Water network flooding information prediction method and device and related equipment
Through digital elevation model and video data analysis, the mapping relationship between the cumulative rainfall of floods and the submerged water volume was established, which solved the problem that hydrodynamic model could not accurately predict the submerged situation of the water network, and achieved more accurate prediction of submerged water volume and situation analysis.
Patent Information
- Application Number
- CN202411229280.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-12-06
AI Technical Summary
The existing hydrodynamic model is difficult to accurately express the real situation of the water network, resulting in poor accuracy of prediction of the flood situation information of the water network.
By obtaining the digital elevation model data and video data of the target water network, the flood boundary line and area of the flooded area are analyzed, the mapping relationship between the accumulated flood rainfall and the flooded water volume is established, and the flooded water volume is predicted.
It improves the accuracy and reliability of water network submersion information prediction, overcomes the uncertainty of parameter rate determination and boundary conditions of the hydrodynamic model, shortens the analysis and judgment time, and improves emergency response capabilities.
Smart Images

Figure CN119088894A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of disaster prevention and reduction, and in particular to a method and device for predicting water network flooding information and related equipment. Background Art
[0002] In the flood control and drainage system of the water network, the analysis and judgment of the water network's flooding situation is crucial to reducing the impact of flood disasters.
[0003] At present, relevant technologies mostly use hydrodynamic models to perform flood calculations. It is found in applications that hydrodynamic models are difficult to express the actual situation of the water network, and the model parameters are difficult to calibrate and verify, and the boundary conditions are uncertain. Therefore, the output calculation results are less reliable, which leads to inaccurate water network flooding situation information based on this analysis.
[0004] That is to say, the accuracy of water network flooding information predicted based on relevant technologies is poor. Summary of the invention
[0005] The purpose of the present disclosure is to provide a method, device and related equipment for predicting water network flooding information, so as to solve the technical problem that the accuracy of water network flooding information predicted by related technologies is poor.
[0006] In a first aspect, the present application provides a method for predicting water network flooding information, the method comprising: Acquire a sequence of data to be processed of a target water network in a current flood period, wherein the sequence of data to be processed includes a plurality of data pairs arranged in time order, each of the data pairs includes first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at a corresponding moment, the second data is determined based on digital elevation model data of the target water network and flooded data of a flooded area of the target water network at a corresponding moment, the flooded data includes at least one of a flooded boundary line and a flooded area of the flooded area, and the flooded data is obtained based on analysis of video data of the target water network at a corresponding moment; Performing data analysis on the multiple data pairs to obtain a target mapping relationship, wherein the target mapping relationship is used to simulate a mapping relationship between the accumulated rainfall of a flood and the inundated water volume of the target water network; According to the target mapping relationship and the accumulated flood rainfall at the target moment, target flooding information is predicted, wherein the target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target moment.
[0007] In a second aspect, the present application provides a water network flooding information prediction device, the device comprising: an acquisition module, used for acquiring a sequence of data to be processed of a target water network in a current flood period, wherein the sequence of data to be processed comprises a plurality of data pairs arranged in time order, each of the data pairs comprises first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at a corresponding moment, the second data being determined based on digital elevation model data of the target water network and flooded data of a flooded area of the target water network at a corresponding moment, the flooded data comprising at least one of a flooded boundary line and a flooded area of the flooded area, and the flooded data being obtained based on analysis of video data of the target water network at a corresponding moment; An analysis module, used for performing data analysis on the plurality of data pairs to obtain a target mapping relationship, wherein the target mapping relationship is used to simulate a mapping relationship between the accumulated rainfall of a flood and the inundated water volume of the target water network; The prediction module is used to predict target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target moment, wherein the target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target moment.
[0008] In a third aspect, the present application provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the method described in the first aspect.
[0009] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the method described in the first aspect are implemented.
[0010] In a fifth aspect, the present application provides a computer program product, comprising computer instructions, which, when executed by a processor, implement the steps of the method described in the first aspect.
