, and a context information instance.

[0098] For example, the performance indicator information instance may include the value or value range of the target indicator requirement corresponding to the performance indicator information. For example, the target indicator requirement corresponding to the performance indicator information template includes a bandwidth parameter, and the performance indicator information instance includes a bandwidth parameter value of 20M, or a bandwidth parameter value range of 10M to 15M. For example, the target indicator requirement corresponding to the performance indicator information template includes a delay parameter, and the delay parameter instance includes a delay parameter value of 2s, or a delay parameter value range of 1s to 5s.

[0099] The target network object indicated by the network object information instance is the instantiation result of the target network object indicated by the network object information template. Exemplarily, the target network object indicated by the network object information instance is one of the target network objects indicated by the network object information template, that is, one of the physical entities or logical entities used to indicate the network management service. At this time, the network object information instance indicates a specific network object. For example, the network object information template indicates a network service, and the network object information instance indicates an energy-saving service.

[0100] The context information instance is used to indicate the constraint conditions of the network management intent expression. Exemplarily, the context information instance includes the constraint parameters of the network management intent expression, for example, the context information instance may include the source and sink information corresponding to the target network object indicated by the network object instance.

[0101] Intent expectation information instances include performance indicator information instances and network object information instances.

[0102] In the embodiment of the present application, the "intention" transmitted through the message refers to the intention expression.

[0103] 5. Intent Examples

[0104] A network management intent instance refers to a network management intent processing process created locally by a network management service provider entity based on a received network management intent expression (e.g., a performance indicator information instance, a network object information instance, a context information instance).

[0105] The network management intent processing process is used to process the network management intent expression. Exemplarily, the network management intent processing process may include an identifier used to identify the process; the network management intent processing process may include computing resources used to perform operations such as network management intent translation and querying a database (e.g., a semantic knowledge base); and may include storage resources used to store network management intent expressions, network management intent translation results, etc.

[0106] Among them, network management intent translation is used to convert the network management intent expression into a corresponding management action group, which can be an instruction acting on a physical entity or a logical entity, such as adjusting the antenna tilt angle of a base station or turning on the energy-saving switch of a cell.

[0107] 6. Network management action group (actions)

[0108] A network management action group is one or more network management actions generated by a network management service production entity based on an intent expression. The network management service production entity satisfies the intent of a network management service consumption entity by executing one or more network management actions. A network management action group can also be referred to as a management operation or an intent operation. A network management action group can be a set of operation instructions for a desired object (e.g., a physical entity or logical entity in a network system intended to act on), containing one or more instructions. For example, adjusting the antenna tilt angle of a base station, turning on the energy-saving switch of a cell, etc.

[0109] The network management service production entity can generate multiple management action groups based on the intent expression. During the execution process, the network management service production entity can select some management action groups from multiple management action groups to execute at a time. In other words, the management action groups generated by the network management service production entity based on the translation of the intent expression are optional operations that can be used to meet the intent. The network management service production entity may select one of the network management action groups to execute to meet the intent, or it may select multiple network management action groups to execute to meet the intent.

[0110] The above describes the relevant terms involved in the embodiments of the present application. Figure 2 The application scenarios to which the embodiments of the present application are applicable are described.

[0111] Figure 2 It is a schematic structural diagram of a communication system applicable to the embodiments of the present application. Firstly, the devices that may be involved in the communication system are described.

[0112] 1. Network management service consumption entity 210: can be used to call management services, or call intent services to manage the network system. Exemplarily, the network management service consumption entity 210 can instantiate the intent template, set the intent expectation and intent context for the network system to generate an intent expression, and send the intent expression to the network management service production entity 220 to realize the expectation for the network system.

[0113] The network management service consumption entity 210 may also be referred to as a network management service consumer, an intent management service consumer, an intent consumer or an intent owner, etc. In future communication systems, the network management service consumption entity may also have other names, which is not specifically limited in this application.

[0114] 2. Network management service production entities 221-222: can be used to provide management services. Exemplarily, the network management service production entities 221-222 can receive intent expressions from the network management service consumption entity 210, and perform intent translation, intent management, and intent execution and maintenance processes based on the intent expressions.

[0115] The network management service production entity 221-222 may also be referred to as an intent management service provider, a network management service producer, an intent provider, an intent handler, etc. In future communication systems, the network management service production entity may also have other names, which is not specifically limited in this application.

[0116] It is understandable that the above-mentioned entity can be a network element in a hardware device, or a software function running on dedicated hardware, or a virtualized function instantiated on a platform (e.g., a cloud platform). It is understandable that the above-mentioned entity can be implemented by one device, or can be implemented by multiple devices together. In addition, the above-mentioned entity can also be a functional module within a system, such as a network management system (network management system, NMS), an equipment management system (equipment management system, EMS) or a functional module within a device, such as one or more functional modules within a network equipment (network equipment, NE), and the network equipment can be a base station or a core network entity.

[0117] Exemplarily, the network management service consumption entity 210 may be deployed in an NMS, and the network management service production entities 221-222 may be deployed in different EMSs. The interaction between the network management service consumption entity 210 and the network management service production entities 221-222 may be performed through information exchange via an interface between the NMS and the EMS.

[0118] As another example, the network management service consumption entity 210 can be deployed in the EMS, the network management service production entities 221-222 can be deployed in different NEs, and the interaction between the network management service consumption entity 210 and the network management service production entities 221-222 can be carried out through the interface between the NMS and the EMS.

[0119] It is understandable that the solution of the present application can also be applied to other systems including corresponding entities, which is not limited in the present application and is not specifically limited in the embodiments of the present application.

[0120] For the sake of simplicity in description, the network management service consumption entity is referred to as the consumption entity, and the network management service production entity is referred to as the production entity.

[0121] A consumer entity can decompose a network management intent into multiple sub-network management intents, and multiple production entities can respectively execute multiple sub-network management intents to achieve the goal of each sub-network management intent, thereby achieving the goal of the network management intent. However, in the process of executing this network management intent, in order to achieve the goal of each sub-network management intent, resources may be wasted. The embodiment of the present application provides a method and device for executing a network management intent, which can improve the execution performance of the network management intent. The following first combines Figure 3 The method of the embodiment of the present application is described.

