Electrochromic window control strategy evaluation method, related device and storage medium
By conducting seasonal evaluation of the control strategy of electrochromic windows and combining building orientation and meteorological data, an electrochromic window control strategy suitable for each region is generated, which solves the problem of unbalanced lighting and energy-saving performance in the existing technology, and improves the Comprehensive performance of control strategies.
Patent Information
- Application Number
- CN202411207879.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-30
AI Technical Summary
The existing control strategies of electrochromic windows ignore seasonal differences and users' needs, resulting in the inability to effectively balance lighting and energy-saving performance, and lack of control strategy selection methods suitable for each climate zone.
By obtaining the building orientation and typical meteorological annual data of the target building, dividing seasons, generating control strategies for electrochromic windows, and calculating comprehensive evaluation indicators based on the glare possibility, effective daylight illumination and energy consumption data of each season, it is proposed to provide suitable areas. The electrochromic window control strategy for this orientation.
The comprehensive performance evaluation of the electrochromic window control strategy in different seasons is realized, and an energy-saving and lighting balance scheme is more suitable for each region and orientation, which improves the seasonal comprehensive performance of the control strategy.
Smart Images

Figure CN119089689A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of smart window technology, and in particular to an evaluation method, related device and storage medium for an electrochromic window control strategy. Background Art
[0002] Since the application of electrochromic windows in the field of architecture, the research on their performance has attracted widespread attention. However, researchers often focus on the energy-saving potential of electrochromic windows and ignore the impact of electrochromic windows on the comprehensive light and heat performance of indoor space.
[0003] In addition, the reasonable setting of the gear parameters and control strategies of electrochromic windows has an important impact on the improvement of their lighting and energy-saving performance. However, current electrochromic windows mostly use unified decision parameters and thresholds throughout the year, ignoring seasonal differences and user needs. Summary of the invention
[0004] In view of this, the present application provides an evaluation method, related device and storage medium for an electrochromic window control strategy, which summarizes the comprehensive performance indicators of the electrochromic window control strategy in different seasons and evaluates its seasonal comprehensive performance. Based on the comprehensive evaluation indicators, a control strategy for electrochromic windows suitable for buildings in this area and orientation is proposed by season.
[0005] The first aspect of the present application provides a method for evaluating an electrochromic window control strategy, comprising:
[0006] Obtain the building orientation of the target building and the typical meteorological data of the area where the target building is located;
[0007] Modify the parameters in the typical building model according to the building orientation of the target building and the area to which the target building belongs, and obtain the target building model;
[0008] Performing seasonal division according to typical meteorological data of the region to which the target building belongs, obtaining seasonal division results of the region to which the target building belongs; wherein the seasons are divided into a transition season, a heating season, and a cooling season; the seasonal division results include a time range of the transition season, a time range of the heating season, and a time range of the cooling season;
[0009] generating a control strategy for the electrochromic window according to typical meteorological data of the region where the target building is located;
[0010] For each of the control strategies, determining a gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs;
[0011] For each of the control strategies, typical meteorological data of the region to which the target building belongs, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season;
[0012] For each season, a first metric, a second metric and a third metric are calculated according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in the season;
[0013] According to the first measurement index, the second measurement index and the third measurement index, a comprehensive evaluation index of the control strategy in the season is determined; wherein, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
[0014] Optionally, generating a control strategy for the electrochromic window according to typical meteorological data of the region to which the target building belongs includes:
[0015] Determining at least one decision parameter based on typical meteorological data of the region where the target building is located;
[0016] For each of the decision parameters, a control parameter threshold of the electrochromic window at each gear position of the decision parameter in each season is determined to generate a control strategy for the electrochromic window.
[0017] Optionally, for each of the control strategies, determining the gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs includes:
[0018] For each of the control strategies, the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy are obtained by testing;
[0019] According to the hourly values of the decision parameters of the control strategy in the typical meteorological year data and the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy, the hourly states of the gears of the electrochromic window are obtained;
[0020] According to the hourly status of the electrochromic window gear, a gear timetable of the electrochromic window under the control strategy is generated.
[0021] Optionally, the method for constructing the typical building model includes:
[0022] For each region, obtain building energy consumption benchmark data, building envelope standards and air conditioning forms according to the corresponding building codes of the region;
[0023] Establish a building model for the region based on the building energy consumption benchmark data, building envelope standards and air conditioning forms in the region;
[0024] A typical building model is generated based on the building models of all the described areas.
[0025] Optionally, the method for constructing the electrochromic window model comprises:
[0026] Using a direct current power supply to obtain different transmittance states of the glass of the electrochromic window;
[0027] For each transmittance state, testing the visible light transmittance and spectral characteristics in the transmittance state to obtain a test result;
[0028] The electrochromic window is configured with a gear setting according to the test result to generate an electrochromic window model.
[0029] Optionally, for each season, the first metric, the second metric, and the third metric are calculated based on the glare possibility, effective daylight illumination, and energy consumption data of the control strategy in the season, including:
[0030] For each season, a first measurement index is calculated according to the glare possibility of the control strategy in the season, the minimum glare possibility of all control strategies in the season, and the maximum glare possibility of all control strategies in the season;
[0031] For each season, a second measurement index is calculated according to the effective daylight illumination of the control strategy in the season, the minimum value of the effective daylight illumination among all control strategies in the season, and the maximum value of the effective daylight illumination among all control strategies in the season;
[0032] For each season, a third measurement indicator is calculated based on the energy consumption data of the control strategy in the season, the minimum value of the energy consumption data among all control strategies in the season, and the maximum value of the energy consumption data among all control strategies in the season.
[0033] Optionally, determining a comprehensive evaluation index of the control strategy in the season according to the first measurement index, the second measurement index, and the third measurement index includes:
[0034] The average value of the first measurement index, the second measurement index and the third measurement index is used as the comprehensive evaluation index of the control strategy in the season.