[0011] In the present application, the inundation water volume of the target water network at the time corresponding to the current flood is back-calculated based on the inundation data obtained from the digital elevation model data and the analysis of the video data, so as to replace the scheme of using the hydrodynamic model to calculate the inundation water volume in the related technology. The accurate and reliable inundation water volume can be obtained conveniently. Based on this, the mapping relationship between the cumulative rainfall of the flood and the inundation water volume is analyzed in combination with the cumulative rainfall at the corresponding time. The inundation water volume is predicted based on the mapping relationship obtained by the analysis and the cumulative rainfall of the flood at the target time, which can make the prediction result more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a flow chart of a method for predicting water network flooding information provided by an embodiment of the present disclosure; Figure 2 is a schematic diagram of a flooded area changing process at different times provided by an embodiment of the present disclosure; Figure 3 It is a structural schematic diagram of a water network flooding information prediction device provided by an embodiment of the present disclosure; Figure 4 It is a schematic diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0013] The following will be combined with the drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.
[0014] The present disclosure provides a method for predicting water network flooding information. Figure 1 As shown, the water network flooding information prediction method includes: Step 101: Obtain a sequence of data to be processed of a target water network in a current flood period.
[0015] The data sequence to be processed includes a plurality of data pairs arranged in time order, each of the data pairs includes first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at the corresponding moment, the second data is determined based on the digital elevation model (DEM) data of the target water network and the flooded data of the flooded area of the target water network at the corresponding moment, the flooded data includes at least one of the flooded boundary line and the flooded area of the flooded area, and the flooded data is obtained based on the video data analysis of the target water network at the corresponding moment.
[0016] A water network usually refers to a network system consisting of water bodies (such as rivers, lakes, reservoirs, etc.) and water conservancy facilities (such as canals, irrigation systems, reservoirs, etc.). In this application, the target water network can be understood as any water network distributed in the plain area.
[0017] The current flood period can be understood as the time period during which the current flood has occurred, that is, the period from the start time of the current flood to the current time.
[0018] Exemplarily, the process of acquiring the second data may be: The DEM data of the target water network is obtained through the Geographic Information System (GIS) or related data sources. On the premise of ensuring that the DEM data covers the target water network, the DEM data is preprocessed to remove noise values and outliers. In particular, when the existing DEM data cannot cover the target water network, the missing parts of the existing DEM data can be supplemented by oblique photography of drones.
[0019] The video data collected by multiple video collection points in the target water network are spatially positioned to give the video data corresponding spatial geographic coordinates. Then, through geometric correction and mosaic processing, the different video data collected by multiple video collection points are spliced to form a water network video. By using GIS to perform spatial analysis on the water network video, the boundary line and flooded area of each flooded area of the target water network can be obtained at each moment in the current flood period. By superimposing the aforementioned DEM data and the boundary lines and inundation areas of each inundation area of the target water network, the inundation volume and inundation water level of each inundation area of the target water network can be obtained. By summing up the inundation volumes of multiple inundation areas of the target water network, the inundation water volume of the target water network can be obtained.
[0020] For example: If the current flood period is set as T0-T n , then, the multiple data pairs of the first data arranged in time order can be expressed as: (T0, P0, W0), (T1, P1, W1), (T2, P2, W2), ... (T n , P n , W n ), where P0 represents the cumulative rainfall of the flood in the target water network at time T0, W0 represents the flooded water volume of the target water network at time T0, P1 represents the cumulative rainfall of the flood in the target water network at time T1, W1 represents the flooded water volume of the target water network at time T1, and the meanings of subsequent parameters are similar.
[0021] Step 102: Perform data analysis on the multiple data pairs to obtain a target mapping relationship.
[0022] The target mapping relationship is used to simulate the mapping relationship between the accumulated rainfall of the flood and the flooded water volume of the target water network.
[0023] In one example, linear fitting or nonlinear fitting can be performed based on the multiple data pairs to obtain the target mapping relationship. In this example, the target mapping relationship can be expressed as: W=f(P), where parameter P represents the accumulated rainfall of the flood and parameter W represents the flooded water volume.
[0024] In another example, a preset neural network model can also be trained based on the multiple data to obtain a prediction model including the target mapping relationship, wherein the model input of the prediction model is the accumulated rainfall of the flood, and the model output of the prediction model is the flooded water volume. The model training process of the prediction model can be understood as follows: in the training stage, feature extraction is performed on the model input, and the extracted features are subjected to convolution and other processing to obtain model prediction values, and then based on the difference between the model prediction value and the true value of the model input, the model parameters are adjusted in reverse until the preset training termination conditions are met.
[0025] Step 103: predict target inundation information according to the target mapping relationship and the accumulated flood rainfall at the target time.
[0026] The target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target time.
[0027] The target time may be understood as any future time later than the current time.
