Tunnel pipe ring convergence measurement method

By monitoring the angle changes of tunnel pipe ring joints to calculate the convergence degree, the problem of low measurement accuracy of tunnel pipe ring convergence deformation in the existing technology is solved, and high-precision tunnel pipe ring convergence deformation monitoring is achieved, improving the safety of construction and operation and maintenance sex.

CN119085588APending Publication Date: 2024-12-06NAT ENG RES CENT OF DREDGING TECH & EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411443163.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art is difficult to achieve high-precision measurement of tunnel pipe ring convergence deformation during the shield construction stage, mainly due to the measurement accuracy bottleneck caused by harsh measurement environment and equipment shading.

Method used

By monitoring the angle changes of the pipe ring joints, the distance change value between non-adjacent joints is calculated, and the convergence degree of the pipe ring is determined. The algorithm design based on the absolute coordinate system is used to simplify the measurement process and improve the accuracy.

Benefits of technology

It realizes high-precision measurement of convergence deformation of tunnel pipe rings, reduces installation difficulty and sensor accuracy requirements, and improves construction safety and operation and maintenance monitoring reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119085588A_ABST
    Figure CN119085588A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a tunnel pipe ring convergence measurement method, and relates to the field of tunnel monitoring. The method comprises the steps that the central angle of each pipe piece relative to the circumference of a pipe ring is determined, and the initial circumference of the pipe ring is an ideal circle formed by splicing the pipe pieces; determining the azimuth angle value of each joint based on the central angle of each segment and the initial azimuth angle value of the F block with the shortest arc length in the plurality of segments, and obtaining the initial coordinates of the joints and the initial distance between any two non-adjacent joints; under the absolute coordinate system, the angle change value of each segment in a set period is measured, and based on the angle change value, the final coordinate value of each joint and the final distance between any two non-adjacent joints are calculated; and for any two non-adjacent joints, calculating a difference value between the final distance and the initial distance, and taking the difference value as a convergence value of the pipe ring in the direction. The method realizes pipe ring convergence deformation measurement, and is simple in mode and easy to implement and popularize.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an algorithm design applied in the field of tunnel monitoring, applied in tunnel construction and operation and maintenance, and in particular to a tunnel pipe ring convergence measurement method. Background Art

[0002] With the rapid development of China's transportation network, the number of tunnels in China has ranked first in the world. Monitoring the safety status of tunnels has become an important part of tunnel safety construction and operation, and the monitoring results have become the main basis for evaluating tunnel safety and durability.

[0003] In order to ensure the safety and stability of the tunnel structure, shield construction uses multi-ring connected prefabricated lining (segments) as the innermost support structure of the tunnel. Affected by multiple factors such as grouting pressure, environmental water and soil pressure, and shield construction force changes, the tunnel ring is prone to convergence and deformation within the tunnel cross section. Automatic detection of tunnel convergence and deformation is of great significance to tunnel construction safety and tunnel operation and maintenance safety monitoring.

[0004] The pipe ring converges and deforms as follows Figure 1 As shown in the figure, there are many tunnel ring monitoring technologies for the tunnel operation and maintenance stage. However, during the shield machine construction stage, it is difficult to achieve high-precision measurement of the pipe ring convergence deformation without a new breakthrough algorithm design due to the limited measurement space blocked by the shield machine equipment and the harsh measurement environment.

[0005] Close to the prior art, CN116105672A proposes a tunnel pipeline convergence deformation monitoring method and system. According to the 16 installation positions of the capping block, a mathematical calculation model corresponding to each installation position is established; according to the endpoint coordinates of each segment, the centroid coordinates of the circle are fitted; according to the centroid coordinates of the fitted circle, the center and radius are fitted, and the fitted circle is drawn; according to the endpoint coordinates of each segment, the radius corresponding to the segment and the center angle corresponding to the segment, the coordinates between the endpoints are fitted using the polar coordinate method, and according to the coordinates between the endpoints corresponding to each segment, the arc curve corresponding to each segment is fitted, and the curve graph of the entire pipe ring is formed by splicing, which is used to reflect the overall deformation of the pipeline. This technical solution has a bottleneck in terms of accuracy due to the limitations of the installation accuracy of the measuring points and the fitting means.

[0006] Based on the above technical problems, the applicant proposed the technical solution of the present application. Summary of the invention

[0007] The purpose of the present invention is to provide a method for measuring the convergence of a tunnel pipe ring. By monitoring the angle change of the pipe ring joint, the distance change value between two non-adjacent pipe ring joints is determined, and then the pipe ring convergence degree is obtained, and an algorithm design for the pipe ring convergence deformation is realized. The measurement method based on the algorithm is simple, easy to implement and promote.