[0035] A second aspect of the present application provides an evaluation device for an electrochromic window control strategy, comprising:
[0036] The first acquisition unit is used to acquire the building orientation of the target building and the typical meteorological data of the area where the target building belongs;
[0037] A modification unit, used for modifying the parameters in the typical building model according to the building orientation of the target building and the region to which the target building belongs, so as to obtain the target building model;
[0038] A division unit, used for performing season division according to typical meteorological data of the region to which the target building belongs, to obtain a season division result of the region to which the target building belongs; wherein the season is divided into a transition season, a heating season and a cooling season; the season division result includes a time range of the transition season, a time range of the heating season and a time range of the cooling season;
[0039] A first generating unit, for generating a control strategy for the electrochromic window according to typical meteorological data of the region to which the target building belongs;
[0040] A first determination unit is used to determine, for each of the control strategies, a gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs;
[0041] An input unit is used to input typical meteorological data of the region to which the target building belongs, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy into the simulation software for each control strategy, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season;
[0042] A calculation unit, for calculating, for each season, the first measurement index, the second measurement index and the third measurement index according to the glare possibility, the effective daylight illumination and the energy consumption data of the control strategy in the season;
[0043] The second determination unit is used to determine the comprehensive evaluation index of the control strategy in the season according to the first measurement index, the second measurement index and the third measurement index; wherein, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
[0044] Optionally, the first generating unit includes:
[0045] A third determination unit is used to determine at least one decision parameter according to typical meteorological data of the region where the target building belongs;
[0046] The first generating subunit is used to determine, for each of the decision parameters, a control parameter threshold of each gear of the electrochromic window of the decision parameter in each season, and generate a control strategy for the electrochromic window.
[0047] Optionally, the first determining unit includes:
[0048] A first testing unit is used to test and obtain corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy for each of the control strategies;
[0049] A first determination subunit is used to determine the hourly state of the electrochromic window gear according to the hourly values of the decision parameters of the control strategy in the typical meteorological year data and the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy;
[0050] The second generating unit is used to generate a gear timetable of the electrochromic window under the control strategy according to the hourly state of the electrochromic window gear.
[0051] Optionally, the construction unit of the typical building model includes:
[0052] The second acquisition unit is used to acquire building energy consumption benchmark data, building envelope standards and air conditioning forms for each region according to the building specifications corresponding to the region;
[0053] A building unit is used to establish a building model of the region according to the building energy consumption benchmark data, envelope structure standards and air conditioning forms of the region;
[0054] The third generating unit is used to generate a typical building model according to the building models of all the areas.
[0055] Optionally, the construction unit of the electrochromic window model includes:
[0056] A third acquisition unit is used to acquire different transmittance states of the glass of the electrochromic window using a DC power supply;
[0057] A second testing unit is used to test the visible light transmittance and spectral characteristics in each transmittance state to obtain a test result;
[0058] The fourth generating unit is used to set the gear position for the electrochromic window according to the test result and generate an electrochromic window model.
[0059] Optionally, the computing unit includes:
[0060] A first calculation subunit is used to calculate a first measurement index for each season according to the glare possibility of the control strategy in the season, the minimum glare possibility of all control strategies in the season, and the maximum glare possibility of all control strategies in the season;
[0061] A second calculation subunit is used to calculate a second measurement index for each season according to the effective daylight illumination of the control strategy in the season, the minimum value of the effective daylight illumination of all control strategies in the season, and the maximum value of the effective daylight illumination of all control strategies in the season;
[0062] The third calculation subunit is used to calculate a third measurement indicator for each season based on the energy consumption data of the control strategy in the season, the minimum value of the energy consumption data among all control strategies in the season, and the maximum value of the energy consumption data among all control strategies in the season.
[0063] Optionally, the second determining unit includes:
[0064] The second determination subunit is used to use the average value of the first measurement index, the second measurement index and the third measurement index as the comprehensive evaluation index of the control strategy in the season.
[0065] A third aspect of the present application provides an electronic device, including:
[0066] one or more processors;
[0067] a storage device having one or more programs stored thereon;
[0068] When the one or more programs are executed by the one or more processors, the one or more processors implement the method for evaluating the electrochromic window control strategy as described in any one of the first aspects.
[0069] A fourth aspect of the present application provides a storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the method for evaluating the electrochromic window control strategy as described in any one of the first aspects is implemented.
[0070] As can be seen from the above scheme, the present application provides an evaluation method, related device and storage medium for the control strategy of electrochromic windows. After obtaining the building orientation of the target building and the typical meteorological data of the area to which the target building belongs; modify the parameters in the typical building model according to the building orientation of the target building and the area to which the target building belongs, and obtain the target building model; then, divide the seasons according to the typical meteorological data of the area to which the target building belongs, and generate the control strategy of the electrochromic window; for each of the control strategies, determine the gear schedule of the electrochromic window under the control strategy according to the typical meteorological data of the area to which the target building belongs; for each of the control strategies, the typical meteorological data of the area to which the target building belongs is set; The annual data, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; for each season, the first measurement index, the second measurement index and the third measurement index are calculated according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in the season; according to the first measurement index, the second measurement index and the third measurement index, the comprehensive evaluation index of the control strategy in the season is determined; wherein, the larger the comprehensive evaluation index, the better the comprehensive performance of the control strategy in the season. The comprehensive performance indicators of the electrochromic window control strategy in different seasons are summarized to evaluate its seasonal comprehensive performance. According to the comprehensive evaluation index, the control strategy of the electrochromic window suitable for the building in this direction in the region is proposed in different seasons. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0072] Figure 1 is a schematic diagram of the structure of an electrochromic window;
[0073] Figure 2 A specific flow chart of an evaluation method for an electrochromic window control strategy provided in an embodiment of the present application;
[0074] Figure 3 A flowchart of a method for constructing a typical building model provided in another embodiment of the present application;
[0075] Figure 4 A schematic diagram of a typical building model provided for another embodiment of the present application;
[0076] Figure 5 A flow chart of a control strategy for generating an electrochromic window provided in another embodiment of the present application;
[0077] Figure 6 A schematic diagram of the correlation of environmental parameters that can be monitored provided by another embodiment of the present application;
[0078] Figure 7 A flow chart of a method for generating a gear schedule of an electrochromic window provided in another embodiment of the present application;
[0079] Figure 8 A flow chart of a method for constructing an electrochromic window model provided in another embodiment of the present application;
[0080] Fig. 9 A schematic diagram of an evaluation method for an electrochromic window control strategy provided by another embodiment of the present application;
[0081] Fig.10 A schematic diagram of an evaluation device for an electrochromic window control strategy provided by another embodiment of the present application;
[0082] Fig.11 A schematic diagram of an electronic device for implementing an evaluation method for an electrochromic window control strategy provided in another embodiment of the present application. DETAILED DESCRIPTION
[0083] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0084] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.
