A structure for quickly treating thermal melt landslide disaster and its implementation method
By setting up a comprehensive treatment structure of sunshade structure, anti-slip structure and drainage ditches in the thermal melt collapse disaster area, the problem of the sustainable development of thermal melt collapse disasters has been solved, and the stability of disaster points and infrastructure safety has been achieved.
Patent Information
- Application Number
- CN202411476892.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2044-10-22
AI Technical Summary
The existing technology is difficult to effectively block and stabilize the sustainable development of thermal melting and collapse disasters, especially in permafrost areas, resulting in serious impacts on infrastructure and the environment.
A comprehensive treatment structure including a sunshade structure, an anti-slip structure and a drainage ditch is adopted. The sunshade structure blocks solar radiation through a sunshade cloth and a bracket. The anti-slip structure prevents the further movement of the slip through a micro anti-slip pile and a recyclable heat rod. The drainage ditch is timely discharged from underground ice melt water.
It effectively slows down the development speed of thermal melt collapse, ensures long-term stability of disaster points, avoids further damage to infrastructure and the environment, and achieves rapid and low-cost treatment effects.
Smart Images

Figure CN119163038B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rapid treatment of thermal melt landslide disasters, and in particular to a rapid treatment structure for thermal melt landslide disasters and an implementation method thereof. Background Art
[0002] The permafrost on the Qinghai-Tibet Plateau is extremely sensitive to temperature changes. Under the influence of climate warming, the permafrost around the world has experienced a continuous degradation process in the past few decades. The melting of ground ice caused by the degradation of permafrost will induce a series of thermal thaw phenomena, which are mainly manifested as thermal thaw landslides in slope areas. Thermal thaw landslides refer to the exposure of ground ice caused by human activities or natural factors on slopes with thick layers of ground ice. During the melting season, the ground ice melts, and the upper thawed soil loses support and collapses under its own weight. The collapsed material covers the front edge of the landslide and the exposed ice layer on both sides. At the same time, new ground ice is exposed above, and it melts again to produce new collapses, and this process repeats. The development of thermal thaw landslides not only affects the water environment, ecological environment, and climate environment in cold regions, but also has a destructive effect on infrastructure construction. Therefore, it is of practical significance to carry out research on the rapid treatment technology of permafrost thermal thaw landslide disasters.
[0003] Thermal melt landslide disasters are characterized by rapid occurrence and long development duration. Especially without human intervention, the landslide range will gradually develop towards the top of the slope. At present, the treatment of thermal melt landslide disasters mainly draws on the experience of ordinary slope management projects, and builds gravity retaining walls and anti-slide piles at the front edge of thermal melt landslides to prevent the impact of thermal melt landslides on the front edge engineering structures. However, this method does not fundamentally block the continuous development of thermal melt landslides, especially the engineering facilities built at the rear edge of the landslide, which are potentially threatened by the continuous development of thermal melt landslides.
[0004] Therefore, there is an urgent need for a structure suitable for the rapid treatment of thermal thaw landslide disasters in permafrost areas, which can achieve rapid and low-cost treatment of thermal thaw landslides while ensuring the long-term stability of the disaster treatment point, thereby achieving the effect of treating both the symptoms and the root causes. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a rapid treatment structure for thermal melt landslide disasters which is highly practical and simple in structure.
[0006] Another technical problem to be solved by the present invention is to provide an implementation method of the structure for rapidly treating thermal melt landslide disasters.
[0007] In order to solve the above problems, the present invention discloses a rapid treatment structure for thermal melt landslide disasters, which is characterized in that: the structure includes a sunshade structure, an anti-skid structure and a drainage ditch arranged along the moving direction of the landslide; the sunshade structure includes a sunshade cloth arranged on a sunshade cloth bracket; the sunshade cloth bracket is arranged at the rear edge of the thermal melt landslide; the anti-skid structure includes a micro anti-skid pile embedded with a recyclable thermal rod; the micro anti-skid pile is arranged below the sunshade structure at the rear edge of the thermal melt landslide, one end of which is driven into the mountain and the other end is exposed, and a thermal rod fixing clamp is provided at the exposed end; the recyclable thermal rod has a heat dissipation fin on the end exposed to the ground, and a thermal conductive coating is provided on the other end and embedded in the interior of the micro anti-skid pile; backfill soil is paved at the rear edge of the thermal melt landslide.
