Foldable full-space supporting scaffold and method for assembling and erecting scaffold body

By designing a foldable full-house support scaffolding and using the structure of sliders and fastening clips, the problems of many loose materials and connecting nodes in the existing technology are solved, the construction efficiency is improved and the risks of high-altitude operations are reduced, and the risk of high-altitude operations is achieved. Flexible adjustment of pole spacing and frame size.

CN119163213APending Publication Date: 2024-12-20CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411425483.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

During the installation and dismantling of existing full-house supporting scaffolding, there are many scattered materials and many connecting nodes, resulting in low construction efficiency and a safety risk of falling from high places.

Method used

A foldable full-house support scaffolding is designed, consisting of multiple continuous frame units, which enables the retractable connection between the vertical pole and the oblique rod through sliders and fasteners, reduces the number of nodes, and is in the factory or material stack. The field is assembled and disassembled to avoid high-altitude operations.

Benefits of technology

The installation and demolition process is simplified, construction efficiency is improved, high-altitude operation time is reduced, arbitrary adjustment of pole spacing and continuous adjustment of multi-layer frame size are achieved, reducing construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119163213A_ABST
    Figure CN119163213A_ABST
Patent Text Reader

Abstract

The invention discloses a foldable full-space supporting scaffold which comprises a scaffold body, the scaffold body is composed of a plurality of continuously-arranged scaffold body units, the multiple scaffold body units can be stretched or folded in the first direction and the second direction at the same time, and the first direction intersects with the second direction. According to the scaffold body, the problem that an existing full-space supporting scaffold needs to be assembled in bulk on an erection site is solved, the number of rod piece node installation and disassembly in the erection and disassembly process of the existing full-space supporting scaffold is greatly reduced, the operation process is simplified, the operation time is saved, the construction efficiency is improved, and the high-altitude operation time is shortened. According to the site construction size requirement, any number of frame body units can be assembled, and the full-space supporting scaffold can be stretched or folded in two directions at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of construction, and in particular to a foldable full-floor supporting scaffold and a frame assembly and erection method. Background Art

[0002] In the field of construction engineering, scaffolding is a working platform set up to ensure the smooth progress of each construction process. According to the location of the scaffolding, it can be divided into external scaffolding and internal scaffolding; according to the purpose of use, it can be divided into working scaffolding and supporting scaffolding; according to different materials, it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding; according to the structural form, it can be divided into pole scaffolding, bridge scaffolding, door scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, climbing scaffolding, etc.

[0003] As a kind of supporting scaffolding, full-height supporting scaffolding is widely used in the construction process of cast-in-place concrete structures in house construction, municipal roads, bridge and tunnel projects.

[0004] As for the full-height support scaffolding used in the existing cast-in-place concrete structure wooden formwork, the common ones are disc-type full-height support scaffolding, bowl-type full-height support scaffolding, wheel-type full-height support scaffolding, steel pipe fastener full-height support scaffolding, etc. Its main erection steps are as follows: Figure 1 As shown, the following steps are included: construction preparation, laying of gaskets, bases and sweeping rods, placement of gaskets, erection of bases and sweeping rods, laying of vertical poles and second-step horizontal poles, erection of vertical poles, erection of second-step horizontal poles, laying of vertical poles and third-step horizontal poles, extension of vertical poles, erection of third-step horizontal poles, repeated erection to the designed height of the frame, reinforcement of diagonal braces and shear braces, installation of top supports, and hanging of horizontal anti-fall nets.

[0005] The steps for dismantling the existing full-floor supporting scaffolding are as follows: Figure 2 As shown, the following processes are included: dismantling preparation work, lowering the height of the top support, dismantling the inner back ribs of the top support, dismantling the top horizontal bars and diagonal bars, dismantling the top support and the top vertical bars, dismantling the next layer of horizontal bars and diagonal bars, dismantling the next layer of vertical bars, repeating the dismantling to the bottom layer of the frame, material sorting, hoisting and transportation.

[0006] From the main erection and dismantling construction steps of the aforementioned disc buckle type, bowl buckle type, wheel buckle type, and steel pipe fastener type full-floor support scaffolding, it can be seen that the construction process has the following deficiencies: 1. There are many loose parts of scaffolding poles, cross bars, diagonal bars and other materials. The material hoisting, transportation and laying process during erection, as well as material sorting, hoisting and transportation during dismantling are very labor-intensive and the construction efficiency is low. 2. Due to the large number of loose parts of scaffolding uprights, crossbars, diagonal bars and other materials, there are many nodes connecting the bars. During the erection and dismantling of the frame, each connection node needs to be manually disassembled and assembled, which results in a large amount of disassembly and assembly work and low construction efficiency. 3. Except for the erection and dismantling of the bottom frame, which can be done on the ground or floor, during the erection and dismantling of the second and higher frames, the workers need to walk back and forth on the scaffolding frame, which has low erection efficiency and a greater safety risk of falling from heights. Summary of the invention

[0007] In order to solve the above problems of the existing full-floor supporting scaffolding, the present application provides a foldable full-floor supporting scaffolding and a frame assembly and erection method, and replaces the construction disadvantages brought by the current numerous scattered parts through a foldable structural design.