[0122] Figure 3 It is a schematic flowchart of a method for executing network management intention provided in an embodiment of the present application.

[0123] S310, the consumer entity decomposes the network management intent into N sub-network management intents. Figure 1 The N production entities receive the corresponding N sub-network management intents decomposed from the network management intent from the consumer entity.

[0124] It can be understood that N is an integer greater than or equal to 2. The embodiment of the present application does not impose any special limitation on the number of production entities. One consumer entity can communicate with multiple production entities. For ease of understanding, the embodiment of the present application uses an example of a consumer entity communicating with two production entities (production entity #1 and production entity #2) as an example.

[0125] In this scenario where the network management intent is achieved by executing the sub-network management intent, the consumer entity can also be called the network management intent system, and the producer entity can also be called the sub-network management intent system. The goal of fulfilling the network management intent can also be described as satisfying the goal of the network management intent, achieving the goal of the network management intent, etc.

[0126] It can also be understood that the embodiment of the present application does not impose any special restrictions on the number of sub-network management intents into which a network management intent is decomposed, and the number of sub-network management intents decomposed may be the same as the number of production entities, or may be different. For ease of understanding, the embodiment of the present application uses the decomposition of a network management intent into two sub-network management intents (sub-network management intent #1 and sub-network management intent #2) as an example.

[0127] For example, the consumer entity sends sub-network management intention #1 to the production entity #1, and the consumer entity sends sub-network management intention #2 to the production entity #2.

[0128] It is understandable that in the present application, the consumer entity and the production entity can communicate directly or through other entities, and the present application does not specifically limit this. For example, the consumer entity can send sub-network management intention #1 directly to production entity #1, or the consumer entity can send sub-network management intention #1 to the consumer entity #1 corresponding to the sub-network management intention #1 system, and consumer entity #1 forwards sub-network management intention #1 to production entity #1. Similarly, production entity #1 can send information directly to the consumer entity, or the production entity can send information to the consumer entity #1 corresponding to the sub-network management intention #1 system, and consumer entity #1 forwards the information to the consumer entity, which will not be elaborated below.

[0129] Consumer entities can be decomposed based on the goals of network management intent. For example, the network management intent is energy-saving intent, and the goal of this energy-saving intent is to achieve an energy-saving power value of 1000kw for base stations in a specific area. Consumer entities can decompose the network management intent into sub-network management intent #1: the energy-saving power value of base stations in sub-area #1 reaches 300kw; sub-network management intent #2: the energy-saving power value of base stations in sub-area #2 reaches 700kw. Among them, sub-area #1 and sub-area #2 are divided by consumer entities based on the specific area. For a more detailed description of the decomposition of network management intent by consumer entities, please refer to the following. Figure 4 The description is not repeated here.

[0130] In an embodiment of the present application, the network management intent may be referred to as an end-to-end intent, and multiple sub-network management intents are multiple different management domain intents decomposed from the end-to-end intent.

[0131] The consumer entity can send intent creation request messages to N production entities respectively, and carry the corresponding sub-network management intent in the intent creation request messages. For example, the consumer entity can send intent creation request message #1 to production entity #1, and the intent creation request message #1 contains sub-network management intent #1. Sub-network management intent #1 can contain the target of sub-network management intent #1, such as sub-network management intent #1 can be used with Figure 1 A similar data structure includes information such as intent expectation, expected target, intent context, etc. The consumer entity can also send an intent creation request message #2 to the producer entity #2. The intent creation request message #2 includes a sub-network management intent #2. The description of sub-network management intent #2 can be similar to that of sub-network management intent #1, which will not be repeated here.

[0132] In the embodiment of the present application, the production entity determines whether to change the management action group based on the instruction of the consumption entity, and does not change the management action group based on the achievement of the sub-network management intention. This method of determining whether to change the management action group can be a default of the consumption entity and the production entity, or it can be instructed by the consumption entity to the production entity.

[0133] Exemplarily, the consumer entity sends the action group freezing indication information to the multiple production entities respectively. Correspondingly, the multiple production entities receive the action group freezing indication information from the consumer entity.

[0134] The action group freeze indication information indicates that multiple production entities do not change the network management action group based on the execution result of the corresponding sub-network management intent. For example, the consumer entity sends the action group freeze indication information to the production entity #1, and the consumer entity sends the action group freeze indication information to the production entity #2. The consumer entity can directly send the action group freeze indication information to multiple production entities, or the consumer entity can also carry the action group freeze indication information in the intent creation request message, such as the intent creation request message includes the sub-network management intent and the action group freeze indication information (such as the actionfrozen cell), or the intent creation request message includes the sub-network management intent, and the sub-network management intent includes the action group freeze indication information (for example, the intent context in the sub-network management intent includes the action group freeze indication information). Thus, the production entity can freeze and replace the management action group before receiving the management indication information from the consumer entity, thereby reducing unnecessary replacement actions.

[0135] In addition, the consumer entity may also indicate when the multiple production entities return the execution results of the sub-network management intent. Exemplarily, the consumer entity sends the trigger conditions for returning the execution results of the sub-network management intent to the multiple production entities respectively. Correspondingly, the multiple production entities receive the trigger conditions for returning the execution results of the sub-network management intent from the consumer entity.

[0136] Exemplarily, the consumer entity sends trigger condition #1 to the production entity #1 for returning the execution result of sub-network management intent #1, and the consumer entity sends trigger condition #2 to the production entity #2 for returning the execution result of sub-network management intent #2. For example, the trigger condition may be that the target of the corresponding sub-network management intent is not achieved within the detection time. For example, the consumer entity may instruct the production entity to detect whether the target of the sub-network management intent is achieved within 30 minutes. If the production entity does not achieve the target of the sub-network management intent within 30 minutes, the production entity returns the execution result of the sub-network management intent. In this case, the production entity receives the execution result of not achieving the sub-network management intent, and may actively query other production entities for the execution results of other sub-network management intents.