[0028] Exemplarily, the rainfall increase data DP from the current moment to the target moment can be obtained based on the weather forecast data from the current moment to the target moment, and then the sum of the flood cumulative rainfall P at the current moment and the rainfall increase data DP is determined as the flood cumulative rainfall at the target moment.
[0029] The present application back-calculates the inundation water volume of the target water network at the time corresponding to the current flood based on the inundation data obtained by analyzing the digital elevation model data and the video data, so as to replace the scheme of using the hydrodynamic model to calculate the inundation water volume in the related technology, and can conveniently obtain accurate and reliable inundation water volume. Based on this, the mapping relationship between the cumulative rainfall of the flood and the inundation water volume is analyzed in combination with the cumulative rainfall at the corresponding time, and the inundation water volume is predicted based on the mapping relationship obtained by the analysis and the cumulative rainfall of the flood at the target time, so that the obtained prediction result can be made more accurate.
[0030] In one embodiment, predicting target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target time includes: The flood volume is predicted according to the target mapping relationship and the accumulated rainfall of the flood at the target time to obtain the target water volume data; A spatial analysis is performed based on the target water volume data and the data elevation model data of the target water network to obtain target boundary data, target area data and target water level data, wherein the target boundary data is used to indicate the inundation boundary line of the inundation area of the target water network at the target moment, the target area data is used to indicate the inundation area of the inundation area of the target water network at the target moment, and the target water level data is used to indicate the inundation water level of the inundation area of the target water network at the target moment, and the target inundation data includes the target boundary data, the target area data and the target water level data.
[0031] In this embodiment, after obtaining the target water volume data, the target water volume data is further refined and analyzed based on the DEM data to obtain the inundation boundary line, inundation area and inundation water level of each inundation area in the target water network, thereby forming target inundation information, which can facilitate users to analyze and judge the inundation situation of the target water network in the future.
[0032] For example, Figure 2 As shown, if the current time is set to T n , the target time is T n+1 , where the flooding water level of the target water network at the current moment is Z n , the flooding water level is W n There are two flooding points, namely, flooding point 1 and flooding point X. The flooding boundary line of flooding point 1 is L1 n , the flood boundary line of flood point X is LX n , the flooded area of flooded point 1 is A1 n , the flooded area of the flooded point X is AX n ; The flooding water level of the target water network at the target time is Z n+1 , the flooding water level is W n+1 There are three flooding points, namely, flooding point 1, flooding point X and flooding point Y. The flooding boundary line of flooding point 1 is L1 n+1 , the flood boundary line of flood point X is LX n+1 , the flood boundary line of flood point Y is LY n+1 , the flooded area of flooded point 1 is A1 n+1 , the flooded area of the flooded point X is AX n+1 , the flooded area of flooded point Y is AY n+1 , the increase in flooding water volume from the current time to the target time is DW n .
[0033] In one embodiment, the number of flooded areas of the target water network is multiple; After performing spatial analysis based on the target water volume data and the data elevation model data of the target water network to obtain target boundary data, target area data and target water level data, the method further includes: Determine at least one target flooded area among the plurality of flooded areas, wherein the target flooded area is the flooded area whose flooded depth at the target time is greater than or equal to a preset depth; In the data map corresponding to the target water network, the at least one target flooded area is highlighted.
[0034] Among them, the flooding water levels in multiple flooded areas remained consistent.
[0035] It should be understood that by performing spatial analysis based on the target water volume data and the elevation model data of the target water network, the target boundary data, target area data and target water level data can be obtained, and the flooding depth of each of the multiple flooding areas can also be obtained accordingly.
[0036] In this embodiment, a target flooded area with a flooding depth greater than or equal to a preset depth is determined and highlighted in a data map to help users quickly identify flooded areas with potential hazards and their locations, thereby reducing the harm caused by floods.
[0037] For example, the target flooded area may be highlighted by zooming in on the location of the target flooded area in the data map, and / or using a warning color (such as red, yellow, etc.) different from the background color of the data map.
[0038] The above-mentioned preset depth can be adaptively adjusted according to actual needs, such as 0.3 meters, 0.5 meters, etc., and the present disclosure does not limit this.
