Multi-stage intelligent power grid station centralized control method, system, application and computer

Through the multi-level smart website centralized control method and improved wolf pack algorithm, the transmission and processing of terminal equipment data in the smart grid are optimized, the problems of uneven resource allocation and increased delay in traditional systems are solved, and efficient scheduling and communication are achieved Stability has improved the interconnection and operation and maintenance efficiency of smart substations across the province.

CN119094526APending Publication Date: 2024-12-06STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +5
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411350857.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Traditional centralized control systems are difficult to meet the problems of uneven resource allocation and increased processing delays under large-scale distributed architectures, especially in the complex distributed architecture, the effective scheduling and balanced resource allocation of intelligent inspection tasks have become technical difficulties, and in-site communications are also the same. Efficient and stable transmission of the network is also a challenge to intelligent operation and maintenance.

Method used

Using the multi-level intelligent power website centralized control method, through the collaborative architecture of intelligent substations, core substations and provincial and municipal centralized control main stations, the improved wolf pack algorithm optimizes the objective function of time delay, energy consumption and load balancing, and establishes constraints. Determine the transmission path and processing method of terminal equipment data to ensure efficient transmission and processing of data between cloud servers, auxiliary control hosts and core substations.

Benefits of technology

It realizes efficient task scheduling and load balancing under a large-scale distributed architecture, ensures high reliability and low latency of the on-site communication network, improves the operation and maintenance efficiency of the smart grid and system reliability, and realizes the province's smart substations Interconnection and data scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119094526A_ABST
    Figure CN119094526A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-level intelligent power grid station centralized control method, system, application and computer, and the method comprises the steps: 1, building a distributed heterogeneous wireless network model under a communication service in which event driving and periodic sampling data coexist in a transformer substation; and designing a heterogeneous network uplink and downlink communication link joint resource allocation method so as to ensure the reliability and real-time performance requirements of heterogeneous data transmission of the transformer substation. 3, researching a cloud edge-edge collaborative system construction method comprising collaboration of a centralized control system host, a plurality of extension terminals and a plurality of intelligent patrol hosts and collaboration among the intelligent patrol hosts; and 4, designing an optimal coverage algorithm considering communication delay and calculating load balance degree, and constructing a cloud edge-edge collaborative centralized control system architecture with optimized deployment positions of the intelligent patrol hosts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of smart grid site centralized control technology, and specifically to a multi-level smart grid site centralized control method, system, application, and computer. Background Art

[0002] With the transformation of the global energy system and the deep integration of digital technologies, the construction of smart grids has become the cornerstone of the modernization of power systems. By deeply integrating power and information flows, smart grids have greatly enhanced the automation, interactivity and flexibility of power grids. This enables power systems to operate more efficiently while improving the reliability and sustainable development capabilities of the system.

[0003] In the construction of smart grid, the Centralized Control System (CCS) plays a vital role. The CCS can realize real-time monitoring and control of the power grid to ensure the safe and stable operation of the power grid. It improves the operating efficiency and economy of the power system by centrally monitoring the power grid status, fault handling, resource scheduling and security assurance.

[0004] At present, the interconnection of smart substations across the province still faces challenges. The traditional centralized control system architecture is difficult to meet the needs of large-scale distributed architecture, and there are problems such as uneven resource allocation and increased processing delay. Especially under the complex distributed architecture, the effective scheduling of smart inspection tasks and balanced resource allocation have become technical difficulties. In addition, the efficient and stable transmission of the intra-station communication network is another core element of intelligent operation and maintenance. Summary of the invention

[0005] The technical problem to be solved by the present invention is how to realize a centralized control method for interconnecting all smart substations in the province.

[0006] The present invention solves the above technical problems through the following technical means:

[0007] A multi-level smart grid site centralized control method, wherein the multi-level smart grid site includes a smart substation, a core substation, and a provincial and municipal level centralized control master station in order of levels;

[0008] The terminal devices in a single smart substation are numbered from 1 to N, where n represents the serial number of the nth terminal device; at the same time, each auxiliary control host of the smart substation is numbered from 1 to K, where k represents the serial number of the kth auxiliary control host;

[0009] The multiple smart substations are numbered from 1 to M, where m represents the sequence number of the mth smart substation;

[0010] The core substations are numbered from 1 to W, where w represents the sequence number of the w-th core substation;

[0011] The centralized control method includes the following steps:

[0012] Let each terminal device of the mth smart substation collect L at each moment m The data is sent to the cloud server or auxiliary control host in the smart substation for processing;

[0013] Each smart substation integrates data and sends it to the smart patrol host of the core substation or the provincial and municipal centralized control master station for task redistribution;

[0014] Taking the weighted minimum of time delay, energy consumption and load balance as the objective function; establishing a constraint condition according to the limiting factors of computing resources, communication resources and device hardware; and forming a system model by the objective function and a series of constraint conditions;

[0015] The objective function is:

[0016] minf1=E+T (1)

[0017] minf2=min{a(E+T+E m +T m +E v +T v )+bB} (2)

[0018] Where E represents the sum of energy consumption in all single smart substations, T represents the sum of delays in a single smart substation, and T m 、E m They represent the transmission delay and transmission energy consumption between intelligent patrol master stations, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. a and b are balance parameters, and B represents the load balancing function, which is calculated by the task volume between different smart substations.