[0008] To achieve the above object, the present invention provides a method for measuring the convergence of a tunnel ring, wherein the ring is composed of a plurality of segments, including: determining the center angle of each segment relative to the circumference of the ring, wherein the circumference of the ring is an ideal circle formed by splicing the segments;

[0009] Based on the central angle of each segment and the initial azimuth angle value of the F block with the shortest arc length among the segments, the azimuth angle value of each joint is determined, and the initial coordinates of the joint and the initial distance between any two non-adjacent joints are obtained;

[0010] In an absolute coordinate system, measuring the angle change value of each pipe segment within a set period, and calculating the final coordinate value of each joint and the final distance between any two non-adjacent joints based on the angle change value;

[0011] For any two of the non-adjacent seams, the difference between the final distance and the initial distance is calculated, and the difference is used as the convergence value of the pipe ring in this direction.

[0012] The present invention also provides a non-transitory computer-readable storage medium, on which processor executable instructions are stored, and the executable instructions are configured to execute the above-mentioned tunnel ring convergence measurement method.

[0013] In one embodiment, measuring the angle change value of each segment within a set period, and obtaining the final coordinate value of each joint and the final distance between any two non-adjacent joints based on the angle change value, comprises:

[0014] Determine the angle change value of each pipe segment in the absolute coordinate system within a preset setting period;

[0015] Select any seam as the starting seam point, and calculate the coordinate value of each seam according to the rigid body rotation coordinate calculation method;

[0016] Select the next seam as the starting seam point in clockwise / counterclockwise order to calculate the corresponding coordinates of each seam. After one cycle, multiple sets of coordinate values ​​corresponding to each seam are obtained.

[0017] After averaging the multiple groups of coordinate values ​​corresponding to each of the seams, a final coordinate value of each of the seams is determined;

[0018] Based on the final coordinate value of each seam, a final distance between any two non-adjacent seams is calculated.

[0019] In one embodiment, the rigid body rotation coordinate calculation method includes:

[0020] The pipe ring is equivalent to a planar multi-link mechanism, and each pipe segment is a connecting rod;

[0021] Taking the first end point of each connecting rod as the rotation center, according to the rotation angle of the connecting rod, assuming that the remaining connecting rods are not relatively bent, calculate the coordinate value of the first end point of the next connecting rod;

[0022] The obtained coordinate value of the first end point of each connecting rod is used as the coordinate value of the connecting rod joint.

[0023] In one embodiment, the coordinate value of each seam is calculated by the following formula:

[0024]

[0025] The subscript i indicates the joint number, and the superscript m indicates the mth rotation of the segment during the iterative calculation process. is the coordinate value of the i-th segment joint, and γ represents the overall change angle value of the segment to be rotated corresponding to each rotation operation during the iterative calculation process.

[0026] In one embodiment, the F segments with the shortest arc length among the segments are determined as azimuthal segments, and the remaining segments are determined as non-azimuthal segments, wherein there is only one azimuthal segment.

[0027] In one embodiment, the center angle of the azimuth segment is the center angle value β of the arc corresponding to the azimuth segment. F The radius of the arc corresponding to the azimuth pipe segment is R0=(R1+R2) / 2, where R1 is the inner diameter of the pipe ring circle, and R2 is the outer diameter of the pipe ring circle.

[0028] In one embodiment, the azimuth angle value of the azimuth segment is set to α F The non-azimuth segments include two first segments adjacent to the azimuth segments and the remaining n-3 second segments, where n is the number of segments, and the joints are numbered M0, M1, ..., M in a counterclockwise manner based on the azimuth segments. n-1 , based on the azimuth segment, the second segments are numbered B1, B2, ... B in sequence. n-3 ;

[0029] The azimuth angle values ​​of a joint M0 between the first segment and the azimuth segment are α F +β F / 2, and the azimuth angle values ​​of the other seam M1 are α F -β F / 2, the azimuth angle values ​​of the remaining segment joints are based on the connection order of the segments and are reduced in sequence based on the joint M1. The first angle is (β L +(i-2)βB ), i is the number subscript of the joint, β L is the center angle of the first segment, β B is the center angle of the second segment.