[0137] For another example, the consumer entity may also instruct the multiple production entities to send the execution results of the sub-network management intention at a time and / or a period. Figure 1 The execution result may be returned after one hour, or the production entity may be instructed to return the execution result every two hours, etc. This application does not impose any special limitation on this.

[0138] The consumer entity can directly send trigger conditions to multiple production entities, or the consumer entity can also carry trigger conditions in the intent to create request message, such as the intent to create request message contains the sub-network management intent and trigger conditions (such as returnperiod or duration information element), or the intent to create request message contains the sub-network management intent, and the sub-network management intent contains the trigger conditions (for example, the intent context in the sub-network management intent contains the trigger conditions). Thus, the production entity can return the execution result of the sub-network management intent based on the trigger condition or under what circumstances.

[0139] S320, multiple production entities execute network management action groups based on different sub-network management intentions respectively.

[0140] Exemplarily, production entity #1 executes network management action group #1 based on sub-network management intention #1, and production entity #2 executes network management action group #2 based on sub-network management intention #2.

[0141] For example, production entity #1 can execute management action group #1 based on sub-network management intention #1 to achieve the goal of sub-network management intention #1. For example, sub-network management intention #1 is energy-saving intention, and production entity #1 determines that the executable management action group #1 includes: timed carrier shutdown, symbol shutdown and RF module sleep in order to achieve the goal of energy-saving intention. Among them, timed carrier shutdown can mean that during a specific time period (such as in the early morning when the data transmission volume is relatively low), production entity #1 can trigger the managed entity of sub-network management intention #1 to shut down the carrier of the RF module to achieve energy saving. Symbol shutdown can mean that when there is no data carried on the symbol, production entity #1 can trigger the managed entity to shut down the power amplifier to achieve energy saving. RF module sleep can mean that during a specific time period, production entity #1 can trigger the RF module of the base station to be in a sleep state to achieve energy saving. Production entity #1 can execute any one or more of timed carrier shutdown, symbol shutdown and RF module sleep. For example, when production entity #1 executes timed carrier shutdown, production entity #1 can send a carrier shutdown instruction to all base stations in sub-area #1, so that the managed entity executes carrier shutdown.

[0142] It is understandable that the above example is an example of a production entity as a device management system capable of managing base stations. The production entity executing a network management action group may include the production entity triggering the managed entity to execute a network management action group, and the consumer entity may be a network management system. The embodiment of the present application may also be applied to a scenario where the production entity is a network element (such as a base station), and the consumer entity may be a device management system. For ease of description, the following mainly takes the production entity as an example of a device management system to introduce the execution method provided in the embodiment of the present application, but the present application does not specifically limit this.

[0143] It is understandable that the embodiment of the present application takes production entity #1 as an unqualified production entity and production entity #2 as a qualified production entity as an example, that is, production entity #1 does not achieve the goal of sub-network management intention #1 by executing management action group #1, and production entity #2 achieves the goal of sub-network management intention #2 by executing management action group #2. For example, the goal of sub-network management intention #1 is to achieve an energy-saving power value of 300kW (the goal of network management intention is to achieve an energy-saving power value of 1000kW), but production entity #1 saves 280kW of energy by executing management action group #1, and does not achieve the goal of sub-network management intention #1. The goal of sub-network management intention #2 is to achieve an energy-saving power value of 700kW, and production entity #2 saves 750kW of energy by executing management action group #2, achieving the goal of sub-network management intention #2.

[0144] In the present application, after executing management action group #1, production entity #1 did not replace management action group #1 because the goal of sub-network management intention #1 was not achieved. For example, in the above example, production entity #1 saves 280kW of energy by executing management action group #1, and production entity #2 saves 750kW of energy by executing management action group #2. The power value of energy saving of production entity #1 and production entity #2 has reached 280+750=1030kw, that is, the total power value is greater than the target of 1000kw, and the goal of network management intention has been achieved. In this case, it is actually unnecessary for production entity #1 to replace management action group #1. If production entity #1 replaces management action group #1 based on the failure to achieve the goal of sub-network management intention #1, it may cause the base station to frequently turn on or off the energy-saving feature, affect the execution of other services of the base station, reduce service coverage, data capacity and user experience, such as unnecessary carrier shutdown will reduce the throughput of the cell and the user. Therefore, in the scheme provided in the embodiment of the present application, production entity #1 can avoid executing unnecessary actions to replace management action group #1, which can improve the execution performance of network management intention.

[0145] S330, the consumer entity receives N execution results corresponding to N sub-network management intentions, and the N execution results come from N network management entities.

[0146] Correspondingly, the N production entities send the execution results of the N sub-network management intentions respectively.

[0147] In an illustrative manner, production entity #1 sends the execution result of sub-network management intent #1 to consumption entity, and production entity #2 sends the execution result of sub-network management intent #2 to consumption entity. Consumption entity determines the execution result of network management intent based on the execution result of sub-network management intent #1 and the execution result of sub-network management intent #2.

[0148] The production entity can detect the achievement of the sub-network management intention and return the execution result to the consumer entity based on the achievement. Exemplarily, the execution results of different sub-network management intentions respectively include the performance indicator values ​​of the managed entities of the corresponding sub-network management intentions. For example, the execution result of sub-network management intention #1 returned by production network element #1 includes the performance indicator values ​​of the managed entities of sub-network management intention #1. For example, the execution result includes an achievement status information element (such as a fulfillmentinfo information element), and the achievement status information element may include an achievement status sub-information element (such as a fulfillmentstatus sub-information element) and a performance indicator information element (such as a value sub-information element). The achievement status sub-information element may indicate whether the goal of the sub-network management intention has been achieved, and the value sub-information element may indicate the performance indicator value. For example, the value sub-information element in the execution result of sub-network management intention #1 may indicate that the energy-saving power value is 280kW. It can be seen that the consumer entity can determine whether the goal of the network management intention has been achieved through the performance indicator values ​​returned by multiple production entities, rather than determining whether the goal of the network management intention has been achieved based on the achievement of the goal of each sub-network management intention, thereby improving the rationality of judging whether the network management intention has achieved the goal.