[0039] Furthermore, after determining at least one target flooded area among the plurality of flooded areas, the method further includes: Determining, in the video data of the target water network, a video image corresponding to each target flooded area in the at least one target flooded area; Performing image rendering on the video image corresponding to each of the target flooded areas to obtain a rendered image corresponding to each of the target flooded areas, wherein the rendered image includes a warning mark for indicating a flooded boundary line, a flooded area, and a flooded water level of the corresponding target flooded area at the target time; Based on the rendered image corresponding to each of the target flooded areas and the coordinate position corresponding to each of the target flooded areas, flooded guidance information is generated, and the flooded guidance information is used to: guide the user to the target flooded area, and based on preset warning objects, prompt the flooded boundary line, flooded area and flooded water level of the target flooded area at the target time.
[0040] After determining the target flooding area, the flooding boundary line, flooding water level and flooding area of the target flooding area at the target time are displayed in the form of warning signs through image rendering, thereby forming flooding guidance information to guide users to place the preset warning objects with reference to the aforementioned warning signs, so as to improve the accuracy of the placement of the preset warning objects, and by pre-deploying warning objects, reduce the difficulty of deploying warning objects and enhance the warning effect of preset warning objects.
[0041] Among them, the video image corresponding to the target flooded area can be understood as an image including the target flooded area and the surrounding background of the target flooded area, and the rendered image corresponding to the target flooded area can be understood as an image formed after marking the flooded boundary line, flooded area and flooded water level of the target flooded area at the target time with warning signs on the basis of the video image corresponding to the target flooded area. For example, the warning signs can be understood as image shadows, image frames and other signs. The above-mentioned image rendering operation can be implemented based on the GIS spatial analysis function.
[0042] Exemplarily, during the flood prevention and control process, flood prevention and control personnel can carry preset warning objects to the target flooding area based on the coordinate position indicated by the flooding guidance information, and deploy the preset warning objects around the target flooding area with reference to the warning signs in the rendered image, wherein the preset warning objects can be warning signs, marker tubes, fences, etc.
[0043] In one embodiment, the flood volume prediction is performed according to the target mapping relationship and the accumulated rainfall of the flood at the target time to obtain the target water volume data, including: Predicting initial water volume data according to the target mapping relationship and the accumulated flood rainfall at the target time; When the accumulated flood rainfall corresponding to the target time exceeds a preset rainfall threshold, the initial water volume data is corrected based on a correction coefficient to obtain target water volume data, wherein the correction coefficient is greater than 1.
[0044] In the context of global warming, the global average annual temperature is rising year by year, the frequency of extreme weather is increasing year by year, and the extreme rainfall brought by extreme rainfall is also gradually increasing. Based on this, this embodiment introduces a threshold judgment of the cumulative rainfall. When the threshold judgment is passed, the predicted initial water volume data is appropriately amplified according to a preset correction coefficient to adapt to the weather impact brought about by the aforementioned global warming situation and output more accurate target water volume data.
[0045] Exemplarily, the aforementioned preset rainfall threshold can be obtained by analyzing the historical data of the target water network, thereby calculating the correlation between the cumulative rainfall of each flood in the historical period and the economic losses caused, and then calculating based on the calculated correlation and the preset maximum acceptable economic losses; The aforementioned preset rainfall threshold may also be determined based on the maximum accumulated rainfall encountered in the target water network.
[0046] In one example, the correction coefficient may be manually set, for example, the correction coefficient may be set to 1.01 or 1.03, or the correction coefficient may be determined based on the following method: Obtaining a first average temperature of a target water network in a time period that has occurred in a current meteorological monitoring cycle, and obtaining a second average temperature of the target water network in a corresponding time period in a historical meteorological monitoring cycle; The correction coefficient is determined according to the ratio of the first average temperature to the second average temperature, wherein the larger the ratio of the first average temperature to the second average temperature is, the larger the correction coefficient is.
[0047] Among them, a meteorological monitoring cycle can be one year, and the historical meteorological monitoring cycle can be understood as a set base year, for example: 2000.
[0048] Taking the average temperature during the meteorological monitoring period as a reference and determining the correction coefficient through the difference in average temperature between the current meteorological monitoring period and the historical meteorological monitoring period can avoid interference from human factors and make the determined correction coefficient more accurate and reliable.
[0049] Among them, the ratio of the first average temperature to the second average temperature can be directly determined as the correction coefficient, or the ratio of the first average temperature to the second average temperature can be converted according to the average temperature-rainfall mapping relationship to obtain the correction coefficient, wherein the average temperature-rainfall mapping relationship is used to represent the correlation between the average temperature and rainfall (such as rainfall intensity, rainfall amount, etc.).
