Mine mining quantity determination method, device, equipment and medium
By restoring and constructing the scale drawing model and real-time three-dimensional model of the mine, the mining impact coefficient is calculated, and the accuracy of the corrected mining volume of mined mines is solved, providing accurate mining volume analysis and corporate responsibility judgment.
Patent Information
- Application Number
- CN202410879267.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-12-06
AI Technical Summary
In the prior art, the lack of accurate measured drawing data makes it difficult to determine the corrected mining volume of mined mines, especially in the case of incomplete data, it is difficult to accurately analyze and calculate the mining volume exceeding the production scale or exceeding the mine boundary.
By restoring the scale drawing model of the target area and building a real-time three-dimensional model, we determine the simulated mining volume of the sub-regions to be mined and mined, calculate the mining impact coefficient, and then correct the mining volume of the sub-regions mined, providing a method for determining the mining volume of the sub-regions in mined, providing a method for determining the mining volume of the mined volume in the method of determining the mining volume of the mined volume in a method of , devices and electronic devices.
Accurate correction of mining volume determination of mined sub-regions is achieved, providing a more accurate basis for subsequent corporate responsibility judgments, ensuring compliance of the mining process and rational utilization of resources.
Smart Images

Figure CN119089629A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of mineral mining volume calculation, and in particular to a method, device, equipment and medium for determining mining volume. Background Art
[0002] Mining resources refer to mineral resources in the earth's crust that can be mined and utilized through mining technology. Mining resources are an important foundation for modern industrial and economic development and are widely used in energy, metallurgy, chemical industry, construction and other fields. Mining resources are important raw materials for industrial production and play an important role in national economic development. For example, coal, oil and natural gas are the main sources of energy and support global energy consumption. Many high-tech products (such as electronic equipment, aerospace equipment, etc.) rely on rare metals and rare earth elements. Mining and its related industries provide a large number of employment opportunities.
[0003] In past mining operations, due to the lack of attention from mining companies, the limitations of surveying and mapping technology, and the negligence of the competent authorities, open-pit mines often lacked accurate measured drawings and data before mining. When a mine is put into production and operation, mining companies tend to mine mineral resources beyond the production scale or beyond the mining boundary for their own profits. With the establishment and improvement of laws and regulations, and the improvement of supervision, management, and law enforcement systems, when the competent authorities impose administrative penalties on them, they need to analyze and calculate the mining volume of open-pit mines that exceeds the production scale or exceeds the mining boundary. In view of this, for mines that have been mined and do not have accurate measured drawings and data, how to determine the restoration of the mountain for the excavated mines and determine the actual amount of resources mined is an urgent problem to be solved. Summary of the invention
[0004] The embodiments of the present application provide a method, device, equipment and medium for determining mining volume of a mine, thereby solving the technical problem in the prior art that it is difficult to determine the revised mining volume of a target mined sub-area when data is incomplete, and achieving the technical effect of accurately determining the revised mining volume of a target mined sub-area.
[0005] In a first aspect, the present application provides a method for determining mining output, the method comprising:
[0006] Restore the scale drawing model in the target area, the target area includes the mining area and the circumscribed area, the circumscribed area is outside the mining area, and the circumscribed area and the mining area are adjacent, and the mining area includes the area to be mined and the mined area;
[0007] Build a real-time 3D model of the target area;
[0008] For a target sub-area to be mined in the target area, determining a simulated mining volume of the target sub-area to be mined in the scale drawing model and a simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model;
[0009] Determine the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined;
[0010] The revised mining volume of the target mined sub-area is determined based on the simulated mining volume of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
[0011] Further, restoring the scale drawing model in the target area includes:
[0012] Obtain historical drawings and materials of the target area;
[0013] Based on the historical drawings and data of the target area, a scale drawing model is drawn to restore the target area.
[0014] Furthermore, before drawing the scale drawing model in the restoration target area, the following steps are included:
[0015] Obtaining measured position parameters of several preset points in the target area, where the preset points are all in the external area or the area to be mined, and the measured position parameters include plane coordinates and elevation;
[0016] The historical drawing data are verified based on the measured position parameters of several preset points.
