Electric power pipe butt joint equipment for electric power construction and operation method of electric power pipe butt joint equipment
By using a motor to drive the automatic movement of the screw and threaded sleeve in the power pipe docking equipment for power construction, combined with the synchronous movement of the gas rod and the slider, and automatically fixing the pipe with the hydraulic rod and the limiting plate, the artificial in the existing technology is solved The problems of low operating efficiency and safety hazards have achieved efficient and automated power pipe docking, improving the stability and accuracy of the connection.
Patent Information
- Application Number
- CN202411428582.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-20
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power pipe docking equipment for power construction requires manual placement of pipes and tightening bolts, resulting in low efficiency, high cost, inconsistent quality and safety hazards, especially in bad weather, which increases the risk.
A power pipe docking equipment for power construction was designed, using a motor to drive the screw rod and the threaded sleeve for automatic movement, combined with the gas rod and the slider to move simultaneously, and automatically fix the pipe with the hydraulic rod and the limit plate to realize automatic docking, and Connection stability is ensured by heating rings and limit wheels.
It improves the degree of automation of the equipment, reduces manual participation, enhances the stability and accuracy of the connection, reduces labor intensity, improves work efficiency, adapts to different specifications of pipes, and provides efficient, safe and reliable power construction solutions.
Smart Images

Figure CN119159828A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of hot-melt butt joint equipment, in particular to a power pipe butt joint equipment for power construction and an operating method thereof. Background Art
[0002] Power pipe docking equipment for power construction is an indispensable tool in power engineering. It is mainly used to connect and install power pipelines to ensure the safety and stability of the power system. This type of equipment usually has efficient docking capabilities, can adapt to the connection requirements of various pipes, and is easy to operate at the construction site, saving time and human resources. As the power industry's requirements for safety and efficiency continue to increase, this type of equipment is gradually developing towards intelligence and automation, and can monitor the quality of joints in real time, improving the overall construction quality and reliability.
[0003] After searching, the existing patent (publication number: CN118417981A) discloses a hot-melt butt fixing device for power pipes used in power construction, specifically relating to the technical field of hot-melt butt equipment. The present invention comprises a base, one side of the base is provided with a cooling device which can cool the grinding disc and collect and filter the impurities polished out, one side of the base is provided with a heating plate, one side of the base is provided with a transmission rod, and one side of the transmission rod is provided with a first transmission machine. The present invention can cool down the grinding disc during the grinding process and collect the polished impurities by providing a cooling device, and at the same time, the impurities follow the coolant to fall into the filter frame for separation, so that the coolant enters the storage box again for secondary utilization, and the filter holes inside the filter frame can be cleaned autonomously, thereby reducing the friction between the grinding disc and the power pipe for a long time, causing the grinding disc itself to have a high temperature and deform, affecting the normal use of the grinding disc, thereby improving the grinding efficiency and service life of the grinding disc.
[0004] However, in the actual use of the above solution, manpower is required to place the pipes on the fixing frame in advance, and then the bolts need to be tightened manually (refer to Figure 1 As we know, there are problems such as low efficiency, high cost, inconsistent quality and safety hazards. During operation, worker fatigue may affect accuracy, and risks increase in bad weather. These factors have prompted the industry to transform to automation and intelligent solutions.
[0005] To this end, the present invention provides an electric power pipe docking device for electric power construction and an operating method thereof. Summary of the invention
[0006] In order to make up for the shortcomings of the prior art and solve the problem of low efficiency caused by manually placing pipes on a fixed frame for processing, the present invention proposes an electric power pipe docking device for electric power construction and an operating method thereof.
[0007] The technical solution adopted by the present invention to solve its technical problems is: the present invention describes an electric power pipe docking device for electric power construction and an operating method thereof, comprising a base, the top of the base is fixedly connected with left and right opposite motors, the output end of the motor is fixedly connected with a screw rod, the outer side of the screw rod is threadedly connected with left and right opposite threaded sleeves, the outer side of the threaded sleeve is fixedly connected with front and rear opposite sliders, the top of the base is fixedly connected with front and rear opposite sliding rods, the sliding rod is slidably connected to the slider, and a fixing component is arranged at the front end of the slider.