[0008] The sunshade cloth is provided with a sunshade cloth reserved hole; the sunshade cloth fixing buckles are provided at the node positions of the sunshade cloth bracket; the sunshade cloth is fixed and covered on the sunshade cloth bracket through the sunshade cloth reserved hole and the sunshade cloth fixing buckles.
[0009] The sunshade cloth is a light film material with a reflective coating, the outer contour of which matches the contour of the rear edge of the hot-melt slide, and a reserved hole for the sunshade cloth is provided at the edge.
[0010] The sunshade cloth bracket is made of square steel pipe, and its outer contour matches the sunshade cloth; the vertical legs of the sunshade cloth bracket are driven 50~80cm below the ground surface, and the gap between the upper edge and the natural ground surface is 30~50cm.
[0011] The number and positions of the reserved holes of the sunshade cloth are arranged correspondingly to the fixing buckles of the sunshade cloth.
[0012] The micro anti-slip pile is made of a round steel pipe with a length of 5 to 8 m and an inner diameter of 100 to 200 mm.
[0013] The outer diameter of the recyclable heat rod is 90-190 mm, and is slightly smaller than the inner diameter of the micro anti-slip pile.
[0014] The inner diameter of the hot rod fixing clamp is equal to the outer diameter of the recyclable hot rod.
[0015] The backfill soil is soil taken from the landslide material at the front edge of the thermal melt landslide or native meadow.
[0016] The implementation method of the thermal melt landslide disaster rapid treatment structure as described above comprises the following steps:
[0017] ⑴ After a thermal melt landslide disaster occurs, use a surveying drone to conduct aerial survey of the thermal melt landslide, and determine the size and shape of the sunshade structure, as well as the layout, quantity and depth of the anti-slip structure into the mountain through calculation; according to the aerial survey and calculation results, process the components of the sunshade structure and the anti-slip structure;
[0018] (2) According to the sliding direction, sliding amount, accumulation characteristics of the landslide and its impact on the engineering structure, determine the optimal drainage route and set up several drainage ditches along the optimal drainage route;
[0019] ⑶ Drive the processed micro anti-slip pile into the mountain at the set position, dig out the soil inside the micro anti-slip pile, and install a hot rod fixing clamp at the exposed end of the micro anti-slip pile;
[0020] (4) Transport the components of the sunshade structure to the site, weld and assemble the sunshade cloth bracket at the designed position, install the sunshade cloth fixing buckle on the sunshade cloth bracket, lay the sunshade cloth on the sunshade cloth bracket, and fix the sunshade cloth on the sunshade cloth bracket through the sunshade cloth reserved holes and sunshade cloth fixing buckle, so as to complete the rapid treatment of thermal melt landslide disaster;
[0021] (5) When the thermal melt collapse tends to stop, apply a thermal conductive coating on one end of the recyclable hot rod, embed the recyclable hot rod into the micro anti-slip pile, and fix the recyclable hot rod with a hot rod fixing clamp;
[0022] (6) After the recyclable heat rod causes the underlying soil layer to freeze and stabilize in the cold season, remove the shade cloth and recycle the recyclable heat rod; at the same time, use machinery to collect the landslide materials at the front edge of the thermal melt landslide, and lay them as backfill soil at the rear edge of the thermal melt landslide, and then cover them with the shade cloth again.
[0023] Compared with the prior art, the present invention has the following advantages:
[0024] 1. In the present invention, setting a sunshade structure at the rear edge of the thermal melt landslide is a key step in achieving rapid disaster treatment. The sunshade structure prevents the exposed underground ice from absorbing heat from direct sunlight after the landslide occurs, promotes rapid cooling of the underground ice, slows down the melting rate of the underground ice, and alleviates the trend of further development of the thermal melt landslide.
[0025] 2. In the present invention, drainage ditches are arranged along the creeping direction of the landslide to timely discharge the underground ice melt water, thus laying a foundation for draining the landslide accumulated near the rear edge of the thermal melt landslide.
[0026] 3. The micro anti-slide piles arranged at the rear edge of the thermal melt landslide in the present invention prevent the further development of the disaster, ensure that the landslide will no longer affect the engineering structures at the front edge of the landslide, and at the same time provide a guarantee for the stability of the potential disaster-stricken structures at the rear edge of the thermal melt landslide.