[0085] It is understandable that before using the technical solutions disclosed in the embodiments of the present disclosure, the types, scope of use, usage scenarios, etc. of the personal information involved in the present disclosure should be informed to the user and the user's authorization should be obtained in an appropriate manner in accordance with relevant laws and regulations.
[0086] It should be noted that the concepts such as "first" and "second" mentioned in this application are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0087] It should be noted that the modifications of "one" and "plurality" mentioned in the present application are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0088] First, the technical terms used in this application are explained:
[0089] Electrochromic (EC) windows can change the transmittance and solar heat gain coefficient according to the small DC voltage applied from the outside, thereby achieving precise control of the visible light and solar radiation heat entering the room. Figure 1 As shown, the electrochromic material is deposited on a glass or plastic substrate to form a nanometer-thick film. When the power is not connected or the power is reversed, the electrochromic coating is in a transparent state, and a large amount of visible light and solar radiation heat can enter the room through the window; when the power is forwarded, the chemical materials, ions and electrons in the electrochromic coating react, the color becomes darker and the transmittance of the window is reduced, thereby blocking part of the sunlight and radiant heat.
[0090] At present, simple rule control is mostly used for the selection of electrochromic window control strategies, and the indoor horizontal illumination or incident solar radiation intensity is generally selected as the decision parameter of the control. Although the logic of this type of control strategy is simple, due to the different solar altitude angles in different seasons, the performance of lighting and energy consumption is obviously different. It also ignores the differences in user needs in different seasons and the characteristics of meteorological parameters changing with the seasons. The evaluation of electrochromic window performance is mostly based on a single performance of lighting or energy consumption. The performance evaluation of electrochromic window control strategy based on a single performance cannot achieve a balance between energy saving and lighting comfort. Moreover, most of the current research on the optimization of electrochromic window control strategies focuses on energy-saving performance, and pays insufficient attention to lighting and visual comfort. For the selection of electrochromic window control parameters and thresholds, empirical values are mostly used, which cannot meet the differentiated needs of different regions and users. There is a lack of control strategy selection methods and systems suitable for each climate zone. For users in different regions and directions, it is difficult to measure the performance of various control strategies in this scenario.
[0091] To this end, the present application embodiment provides an evaluation method for an electrochromic window control strategy, such as Figure 2 As shown, the specific steps include:
[0092] S201. Obtain the building orientation of the target building and typical meteorological data of the region where the target building is located.
[0093] Among them, typical meteorological year data include but are not limited to temperature, humidity, solar radiation, wind speed, etc., which are not limited here.
[0094] It should be noted that buildings can include but are not limited to residential buildings, office buildings, etc., and are not limited here.
[0095] S202: modify the parameters in the typical building model according to the building orientation of the target building and the region to which the target building belongs, to obtain the target building model.
[0096] The typical building model includes building models of multiple regions, and can be selected and modified according to actual conditions. For example, if the target building is located in Changsha, then in the typical building model, select Changsha as the region and the building orientation of the target building to finally obtain the target building model.
[0097] Optionally, in another embodiment of the present application, a typical building model construction method is implemented as follows: Figure 3 As shown, including:
[0098] S301. For each region, obtain building energy consumption benchmark data, building envelope standards and air conditioning forms according to the corresponding building codes of the region.
[0099] Among them, the building energy consumption benchmark data involves multiple aspects, including but not limited to the energy consumption standards of various links such as building design, construction, operation and management; the envelope structure standards include but are not limited to the materials and thermal parameters of the building's walls, roofs, windows, floors and other envelope structures; the air-conditioning form includes but is not limited to the type of air-conditioning system used in the building (such as central air-conditioning, split air-conditioning, etc.) and its performance parameters (such as energy efficiency ratio, etc.).
[0100] S302. Establish a regional building model based on the regional building energy consumption benchmark data, building envelope standards and air conditioning forms.
[0101] S303: Generate a typical building model based on the building models of all regions.
[0102] like Figure 4 Shown is a schematic diagram of a typical building model provided in an embodiment of the present application.
[0103] S203, performing seasonal division according to typical meteorological data of the region to which the target building belongs, and obtaining seasonal division results of the region to which the target building belongs.
[0104] Among them, the seasons are divided into transition season, heating season and cooling season; the seasonal division results include the time range of the transition season, the time range of the heating season and the time range of the cooling season.
[0105] Specifically, the temperature thresholds used to divide seasons are determined based on local climate characteristics and comfortable temperature range. The following are commonly used temperature thresholds:
[0106] Transition season: Temperatures are between 18°C and 24°C, with no need for additional heating or cooling.