[0030] In one embodiment, the initial coordinates P of the seam are i (x i ,y i ) is calculated by the following formula:

[0031]

[0032] Where, the subscript i represents the number of the joint, α i Represents the azimuth angle corresponding to the joint of the i-th segment.

[0033] In one embodiment, the method further comprises:

[0034] The difference between the final distance and the initial distance is compared with a preset threshold range. If the difference is within the preset threshold range, it is determined that the pipe ring meets the convergence expectations. If the difference is outside the preset threshold range, it is determined that the pipe ring exceeds the convergence expectations and an alarm message is issued. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a schematic diagram of the flow chart of the tunnel pipe ring convergence measurement method of the present invention;

[0036] Figure 2 The industry's tunnel ring convergence deformation and indicators, where (a) is a schematic diagram of tunnel ring convergence deformation and (b) is a schematic diagram of common measurement indicators of existing ring deformation;

[0037] Figure 3 Schematic diagram of the principle of the technical solution of the present invention, wherein (a) is a schematic diagram of the set pipe ring deformation measurement index, (b) is a schematic diagram of the equivalent conversion of the pipe segment into a connecting rod mechanism, (c) is a schematic diagram of the corresponding central angle of the pipe segment, and (d) is a schematic diagram of the pipe segment joint number and joint azimuth;

[0038] Figure 4 is a schematic diagram of the convergence target circle;

[0039] Figure 5 It is a schematic diagram of rotation around a point on a plane in a coordinate system, where (a) is a schematic diagram of a single rigid body point rotating around a point on a plane in a coordinate system, and (b) is a schematic diagram of a multi-link mechanism undergoing rotational displacement;

[0040] Figure 6 Schematic diagram of the seam spacing convergence curve comparing manual measurement and system measurement in the present invention, wherein (a), (b), (c), and (d) illustrate experimental curves of multiple groups of different seams. DETAILED DESCRIPTION

[0041] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0042] like Figure 1 As shown:

[0043] A method for measuring the convergence of a tunnel ring, wherein the tunnel ring is composed of a plurality of segments, is characterized by comprising the following steps:

[0044] Determine the center angle of each pipe segment relative to the circumference of the pipe ring, wherein the circumference of the pipe ring is an ideal circle formed by splicing the pipe segments;

[0045] Based on the central angle of each segment and the initial azimuth angle value of the F block with the shortest arc length among the segments, the azimuth angle value of each joint is determined, and the initial coordinates of the joint and the initial distance between any two non-adjacent joints are obtained;

[0046] In an absolute coordinate system, measuring the angle change value of each pipe segment within a set period, and calculating the final coordinate value of each joint and the final distance between any two non-adjacent joints based on the angle change value;

[0047] For any two of the non-adjacent seams, the difference between the final distance and the initial distance is calculated, and the difference is used as the convergence value of the pipe ring in this direction.

[0048] The algorithm design of the present invention is introduced below to better understand the above technical solution, namely the tunnel ring convergence measurement method.

[0049] The key to achieving the measurement of pipe ring convergence is to reasonably describe the degree of pipe ring convergence deformation. The same ring pipe ring is composed of multiple pipe segments. Assuming that the pipe segments are rigid bodies, the relative rotation of each pipe segment within the cross section of the pipe ring causes the pipe ring convergence deformation.

[0050] like Figure 2 As shown in (b), the existing pipe ring deformation measurement indicators are the waistline distance and vertical distance change values. This value is relatively rough and cannot fully describe the overall deformation of the pipe ring.

[0051] like Figure 3 In (a), the algorithm design of the present invention uses the distance change value between each joint in the pipe ring and the joints at other positions to describe the degree of convergence deformation of the pipe ring.

[0052] The measurement principle and mathematical model of the present invention are described below.

[0053] Based on the assumption, the whole ring of segments is equivalent to a planar multi-link mechanism. Each concrete segment in the same ring is regarded as a rigid body and equivalent to a rigid connecting rod. The midpoint of the intersection line between the contact surface of the adjacent ring segment and the cross section is used as the rotation center of each segment. The relative rotation of each segment in the cross section plane causes the ring to deform, such as Figure 3 As shown in (b), the pipe ring is equivalent to a planar linkage mechanism, and each pipe segment is numbered. The pipe ring numbered F is the pipe segment with the shortest circumference among all pipe rings, that is, the azimuth pipe segment, which can also be called F block. The remaining pipe segments are non-azimuth pipe segments, and there is only one azimuth pipe segment. The number of non-azimuth pipe segments can be an even number or a cardinality, assuming it is n. Usually, the number of pipe segments contained in a complete pipe ring in tunnels of different diameters varies, and is commonly 6, 8, 10, etc.