[0017] Furthermore, a real-time three-dimensional model of the target area is constructed, including:
[0018] Arrange photo control points in the target area and conduct oblique photogrammetry to obtain the current status point data of the target area;
[0019] Based on the current fragmented point data of the target area, a real-time three-dimensional model of the target area is constructed.
[0020] Furthermore, the formula for determining the mining impact coefficient of the target area includes:
[0021] α=(P1-P2)÷M1
[0022] Among them, α is the mining influence coefficient, M1 is the area of the target sub-area to be mined, P1 is the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and P2 is the simulated mining volume of the target sub-area to be mined in the scale drawing model.
[0023] Furthermore, the formula for determining the revised production volume of the target mined sub-area includes:
[0024] P3=P4-M2×α
[0025] Among them, P3 is the corrected mining volume of the target mined sub-area, P4 is the simulated mining volume of the target mined sub-area in the scale drawing model, M2 is the area of the target mined sub-area, and α is the mining influence coefficient.
[0026] Further, the simulated mining volume of the target mined sub-area in the scale drawing model is determined, including:
[0027] Based on the DTM method, the simulated mining volume of the target mined sub-area in the scale drawing model is determined.
[0028] In a second aspect, the present application provides a device for determining a mining output, the device comprising:
[0029] A restoration module is used to restore the scale drawing model in the target area, the target area includes the mining area and the circumscribed area, the circumscribed area is outside the mining area, and the circumscribed area and the mining area are adjacent, and the mining area includes the area to be mined and the mined area;
[0030] A construction module for constructing a real-time three-dimensional model of the target area;
[0031] A simulation quantity determination module, for determining, for a target sub-region to be mined in a target region, a simulated mining quantity of the target sub-region to be mined in a scale drawing model and a simulated mining quantity of the target sub-region to be mined in a real-time three-dimensional model;
[0032] An influence coefficient determination module is used to determine the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined;
[0033] The correction amount determination module is used to determine the corrected mining amount of the target mined sub-area according to the simulated mining amount of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
[0034] In a third aspect, the present application provides an electronic device, including:
[0035] processor;
[0036] a memory for storing processor-executable instructions;
[0037] The processor is configured to execute to implement a method for determining a mine production volume as provided in the first aspect.
[0038] In a fourth aspect, the present application provides a non-temporary computer-readable storage medium. When the instructions in the storage medium are executed by a processor of an electronic device, the electronic device is enabled to implement a method for determining a mine production volume as provided in the first aspect.
[0039] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0040] The present application provides a method for determining mining production, the method comprising: restoring a scale drawing model in a target area, the target area comprising a mining area and a circumscribed area, the circumscribed area being outside the mining area, and the circumscribed area and the mining area being adjacent to each other, and the mining area comprising an area to be mined and an area already mined; constructing a real-time three-dimensional model of the target area; for a target sub-area to be mined in the target area, determining a simulated mining production of the target sub-area to be mined in the scale drawing model and a simulated mining production of the target sub-area to be mined in the real-time three-dimensional model; determining a mining influence coefficient of the target area according to the simulated mining production of the target sub-area to be mined in the scale drawing model, the simulated mining production of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined; determining a revised mining production of the target mined sub-area according to the simulated mining production of the target mined sub-area in the scale drawing model, the area of the target mined sub-area, and the mining influence coefficient. The present application can determine the mining influence coefficient of the target area through the simulated mining volume of the target sub-area to be mined in the scale drawing model and the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, which means that the degree of difference between the scale drawing model and the real-time three-dimensional model is determined, and based on the mining influence coefficient, the corrected mining volume of the target mined sub-area can be restored more accurately, which provides a more accurate basis for subsequently determining the enterprise's responsibility and judging whether the enterprise is over-mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0042] Figure 1 A schematic diagram of a method for determining mining volume provided in this application;
[0043] Figure 2 A schematic diagram of the structure of a device for determining mining volume provided in this application;
[0044] Figure 3 A schematic diagram of the structure of an electronic device provided in this application. DETAILED DESCRIPTION
[0045] The embodiment of the present application solves the technical problem in the prior art that it is difficult to determine the revised mining volume of a target mined sub-area when data is incomplete by providing a method for determining mining volume.