[0107] Heating season: When the temperature is below 18°C, turn on the heating system.
[0108] Cooling season: When the temperature is higher than 24°C, turn on the refrigeration system.
[0109] It should be noted that the time ranges of the transition season, heating season and cooling season are different in different regions. They are not simply divided by summer and winter, but are divided according to local climate characteristics. For example, Beijing's heating season is from November 12 to March 14 of the following year, and the cooling season is from June 20 to August 3, and the rest of the time is the transition season; Changsha's heating season is from December 26 to February 11 of the following year, and the cooling season is from June 25 to August 23, and the rest of the time is the transition season.
[0110] S204: Generate a control strategy for the electrochromic window based on typical meteorological data of the region where the target building is located.
[0111] In the specific implementation process of this application, correlation analysis is carried out on the monitored environmental parameters (as shown in Table 1), and the correlation between the parameters in different regions is obtained by using statistical analysis methods to evaluate the impact of each parameter on building energy consumption, daylight utilization and indoor comfort. The decision parameters with a high target number of correlations corresponding to the climate zone are selected as the decision parameters of each control strategy, and the optimal control thresholds of these decision variables are determined through optimization analysis.
[0112] Environmental parameters unit Direct radiation W / ㎡ Diffuse Radiation W / ㎡ Outdoor horizontal sky illuminance lx Outdoor horizontal beam illumination lx Outdoor beam normal illuminance lx Scattered radiation efficiency lum / W Beam radiant light efficiency lum / W Sky brightness cd / ㎡ Incoming solar radiation W / ㎡ Incident beam radiation W / ㎡ Horizontal illumination lx
[0113] Table 1
[0114] Optionally, in another embodiment of the present application, an implementation of step S204 is as follows: Figure 5 As shown, including:
[0115] S501. Determine at least one decision parameter based on typical meteorological data of the region where the target building is located.
[0116] In the specific implementation process of this application, taking Harbin as an example, according to its typical meteorological year data, we can get Figure 6 The correlation diagram from Figure 6It can be seen that the incident solar radiation (ISR), horizontal illuminance (IL) and indoor glare potential (DGP) have a strong correlation. In addition, the incident beam radiation (IBSR) and beam radiation light efficiency (BSRLE) also have a great influence on the possibility of indoor glare. Therefore, for Harbin area, ISR, IL, IBSR and BSRLE are selected as the lighting decision parameters of the control strategy.
[0117] It is understandable that in the specific implementation process of the present application, a larger number of parameters with a strong correlation with DGP may be selected.
[0118] S502 . For each decision parameter, determine the control parameter threshold of each gear of the electrochromic window in each season, and generate a control strategy for the electrochromic window.
[0119] Continuing with the above example, taking the BRSLE decision parameter as an example, in the transition season, the four gears are divided according to the distribution of BRSLE values when the electrochromic window is set to S1, S2, S3, and S4 at intervals of 20lum / W, so as to determine the control parameter thresholds of each gear. Finally, for the transition season in Harbin, BSRLE is set to S1 when it is lower than 60lum / W, S2 when it is 60-80lum / W, S3 when it is 80-100lum / W, and S4 when it is higher than 100lum / W; if the horizontal illuminance (IL) is used as the decision parameter, when IL is lower than 500lx, the electrochromic window is set to S1, 1500-4000lx is set to S2, 4000-20000lx is set to S3, and S4 when it exceeds 20000lx.
[0120] S205. For each control strategy, determine the gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region where the target building is located.
[0121] Specifically, according to the determined control strategy and the typical meteorological data of the area where the target building is located, the gear schedule of the electrochromic window under the control strategy can be compiled.
[0122] Optionally, in another embodiment of the present application, an implementation of step S205 is as follows: Figure 7 As shown, including:
[0123] S701. For each control strategy, test and obtain corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy.
[0124] Continuing with the above example, taking the transition season in Harbin as an example, when BSRLE is used as the decision variable, the BSRLE below 60lum / W is set to S1, 60-80lum / W is set to S2, 80-100lum / W is set to S3, and above 100lum / W is set to S4. The parameters (transmittance, reflectivity, absorptivity, etc.) of the four gears of the electrochromic window obtained by actual measurement.
[0125] S702, obtaining the hourly state of the electrochromic window gear according to the hourly values of the decision parameters of the control strategy in the typical meteorological year data and the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy.
[0126] According to the hourly values of BSRLE in the typical meteorological year parameters and the corresponding states of different gears of the electrochromic window when the control strategy uses BSRLE as the decision variable, the hourly states of the electrochromic window gears (including the transmittance and shading state of the electrochromic window in each state) can be obtained.
[0127] S703: Generate a gear timetable of the electrochromic window under the control strategy according to the hourly status of the gear of the electrochromic window.
[0128] S206. For each control strategy, the typical meteorological data of the target building area, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season.
[0129] In the specific implementation process of this application, the simulation software can use but is not limited to Rhino's plug-in Grasshopper to simulate energy consumption and lighting at the same time. This is not limited here. Grasshopper can be integrated with EnergyPlus and Radiance through plug-ins, and can perform comprehensive analysis in one environment, covering multiple aspects such as building energy consumption and natural lighting. EnergyPlus is a computer software for building energy consumption simulation. It can simulate energy consumption performance under different conditions, including heating, ventilation, air conditioning (HVAC), lighting, and hot water system energy consumption. Through the input of the target building model, electrochromic window model, typical meteorological year parameters and electrochromic window gear schedule, energy consumption data can be simulated. Radiance is a computer software for lighting analysis and visualization, which can relatively accurately simulate the distribution of sunlight and artificial light inside the building to optimize the lighting design. By determining a good gear schedule, the lighting effects of different seasons can be obtained.