[0019] Use equations (23) to (29) to establish constraints:

[0020] x n,k ∈[0,1](3)

[0021]

[0022] z m,w ∈[0,1](5)

[0023]

[0024] In formula (23), x n,kIt represents the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected. Formula (23) indicates that the data packet of the nth terminal device can be transmitted to the cloud server or the auxiliary control host;

[0025] Formula (24) indicates that the data sent by the terminal device cannot exceed its data packet upper limit;

[0026] In formula (25), z m,w It represents the percentage of data transmitted from the m-th smart substation to the w-th core substation in the total data collected. Formula (25) indicates that the data packet of the m-th smart substation can be transmitted to the core substation or the provincial or municipal smart master station;

[0027] Formula (26) indicates that the data sent by the smart substation cannot exceed its data packet upper limit;

[0028] Formula (27) indicates that the computing resources consumed by the data transmitted to the auxiliary control host in the smart substation cannot exceed the total computing resources of the auxiliary control host, μ max Indicates the total computing resources of the auxiliary control host;

[0029] In formula (28), d n,k represents the distance between the nth terminal device and the kth auxiliary control host. Formula (28) indicates that each terminal device in the smart substation is covered by at least one auxiliary control host. R K Indicates the coverage of the auxiliary control host;

[0030] In formula (29), d m,w represents the distance from the mth smart substation to the wth core substation. Formula (29) indicates that each terminal device in the smart substation is covered by at least one core substation. R W Indicates the coverage of the core substation.

[0031] Furthermore, the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent to the auxiliary control host for processing within the smart substation are determined using equations (1) to (4):

[0032] r e =B n log2(1+p0*H e / σ 2 ) (10)

[0033]

[0034] In the formula, r e and p0 are the transmission rate and transmission power from the nth terminal device to the auxiliary control host, σ 2 is the noise power, B nis the bandwidth resource of the nth terminal device, H e is the channel gain between the nth terminal device and the auxiliary control host, x n,k It indicates the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected, where x n,k =1 means that all the data collected by the nth terminal device is transmitted to the kth auxiliary control host, x n,k =0 means that the data collected by the nth terminal device has not been transmitted to the kth auxiliary control host. Indicates the transmission delay between the nth terminal device and the auxiliary control host. represents the transmission energy consumption between the nth terminal device and the auxiliary control host, d n,k Indicates the distance between the nth terminal device and the kth auxiliary control host.

[0035] Furthermore, equations (5) to (8) are used to determine the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent from the smart substation to the cloud server for processing:

[0036] r c =B n log2(1+p1*H c / σ 2 ) (14)

[0037]

[0038] In formula (5) to formula (8), r c and p1 are the transmission rate and transmission power from the nth terminal device to the cloud server, respectively. c is the channel gain between the nth terminal device and the cloud server, Indicates the transmission delay between the nth terminal device and the auxiliary control host. Represents the transmission energy consumption between the nth terminal device and the cloud service.

[0039] Furthermore, the computing energy consumption and computing delay of the edge device are calculated using equations (9) and (10), and the total delay and total energy consumption inside the smart substation are calculated according to equations (11) and (12):

[0040]

[0041] Among them, c e represents the number of CPU cycles required for data processing, μ represents the processing power of edge devices, e1 is the power consumption coefficient, Indicates the calculation delay of the auxiliary control host. It indicates the transmission energy consumption of the auxiliary control host, and T0 is the network fluctuation.

[0042] Furthermore, the time delay and energy consumption generated by transmission to the core substation are determined using equations (13) to (16):

[0043] r m =B m log2(1+p2*H m / σ 2 ) (twenty two)

[0044]

[0045] E m =p m T m (25)

[0046] In formula (13) to formula (16), r m , p2 and H m They are the transmission rate, transmission power and channel gain between the intelligent patrol master stations, T m 、E m They represent the transmission delay and transmission energy consumption between the intelligent patrol master stations, z m,w represents the percentage of data transmitted from the mth smart substation to the wth core substation in the total data collected, d m,w Represents the distance from the mth smart substation to the wth core substation.

