Real-time monitoring and inversion method for surrounding rock convergence deformation field of underground mine roadway

By using rotatable laser ranging device and underground network transmission technology in underground metal mine tunnels, continuous real-time monitoring and inversion analysis of the convergence deformation field of the tunnel surrounding rock is achieved, and the surrounding rock stability evaluation in the existing technology is solved The inaccurate problem has improved the ability to prevent and control ground pressure disasters and optimize mining processes.

CN119085518APending Publication Date: 2024-12-06NORTHEASTERN UNIV CHINA
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411242179.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing technology is difficult to realize continuous real-time monitoring and inversion analysis of the convergence deformation field of the surrounding rock in underground metal mine tunnels, resulting in inaccurate assessment of surrounding rock stability and unable to meet the needs of regional ground-pressure disaster prevention and control and systematic mining process optimization and regulation. .

Method used

The rotatable laser ranging device is used to monitor the settlement amount of the tunnel roof and the convergence deformation amount of the two-gang. The data is transmitted in real time through the underground network connection to the surface server, and the inversion analysis is performed using the interpolation calculation method to generate a cloud map of the convergence deformation of the tunnel surrounding rock.

Benefits of technology

Continuous real-time monitoring and inversion analysis of the convergence deformation field of the surrounding rock in underground metal mine tunnels is realized, and the accuracy of the surrounding rock stability evaluation is improved. It can simultaneously monitor the convergence deformation of multiple tunnels and multiple sections, and grasp the changes of regional deformation field in real time. trend.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119085518A_ABST
    Figure CN119085518A_ABST
Patent Text Reader

Abstract

The invention provides an underground mine roadway surrounding rock convergence deformation field real-time monitoring and inversion method, and relates to the technical field of roadway surrounding rock monitoring. Comprising the following steps: (1) selecting points, arranging a roadway laser deformation monitoring device, and collecting roadway surrounding rock convergence deformation information; (2) multi-roadway multi-section deformation information is transmitted in real time; and (3) inversely analyzing the surrounding rock convergence deformation field of the underground metal mine roadway. According to the invention, the rotary laser ranging device is adopted, so that the continuous real-time monitoring of the displacement deformation of the roadway can be realized; a network data transmission method is adopted, surrounding rock convergence deformation data of multiple sections of multiple roadways can be transmitted at the same time, the efficiency is high, and the time is short; the multi-section convergence deformation of multiple roadways can be monitored at the same time, and the change trend of the underground metal mine regional roadway deformation field can be mastered in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel surrounding rock monitoring, and in particular to a real-time monitoring and inversion method for the convergence deformation field of the surrounding rock of an underground mine tunnel. Background Art

[0002] During the underground mining of metal mines, the underground space formed by the excavation of tunnels and stopes has a deformation that converges to the middle over time under the action of secondary stress. Generally speaking, metal mines have a large mining range and complex distribution of shaft and tunnel engineering. The cumulative extension length of shaft and tunnel engineering can reach tens of thousands of meters, presenting a complex three-dimensional staggered arrangement of thousands of meters vertically and thousands of meters horizontally. In this case, the deformation and damage of tunnels at different locations are quite different and are closely related to the mining process. Local tunnel convergence deformation monitoring cannot reveal the overall ground pressure manifestation characteristics and change laws of metal mines, and cannot meet the needs of regional ground pressure disaster prevention and control and systematic mining process optimization and regulation. Therefore, it is urgent to carry out large-scale tunnel surrounding rock convergence deformation observations to obtain regional tunnel surrounding rock convergence deformation fields, thereby revealing the overall ground pressure manifestation characteristics of the mine.