[0050] In one embodiment, after predicting target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target time, the method further includes: Comparing the target water volume data with preset water volume threshold information to obtain a comparison result; Generate corresponding warning information according to the comparison result.
[0051] In this embodiment, a comparison is made between the target water volume data and the preset water volume threshold information, and corresponding warning information is generated accordingly to replace manual automatic determination of excessive flooding water volume and warning broadcasting, thereby improving the user experience.
[0052] Exemplarily, the water volume threshold information may include multiple groups of water volume warning thresholds, each group of water volume warning thresholds corresponds to a water volume warning gear, wherein the higher the water volume warning gear is, the larger the corresponding water volume warning threshold is, and for two water volume warning gears of different gears, the maximum threshold in a group of water volume warning thresholds corresponding to the low-level water volume warning gear is smaller than the minimum threshold in a group of water volume warning thresholds corresponding to the high-level water volume warning gear.
[0053] For example, if the water volume threshold information is set to include two groups of water volume warning thresholds, wherein one group of water volume warning thresholds corresponds to the yellow water volume warning gear, specifically including threshold A and threshold B, and the other group of water volume warning thresholds corresponds to the red water volume warning gear, specifically including threshold C and threshold D, wherein threshold A<threshold B<threshold C<threshold D; Then, when the comparison result indicates that the target water volume threshold is between threshold A and threshold B, the generated warning information indicates a yellow level 1 warning; When the comparison result indicates that the target water volume threshold is between threshold B and threshold C, the generated warning information indicates a yellow level 2 warning; When the comparison result indicates that the target water volume threshold is between threshold C and threshold D, the generated warning information indicates a red level 1 warning; When the comparison result indicates that the target water volume threshold exceeds the threshold value D, the generated warning information indicates a red level 2 warning.
[0054] In general, this application, based on GIS technology, DEM data and video surveillance data, achieves rapid prediction of flood inundation range, shortens analysis time and improves emergency response capabilities.
[0055] Among them, since DEM data reflects the actual topographic and geomorphological characteristics of the target water network, it can overcome the error caused by terrain generalization when applying hydrodynamic models for inundation analysis; at the same time, the use of video surveillance data and DEM data to directly obtain inundation parameters such as inundation water volume W, inundation area A, and inundation water level Z can overcome the difficulties in model calibration and verification caused by insufficient model monitoring data, and improve the accuracy of situation analysis; secondly, through the direct inversion of parameters such as inundation range through meteorological forecast data and DEM data, the inundation parameter increment can be directly obtained, and the inundation change situation can be quickly analyzed. The calculation method is convenient, which can overcome the uncertainty of the calculation accuracy of the hydrodynamic model and the limitations of the model generalization ability, and improve the timeliness and rapid response ability of inundation situation analysis.
[0056] See also Figure 3 , Figure 3 A water network flooding information prediction device provided by an embodiment of the present disclosure is Figure 3 As shown, the water network flooding information prediction device 300 includes: The acquisition module 301 is used to acquire a sequence of data to be processed of a target water network in a current flood period, wherein the sequence of data to be processed includes a plurality of data pairs arranged in time order, each of the data pairs includes first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at a corresponding moment, the second data is determined based on digital elevation model data of the target water network and flooded data of a flooded area of the target water network at a corresponding moment, the flooded data includes at least one of a flooded boundary line and a flooded area of the flooded area, and the flooded data is obtained based on analysis of video data of the target water network at a corresponding moment; An analysis module 302 is used to perform data analysis on the plurality of data pairs to obtain a target mapping relationship, wherein the target mapping relationship is used to simulate a mapping relationship between the accumulated rainfall of a flood and the flooded water volume of the target water network; The prediction module 303 is used to predict target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target moment, wherein the target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target moment.
[0057] In one embodiment, the prediction module 303 includes: A flooding water volume prediction unit is used to predict the flooding water volume according to the target mapping relationship and the accumulated rainfall of the flood at the target time to obtain target water volume data; A spatial analysis prediction unit is used to perform spatial analysis based on the target water volume data and the data elevation model data of the target water network to obtain target boundary data, target area data and target water level data, wherein the target boundary data is used to indicate the inundation boundary line of the inundation area of the target water network at the target time, the target area data is used to indicate the inundation area of the inundation area of the target water network at the target time, and the target water level data is used to indicate the inundation water level of the inundation area of the target water network at the target time, and the target inundation data includes the target boundary data, the target area data and the target water level data.