[0047] Furthermore, the time delay and energy consumption caused by transmitting data from the intelligent patrol master station to the provincial and municipal centralized control master station are determined using equations (17) to (20):

[0048] r v =B v log2(1+p3*H v / σ 2 ) (26)

[0049]

[0050]

[0051] E v =p v T v (29)

[0052] In formula (17) to formula (20), r v , p3 and H v They are the transmission rate, transmission power and channel gain from the intelligent patrol master station to the provincial and municipal centralized control master station, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. vIndicates the size of data transmitted from the Zhixun master station to the provincial and municipal centralized control master stations.

[0053] Furthermore, the objective function solving process is as follows:

[0054] Step 10.1: Use the improved wolf pack algorithm to solve the objective function f1. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider x n,k In the special case where all the values ​​are 1, the random edge device position is input into the improved wolf pack algorithm as the solution target, and the merit function is solved. The wolf pack is divided into three types: leader, follower and border scout according to the merit value from best to worst. Among them, the general wolf with the worst adaptability will be directly led to the vicinity of the head wolf and randomly distributed within the -ADS range; the leader searches according to the current optimal solution and updates its own position; the follower wolf is synchronously updated according to the leader's position; the border scout wolf randomly searches for a new position to jump out of the local optimal solution, and finally according to the update before and after The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output;

[0055] Step 10.2: Use the improved wolf pack algorithm to solve the objective function f2. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider z m,w The special case where all are 1, and the d obtained in step 10.1 n,k Substitute the random core substation location into the improved wolf pack algorithm as the solution target, perform the same operation, and finally calculate the value of the random core substation location based on the update before and after. The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output;

[0056] Step 10.3: Use the improved wolf pack algorithm to solve the objective function f2, and use the objective function as the quality function of the improved wolf pack algorithm model. n,k and m,w Back-substitution, the random x n,k and z m,w Substitute the improved wolf pack algorithm as the solution target and perform the same operation as above. Finally, according to the x before and after an update n,k and z m,w The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output;

[0057] Step 10.4: n,k and z m,w Go back to steps 10.1 and 10.2 to perform another layout calculation, and repeat multiple times until the difference between the two objective functions f2 is less than ε. Stop updating and output the optimal solution.

[0058] The present invention also provides a multi-level smart grid site centralized control system, wherein the multi-level smart grid site includes a provincial and municipal level centralized control master station, a core substation, and a smart substation;

[0059] The terminal devices in a single smart substation are numbered from 1 to N, where n represents the serial number of the nth terminal device; at the same time, each auxiliary control host is numbered from 1 to K, where k represents the serial number of the kth auxiliary control host;

[0060] The multiple smart substations are numbered from 1 to M, where m represents the sequence number of the mth smart substation;

[0061] The core substations are numbered from 1 to W, where w represents the sequence number of the w-th core substation;

[0062] The centralized control system includes:

[0063] Terminal equipment collection and transmission module: each terminal equipment at the mth intelligent substation collects L at each moment m The data is sent to the cloud server or auxiliary control host in the smart substation for processing;

[0064] Smart substation data integration and transmission module: enables each smart substation to integrate data and send it to the smart patrol host of the core substation or the provincial and municipal centralized control master station for task redistribution;

[0065] Task scheduling and load balancing calculation module: taking the weighted minimum of time delay, energy consumption and load balancing as the objective function; establishing a constraint condition according to the limiting factors of computing resources, communication resources and device hardware; the objective function and a series of constraint conditions constitute a system model;

[0066] The objective function is:

[0067] minf1=E+T (30)

[0068] minf2=min{a(E+T+E m +T m +E v +T v )+bB} (31)

[0069] Where E represents the sum of energy consumption in all single smart substations, T represents the sum of delays in a single smart substation, and T m 、E m They represent the transmission delay and transmission energy consumption between intelligent patrol master stations, T v 、E vThey represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. a and b are balance parameters, and B represents the load balancing function, which is calculated by the task volume between different smart substations.