[0008] The present application adopts the following technical solution: a foldable full-floor support scaffold is provided, comprising a frame body, the frame body is composed of a plurality of frame body units arranged continuously, the plurality of frame body units can be respectively stretched or folded along a first direction and a second direction at the same time, the first direction intersecting with the second direction; Each frame unit includes a first upper upright and a first lower upright that can be spliced ​​and connected to the first upper upright, a second upper upright and a second lower upright that can be spliced ​​and connected to the second upper upright; a first slider arranged on the first lower upright, a second slider arranged on the second lower upright, the first slider can slide along the first lower upright, and the second slider can slide along the second lower upright; and a first oblique rod and a second oblique rod, one end of the first oblique rod is hingedly connected to the second upper upright, and the other end is connected to the first slider, one end of the second oblique rod is hingedly connected to the first upper upright, and the other end is connected to the second slider, the first upper upright and the first lower upright constitute the first upright, the second upper upright and the second lower upright constitute the second upright, the first oblique rod and the second oblique rod intersect in the middle of the first upright and the second upright and are hingedly connected at the intersection.

[0009] Preferably, fastening clamps are provided on the first slider and the second slider, and the fastening clamps are used to lock the positions of the first slider on the first lower upright pole and the second slider on the second lower upright pole.

[0010] Preferably, the first slider and the second slider are in the shape of steel pipes, and circular holes are formed on the first slider and the second slider, and nuts are arranged at the circular holes; the fastening fixture is composed of a horizontal screw rod and a vertical handle, and the screw rod is cooperatively connected with the nut.

[0011] Preferably, a third slider is provided on the first lower upright and can slide along the first lower upright; a fourth slider is provided on the second lower upright and can slide along the second lower upright, and circular holes are also provided on the third slider and the fourth slider.

[0012] Preferably, the first vertical pole or the second vertical pole is divided into a corner vertical pole, an end vertical pole and a middle vertical pole according to the position in the frame; When the first vertical pole or the second vertical pole is a corner vertical pole, two hinge points are arranged on the upper vertical pole of the corner vertical pole, and correspondingly, two sliders are arranged on the lower vertical pole of the corner vertical pole, and each slider is provided with a connecting ear plate; When the first vertical rod or the second vertical rod is an end vertical rod, three hinge points are arranged on the upper vertical rod of the end vertical rod, and correspondingly, two sliders are arranged on the lower vertical rod of the end vertical rod, one of the sliders is arranged with one connecting ear plate, and the other is arranged with two connecting ear plates; When the first vertical pole or the second vertical pole is an intermediate vertical pole, four hinge points are arranged on the upper vertical pole of the intermediate vertical pole, and correspondingly, two sliders are arranged on the lower vertical pole of the intermediate vertical pole, and two connecting ear plates are arranged on each slider; The connecting ear plate is a semicircular thin plate, on which a reamed hole is opened, and the reamed hole is a through hole.

[0013] Preferably, the connecting ear plate is a flat steel strip, which consists of a section of transverse steel strip and a section of diagonal steel strip, the diagonal steel strip section is welded to the outer surface of the slider, and the transverse steel strip section is connected to the first diagonal rod or the second diagonal rod through rivets.

[0014] Furthermore, a method for assembling a foldable full-height support scaffolding frame is provided, which is assembled from the foldable full-height support scaffolding described above, and comprises the following steps: Step S01: according to the length and width requirements of the frame to be erected, take an appropriate number of first upper vertical poles, second upper vertical poles, first lower vertical poles, second lower vertical poles, first sliders, second sliders, third sliders, fourth sliders, first diagonal poles, and second diagonal poles, and place them on the ground; Step S02: hinge one end of the first oblique rod to the second upper vertical rod; hinge one end of the second oblique rod to the first upper vertical rod; Step S03: connecting the other end of the first inclined rod to the first slider, and connecting the other end of the second inclined rod to the second slider; Step S04: intersecting the first inclined rod and the second inclined rod and hinge-connecting them at the intersection; Step S05: passing the first lower upright through the first slider, the third slider and the first upper upright; passing the second lower upright through the second slider, the fourth slider and the second upper upright, so as to assemble a foldable full-floor support scaffolding frame unit; Step S06: Repeat steps S01-S05, and assemble appropriate amounts of foldable full-height support scaffolding frame units along the first direction and the second direction according to the size requirements of the frame to be erected to form a frame.

[0015] Preferably, in step S06, during the process of repeating steps S01-S05, the third slider is used to connect with the first diagonal rod or the second diagonal rod of another foldable full-floor supporting scaffolding adjacent to the same plane a, and the fourth slider is used to connect with the first diagonal rod or the second diagonal rod of another foldable full-floor supporting scaffolding adjacent to plane b, the first direction coordinate line is parallel to plane a, the second direction coordinate line is parallel to plane b, and plane a and plane b intersect in space.

[0016] Preferably, plane a and plane b are perpendicular to each other.