[0058] In one embodiment, the number of flooded areas of the target water network is multiple; The device 300 further includes: A flooding area determination module, configured to determine at least one target flooding area among the plurality of flooding areas, wherein the target flooding area is the flooding area having a flooding depth greater than or equal to a preset depth at the target time; The flooded area display module is used to highlight the at least one target flooded area in the data map corresponding to the target water network.
[0059] In one embodiment, the apparatus 300 further includes: An image determination module, configured to determine, in the video data of the target water network, a video image corresponding to each target flooded area of the at least one target flooded area; An image rendering module is used to render the video image corresponding to each of the target flooded areas to obtain a rendered image corresponding to each of the target flooded areas, wherein the rendered image includes a warning mark for indicating a flooded boundary line, a flooded area, and a flooded water level of the corresponding target flooded area at the target time; A guidance information generation module is used to generate flooding guidance information based on the rendering image corresponding to each of the target flooding areas and the coordinate position corresponding to each of the target flooding areas. The flooding guidance information is used to: guide the user to the target flooding area, and based on preset warning objects, prompt the flooding boundary line, flooding area and flooding water level of the target flooding area at the target time.
[0060] In one embodiment, the flood water volume prediction unit is specifically configured to include: An initial prediction unit, used to predict initial water volume data according to the target mapping relationship and the accumulated flood rainfall at the target time; When the accumulated flood rainfall corresponding to the target time exceeds a preset rainfall threshold, the initial water volume data is corrected based on a correction coefficient to obtain target water volume data, wherein the correction coefficient is greater than 1.
[0061] In one embodiment, the apparatus 300 further includes: A comparison module, used for comparing the target water volume data with preset water volume threshold information to obtain a comparison result; The early warning module is used to generate corresponding early warning information according to the comparison result.
[0062] The water network flooding information prediction device 300 provided in the embodiment of the present disclosure can implement each process in the above-mentioned water network flooding information prediction method embodiment, and will not be described again here to avoid repetition.
[0063] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device and a readable storage medium.
[0064] Figure 4A schematic block diagram of an example electronic device 400 that can be used to implement an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.
[0065] like Figure 4 As shown, the device 400 includes a computing unit 401, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 402 or a computer program loaded from a storage unit 408 to a random access memory (RAM) 403. In the RAM 403, various programs and data required for the operation of the device 400 can also be stored. The computing unit 401, the ROM 402, and the RAM 403 are connected to each other via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.
[0066] A number of components in the device 400 are connected to the I / O interface 405, including: an input unit 406, such as a keyboard, a mouse, etc.; an output unit 407, such as various types of displays, speakers, etc.; a storage unit 408, such as a disk, an optical disk, etc.; and a communication unit 409, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 409 allows the device 400 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0067] The computing unit 401 may be various general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 401 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The computing unit 401 performs the various methods and processes described above, such as the water network flooding information prediction method. For example, in some embodiments, the water network flooding information prediction method may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 408. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 400 via the ROM 402 and / or the communication unit 409. When the computer program is loaded into the RAM 403 and executed by the computing unit 401, one or more steps of the water network flooding information prediction method described above may be performed. Alternatively, in other embodiments, the computing unit 401 may be configured to execute the water network flooding information prediction method in any other appropriate manner (for example, by means of firmware).
[0068] Various embodiments of the systems and techniques described above herein may be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0069] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0070] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0071] As used herein, the term "machine-readable medium" refers to any computer program product, apparatus, and / or device (e.g., disk, optical disk, memory, programmable logic device (PLD)) for providing machine instructions and / or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term "machine-readable signal" refers to any signal for providing machine instructions and / or data to a programmable processor.
[0072] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0073] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0074] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.
[0075] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement the above Figure 1 The various processes of the method embodiment shown can achieve the same technical effect, and will not be described again here to avoid repetition.
[0076] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.
[0077] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.
Claims
1. A method for predicting water network flooding information, characterized in that: The method comprises: Acquire a sequence of data to be processed of a target water network in a current flood period, wherein the sequence of data to be processed includes a plurality of data pairs arranged in time order, each of the data pairs includes first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at a corresponding moment, the second data is determined based on digital elevation model data of the target water network and flooded data of a flooded area of the target water network at a corresponding moment, the flooded data includes at least one of a flooded boundary line and a flooded area of the flooded area, and the flooded data is obtained based on analysis of video data of the target water network at a corresponding moment; Performing data analysis on the multiple data pairs to obtain a target mapping relationship, wherein the target mapping relationship is used to simulate a mapping relationship between the accumulated rainfall of a flood and the inundated water volume of the target water network; According to the target mapping relationship and the accumulated flood rainfall at the target moment, target flooding information is predicted, wherein the target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target moment.