[0046] The technical solution of the embodiment of the present application is to solve the above technical problems, and the overall idea is as follows:
[0047] A method for determining mining volume of a mine, the method comprising: restoring a scale drawing model in a target area, the target area comprising a mining area and a circumscribed area, the circumscribed area being outside the mining area, and the circumscribed area and the mining area being adjacent to each other, and the mining area comprising an area to be mined and an area already mined; constructing a real-time three-dimensional model of the target area; for a target sub-area to be mined in the target area, determining a simulated mining volume of the target sub-area to be mined in the scale drawing model and a simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model; determining a mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined; determining a revised mining volume of the target mined sub-area according to the simulated mining volume of the target mined sub-area in the scale drawing model, the area of the target mined sub-area, and the mining influence coefficient.
[0048] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0049] First of all, the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0050] This application provides Figure 1 A method for determining mining output is shown, comprising steps S11-S15.
[0051] Step S11, restore the scale drawing model in the target area, the target area includes a mining area and a circumscribed area, the circumscribed area is outside the mining area, and the circumscribed area and the mining area are adjacent, and the mining area includes an area to be mined and an area that has been mined.
[0052] Step S12: construct a real-time three-dimensional model of the target area.
[0053] Step S13, for the target sub-area to be mined in the target area, determining the simulated mining volume of the target sub-area to be mined in the scale drawing model and the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model.
[0054] Step S14, determining the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined.
[0055] Step S15, determining the revised mining volume of the target mined sub-region according to the simulated mining volume of the target mined sub-region in the scale drawing model, the area of the target mined sub-region and the mining influence coefficient.
[0056] Regarding step S11, the scale drawing model in the target area is restored, the target area includes a mining area and a circumscribed area, the circumscribed area is outside the mining area, and the circumscribed area and the mining area are adjacent, and the mining area includes an area to be mined and an area that has been mined.
[0057] The purpose of this application is to determine the mining volume of the mining area where the data is incomplete and has been mined. It is understood that although the data in this section is incomplete, it does not mean that there is no data.
[0058] The target area refers to the mining area where there is a certain demand for mining volume. The target area includes the mining area and the external area. The external area refers to the area surrounding the mining area. The external area is outside the mining area and is adjacent to the mining area. The size of the external area can be determined according to actual conditions. For example, the external area refers to the area within 1000m outside the mining area.
[0059] The mining area includes the area to be mined and the mined area. The mined area means that this area has been developed and mined, while the area to be mined means that this area is waiting to be developed and mined.
[0060] Before drawing the scale drawing model in the restored target area, the steps include: obtaining the measured position parameters of several preset points in the target area, where the preset points are all in the external area or the area to be mined, and the measured position parameters include plane coordinates and elevations; and verifying the historical drawing data based on the measured position parameters of several preset points.
[0061] Before drawing a scale drawing model to restore the target area, historical drawing data of the target area can be obtained first. After obtaining the historical drawing data of the target area, the measured position parameters of several preset points in the target area are obtained. The preset points are all in the external area or the area to be mined.
[0062] Furthermore, the preset points are all located in areas not affected by human engineering activities. It can be understood that setting the preset points in areas not affected by human engineering activities can ensure that the plane coordinates, elevation and other parameters of the preset points do not change as much as possible, thereby improving the accuracy of subsequent verification.
[0063] After obtaining the measured position parameters of several preset points in the target area, find the corresponding positions of each preset point in the historical drawing data, and check the measured position parameters of the preset points with the plane positions and elevations recorded in the corresponding preset points in the historical drawing data.
