Method, device, medium and terminal for determining mineral resource reserves
By demarcating the boundary profile of the ore body and dividing the block segments, combining the taste distribution data of the exploration point, the problem of low accuracy in determining mineral resource reserves in the existing technology is solved, and higher accuracy is achieved.
Patent Information
- Application Number
- CN202410998168.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2044-07-24
AI Technical Summary
When determining mineral resource reserves, the prior art errors are large, resulting in low accuracy for ore bodies with thin thickness, extremely irregular shape and relatively few exploration points.
By obtaining the mineral exploration data of the target ore body, the boundary profile of the ore body is circled based on the location distribution data of the exploration point, the boundary profile is divided into multiple block segments by vertical bisectoring method, the horizontal area of each block segment is calculated, and the mineral resource reserves are determined based on the taste distribution data of the exploration point.
The error in estimating volume of irregular ore bodies is reduced as approximate plate bodies, and the accuracy of determining mineral resource reserves is improved.
Smart Images

Figure CN119128234B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mineral exploration technology, and in particular to a method and device, medium, and terminal for determining mineral resource reserves. Background Art
[0002] Determining the reserves of mineral resources (i.e. determining the quantity of industrially useful underground minerals) is an extremely important link in mineral exploration work. It is an important basis for estimating the economic value of mineral deposits, determining the production scale and service life of mines, etc.
[0003] Since the natural form of the ore body is complex and deeply buried underground, and is affected by a variety of geological factors, when determining the reserves of mineral resources, we can only approximately describe or replace the real ore body with regular geometric bodies to determine the volume of the ore body. At present, common methods include arithmetic mean method, geological block method, mining block method and cross-section method. The above methods all determine the reserves of mineral resources on the basis of considering the ore body as an approximate plate-like body.
[0004] However, for ore bodies with varying thicknesses, extremely irregular shapes, and relatively few exploration points that cannot control their shapes, the error in determining the volume of the ore bodies is large because they are considered to be approximately plate-like, which leads to low accuracy in the determination of mineral resource reserves. Summary of the invention
[0005] In view of this, the present application provides a method and device, medium, and terminal for determining mineral resource reserves. The main purpose is to solve the problem that the existing ore bodies are shallowly buried, thinly thick, extremely irregular in shape, have relatively few exploration points and cannot control their shape, and change along the terrain, which leads to large errors in determining the volume of the ore bodies, thereby causing low accuracy in the determination of mineral resource reserves.
[0006] According to one aspect of the present application, a method for determining mineral resource reserves is provided, comprising:
[0007] Acquire mineral exploration data of the target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points;
[0008] Based on the exploration point location distribution data, the target ore body is delineated to determine the boundary contour of the target ore body; based on the perpendicular bisection method, the boundary contour is divided into blocks to obtain multiple blocks; and the horizontal area of each block is calculated, wherein each block contains an exploration point;
[0009] The mineral resource reserves of the target ore body are determined according to the horizontal area of each of the blocks and the grade distribution data of the exploration points contained in the blocks.
[0010] Preferably, performing a boundary delineation operation on the target ore body based on the exploration point location distribution data to determine the boundary contour of the target ore body includes:
[0011] Connecting adjacent exploration points in the exploration point location distribution data by straight lines to obtain an exploration point network structure diagram, wherein the network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points;
[0012] Extracting adjacent triangles of each of the surrounding exploration points respectively, and extending the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram respectively, to obtain a plurality of boundary contour points;
[0013] The boundary contour points are sequentially connected with straight lines to determine the boundary contour of the target ore body.
[0014] Preferably, the block segmentation operation is performed on the boundary contour based on the perpendicular bisection method to obtain a plurality of blocks, including:
[0015] Draw perpendicular bisectors of the sides of the triangles respectively, wherein the perpendicular bisectors intersect at the orthocenter of the triangles;
[0016] Extending the perpendicular midline in the direction of the boundary line of the boundary contour so that the perpendicular midline intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular midline and the boundary line of the boundary contour;
[0017] Based on the plurality of perpendicular centers and the intersection points of the plurality of perpendicular bisectors with the boundary line of the boundary contour, the boundary contour is divided into blocks to obtain a plurality of blocks.
[0018] Preferably, the determining of the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block includes:
[0019] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0020] Multiplying the thickness of each ore body by the horizontal area of the block to obtain the volume of the ore body of each grade in the block;
[0021] Multiply the volume of the ore body of each grade by the grade to obtain the mineral resource reserves of each grade in the block;
[0022] Adding up the mineral resource reserves of each grade in the block to obtain the mineral resource reserves of the block;
[0023] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0024] Preferably, the determining of the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block includes:
[0025] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0026] The thickness of the ore bodies of each grade is added together to obtain the total thickness of the ore body of the block;
[0027] Calculate the proportion of the thickness of the ore body of each grade in the total thickness of the ore body to obtain the proportion of the thickness of the ore body of each grade;
[0028] Perform a weighted summation on the product of the thickness proportion of each ore body and the corresponding grade to obtain the weighted grade of the block;
[0029] Multiplying the weighted grade by the total ore body thickness to obtain the mineral resource reserves of the block;
[0030] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0031] Preferably, the method further comprises:
[0032] When a newly added exploration point is monitored, updated exploration point location distribution data is obtained, wherein the updated exploration point location distribution data includes the location data of the newly added exploration point;
[0033] Connecting the newly added exploration point with each adjacent exploration point in the updated exploration point location distribution data in a straight line to obtain an updated exploration point network structure diagram;
[0034] Extracting adjacent triangles of the newly added exploration point, and extending the sides of the adjacent triangles of the newly added exploration point by the preset length in the direction of the boundary line of the updated network structure diagram, to obtain a plurality of newly added boundary contour points;
[0035] updating the boundary contour of the target ore body based on the plurality of newly added boundary contour points to obtain an updated boundary contour;
[0036] Draw perpendicular bisectors of the sides of the adjacent triangles of the newly added exploration point, wherein the perpendicular bisectors intersect at the orthocenters of the adjacent triangles of the newly added exploration point;
[0037] Extending the perpendicular bisector in the direction of the boundary line of the updated boundary contour so that the perpendicular bisector intersects with the boundary line of the updated boundary contour, thereby obtaining an intersection point between the perpendicular bisector and the boundary line of the updated boundary contour;
[0038] Connect the intersection of the orthocenter, the perpendicular bisector and the updated boundary contour line with a straight line to obtain a newly added block where the newly added exploration point is located;
[0039] The mineral resource reserves of the target ore body are updated based on the mineral resource reserves of the newly added block.