[0017] Furthermore, a method for erecting a foldable full-floor supporting scaffolding frame is provided, comprising the following steps: Step M01: Use a hoisting device to hoist the frame to the location to be installed, and set positioning lines in advance at the location to be installed according to the requirements of the erection, wherein the positioning lines at least include sideline positioning lines in the first direction and the second direction and an angle positioning line, and the initial position of one corner of the frame is set at the angle positioning line; Step M02: Use the transport equipment to lift up one end of the frame, loosen the sliders on each supporting scaffold in the first direction one by one from the corner line positioning line, move the transport equipment to gradually unfold the frame along the first direction until the side line positioning line in the second direction, and then lock each loosened slider with a fastening clamp; Step M03: Similarly, use the transport equipment to lift up the other end of the frame, loosen the sliders on each supporting scaffold in the second direction one by one from the corner line positioning line, move the transport equipment to gradually unfold the frame along the second direction until the first direction side line positioning line, and then lock each loosened slider with a fastening clamp; Step M04: according to the construction requirements, other rod structures are set up on the frame, and a top support is installed on the top of the frame; Step M05: Install the back ribs and formwork on the top support to complete the frame erection.

[0018] Beneficial effects of the present application: The foldable full-floor support scaffolding described in the present application is used as a unit to assemble into multiple rows and columns of frames required for construction. This frame has the functions of integrating scattered parts, being foldable and retractable. After being erected on site, it can bring the following advantages: 1. It changes the existing disc-type, bowl-type, wheel-type, steel pipe fastener-type and other full-floor support scaffolding, which requires loose assembly and disassembly at the erection site during erection and dismantling. It greatly reduces the number of rod node installation and disassembly during the erection and dismantling of the existing full-floor support scaffolding, simplifies the installation and dismantling process of the full-floor support scaffolding, saves working time and improves construction efficiency.

[0019] 2. The installation and dismantling of the existing full-height support scaffolding frame rod nodes such as disc buckle type, bowl buckle type, wheel buckle type, and steel pipe fastener type mostly need to be operated on the frame; while the assembly and disassembly process of the foldable full-height support scaffolding frame of the present application can be carried out in the factory or in the material yard, all on the ground, reducing the time of high-altitude operations.

[0020] 3. The foldable full-floor supporting scaffolding of the present application is composed of diagonal rods and sliders, which can realize the adjustment of any spacing between the vertical poles, overcoming the problem that the existing disc-type, bowl-type, wheel-type, steel pipe fastener-type full-floor supporting scaffolding can only determine the spacing between the vertical poles according to the length of the cross bar.

[0021] 4. The foldable full-floor supporting scaffolding frame of the present application can select any number of foldable full-floor supporting scaffolding units in the first direction and the second direction according to the construction size requirements, so as to realize continuous adjustment of the size of the multi-layer frame and unlimited expansion, thus overcoming the problem that the length or width of the existing full-floor supporting scaffolding does not match the actual construction requirements and cannot be continuously adjusted, causing the phenomenon of temporary use of other structural parts for local mixing on site.

[0022] 5. This application sets two sliders on each lower vertical pole to avoid interference between the two plane frames in the X and Y directions in space during the unfolding or folding process after the scaffolding is assembled into a frame. The design of the steel tube slider structure allows it to slide along the vertical pole at any distance and angle.