[0003] At present, the methods for monitoring the convergence and deformation of surrounding rocks in mine tunnels include steel tape measurement detection method, convergence meter detection method, three-dimensional laser scanning method, etc. For example, the invention patent with patent number CN103616009B provides a convergence meter constant torque loading device for tunnel monitoring and measurement. The device relies on a spring tube with a nut and a screw to measure the convergence deformation. The device has the problem of requiring manual regular measurement and cannot achieve continuous real-time monitoring; the utility model patent with patent number CN219161238U provides a tunnel deformation monitoring device using a sensor installed in a monitoring column. The monitoring column mentioned in the device is installed It is placed on the ground and the roof, and is not suitable for the arched tunnels of underground metal mines; the invention patent with patent number CN116697868A provides a device that uses a rope-row measuring mechanism to measure the deformation of the tunnel after arranging an arch frame in the tunnel. This device has the problem of complex installation and easy to affect the passage of underground vehicles; the utility model patent with patent number CN217687110U provides a portable device for measuring three-dimensional laser scanners, which can realize manual carrying of the three-dimensional laser scanner to the tunnel for measurement. This device has a long single scanning time, which will affect the normal construction in the underground tunnel during use.

[0004] In order to meet the needs of regional ground pressure disaster prevention and control and systematic mining process optimization and regulation in underground metal mine tunnel engineering, it is necessary to invent a real-time monitoring and inversion method for the convergence deformation field of the surrounding rock of underground mine tunnels. At present, it is difficult to obtain the deformation law of the convergence deformation displacement field of the surrounding rock of underground tunnels, and the surrounding rock stability assessment is not accurate enough. The existing technologies have not been able to fully realize the continuous real-time monitoring and inversion analysis of the convergence deformation field of the surrounding rock of underground metal mine tunnels. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a real-time monitoring and inversion method for the convergence deformation field of the surrounding rock of an underground mine tunnel in response to the deficiencies of the above-mentioned prior art, so as to solve the practical problems that it is difficult to obtain the deformation law of the convergence deformation displacement field of the surrounding rock of the underground tunnel and the surrounding rock stability assessment is not accurate enough.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] A real-time monitoring and inversion method for the convergence deformation field of surrounding rock in underground mine tunnels comprises the following steps:

[0008] Step 1: Select points to install a rotatable laser ranging device according to the flatness of the two sides of the tunnel, fix the initial angle of the collector, monitor the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel respectively, and realize continuous real-time monitoring of the convergence deformation field of the surrounding rock of the underground metal mine tunnel;

[0009] Step 2: After installing rotatable laser ranging devices in multiple underground tunnels, they are connected through an underground network, and a surrounding rock convergence and deformation monitoring system for underground metal mine tunnels is formed by using the rotatable laser ranging devices in multiple underground tunnels. The surrounding rock convergence and deformation monitoring data of multiple tunnels obtained by the monitoring system are transmitted to the surface server in real time through network transmission;

[0010] Preferably, the rotatable laser ranging device adopts model YHJ-200J.

[0011] Step 3: Use the interpolation calculation method to process the underground metal mine tunnel surrounding rock convergence deformation monitoring data received by the surface server, specifically involving two types of data: tunnel roof settlement and tunnel side convergence deformation, and then perform an inversion analysis on the surrounding rock convergence deformation field of the overall tunnel project of the underground metal mine.

[0012] Furthermore, the rotatable laser ranging device includes a laser transmitter head, a reflector, a data processing mainboard, an intelligent collector, and a battery; the rotatable laser ranging device is responsible for continuous real-time monitoring of the convergence and deformation of the surrounding rock of the underground metal mine tunnel, and acquiring data, and using the underground network to simultaneously measure and transmit data to multiple tunnels; the laser transmitter head emits a laser, and the data processing mainboard calculates the reciprocating time of the laser reflection, and further calculates the deformation data.

[0013] Furthermore, in the step 2, the real-time transmission of the surrounding rock convergence and deformation monitoring data of multiple tunnels is completed by relying on a wireless network, a data transfer device, an underground data exchange device and a wellhead monitoring data processing device, and the collected tunnel surrounding rock convergence and deformation monitoring data is uploaded to the data transfer device in real time for conversion, and then transmitted to the server on the surface through the underground network; the intelligent collector in the rotatable laser ranging device adopts a chip with automatic address recognition, and each intelligent collector in the underground metal mine tunnel surrounding rock convergence and deformation monitoring system will set an address. When the underground metal mine tunnel surrounding rock convergence and deformation monitoring system is working, the underground data exchange device continuously sends address information in a loop, and when the address of the underground data exchange device matches that of the intelligent collector, the intelligent collector will perform a measurement.