[0149] It is understandable that the performance indicator value may also be referred to as the current performance value or the achieved value for fulfilment, and may be expressed in various forms. For example, it may be the performance indicator value that the managed entity of the current sub-network management intention has achieved (such as the energy-saving power value of 280 kW), or it may be the difference between the managed entity of the current sub-network management intention and the target (such as the difference between the energy-saving power value and the target of fulfilment is 20 kW), and this application does not specifically limit this.

[0150] Optionally, the execution result of the sub-network management intent returned by the non-compliant production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant production entity has a network management action group that can be used for replacement. For example, the execution result of the sub-network management intent #1 returned by production entity #1 may include the action group exhaustion indication information. For example, an action group exhaustion information element (such as actionAllTried) may be defined in the execution result of the sub-network management intent #1. If production entity #1 generates three management action groups based on sub-network management intent #1: timed carrier shutdown, symbol shutdown, and radio frequency module sleep, and production entity #1 executes timed carrier shutdown, but has not yet executed symbol shutdown and radio frequency module sleep, then the action group exhaustion indication information indicates that production entity #1 can replace the management action group. If production entity #1 has executed all management action groups, then the action group exhaustion indication information indicates that production entity #1 cannot replace the management action group.

[0151] It is understandable that the execution result returned by the qualified production entity (the production entity that has achieved the target of the corresponding sub-network management intention) may include action group exhaustion indication information or may not include action group exhaustion indication information, and this application does not specifically limit this.

[0152] If the consumer entity instructs the production entity to return the triggering condition of the execution result of the sub-network management intention (such as described in step S310), the production entity can return the execution result of the sub-network management intention to the consumer entity in response to the triggering condition being met. For example, if the consumer entity instructs the production entity that if the target of the sub-network management intention is not achieved within the detection time, then the unqualified production entity will return the execution result of the sub-network management intention to the consumer entity. Based on the return result of the unqualified production entity, or the fact that the target of the sub-network management intention is not achieved, the consumer entity can send execution result query information to other production entities that have not returned execution results, so that other production entities can return the corresponding sub-network management intention execution results to the consumer entity in response to the execution result query information. For example Figure 3 As shown, production entity #1 did not achieve the goal of sub-network management intention #1 within the detection time. In response to the trigger condition being met, production entity #1 returns the execution result of sub-network management intention #1 to the consumer entity. The consumer entity actively sends execution result query information to production entity #2 based on the execution result of network management intention #1. The execution result query information requests production entity #2 to return the execution result. Production entity #2 returns the execution result of sub-network management intention #2 to the consumer entity in response to the execution result query information. Thus, the consumer entity can determine the execution result of the network management intention based on the execution results of different sub-network management intentions.

[0153] If the consumer entity instructs the producer entity to return the execution result of the sub-network management intent at a time and / or a period, then each producer entity may return the execution result of the sub-network management intent to the consumer entity based on the time and / or period. This application does not specifically limit this.

[0154] The consumer entity can determine whether the network management intention is achieved based on the execution results of different sub-network management intentions returned by multiple production entities. The way in which the consumer entity determines whether the network management intention is achieved is related to the type or decomposition method of the network management intention. For example, for an energy-saving intention with an energy-saving power value of 1000kW, the consumer entity can sum the performance indicator value (280kW) in the execution result of sub-network management intention #1 and the performance indicator value (750kW) in the execution result of sub-network management intention #2 to determine that the target of the network management intention (1000kW) has been achieved. For another example, when the average throughput rate in a specific area reaches a specific threshold, the consumer entity can perform weighted averaging on the returned performance indicator values ​​to determine whether the target of the network management intention is achieved. This application does not specifically limit this.

[0155] S340, the consumer entity determines whether the production entity that does not meet the standards should change the management action group.

[0156] For example, the consumer entity can determine whether the non-compliant production entity should change the management action group #1 based on the execution result of the network management intent. If the execution result of the network management intent is achieved, the consumer entity can determine that the non-compliant production entity does not change the network management action group. If the execution result of the network management intent is not achieved, the consumer entity can determine that the non-compliant production entity changes the action group.

[0157] If the execution result returned by the non-compliant production entity also includes action group exhaustion indication information, when the execution result of the network management intent is not achieved, the consumer entity can determine whether the non-compliant production entity should replace the management action group based on the execution result of the network management intent and the action group exhaustion indication information. When the action group exhaustion indication information indicates that the non-compliant production entity has a management action group that can be used for replacement, the consumer entity can determine that production entity #1 replaces the management action group. When the action group exhaustion indication information indicates that the non-compliant production entity does not have a management action group that can be used for replacement, even if the goal of the network management intent is not achieved, the consumer entity does not instruct the non-compliant production entity to replace the management action group. In this case, the consumer entity can re-execute the above steps starting from step S310, that is, the consumer entity can re-decompose the network management intent.

[0158] The consuming entity may also adjust the target of at least one sub-network management intention based on the execution results of different sub-network management intentions returned by multiple producing entities. At this time, the consuming entity may execute the following step S350.

[0159] Optionally, at S350, the consumer entity adjusts a target of the sub-network management intent.

[0160] Exemplarily, the consumer entity adjusts the target of the sub-network management intent corresponding to the production entity that has not reached the target. Still taking the energy-saving intent (target is 1000kW) as an example, production entity #1 achieves an energy-saving power value of 280kW (target is 300kW), and production entity #2 achieves an energy-saving power value of 750kW (target is 700kW). Based on the execution result, the consumer entity can adjust the target of the sub-network management intent #1 corresponding to production entity #1 to 270kW, so that both the target of sub-network management intent #1 and the target of network management intent can be achieved. In addition, the consumer entity can also adjust the target of the sub-network management intent #2 corresponding to production entity #2 to 730kW, so that the decomposition method of network management intent is more reasonable.

[0161] S360, the consumer entity sends management instruction information to the production entity that does not meet the standards.

[0162] Correspondingly, the non-compliant production entity receives management instruction information from the consumer entity.

[0163] The non-compliant production entity is a production entity that fails to achieve the target of the corresponding sub-network management intention among the multiple production entities. The management instruction information indicates whether the non-compliant production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

[0164] Exemplarily, the consumer entity sends management instruction information to the producer entity #1, where the management instruction information indicates whether the producer entity #1 should replace the network management action group #1 used to achieve the goal of the sub-network management intention #1.