[0070] Use equations (23) to (29) to establish constraints:

[0071] x n,k ∈[0,1](32)

[0072]

[0073] z m,w ∈[0,1](34)

[0074]

[0075] In formula (23), x n,k It represents the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected. Formula (23) indicates that the data packet of the nth terminal device can be transmitted to the cloud server or the auxiliary control host;

[0076] Formula (24) indicates that the data sent by the terminal device cannot exceed its data packet upper limit;

[0077] In formula (25), z m,w It represents the percentage of data transmitted from the m-th smart substation to the w-th core substation in the total data collected. Formula (25) indicates that the data packet of the m-th smart substation can be transmitted to the core substation or the provincial or municipal smart master station;

[0078] Formula (26) indicates that the data sent by the smart substation cannot exceed its data packet upper limit;

[0079] Formula (27) indicates that the computing resources consumed by the data transmitted to the auxiliary control host in the smart substation cannot exceed the total computing resources of the auxiliary control host, μ max Indicates the total computing resources of the auxiliary control host;

[0080] In formula (28), d n,k represents the distance between the nth terminal device and the kth auxiliary control host. Formula (28) indicates that each terminal device in the smart substation is covered by at least one auxiliary control host. R K Indicates the coverage of the auxiliary control host;

[0081] In formula (29), d m,w represents the distance from the mth smart substation to the wth core substation. Formula (29) indicates that each terminal device in the smart substation is covered by at least one core substation. R W Indicates the coverage of the core substation.

[0082] The present invention also provides a power grid system using the above system.

[0083] The present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions enable the computer to execute the above method.

[0084] The advantages of the present invention are:

[0085] The centralized control system architecture based on cloud-edge-edge collaboration can better adapt to the needs of large-scale distributed architecture and achieve efficient task scheduling and load balancing. At the same time, the architecture can also ensure the high reliability and low latency of the intra-station communication network, and enhance the communication quality and stability of the centralized control system in complex electromagnetic environments, network congestion, and hardware failures. This will help improve the operation and maintenance efficiency and system reliability of the smart grid, and realize the interconnection and data scheduling of smart substations across the province. BRIEF DESCRIPTION OF THE DRAWINGS

[0086] Figure 1 This is a block diagram of the centralized control system architecture for cloud-edge-edge-edge collaboration in an embodiment of the present invention;

[0087] Figure 2a and Figure 2b They are Figure 1 Enlarged views of the left and right parts. DETAILED DESCRIPTION

[0088] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0089] The present embodiment provides a multi-level smart grid site centralized control method, wherein the multi-level smart grid site includes a smart substation, a core substation, and a provincial and municipal centralized control station. The core substation includes a smart patrol station and an extended terminal (a device that collects and sends data on the smart patrol station), and the smart substation includes a terminal device, an auxiliary control host, a cloud server module, and a communication module. In the present embodiment, in the cloud-edge collaborative centralized control system architecture, the cloud refers to the provincial and municipal centralized control station / smart patrol station, edge 1 refers to the smart patrol host and extended terminal of the core substation (manned substation), edge 2 refers to all substation auxiliary control hosts, and the end refers to the equipment in the substation. Figure 1 As shown, enlarge the picture Figure 2a , Figure 2bDuring the execution of this embodiment, a distributed heterogeneous wireless network model is first established under the communication service of event-driven and periodic sampling data coexisting in the substation. And in view of the different reliability index requirements of multiple data types in the substation, a joint resource allocation method for uplink and downlink communication links in heterogeneous networks is designed to ensure the reliability and real-time requirements of heterogeneous data transmission in the substation. Then, a method for constructing a cloud-edge-edge-edge collaborative system including the collaboration between the host of the centralized control system and multiple extended terminals and multiple intelligent patrol hosts, as well as the collaboration between intelligent patrol hosts is studied. Finally, an optimal coverage algorithm considering communication delay and computational load balancing is designed to construct a cloud-edge-edge-edge collaborative centralized control system architecture with optimized deployment location of intelligent patrol hosts.

[0090] The specific steps are as follows:

[0091] Step 1: Set the minimum data transmission, maximum delay and maximum packet loss rate supported by the network in the smart substation, select WIFI as the main wireless communication standard, and use star topology as the network topology architecture of the centralized control system. Perform periodic sampling on the system. When a fault alarm or other event occurs, the system will expedite multiple data sampling and processing.

[0092] Step 2: From the perspective of a single smart substation, the terminal devices inside it are numbered from 1 to N, where n represents the serial number of the nth terminal device; at the same time, each auxiliary control host is numbered from 1 to K, where k represents the serial number of the kth auxiliary control host;

[0093] From a global perspective, multiple smart substations are numbered from 1 to M, where m represents the serial number of the mth smart substation; each smart substation will integrate data and send it to the smart patrol host of the core substation or the provincial and municipal centralized control master station for task redistribution, and the core substations are numbered from 1 to W, where w represents the serial number of the wth core substation;

[0094] Let each terminal device of the mth smart substation collect L at each moment m The data is collected and sent to the cloud server or auxiliary control host for processing.