[0014] Furthermore, in step 3, the deformation curve is drawn according to the monitoring time for the convergence deformation data of the tunnel surrounding rock, including the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel, through the monitoring terminal on the surface, to obtain the convergence deformation of the surrounding rock of the underground metal mine tunnel. According to the convergence deformation size of different sections, it is divided into large deformation section, relatively large deformation section, medium deformation section, and small deformation section. The safety of different sections is judged according to the engineering analogy method and field observation method mentioned in the non-ferrous metal mine shaft and tunnel engineering design specification GB50915-2013. By using the interpolation calculation method, the convergence deformation data obtained from adjacent sections are interpolated, and the deformation field of the adjacent monitoring area is obtained by inversion analysis, and then the overall underground metal mine tunnel surrounding rock convergence deformation field is obtained, and finally the underground metal mine tunnel convergence deformation cloud map is obtained.

[0015] The beneficial effects of adopting the above technical scheme are: the continuous real-time monitoring and inversion analysis method of the convergence and deformation field of the surrounding rock of the underground metal mine tunnel provided by the present invention adopts a rotatable laser ranging device, which can achieve continuous real-time monitoring of the displacement deformation of the tunnel; the network data transmission method is adopted, and the surrounding rock convergence and deformation data of multiple sections of multiple tunnels can be transmitted simultaneously, which is highly efficient and time-saving; the convergence and deformation of multiple tunnels and multiple sections can be monitored simultaneously, and the change trend of the regional tunnel deformation field of the underground metal mine can be grasped in real time. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1A schematic diagram of the overall process provided by an embodiment of the present invention;

[0017] Figure 2 The layout of monitoring devices and distribution of measuring points in the tunnel provided by the embodiment of the present invention;

[0018] Figure 3 A schematic diagram of the monitoring system provided in an embodiment of the present invention;

[0019] Figure 4 The cloud map of deformation monitoring results of underground metal mine tunnels finally obtained in the embodiment of the present invention.

[0020] In the figure: 1. Rotatable laser ranging device; 2. Monitoring point; 3. Sensor measurement path; 4. Monitoring section; 5. Data transfer device; 6. Downhole data exchange device; 7. Wellhead monitoring data processing device; 8. Wireless transmission signal tower. DETAILED DESCRIPTION

[0021] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0022] like Figure 1 As shown, the method of this embodiment is described as follows.

[0023] Step 1: According to the flatness of the two sides of the tunnel, select and install a rotatable laser ranging device 1, which contains a laser ranging sensor and a main control chip, fix the initial angle of the collector, and monitor the settlement deformation of the tunnel roof and the convergence deformation of the two sides of the tunnel respectively, so as to achieve continuous real-time monitoring of the convergence deformation field of the surrounding rock of the underground metal mine tunnel. The laser ranging sensor is responsible for continuous real-time monitoring of the convergence deformation of the surrounding rock of the underground metal mine tunnel, and obtains data, and uses the underground network to simultaneously measure and transmit data for multiple tunnels.

[0024] The layout of monitoring devices and distribution of measuring points in the tunnel are as follows: Figure 2 According to the preset monitoring point 2, the rotatable laser distance measuring device performs laser distance measurement on the deformation displacement of different points.

[0025] This embodiment adopts a three-point monitoring method for calculating the convergence deformation of the tunnel surrounding rock. Generally, point A located at the top plate and points B and C located at the two sides are selected. By measuring the distances between points AB, AC and BC, that is, the sensor measurement path 3, including L AB , L AC , L BC , the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel are calculated. Through long-term monitoring data analysis, the changes in the clearance size inside the tunnel are obtained.

[0026] Step 2: After installing the rotatable laser ranging device 1 in multiple underground tunnels, they are connected through the underground network, and the rotatable laser ranging devices 1 in multiple underground tunnels are used to form an underground metal mine tunnel surrounding rock convergence deformation monitoring system, and the monitoring data of multiple tunnel surrounding rock convergence deformation obtained by the monitoring system are transmitted to the surface server in real time through network transmission. In this embodiment, the rotatable laser ranging device 1 adopts the model YHJ-200J.

[0027] like Figure 3 As shown in FIG. 1 , it is a schematic diagram of the composition of the surrounding rock convergence deformation monitoring system of underground metal mine tunnels in this embodiment. The monitoring system can monitor multiple tunnels underground at the same time, and multiple monitoring sections 4 can be arranged in one tunnel for continuous real-time monitoring according to monitoring requirements.