[0040] Preferably, the updating of the mineral resource reserves of the target ore body based on the mineral resource reserves of the newly added block includes:
[0041] Obtaining the original mineral resource reserves of the block adjacent to the newly added block, and calculating the updated mineral resource reserves of the adjacent block after the newly added exploration point;
[0042] The original mineral resource reserves of the adjacent blocks are subtracted from the mineral resource reserves of the target ore body, and the updated mineral resource reserves and the mineral resource reserves of the newly added blocks are added to obtain the updated mineral resource reserves of the target ore body.
[0043] According to another aspect of the present application, a device for determining mineral resource reserves is provided, comprising:
[0044] A mineral exploration data acquisition module is used to acquire mineral exploration data of a target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points;
[0045] A block segmentation module is used to perform a boundary delineation operation on the target ore body based on the exploration point location distribution data, determine the boundary contour of the target ore body, perform a block segmentation operation on the boundary contour based on a perpendicular bisection method to obtain a plurality of blocks, and calculate the horizontal area of each of the blocks, each of which contains an exploration point;
[0046] The mineral resource reserve determination module is used to determine the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block.
[0047] Preferably, the block segmentation module is used to:
[0048] Connecting adjacent exploration points in the exploration point location distribution data by straight lines to obtain an exploration point network structure diagram, wherein the network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points;
[0049] Respectively extracting adjacent triangles of each of the peripheral exploration points, and extending the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram to obtain a plurality of boundary contour points;
[0050] The boundary contour points are sequentially connected with straight lines to determine the boundary contour of the target ore body.
[0051] Preferably, the block segment division module is further used for:
[0052] Draw perpendicular bisectors of the sides of the triangles respectively, wherein the perpendicular bisectors intersect at the orthocenter of the triangles;
[0053] Extending the perpendicular midline in the direction of the boundary line of the boundary contour so that the perpendicular midline intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular midline and the boundary line of the boundary contour;
[0054] Based on the plurality of perpendicular centroids and the intersection points of the plurality of perpendicular bisectors with the boundary line of the boundary contour, the boundary contour is divided into blocks to obtain a plurality of blocks.
[0055] Preferably, the mineral resource reserve determination module is used to:
[0056] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0057] Multiplying the thickness of each ore body by the horizontal area of the block to obtain the volume of the ore body of each grade in the block;
[0058] Multiply the volume of the ore body of each grade by the grade to obtain the mineral resource reserves of each grade in the block;
[0059] Adding up the mineral resource reserves of each grade in the block to obtain the mineral resource reserves of the block;
[0060] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0061] Preferably, the mineral resource reserve determination module is also used to:
[0062] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0063] The thickness of the ore bodies of each grade is added together to obtain the total thickness of the ore body of the block;
[0064] Calculate the proportion of the thickness of the ore body of each grade in the total thickness of the ore body to obtain the proportion of the thickness of the ore body of each grade;
[0065] Perform a weighted summation on the product of the thickness proportion of each ore body and the corresponding grade to obtain the weighted grade of the block;
[0066] Multiplying the weighted grade by the total ore body thickness to obtain the mineral resource reserves of the block;
[0067] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0068] Preferably, the device further comprises a mineral resource reserve updating module, comprising:
[0069] An exploration point location distribution data updating unit, used for acquiring updated exploration point location distribution data when a newly added exploration point is monitored, wherein the updated exploration point location distribution data includes the location data of the newly added exploration point;
[0070] An exploration point network structure diagram updating unit, used to connect the newly added exploration point with each adjacent exploration point in the updated exploration point location distribution data in a straight line to obtain an updated exploration point network structure diagram;
[0071] A boundary contour updating unit is used to extract adjacent triangles of the newly added exploration points, extend the sides of the adjacent triangles of the newly added exploration points by the preset lengths in the direction of the updated network structure diagram boundary line, and obtain a plurality of newly added boundary contour points; and update the boundary contour of the target ore body based on the plurality of newly added boundary contour points to obtain an updated boundary contour;
[0072] The block updating unit is used to make the perpendicular bisectors of the sides of the adjacent triangles of the newly added exploration point, the perpendicular bisectors intersecting at the orthocenters of the adjacent triangles of the newly added exploration point; extend the perpendicular bisectors in the direction of the boundary line of the updated boundary contour so that the perpendicular bisectors intersect with the boundary line of the updated boundary contour to obtain the intersection point of the perpendicular bisectors and the boundary line of the updated boundary contour; connect the orthocenter and the intersection point of the perpendicular bisectors and the boundary line of the updated boundary contour by straight lines to obtain the newly added block where the newly added exploration point is located;
[0073] A mineral resource reserve updating unit is used to update the mineral resource reserves of the target ore body based on the mineral resource reserves of the newly added block.