[0095] Step 3: Use equations (1) to (4) to determine the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent to the auxiliary control host for processing within the smart substation:

[0096] r e =B n log2(1+p0*H e / σ 2 ) (39)

[0097]

[0098] In formula (1) to formula (4), r e and p0 are the transmission rate and transmission power from the nth terminal device to the auxiliary control host, σ 2 is the noise power, B n The bandwidth resource of the nth terminal device, H e is the channel gain between the nth terminal device and the auxiliary control host, x n,k It indicates the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected, where x n,k =1 means that all the data collected by the nth terminal device is transmitted to the kth auxiliary control host, x n,k =0 means that the data collected by the nth terminal device has not been transmitted to the kth auxiliary control host. Indicates the transmission delay between the nth terminal device and the auxiliary control host. represents the transmission energy consumption between the nth terminal device and the auxiliary control host, d n,k The distance between the nth terminal device and the kth auxiliary control host.

[0099] Step 4: Use equations (5) to (8) to determine the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent from the smart substation to the cloud server for processing:

[0100] r c =B n log2(1+p1*H c / σ 2 ) (43)

[0101]

[0102] In formula (5) to formula (8), r c and p1 are the transmission rate and transmission power from the nth terminal device to the cloud server, respectively. c is the channel gain between the nth terminal device and the cloud server, Indicates the transmission delay between the nth terminal device and the auxiliary control host. Represents the transmission energy consumption between the nth terminal device and the cloud service.

[0103] Step 5: Use equations (9) and (10) to calculate the computing energy consumption and computing delay of the edge device, and use equations (11) and (12) to calculate the total delay and total energy consumption inside the smart substation:

[0104]

[0105]

[0106] Among them, c erepresents the number of CPU cycles required for data processing, μ represents the processing power of edge devices, e1 is the power consumption coefficient, Indicates the calculation delay of the auxiliary control host. It indicates the transmission energy consumption of the auxiliary control host, and T0 is the network fluctuation.

[0107] Step 6: Use equations (13) to (16) to determine the time delay and energy consumption generated by transmission to the core substation:

[0108] r m =B m log2(1+p2*H m / σ 2 ) (51)

[0109]

[0110] E m =p m T m (54)

[0111] In formula (13) to formula (16), r m , p2 and H m They are the transmission rate, transmission power and channel gain between the intelligent patrol master stations, T m 、E m They represent the transmission delay and transmission energy consumption between the intelligent patrol master stations, z m,w represents the percentage of data transmitted from the mth smart substation to the wth core substation in the total data collected, d m,w Represents the distance from the mth smart substation to the wth core substation.

[0112] Step 7: Use equations (17) to (20) to determine the time delay and energy consumption caused by transmitting data from the smart patrol master station to the provincial and municipal centralized control master station:

[0113] r v =B v log2(1+p3*H v / σ 2 ) (55)

[0114]

[0115] E v =p v T v (58)

[0116] In formula (17) to formula (20), r v , p3 and H vThey are the transmission rate, transmission power and channel gain from the intelligent patrol master station to the provincial and municipal centralized control master station, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. v Indicates the size of data transmitted from the Zhixun master station to the provincial and municipal centralized control master stations.

[0117] Step 8: Taking the weighted minimum of time delay, energy consumption and load balance as the objective function; establishing a series of constraints according to the limiting factors of computing resources, communication resources and device hardware; and forming a system model by the objective function and the series of constraints;

[0118] Step 9. Use the improved wolf pack algorithm to find the local system edge device layout under cloud-edge-edge-edge collaboration; use the improved wolf pack algorithm to find the local system edge core substation layout under cloud-edge-edge-edge collaboration; use the improved wolf pack algorithm to find the system optimal scheduling based on the local optimal layout under cloud-edge-edge-edge collaboration; use the improved wolf pack algorithm to loop to get the optimal centralized control system architecture;

[0119] In this embodiment, step eight is performed as follows:

[0120] Step 8.1: Use equations (21) and (22) to establish the objective function:

[0121] minf1=E+T (59)

[0122] minf2=min{a(E+T+E m +T m +E v +T v )+bB} (60)

[0123] Among them, a and b are balance parameters respectively, and B represents the load balancing function, which is calculated by the task volume between different smart substations.