[0023] 6. If the diagonal rod of the present application adopts a disc-buckle diagonal rod, in order to realize an effective connection between the end section of the disc-buckle diagonal rod and the slider, the present application provides a connection method between the disc-buckle diagonal rod and the slider by welding a flat steel strip on the slider. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a flow chart of erecting a frame of an existing full-floor support scaffold as described in the background technology; Figure 2 It is a flow chart of dismantling the existing full-floor support scaffolding frame described in the background technology; Figure 3 It is a schematic diagram of the structure of the frame unit of the foldable full-floor support scaffolding of the present application; Figure 4 yes Figure 3 Schematic diagram of the middle slider structure; Figure 5 It is a schematic diagram of a plurality of foldable full-floor support scaffolding frame units connected in the present application; Figure 6 yes Figure 5 Schematic diagram of the folded state; Figure 7 yes Figure 1 A schematic diagram of the structure in which the middle slider is locked by a fastening clamp; Figure 8 yes Figure 7 Schematic diagram of the structure of the fastening card; Fig. 9 yes Figure 5 A schematic diagram of multiple foldable full-floor support scaffolding frame units after being locked with fastening clips; Fig.10 It is a schematic diagram of the arrangement of the corner uprights and end upright sliders of the foldable full-floor support scaffolding of the present application; Fig.11 yes Fig.10 A schematic diagram of a structure in which two sliders are arranged on each lower upright at the intersection of two planes; Fig.12 It is a schematic diagram of the structure of the foldable full-floor support scaffolding frame of the present application; Fig.13 This is a schematic diagram of the structure of the hinge point when the upper upright pole of the present application is a corner upright pole; Fig.14 and Fig.13 A schematic diagram of the structure of the slider when the corresponding lower upright is a corner upright; Fig.15 It is a structural schematic diagram of the hinge point when the upper upright pole of the present application is an end upright pole; Fig.16 is with Fig.15 A schematic diagram of the structure of the slider when the corresponding lower upright is an end upright; Fig.17 This is a structural schematic diagram of the hinge point when the upper upright pole of the present application is an intermediate upright pole; Fig.18 is with Fig.17 A schematic diagram of the structure of the slider when the corresponding lower upright is the middle upright; Fig.19 It is a schematic diagram of assembling a foldable full-height support scaffolding frame unit using the frame assembly method of the present application; Fig. 20 It is a schematic diagram of assembling a plurality of foldable full-floor support scaffold frame units along the X direction; Fig.21 is Fig. 20 Schematic diagram of assembling the first vertical pole of the second layer edge along the Z direction on the foundation; Fig. 22 is Fig.21 Schematic diagram of assembling a second-layer foldable full-floor support scaffolding frame unit along the Z direction on the foundation; Fig.23 It is a schematic diagram of the structure of a 5*6 foldable full-floor support scaffolding frame; Fig.24 It is a schematic diagram of step M01 of the frame erection method of the present application; Fig.25 It is a schematic diagram of steps M02 and M03 of the frame erection method of the present application; Fig.26 This is a structural diagram after the frame of this application is erected; Fig. 27 It is a schematic diagram of the connection between the first diagonal rod or the second diagonal rod of the present application and the slider after adopting the disc buckle diagonal rod; Fig.28 yes Fig. 27 Schematic diagram of the local structure at K in the middle; Fig.29 yes Figure 3 Foldable full-floor support scaffolding Fig. 27 and Fig.28 Schematic diagram of the structure after the structure is replaced.

[0025] Figure markings: 11-first upper upright, 12-second upper upright, 13-hinge; 21-first lower upright, 22-second lower upright; 31-first slider, 32-second slider, 33-third slider, 34-fourth slider, 35-round hole, 36-nut, 37-connecting ear plate, 371-reamed hole, 38-flat steel strip, 39-rivet; 41-first diagonal rod, 42-second diagonal rod; 5-fastening clip, 51-screw, 52-handle; 61-first upright, 62-second upright, 63-third upright, 7-buckle. DETAILED DESCRIPTION

[0026] The specific implementation methods of the present application are described below in conjunction with the accompanying drawings so that those skilled in the art can better understand the present application.

[0027] In order to clearly describe the technical solution and working principle of this application, the following contents of this application are explained and set: The first direction is the X direction, the second direction is the Y direction, plane a is a plane formed by two adjacent poles along the X direction coordinate line, plane b is a plane formed by two adjacent poles along the Y direction coordinate line, plane a and plane b intersect in space, preferably, X and Y are perpendicular, and plane a and plane b are perpendicular to each other. Example

[0028] like Figure 3As shown, a foldable full-floor support scaffolding frame unit is provided, comprising a first upper upright bar 11 and a first lower upright bar 21 which can be spliced ​​and connected to the first upper upright bar 11, a second upper upright bar 12 and a second lower upright bar 22 which can be spliced ​​and connected to the second upper upright bar 12; a first slider 31 arranged on the first lower upright bar 21, and a second slider 32 arranged on the second lower upright bar 22, wherein the first slider 31 can slide along the first lower upright bar 21, and the second slider 32 can slide along the second lower upright bar 22; And a first diagonal rod 41 and a second diagonal rod 42, one end of the first diagonal rod 41 is hinged to the second upper vertical rod 12, and the other end is connected to the first slider 31, one end of the second diagonal rod 42 is hinged to the first upper vertical rod 11, and the other end is connected to the second slider 32, the first upper vertical rod 11 and the first lower vertical rod 21 constitute a first vertical rod, the second upper vertical rod 12 and the second lower vertical rod 22 constitute a second vertical rod, the first diagonal rod 41 and the second diagonal rod 42 intersect in the middle of the first vertical rod and the second vertical rod and are hingedly connected at the intersection.

[0029] like Figures 5 and 6 As shown, Figure 3 The foldable full-floor support scaffolding is a basic unit, and a plurality of such scaffolding units are arranged in sequence. Since the first vertical pole, the second vertical pole, the first diagonal pole, the second diagonal pole and the first slider and the second slider in each scaffolding unit form a parallelogram, a row of foldable and retractable frames can be formed by utilizing the instability of the parallelogram. Figure 5 This is the state before folding. Figure 6 In the folded state.

[0030] like Figure 4 As shown, the first slider 31 and the second slider 32 are in the shape of steel tubes, a through hole 35 is opened on the annular surface of the steel tube, and a nut 36 is arranged at the through hole 35 (see Fig. 22 ).

[0031] like Figures 7 and 8 As shown, a fastening clamp 5 is provided, which is composed of a horizontal screw rod 51 and a vertical handle 52. The horizontal screw rod 51 is threadedly connected with the nut 36 on the slider. Figure 5 When the multiple continuous scaffolds are fixed, the fastening clamps 5 are used to lock the slider on each vertical pole. At this time, in each foldable full-floor supporting scaffolding unit, the first vertical pole, the second vertical pole and the first diagonal pole, the second diagonal pole form a triangular hinged body. According to the self-stabilizing characteristics of the triangle, the multiple continuous scaffolds form a stable truss structure.