[0008] Furthermore, the fixing assembly includes a gas rod, the front end of the slider is fixedly connected to the gas rod, the outer side of the rear end of the gas rod is fixedly connected to a support arm, the top of the gas rod is provided with a lifting column, and the rear side of the lifting column is fixedly connected to a clamping arm.
[0009] Furthermore, a left and right supporting frame is fixedly connected to the middle side of the top end of the base, and a first limiting frame is fixedly connected to the outer side of the top end of the supporting frame.
[0010] Furthermore, a fixing frame is fixedly connected to the middle end of the outer side of the first limiting frame, a top plate is fixedly connected to the inner end of the outer side of the fixing frame, a spring is fixedly connected to the bottom plate at the bottom end of the top plate, and a first connecting rod is fixedly connected to the inner side of the bottom plate.
[0011] Furthermore, a second limit frame is fixedly connected to an inner side of the first connection rod, a limit wheel is rotatably connected to an inner side of the second limit frame, and the second limit frame is slidably connected to the first limit frame.
[0012] Furthermore, one end of the inner side of the support frame is fixedly connected to a uniformly distributed third limit frame, the inner side of the third limit frame is fixedly connected to a hydraulic rod, the output end of the hydraulic rod is fixedly connected to a second connecting rod, and one end of the inner side of the second connecting rod is fixedly connected to a limit plate.
[0013] Furthermore, a heating ring is fixedly connected to one inner end of the third limiting frame.
[0014] Furthermore, a pipe is fixedly connected to the top end of the support arm, and the pipe is rotatably connected to the limiting wheel.
[0015] Furthermore, a rubber layer is provided on the outer side of the limiting wheel.
[0016] Furthermore, a power pipe docking device for power construction and an operation method thereof are characterized by comprising the following steps:
[0017] S1. First place the pipe on the top of the support arm, then drive the lifting column downward through the gas rod, and then drive the clamping arm downward through the lifting column to fix the pipe;
[0018] S2. The motor drives the screw to rotate, and then the screw drives the threaded sleeve to move left and right. At the same time, the threaded sleeve drives the slider to move synchronously on the slide rod, and the slider drives the gas rod to move synchronously, so as to move the pipe. By controlling the motors on both sides to move, the pipes at both ends are driven to move in opposite directions at the same time;
[0019] S3. The pipe is passed through the inner side of the limiting wheel, and the bottom plate is pushed downward through the bottom plate with the top plate as the stress point, and the first connecting rod, the second limiting frame and the limiting wheel are driven to move downward, thereby limiting the pipe in multiple directions;
[0020] S4. After the heating ring heats the pipe connection position, it continues to move in opposite directions to connect. At the same time, the second connecting rod is used through the hydraulic rod to drive the limit plate to move inward, thereby wrapping and limiting the pipe connection, thereby limiting the outside.
[0021] The beneficial effects of the present invention are as follows:
[0022] 1. The present invention describes an electric power pipe docking device for electric power construction and an operating method thereof. The pipe is directly placed on the top of the support arm through an external device. The clamping arm is then driven downward by a gas rod to fix the pipe. At the same time, a motor uses a screw rod to drive the threaded sleeve and the slider to move left and right, and at the same time drives the gas rod and the pipe to move synchronously, thereby replacing manpower, improving the automation of the equipment, and reducing human participation.
[0023] 2. The present invention describes an electric power pipe docking device for electric power construction and an operating method thereof, which uses a hydraulic rod to utilize a second connecting rod to drive a limit plate to engage on the outside of the pipe connection, thereby limiting the interface to avoid wrinkles on the outside and the like, and at the same time limiting the connection direction, which can evenly distribute pressure, enhance the stability of the connection, and improve docking accuracy.