[0054] Assuming that the plane where the planar linkage mechanism is located is the target cross section, the center point of the intersection of the target cross section and the contact surface of the adjacent segment is defined as the hinge point. The circumference where the hinge point is located is the median circumference of the mean radius of the outer circle radius and the inner circle radius of the pipe ring, as shown in the following example: Figure 4 As shown in the figure, the long solid line section in the center represents the minimum circle 1 of the cross section, the short dashed line section slightly larger on the periphery represents the median circle 2 of the cross section (i.e., the reference circle), and the long dashed line section larger on the periphery represents the maximum circle 3 of the cross section. The section formed by the median circle 2 of the cross section is the target cross section, and the boundary point on the center line of the target cross section is the hinge point.

[0055] The complete pipe ring is equivalent to a planar multi-link mechanism. The relative distance change value of the corresponding joint can be calculated by simply measuring the rotation angle of each pipe segment. For this reason, when the algorithm of the present invention is applied, it is only necessary to install an inclination sensor on each pipe segment of the same pipe ring (there is no accuracy requirement for the installation site), measure the angle change value of the pipe segment in the cross section, and realize the monitoring of basic measurement data. The measurement of pipe ring convergence needs to be based on the following assumptions: a inclination sensor is arranged on each pipe segment, and the start measurement time is set. It is assumed that the pipe segment is an undeformed perfect circle, and the angle change value of each pipe segment in the cross section is measured according to the specified period. According to the change angle and geometric parameters of the pipe segment, the coordinates of the next joint point are calculated in turn. After the coordinates of the joint points of the entire ring are obtained, the distance of each joint can be calculated. The calculated distance value is subtracted from the ideal pipe segment joint distance value to obtain the pipe ring convergence distance value from the start measurement time to the current time.

[0056] The calculation of the basic parameters of the pipe ring is described as follows. In general, the number of pipe segments contained in a complete pipe ring in tunnels of different diameters is different. Here, it is assumed that the pipe ring is composed of n pieces of pipe rings, that is, n is commonly 6, 8, 10, etc. Figure 3(c) Take 10 segments as an example, facing the excavation direction, the two segments adjacent to segment F are numbered L1 and L2, and the remaining segments are numbered B1, B2, ... B(n-3) in the order of connection. Therefore, starting from the wedge-shaped capping block, the numbering of each segment in the counterclockwise or clockwise direction is: F, L1, B1, B2... B(n-3), L2. The circle with the axial center of the pipe ring as the center and the average value of the inner and outer diameters of the pipe ring as the radius (i.e. Figure 4 The median circle shown in the figure is the reference circle. On this circle, each segment can be equivalent to an arc. Generally, the arc lengths of L1 and L2 are equal, the arc lengths of B1, B2...B(n-3) are equal, and the arc length of F is the shortest. Assuming the inner diameter of the pipe ring is R1 and the outer diameter is R2, the radius of the reference circle is R0 = (R1+R2) / 2. Taking a pipe ring with 10 segments as an example, the corresponding central angle of the segment is Figure 3 As shown in (d), the central angle of the arc corresponding to block F is β F , the center angle of the arc corresponding to blocks L1 and L2 is β L1 =β L2 =β L , the corresponding central angles of the other segments are β B1 =β B2 =... =β B(n-3) =β β2 =(2π-β F -2β L ) / (n-3)=β B The pipe ring has a wedge shape, among which the F block is the shortest. By adjusting the circumferential position of the F block, the tunnel direction can be adjusted, and finally the tunnel line shape is close to the tunnel design axis. Therefore, the F block can be assembled to the azimuth angle α F Describes the orientation of the entire pipe ring. Facing the excavation direction, the top is 0° and the angle increases clockwise.

[0057] Description: Beta L is the center angle of the first segment, β B is the center angle of the second segment; β F is the center angle of the azimuth segment.

[0058] The azimuth angle value of the azimuth segment is set to α F The non-azimuth segments include two first segments adjacent to the azimuth segments and the remaining n-3 second segments, where n is the number of segments, and the joints are numbered M0, M1, ..., M in a counterclockwise manner based on the azimuth segments. n-1 , based on the azimuth segment, the second segments are numbered B1, B2, ... B in sequence. n-3 ;

[0059] The azimuth angle values ​​of a joint M0 between the first segment and the azimuth segment are αF+βF / 2, and the azimuth angle values ​​of the other seam M1 are α F -β F / 2, the azimuth angle values ​​of the remaining segment joints are based on the connection order of the segments, and the first angle is subtracted from the joint M1. The first angle is (βL+(i-2)β B ), i is the number subscript of the joint, β L is the center angle of the first segment, β B is the center angle of the second segment.