[0032] like Fig. 9 As shown, a row of stable truss structures is formed by multiple continuous scaffolds after each slider is locked by a fastening clamp 5.

[0033] The full-height support scaffolding in the project needs to be combined into a frame structure in multiple rows and columns. In order to avoid cross interference in the X and Y directions when the foldable full-height support scaffolding described in the present application is used as a basic unit for assembly operations, two sliders are set at the lower uprights of each scaffolding unit.

[0034] like Figures 10 to 12 As shown, each upright has adjacent uprights in the X and Y directions in the entire frame structure. If there is only one slider on each upright, the folding function of the full-height support scaffolding of the present application can only be realized within one plane. If the folding function of the full-height support scaffolding needs to be realized in both the X and Y directions, it can be achieved by setting two sliders on each upright.

[0035] like Fig.11 As shown, a set of structural diagrams of two planes intersecting in the X direction and the Y direction are provided. According to the above description and setting, it can be known that the plane where the three vertical poles arranged in the X direction are located is plane a, and the plane where the three vertical poles arranged in the Y direction are located is plane b. The vertical pole at the intersection of plane a and plane b is recorded as the first vertical pole 61, the vertical pole adjacent to the first vertical pole 61 on plane a is recorded as the second vertical pole 62, and the vertical pole adjacent to the first vertical pole 61 on plane b is recorded as the third vertical pole 63. Two sliders are set on the lower vertical pole of each vertical pole. The two sliders at the lower vertical pole of the first vertical pole 61 are recorded as the first slider 31 and the third slider 33, and the two sliders at the lower vertical pole of the second vertical pole 62 and the lower vertical pole of the third vertical pole 63 are both the second slider 32 and the fourth slider 34. By Fig.11 It can be seen that the first slider 31 on the lower vertical rod of the first vertical rod 61 is connected to the upper vertical rod of the second vertical rod 62 on plane a, and the third slider 33 on the lower vertical rod of the first vertical rod 61 is connected to the upper vertical rod of the third vertical rod 63 on plane b; similarly, the second slider 32 at the lower vertical rod of the second vertical rod 62 is connected to the upper vertical rod of the first vertical rod 61 on plane a, and the fourth slider 34 at the lower vertical rod of the second vertical rod 62 is connected to the upper vertical rod of the vertical rod adjacent to it on a plane parallel to plane b and passing through the second vertical rod 62 ( Fig.11 By analogy, the third vertical rod 63 is also connected to the adjacent vertical rods on the two intersecting surfaces in the same way.

[0036] like Fig.12 As shown, the frame structure is formed after being assembled by the above method, and this frame structure can be unfolded and folded along the X direction and the Y direction at the same time.

[0037] like Figure 10 to Figure 11 As shown, the vertical poles in the frame unit are divided into corner vertical poles A, end vertical poles B and middle vertical poles C according to their different positions in the frame (see Fig.11), the corner pole A is connected to two adjacent poles on plane a and plane b; the end pole B is connected to two adjacent poles on plane a (or plane b), and is also connected to an adjacent pole on plane b (or plane a); the middle pole C is connected to two adjacent poles on plane a and plane b respectively. The poles at these three different positions have different connection point structures on the corresponding upper poles and lower poles, specifically: like Fig.13 and Fig.14 As shown, Fig.13 The upper upright of the corner upright A is shown, on which two hinge points 13 are arranged, corresponding to the upper upright. Fig.14 The figure shows the lower upright of the corner upright A, on which two sliders are arranged, each slider being provided with a connecting ear plate 37. Preferably, the connecting ear plates 37 on the two sliders are installed at perpendicular positions to each other, so that the corner upright A can be connected to the two adjacent uprights on plane a and plane b; like Fig.15 and Fig.16 As shown, Fig.15 The upper upright of the end upright B is shown, on which three hinge points 13 are arranged, corresponding to the upper upright. Fig.16 The figure shows the lower upright of the end upright B, on which two sliders are arranged, one of which is provided with a connecting ear plate 37, and the other is provided with two connecting ear plates 37, the connecting ear plates 37 on the two sliders are installed at perpendicular positions to each other, and the two connecting ear plates 37 arranged on the same slider are in the same plane, so that the end upright B can be connected to two adjacent uprights on plane a (or plane b), and connected to one adjacent upright on plane b (or plane a) at the same time; like Fig.17 and Fig.18 As shown, Fig.17 The upper upright of the middle upright is shown, on which four hinge points 13 are arranged, corresponding to the upper upright. Fig.18 The figure shows the lower upright of the middle upright, on which two sliders are arranged. Two connecting ear plates 37 are arranged on each slider. The two connecting ear plates 37 on each slider are in the same plane. The connecting ear plates 37 on the two sliders are installed at perpendicular positions to each other, so that the middle upright C can be connected with two adjacent uprights on plane a and plane b.