[0028] Among them, the data transfer device 5 is responsible for transferring the data collected by the rotatable laser monitoring device 1 and other access and data through network communication equipment, and has an explosion-proof housing, which meets the underground explosion-proof requirements;

[0029] The downhole data exchange device 6 is responsible for receiving the data transmitted by the rotatable laser monitoring device 1 and uploading the data to the wellhead monitoring data processing device 7. The downhole data exchange device 6 is connected to the nearest data transfer device 5 through a twisted pair or an optical cable, and communicates with the surface storage server using the transmission control protocol (TCP). It has an explosion-proof housing and meets the underground explosion-proof requirements;

[0030] The wellhead monitoring data processing device 7 is responsible for the human-machine interaction function of the displacement deformation data of the underground tunnel, and is responsible for processing the data transmitted to the server by the rotatable laser monitoring device 1, which can be remotely transmitted through wireless signals;

[0031] The surface wireless transmission signal tower 8 is responsible for transmitting the underground data to the remote server after the underground data is transmitted to the monitoring terminal located on the surface.

[0032] Step 3: Through the monitoring terminal on the surface, the deformation curve is drawn according to the monitoring time for the convergence and deformation data of the tunnel surrounding rock, including the settlement of the tunnel roof and the convergence and deformation of the two sides of the tunnel, to obtain the convergence and deformation of the surrounding rock of the underground metal mine tunnel. According to the convergence and deformation size of different sections, it is divided into large deformation section, large deformation section, medium deformation section and small deformation section. The safety is judged according to the engineering analogy method and field observation method mentioned in the non-ferrous metal mine shaft and tunnel engineering design specification GB 50915-2013. By using the interpolation calculation method, the convergence and deformation data obtained from adjacent sections are interpolated and inverted to obtain the deformation field of the adjacent monitoring area, and then the overall underground metal mine tunnel surrounding rock convergence deformation field is obtained, and finally the underground metal mine tunnel convergence deformation cloud map is obtained.

[0033] like Figure 4 As shown, it is a cloud map of the convergence deformation monitoring results of underground metal mine tunnels obtained in this embodiment.

[0034] Large deformation area: Based on the comprehensive evaluation of the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel, it is concluded that the overall convergence deformation of the tunnel in this area is large, and this area is judged to be a large deformation area.

[0035] Large deformation area: Based on the comprehensive evaluation of the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel, it is concluded that the overall convergence deformation of the tunnel in this area is large, and this area is judged to be a large deformation area.

[0036] Medium deformation area: Based on the comprehensive evaluation of the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel, it is concluded that the overall convergence deformation of the tunnel in this area is medium, and this area is judged to be a medium deformation area.

[0037] Minor deformation area: Based on a comprehensive evaluation of the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel, it is concluded that the overall convergence deformation of the tunnel in this area is small, and the area is judged to be a minor deformation area.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope defined by the claims of the present invention.

Claims

1. A real-time monitoring and inversion method for the convergence deformation field of surrounding rock in underground mine tunnels, characterized by: The steps include: Step 1: Select points to install a rotatable laser ranging device (1) according to the flatness of the two sides of the tunnel, fix the initial angle of the collector, monitor the settlement of the tunnel roof and the convergence deformation of the two sides of the tunnel respectively, and realize continuous real-time monitoring of the convergence deformation field of the surrounding rock of the underground metal mine tunnel; Step 2: After installing the rotatable laser ranging devices (1) in multiple underground tunnels, they are connected through an underground network, and the rotatable laser ranging devices (1) in multiple underground tunnels are used to form an underground metal mine tunnel surrounding rock convergence deformation monitoring system, and the monitoring data of the surrounding rock convergence deformation of multiple tunnels obtained by the monitoring system are transmitted to the surface server in real time through network transmission; Step 3: Use the interpolation calculation method to process the underground metal mine tunnel surrounding rock convergence deformation monitoring data received by the surface server, specifically involving two types of data: tunnel roof settlement and tunnel side convergence deformation, and then perform an inversion analysis on the surrounding rock convergence deformation field of the overall tunnel project of the underground metal mine.