[0130] It should be noted that natural lighting is the process of introducing direct and scattered natural light into the room through the light-transmitting enclosure structure on the building enclosure structure and providing lighting for users. Good natural lighting can create a comfortable and efficient working environment, thereby effectively reducing fatigue and seasonal discomfort, and meeting the psychological needs of indoor personnel to communicate with nature. However, too much natural lighting may cause uncomfortable glare. In order to evaluate visual comfort, the present invention uses glare possibility and effective daylight illumination to evaluate visual comfort.
[0131] Glare is a complex phenomenon, which refers to the visual distribution in the field of vision that causes visual discomfort and reduces the visibility of objects due to inappropriate brightness distribution or extreme brightness ratios in space or time. At present, the commonly used glare indicators at home and abroad include: Discomfort Glare Index (DGI), International Illumination Commission Unified Glare Rating (UGR), and Glare Probability (DGP). Among them, DGI and UGR are evaluation indicators based on contrast calculation. UGR is often used to evaluate indoor artificial lighting glare, and DGI is often used to evaluate natural lighting glare, but it is easy to overestimate the degree of discomfort. The calculation formulas of the glare possibility index and the simplified glare possibility index are as follows:
[0132]
[0133] DGPs = 6.22 × 10 -5 E V +0.184
[0134] E V is the vertical illuminance of the eye generated by the light source (lx), L s is the brightness of the glare source (cd / ㎡), ω s is the solid angle (sr) corresponding to the glare source, P is the position index, DGP is the glare possibility, DGPs is the simplified glare possibility, i refers to the i-th glare source, the vertical illuminance of the eye generated by the light source, the brightness of the glare source, the solid angle corresponding to the glare source, and the position index can be obtained through, but not limited to, Radiance modeling. These parameters can be obtained through software simulation to calculate the DGP value. Among them, DGPs is only related to the vertical eye illuminance, while DGP takes into account the illuminance saturation and brightness contrast, and is superior to other indicators in distinguishing glare interference / non-interference scenes. Therefore, in the present invention, DGP is used as a glare evaluation index, and according to the value range of DGP, the glare possibility can be divided into the following four levels, as shown in Table 2.
[0135] DGP value range Glare level DGP≤0.35 Imperceptible glare 0.35<DGP≤0.40 Perceivable glare 0.40<DGP≤0.45 Disturbed by glare DGP>0.45 Can't stand the glare
[0136] Table 2
[0137] At present, the commonly used indicators for evaluating light quantity at home and abroad are divided into two categories: static indicators and dynamic indicators. Static indicators represent the natural lighting conditions in a building at a certain moment, such as the illuminance value of the working surface and the daylight factor (DF). These indicators are short-term standards for evaluating light quantity, which are simple and direct, and their thresholds vary depending on the type of building and the purpose of the space. However, static indicators are mostly obtained by simplifying the calculation using the CIE standard full cloudy model, ignoring the impact of actual working conditions on natural lighting. On this basis, there are also some dynamic performance indicators such as daylight autonomy (DA), spatial daylight autonomy (sDA), and effective daylight illumination (UDI). These indicators are calculated by combining the meteorological data of the whole year and using the Perez sky model, which can better reflect the actual lighting conditions. The effective natural daylight illumination (UDI) is defined as: the proportion of time that the indoor horizontal daylight illumination at a certain point in a year is within a given range. This indicator is divided into three levels. Usually, it is divided into 100lx, 500lx and 2000 / 2500lx. Therefore, in order to achieve the best lighting performance, this patent uses 500~2000lx as the indoor illumination value area. At the same time, considering that this patent evaluates the control strategy performance of a certain season, UDI is used. season As an effective natural lighting illuminance evaluation index, it is defined as the proportion of time that the indoor horizontal daylight illuminance at a certain point in a certain season is within a given range (500-2000lx). This patent can consider but is not limited to the effective natural lighting illuminance at the working plane (0.75m) 2m away from the window, which is not limited here.
[0138] Optionally, in another embodiment of the present application, an implementation method of a method for constructing an electrochromic window model is as follows: Figure 8 As shown, including:
[0139] S801. Use a direct current power supply to obtain different transmittance states of the glass of the electrochromic window.
[0140] S802 . For each transmittance state, test the visible light transmittance and spectral characteristics in the transmittance state to obtain a test result.
[0141] In the specific implementation process of the present application, a spectrophotometer can be used, but not limited to, to measure the transmittance, reflectance, and absorptivity of the electrochromic window at different wavelengths (visible light and near infrared bands). At the same time, its heat transfer coefficient, solar heat gain coefficient, and visible light transmittance are measured. This is not limited here.
[0142] S803: Setting the gear position for the electrochromic window according to the test results, and generating an electrochromic window model.
[0143] Select the target number of states from all the result parameters, and set the corresponding gears as the target number of electrochromic windows. Take four gears as an example, and name them according to the transmittance: S1 (transparent state), S2 (low coloring), S3 (medium coloring), S4 (high coloring). According to the test result data, the model of the described electrochromic window in the four states is established.
[0144] S207. For each season, a first measurement index, a second measurement index, and a third measurement index are calculated based on the glare possibility, effective daylight illumination, and energy consumption data of the control strategy in the season.
[0145] Optionally, in another embodiment of the present application, an implementation of step S207 includes:
[0146] For each season, a first measurement index is calculated according to the glare possibility of the control strategy in the season, the minimum glare possibility of all control strategies in the season, and the maximum glare possibility of all control strategies in the season.
[0147] For each season, the second measurement index is calculated based on the effective daylight illumination of the control strategy in the season, the minimum effective daylight illumination of all control strategies in the season, and the maximum effective daylight illumination of all control strategies in the season.