[0064] After checking the historical drawing data, the scale drawing model in the target area can be restored, including: obtaining the historical drawing data of the target area; and drawing the scale drawing model in the target area according to the historical drawing data of the target area.
[0065] Specifically, based on the relevant information recorded in the historical drawing materials, vectorization and encryption processing are carried out, and further drawing and restoration are carried out to obtain the scale drawing model of the target area.
[0066] It is understandable that although the measured position parameters have been used for verification, the accuracy of the scale drawing model is not high, because the historical drawing data is small in scale and the mining area is no longer able to verify the accuracy of the historical drawing data.
[0067] Regarding step S12, a real-time three-dimensional model of the target area is constructed.
[0068] Constructing a real-time three-dimensional model of the target area includes: laying out image control points in the target area, and performing oblique photogrammetry to obtain current fragmented point data of the target area; and constructing a real-time three-dimensional model of the target area based on the current fragmented point data of the target area.
[0069] Image control points are placed in the target area to calibrate and locate oblique photogrammetry data. Oblique photogrammetry is image data obtained by special photographic equipment (such as oblique cameras) to capture the three-dimensional shape and appearance of buildings, ground and other objects.
[0070] Use oblique photogrammetry data processing software (such as Pix4D, RealityCapture, etc.) to process the images to generate point cloud data. Point cloud is a data set composed of a large number of discrete points, each point has spatial coordinates and other attributes, which can represent the shape of the surface and buildings in the target area.
[0071] The acquired point cloud data is processed and cleaned, including removing noise points, filling in missing areas (such as occluded areas), etc.
[0072] Use professional 3D modeling software (such as Autodesk Recap, Trimble RealWorks, Bentley Context Capture, etc.) to import the cleaned point cloud data and perform 3D modeling.
[0073] Texture mapping is performed on the established 3D model, the image texture obtained from oblique photogrammetry is fitted to the model surface, and the completed real-time 3D model is exported to common 3D file formats (such as OBJ, FBX, etc.).
[0074] Regarding step S13, for the target sub-area to be mined in the target area, the simulated mining volume of the target sub-area to be mined in the scale drawing model and the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model are determined. The target sub-area to be mined refers to a part of the area to be mined, and can be selected according to actual conditions.
[0075] This application can be implemented based on "DTM method earthwork calculation - calculation of earthwork in two periods" when determining the "simulated mining volume".
[0076] The DTM method (Digital Terrain Model) is a commonly used method in earthwork engineering, which is used to determine the amount of earthwork between terrain surfaces (usually the ground), that is, to calculate the amount of cut and fill.
[0077] The DTM method includes: (Cross-sectional method: The terrain sections of two stages are superimposed on each other, and the earthwork volume is determined by calculating the cross-sectional area between the sections.
[0078] Volume calculation method: Superimpose two DTM models and use mathematical methods (such as integration method or contour method) to calculate the volume difference between the two surfaces, that is, the volume of cut and fill.
[0079] DTM earthwork calculation is one of the commonly used methods in modern civil engineering and earthwork engineering. DTM earthwork calculation provides an efficient and accurate earthwork volume calculation solution through digital processing and accurate terrain data.
[0080] Regarding step S14, the mining influence coefficient of the target area is determined based on the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined.
[0081] The formula for determining the mining impact factor for the target area includes:
[0082] α=(P1-P2)÷M1
[0083] Among them, α is the mining influence coefficient, M1 is the area of the target sub-area to be mined, P1 is the simulated mining volume of the target sub-area to be mined in the real-time 3D model, and P2 is the simulated mining volume of the target sub-area to be mined in the scale drawing model. It can be understood that there may be multiple target sub-areas to be mined in the target area. When there are multiple target sub-areas to be mined, one of the maximum values of the mining influence coefficients corresponding to the several target sub-areas to be mined can be used as the mining influence coefficient.