2. The method for real-time monitoring and inversion of surrounding rock convergence deformation field in underground mine tunnels according to claim 1 is characterized by: The rotatable laser distance measuring device (1) is responsible for continuous real-time monitoring of the convergence and deformation of the surrounding rock in underground metal mine tunnels, acquiring data, and using an underground network to simultaneously measure multiple tunnels and transmit data, and comprises a laser transmitter head, a reflector, a data processing mainboard, an intelligent collector, and a battery; the laser transmitter head emits a laser, and the data processing mainboard calculates the reciprocating time of laser reflection, and further calculates the deformation data.

3. The method for real-time monitoring and inversion of surrounding rock convergence deformation field in underground mine tunnels according to claim 2 is characterized by: The rotatable laser distance measuring device (1) adopts the model YHJ-200J.

4. The method for real-time monitoring and inversion of surrounding rock convergence deformation field in underground mine tunnels according to claim 2 is characterized by: In step 2, the real-time transmission of the surrounding rock convergence and deformation monitoring data of multiple tunnels is completed by relying on a wireless network, a data transfer device (5), a downhole data exchange device (6) and a wellhead monitoring data processing device (7). The collected tunnel surrounding rock convergence and deformation monitoring data is uploaded to the data transfer device (5) in real time for conversion, and then transmitted to a server located on the surface through the downhole network.

5. The method for real-time monitoring and inversion of surrounding rock convergence deformation field of underground mine tunnel according to claim 4 is characterized by: The data transfer device (5) is responsible for transferring the data collected by the rotatable laser monitoring device and other access and data through the network communication device, and has an explosion-proof housing that meets the underground explosion-proof requirements; The downhole data exchange device (6) is responsible for receiving the data transmitted by the rotatable laser monitoring device and uploading the data to the wellhead monitoring data processing device (7). The downhole data exchange device (6) is connected to the nearest data transfer device (5) via a twisted pair or an optical cable, and communicates with the surface storage server using the transmission control protocol, namely TCP. It has an explosion-proof housing and meets the underground explosion-proof requirements. The wellhead monitoring data processing device (7) is responsible for the human-machine interaction function of the displacement deformation data of the underground tunnel, is responsible for processing the data transmitted to the server by the rotatable laser monitoring device, and performs remote transmission via wireless signals; The surface wireless transmission signal tower (8) is responsible for transmitting the underground data to a remote server after the underground data is transmitted to a monitoring terminal located on the surface.

6. The method for real-time monitoring and inversion of surrounding rock convergence deformation field in underground mine tunnels according to claim 4 is characterized by: In the step 2, a chip with automatic address recognition is used in the intelligent collector in the rotatable laser ranging device (1). Each intelligent collector in the underground metal mine tunnel surrounding rock convergence and deformation monitoring system is set with an address. When the underground metal mine tunnel surrounding rock convergence and deformation monitoring system is working, the underground data exchange device continuously sends address information in a loop. When the address of the underground data exchange device matches that of the intelligent collector, the intelligent collector performs a measurement.

7. The method for real-time monitoring and inversion of surrounding rock convergence deformation field in underground mine tunnels according to claim 6 is characterized by: In the step 3, the deformation curve is drawn according to the monitoring time for the tunnel surrounding rock convergence deformation data, including the tunnel roof settlement and the tunnel two sides convergence deformation data, through the monitoring terminal on the surface, to obtain the convergence deformation of the underground metal mine tunnel surrounding rock. According to the convergence deformation size of different sections, it is divided into large deformation section, relatively large deformation section, medium deformation section, and small deformation section. The safety of different sections is judged according to the engineering analogy method and field observation method mentioned in the non-ferrous metal mine shaft and tunnel engineering design specification GB 50915-2013. By using the interpolation calculation method, the convergence deformation data obtained from adjacent sections are interpolated, and the deformation field of the adjacent monitoring area is obtained by inversion analysis, and then the overall underground metal mine tunnel surrounding rock convergence deformation field is obtained, and finally the underground metal mine tunnel convergence deformation cloud map is obtained.

Citation Information

Cited By

  • Shield construction data monitoring method and equipment

    CN121576992A