[0060] It should be noted that the first segment can also be called an adjacent block, that is, it is adjacent to the azimuth segment, and the second segment can also be called a standard block, that is, except for the azimuth segment and the adjacent block, all are standard blocks, and the circumferential curvature of the standard blocks is the same.

[0061] like Figure 3 (d) By numbering each joint of the pipe segment, the corresponding joint azimuth angle can be calculated. The following is an example of a pipe ring containing 10 pipe segments. Facing the excavation direction of the shield construction, with the top as 0° and the angle increasing clockwise, the joints of the pipe ring are numbered, and their corresponding azimuth angles are shown in the following table:

[0062] Table 1. Seam number and angle table

[0063]

[0064]

[0065] Get the initial coordinates / ideal coordinates P of the pipe ring joint point i (x i ,y i )(i is the joint number), can be calculated by the following formula:

[0066]

[0067] Where, the arc radius R0, the subscript i represents the number of the joint, α i Represents the azimuth angle corresponding to the joint of the i-th segment.

[0068] After the initial coordinates of each joint point are calculated by the above formula, based on this, the coordinates of the joint point after rotation can be calculated by simply measuring the angle change of each segment relative to the initial moment at each measurement moment. The key to the segment convergence measurement algorithm is the calculation of the target point coordinates after the equivalent rigid body rotation. The case of a single rigid body point rotating around a plane point in the coordinate system is as follows: Figure 5 As shown in (a).

[0069] Take any pipe segment as an example to illustrate the algorithm: after a single pipe segment / connecting rod rotates around one end point A1 by θ, the other end point B1 moves to point Bj (B jx , B jy ), the Bj coordinate can be solved by the following formula:

[0070]

[0071] The above calculation method can only calculate the coordinates of the endpoints of a single link after rotation, but the pipe ring is equivalent to an open-loop multi-link mechanism connected in sequence. When the links in the mechanism rotate relative to each other, the above method is difficult to effectively calculate the coordinates of each hinge point. Figure 5 As shown in (b) (taking a 4-link mechanism as an example), each link rotates around one end point. The coordinates of the hinge point after each link has rotated relative to each other can be calculated according to the following method, which can also be called the joint point coordinates.

[0072] Note: where θ AB ,θ BC ,θ CD and θ DE are the rotation angles of the corresponding rigid body links relative to the x-axis, θ A ,θ B ,θ C and θ D Both refer to the relative rotation angle of the rigid link relative to the upper rigid link.

[0073] The first step is to use A1 as the rotation center and rotate the rigid body A1B1 by an angle θ A That is, θ AB Calculate the point B when the other connecting rods are not bent relative to each other. j (i.e. B2), C2, D2, E2 coordinates.

[0074] The second step is to calculate the rotation angle θ of the rigid body B1C1 with B2 as the rotation center. B =θ BC -θ AB , further calculate the point C when the other connecting rods do not bend relative to each other j (i.e. C3), D3, E3 coordinates.

[0075] The third step is to calculate the rotation angle θ of the rigid body C1D1 with C3 as the rotation center. C =θ CD -θ BC , further calculate the point D when the remaining connecting rods do not bend relative to each other j (i.e. D4) and E4 coordinates.

[0076] Step 4: Calculate the rotation angle θ of the rigid body D1E1 with D4 as the rotation center D =θ DE -θ CD, further calculate the point E when the remaining connecting rods do not bend relative to each other j (i.e. E5) coordinates. So far, the calculation of the coordinates of each hinge point after the rotation of each connecting rod has been completed.

[0077] Based on the above rigid body rotation coordinate calculation method, taking a pipe ring composed of 10 pipe segments as an example, the calculation method of the pipe ring convergence distance is explained under the premise of knowing the rotation angle of each pipe segment. Figure 1 As shown, the specific process is:

[0078] Step 101, determining the center angle of each pipe segment relative to the circumference of the pipe ring, wherein the circumference of the pipe ring is an ideal circle formed by splicing the pipe segments.

[0079] Step 102, based on the central angle of each segment and the initial azimuth angle value of the F block with the shortest arc length among the segments, determine the azimuth angle value of each joint, and obtain the initial coordinates of the joint and the initial distance between any two non-adjacent joints.