[0084] Through step S14, the difference between the scale drawing model and the real-time three-dimensional model can be clearly known. In other words, it means that compared with the real-time three-dimensional model, the difference rate (mining impact coefficient) of the scale drawing model can be used to correct the mining volume of the excavated part in the scale drawing model based on the mining impact coefficient.
[0085] Regarding step S15, the corrected mining volume of the target mined sub-area is determined according to the simulated mining volume of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
[0086] The formula for determining the modified production volume for the targeted mined sub-area includes:
[0087] P3=P4-M2×α
[0088] Among them, P3 is the corrected mining volume of the target mined sub-area, P4 is the simulated mining volume of the target mined sub-area in the scale drawing model, M2 is the area of the target mined sub-area, and α is the mining influence coefficient. Specific embodiment:
[0090] For a project
[0091] The “DTM method for earthwork calculation - calculation of earthwork in two periods” was used to select an area on the top of the mountain on the north side of the mining boundary as the target sub-area to be mined, and the revised mining volume was determined.
[0092] Table 1
[0093]
[0094] The excavation area of the original mining area is 127200.52m 2 The excavation volume adopts the "DTM method - calculating the earthwork in two periods", that is, the simulated excavation volume of the scale drawing model is 5010507.7m 3 .
[0095] The mining impact coefficient is 0.358647902, and the corrected mining volume = 5010507.7-(127200.52×0.358647902) = 4964842.71m 3 .
[0096] In summary, the present application provides a method for determining the mining volume of a mine, the method comprising: restoring a scale drawing model in a target area, the target area comprising a mining area and a circumscribed area, the circumscribed area being outside the mining area, and the circumscribed area and the mining area being adjacent to each other, and the mining area comprising an area to be mined and an area already mined; constructing a real-time three-dimensional model of the target area; for a target sub-area to be mined in the target area, determining a simulated mining volume of the target sub-area to be mined in the scale drawing model and a simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model; determining a mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined; determining a corrected mining volume of the target mined sub-area according to the simulated mining volume of the target mined sub-area in the scale drawing model, the area of the target mined sub-area, and the mining influence coefficient. The present application can determine the mining influence coefficient of the target area through the simulated mining volume of the target sub-area to be mined in the scale drawing model and the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, which means that the degree of difference between the scale drawing model and the real-time three-dimensional model is determined, and based on the mining influence coefficient, the corrected mining volume of the target mined sub-area can be restored more accurately, which provides a more accurate basis for subsequently determining the enterprise's responsibility and judging whether the enterprise is over-mining.
[0097] Based on the same inventive concept, the present application provides Figure 2 A device for determining mining output is shown, the device comprising:
[0098] The restoration module 21 is used to restore the scale drawing model in the target area, the target area includes the mining area and the circumscribed area, the circumscribed area is outside the mining area, and the circumscribed area and the mining area are adjacent to each other, and the mining area includes the area to be mined and the mined area;
[0099] A construction module 22, used to construct a real-time three-dimensional model of the target area;
[0100] A simulation quantity determination module 23, for determining, for a target sub-region to be mined in a target region, a simulated mining quantity of the target sub-region to be mined in a scale drawing model and a simulated mining quantity of the target sub-region to be mined in a real-time three-dimensional model;
[0101] An influence coefficient determination module 24 is used to determine the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined;
[0102] The correction amount determination module 25 is used to determine the corrected mining amount of the target mined sub-area according to the simulated mining amount of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
[0103] Based on the same inventive concept, the present application also provides Figure 3 An electronic device is provided, comprising:
[0104] Processor 31;
[0105] A memory 31 for storing instructions executed by the processor 31;
[0106] The processor 31 is configured to execute to implement a method for determining a mine production volume as provided above.
[0107] Based on the same inventive concept, the present application also provides a non-temporary computer-readable storage medium. When the instructions in the storage medium are executed by the processor 31 of the electronic device, the electronic device can execute a method for determining the mining volume as provided above.