[0165] If the consumer entity also adjusts the target of the sub-network management intention #1 through step S350 described above, the management indication information may also indicate the adjusted target of the sub-network management intention #1.

[0166] The non-compliant production entity (production entity #1) can determine whether to change the management action group based on the management instruction information. When the management instruction information indicates not to change the management action group, production entity #1 does not change the management action group #1, that is, production entity #1 does not perform unnecessary operations of changing the management action group, thereby avoiding waste of resources. When the management instruction information indicates to change the management action group, the non-compliant production entity can perform the following action S370.

[0167] Optionally, S370, a management action group for replacing non-compliant production entities.

[0168] Exemplarily, production entity #1 replaces management action group #1.

[0169] Production entity #1 can determine to replace the management action group based on the management instruction information. When the management instruction information indicates to replace the management action group #1, production entity #1 can select other management action groups that can be executed (such as symbol shutdown or RF module sleep that have not been executed yet) to execute, so as to achieve the goal of sub-network management intention #1.

[0170] If the consuming entity further adjusts the target of sub-network management intention #2 in step S360, the consuming entity may further perform the following step S380.

[0171] Optionally, at S380, the consumer entity sends adjustment instruction information to the qualified production entity (production entity #2). Correspondingly, the qualified production entity receives the adjustment instruction information from the consumer entity.

[0172] The adjustment indication information indicates the adjusted target of sub-network management intention #2. Therefore, during the duration of sub-network management intention #2, production entity #2 can execute sub-network management intention #2 based on the adjusted target.

[0173] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group through the achievement of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid executing unnecessary actions to replace the management action group, thereby improving the management method of network management intentions.

[0174] The above is an explanation of the execution method of the network management intent provided by the present application. Before the consumer entity sends different sub-network management intents to multiple production entities, it can also collect the capability information of the production entity for decomposing the network management intent. In order to facilitate the understanding of the present application embodiment, the following still takes production entity #1 and production entity #2 as an example, combined with Figure 4 This is a brief description of the execution method of this network management intention. For a more detailed description of the steps, please refer to Figure 3 , which will not be elaborated below.

[0175] Figure 4 It is another schematic flowchart of a method for network management intention provided in an embodiment of the present application.

[0176] Optionally, S401, the consumer entity obtains a network management service intention.

[0177] Consumer entities can obtain network management service intents, such as Figure 1 As shown in the data structure, the management service intent may include information such as intent expectations, goals, intent context, etc.

[0178] Optionally, S402, the consumer entity sends capability query information #1 to the producer entity #1.

[0179] Capability query information #1 may request production entity #1 to return the capability of production entity #1 to execute network management intent. For example, the consumer entity may determine capability attributes related to network management intent, such as energy saving attributes, latency attributes, etc. Capability query information #1 may include the capability attributes, indicating production entity #1 to return capability information corresponding to the capability attributes.

[0180] Optionally, S403, the consumer entity sends capability query information #2 to the producer entity #2

[0181] Capability query information #2 may be similar to capability query information #1, and reference may be made to the above description.

[0182] Optionally, S404, the production entity #1 sends capability information #1 to the consumption entity.

[0183] Production entity #1 can return a capability value to a consumer entity based on the capability attributes in capability query information #1. For example, if capability query information #1 requests energy-saving capability, production entity #1 can return an estimated power saving value or range to the consumer entity, such as a power saving of 200kw to 500kw.

[0184] Optionally, S405, the production entity #2 sends capability information #2 to the consumption entity.

[0185] Capability information #2 may be similar to capability information #1, and reference may be made to the above description.

[0186] Optionally, in S406, the consumer entity decomposes the network management intent based on capability information #1 and capability information #2.

[0187] Schematically, the consumer entity can decompose the goal of the network management intention (such as saving 1000kw of energy) into the goal of sub-network management intention #1 (such as saving 300kw of energy) and the goal of sub-network management intention #2 (such as saving 700kw of energy), and decompose the managed objects of the network management intention into the managed objects of sub-network management intention #1 and the managed objects of sub-network management intention #2.

[0188] S407, the consumer entity sends a request message #1 to the producer entity #1.

[0189] Request message #1 is used to request production entity #1 to execute sub-network management intention #1. Request message #1 includes sub-network management intention #1, sub-network management intention #1 includes the target of sub-network management intention #1, and may also include managed objects. Request message #1 may also include action group freezing indication information and / or triggering conditions.

[0190] S408, the consumer entity sends a request message #2 to the producer entity #2.

[0191] Request message #2 is used to request production entity #2 to execute sub-network management intention #2. Request message #2 includes sub-network management intention #2, sub-network management intention #2 includes the target of sub-network management intention #2, and may also include managed objects. Request message #2 may also include action group freeze indication information and / or trigger conditions.

[0192] S409, production entity #1 executes management action group #1.

[0193] Production entity #1 executes management action group #1 to achieve the goal of sub-network management intention #1. If production entity #1 fails to achieve the goal of sub-network management intention #1, production entity #1 does not change the management action group at this time.

[0194] S410, production entity #2 executes management action group #2.

[0195] Production entity #2 executes management action group #2 to achieve the goal of sub-network management intention #2. If production entity #2 fails to achieve the goal of sub-network management intention #2, production entity #2 does not change the management action group at this time.

[0196] S411, production entity #1 sends the execution result of sub-network management intention #1 to the consumption entity.

[0197] Optionally, S412, the consumer entity sends achievement status query information to the producer entity #2.

[0198] S413, production entity #2 sends the execution result of sub-network management intention #2 to the consumption entity.

[0199] S414, the consumer entity obtains the execution result of the network management intention.

[0200] For the description of steps S411 to S414, reference may be made to the description of step S330 above, which will not be repeated here.

[0201] S415, the consumer entity determines whether the producer entity #1 changes the network management action group.

[0202] For the description of step S415, reference may be made to the description of step S340 above, which will not be repeated here.

[0203] Optionally, S416, the consumer entity adjusts the target of the sub-network management intent.