[0074] Preferably, the mineral resource reserve updating unit is specifically used for:
[0075] Obtaining the original mineral resource reserves of the block adjacent to the newly added block, and calculating the updated mineral resource reserves of the adjacent block after the newly added exploration point;
[0076] The original mineral resource reserves of the adjacent blocks are subtracted from the mineral resource reserves of the target ore body, and the updated mineral resource reserves and the mineral resource reserves of the newly added blocks are added to obtain the updated mineral resource reserves of the target ore body.
[0077] According to another aspect of the present application, a storage medium is provided, in which at least one executable instruction is stored, and the executable instruction enables a processor to perform operations corresponding to the above-mentioned method for determining mineral resource reserves.
[0078] According to another aspect of the present application, a terminal is provided, comprising: a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other through the communication bus;
[0079] The memory is used to store at least one executable instruction, and the executable instruction enables the processor to execute operations corresponding to the above-mentioned method for determining mineral resource reserves.
[0080] By means of the above technical solution, the technical solution provided by the embodiment of the present application has at least the following advantages:
[0081] The present application provides a method and device, medium, and terminal for determining mineral resource reserves. First, mineral exploration data of a target ore body is obtained, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points. Secondly, a boundary delineation operation is performed on the target ore body based on the exploration point location distribution data to determine the boundary contour of the target ore body. A block segmentation operation is performed on the boundary contour based on a vertical bisect method to obtain a plurality of blocks. The horizontal area of each of the blocks is calculated, wherein each of the blocks contains an exploration point. Finally, the mineral resource reserves of the target ore body are determined based on the horizontal area of each of the blocks and the grade distribution data of the exploration points contained in the blocks. Compared with the prior art, the embodiment of the present application first delineates the boundary contour of the target ore body based on the exploration point location distribution data, and then divides the target ore body with the delineated boundary contour into multiple blocks based on the vertical bisection method, and further calculates the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration point in the block. Since the block division is based on the location of the exploration point, the mineral resource distribution in each block is relatively consistent with the mineral resource distribution at the exploration point location, which reduces the error caused by directly treating the ore body with different thicknesses and extremely irregular shapes as an approximate plate-like body for volume estimation. Moreover, since the mineral resource distribution in each block is consistent with the mineral resource distribution at the exploration point location, the block mineral resource reserves calculated according to the horizontal area of the block and the grade distribution data of the corresponding exploration point are more accurate, thereby making the calculated mineral resource reserves of the target ore body more accurate.
[0082] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0084] Figure 1 A flow chart of a method for determining mineral resource reserves provided in an embodiment of the present application is shown;
[0085] Figure 2 A data diagram of the location distribution of exploration points provided in an embodiment of the present application is shown;
[0086] Figure 3A flow chart of another method for determining mineral resource reserves provided in an embodiment of the present application is shown;
[0087] Figure 4 The network structure diagram of the exploration points provided in the embodiment of the present application is shown;
[0088] Figure 5 shows a distribution diagram of boundary contour points provided by an embodiment of the present application;
[0089] Figure 6 shows a boundary contour diagram provided by an embodiment of the present application;
[0090] Figure 7 A block segment division diagram provided by an embodiment of the present application is shown;
[0091] Figure 8 A flow chart of a method for updating mineral resource reserves provided in an embodiment of the present application is shown;
[0092] Fig. 9 shows an updated exploration point location distribution data diagram provided by an embodiment of the present application;
[0093] Fig.10 An updated exploration point network structure diagram provided by an embodiment of the present application is shown;
[0094] Fig.11 A distribution diagram of newly added boundary contour points provided in an embodiment of the present application is shown;
[0095] Fig.12 An updated boundary contour map provided by an embodiment of the present application is shown;
[0096] Fig.13 An updated block segment division diagram provided by an embodiment of the present application is shown;
[0097] Fig.14 A block diagram of a device for determining mineral resource reserves provided in an embodiment of the present application is shown;
[0098] Fig.15 A schematic diagram of the structure of a terminal provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0099] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0100] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0101] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present application, its application, or uses.
[0102] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.
[0103] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0104] The embodiments of the present application can be applied to computer systems / servers, which can operate with many other general or special computing system environments or configurations. Examples of well-known computing systems, environments and / or configurations suitable for use with computer systems / servers include, but are not limited to: personal computer systems, server computer systems, thin clients, thick clients, handheld or laptop devices, microprocessor-based systems, set-top boxes, programmable consumer electronics, network personal computers, small computer systems, large computer systems, and distributed cloud computing technology environments including any of the above systems, etc.
[0105] Computer systems / servers may be described in the general context of computer system executable instructions (such as program modules) executed by a computer system. In general, program modules may include routines, programs, object programs, components, logic, data structures, etc., which perform specific tasks or implement specific abstract data types. Computer systems / servers may be implemented in a distributed cloud computing environment where tasks are performed by remote processing devices linked through a communication network. In a distributed cloud computing environment, program modules may be located on local or remote computing system storage media including storage devices.
[0106] The present application embodiment provides a method for determining mineral resource reserves, such as Figure 1 As shown, the method includes:
[0107] 101. Obtain mineral exploration data of the target ore body.
[0108] Among them, mineral exploration data includes exploration point location distribution data and grade distribution data of each exploration point; exploration point location distribution data, such as Figure 2As shown, the dots represent exploration points; the grade distribution data of the exploration points, for example, the ore body grade is 30% at 10-15 meters, 40% at 15-20 meters, 50% at 20-25 meters, etc. In the embodiment of the present application, the current execution end may be a mineral resource reserve monitoring module of a mining system.
[0109] 102. Based on the exploration point location distribution data, the boundary of the target ore body is delineated to determine the boundary contour of the target ore body. The boundary contour is divided into blocks based on the vertical bisection method to obtain multiple blocks, and the horizontal area of each block is calculated.