[0024] 3. The power pipe docking equipment and operation method for power construction described in the present invention push the bottom plate inward with the top plate and the fixed frame as stress points through a spring, and at the same time drive the first connecting rod to move inward, and drive the second limit frame and the limit wheel to move inward through the first connecting rod, thereby squeezing the pipe, thereby limiting the travel direction of the pipe, improving the docking accuracy and stability, reducing errors and sliding risks, and enhancing safety. Its automated design reduces labor intensity, improves work efficiency, adapts to pipes of different specifications, and provides an efficient, safe and reliable power construction solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described below in conjunction with the accompanying drawings.
[0026] Figure 1 The present invention is a three-dimensional Figure 1 and enlarged images;
[0027] Figure 2 The present invention is a three-dimensional Figure 2 and enlarged images;
[0028] Figure 3 It is a partial stereoscopic diagram of the present invention. Figure 1 ;
[0029] Figure 4 It is a partial stereoscopic diagram of the present invention. Figure 2 ;
[0030] Figure 5 It is a partial stereoscopic diagram of the present invention. Figure 3 ;
[0031] In the figure: 1. base; 2. motor; 21. screw; 22. threaded sleeve; 23. slide rod; 24. slider; 3. gas rod; 31. support arm; 32. lifting column; 33. clamping arm; 4. support frame; 41. first limit frame; 42. fixed frame; 43. top plate; 44. spring; 45. bottom plate; 46. first connecting rod; 47. second limit frame; 48. limit wheel; 5. third limit frame; 51. hydraulic rod; 52. second connecting rod; 53. limit plate; 6. heating ring; 7. pipe. DETAILED DESCRIPTION
[0032] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0033] Embodiment 1:
[0034] like Figures 1 to 5 As shown, an electric power pipe docking device for electric power construction and an operating method thereof described in the present invention include a base 1, a motor 2 opposite to the left and right is fixedly connected to the top of the base 1, the motor 2 on both sides is fixed by the base 1, a screw rod 21 is fixedly connected to the output end of the motor 2, the screw rod 21 is driven to rotate by the motor 2, a threaded sleeve 22 opposite to the left and right is threadedly connected to the outer side of the screw rod 21, the threaded sleeve 22 is driven to move left and right by the screw rod 21, a slider 24 opposite to the front and back is fixedly connected to the outer side of the threaded sleeve 22, the sliders 24 on both sides of the front and back are fixed by the threaded sleeve 22 at the same time, a sliding rod 23 opposite to the front and back is fixedly connected to the top of the base 1, the sliding rod 23 is fixed by the base 1, the sliding rod 23 is slidably connected to the sliding rod 24, the sliding rod 24 is limited by the sliding rod 23, so that the sliding rod 24 slides on the sliding rod 23, and a fixing component is arranged at the front end of the sliding rod 24.
[0035] The fixing assembly includes a gas rod 3, the front end of the slider 24 is fixedly connected to the gas rod 3, the gas rod 3 is fixed by the slider 24, the rear end of the gas rod 3 is fixedly connected to the outer side of the support arm 31, the support arm 31 is fixed by the gas rod 3, a lifting column 32 is arranged at the top of the gas rod 3, the lifting column 32 is driven by the gas rod 3 to be lifted and lowered, a clamping arm 33 is fixedly connected to the rear side of the lifting column 32, the clamping arm 33 is fixed by the lifting column 32, and the clamping arm 33 is driven by the lifting column 32 to be lifted and lowered synchronously.
[0036] The middle side of the top of the base 1 is fixedly connected with left and right opposing support frames 4, and the support frames 4 on both sides are fixed by the base 1 at the same time. The outer side of the top of the support frame 4 is fixedly connected with evenly distributed first limit frames 41, and multiple first limit frames 41 are fixed by the support frame 4 at the same time.
[0037] A fixing frame 42 is fixedly connected to the middle end of the outer side of the first limiting frame 41, and the fixing frame 42 is supported and fixed by the first limiting frame 41; a top plate 43 is fixedly connected to the inner end of the outer side of the fixing frame 42, and the top plate 43 is fixed by the fixing frame 42; a spring 44 is fixedly connected to the bottom end of the top plate 43, and the spring 44 is fixed by the top plate 43; a bottom end of the spring 44 is fixedly connected to a bottom plate 45, and the bottom plate 45 is fixed by the spring 44; a first connecting rod 46 is fixedly connected to the inner side of the bottom plate 45, and the bottom plate 45 is fixed by the first connecting rod 46.