[0204] For the description of step S416, reference may be made to the description of step S350 above, which will not be repeated here.

[0205] S417, the consumer entity sends management instruction information to the producer entity #1.

[0206] For the description of step S417, please refer to the description of step S360 above, which will not be repeated here.

[0207] Optionally, S418, production entity #1 determines to replace the management action group based on the management instruction information.

[0208] For the description of step S418, please refer to the description of step S370 above, which will not be repeated here.

[0209] Optionally, S419, the consumer entity sends adjustment indication information to the producer entity #2.

[0210] For the description of step S419, please refer to the description of step S380 above, which will not be repeated here.

[0211] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group through the achievement of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid executing unnecessary actions to replace the management action group and improve the execution performance of the network management intention.

[0212] It can also be understood that in the above-mentioned method embodiments, the methods and operations implemented by the production entity can also be implemented by components that can be produced by the production entity (such as chips or circuits); in addition, the methods and operations implemented by the consumer entity can also be implemented by components that can be consumed by the consumer entity (such as chips or circuits), without limitation.

[0213] Corresponding to the methods given in the above-mentioned method embodiments, the embodiments of the present application also provide corresponding devices, and the devices include modules for executing the corresponding methods in the above-mentioned method embodiments. The module can be software, hardware, or a combination of software and hardware. It can be understood that the technical features described in the above-mentioned method embodiments are also applicable to the following device embodiments.

[0214] See also Figure 5 , as an example, Figure 51 is a schematic diagram of a communication device 10 provided in an embodiment of the present application. The device 10 includes a transceiver unit 11 and a processing unit 12. The transceiver unit 11 can be used to implement a corresponding communication function. The transceiver unit 11 can also be called a communication interface or a communication unit. The processing unit 12 can be used to process data or information.

[0215] Optionally, the device 10 further includes a storage unit, which can be used to store instructions and / or data, and the processing unit 12 can read the instructions and / or data in the storage unit so that the device implements the aforementioned various method embodiments.

[0216] In a possible design, the device 10 can be used to execute the actions performed by the production entity in the above method embodiments. In this case, the device 10 can be a production entity or a component of a production entity, the transceiver unit 11 is used to execute the transceiver-related operations on the production entity side in the above method embodiments, and the processing unit 12 is used to execute the processing-related operations on the production entity side in the above method embodiments.

[0217] In a first possible implementation, the transceiver unit 11 is used to decompose the N sub-network management intentions obtained from the network management intention. Figure 1 Send to N network management service production entities in one place; the transceiver unit 11 receives N execution results corresponding to N sub-network management intentions, the N execution results correspond to the N network management entities, and obtains the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; the processing unit 12 is used to send management instruction information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity that has not achieved the target of the corresponding sub-network management intention among the N network management service production entities, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

[0218] The device 10 can implement the steps or processes performed by the production entity in the method embodiment according to the embodiment of the present application, and the device 10 may include a unit for executing the method performed by the production entity in the method embodiment of the present application. The specific process of each unit performing the above corresponding steps has been described in detail in the above method embodiments, and for the sake of brevity, it will not be repeated here.

[0219] Another possible design is that the device 10 can be used to execute the actions performed by the consumer entity in the above method embodiments. In this case, the device 10 can be a consumer entity or a component of a consumer entity, the transceiver unit 11 is used to execute the transceiver related operations on the consumer entity side in the above method embodiments, and the processing unit 12 is used to execute the processing related operations on the consumer entity side in the above method embodiments.

[0220] In a first possible implementation, the transceiver unit 11 is used to receive a sub-network management intent decomposed from the network management intent; the transceiver unit 11 is used to send an execution result of the sub-network management intent, wherein the execution result of the sub-network management intent indicates that the goal of the sub-network management intent has not been achieved; the transceiver unit 11 is used to receive management indication information, wherein the management indication information indicates whether to replace a network management action group used to achieve the goal of the sub-network management intent, and the management indication information is determined based on the execution result of the network management intent.

[0221] The device 10 can implement the steps or processes performed by the consumer entity in the method embodiment according to the embodiment of the present application, and the device 10 may include a unit for executing the method performed by the consumer entity in the method embodiment of the present application. The specific process of each unit performing the above corresponding steps has been described in detail in the above method embodiments, and for the sake of brevity, it will not be repeated here.

[0222] It is understandable that the device 10 here is embodied in the form of a functional unit. The term "unit" here may refer to an application specific integrated circuit (ASIC), an electronic circuit, a processor (such as a shared processor, a dedicated processor or a group processor, etc.) and a memory for executing at least one software or firmware program, a merged logic circuit and / or other suitable components that support the described functions. In an optional example, those skilled in the art may understand that the device 10 may be specifically a production entity in the above-mentioned embodiment, and may be used to execute the various processes and / or steps corresponding to the production entity in the above-mentioned method embodiments; or, the device 10 may be specifically a consumer entity in the above-mentioned embodiment, and may be used to execute the various processes and / or steps corresponding to the consumer entity in the above-mentioned method embodiments. To avoid repetition, it will not be repeated here.

[0223] The device 10 of each of the above schemes has the function of implementing the corresponding steps performed by the communication equipment (such as a production entity, and also such as a consumption entity) in the above method. The function can be implemented by hardware, or by hardware executing the corresponding software implementation. The hardware or software includes at least one module corresponding to the above function; for example, the transceiver unit can be replaced by a transceiver (for example, the sending unit in the transceiver unit can be replaced by a transmitter, and the receiving unit in the transceiver unit can be replaced by a receiver), and other units, such as the processing unit, can be replaced by a processor to respectively perform the sending and receiving operations and related processing operations in each method embodiment.

[0224] In addition, the transceiver unit 11 may also be a transceiver circuit (for example, may include a receiving circuit and a sending circuit), and the processing unit may be a processing circuit.

[0225] It should be pointed out that Figure 5 The device in the above-mentioned embodiment may be a device, or a chip or a chip system, such as a system on chip (SoC). The transceiver unit may be an input / output circuit or a communication interface; the processing unit may be a processor or a microprocessor or an integrated circuit integrated on the chip. This is not limited here.