[0027] 4. The recyclable heat rods embedded in the micro anti-slide piles of the present invention promote the refreezing of underground ice and shallow soil at the rear edge of thermal melt landslide in the cold season, avoiding the re-melting of underground ice in the warm season, thus ensuring the long-term stability of the disaster site.
[0028] 5. The present invention has a simple structure and strong practicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings.
[0030] Figure 1 It is a top view of the present invention.
[0031] Figure 2 It is a schematic diagram of the AA section in the present invention.
[0032] Figure 3 It is a schematic diagram of the arrangement of the sunshade cloth bracket and the anti-slip structure in the present invention.
[0033] Figure 4 It is a three-dimensional schematic diagram of the anti-slip structure in the present invention.
[0034] Figure 5 This is an actual photo before the treatment of thermal melt landslide disaster according to the present invention.
[0035] Figure 6 These are actual photos after the implementation of the rapid treatment plan for thermal melt landslide disasters of the present invention.
[0036] Figure 7 This is a diagram showing the treatment effect of the thermal melt landslide disaster of the present invention.
[0037] In the figure: 1-mountain, 2-landscape, 3-sunshade structure, 31-sunshade cloth, 32-sunshade cloth bracket, 33-sunshade cloth reserved holes, 34-sunshade cloth fixing buckles, 4-anti-slip structure, 41-micro anti-slip piles, 42-recyclable thermal rods, 43-thermal rod fixing clamps, 44-thermal conductive coating, 5-drainage ditch, 6-engineering structures, 7-potentially affected structures, 8-backfill soil. DETAILED DESCRIPTION
[0038] like Figures 1 to 4 As shown, a structure for rapid treatment of thermal melt landslide disasters includes a sunshade structure 3, an anti-slip structure 4, and a drainage ditch 5 arranged along the moving direction of the landslide 2. The sunshade structure 3 includes a sunshade cloth 31 arranged on a sunshade cloth bracket 32; the sunshade cloth bracket 32 is arranged at the rear edge of the thermal melt landslide; the anti-slip structure 4 includes a micro anti-slip pile 41 embedded with a recyclable heat rod 42; the micro anti-slip pile 41 is arranged below the sunshade structure 3 at the rear edge of the thermal melt landslide, one end of which is driven into the mountain 1, and the other end is exposed, and a heat rod fixing clamp 43 is provided at the exposed end; the end of the recyclable heat rod 42 exposed to the surface is provided with a heat dissipation fin, and the other end is provided with a heat conductive coating 44 and embedded in the interior of the micro anti-slip pile 41; the backfill soil 8 is laid at the rear edge of the thermal melt landslide.
[0039] Wherein: a sunshade cloth reserved hole 33 is provided on the sunshade cloth 31; a sunshade cloth fixing buckle 34 is provided at the node position of the sunshade cloth bracket 32; the sunshade cloth 31 is fixed and covered on the sunshade cloth bracket 32 through the sunshade cloth reserved hole 33 and the sunshade cloth fixing buckle 34.
[0040] The sunshade cloth 31 is a light film material with a reflective coating, the outer contour of which matches the contour of the rear edge of the hot-melt slide collapse, and a sunshade cloth reserved hole 33 is provided at the edge.
[0041] The sunshade cloth bracket 32 is made of a square steel pipe, and its outer contour matches the sunshade cloth 31; the vertical legs of the sunshade cloth bracket 32 are driven 50-80 cm below the ground surface, and the gap between the upper edge and the natural ground surface is 30-50 cm.
[0042] The number and positions of the sunshade cloth reserved holes 33 are arranged correspondingly to the sunshade cloth fixing buckles 34 .
[0043] The micro anti-slip pile 41 is made of a round steel pipe with a length of 5 to 8 m and an inner diameter of 100 to 200 mm.
[0044] The outer diameter of the recyclable hot rod 42 is 90-190 mm, and is slightly smaller than the inner diameter of the micro anti-slip pile 41 .
[0045] The inner diameter of the hot rod fixing clamp 43 is equal to the outer diameter of the recyclable hot rod 42 .
[0046] The backfill soil 8 is soil or native meadow taken from the landslide material 2 at the front edge of the thermal melt landslide.