[0108] Since the electronic device introduced in this embodiment is an electronic device used to implement the information processing method in the embodiment of the present application, based on the information processing method introduced in the embodiment of the present application, a person skilled in the art can understand the specific implementation of the electronic device of the present embodiment and its various variations, so how the electronic device implements the method in the embodiment of the present application is not described in detail here. As long as a person skilled in the art implements the electronic device used by the information processing method in the embodiment of the present application, it belongs to the scope of protection of this application.
[0109] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0110] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0111] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0112] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0113] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0114] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for determining mining output, characterized in that: The method comprises: Restoring a scale drawing model in a target area, wherein the target area includes a mining area and a circumscribed area, wherein the circumscribed area is outside the mining area and is adjacent to the mining area, and the mining area includes an area to be mined and an area that has been mined; Constructing a real-time three-dimensional model of the target area; For the target sub-region to be mined in the target region, determining the simulated mining volume of the target sub-region to be mined in the scale drawing model and the simulated mining volume of the target sub-region to be mined in the real-time three-dimensional model; Determine the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined; The revised production volume of the target mined sub-area is determined according to the simulated production volume of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
2. A method for determining mining output according to claim 1, characterized in that: The scale drawing model in the restoration target area includes: Obtain historical drawings and materials of the target area; Based on the historical drawing data of the target area, a scale drawing model within the target area is drawn and restored.
3. A method for determining mining output according to claim 2, characterized in that: Before drawing and restoring the scale drawing model in the target area, the method includes: Acquire measured position parameters of a plurality of preset points in the target area, wherein the preset points are all in the circumscribed area or the area to be mined, and the measured position parameters include plane coordinates and elevations; The historical drawing data are verified according to the measured position parameters of several preset points.
4. A method for determining mining output according to claim 1, characterized in that: The constructing of the real-time three-dimensional model of the target area comprises: Arrange photo control points in the target area, and perform oblique photogrammetry to obtain current fragmented point data of the target area; A real-time three-dimensional model of the target area is constructed according to the current fragmented point data of the target area.
5. A method for determining mining output according to claim 1, characterized in that: The formula for determining the mining impact coefficient of the target area includes: α=(P1-P2)÷M1 Among them, α is the mining influence coefficient, M1 is the area of the target sub-area to be mined, P1 is the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and P2 is the simulated mining volume of the target sub-area to be mined in the scale drawing model.
6. A method for determining mining output according to claim 1, characterized in that: The formula for determining the modified production volume of the target produced sub-area comprises: P3=P4-M2×α Among them, P3 is the corrected mining volume of the target mined sub-area, P4 is the simulated mining volume of the target mined sub-area in the scale drawing model, M2 is the area of the target mined sub-area, and α is the mining influence coefficient.
7. A method for determining mining output according to claim 1, characterized in that: Determine the simulated production volumes for the targeted mined sub-areas in the scaled drawing model, including: Based on the DTM method, the simulated mining volume of the target mined sub-area in the scale drawing model is determined.
8. A device for determining mining output, characterized in that: The device comprises: A restoration module, used for restoring a scale drawing model in a target area, wherein the target area includes a mining area and a circumscribed area, wherein the circumscribed area is outside the mining area and is adjacent to the mining area, and the mining area includes an area to be mined and an already mined area; A construction module, used for constructing a real-time three-dimensional model of the target area; A simulation quantity determination module, for determining, for a target sub-region to be mined in the target region, a simulated mining quantity of the target sub-region to be mined in the scale drawing model and a simulated mining quantity of the target sub-region to be mined in the real-time three-dimensional model; An influence coefficient determination module, used to determine the mining influence coefficient of the target area according to the simulated mining volume of the target sub-area to be mined in the scale drawing model, the simulated mining volume of the target sub-area to be mined in the real-time three-dimensional model, and the area of the target sub-area to be mined; The correction amount determination module is used to determine the corrected mining amount of the target mined sub-area according to the simulated mining amount of the target mined sub-area in the scale drawing model, the area of the target mined sub-area and the mining influence coefficient.
9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute to implement a method for determining a mine production volume as described in any one of claims 1 to 7.