[0038] A second limit frame 47 is fixedly connected to the inner side of the first connecting rod 46, and the second limit frame 47 is fixed by the first connecting rod 46. The inner side of the second limit frame 47 is rotatably connected to the limit wheel 48, and the limit wheel 48 is limited by the second limit frame 47. The second limit frame 47 is slidably connected to the first limit frame 41, and the second limit frame 47 is limited by the first limit frame 41, so that the second limit frame 47 slides inside the first limit frame 41.
[0039] One end of the inner side of the support frame 4 is fixedly connected to a third limit frame 5 which is evenly distributed, and the third limit frame 5 is fixed by the support frame 4. A hydraulic rod 51 is fixedly connected to the inner side of the third limit frame 5, and the hydraulic rod 51 is fixed by the third limit frame 5. A second connecting rod 52 is fixedly connected to the output end of the hydraulic rod 51, and the second connecting rod 52 is fixed by the hydraulic rod 51. One end of the inner side of the second connecting rod 52 is fixedly connected to a limit plate 53, and the limit plate 53 is fixed by the second connecting rod 52.
[0040] A heating ring 6 is fixedly connected to one end of the inner side of the third limiting frame 5 , and the heating ring 6 is fixed by the third limiting frame 5 .
[0041] The top of the support arm 31 is fixedly connected with the pipe 7 , and the pipe 7 is supported by the support arm 31 . Meanwhile, the top of the pipe 7 is fixed by moving the clamping arm 33 downward. The pipe 7 is rotatably connected with the limiting wheel 48 .
[0042] A rubber layer is disposed on the outer side of the limiting wheel 48 , and by disposing the rubber layer on the outer side of the limiting wheel 48 , the friction between the limiting wheel 48 and the pipe 7 is increased.
[0043] An electric power pipe docking device for electric power construction and an operating method thereof, characterized in that it comprises the following steps:
[0044] S1. First, place the pipe 7 on the top of the support arm 31, and then drive the lifting column 32 downward through the gas rod 3, so that the clamping arm 33 moves downward through the lifting column 32 to fix the pipe 7;
[0045] S2. The motor 2 drives the screw rod 21 to rotate, and then the screw rod 21 drives the threaded sleeve 22 to move left and right, and the threaded sleeve 22 drives the slider 24 to move synchronously on the slide rod 23, and the slider 24 drives the gas rod 3 to move synchronously, so as to move the pipe 7, and the motors 2 on both sides are controlled to move, and the pipes 7 at both ends are driven to move in opposite directions at the same time;
[0046] S3. The pipe 7 is passed through the inner side of the limiting wheel 48, and the bottom plate 45 is pushed downward with the top plate 43 as the stress point, and the first connecting rod 46, the second limiting frame 47 and the limiting wheel 48 are driven to move downward, thereby limiting the pipe 7 in multiple directions;
[0047] S4. After the heating ring 6 heats the connection position of the pipe 7, it continues to move in opposite directions to connect. At the same time, the hydraulic rod 51 uses the second connecting rod 52 to drive the limiting plate 53 to move inward, thereby wrapping and limiting the connection of the pipe 7, thereby limiting the outside.
[0048] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.
[0049] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.
[0050] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A power pipe docking device for power construction and an operation method thereof, characterized in that: The invention comprises a base (1), wherein the top end of the base (1) is fixedly connected to a motor (2) opposite to the left and right, the output end of the motor (2) is fixedly connected to a screw rod (21), the outer side of the screw rod (21) is threadedly connected to a threaded sleeve (22) opposite to the left and right, the outer side of the threaded sleeve (22) is fixedly connected to a slider (24) opposite to the front and back, the top end of the base (1) is fixedly connected to a sliding rod (23) opposite to the front and back, the sliding rod (23) is slidably connected to the slider (24), and a fixing component is arranged at the front end of the slider (24).