[0148] For each season, the third measurement index is calculated based on the energy consumption data of the control strategy in the season, the minimum value of the energy consumption data among all the control strategies in the season, and the maximum value of the energy consumption data among all the control strategies in the season.
[0149] In the specific implementation process of this application, the following calculation formula can be used to calculate the first measurement indicator, the second measurement indicator and the third measurement indicator:
[0150]
[0151] Among them, SCPI (Seasonal comprehensive performance index) represents the seasonal comprehensive performance index, which is a dimensionless evaluation index. i represents the performance value of index i under a certain control strategy in a certain season, X min represents the minimum value of index i within the range of all control strategies in a certain season, X maxIndicates the maximum value of the i index within the range of all control strategies in a season. The i index refers to one of the glare possibility, effective sunshine intensity and energy consumption data. According to the above calculation formula, the first measurement index SCPI1 (DGP<0.35) and the second measurement index SCPI2 (UDI season ) and the third metric SCPI3 (energy consumption). SCPI1 (DGP < 0.35) refers to the proportion of time when the glare probability (DGP) in a certain season is less than 0.35 under a certain control strategy. SCPI2 (UDI seaon ) refers to the proportion of time that the indoor horizontal daylight illumination at the working plane (0.75m) 2m away from the window is within a given range (500-2000lx) in this season under this control strategy.
[0152] S208. Determine a comprehensive evaluation index of the control strategy under the season according to the first measurement index, the second measurement index and the third measurement index.
[0153] Among them, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
[0154] Optionally, in another embodiment of the present application, the average value of the first measurement index, the second measurement index and the third measurement index can be used as a comprehensive evaluation index of the control strategy under the season, which is not limited here.
[0155] like Fig. 9 As shown, it is an overall architecture diagram of an evaluation method for an electrochromic window control strategy provided in an embodiment of the present application. The parameters of the glass of the electrochromic window are tested to obtain the photothermal characteristic parameters and the structural parameters, and the electrochromic window model is generated. According to the building specifications corresponding to each region, the building energy consumption benchmark data, the envelope structure standard and the air-conditioning form are obtained to generate a typical building model; after determining the climate zone (local season) and the building orientation, the decision variables (parameters) in the control strategy are determined and the control threshold is determined. For each control strategy, the typical meteorological year data of the region to which the target building belongs, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software. The simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season, and then obtains the seasonal comprehensive performance evaluation index (comprehensive evaluation index under the season).
[0156] It can be seen from the above scheme that the present application provides an evaluation method for the control strategy of an electrochromic window. After obtaining the building orientation of a target building and the typical meteorological data of the region to which the target building belongs; the parameters in the typical building model are modified according to the building orientation of the target building and the region to which the target building belongs, so as to obtain the target building model; then, according to the typical meteorological data of the region to which the target building belongs, a control strategy for the electrochromic window is generated; for each control strategy, the gear schedule of the electrochromic window under the control strategy is determined according to the typical meteorological data of the region to which the target building belongs; for each control strategy, the typical meteorological data of the region to which the target building belongs is set. The annual data, target building model, electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; for each season, the first measurement index, the second measurement index and the third measurement index are calculated according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in the season; according to the first measurement index, the second measurement index and the third measurement index, the comprehensive evaluation index of the control strategy in the season is determined; among them, the larger the comprehensive evaluation index, the better the comprehensive performance of the control strategy in the season. The comprehensive performance indicators of the electrochromic window control strategy in different seasons are summarized to evaluate its seasonal comprehensive performance. According to the comprehensive evaluation index, the control strategy of the electrochromic window suitable for the building in this orientation in the region is proposed in different seasons.
[0157] The present application embodiment provides an evaluation device for an electrochromic window control strategy, such as Fig.10 As shown, specifically including:
[0158] The first acquisition unit 1001 is used to acquire the building orientation of the target building and the typical meteorological data of the area where the target building belongs.
[0159] The modifying unit 1002 is used to modify the parameters in the typical building model according to the building orientation of the target building and the region to which the target building belongs, so as to obtain the target building model.
[0160] Optionally, in another embodiment of the present application, an implementation of a construction unit of a typical building model includes:
[0161] The second acquisition unit is used to acquire building energy consumption benchmark data, envelope structure standards and air conditioning forms for each region according to the building specifications corresponding to the region.
[0162] A unit is established to establish a regional building model based on regional building energy consumption baseline data, envelope structure standards and air conditioning forms.
[0163] The third generating unit is used to generate a typical building model according to the building models of all regions.
[0164] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0165] The division unit 1003 is used to perform season division according to the typical meteorological data of the area where the target building belongs, and obtain the seasonal division result of the area where the target building belongs.
[0166] Among them, the seasons are divided into transition season, heating season and cooling season; the seasonal division results include the time range of the transition season, the time range of the heating season and the time range of the cooling season.
[0167] The first generating unit 1004 is used to generate a control strategy for the electrochromic window according to typical meteorological data of the region where the target building is located.
[0168] Optionally, in another embodiment of the present application, an implementation of the first generating unit 1004 includes:
[0169] The third determination unit is used to determine at least one decision parameter according to typical meteorological data of the area where the target building is located.
[0170] The first generating subunit is used to determine, for each decision parameter, a control parameter threshold value of each gear of the electrochromic window in each season, and generate a control strategy for the electrochromic window.
[0171] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0172] The first determination unit 1005 is used to determine, for each control strategy, a gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs.
[0173] Optionally, in another embodiment of the present application, an implementation of the first generating unit 1005 includes:
[0174] The first test unit is used to test each control strategy to obtain corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy.
[0175] The first determination subunit is used to determine the hourly state of the electrochromic window gear according to the hourly values of the decision parameters of the control strategy in the typical meteorological year data and the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy.
[0176] The second generating unit is used to generate a gear timetable of the electrochromic window under the control strategy according to the hourly state of the electrochromic window gear.
