Large-diameter pile foundation anti-sloughing hole construction method and anti-sloughing hole structure thereof
By using an expandable wall guard sleeve and optimizing the connection structure in the pile foundation hole, the compaction problem of the pipe drilling system under irregular hole walls or slight collapse is solved, the risk of collapse of the hole is reduced, and the construction safety is improved. efficiency.
Patent Information
- Application Number
- CN202411174867.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-20
AI Technical Summary
The existing pipe drilling system has poor compaction effect when facing irregular hole walls or slight collapse, and there is a risk of hole collapse. The existing solutions are complex in operation and limited in effect.
A specially made wall guard sleeve with an expandable and contractible structure, installed and expanded in the pile foundation hole to fit the side walls closely, providing stable support, and ensuring elastic steel plates through an optimized connection structure and top support mechanism Press tightly on the hole wall to improve support and construction safety.
It effectively reduces the risk of collapse in large-diameter pile foundation construction, improves construction safety and efficiency, and enhances the overall stability of the structure and construction flexibility.