[0226] See also Figure 6 , as an example, Figure 6 2 is a schematic diagram of another communication device 20 provided in an embodiment of the present application. The device 20 includes a processor 21, and the processor 21 is coupled to a memory 22. Optionally, the device 20 also includes a memory 22. The memory 22 is used to store computer programs or instructions and / or data, and the processor 21 is used to execute the computer programs or instructions stored in the memory 22, or read the data stored in the memory 22, so as to execute the methods in the above method embodiments.

[0227] Optionally, there is at least one processor 21.

[0228] Optionally, there is at least one memory 22.

[0229] Optionally, the memory 22 is integrated with the processor 21, or is separately provided.

[0230] Alternatively, if Figure 6 As shown, the device 20 further includes a transceiver 23, and the transceiver 23 is used for receiving and / or sending signals. For example, the processor 21 is used to control the transceiver 23 to receive and / or send signals.

[0231] As a solution, the device 20 is used to implement the operations performed by the production entity in the above various method embodiments.

[0232] For example, the processor 21 is used to execute the computer program or instructions stored in the memory 22 to implement the relevant operations of the production entity in the above various method embodiments. Figure 3 The method performed by the production entity in the illustrated embodiment.

[0233] As another solution, the device 20 is used to implement the operations performed by the consumer entity in the above various method embodiments.

[0234] For example, the processor 21 is used to execute the computer program or instructions stored in the memory 22 to implement the relevant operations of the consumer entity in each of the above method embodiments. Figure 3 The method performed by the consuming entity in the illustrated embodiment.

[0235] It is understandable that the processor mentioned in the embodiments of the present application may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0236] It can also be understood that the memory mentioned in the embodiments of the present application can be a volatile memory and / or a non-volatile memory. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM) or a flash memory. The volatile memory can be a random access memory (RAM). For example, RAM can be used as an external cache. As an example and not a limitation, RAM includes the following forms: static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous connection dynamic random access memory (SLDRAM) and direct rambus RAM (DR RAM).

[0237] When the processor is a general-purpose processor, a DSP, an ASIC, an FPGA or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component, the memory (storage module) may be integrated into the processor.

[0238] Memory described herein is intended to include, without being limited to, these and any other suitable types of memory.

[0239] See also Figure 7 , as an example, Figure 7 Schematic diagram of a chip system 30 provided in an embodiment of the present application. The chip system 30 (or also referred to as a processing system) includes a logic circuit 31 and an input / output interface 32 .

[0240] Among them, the logic circuit 31 can be a processing circuit in the chip system 30. The logic circuit 31 can be coupled to the storage unit and call the instructions in the storage unit so that the chip system 30 can implement the methods and functions of each embodiment of the present application. The input / output interface 32 can be an input / output circuit in the chip system 30, outputting information processed by the chip system 30, or inputting data or signaling information to be processed into the chip system 30 for processing.

[0241] Specifically, for example, if the production entity installs the chip system 30, the logic circuit 31 is coupled to the input / output interface 32, and the input / output interface 32 can input the wake-up signal to the logic circuit 31 for processing.

[0242] As a solution, the chip system 30 is used to implement the operations performed by the production entity in the above various method embodiments.

[0243] For example, the logic circuit 31 is used to implement the processing-related operations performed by the production entity in the above method embodiment, such as: Figure 3 The processing-related operations performed by the production entity in the embodiment shown; the input / output interface 32 is used to implement the sending and / or receiving-related operations performed by the production entity in the above method embodiment, such as, Figure 3 The production entity in the illustrated embodiment performs sending and / or receiving related operations.

[0244] As another solution, the chip system 30 is used to implement the operations performed by the consumer entity in the above various method embodiments.

[0245] For example, the logic circuit 31 is used to implement the processing-related operations performed by the consumer entity in the above method embodiment, such as: Figure 3 The processing-related operations performed by the consuming entity in the illustrated embodiment; the input / output interface 32 is used to implement the sending and / or receiving-related operations performed by the consuming entity in the above method embodiment, such as, Figure 3 The consuming entity in the illustrated embodiment performs sending and / or receiving related operations.

[0246] An embodiment of the present application also provides a computer-readable storage medium on which computer instructions for implementing the methods executed by the device in the above-mentioned method embodiments are stored.

[0247] For example, when the computer program is executed by a computer, the computer can implement the methods performed by the production entity in each embodiment of the above method.

[0248] For another example, when the computer program is executed by a computer, the computer can implement the methods performed by the consumer entity in each embodiment of the above method.

[0249] An embodiment of the present application also provides a computer program product, comprising instructions, which, when executed by a computer, implement the methods performed by a production entity or a consumption entity in the above-mentioned method embodiments.

[0250] An embodiment of the present application further provides a communication system, which includes the production entity and the consumption entity in the above embodiments.

[0251] The explanation of the relevant contents and beneficial effects of any of the above-mentioned devices can be referred to the corresponding method embodiments provided above, which will not be repeated here.

[0252] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as at least two units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0253] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes at least one computer instruction. When the computer program instruction is loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. For example, the computer can be a personal computer, a server, or a network device, etc. The computer instruction can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instruction can be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains at least one available medium integrated. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a magnetic tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid state disk (SSD), etc. For example, the aforementioned available medium includes, but is not limited to, various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0254] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for managing network management intentions, characterized in that: The method comprises: Sending N sub-network management intentions decomposed from the network management intention to N network management service production entities one-to-one; Receiving N execution results corresponding to N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtaining an execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; Based on the execution result of the network management intention, management instruction information is sent to the non-compliant network management service production entity, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the corresponding sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

2. The method according to claim 1, characterized in that The N execution results respectively include performance indicator values ​​of managed entities of corresponding sub-network management intentions, and the execution result of the network management intention obtained based on the N execution results includes: The execution result of the network management intention is determined to be achieved or not based on the performance indicator values ​​of the managed entities of the N sub-network management intentions.

3. The method according to claim 1 or 2, characterized in that The execution result of the sub-network management intention from the non-compliant network management production entity further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.