[0080] Specifically, according to the angle (assembly azimuth) α of the F block set within the circumference F Calculate the seam L 2-F That is, the angle of seam 0 is α0 = α F +β F / 2, calculate the remaining joint angles α1...α according to Table 1 n-1 (Here n = 10), calculate the initial coordinates P of each seam point k0 (x k ,y k )——k is the seam number, and the initial distance between each seam point is calculated.

[0081] Step 103, in an absolute coordinate system, measuring the angle change value of each pipe segment within a set period, and based on the angle change value, calculating the final coordinate value of each joint and the final distance between any two non-adjacent joints.

[0082] Step 103 includes the following sub-steps:

[0083] Step 1031, determining the angle change value of each pipe segment in the absolute coordinate system within a preset setting period.

[0084] Step 1032, select any seam as the starting seam point, and calculate the coordinate value of each seam according to the rigid body rotation coordinate calculation method.

[0085] Step 1033, selecting the next seam in a clockwise / counterclockwise direction as the starting seam point to calculate the coordinates corresponding to each seam, and multiple sets of coordinate values ​​corresponding to each seam.

[0086] Step 1034, after taking the average of the multiple groups of coordinate values ​​corresponding to each of the seams, determine the final coordinate value of each of the seams.

[0087] Step 1035: Calculate the final distance between any two non-adjacent seams based on the final coordinate value of each seam.

[0088] Specifically, at the beginning of the measurement, the initial angle value θ of each segment is obtained. F-0 ,θ L1-0 ,θ B1-0 ,......θ B7-0 ,θ L2-0 After a period of time, which may be i measurement cycles, the corresponding angle value is θ F-i ,θ L1-i ,θ B1-i ,......θ B7-i ,θ L2-i . Calculate the change angle of each segment relative to the initial moment: Δθ F-i =θ F-i -θ F-0 , Δθ L1-i =θ L1-i -θ L1-0 , Δθ B1-i =θ B1-i -θ B1-0 ,......Δθ B7-i =θ B7-i -θ B7-0 , Δθ L2-i =θ L2-i -θ L2-0 .

[0089] After that, select any seam as the starting seam for calculation (here seam point 0 is used as an example), take seam point 0 as the rotation center, and calculate the first rotation angle γ = Δθ of seam point 1 and subsequent points F-i -0, according to the rigid body rotation coordinate calculation method, calculate the coordinates of seams 1-9 after the first rotation The subscript of the symbol is the joint number, and the superscript is the number of rotations. For example, the calculation is as follows:

[0090]

[0091] Seam point 1 obtained from the above steps As the rotation center, calculate the second rotation angle γ = Δθ of the joint point 2 and the subsequent points L1-i -Δθ F-i , according to the rigid body rotation coordinate calculation method, calculate the coordinates of seam 2-9 after the second rotation by For example, the calculation is as follows:

[0092]

[0093] Repeat the above steps to calculate the seam coordinates one by one wait.

[0094] At this point, the coordinate values ​​of each seam point with the rotation center starting from seam position 0 are obtained.

[0095] Reselect joint points 1, 2...9 as the initial rotation center in turn, and repeat the steps to calculate the coordinates of each joint point, thereby obtaining 10 sets of coordinate values ​​corresponding to each joint point, and calculate the average value of the joint point coordinates to obtain the final joint coordinate values ​​measured in this cycle.

[0096] From the above, it can be inferred that the coordinate value of each seam is calculated by the following formula:

[0097]

[0098] The subscript i indicates the joint number, and the superscript m indicates the mth rotation of the segment during the iterative calculation process. is the coordinate value of the i-th segment joint, and Y represents the overall change angle value of the segment to be rotated corresponding to each rotation operation during the iterative calculation process.

[0099] Step 104: for any two of the non-adjacent seams, calculate the difference between the final distance and the initial distance, and use the difference as the convergence value of the pipe ring in this direction.

[0100] In one example, the following steps are also included: comparing the difference between the final distance and the initial distance with a preset threshold range; if the difference is within the preset threshold range, determining that the pipe ring meets the convergence expectations; if the difference is outside the preset threshold range, determining that the pipe ring exceeds the convergence expectations, and issuing an alarm message.

[0101] The application system developed based on the algorithm of the present invention is referred to as "application system". The following is an explanation using a specific on-site construction scenario as an example.