[0110] Each block contains an exploration point. In the embodiment of the present application, the boundary contour of the target ore body needs to be Figure 2 All the exploration points in the target ore body are surrounded. Therefore, when delineating the boundary of the target ore body, the line between the exploration points can be extended in the reverse direction for a certain length to obtain the boundary points, and then the boundary points are connected. Furthermore, the boundary contour is divided into multiple blocks based on the vertical bisection method. Since the block division is based on the location of the exploration point, the distribution of mineral resources in each block is relatively consistent with the distribution of mineral resources at the location of the exploration point, which reduces the error caused by directly treating the ore body with different thickness and extremely irregular shape as an approximate plate-like body for volume estimation. Finally, the horizontal area of each block is calculated.
[0111] 103. Determine the mineral resource reserves of the target ore body based on the horizontal area of each block and the grade distribution data of the exploration points contained in the block.
[0112] In the embodiment of the present application, the mineral resource reserves of the target ore body can be calculated by two methods. First, for a single block, the thickness of the ore body of each grade can be determined according to the grade distribution data, and then the ore body thickness can be multiplied by the horizontal area of the block to obtain the volume of the ore body of each grade. Then, the mineral resource reserves of each grade can be calculated according to the volume of the ore body of each grade, and then the mineral resource reserves of all grades can be added together to obtain the mineral resource reserves of the block. Finally, the mineral resource reserves of all blocks can be added together to obtain the mineral resource reserves of the target ore body. Second, similarly, First, for a single block, the thickness of the ore body of each grade is determined according to the grade distribution data, and then the thickness of the ore body of each grade is added to obtain the total ore body thickness of the block, and then the proportion of the thickness of the ore body of each grade in the total ore body thickness is calculated to obtain the proportion of the thickness of the ore body of each grade, and then the proportion of the thickness of each ore body is multiplied by the corresponding grade and weighted summed to obtain the weighted grade of the block, and the weighted grade is multiplied by the total ore body thickness to obtain the mineral resource reserves of the block, and finally the mineral resource reserves of all blocks are added to obtain the mineral resource reserves of the target ore body. Both of the above calculation methods are acceptable, and are not specifically limited in the embodiments of the present application.
[0113] Compared with the prior art, the embodiment of the present application first delineates the boundary contour of the target ore body based on the exploration point location distribution data, and then divides the target ore body with the delineated boundary contour into multiple blocks based on the vertical bisection method, and further calculates the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration point in the block. Since the block division is based on the location of the exploration point, the mineral resource distribution in each block is relatively consistent with the mineral resource distribution at the exploration point location, which reduces the error caused by directly treating the ore body with different thicknesses and extremely irregular shapes as an approximate plate-like body for volume estimation. Moreover, since the mineral resource distribution in each block is consistent with the mineral resource distribution at the exploration point location, the block mineral resource reserves calculated according to the horizontal area of the block and the grade distribution data of the corresponding exploration point are more accurate, thereby making the calculated mineral resource reserves of the target ore body more accurate.
[0114] The present application embodiment provides another method for determining mineral resource reserves, such as Figure 3 As shown, the method includes:
[0115] 201. Connect each adjacent exploration point in the exploration point location distribution data with a straight line to obtain an exploration point network structure diagram.
[0116] The network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points. Figure 4 As shown in the figure, the exploration points located on the boundary line of the network structure diagram are peripheral exploration points, and the exploration points located inside the boundary line of the network structure diagram are internal exploration points.
[0117] 202. Extract adjacent triangles of each peripheral exploration point respectively, extend the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram respectively, and obtain a plurality of boundary contour points.
[0118] The preset length can be set according to the taste data of the surrounding exploration points. For example, if the taste data of the surrounding exploration points is high, the preset length can be appropriately lengthened, such as two-thirds of the length of the side of the adjacent triangle; if the taste data of the surrounding exploration points is average, the preset length can be shortened, such as one-half of the length of the side of the adjacent triangle. In the embodiment of the present application, the boundary contour points are distributed, such as Figure 5 As shown in the figure, the endpoints of each line segment are boundary contour points.
[0119] 203. Connect each boundary contour point in sequence with straight lines to determine the boundary contour of the target ore body.
[0120] Among them, the boundary contour, such as Figure 6 shown.
[0121] 204. Draw the perpendicular bisectors of each side of each triangle.
[0122] Among them, the perpendicular bisectors intersect at the orthocenter of the triangle.
[0123] 205. Extend the perpendicular bisector in the direction of the boundary line of the boundary contour so that the perpendicular bisector intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular bisector and the boundary line of the boundary contour.
[0124] 206. Based on the intersection points of the plurality of perpendicular centroids and the plurality of perpendicular bisectors with the boundary line of the boundary contour, perform a segment division operation on the boundary contour to obtain a plurality of segments.
[0125] In the embodiment of the present application, according to the steps 204-206 of the embodiment, Figure 6 The boundary contour in is divided into multiple polygonal blocks, and the block segmentation of the target ore body is as follows: Figure 7 shown.
[0126] 207. Determine the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block.
[0127] In the embodiment of the present application, the mineral resource reserves of the target ore body can be calculated by two methods. First, for a single block, the thickness of the ore body of each grade can be determined according to the grade distribution data, and then the ore body thickness can be multiplied by the horizontal area of the block to obtain the volume of the ore body of each grade. Then, the mineral resource reserves of each grade can be calculated according to the volume of the ore body of each grade, and then the mineral resource reserves of all grades can be added together to obtain the mineral resource reserves of the block. Finally, the mineral resource reserves of all blocks can be added together to obtain the mineral resource reserves of the target ore body. Second, similarly, First, for a single block, determine the ore body thickness of each grade based on the grade distribution data, then add up the ore body thickness of each grade to get the total ore body thickness of the block, then calculate the proportion of the ore body thickness of each grade in the total ore body thickness to get the proportion of ore body thickness of each grade, then multiply the proportion of each ore body thickness with the corresponding grade and take weighted sum to get the weighted grade of the block, multiply the weighted grade with the total ore body thickness to get the mineral resource reserves of the block, and finally add up the mineral resource reserves of all blocks to get the mineral resource reserves of the target ore body.