[0038] The upper end of the first oblique rod 41 or the second oblique rod 42 is hinged to the hinge point 13. The connecting ear plate 37 is a semicircular thin plate. A hinge hole 371 is provided on the semicircular thin plate. The hinge hole 371 is a through hole. The end of the first oblique rod 41 or the second oblique rod is hinged to the hinge hole 371.

[0039] like Figures 19 to 23 As shown, further, a method for assembling the above-mentioned foldable full-floor supporting scaffolding frame is provided, comprising the following steps: Step S01: Fig.19 As shown, according to the length and width requirements of the frame to be erected, take an appropriate number of first upper vertical rods 11, second upper vertical rods 12, first lower vertical rods 21, second lower vertical rods 22, first sliders 31, second sliders 32, third sliders 33, fourth sliders 34, first diagonal rods 41, and second diagonal rods 42, and place them on the ground; Step S02: hinge one end of the first oblique rod 41 to the second upper vertical rod 12; hinge one end of the second oblique rod 42 to the first upper vertical rod 11; Step S03: connecting the other end of the first inclined rod 41 to the first slider 31 , and connecting the other end of the second inclined rod 42 to the second slider 32 ; Step S04: intersecting the first oblique rod 41 and the second oblique rod 42 and hingedly connecting them at the intersection; Step S05: The first lower upright bar 21 is connected to the first upper upright bar 11 through the first slider 31 and the third slider 33; the second lower upright bar 22 is connected to the second upper upright bar 12 through the second slider 32 and the fourth slider 34, so as to assemble a foldable full-floor support scaffolding frame unit; Step S06: Fig. 20 As shown, repeat steps S01-S05 to assemble five consecutive foldable full-floor support scaffolding frame units along the X direction; like Fig.21 and Fig. 22 As shown, then along the Z direction, 6 layers of 5 consecutive foldable full-floor support scaffolding frame units are set up, among which Fig.21 This is a schematic diagram of assembling the first vertical pole of the second floor. Fig. 22 This is a schematic diagram of assembling to the second pole of the second layer. At this time, the first frame unit of the second layer has been formed. By analogy, it is finally assembled into a 5*6 specification foldable full-floor support scaffolding frame (see Fig.23 ).

[0040] If the frame needs to be disassembled, it can be disassembled in whole or in part according to the sequence of steps S06-S01.

[0041] Further, if Figure 24 to Figure 26 , providing a method for erecting a foldable full-floor supporting scaffolding frame, The following steps are involved: Step M01: Fig.24 As shown, the frame is hoisted to the location to be installed using a hoisting device, and positioning lines are set in advance at the location to be installed according to the requirements of the erection. The positioning lines include a positioning line dx parallel to the X direction, a positioning line dy parallel to the Y direction, and a corner positioning line dj. One corner of the frame is set at the positioning line dj. Step M02: Fig.25As shown, use the transport equipment to lift up one end of the frame, loosen the sliders on each supporting scaffold in the X direction one by one from the corner positioning line dj, move the transport equipment to gradually unfold the frame along the X direction until the Y direction edge positioning line dy, and then lock each loosened slider with a fastening clamp; Step M03: Similarly, use the transport equipment to lift the other end of the frame, loosen the sliders on each supporting scaffold in the Y direction one by one from the corner positioning line dj, move the transport equipment to gradually unfold the frame along the Y direction until the X-direction edge positioning line dx, and then lock each loosened slider with a fastening clip. At this time, the entire frame has been unfolded and fixed according to the erection requirements (see Fig.26 ); Step M04: according to the construction requirements, other rod structures are set up on the frame, and a top support is installed on the top of the frame; Step M05: Install the back ribs and formwork on the top support to complete the frame erection.

[0042] Furthermore, a method for dismantling a foldable full-floor support scaffolding frame is provided, comprising the following steps: First, loosen the top support of the frame, pull out the inner template and back rib of the top support, as well as other rod structures on the frame; Secondly, loosen the fastening clamps of the sliders in the X direction (or Y direction) of the frame, fold the frame along the X direction (or Y direction), and after folding, lock the corresponding sliders in the X direction (or Y direction) with the fastening clamps; Finally, loosen the fastening clamps of the sliders in the Y direction (or X direction) of the frame, fold the frame along the Y direction (or X direction), and after folding, lock the corresponding sliders in the Y direction (or X direction) with the fastening clamps.

[0043] The frame described in this application can be used repeatedly in different construction projects. The turnover method of the frame is as follows: (1) Use forks and other equipment to lift both ends of the frame at the same time and to a certain height from the ground. Since the diagonal bars in the X and Y directions are in a fastened state, the entire frame is a statically determinate structure and the frame will be lifted as a whole; (2) After all the vertical poles of the entire frame are off the ground, use a fork to drag the frame out from under the floor; (3) Determine whether it is necessary to adjust the number of foldable full-height support scaffolding basic units in the X and Y directions of the frame according to the size of the frame to be erected in the next construction section; (4) When the number of basic units needs to be adjusted, the frame is first transported to the assembly site as a whole, assembled or disassembled according to the above frame assembly and disassembly methods, and then transported to the next construction area and used in rotation according to the above installation and disassembly construction methods; (5) When there is no need to adjust the assembly quantity of the basic frame unit, the frame as a whole is directly transported to the next construction area and used in rotation according to the aforementioned installation and dismantling construction methods.