[0102] Each ring of the tunnel pipe ring is composed of 10 independent pipe segments. The outer diameter of the pipe ring used is 15.2m, the inner diameter is 13.9m, the pipe segment thickness is 650mm, and the ring width is 2m. The corresponding No. 286 slurry shield machine is used as the system carrier platform. The measurement test verification of the 280th ring pipe ring convergence degree is taken as an example to illustrate the measurement accuracy of the application system. Due to the actual operability of manual measurement, manual measurement and application system data collection are selected after the pipe ring is separated from the trolley, and the pipe ring convergence values ​​measured by manual measurement and application system measurement are compared to verify the measurement accuracy of the application system.

[0103] An inclination sensor is pasted and installed on each segment of the same ring to measure the rotation angle of each segment in the cross-sectional direction of the ring, so that the application system can collect data and calculate the convergence. Reflective sheets are pasted near the joints where reflective sheets can be installed to provide a mark for the total station to measure the joint position, so as to facilitate the measurement of the convergence value of the joints and joint spacing of the ring segments.

[0104] Due to the obstruction of ventilation and sewage pipelines, reflectors could not be installed on some pipe ring joints. Finally, 10 reflectors were installed. When two prisms were attached to the same joint position, the average value of the two was taken as the joint coordinate. The corresponding relationship between the reflector and the pipe ring assembly position is shown in Table 2 below:

[0105] Table 2 Correspondence between reflective sheets, joints and tube segments

[0106]

[0107] Manual measurements were taken four times a day, at 9:00, 12:00, 15:00, and 19:00, for a total of about four days of monitoring, and a total of 12 sets of joint spacing values ​​were collected. The application system used for convergence measurement measures data every 15 minutes, so a time period close to the manual measurement was selected and the corresponding data was extracted as effective comparison data. The data at 9:00 on the first day was used as the initial data for comparison, and the latter's convergence distance changes were based on the change value relative to that moment. The relatively distant joints in the pipe ring were selected as comparison objects. This ring selected four pairs of joints: 1-5, 1-6, 4-9, and 5-9 for comparison. The corresponding curve change values ​​are as follows: Figure 6 shown.

[0108] As can be seen from the figure, both the manual measurement and the application system measurement results show that the ring convergence distance changes little, generally less than 1mm. Although there are deviations in individual positions, the overall trend is similar, and considering the measurement errors of manual and application systems, the measurement results of the two can be basically considered consistent within the order of 1mm.

[0109] A second embodiment of the present invention relates to a non-transitory computer-readable storage medium, on which processor-executable instructions are stored. The executable instructions are configured to execute the tunnel ring convergence measurement method as described in the first embodiment.

[0110] Regarding the inventive step, this specification further discloses the following description and comparison:

[0111] CN116105672A proposes a tunnel pipeline convergence deformation monitoring method and system that uses roundness error and radial shrinkage as two indicators to describe the pipe ring convergence deformation and issue an early warning; whereas the present invention uses the distance change value of each non-adjacent joint relative to an ideal circular ring to describe the pipe ring convergence, and a convergence threshold can be set for description. CN116105672A proposes a tunnel pipeline convergence deformation monitoring method and system. In its technical solution, it is necessary to determine the endpoint coordinates of the pipe segment according to the inclination information, reference position information and chord length information of the pipe segment. In order to achieve higher measurement accuracy, it is necessary to require the sensor measurement axis to be parallel to the pipe ring chord length. Due to the limitations of on-site construction conditions, the sensor measurement axis can only be nearly parallel to the pipe ring chord length, and its measurement algorithm itself has insurmountable inherent errors. In the present invention, the distance change between two non-adjacent pipe ring joints is determined by monitoring the angle change of the pipe ring joint, and then the pipe ring convergence is further calculated. The focus is on the angle change of the pipe ring joint rather than the actual pipe ring angle. Therefore, the measurement accuracy of the pipe ring angle will not affect the calculation of the pipe ring convergence, thereby greatly reducing the difficulty of installation. During installation, the sensor measurement axis only needs to be arranged in the same direction along the circumference. The sensor can be installed at any position of the pipe segment, and the on-site operation is convenient.