[0128] Correspondingly, step 207 of the embodiment includes: determining the thickness of the ore body of each grade in the block segment based on the grade distribution data of the exploration points contained in each block segment; multiplying the thickness of each ore body by the horizontal area of the block segment to obtain the volume of the ore body of each grade in the block segment; multiplying the volume of the ore body of each grade by the grade to obtain the mineral resource reserves of each grade in the block segment; adding up the mineral resource reserves of each grade in the block segment to obtain the mineral resource reserves of the block segment; adding up the mineral resource reserves of each block segment to obtain the mineral resource reserves of the target ore body. Or, based on the grade distribution data of the exploration points contained in each block, determine the ore body thickness of each grade in the block; add up the ore body thickness of each grade to obtain the total ore body thickness of the block; calculate the proportion of the ore body thickness of each grade in the total ore body thickness to obtain the proportion of ore body thickness of each grade; perform weighted summation on the product of each ore body thickness proportion and the corresponding grade to obtain the weighted grade of the block; multiply the weighted grade by the total ore body thickness to obtain the mineral resource reserves of the block; add up the mineral resource reserves of each block to obtain the mineral resource reserves of the target ore body.
[0129] In addition, in the embodiment of the present application, the mineral resource reserves of each grade of ore bodies in the target ore body can also be calculated. Specifically, the thickness of the ore body of each grade in the block segment is determined based on the grade distribution data of the exploration points contained in each block segment; the thickness of each ore body is multiplied by the horizontal area of the block segment to obtain the volume of the ore body of each grade in the block segment; the volume of the ore body of the same grade in each block segment is added to obtain the sum of the volume of the ore body of each grade; the sum of the volume of the ore body of each grade is multiplied by the grade to obtain the mineral resource reserves of each grade.
[0130] In an embodiment of the present application, in order to further define and illustrate, Figure 8 As shown, the embodiment method also includes:
[0131] 301. When a new exploration point is monitored, updated location distribution data of the exploration point is obtained.
[0132] The updated exploration point location distribution data includes the location data of the newly added exploration points. In the embodiment of the present application, if production prospecting is carried out during the production process, newly added exploration points will be generated. The updated exploration point location distribution data, such as Fig. 9 As shown in the figure, the dot on the far right is a newly added exploration point.
[0133] 302. In the updated exploration point location distribution data, the newly added exploration point is connected with each adjacent exploration point by straight lines to obtain an updated exploration point network structure diagram.
[0134] In the embodiment of the present application, the updated exploration point network structure diagram is as follows: Fig.10shown.
[0135] 303. Extract adjacent triangles of the newly added exploration points, and extend the sides of the adjacent triangles of the newly added exploration points by a preset length in the direction of the boundary line of the updated network structure diagram to obtain a plurality of newly added boundary contour points.
[0136] The preset length can be the same as the length used in the first calculation. In the embodiment of the present application, a new boundary contour point distribution is added, such as Fig.11 As shown in the figure, the endpoint of the rightmost line segment is the newly added boundary contour point.
[0137] 304. Update the boundary contour of the target ore body based on the multiple newly added boundary contour points to obtain an updated boundary contour.
[0138] In the embodiment of the present application, the newly added boundary contour points are connected with the adjacent original boundary contour points by straight lines to update the boundary contour of the target ore body. The updated boundary contour is as follows: Fig.12 shown.
[0139] 305. Draw the perpendicular bisectors of the sides of the adjacent triangles of the newly added exploration points.
[0140] Among them, the perpendicular bisectors intersect at the orthocenters of the adjacent triangles of the newly added exploration points.
[0141] 306. Extend the perpendicular bisector toward the boundary line of the updated boundary contour so that the perpendicular bisector intersects with the boundary line of the updated boundary contour, thereby obtaining an intersection point of the perpendicular bisector and the boundary line of the updated boundary contour.
[0142] 307. Connect the intersection points of the orthocenter and the perpendicular bisector with the updated boundary contour line with straight lines to obtain a newly added block segment where the newly added exploration point is located.
[0143] In the embodiment of the present application, according to the steps 305-307 of the embodiment, the newly added block segment where the newly added exploration point is located can be obtained, such as Fig.13 As shown in the figure, the polygon where the rightmost circle is located is the newly added block segment.
[0144] 308. Update the mineral resource reserves of the target ore body based on the mineral resource reserves of the newly added block.
[0145] It should be noted that according to Fig.13 It can be seen that after a new exploration point is added, the two blocks adjacent to the new exploration point are re-divided, resulting in overlapping parts between the new block and the two adjacent original blocks. In order to improve the accuracy of mineral resource reserve determination, in an embodiment of the present application, the new block and the updated block of the adjacent block after the new exploration point are used to replace the original block of the adjacent block, so as to avoid the problem of decreased accuracy in mineral resource reserve determination caused by the overlapping parts.
[0146] Correspondingly, step 308 of the embodiment specifically includes: obtaining the original mineral resource reserves of the blocks adjacent to the newly added blocks, and calculating the updated mineral resource reserves of the adjacent blocks after the newly added exploration points; subtracting the original mineral resource reserves of the adjacent blocks from the mineral resource reserves of the target ore body, and adding the updated mineral resource reserves and the mineral resource reserves of the newly added blocks to obtain the updated mineral resource reserves of the target ore body.
[0147] In a specific application scenario, the location of the newly added exploration point can be outside the already defined boundary or within the boundary. The embodiment of the present application does not make specific limitations. The specific method for determining the mineral resource reserves is the same as the method described above and will not be repeated here.