[0124] Step 8.2: Use equations (23) to (29) to establish constraints:

[0125] x n,k ∈[0,1](61)

[0126]

[0127] z m,w ∈[0,1](63)

[0128]

[0129] Formula (23) indicates that the data packet of the nth terminal device can be transmitted to the cloud server or the auxiliary control host;

[0130] Formula (24) indicates that the data sent by the terminal device cannot exceed its data packet upper limit;

[0131] Formula (25) indicates that the data packet of the wth smart substation can be transmitted to the core substation or the provincial or municipal smart master station;

[0132] Formula (26) indicates that the data sent by the smart substation cannot exceed its data packet upper limit;

[0133] Formula (27) indicates that the computing resources consumed by the data transmitted to the auxiliary control host in the smart substation cannot exceed the total computing resources of the auxiliary control host, μ max Indicates the total computing resources of the auxiliary control host;

[0134] Formula (28) indicates that each terminal device in the smart substation is covered by at least one auxiliary control host, R K Indicates the coverage of the auxiliary control host;

[0135] Formula (29) indicates that each terminal device in the smart substation is covered by at least one core substation, R W Indicates the coverage of the core substation;

[0136] In this embodiment, the improved wolf pack algorithm in step nine is solved according to the following steps:

[0137] Step 10.1: Use the improved wolf pack algorithm to solve the objective function f1. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider x n,k In the special case where all the values ​​are 1, the random edge device position is input into the improved wolf pack algorithm as the solution target, and the merit function is solved. The wolf pack is divided into three types: leader, follower and border scout according to the merit value from best to worst. Among them, the general wolf with the worst adaptability will be directly led to the vicinity of the head wolf and randomly distributed within the -ADS range; the leader searches according to the current optimal solution and updates its own position; the follower wolf is synchronously updated according to the leader's position; the border scout wolf randomly searches for a new position to jump out of the local optimal solution, and finally according to the update before and after The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output.

[0138] Step 10.2: Use the improved wolf pack algorithm to solve the objective function f2. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider z m,w The special case where all are 1, and the d obtained in step 10.1 n,k Substitute the random core substation location into the improved wolf pack algorithm as the solution target, perform the same operation, and finally calculate the value of the random core substation location based on the update before and after. The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output.

[0139] Step 10.3: Use the improved wolf pack algorithm to solve the objective function f2, and use the objective function as the quality function of the improved wolf pack algorithm model. n,k and m,w Back-substitution, the random x n,k and z m,w Substitute the improved wolf pack algorithm as the solution target and perform the same operation as above. Finally, according to the x before and after an update n, k and z m,w The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output.

[0140] Step 10.4: n,k and z m,w Go back to steps 10.1 and 10.2 to perform another layout calculation, and repeat multiple times until the difference between the two objective functions f2 is less than ε. Stop updating and output the optimal solution.

[0141] This embodiment is based on the centralized control system architecture of cloud-edge-edge collaboration, which can better adapt to the needs of large-scale distributed architecture and realize efficient scheduling and load balancing of tasks. At the same time, the architecture can also ensure the high reliability and low latency of the intra-station communication network, and enhance the communication quality and stability of the centralized control system in complex electromagnetic environments, network congestion, and hardware failures. This will help improve the operation and maintenance efficiency and system reliability of the smart grid, and realize the interconnection and data scheduling of smart substations across the province.

[0142] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A multi-level smart grid site centralized control method, wherein the multi-level smart grid site includes a smart substation, a core substation, and a provincial and municipal centralized control master station in order of levels; The terminal devices in a single smart substation are numbered from 1 to N, where n represents the serial number of the nth terminal device; at the same time, each auxiliary control host of the smart substation is numbered from 1 to K, where k represents the serial number of the kth auxiliary control host; The multiple smart substations are numbered from 1 to M, where m represents the sequence number of the mth smart substation; The core substations are numbered from 1 to W, where w represents the sequence number of the w-th core substation; It is characterized in that The centralized control method includes the following steps: Let each terminal device of the mth smart substation collect L at each moment m The data is sent to the cloud server or auxiliary control host in the smart substation for processing; Each smart substation integrates data and sends it to the smart patrol host of the core substation or the provincial and municipal centralized control master station for task redistribution; Taking the weighted minimum of time delay, energy consumption and load balance as the objective function; establishing a constraint condition according to the limiting factors of computing resources, communication resources and device hardware; and forming a system model by the objective function and a series of constraint conditions; The objective function is: minf1=E+T (68) minf2=min{a(E+T+E m +T m +E v +T v )+bB} (69) Where E represents the sum of energy consumption in all single smart substations, T represents the sum of delays in a single smart substation, and T m 、E m They represent the transmission delay and transmission energy consumption between intelligent patrol master stations, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. a and b are balance parameters, and B represents the load balancing function, which is calculated by the task volume between different smart substations. Use equations (23) to (29) to establish constraints: x n,k ∈[0,1](70) z m,w ∈[0,1](72) In formula (23), x n,k It represents the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected. Formula (23) indicates that the data packet of the nth terminal device can be transmitted to the cloud server or the auxiliary control host; Formula (24) indicates that the data sent by the terminal device cannot exceed its data packet upper limit; In formula (25), z m,w It represents the percentage of data transmitted from the m-th smart substation to the w-th core substation in the total data collected. Formula (25) indicates that the data packet of the m-th smart substation can be transmitted to the core substation or the provincial or municipal smart master station; Formula (26) indicates that the data sent by the smart substation cannot exceed its data packet upper limit; Formula (27) indicates that the computing resources consumed by the data transmitted to the auxiliary control host in the smart substation cannot exceed the total computing resources of the auxiliary control host, μ max Indicates the total computing resources of the auxiliary control host; In formula (28), d n,k represents the distance between the nth terminal device and the kth auxiliary control host. Formula (28) indicates that each terminal device in the smart substation is covered by at least one auxiliary control host. R K Indicates the coverage of the auxiliary control host; In formula (29), d m,w represents the distance from the mth smart substation to the wth core substation. Formula (29) indicates that each terminal device in the smart substation is covered by at least one core substation. R W Indicates the coverage of the core substation.