[0044] The turnover frequency of full-height support scaffolding in engineering is very high. The use of the foldable full-height support scaffolding described in this application can greatly save the time of assembling and dismantling the scaffolding and increase the turnover frequency. Example

[0045] The main difference between the second embodiment and the first embodiment is that the second embodiment uses a disc-shaped oblique rod. The disc-shaped oblique rod is a common node connector, which is mainly assembled by connecting a circular disc, a pull rod plug and a pin, and can be used to connect rods. The end of the disc-shaped oblique rod becomes thinner from thick. In order to facilitate the good connection between this type of oblique rod and the slider, the present application specially welds a flat steel strip on the slider to achieve this.

[0046] like Figure 27 to Figure 28 As shown, a connection structure between a buckle inclined rod and a slider is provided, taking the connection between the first slider 31 and the first inclined rod 41 as an example, Fig.21 The structure at K in the middle includes a first steel tubular slider 31, and a flat steel belt 38 is welded to the outside of the first slider 31. The flat steel belt 38 consists of a horizontal belt and an oblique belt, wherein the oblique belt is directly welded to the first slider 31, and the horizontal belt is connected to the end of the first oblique rod 41 by a rivet 39. Of course, the rivet can also be replaced by other connecting parts.

[0047] like Fig.29 As shown, a foldable full-floor support scaffolding is assembled by using a buckle diagonal rod, wherein the first diagonal rod 41 and the second diagonal rod 42 are both buckle diagonal rods, the first upper vertical rod 11 and the second upper vertical rod 12 are provided with buckles 7, the upper end of the first diagonal rod 41 is connected to the buckle 7 on the second upper vertical rod 12, and the lower end of the first diagonal rod 41 is connected to the first slide block 31 by Fig.28 Similarly, the upper end of the second inclined rod 42 is connected to the buckle 7 on the first upper vertical rod 11, and the lower end of the second inclined rod 42 is connected to the second slider 32 by Fig.28 Structural connection. The foldable full-floor supporting scaffolding unit thus formed can be assembled and disassembled, erected and dismantled according to the method described in Example 1.

[0048] The above are preferred embodiments of the present application. Other simple replacement implementation schemes made on the basis of the above technical solutions of the present application are all protected contents of the present application.

Claims

1. A foldable full-height support scaffold, characterized by: The frame comprises a frame body, wherein the frame body is composed of a plurality of frame body units arranged continuously, and the plurality of frame body units can be respectively stretched or folded along a first direction and a second direction at the same time, and the first direction intersects with the second direction; Each frame unit comprises: a first upper upright bar (11) and a first lower upright bar (21) that can be spliced ​​and connected to the first upper upright bar (11), a second upper upright bar (12) and a second lower upright bar (22) that can be spliced ​​and connected to the second upper upright bar (12); a first sliding block (31) arranged on the first lower upright bar (21), and a second sliding block (32) arranged on the second lower upright bar (22), wherein the first sliding block (31) can slide along the first lower upright bar (21), and the second sliding block (32) can slide along the second lower upright bar (22); and a first diagonal bar (41). and a second oblique rod (42), wherein one end of the first oblique rod (41) is hingedly connected to the second upper vertical rod (12), and the other end is connected to the first sliding block (31); one end of the second oblique rod (42) is hingedly connected to the first upper vertical rod (11), and the other end is connected to the second sliding block (32); the first upper vertical rod (11) and the first lower vertical rod (21) constitute a first vertical rod, and the second upper vertical rod (12) and the second lower vertical rod (22) constitute a second vertical rod; the first oblique rod (41) and the second oblique rod (42) intersect at a middle portion between the first vertical rod and the second vertical rod and are hingedly connected at the intersection.

2. A foldable full-floor support scaffolding according to claim 1, characterized in that: A fastening clamp (5) is provided on the first slider (31) and the second slider (32), and the fastening clamp (5) is used to lock the first slider (31) at the position of the first lower upright pole (21) and the second slider (32) at the position of the second lower upright pole (22).

3. A foldable full-floor support scaffolding according to claim 2, characterized in that: The first slider (31) and the second slider (32) are in the shape of steel tubes. A circular hole (35) is formed on the first slider (31) and the second slider (32). Nuts (36) are arranged at the circular holes (35). The fastening clamp (5) is composed of a horizontal screw rod (51) and a vertical handle (52). The screw rod (51) is connected to the nut (36) in a cooperative manner.

4. A foldable full-floor support scaffolding according to claim 3, characterized in that: The first lower upright bar (21) is also provided with a third slider (33), and the third slider (33) can slide along the first lower upright bar (21); the second lower upright bar (22) is also provided with a fourth slider (34), and the fourth slider (34) can slide along the second lower upright bar (22); and the third slider (33) and the fourth slider (34) are both provided with round holes (35).