[0047] A method for implementing a rapid treatment structure for thermal melt landslide disasters, comprising the following steps:
[0048] (1) After the thermal melt landslide disaster occurs, use a surveying drone to conduct aerial survey of the thermal melt landslide, and determine the size and shape of the sunshade structure 3, as well as the layout position, quantity and depth of the anti-slip structure 4 into the mountain 1 through calculation; according to the aerial survey and calculation results, process the components of the sunshade structure 3 and the anti-slip structure 4;
[0049] (2) According to the sliding direction, sliding amount, accumulation characteristics of the landslide 2 and its impact on the engineering structure 6, determine the optimal drainage route, and set up several drainage ditches 5 along the optimal drainage route;
[0050] (3) Driving the processed micro anti-slip pile 41 into the mountain 1 at the set position, digging out the soil inside the micro anti-slip pile 41, and installing the hot rod fixing clamp 43 at the exposed end of the micro anti-slip pile 41;
[0051] (4) After the components of the sunshade structure 3 are transported to the site, the sunshade cloth bracket 32 is welded and assembled at the designed position, the sunshade cloth fixing buckle 34 is installed on the sunshade cloth bracket 32, and the sunshade cloth 31 is laid on the sunshade cloth bracket 32, and the sunshade cloth 31 is fixed on the sunshade cloth bracket 32 through the sunshade cloth reserved hole 33 and the sunshade cloth fixing buckle 34, so as to complete the rapid treatment of the thermal melt landslide disaster;
[0052] (5) When the thermal melt collapse tends to stop, a thermal conductive coating 44 is applied to one end of the recyclable hot rod 42, the recyclable hot rod 42 is embedded in the micro anti-slip pile 41, and the recyclable hot rod 42 is fixed by a hot rod fixing clamp 43;
[0053] (6) After the recyclable heat rod 42 causes the underlying soil layer to freeze and stabilize in the cold season, the sunshade cloth 31 is removed and the recyclable heat rod 42 is recovered; at the same time, the landslide material 2 at the front edge of the thermal melt landslide is collected by machinery and laid as backfill soil 8 at the rear edge of the thermal melt landslide, and the sunshade cloth 31 is covered again.
[0054] The working principle of the present invention is:
[0055] After the thermal melt landslide occurs, the drainage ditch 5 set along the sliding direction of the landslide 2 will promptly drain the melted water from the underground ice, thereby promoting the drainage and strength improvement of the landslide 2; secondly, the micro anti-slide piles 41 set at the rear edge of the landslide hinder the further development of the disaster and prevent the landslide 2 from continuing to affect the engineering structure 6; in addition, the sunshade structure 3 set at the rear edge of the landslide effectively blocks the exposed underground ice from direct sunlight, and the gap between the sunshade cloth 31 and the ground surface can provide natural wind convection heat exchange, thereby promoting the rapid cooling of the underground ice, slowing down the melting rate of the underground ice, and alleviating the further development of the thermal melt landslide.
[0056] After the thermal melt landslide stops developing in the cold season, embedding the recyclable heat rod 42 in the micro anti-slide pile 41 promotes the refreezing of underground ice and shallow soil at the rear edge of the thermal melt landslide, prevents the underground ice from melting again in the warm season, and ensures the long-term stability of the disaster site.
[0057] Figure 5 This is an actual photo of a thermal melt landslide on a certain railway before treatment. The incident occurred in June 2024. It can be seen from the figure (the photo was taken on July 10, 2024) that after the thermal melt landslide disaster occurred, the landslide 2 had a certain impact on the railway, especially causing bias pressure on the bridge piers. At the same time, the continued development of the thermal melt landslide posed a potential threat to the potential affected structure 7 located at the rear edge of the landslide.
[0058] Figures 6 and 7 It can be seen from the figure (taken on August 13, 2024) that by setting a drainage ditch in the direction of thermal melt landslide and setting a sunshade structure 3 at the rear edge, the continuous development of thermal melt landslide is prevented, and the impact of thermal melt landslide on the potential disaster-stricken structure 7 at the rear edge is avoided; especially from Figure 7 It can be seen that under the dual effects of the sunshade structure 3 and the drainage ditch 5, the landslide 2 is quickly drained and its strength is improved, thus preventing the landslide 2 from continuously affecting the railway.