2. The multi-level smart grid site centralized control method according to claim 1, characterized in that: Formula (1) to Formula (4) are used to determine the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent to the auxiliary control host for processing within the smart substation: r e =B n log2(1+p0*H e / s 2 ) (77) In the formula, r e and p0 are the transmission rate and transmission power from the nth terminal device to the auxiliary control host, σ 2 is the noise power, B n is the bandwidth resource of the nth terminal device, H e is the channel gain between the nth terminal device and the auxiliary control host, x n,k It indicates the percentage of data transmitted from the nth terminal device to the kth auxiliary control host in the total data collected, where x n,k =1 means that all the data collected by the nth terminal device is transmitted to the kth auxiliary control host, x n,k =0 means that the data collected by the nth terminal device has not been transmitted to the kth auxiliary control host. Indicates the transmission delay between the nth terminal device and the auxiliary control host. represents the transmission energy consumption between the nth terminal device and the auxiliary control host, d n,k Indicates the distance between the nth terminal device and the kth auxiliary control host.

3. The multi-level smart grid site centralized control method according to claim 1, characterized in that: Formulas (5) to (8) are used to determine the time delay and energy consumption required for the data packet generated by the nth terminal device to be sent from the smart substation to the cloud server for processing: r c =B n log2(1+p1*H c / s 2 ) (81) In formula (5) to formula (8), r c and p1 are the transmission rate and transmission power from the nth terminal device to the cloud server, respectively. c is the channel gain between the nth terminal device and the cloud server, Indicates the transmission delay between the nth terminal device and the auxiliary control host. Represents the transmission energy consumption between the nth terminal device and the cloud service.

4. The multi-level smart grid site centralized control method according to claim 1, characterized in that: The computing energy consumption and computing delay of the edge device are calculated using equations (9) and (10), and the total delay and total energy consumption inside the smart substation are calculated using equations (11) and (12): Among them, c e represents the number of CPU cycles required for data processing, μ represents the processing power of edge devices, e1 is the power consumption coefficient, Indicates the calculation delay of the auxiliary control host. It indicates the transmission energy consumption of the auxiliary control host, and T0 is the network fluctuation.

5. The multi-level smart grid site centralized control method according to claim 1, characterized in that: The time delay and energy consumption caused by transmission to the core substation are determined using equations (13) to (16): r m =B m log2(1+p2*H m / s 2 ) (89) E m =p m T m (92) In formula (13) to formula (16), r m , p2 and H m They are the transmission rate, transmission power and channel gain between the intelligent patrol master stations, T m 、E m They represent the transmission delay and transmission energy consumption between the intelligent patrol master stations, z m,w represents the percentage of data transmitted from the mth smart substation to the wth core substation in the total data collected, d m,w Represents the distance from the mth smart substation to the wth core substation.

6. The multi-level smart grid site centralized control method according to claim 1, characterized in that: Formula (17)-(20) are used to determine the time delay and energy consumption caused by the transmission of data from the intelligent patrol master station to the provincial and municipal centralized control master station: r v =B v log2(1+p3*H v / s 2 ) (93) E v =p v T v (96) In formula (17) to formula (20), r v , p3 and H v They are the transmission rate, transmission power and channel gain from the intelligent patrol master station to the provincial and municipal centralized control master station, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. v Indicates the size of data transmitted from the Zhixun master station to the provincial and municipal centralized control master stations.