5. A foldable full-floor support scaffolding according to claim 4, characterized in that: The first vertical pole or the second vertical pole is divided into a corner vertical pole, an end vertical pole and a middle vertical pole according to the position in the frame. When the first upright pole or the second upright pole is a corner upright pole, two hinge points (13) are provided on the upper upright pole of the corner upright pole, and correspondingly, two sliders are provided on the lower upright pole of the corner upright pole, and each slider is provided with a connecting ear plate (37); When the first vertical rod or the second vertical rod is an end vertical rod, three hinge points (13) are arranged on the upper vertical rod of the end vertical rod, and correspondingly, two sliders are arranged on the lower vertical rod of the end vertical rod, one of the sliders is provided with a connecting ear plate (37), and the other is provided with two connecting ear plates (37); When the first vertical pole or the second vertical pole is an intermediate vertical pole, four hinge points (13) are arranged on the upper vertical pole of the intermediate vertical pole, and correspondingly, two sliding blocks are arranged on the lower vertical pole of the intermediate vertical pole, and each sliding block is provided with two connecting ear plates (37); The connecting ear plate (37) is a semicircular thin plate, on which a reamed hole (371) is provided, and the reamed hole (371) is a through hole.

6. A foldable full-floor support scaffolding according to claim 5, characterized in that: The connecting ear plate (37) is a flat steel strip (38), and the flat steel strip (38) is composed of a section of transverse steel strip and a section of oblique steel strip. The oblique steel strip section is welded to the outer surface of the slider, and the transverse steel strip section is connected to the first oblique rod (41) or the second oblique rod (42) via a rivet (39).

7. A method for assembling a foldable full-floor support scaffolding frame, characterized in that: The foldable full-floor support scaffolding as claimed in claim 4 is assembled, comprising the following steps: S01: According to the length and width requirements of the frame to be erected, take an appropriate number of first upper vertical rods (11), second upper vertical rods (12), first lower vertical rods (21), second lower vertical rods (22), first sliding blocks (31), second sliding blocks (32), third sliding blocks (33), fourth sliding blocks (34), first diagonal rods (41), and second diagonal rods (42), and place them on the ground; S02: hinge one end of the first oblique rod (41) to the second upper vertical rod (12); hinge one end of the second oblique rod (42) to the first upper vertical rod (11); S03: connecting the other end of the first inclined rod (41) to the first sliding block (31), and connecting the other end of the second inclined rod (42) to the second sliding block (32); S04: intersecting the first oblique rod (41) and the second oblique rod (42) and hinge-connecting them at the intersection; S05: passing the first lower upright bar (21) through the first slider (31), the third slider (33) and connecting it to the first upper upright bar (11); passing the second lower upright bar (22) through the second slider (32), the fourth slider (34) and connecting it to the second upper upright bar (12), thereby assembling a foldable full-floor support scaffolding frame unit; S06: Repeat steps S01-S05, and assemble appropriate amounts of foldable full-height support scaffolding frame units along the first direction and the second direction according to the size requirements of the frame to be erected to form a frame.

8. The method for assembling a foldable full-floor support scaffolding frame according to claim 7, characterized in that: In step S06, during the process of repeating steps S01-S05, the third slider (33) is used to connect with the first diagonal rod (41) or the second diagonal rod (42) of another foldable full-floor supporting scaffold adjacent to the same plane a, and the fourth slider (34) is used to connect with the first diagonal rod (41) or the second diagonal rod (42) of another foldable full-floor supporting scaffold adjacent to the plane b, the first direction coordinate line is parallel to the plane a, the second direction coordinate line is parallel to the plane b, and the plane a and the plane b intersect in space.

9. A method for assembling a foldable full-floor support scaffolding frame according to claim 8, characterized in that: The plane a and the plane b are perpendicular to each other.

10. A method for erecting a foldable full-floor support scaffolding frame, characterized in that: The following steps are involved: M01: Use hoisting equipment to hang the frame at the location to be installed, and set positioning lines at the location to be installed in advance according to the requirements of the erection. The positioning lines include at least sideline positioning lines in the first direction and the second direction and an angle positioning line. The initial position of one corner of the frame is set at the angle positioning line; M02: Use the transport equipment to lift up one end of the frame, loosen the sliders on each supporting scaffold in the first direction one by one from the corner positioning line, move the transport equipment to gradually unfold the frame along the first direction until the side positioning line in the second direction, and then lock each loosened slider with a fastening clamp; M03: Similarly, use the transport equipment to lift up the other end of the frame, loosen the sliders on each supporting scaffold in the second direction one by one from the corner positioning line, move the transport equipment to gradually unfold the frame along the second direction until the first direction sideline positioning line, and then lock each loosened slider with a fastening clamp; M04: According to construction needs, other rod structures are set up on the frame, and the top support is installed on the top of the frame; M05: Install the back ribs and formwork on the top support to complete the frame erection.