Claims
1. A structure for rapid treatment of thermal melt landslide disasters, characterized in that: The structure comprises a sunshade structure (3), an anti-slip structure (4) and a drainage ditch (5) arranged along the moving direction of the landslide (2); the sunshade structure (3) comprises a sunshade cloth (31) arranged on a sunshade cloth bracket (32); the sunshade cloth bracket (32) is arranged at the rear edge of the thermal melt landslide; the anti-slip structure (4) comprises a micro anti-slip pile (41) embedded with a recyclable thermal rod (42); the micro anti-slip pile (41) is arranged at the rear edge of the thermal melt landslide; 3), one end of which is driven into the mountain (1) and the other end is exposed, and a heat rod fixing clamp (43) is provided at the exposed end; the end of the recyclable heat rod (42) exposed to the ground has a heat dissipation fin, and the other end is provided with a heat conductive coating (44) and embedded in the interior of the micro anti-slip pile (41); the back edge of the thermal melt landslide is paved with backfill soil (8); the sunshade cloth (31) is provided with a sunshade cloth reserved hole (33); the micro anti-slip pile (41) is made of a round steel pipe; The implementation method of the thermal melt landslide disaster rapid treatment structure comprises the following steps: (1) After a thermal melt landslide disaster occurs, use a surveying drone to conduct an aerial survey of the thermal melt landslide, and determine the size and shape of the sunshade structure (3), as well as the layout position, quantity and depth of the anti-slip structure (4) into the mountain (1) through calculation; based on the aerial survey and calculation results, process the components of the sunshade structure (3) and the anti-slip structure (4); (2) Determine the optimal drainage route based on the sliding direction, sliding amount, accumulation characteristics of the landslide (2) and its impact on the engineering structure (6), and set up several drainage ditches (5) along the optimal drainage route; (3) driving the processed micro anti-slip pile (41) into the mountain (1) at the set position, digging out the soil inside the micro anti-slip pile (41), and installing a hot rod fixing clamp (43) at the exposed end of the micro anti-slip pile (41); (4) After the components of the sunshade structure (3) are transported to the site, the sunshade cloth bracket (32) is welded and assembled at the designed position, the sunshade cloth fixing buckle (34) is installed on the sunshade cloth bracket (32), and the sunshade cloth (31) is laid on the sunshade cloth bracket (32), and the sunshade cloth (31) is fixed to the sunshade cloth bracket (32) through the sunshade cloth reserved hole (33) and the sunshade cloth fixing buckle (34), thereby completing the rapid treatment of the thermal melt landslide disaster; (5) When the thermal melt collapse tends to stop, a thermal conductive coating (44) is applied to one end of the recyclable hot rod (42), the recyclable hot rod (42) is embedded in the micro anti-slip pile (41), and the recyclable hot rod (42) is fixed by a hot rod fixing clamp (43); (6) After the recyclable heat rod (42) causes the underlying soil layer to freeze and stabilize in the cold season, the sunshade cloth (31) is removed and the recyclable heat rod (42) is recovered; at the same time, the landslide material (2) at the front edge of the thermal melt landslide is collected by machinery and laid as backfill soil (8) at the rear edge of the thermal melt landslide, and the sunshade cloth (31) is covered again.
2. A structure for rapid treatment of thermal melt landslide disasters as claimed in claim 1, characterized in that: The sunshade cloth (31) is a lightweight film material with a reflective coating, its outer contour matches the contour of the rear edge of the thermal melt slide, and a sunshade cloth reserved hole (33) is provided at the edge.
3. A rapid treatment structure for thermal melt landslide disasters as claimed in claim 1, characterized in that: The sunshade cloth bracket (32) is made of a square steel pipe, and its outer contour matches the sunshade cloth (31); the vertical legs of the sunshade cloth bracket (32) are driven into the ground 50 to 80 cm below the ground surface, and the gap between the upper edge and the natural ground surface is 30 to 50 cm.
4. A structure for rapid treatment of thermal melt landslide disasters as claimed in claim 1, characterized in that: The number and positions of the sunshade cloth reserved holes (33) are arranged correspondingly to the sunshade cloth fixing buckles (34).
5. A structure for rapid treatment of thermal melt landslide disasters as claimed in claim 1, characterized in that: The micro anti-sliding pile (41) has a length of 5 to 8 m and an inner diameter of 100 to 200 mm.
6. A structure for rapid treatment of thermal melt landslide disasters as claimed in claim 1, characterized in that: The outer diameter of the recyclable heat rod (42) is 90-190 mm, and is slightly smaller than the inner diameter of the micro anti-slip pile (41).
7. A structure for rapid treatment of thermal melt landslide disasters as claimed in claim 1, characterized in that: The inner diameter of the hot rod fixing clamp (43) is equal to the outer diameter of the recyclable hot rod (42).