7. The multi-level smart grid site centralized control method according to claim 1, characterized in that: The objective function solving process is as follows: Step 10.1: Use the improved wolf pack algorithm to solve the objective function f1. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider x n,k In the special case where all the values ​​are 1, the random edge device position is input into the improved wolf pack algorithm as the solution target, and the merit function is solved. The wolf pack is divided into three types: leader, follower and border scout according to the merit value from best to worst. Among them, the general wolf with the worst adaptability will be directly led to the vicinity of the head wolf and randomly distributed within the -ADS range; the leader searches according to the current optimal solution and updates its own position; the follower wolf is synchronously updated according to the leader's position; the border scout wolf randomly searches for a new position to jump out of the local optimal solution, and finally according to the update before and after The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output; Step 10.2: Use the improved wolf pack algorithm to solve the objective function f2. Take the objective function as the quality function of the improved wolf pack algorithm model. First, consider z m,w The special case where all are 1, and the d obtained in step 10.1 n,k Substitute the random core substation location into the improved wolf pack algorithm as the solution target, perform the same operation, and finally calculate the value of the random core substation location based on the update before and after. The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output; Step 10.3: Use the improved wolf pack algorithm to solve the objective function f2, and use the objective function as the quality function of the improved wolf pack algorithm model. n,k and m,w Back-substitution, replace the random x n,k and z m,w Substitute the improved wolf pack algorithm as the solution target and perform the same operation as above. Finally, according to the x before and after an update n,k and z m,w The change in the size of is used as the termination function. If the termination function is less than ε, the update is stopped and the optimal solution is output; Step 10.4: n,k and z m,w Go back to steps 10.1 and 10.2 to perform another layout calculation, and repeat multiple times until the difference between the two objective functions f2 is less than ε. Stop updating and output the optimal solution.

8. Multi-level smart grid site centralized control system, multi-level smart grid sites include provincial and municipal centralized control master stations, core substations, and smart substations; The terminal devices in a single smart substation are numbered from 1 to N, where n represents the serial number of the nth terminal device; at the same time, each auxiliary control host is numbered from 1 to K, where k represents the serial number of the kth auxiliary control host; The multiple smart substations are numbered from 1 to M, where m represents the sequence number of the mth smart substation; The core substations are numbered from 1 to W, where w represents the sequence number of the w-th core substation; It is characterized in that The centralized control system includes: Terminal equipment collection and transmission module: each terminal equipment at the mth intelligent substation collects L at each moment m The data is sent to the cloud server or auxiliary control host in the smart substation for processing; Smart substation data integration and transmission module: enables each smart substation to integrate data and send it to the smart patrol host of the core substation or the provincial and municipal centralized control master station for task redistribution; Task scheduling and load balancing calculation module: taking the weighted minimum of time delay, energy consumption and load balancing as the objective function; establishing a constraint condition according to the limiting factors of computing resources, communication resources and device hardware; the objective function and a series of constraint conditions constitute a system model; The objective function is: minf1=E+T (97) minf2=min{a(E+T+E m +T m +E v +T v )+bB} (98) Where E represents the sum of energy consumption in all single smart substations, T represents the sum of delays in a single smart substation, and T m 、E m They represent the transmission delay and transmission energy consumption between intelligent patrol master stations, T v 、E v They represent the transmission delay and transmission energy consumption from the intelligent patrol master station to the provincial and municipal centralized control master station, respectively. a and b are balance parameters, and B represents the load balancing function, which is calculated by the task volume between different smart substations. Use equations (23) to (29) to establish constraints: x n,k ∈[0,1](99) z m,w ∈[0,1](101) In formula (23), x n, k represents the percentage of data transmitted from the nth terminal device to the kth auxiliary control host to the total data collected. Formula (23) indicates that the data packet of the nth terminal device can be transmitted to the cloud server or the auxiliary control host; Formula (24) indicates that the data sent by the terminal device cannot exceed its data packet upper limit; In formula (25), z m,w It represents the percentage of data transmitted from the m-th smart substation to the w-th core substation in the total data collected. Formula (25) indicates that the data packet of the m-th smart substation can be transmitted to the core substation or the provincial or municipal smart master station; Formula (26) indicates that the data sent by the smart substation cannot exceed its data packet upper limit; Formula (27) indicates that the computing resources consumed by the data transmitted to the auxiliary control host in the smart substation cannot exceed the total computing resources of the auxiliary control host, μ max Indicates the total computing resources of the auxiliary control host; In formula (28), d n,k represents the distance between the nth terminal device and the kth auxiliary control host. Formula (28) indicates that each terminal device in the smart substation is covered by at least one auxiliary control host. R K Indicates the coverage of the auxiliary control host; In formula (29), d m,w represents the distance from the mth smart substation to the wth core substation. Formula (29) indicates that each terminal device in the smart substation is covered by at least one core substation. R W Indicates the coverage of the core substation.

9. A power grid system using the system according to claim 8.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions enable the computer to execute the method according to any one of claims 1 to 7.