[0148] The present application provides a method for determining mineral resource reserves, firstly obtaining mineral exploration data of a target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points; secondly, performing a boundary delineation operation on the target ore body based on the exploration point location distribution data to determine the boundary contour of the target ore body, performing a block segmentation operation on the boundary contour based on a vertical bisect method to obtain a plurality of blocks, calculating the horizontal area of each of the blocks, wherein each of the blocks contains an exploration point; finally, determining the mineral resource reserves of the target ore body according to the horizontal area of each of the blocks and the grade distribution data of the exploration points contained in the blocks. Compared with the prior art, the embodiment of the present application first delineates the boundary contour of the target ore body based on the exploration point location distribution data, and then divides the target ore body with the delineated boundary contour into multiple blocks based on the vertical bisection method, and further calculates the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration point in the block. Since the block division is based on the location of the exploration point, the mineral resource distribution in each block is relatively consistent with the mineral resource distribution at the exploration point location, which reduces the error caused by directly treating the ore body with different thicknesses and extremely irregular shapes as an approximate plate-like body for volume estimation. Moreover, since the mineral resource distribution in each block is consistent with the mineral resource distribution at the exploration point location, the block mineral resource reserves calculated according to the horizontal area of the block and the grade distribution data of the corresponding exploration point are more accurate, thereby making the calculated mineral resource reserves of the target ore body more accurate.
[0149] Furthermore, as a response to the above Figure 1 The implementation of the method shown in the embodiment of the present application provides a device for determining the reserves of mineral resources, such as Fig.14 As shown, the device comprises:
[0150] Mineral exploration data acquisition module 41, block segmentation module 42, mineral resource reserve determination module 43;
[0151] A mineral exploration data acquisition module 41 is used to acquire mineral exploration data of a target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points;
[0152] A block segmentation module 42 is used to perform a boundary delineation operation on the target ore body based on the exploration point location distribution data, determine the boundary contour of the target ore body, perform a block segmentation operation on the boundary contour based on a perpendicular bisection method to obtain a plurality of blocks, and calculate the horizontal area of each of the blocks, each of which contains an exploration point;
[0153] The mineral resource reserve determination module 43 is used to determine the mineral resource reserve of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block.
[0154] In specific application scenarios, the block segmentation module is used to:
[0155] Connecting adjacent exploration points in the exploration point location distribution data by straight lines to obtain an exploration point network structure diagram, wherein the network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points;
[0156] Extracting adjacent triangles of each of the surrounding exploration points respectively, and extending the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram respectively, to obtain a plurality of boundary contour points;
[0157] The boundary contour points are sequentially connected with straight lines to determine the boundary contour of the target ore body.
[0158] In a specific application scenario, the block segment division module is also used to:
[0159] Draw perpendicular bisectors of the sides of the triangles respectively, wherein the perpendicular bisectors intersect at the orthocenter of the triangles;
[0160] Extending the perpendicular midline in the direction of the boundary line of the boundary contour so that the perpendicular midline intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular midline and the boundary line of the boundary contour;
[0161] Based on the plurality of perpendicular centers and the intersection points of the plurality of perpendicular bisectors with the boundary line of the boundary contour, the boundary contour is divided into blocks to obtain a plurality of blocks.
[0162] In a specific application scenario, the mineral resource reserve determination module is used to:
[0163] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0164] Multiplying the thickness of each ore body by the horizontal area of the block to obtain the volume of the ore body of each grade in the block;
[0165] Multiply the volume of the ore body of each grade by the grade to obtain the mineral resource reserves of each grade in the block;
[0166] Adding up the mineral resource reserves of each grade in the block to obtain the mineral resource reserves of the block;
[0167] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0168] In a specific application scenario, the mineral resource reserve determination module is also used to:
[0169] Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block;
[0170] The thickness of the ore bodies of each grade is added together to obtain the total thickness of the ore body of the block;
[0171] Calculate the proportion of the thickness of the ore body of each grade in the total thickness of the ore body to obtain the proportion of the thickness of the ore body of each grade;
[0172] Perform a weighted summation on the product of the thickness proportion of each ore body and the corresponding grade to obtain the weighted grade of the block;
[0173] Multiplying the weighted grade by the total ore body thickness to obtain the mineral resource reserves of the block;
[0174] The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
[0175] In a specific application scenario, the device further includes a mineral resource reserve update module, including:
[0176] An exploration point location distribution data updating unit, used for acquiring updated exploration point location distribution data when a newly added exploration point is monitored, wherein the updated exploration point location distribution data includes the location data of the newly added exploration point;
[0177] An exploration point network structure diagram updating unit, used to connect the newly added exploration point with each adjacent exploration point in the updated exploration point location distribution data in a straight line to obtain an updated exploration point network structure diagram;
[0178] A boundary contour updating unit is used to extract adjacent triangles of the newly added exploration points, extend the sides of the adjacent triangles of the newly added exploration points by the preset lengths in the direction of the updated network structure diagram boundary line, and obtain a plurality of newly added boundary contour points; and update the boundary contour of the target ore body based on the plurality of newly added boundary contour points to obtain an updated boundary contour;
[0179] The block updating unit is used to make the perpendicular bisectors of the sides of the adjacent triangles of the newly added exploration point, the perpendicular bisectors intersecting at the orthocenters of the adjacent triangles of the newly added exploration point; extend the perpendicular bisectors in the direction of the boundary line of the updated boundary contour so that the perpendicular bisectors intersect with the boundary line of the updated boundary contour to obtain the intersection point of the perpendicular bisectors and the boundary line of the updated boundary contour; connect the orthocenter and the intersection point of the perpendicular bisectors and the boundary line of the updated boundary contour by straight lines to obtain the newly added block where the newly added exploration point is located;
[0180] A mineral resource reserve updating unit is used to update the mineral resource reserves of the target ore body based on the mineral resource reserves of the newly added block.