[0177] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0178] The input unit 1006 is used to input the typical meteorological data of the area where the target building is located, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy into the simulation software for each control strategy. The simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season.
[0179] Optionally, in another embodiment of the present application, an implementation of a construction unit of an electrochromic window model includes:
[0180] The third acquisition unit is used to acquire different transmittance states of the glass of the electrochromic window by using a direct current power supply.
[0181] The second testing unit is used to test the visible light transmittance and spectral characteristics in each transmittance state to obtain a test result.
[0182] The fourth generating unit is used to set the gear position for the electrochromic window according to the test result and generate the electrochromic window model.
[0183] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0184] The calculation unit 1007 is used to calculate the first measurement index, the second measurement index and the third measurement index according to the glare possibility, effective daylight illumination and energy consumption data of the season in the control strategy for each season.
[0185] Optionally, in another embodiment of the present application, an implementation of the calculation unit 1007 includes:
[0186] The first calculation subunit is used to calculate a first measurement index for each season according to the glare possibility of the control strategy in the season, the minimum glare possibility of all control strategies in the season, and the maximum glare possibility of all control strategies in the season.
[0187] The second calculation subunit is used to calculate a second measurement index for each season based on the effective daylight illumination of the control strategy in the season, the minimum effective daylight illumination of all control strategies in the season, and the maximum effective daylight illumination of all control strategies in the season.
[0188] The third calculation subunit is used to calculate a third measurement index for each season based on the energy consumption data of the control strategy in the season, the minimum value of the energy consumption data among all control strategies in the season, and the maximum value of the energy consumption data among all control strategies in the season.
[0189] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0190] The second determining unit 1008 is used to determine the comprehensive evaluation index of the control strategy under the season according to the first measurement index, the second measurement index and the third measurement index.
[0191] Among them, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
[0192] For the specific working process of the units disclosed in the above embodiments of the present application, please refer to the corresponding method embodiments, such as Figure 2 As shown, no further description is given here.
[0193] Optionally, in another embodiment of the present application, an implementation of the second determining unit 1008 includes:
[0194] The second determination subunit is used to use the average value of the first measurement index, the second measurement index and the third measurement index as the comprehensive evaluation index of the control strategy under the season.
[0195] The specific working process of the units disclosed in the above embodiments of the present application can be found in the corresponding method embodiments, which will not be repeated here.
[0196] It can be seen from the above scheme that the present application provides an evaluation device for the control strategy of an electrochromic window. After the first acquisition unit 1001 acquires the building orientation of the target building and the typical meteorological data of the region to which the target building belongs; the modification unit 1002 modifies the parameters in the typical building model according to the building orientation of the target building and the region to which the target building belongs, and obtains the target building model; the division unit 1003 divides the seasons according to the typical meteorological data of the region to which the target building belongs, and obtains the seasonal division results of the region to which the target building belongs, and then the first generation unit 1004 generates the control strategy of the electrochromic window according to the typical meteorological data of the region to which the target building belongs; the first determination unit 1005 determines the electrochromic window under the control strategy according to the typical meteorological data of the region to which the target building belongs for each control strategy. The input unit 1006 inputs the typical meteorological data of the target building area, the target building model, the electrochromic window model and the electrochromic window gear schedule under the control strategy into the simulation software for each control strategy, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; the calculation unit 1007 calculates the first measurement index, the second measurement index and the third measurement index according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; the second determination unit 1008 determines the comprehensive evaluation index of the control strategy in the season according to the first measurement index, the second measurement index and the third measurement index; wherein, the larger the comprehensive evaluation index, the better the comprehensive performance of the control strategy in the season. The comprehensive performance indicators of the electrochromic window control strategy in different seasons are summarized to evaluate its seasonal comprehensive performance. According to the comprehensive evaluation index, the control strategy of the electrochromic window suitable for the building in this direction in the region is proposed in different seasons.
[0197] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0198] Another embodiment of the present application provides an electronic device, such as Fig.11 As shown, including:
[0199] One or more processors 1101.
[0200] The storage device 1102 stores one or more programs.
[0201] When the one or more programs are executed by the one or more processors 1101, the one or more processors 1101 implement the evaluation method of the electrochromic window control strategy as described in any one of the above embodiments.
[0202] Another embodiment of the present application provides a storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the evaluation method of the electrochromic window control strategy as described in any one of the above embodiments is implemented.
[0203] In the context of the present application, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0204] It should be noted that the computer-readable medium mentioned above in the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0205] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.
[0206] Another embodiment of the present application provides a computer program product. When the computer program product is executed, it is used to execute any of the above-mentioned evaluation methods for the electrochromic window control strategy.
[0207] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network via a communication device, or installed from a storage device, or installed from a ROM. When the computer program is executed by a processing device, the above-mentioned functions defined in the method of the embodiment of the present application are executed.
[0208] Although the subject matter has been described in language specific to structural features and / or methodological logical actions, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or actions described above. On the contrary, the specific features and actions described above are merely example forms of implementing the claims.
[0209] Although several specific implementation details are included in the above discussion, these should not be interpreted as limiting the scope of the present application. Certain features described in the context of a separate embodiment can also be implemented in a single embodiment in combination. On the contrary, the various features described in the context of a single embodiment can also be implemented in multiple embodiments individually or in any suitable sub-combination.
[0210] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.