2. The method according to claim 1, characterized in that The predicting target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target time includes: The flood volume is predicted according to the target mapping relationship and the accumulated rainfall of the flood at the target time to obtain the target water volume data; A spatial analysis is performed based on the target water volume data and the data elevation model data of the target water network to obtain target boundary data, target area data and target water level data, wherein the target boundary data is used to indicate the inundation boundary line of the inundation area of the target water network at the target moment, the target area data is used to indicate the inundation area of the inundation area of the target water network at the target moment, and the target water level data is used to indicate the inundation water level of the inundation area of the target water network at the target moment, and the target inundation data includes the target boundary data, the target area data and the target water level data.
3. The method according to claim 2, characterized in that The number of flooded areas of the target water network is multiple; After performing spatial analysis based on the target water volume data and the data elevation model data of the target water network to obtain target boundary data, target area data and target water level data, the method further includes: Determine at least one target flooded area among the plurality of flooded areas, wherein the target flooded area is the flooded area having a flooded depth greater than or equal to a preset depth at the target time; In the data map corresponding to the target water network, the at least one target flooded area is highlighted.
4. The method according to claim 3, characterized in that After determining at least one target flooded area among the plurality of flooded areas, the method further includes: Determining, in the video data of the target water network, a video image corresponding to each target flooded area in the at least one target flooded area; Performing image rendering on the video image corresponding to each of the target flooded areas to obtain a rendered image corresponding to each of the target flooded areas, wherein the rendered image includes a warning mark for indicating a flooded boundary line, a flooded area, and a flooded water level of the corresponding target flooded area at the target time; Based on the rendered image corresponding to each of the target flooded areas and the coordinate position corresponding to each of the target flooded areas, flooded guidance information is generated, and the flooded guidance information is used to: guide the user to the target flooded area, and based on preset warning objects, prompt the flooded boundary line, flooded area and flooded water level of the target flooded area at the target time.
5. The method according to claim 2, characterized in that: The method of predicting the flood volume according to the target mapping relationship and the accumulated rainfall at the target time to obtain target water volume data includes: Predicting initial water volume data according to the target mapping relationship and the accumulated flood rainfall at the target time; When the accumulated flood rainfall corresponding to the target time exceeds a preset rainfall threshold, the initial water volume data is corrected based on a correction coefficient to obtain target water volume data, wherein the correction coefficient is greater than 1.
6. The method according to any one of claims 1 to 5, characterized in that After predicting target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target time, the method further includes: Comparing the target water volume data with preset water volume threshold information to obtain a comparison result; Generate corresponding warning information according to the comparison result.
7. A water network flooding information prediction device, characterized in that: The device comprises: an acquisition module, used for acquiring a sequence of data to be processed of a target water network in a current flood period, wherein the sequence of data to be processed comprises a plurality of data pairs arranged in time order, each of the data pairs comprises first data indicating the accumulated rainfall at a corresponding moment, and second data indicating the flooded water volume of the target water network at a corresponding moment, the second data being determined based on digital elevation model data of the target water network and flooded data of a flooded area of the target water network at a corresponding moment, the flooded data comprising at least one of a flooded boundary line and a flooded area of the flooded area, and the flooded data being obtained based on analysis of video data of the target water network at a corresponding moment; An analysis module, used for performing data analysis on the plurality of data pairs to obtain a target mapping relationship, wherein the target mapping relationship is used to simulate a mapping relationship between the accumulated rainfall of a flood and the inundated water volume of the target water network; The prediction module is used to predict target flooding information according to the target mapping relationship and the accumulated flood rainfall at the target moment, wherein the target flooding information includes target water volume data indicating the flooding water volume of the target water network at the target moment.
8. An electronic device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program implements the steps of the method according to any one of claims 1 to 6 when executed by the processor.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product, characterized in that The method comprises computer instructions, which, when executed by a processor, implement the steps of the method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Unmanned aerial vehicle monitoring method and system for urban flood scenes
CN110044337A
Flood inundation risk early warning method, device and equipment and storage medium
CN117690259A
Flood inundation risk dynamic simulation deduction method based on three-dimensional GIS
CN117951212A