[0181] In a specific application scenario, the mineral resource reserve updating unit is specifically used to:
[0182] Obtaining the original mineral resource reserves of the block adjacent to the newly added block, and calculating the updated mineral resource reserves of the adjacent block after the newly added exploration point;
[0183] The original mineral resource reserves of the adjacent blocks are subtracted from the mineral resource reserves of the target ore body, and the updated mineral resource reserves and the mineral resource reserves of the newly added blocks are added to obtain the updated mineral resource reserves of the target ore body.
[0184] The present application provides a device for determining mineral resource reserves, which first obtains mineral exploration data of a target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points; secondly, based on the exploration point location distribution data, a boundary delineation operation is performed on the target ore body to determine the boundary contour of the target ore body, and based on the vertical bisect method, a block segmentation operation is performed on the boundary contour to obtain multiple blocks, and the horizontal area of each of the blocks is calculated, wherein each of the blocks contains an exploration point; finally, the mineral resource reserves of the target ore body are determined according to the horizontal area of each of the blocks and the grade distribution data of the exploration points contained in the blocks. Compared with the prior art, the embodiment of the present application first delineates the boundary contour of the target ore body based on the exploration point location distribution data, and then divides the target ore body with the delineated boundary contour into multiple blocks based on the vertical bisection method, and further calculates the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration point in the block. Since the block division is based on the location of the exploration point, the mineral resource distribution in each block is relatively consistent with the mineral resource distribution at the exploration point location, which reduces the error caused by directly treating the ore body with different thicknesses and extremely irregular shapes as an approximate plate-like body for volume estimation. Moreover, since the mineral resource distribution in each block is consistent with the mineral resource distribution at the exploration point location, the block mineral resource reserves calculated according to the horizontal area of the block and the grade distribution data of the corresponding exploration point are more accurate, thereby making the calculated mineral resource reserves of the target ore body more accurate.
[0185] According to one embodiment of the present application, a storage medium is provided, wherein the storage medium stores at least one executable instruction, and the computer executable instruction can execute the method for determining the mineral resource reserves in any of the above method embodiments.
[0186] Based on this understanding, the technical solution of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each implementation scenario of the present application.
[0187] Fig.15 A schematic diagram of the structure of a terminal provided according to an embodiment of the present application is shown, and the specific embodiment of the present application does not limit the specific implementation of the terminal.
[0188] like Fig.15As shown, the terminal may include: a processor (processor) 502 , a communication interface (Communications Interface) 504 , a memory (memory) 506 , and a communication bus 508 .
[0189] The processor 502 , the communication interface 504 , and the memory 506 communicate with each other via a communication bus 508 .
[0190] The communication interface 504 is used to communicate with other devices such as clients or other servers.
[0191] The processor 502 is used to execute the program 510, and specifically can execute the relevant steps in the above-mentioned embodiment of the method for determining the mineral resource reserves.
[0192] Specifically, the program 510 may include program codes, which include computer operation instructions.
[0193] The processor 502 may be a central processing unit (CPU), or an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application. The one or more processors included in the computer device may be processors of the same type, such as one or more CPUs; or may be processors of different types, such as one or more CPUs and one or more ASICs.
[0194] The memory 506 is used to store the program 510. The memory 506 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.
[0195] The program 510 may be specifically configured to enable the processor 502 to perform the following operations:
[0196] Acquire mineral exploration data of the target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points;
[0197] Based on the exploration point location distribution data, the target ore body is delineated to determine the boundary contour of the target ore body; based on the perpendicular bisection method, the boundary contour is divided into blocks to obtain multiple blocks; and the horizontal area of each block is calculated, wherein each block contains an exploration point;
[0198] The mineral resource reserves of the target ore body are determined according to the horizontal area of each of the blocks and the grade distribution data of the exploration points contained in the blocks.
[0199] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages the hardware and software resources of the physical device of the method for determining the mineral resource reserves, and supports the operation of the information processing program and other software and / or programs. The network communication module is used to realize the communication between the components inside the storage medium, and the communication with other hardware and software in the information processing physical device.
[0200] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0201] The method and system of the present application may be implemented in many ways. For example, the method and system of the present application may be implemented by software, hardware, firmware, or any combination of software, hardware, and firmware. The above order of steps for the method is for illustration only, and the steps of the method of the present application are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present application may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present application. Therefore, the present application also covers a recording medium storing a program for executing the method according to the present application.
[0202] Obviously, those skilled in the art should understand that the above modules or steps of the present application can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order from that herein, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present application is not limited to any specific combination of hardware and software.
[0203] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for determining mineral resource reserves, characterized in that: include: Acquire mineral exploration data of the target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points; Based on the exploration point location distribution data, the target ore body is delineated to determine the boundary contour of the target ore body; based on the perpendicular bisection method, the boundary contour is divided into blocks to obtain multiple blocks; and the horizontal area of each block is calculated, wherein each block contains an exploration point; Determine the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block; The target ore body is delineated based on the exploration point location distribution data to determine the boundary contour of the target ore body, and the boundary contour is divided into blocks based on the perpendicular bisection method to obtain multiple blocks, including: Connecting adjacent exploration points in the exploration point location distribution data by straight lines to obtain an exploration point network structure diagram, wherein the network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points; Respectively extracting adjacent triangles of each of the peripheral exploration points, and extending the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram to obtain a plurality of boundary contour points; Connecting the boundary contour points in sequence with straight lines to determine the boundary contour of the target ore body; Draw perpendicular bisectors of the sides of the triangles respectively, wherein the perpendicular bisectors intersect at the orthocenter of the triangles; Extending the perpendicular midline in the direction of the boundary line of the boundary contour so that the perpendicular midline intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular midline and the boundary line of the boundary contour; Based on the plurality of perpendicular centroids and the intersection points of the plurality of perpendicular bisectors with the boundary line of the boundary contour, the boundary contour is divided into blocks to obtain a plurality of blocks.