4. The method according to any one of claims 1 to 3, characterized in that Before obtaining the execution result of the network management intention based on the N execution results, the method further includes: Action group freezing indication information is sent to the N network management service production entities respectively, and the action group freezing indication information instructs the N network management service production entities not to change the network management action group based on the execution result of the corresponding sub-network management intention.

5. The method according to any one of claims 1 to 4, characterized in that The method further comprises: The target of the sub-network management intention corresponding to the non-compliant network management service production entity is adjusted based on the N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the non-compliant network management service production entity.

6. The method according to any one of claims 1 to 5, characterized in that Before obtaining the execution result of the network management intention based on the N execution results, the method further includes: A trigger condition for returning the execution result of the sub-network management intention is sent to each of the N network management service production entities, and the trigger condition is that the target of the corresponding sub-network management intention is not achieved within the detection time.

7. The method according to claim 6, characterized in that The receiving the execution results of the corresponding sub-network management intentions from the N network management service production entities respectively includes: Receiving the execution result of the corresponding sub-network management intention from the non-compliant network management service production entity; Sending achievement status query information to other network management service production entities among the N network management service production entities except the network management service production entity that does not meet the standards, wherein the achievement status query information requests to return the execution result of the corresponding sub-network management intention; Receive the execution result of the corresponding sub-network management intention from the other network management service production entity.

8. The method according to any one of claims 1 to 7, characterized in that The method further comprises: In the case where the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not change the network management action group, and the management instruction information instructs the non-compliant network management service production entity not to change the network management action group; In the case where the execution result of the network management intention is not achieved, the non-compliant network management service production entity is determined to replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group; or, in the case where the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, the non-compliant network management service production entity is determined to replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group.

9. The method according to any one of claims 1 to 8, characterized in that The N network management service production entities are respectively N different equipment management systems, or the N network management production entities are respectively N different network elements.

10. The method according to any one of claims 1 to 9, characterized in that The network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.

11. A method for managing network management intentions, characterized in that: The method comprises: receiving a sub-network management intent decomposed from the network management intent; Sending an execution result of the sub-network management intention, wherein the execution result of the sub-network management intention indicates that a goal of the sub-network management intention has not been achieved; Management indication information is received, wherein the management indication information indicates whether to replace a network management action group used to achieve a target of the sub-network management intention, and the management indication information is determined based on an execution result of the network management intention.

12. The method according to claim 11, characterized in that The execution result of the sub-network management intention includes the current performance value of the managed entity of the sub-network management intention, and the performance indicator value is used to determine whether the execution result of the network management intention is achieved or not.

13. The method according to claim 11 or 12, characterized in that The execution result of the sub-network management intention further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether there is a network management action group that can be used for replacement.

14. The method according to any one of claims 11 to 13, characterized in that Before sending the execution result of the sub-network management intention, the method further includes: Action group freezing indication information is received, where the action group freezing indication information indicates not to change the network management action group based on the execution result of the sub-network management intention.

15. The method according to any one of claims 11 to 14, characterized in that The management indication information also indicates the adjusted target of the sub-network management intention.

16. The method according to any one of claims 11 to 15, characterized in that Before sending the execution result of the sub-network management intention, the method further includes: receiving a trigger condition for returning an execution result of the sub-network management intention, wherein the trigger condition is that a target of the sub-network management intention is not achieved within a detection time period; The execution result of sending the sub-network management intention includes: In response to the trigger condition being met, sending the execution result of the sub-network management intention.

17. The method according to any one of claims 11 to 16, characterized in that The method further comprises: Based on the management instruction information, it is determined whether to replace the network management action group used to achieve the target of the sub-network management intention.

18. The method according to any one of claims 11 to 17, characterized in that The network management intent is an end-to-end intent, and the sub-network management intent is a management domain intent decomposed from the end-to-end intent.

19. A method for managing network management intentions, characterized in that: The method comprises: Sending N sub-network management intentions decomposed from the network management intention to N network management service production entities one-to-one, and the N network management service production entities receive the corresponding sub-network management intentions respectively; The N network management service production entities respectively send the execution results of the corresponding sub-network management intentions, receive N execution results corresponding to the N sub-network management intentions, the N execution results correspond to the N network management entities, and obtain the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; Based on the execution result of the network management intention, management instruction information is sent to the non-compliant network management service production entity, and the non-compliant network management service production entity receives the management instruction information, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

20. A device for managing network management intentions, characterized in that: The device comprises a transceiver unit and a processing unit. The transceiver unit is used to send N sub-network management intentions obtained by decomposing the network management intention to N network management service production entities one-to-one; The transceiver unit is used to receive N execution results corresponding to N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtain the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; The processing unit is used to send management instruction information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.

21. A device for managing network management intentions, characterized in that: The device comprises a transceiver unit and a processing unit. The transceiver unit is used to receive the sub-network management intent decomposed from the network management intent; The transceiver unit is used to send the execution result of the sub-network management intention, and the execution result of the sub-network management intention indicates that the goal of the sub-network management intention has not been achieved; The transceiver unit is used to receive management indication information, where the management indication information indicates whether to replace the network management action group used to achieve the target of the sub-network management intention, and the management indication information is determined based on the execution result of the network management intention.

22. A communication system, comprising an apparatus for executing the method according to any one of claims 1 to 10 and an apparatus for executing the method according to any one of claims 11 to 18.

23. The system of claim 22, wherein: Also included are managed entities for network management purposes.

24. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed on a computer, the computer is caused to execute the method according to any one of claims 1 to 10, or the computer is caused to execute the method according to any one of claims 11 to 18.

25. A computer program product, characterized in that The method comprises a computer program code, which, when executed on a computer, causes the computer to implement the method according to any one of claims 1 to 10 or causes the computer to implement the method according to any one of claims 11 to 18.

26. A communication device, characterized in that: include: A processor, configured to execute a computer program stored in a memory so that the apparatus performs the method as claimed in any one of claims 1 to 10, or configured to execute a computer program stored in a memory so that the apparatus performs the method as claimed in any one of claims 11 to 18.

27. The device according to claim 26, characterized in that The apparatus also includes the memory.

Citation Information

Cited By

  • Network management service intention management method, device and system

    EP4712449A1

  • Network management service intention management method, device and system

    WO2024244874A1