Claims

1. A method for measuring the convergence of a tunnel ring, wherein the tunnel ring is composed of a plurality of segments, characterized in that: The following steps are involved: Determine the center angle of each pipe segment relative to the circumference of the pipe ring, wherein the circumference of the pipe ring is an ideal circle formed by splicing the pipe segments; Based on the central angle of each segment and the initial azimuth angle value of the F block with the shortest arc length among the segments, the azimuth angle value of each joint is determined, and the initial coordinates of the joint and the initial distance between any two non-adjacent joints are obtained; In an absolute coordinate system, measuring the angle change value of each pipe segment within a set period, and calculating the final coordinate value of each joint and the final distance between any two non-adjacent joints based on the angle change value; For any two of the non-adjacent seams, the difference between the final distance and the initial distance is calculated, and the difference is used as the convergence value of the pipe ring in this direction.

2. The tunnel ring convergence measurement method according to claim 1 is characterized in that: The measuring the angle change value of each segment within a set period, and obtaining the final coordinate value of each joint and the final distance between any two non-adjacent joints based on the angle change value, comprises: Determine the angle change value of each pipe segment in the absolute coordinate system within a preset setting period; Select any seam as the starting seam point, and calculate the coordinate value of each seam according to the rigid body rotation coordinate calculation method; Select the next seam as the starting seam point in clockwise / counterclockwise order to calculate the corresponding coordinates of each seam. After one cycle, multiple sets of coordinate values ​​corresponding to each seam are obtained. After averaging the multiple groups of coordinate values ​​corresponding to each of the seams, a final coordinate value of each of the seams is determined; Based on the final coordinate value of each seam, a final distance between any two non-adjacent seams is calculated.

3. The tunnel ring convergence measurement method according to claim 2 is characterized in that: The rigid body rotation coordinate calculation method comprises: The pipe ring is equivalent to a planar multi-link mechanism, and each pipe segment is a connecting rod; Taking the first end point of each connecting rod as the rotation center, according to the rotation angle of the connecting rod, assuming that the remaining connecting rods are not relatively bent, calculate the coordinate value of the first end point of the next connecting rod; The obtained coordinate value of the first end point of each connecting rod is used as the coordinate value of the connecting rod joint.

4. The tunnel ring convergence measurement method according to claim 3 is characterized in that: The coordinate value of each seam is calculated by the following formula: The subscript i indicates the joint number, and the superscript m indicates the mth rotation of the segment during the iterative calculation process. is the coordinate value of the i-th segment joint, and γ represents the overall change angle value of the segment to be rotated corresponding to each rotation operation during the iterative calculation process.

5. The tunnel ring convergence measurement method according to claim 4 is characterized in that: The F segments with the shortest arc length among the segments are determined as azimuthal segments, and the remaining segments are determined as non-azimuthal segments, wherein there is only one azimuthal segment.

6. The tunnel ring convergence measurement method according to claim 5 is characterized in that: The center angle of the azimuth segment is the center angle value β of the arc corresponding to the azimuth segment. F The radius of the arc corresponding to the azimuth pipe segment is R0=(R1+R2) / 2, where R1 is the inner diameter of the pipe ring circle, and R2 is the outer diameter of the pipe ring circle.

7. The tunnel ring convergence measurement method according to claim 6 is characterized in that: The azimuth angle value of the azimuth segment is set to α F The non-azimuth segments include two first segments adjacent to the azimuth segments and the remaining n-3 second segments, where n is the number of segments, and the joints are numbered M0, M1, ..., M in a counterclockwise manner based on the azimuth segments. n-1 , based on the azimuth segment, the second segments are numbered B1, B2, ... B in sequence. n-3 ; The azimuth angle values ​​of a joint M0 between the first segment and the azimuth segment are α F +β F / 2, and the azimuth angle values ​​of the other seam M1 are α F -β F / 2, the azimuth angle values ​​of the remaining segment joints are based on the connection order of the segments and are reduced in sequence based on the joint M1. The first angle is (β L +(i-2)β B ), i is the number subscript of the joint, β L is the center angle of the first segment, β B is the center angle of the second segment.

8. The tunnel ring convergence measurement method according to claim 7 is characterized in that: The initial coordinates P of the seam i (x i ,y i ) is calculated by the following formula: Where, the subscript i represents the number of the joint, α i Represents the azimuth angle corresponding to the joint of the i-th segment.

9. The tunnel ring convergence measurement method according to claim 1, characterized in that: The method further comprises: The difference between the final distance and the initial distance is compared with a preset threshold range. If the difference is within the preset threshold range, it is determined that the pipe ring meets the convergence expectations. If the difference is outside the preset threshold range, it is determined that the pipe ring exceeds the convergence expectations and an alarm message is issued.

10. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores processor-executable instructions, and the executable instructions are configured to execute the tunnel ring convergence measurement method according to any one of claims 1 to 9.