2. The method according to claim 1, characterized in that: Determining the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block includes: Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block; Multiplying the thickness of each ore body by the horizontal area of the block to obtain the volume of the ore body of each grade in the block; Multiply the volume of the ore body of each grade by the grade to obtain the mineral resource reserves of each grade in the block; Adding up the mineral resource reserves of each grade in the block to obtain the mineral resource reserves of the block; The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
3. The method according to claim 1, characterized in that Determining the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block includes: Determine the thickness of the ore body of each grade in the block based on the grade distribution data of the exploration points contained in each block; The thickness of the ore bodies of each grade is added together to obtain the total thickness of the ore body of the block; Calculate the proportion of the thickness of the ore body of each grade in the total thickness of the ore body to obtain the proportion of the thickness of the ore body of each grade; Perform a weighted summation on the product of the thickness proportion of each ore body and the corresponding grade to obtain the weighted grade of the block; Multiplying the weighted grade by the total ore body thickness to obtain the mineral resource reserves of the block; The mineral resource reserves of each block are added together to obtain the mineral resource reserves of the target ore body.
4. The method according to claim 2, characterized in that: The method further comprises: When a newly added exploration point is monitored, updated exploration point location distribution data is obtained, wherein the updated exploration point location distribution data includes the location data of the newly added exploration point; Connecting the newly added exploration point with each adjacent exploration point in the updated exploration point location distribution data in a straight line to obtain an updated exploration point network structure diagram; Extracting adjacent triangles of the newly added exploration point, and extending the sides of the adjacent triangles of the newly added exploration point by the preset length in the direction of the boundary line of the updated network structure diagram, to obtain a plurality of newly added boundary contour points; updating the boundary contour of the target ore body based on the plurality of newly added boundary contour points to obtain an updated boundary contour; Draw perpendicular bisectors of the sides of the adjacent triangles of the newly added exploration point, wherein the perpendicular bisectors intersect at the orthocenters of the adjacent triangles of the newly added exploration point; Extending the perpendicular bisector in the direction of the boundary line of the updated boundary contour so that the perpendicular bisector intersects with the boundary line of the updated boundary contour, thereby obtaining an intersection point between the perpendicular bisector and the boundary line of the updated boundary contour; Connect the intersection of the orthocenter, the perpendicular bisector and the updated boundary contour line with a straight line to obtain a newly added block where the newly added exploration point is located; The mineral resource reserves of the target ore body are updated based on the mineral resource reserves of the newly added block.
5. The method according to claim 4, characterized in that The updating of the mineral resource reserves of the target ore body based on the mineral resource reserves of the newly added block includes: Obtaining the original mineral resource reserves of the block adjacent to the newly added block, and calculating the updated mineral resource reserves of the adjacent block after the newly added exploration point; The original mineral resource reserves of the adjacent blocks are subtracted from the mineral resource reserves of the target ore body, and the updated mineral resource reserves and the mineral resource reserves of the newly added blocks are added to obtain the updated mineral resource reserves of the target ore body.
6. A device for determining mineral resource reserves, characterized in that: include: A mineral exploration data acquisition module is used to acquire mineral exploration data of a target ore body, wherein the mineral exploration data includes exploration point location distribution data and grade distribution data of each of the exploration points; A block segmentation module is used to perform a boundary delineation operation on the target ore body based on the exploration point location distribution data, determine the boundary contour of the target ore body, perform a block segmentation operation on the boundary contour based on a perpendicular bisection method to obtain a plurality of blocks, and calculate the horizontal area of each of the blocks, each of which contains an exploration point; A mineral resource reserve determination module, used to determine the mineral resource reserves of the target ore body according to the horizontal area of each block and the grade distribution data of the exploration points contained in the block; The block segment division module is used to: Connecting adjacent exploration points in the exploration point location distribution data by straight lines to obtain an exploration point network structure diagram, wherein the network structure diagram is composed of a plurality of adjacent triangles, and the exploration points located on the boundary line of the network structure diagram are peripheral exploration points; Respectively extracting adjacent triangles of each of the peripheral exploration points, and extending the sides of the adjacent triangles by a preset length in the direction of the boundary line of the network structure diagram to obtain a plurality of boundary contour points; Connecting the boundary contour points in sequence with straight lines to determine the boundary contour of the target ore body; Draw perpendicular bisectors of the sides of the triangles respectively, wherein the perpendicular bisectors intersect at the orthocenter of the triangles; Extending the perpendicular midline in the direction of the boundary line of the boundary contour so that the perpendicular midline intersects with the boundary line of the boundary contour, thereby obtaining a plurality of intersection points between the perpendicular midline and the boundary line of the boundary contour; Based on the plurality of perpendicular centroids and the intersection points of the plurality of perpendicular bisectors with the boundary line of the boundary contour, the boundary contour is divided into blocks to obtain a plurality of blocks.
7. A storage medium, wherein at least one executable instruction is stored in the storage medium, characterized in that: The executable instructions enable the processor to perform operations corresponding to the method for determining mineral resource reserves as described in any one of claims 1-5.
8. A terminal, comprising: A processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus; The memory is used to store at least one executable instruction, characterized in that the executable instruction enables the processor to perform operations corresponding to the method for determining mineral resource reserves as described in any one of claims 1-5.
Citation Information
Patent Citations
Three-dimensional visual geological exploration reserve estimation method
CN103824329A