2. The power pipe docking device for power construction and the operation method thereof according to claim 1, characterized in that: The fixing assembly comprises a gas rod (3), the front end of the slider (24) is fixedly connected to the gas rod (3), the rear end of the gas rod (3) is fixedly connected to the outer side thereof, a lifting column (32) is arranged at the top end of the gas rod (3), and a clamping arm (33) is fixedly connected to the rear side of the lifting column (32).
3. The power pipe docking device for power construction and the operation method thereof according to claim 2, characterized in that: The middle side of the top end of the base (1) is fixedly connected to left and right opposing support frames (4), and the outer side of the top end of the support frame (4) is fixedly connected to evenly distributed first limiting frames (41).
4. The power pipe docking device for power construction and the operation method thereof according to claim 3, characterized in that: The middle end of the outer side of the first limiting frame (41) is fixedly connected to a fixing frame (42), the inner end of the outer side of the fixing frame (42) is fixedly connected to a top plate (43), the bottom end of the top plate (43) is fixedly connected to a spring (44), the bottom end of the spring (44) is fixedly connected to a bottom plate (45), and the inner side of the bottom plate (45) is fixedly connected to a first connecting rod (46).
5. The power pipe docking device for power construction and the operation method thereof according to claim 4, characterized in that: A second limiting frame (47) is fixedly connected to the inner side of the first connecting rod (46), a limiting wheel (48) is rotatably connected to the inner side of the second limiting frame (47), and the second limiting frame (47) is slidably connected to the first limiting frame (41).
6. The power pipe docking device for power construction and the operating method thereof according to claim 5, characterized in that: One end of the inner side of the support frame (4) is fixedly connected to a third limit frame (5) that is evenly distributed, the inner side of the third limit frame (5) is fixedly connected to a hydraulic rod (51), the output end of the hydraulic rod (51) is fixedly connected to a second connecting rod (52), and one end of the inner side of the second connecting rod (52) is fixedly connected to a limit plate (53).
7. The power pipe docking device for power construction and the operating method thereof according to claim 6, characterized in that: A heating ring (6) is fixedly connected to one end of the inner side of the third limiting frame (5).
8. The power pipe docking device for power construction and the operating method thereof according to claim 2, characterized in that: A pipe (7) is fixedly connected to the top end of the support arm (31), and the pipe (7) is rotatably connected to a limiting wheel (48).
9. The power pipe docking device for power construction and the operating method thereof according to claim 8, characterized in that: A rubber layer is arranged on the outer side of the limiting wheel (48).
10. An electric power pipe docking device for electric power construction and an operating method thereof, characterized in that: The following steps are involved: S1. First, place the pipe (7) on the top of the support arm (31), and then drive the lifting column (32) downward through the gas rod (3), so that the clamping arm (33) is driven downward by the lifting column (32) to fix the pipe (7); S2. The motor (2) drives the screw rod (21) to rotate, and then the screw rod (21) drives the threaded sleeve (22) to move left and right, and at the same time, the threaded sleeve (22) drives the slider (24) to move synchronously on the slide rod (23), and the slider (24) drives the gas rod (3) to move synchronously, so as to move the pipe (7), and by controlling the motors (2) on both sides to move, the pipes (7) at both ends are driven to move in opposite directions; S3. The pipe (7) is passed through the inner side of the limiting wheel (48), and the bottom plate (45) is pushed downward with the top plate (43) as the stress point through the bottom plate (45), and the first connecting rod (46), the second limiting frame (47) and the limiting wheel (48) are driven to move downward, thereby limiting the pipe (7) in multiple directions; S4. After the heating ring (6) heats the connection position of the pipe (7), it continues to move in opposite directions to connect. At the same time, the hydraulic rod (51) uses the second connecting rod (52) to drive the limiting plate (53) to move inward, thereby wrapping and limiting the connection of the pipe (7), thereby limiting the outside.
Citation Information
Patent Citations
Electric power pipe hot melting butt joint fixing device for electric power construction
CN118417981A