Claims
1. An evaluation method for electrochromic window control strategy, It is characterized in that include: Obtain the building orientation of the target building and the typical meteorological data of the area where the target building is located; Modify the parameters in the typical building model according to the building orientation of the target building and the area to which the target building belongs, and obtain the target building model; Performing seasonal division according to typical meteorological data of the region to which the target building belongs, obtaining seasonal division results of the region to which the target building belongs; wherein the seasons are divided into a transition season, a heating season, and a cooling season; the seasonal division results include a time range of the transition season, a time range of the heating season, and a time range of the cooling season; generating a control strategy for the electrochromic window according to typical meteorological data of the region where the target building is located; For each of the control strategies, determining a gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs; For each of the control strategies, the typical meteorological data of the region where the target building is located, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy are input into the simulation software, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; For each season, a first metric, a second metric and a third metric are calculated according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in the season; According to the first measurement index, the second measurement index and the third measurement index, a comprehensive evaluation index of the control strategy in the season is determined; wherein, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
2. The method for evaluating the electrochromic window control strategy according to claim 1, It is characterized in that The control strategy of the electrochromic window is generated according to the typical meteorological data of the region where the target building is located, including: Determining at least one decision parameter based on typical meteorological data of the region where the target building is located; For each of the decision parameters, a control parameter threshold of the electrochromic window at each gear position of the decision parameter in each season is determined to generate a control strategy for the electrochromic window.
3. The method for evaluating the electrochromic window control strategy according to claim 2, It is characterized in that For each of the control strategies, determining the gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs includes: For each of the control strategies, the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy are obtained by testing; According to the hourly values of the decision parameters of the control strategy in the typical meteorological year data and the corresponding states of different gears of the electrochromic window under the decision parameters of the control strategy, the hourly states of the gears of the electrochromic window are obtained; According to the hourly status of the electrochromic window gear, a gear timetable of the electrochromic window under the control strategy is generated.
4. The method for evaluating the electrochromic window control strategy according to claim 1, It is characterized in that The method for constructing the typical building model comprises: For each region, obtain building energy consumption benchmark data, building envelope standards and air conditioning forms according to the corresponding building codes of the region; Establish a building model for the region based on the building energy consumption benchmark data, building envelope standards and air conditioning forms in the region; A typical building model is generated based on the building models of all the described areas.
5. The method for evaluating the electrochromic window control strategy according to claim 1, It is characterized in that The method for constructing the electrochromic window model comprises: Using a direct current power supply to obtain different transmittance states of the glass of the electrochromic window; For each transmittance state, testing the visible light transmittance and spectral characteristics in the transmittance state to obtain a test result; The electrochromic window is configured with a gear setting according to the test result to generate an electrochromic window model.
6. The method for evaluating the electrochromic window control strategy according to claim 1, It is characterized in that For each season, the first metric, the second metric and the third metric are calculated according to the glare possibility, effective daylight illumination and energy consumption data of the control strategy in the season, including: For each season, a first measurement index is calculated according to the glare possibility of the control strategy in the season, the minimum glare possibility of all control strategies in the season, and the maximum glare possibility of all control strategies in the season; For each season, a second measurement index is calculated according to the effective daylight illumination of the control strategy in the season, the minimum value of the effective daylight illumination among all control strategies in the season, and the maximum value of the effective daylight illumination among all control strategies in the season; For each season, a third measurement indicator is calculated based on the energy consumption data of the control strategy in the season, the minimum value of the energy consumption data among all control strategies in the season, and the maximum value of the energy consumption data among all control strategies in the season.
7. The method for evaluating the electrochromic window control strategy according to claim 1, It is characterized in that Determining the comprehensive evaluation index of the control strategy in the season according to the first measurement index, the second measurement index and the third measurement index includes: The average value of the first measurement index, the second measurement index and the third measurement index is used as the comprehensive evaluation index of the control strategy in the season.
8. An evaluation device for electrochromic window control strategy, It is characterized in that include: The first acquisition unit is used to acquire the building orientation of the target building and the typical meteorological data of the area where the target building belongs; A modification unit, used for modifying the parameters in the typical building model according to the building orientation of the target building and the region to which the target building belongs, so as to obtain the target building model; A division unit, used for performing season division according to typical meteorological data of the region to which the target building belongs, to obtain a season division result of the region to which the target building belongs; wherein the season is divided into a transition season, a heating season and a cooling season; the season division result includes a time range of the transition season, a time range of the heating season and a time range of the cooling season; A first generating unit, for generating a control strategy for the electrochromic window according to typical meteorological data of the region to which the target building belongs; A first determination unit is used to determine, for each of the control strategies, a gear schedule of the electrochromic window under the control strategy according to typical meteorological data of the region to which the target building belongs; An input unit is used to input typical meteorological data of the region to which the target building belongs, the target building model, the electrochromic window model and the gear schedule of the electrochromic window under the control strategy into the simulation software for each control strategy, and the simulation software outputs the glare possibility, effective daylight illumination and energy consumption data of the control strategy in each season; A calculation unit, for calculating, for each season, the first measurement index, the second measurement index and the third measurement index according to the glare possibility, the effective daylight illumination and the energy consumption data of the control strategy in the season; The second determination unit is used to determine the comprehensive evaluation index of the control strategy in the season according to the first measurement index, the second measurement index and the third measurement index; wherein, the larger the comprehensive evaluation index is, the better the comprehensive performance of the control strategy in the season is.
9. An electronic device, It is characterized in that include: one or more processors; a storage device having one or more programs stored thereon; When the one or more programs are executed by the one or more processors, the one or more processors implement the method for evaluating the electrochromic window control strategy as claimed in any one of claims 1 to 7.
10. A storage medium, It is characterized in that A computer program is stored thereon, wherein when the computer program is executed by a processor, the evaluation method for the electrochromic window control strategy as claimed in any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Electrochromic window control systems and methods
CN117850115A
System, device, and method for controlling smart windows
US20170234067A1
Cited By
Electrochromic window multi-scene control method, system and equipment based on indoor human body thermal comfort and medium
CN121252245A
A method, system, device and medium for multi-scene control of an electrochromic window based on indoor human thermal comfort
CN121252245B
